PROYECTO: "REMODELACION CASA "

PRESUPUESTO DE ACTIVIDADES
1 1.1 1.2 1.3 1.4
LOCALIZACION Y REPLANTEO CERRAMIENTO PROVISIONAL DEMOLICION DE MUROS RETIRO DE ESCOMBROS SUBTOTAL

PRELIMINARES

UND. M2 ML M2 M3

CANT. 100 80 50 20

VR. UNT. $ 1,100.00 $ 4,500.00 $ 5,000.00 $ 7,991.67

VR. TOTAL $ 110,000 $ 360,000 $ 250,000 $ 159,833

$ 879,833.33
UND. M2 M2 M2 M2 M2 M2 CANT. 25 29.5 8 12 10 8 VR. UNT. $ 25,000.00 $ 15,000.00 $ 75,000.00 $ 15,000.00 $ 35,000.00 $ 32,000.00 VR. TOTAL 625,000 442,500 600,000 180,000 350,000 256,000

2 2.1 2.3 2.5 2.6 2.9 2.10


FRISOS MUROS

MAMPOSTERIA Y ACABADOS
MUROS EN BLOQUE H-10

CIELO RASO EN DRY WALL ESTUCO Y PINTURA INTERIOR PISOS BAOS CERAMICA ANTIDESLIZANTE PARED BAOS EN CERAMICA SUBTOTAL

$ 2,453,500.00

TOTAL COSTO DIRECTO Administracin (15%) Imprevistos (2%) Utilidad (3%) TOTAL A.I.U. (20%) SUBTOTAL A.I.U (20%) + COSTO DIRECTO

3,333,333 500,000 66,667 100,000 666,667 4,000,000

COSTO TOTAL PROYECTO

4,000,000

SUBANALISIS DE MANOS DE OBRA POR FUNCIONES AYUDANTE JORNAL SUB DE TRANS. PRES. SOCIALES SALARIO DIARIO SALARIO MENSUAL SALARIO MEN. SIN PRES. VR HORA OFICIAL JORNAL SUB DE TRANS. PRES. SOCIALES SALARIO DIARIO SALARIO MENSUAL SALARIO MEN. SIN PRES. VR HORA MAESTRO JORNAL SUB DE TRANS. PRES. SOCIALES SALARIO DIARIO SALARIO MENSUAL SALARIO MEN. SIN PRES. VR HORA AUX. RESIDENTE JORNAL SUB DE TRANS. PRES. SOCIALES SALARIO DIARIO SALARIO MENSUAL SALARIO MEN. SIN PRES. VR HORA CONTRAMAESTRO %/K 1.000 VALOR 496,900 55,000 551,900 469,115 1,021,015 VR TOTAL 16,563 1,833 18,397 15,637 34,034 1,021,015 551,900 4,254 28,158 1,833 29,991 25,492 55,483 1,664,501 899,730 6,935 VR TOTAL 49,690.000 49,690.000 42,236.500 91,926.500 ### ### 11,490.813 VR TOTAL 41,408.333 41,408.333 35,197.083 76,605.417 ### ### 9,575.677 VR TOTAL

0.850 30.000 30.000 0.125

1.700 496,900.000 55,000.000 0.850 30.000 30.000 0.125 %/K VALOR 3.000 496,900.000 0.000 0.850 30.000 30.000 0.125 %/K VALOR 2.500 496,900.000 0.000 0.850 30.000 30.000 0.125 %/K

VALOR

JORNAL SUB DE TRANS. PRES. SOCIALES SALARIO DIARIO SALARIO MENSUAL SALARIO MEN. SIN PRES. VR HORA TOPOGRAFO JORNAL SUB DE TRANS. PRES. SOCIALES SALARIO DIARIO SALARIO MENSUAL SALARIO MEN. SIN PRES. VR HORA RESIDENTE JORNAL SUB DE TRANS.

2.000 496,900.000 55,000.000 0.850 30.000 30.000 0.125 %/K VALOR 3.000 496,900.000 0.000 0.850 30.000 30.000 0.125 %/K VALOR 5.000 496,900.000 0.000

33,126.667 1,833.333 34,960.000 29,716.000 64,676.000 ### ### 8,084.500 VR TOTAL 49,690.000 49,690.000 37,267.500 86,957.500 ### ### 10,869.688 VR TOTAL 82,816.667 82,816.667 70,394.167 153,210.833 ### ### 19,151.354 VR TOTAL 19,876.000 0.000 19,876.000 16,894.600 36,770.600 ### 596,280.000 4,596.325 VR TOTAL 26,832.600 1,833.333 28,665.933 24,366.043 53,031.977 ### 859,978.000

PRES. SOCIALES 0.850 SALARIO DIARIO SALARIO MENSUAL 30.000 SALARIO MEN. SIN PRES. 30.000 VR HORA 0.125 CELADOR DIURNO / HERRAMENTERO / K % VALOR JORNAL 1.200 496,900.000 SUB DE TRANS. 0.000 PRES. SOCIALES SALARIO DIARIO SALARIO MENSUAL SALARIO MEN. SIN PRES. VR HORA CELADOR NOCTURNO JORNAL (RECARGO NOCTURNO 35%) SUB DE TRANS. PRES. SOCIALES SALARIO DIARIO SALARIO MENSUAL SALARIO MEN. SIN PRES. 0.850 30.000 30.000 0.125 %/K VALOR 1.620 496,900.000 55,000.000 0.850 30.000 30.000

VR HORA

0.125

6,628.997

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS
ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL

LOCALIZACION Y REPLANTEO
MATERIALES UND CANT

1.1
VR UNIT

M2
DESPERDICIO %

TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO 100.00 V/TOTAL 100.00

TOTAL EQUIPO TRANSPORTE CANT. UNID. KM. PRECIO/KM VR TOTAL

TOTAL TRANSPORTE MANO DE OBRA TOPOGRAFO AYUDANTE UND JORNAL JORNAL CANT 1.00 2.00 JORNAL 49,690.00 16,563.33 % PREST. 37,267.50 15,637.17 RENDIMIENTO 150.00 150.00 TOTAL MANO OBRA V/UNITARIO 579.72 214.67 V/TOTAL 579.72 429.34 1,009.06

TOTAL COSTO DIRECTO

1,109

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS
ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL

DESCAPOTE
MATERIALES UND CANT

1.2
VR UNIT

M2
DESPERDICIO %

TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO 100.00 V/TOTAL 200.00

TOTAL EQUIPO TRANSPORTE CANT. UNID. KM. PRECIO/KM VR TOTAL

TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL % PREST. RENDIMIENTO 16.00 16.00 TOTAL MANO OBRA V/UNITARIO 3,353.13 2,012.53

0.00 V/TOTAL 3,353.13 2,012.53 5,365.66

28,158 16,563

25,492
15,637.17

TOTAL COSTO DIRECTO

5,566

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS VALLA INFORMATIVA DE 5.00 X 2,8 MTS
MATERIALES VALLA INFORMATIVA DE 5.00 X 2,8 MTS UND UND CANT 1.000 ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 1,400,000.00

1.3
VR UNIT 1,400,000.00

UND
DESPERDICIO % 0.00

TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR ANDAMIOS UND DIA RENDIMIENTO 0.25 TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIAL CANT. 0.65 UNID. KM/TON KM. 154.000 PRECIO/KM 800.00 V/UNITARIO 6,000.00

1,400,000.00 V/TOTAL 2,100.00 24,000.00 26,100.00 VR TOTAL 80,080.00

TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL % PREST. RENDIMIENTO 1.00 1.00 TOTAL MANO OBRA V/UNITARIO 53,650.02 32,200.50

80,080.00 V/TOTAL 25,493.35 15,638.17 41,131.52

28,158 16,563

25,492
15,637.17

TOTAL COSTO DIRECTO

1,547,312

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS CAMPAMENTO E INSTALACIONES PROVISIONALES 40 M2
MATERIALES BISAGRA COBRIZADA 3" CONCRETO 2000 PSI AMARRE PARA TEJA PORTACANDADO NEGRO No. 4 PUNTILLA 2" CON CABEZA ACERO TABLA CHAPA .30x.025x3 MTS ORDINARIA LAMINA DE ZINC VARA DE CLAVO 6 METROS. UND UND M3 UND UND LB KG ML M2 ML CANT 12.00 0.40 90.00 4.00 5.00 5.00 70.00 40.000 18.00 ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 54,000.00 132,012.83 45,000.00 9,280.00 11,550.00 27,852.22 346,500.00 320,000.00 65,340.00 1,011,535.05

1.4
VR UNIT 4,500.00 314,316.25 500.00 2,320.00 2,200.00 5,064.04 4,500.00 8,000.00 3,300.00 TOTAL MATERIALES

GLOBAL
DESPERDICIO % 0.00 0.05 0.00 0.00 0.05 0.10 0.10 0.00 0.10

EQUIPO/HERRAMIENTA HERRAMIENTA MENOR

UND

RENDIMIENTO

V/UNITARIO

V/TOTAL 2,500.00 2,500.00

TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIAL CANT. 1.20 UNID. KM/TON KM. 154.000 PRECIO/KM 800.00

VR TOTAL 147,840.00

TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE UND JORNAL JORNAL JORNAL CANT 1.00 1.00 3.00 JORNAL 49,690.00 % PREST. 42,236.50 RENDIMIENTO 0.50 0.50 0.50 TOTAL MANO OBRA V/UNITARIO 183,853.00 107,300.03 64,401.00

147,840.00 V/TOTAL 183,853.00 107,300.03 193,203.00 484,356.03

28,158 16,563

25,492
15,637.17

TOTAL COSTO DIRECTO

1,646,231

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS
ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 2,887.50 2,750.00 5,637.50

CERRAMIENTO PROVISIONAL
MATERIALES TELA EN FIBRA PARALES , MADERA , PUNTILLA, ALAMBRE Y DEMAS INSUMOS UND M2 GLOBAL CANT 1.000 1.00

1.5
VR UNIT 2,750.00 2,500.00 TOTAL MATERIALES

ML
DESPERDICIO % 0.05 0.10

EQUIPO/HERRAMIENTA HERRAMIENTA MENOR

UND

RENDIMIENTO

V/UNITARIO

V/TOTAL 800.00 800.00

TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIAL CANT. 0.60 UNID. KM/TON KM. 1.000 PRECIO/KM 800.00

VR TOTAL 480.00

TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 2.00 JORNAL % PREST. RENDIMIENTO 125.00 125.00 TOTAL MANO OBRA V/UNITARIO 429.20 257.60

480.00 V/TOTAL 429.20 515.21 944.41

28,158 16,563

25,492
15,637.17

TOTAL COSTO DIRECTO

7,862

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS DEMOLICION DE MAMPOSTERIA DE BAOS Y DUCHAS, DEMOLICION MURO CERRAMIENTO EXISTENTE
MATERIALES UND CANT ITEMS UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL

1.6 - 6.1
VR UNIT

M2
DESPERDICIO %

TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO V/TOTAL 200.00 200.00 PRECIO/KM VR TOTAL

TOTAL EQUIPO TRANSPORTE CANT. UNID. KM.

TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL % PREST. RENDIMIENTO 14.00 14.00 TOTAL MANO OBRA V/UNITARIO 3,832.14 2,300.04 V/TOTAL 3,832.14 2,300.04 6,132.18

28,158 16,563

25,492
15,637.17

TOTAL COSTO DIRECTO

6,332

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS DEMOLICION DE ENCHAPES PARED
MATERIALES UND CANT ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL

1.7
VR UNIT

M2
DESPERDICIO %

TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO V/TOTAL 200.00 200.00 PRECIO/KM VR TOTAL

TOTAL EQUIPO TRANSPORTE CANT. UNID. KM.

TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL % PREST. RENDIMIENTO 11.00 10.00 TOTAL MANO OBRA V/UNITARIO 4,877.27 3,220.05

0.00 V/TOTAL 4,877.27 3,220.05 8,097.32

28,158 16,563

25,492
15,637.17

TOTAL COSTO DIRECTO

8,297

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS
ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL

DEMOLICION DE PISO INTERIOR


MATERIALES UND CANT

1.8
VR UNIT

M2
DESPERDICIO %

TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO V/TOTAL 200.00 200.00 PRECIO/KM VR TOTAL

TOTAL EQUIPO TRANSPORTE CANT. UNID. KM.

TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL % PREST. RENDIMIENTO 11.00 9.00 TOTAL MANO OBRA V/UNITARIO 4,877.27 3,577.83 V/TOTAL 4,877.27 3,577.83 8,455.11

28,158 16,563

25,492
15,637.17

TOTAL COSTO DIRECTO

8,655

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS
ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL

RETIRO DE ESCOMBROS
MATERIALES UND CANT

1.9 - 6.4
VR UNIT

M3
DESPERDICIO %

TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO V/TOTAL 400.00 400.00 PRECIO/KM 5,000.00 VR TOTAL 12,000.00

TOTAL EQUIPO TRANSPORTE VOLQUETA CANT. 0.20 UNID. KM/TON KM. 12.000

TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 2.00 JORNAL % PREST. RENDIMIENTO 8.00 8.00 TOTAL MANO OBRA V/UNITARIO 6,706.25 4,025.06

12,000.00 V/TOTAL 6,706.25 8,050.13 14,756.38

28,158 16,563

25,492
15,637.17

TOTAL COSTO DIRECTO

27,156

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS EXCAVACION EN MATERIAL COMUN
MATERIALES UND CANT ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL

1.10 - 6.2
VR UNIT

M3
DESPERDICIO %

TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO V/TOTAL 200.00 200.00 PRECIO/KM VR TOTAL

TOTAL EQUIPO TRANSPORTE CANT. UNID. KM.

TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL % PREST. RENDIMIENTO 4.00 2.50 TOTAL MANO OBRA V/UNITARIO 13,412.50 12,880.20 V/TOTAL 13,412.50 12,880.20 26,292.70

28,158 16,563

25,492
15,637.17

TOTAL COSTO DIRECTO

26,493

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS
ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL

EXCAVACION PARA CAISSONS (2 - 5 METROS DE PROFUNDIDAD)


MATERIALES UND CANT

1.11
VR UNIT

M3
DESPERDICIO %

TOTAL MATERIALES EQUIPO/HERRAMIENTA ENTIBADO MOTOBOMBA HERRAMIENTA MENOR UND DIA DIA RENDIMIENTO 2.00 2.00 V/UNITARIO 14,000.00 12,000.00 V/TOTAL 7,000.00 6,000.00 600.00 13,600.00 PRECIO/KM 800.00 VR TOTAL 36,960.00

TOTAL EQUIPO TRANSPORTE TRANSPORTE ENTIBADO CANT. 0.30 UNID. KM/TON KM. 154.000

TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE UND JORNAL JORNAL JORNAL CANT 1.00 1.00 1.00 JORNAL 49,690.00 % PREST. 42,236.50 RENDIMIENTO 11.00 10.00 1.50 TOTAL MANO OBRA V/UNITARIO 8,356.95 5,365.00 21,467.00

36,960.00 V/TOTAL 8,356.95 5,365.00 21,467.00 35,188.96

28,158 16,563

25,492
15,637.17

TOTAL COSTO DIRECTO

85,749

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS EXCAVACION PARA CAISSONS ( 5 - 8 METROS DE PROFUNDIDAD)
MATERIALES UND CANT ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL

1.12
VR UNIT

M3
DESPERDICIO %

TOTAL MATERIALES EQUIPO/HERRAMIENTA ENTIBADO MOTOBOMBA HERRAMIENTA MENOR UND DIA DIA RENDIMIENTO 2.00 2.00 V/UNITARIO 14,000.00 12,000.00 V/TOTAL 7,000.00 6,000.00 600.00 13,600.00 PRECIO/KM 800.00 VR TOTAL 36,960.00

TOTAL EQUIPO TRANSPORTE TRANSPORTE ENTIBADO CANT. 0.30 UNID. KM/TON KM. 154.000

TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE UND JORNAL JORNAL JORNAL CANT 1.00 1.00 1.00 JORNAL 49,690.00 28,158 16,563 % PREST. 42,236.50 25,492 15,637.17 RENDIMIENTO 11.00 10.00 1.00 TOTAL MANO OBRA V/UNITARIO 8,356.95 5,365.00 32,200.50

36,960.00 V/TOTAL 8,356.95 5,365.00 32,200.50 45,922.46

TOTAL COSTO DIRECTO

96,482

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS
ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL

RELLENO EN MATERIAL COMUN


MATERIALES UND CANT

1.13 - 6.3
VR UNIT

M3
DESPERDICIO %

TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO V/TOTAL 600.00 600.00 PRECIO/KM VR TOTAL

TOTAL EQUIPO TRANSPORTE CANT. UNID. KM.

TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 4.00 4.00 TOTAL MANO OBRA V/UNITARIO 13,412.50 8,050.13 V/TOTAL 13,412.50 8,050.13 21,462.63

TOTAL COSTO DIRECTO

22,063

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS RELLENO CON MATERIAL SELECCIONADO
MATERIALES RECEBO SELECCIONADO UND M3 CANT 1.200 ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 21,600.00

1.14
VR UNIT 18,000.00

M3
DESPERDICIO % 0.00

TOTAL MATERIALES EQUIPO/HERRAMIENTA VIBROCOMPACTADOR A GASOLINA HERRAMIENTA MENOR UND DIA RENDIMIENTO 25.00 V/UNITARIO 90,000.00

21,600.00 V/TOTAL 3,600.00 200.00 3,800.00 PRECIO/KM 3,000.00 VR TOTAL 5,400.00

TOTAL EQUIPO TRANSPORTE TRANSPORTE RECEBO CANT. 0.15 UNID. KM/TON KM. 12.000

TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 25.00 25.00 TOTAL MANO OBRA V/UNITARIO 2,146.00 1,288.02

5,400.00 V/TOTAL 2,146.00 1,288.02 3,434.02

TOTAL COSTO DIRECTO

34,234

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS SUB - BASE GRANULAR BAJO PAVIMENTO e= 12 CM
MATERIALES SUB - BASE GRANULAR BAJO PAVIMENTO e= 12 CM UND M3 CANT 1.200 ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 66,000.00

1.15
VR UNIT 55,000.00

M3
DESPERDICIO % 0.00

TOTAL MATERIALES EQUIPO/HERRAMIENTA VIBRO - COMPACTADOR HERRAMIENTA MENOR UND DIA RENDIMIENTO 25.00 V/UNITARIO 90,000.00

66,000.00 V/TOTAL 3,600.00 500.00 4,100.00 PRECIO/KM 3,000.00 VR TOTAL 5,400.00

TOTAL EQUIPO TRANSPORTE TRANSPORTE BASE GRANULAR CANT. 0.15 UNID. KM/TON KM. 12.000

TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE UND JORNAL JORNAL JORNAL CANT 1.00 1.00 1.00 JORNAL 49,690.00 28,158 16,563 % PREST. 42,236.50 25,492 15,637.17 RENDIMIENTO 25.00 25.00 3.00 TOTAL MANO OBRA V/UNITARIO 3,677.06 2,146.00 10,733.50

5,400.00 V/TOTAL 3,677.06 2,146.00 10,733.50 16,556.56

TOTAL COSTO DIRECTO

92,057

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS SUELO CEMENTO RELLENO CAISSONS
MATERIALES SUELO SELECCIONADO CEMENTO PORTLAND TIPO 1 UND M3 KG CANT 1.200 8.00 ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 8,820.00 3,444.00 12,264.00

1.16
VR UNIT 7,000.00 410.00 TOTAL MATERIALES

M3
DESPERDICIO % 0.05 0.05

EQUIPO/HERRAMIENTA VIBRO - COMPACTADOR HERRAMIENTA MENOR

UND DIA

RENDIMIENTO 15.00

V/UNITARIO 90,000.00

V/TOTAL 6,000.00 150.00 6,150.00

TOTAL EQUIPO TRANSPORTE TRANSPORTE SUELO SELECCIONADO TRANSPORTE CEMENTO CANT. 0.15 0.002 UNID. KM/TON KM/TON KM. 12.000 154.00 TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE UND JORNAL JORNAL JORNAL CANT 1.00 1.00 1.00 JORNAL 49,690.00 28,158 16,563 % PREST. 42,236.50 25,492 15,637.17 RENDIMIENTO 30.00 30.00 4.00 TOTAL MANO OBRA V/UNITARIO 3,064.22 1,788.33 8,050.13 PRECIO/KM 3,000.00 800.00

VR TOTAL 5,400.00 184.80 5,584.80 V/TOTAL 3,064.22 1,788.33 8,050.13 12,902.68

TOTAL COSTO DIRECTO

36,901

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS
ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 12,949.83

SOLADOS, CONCRETO 2000 PSI


MATERIALES CONCRETO 2000 PSI UND M3 CANT 0.040

2.1 - 6.8
VR UNIT 314,316.25

M2
DESPERDICIO % 0.03

TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO

12,949.83 V/TOTAL 300.00 300.00 PRECIO/KM 800.00 3,000.000 VR TOTAL 184.80 72.00 256.80 V/UNITARIO 4,470.83 2,683.38 V/TOTAL 4,470.83 2,683.38 7,154.21

TOTAL EQUIPO TRANSPORTE TRANSPORTE CEMENTO TRANSPORTE ARENA Y TRITURADO CANT. 0.002 0.002 UNID. KM/TON KM/TON KM. 154.00 12.000 TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 12.00 12.00 TOTAL MANO OBRA

TOTAL COSTO DIRECTO

20,661

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS VIGA DE AMARRE DE 0,2 X O,15 M PSI MURO FRONTAL
MATERIALES CONCRETO 3000 PSI MADERA ROLLISA TABLA 3 MTS PUNTILLA DE 2"

MUNICIPIO DE

3000
UND M3 ML ML LB CANT 0.03 0.22 0.170 0.08

ITEM

UNIDAD

FECHA SEPTIEMBRE DE 2010 VR TOTAL 11,125.99 556.60 785.40 246.71 12,714.70

2.2 - 6.11
VR UNIT 353,206.00 2,300.00 4,200.00 2,937.00 TOTAL MATERIALES

ML
DESPERDICIO % 0.05 0.10 0.10 0.05

EQUIPO/HERRAMIENTA HERRAMIENTA MENOR

UND

RENDIMIENTO

V/UNITARIO

V/TOTAL 300.00 300.00

TOTAL EQUIPO TRANSPORTE TRANSPORTE CEMENTO TRANSPORTE ARENA Y TRITURADO CANT. 0.040 0.020 UNID. KM/TON KM/TON KM. 154.00 12.000 TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 4.00 4.00 TOTAL MANO OBRA V/UNITARIO 13,412.50 8,050.13 PRECIO/KM 800.00 3,000.000

VR TOTAL 4,928.00 720.00 5,648.00 V/TOTAL 13,412.50 8,050.13 21,462.63

TOTAL COSTO DIRECTO

40,125

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS VIGA DE AMARRE DE 0,2 X 0,15 M 3000 PSI MURO FRONTAL
MATERIALES CONCRETO 3000 PSI MADERA ROLLISA TABLA 3 MTS PUNTILLA DE 2" UND M3 ML ML LB CANT 0.0150 0.30 0.40 0.19 ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 5,563.78 704.55 1,377.20 585.93 8,231.46

2.3 - 6.11
VR UNIT 353,256.00 2,135.00 3,130.00 2,937.00 TOTAL MATERIALES

ML
DESPERDICIO % 0.05 0.10 0.10 0.05

EQUIPO/HERRAMIENTA HERRAMIENTA MENOR

UND

RENDIMIENTO

V/UNITARIO

V/TOTAL 300.00

TOTAL EQUIPO TRANSPORTE TRANSPORTE CEMENTO TRANSPORTE ARENA Y TRITURADO CANT. 0.040 0.020 UNID. KM/TON KM/TON KM. 154.00 12.000 TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 3.00 4.00 TOTAL MANO OBRA V/UNITARIO 17,883.34 8,050.13 PRECIO/KM 800.00 3,000.000

300.00 VR TOTAL 4,928.00 720.00 5,648.00 V/TOTAL 17,883.34 8,050.13 25,933.46

TOTAL COSTO DIRECTO

40,113

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS ANTEPISO EN CONCRETO 2500 PSI, 8 CM
MATERIALES CONCRETO 2500 PSI UND M3 CANT 0.080 ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 29,523.17

2.4
VR UNIT 351,466.25

M2
DESPERDICIO % 0.05

TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO

29,523.17 V/TOTAL 200.00 100.00 PRECIO/KM 800.00 3,000.000 VR TOTAL 1,848.00 540.00 2,388.00 V/UNITARIO 5,961.11 3,577.83 V/TOTAL 5,961.11 3,577.83 9,538.95

TOTAL EQUIPO TRANSPORTE TRANSPORTE CEMENTO TRANSPORTE ARENA Y TRITURADO CANT. 0.015 0.015 UNID. KM/TON KM/TON KM. 154.00 12.000 TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 9.00 9.00 TOTAL MANO OBRA

TOTAL COSTO DIRECTO

41,550

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS
PAVIMENTO RIGIDO EN PAVICRETO MR - 41 , E= 16 CM
MATERIALES PAVICRETO MR - 41 UND M3 CANT 0.160 ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 63,840.00

2.5
VR UNIT 380,000.00

M2
DESPERDICIO % 0.05

TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR TOTAL EQUIPO TRANSPORTE TRANSPORTE CEMENTO TRANSPORTE ARENA Y TRITURADO CANT. 0.080 0.080 UNID. KM/TON KM/TON KM. 154.00 12.000 PRECIO/KM 800.00 3,000.000 UND RENDIMIENTO V/UNITARIO

63,840.00 V/TOTAL 600.00 600.00 VR TOTAL 9,856.00 2,880.00

TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE UND JORNAL JORNAL JORNAL CANT 1.00 1.00 1.00 JORNAL 49,690.00 28,158 16,563 % PREST. 42,236.50 25,492 15,637.17 RENDIMIENTO 25.00 25.00 8.00 TOTAL MANO OBRA V/UNITARIO 3,677.06 2,146.00 4,025.06

12,736.00 V/TOTAL 3,677.06 2,146.00 4,025.06 9,848.12

TOTAL COSTO DIRECTO

87,024

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS COLUMNETAS MURO FRONTAL 15 X 20
MATERIALES CONCRETO 3000 PSI UND M3 CANT 0.032 ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 11,867.72

2.6
VR UNIT 353,206.00

ML
DESPERDICIO % 0.05

TOTAL MATERIALES EQUIPO/HERRAMIENTA FORMALETA HERRAMIENTA MENOR UND DIA RENDIMIENTO 2.00 V/UNITARIO 5,000.00

11,867.72 V/TOTAL 2,500.00 150.00 2,650.00 PRECIO/KM 800.00 3,000.000 VR TOTAL 1,232.00 360.00 1,592.00 V/UNITARIO 18,385.30 10,730.00 8,050.13 V/TOTAL 18,385.30 10,730.00 8,050.13 37,165.43

TOTAL EQUIPO TRANSPORTE TRANSPORTE CEMENTO TRANSPORTE ARENA Y TRITURADO CANT. 0.010 0.010 UNID. KM/TON KM/TON KM. 154.00 12.000 TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE UND JORNAL JORNAL JORNAL CANT 1.00 1.00 1.00 JORNAL 49,690.00 28,158 16,563 % PREST. 42,236.50 25,492 15,637.17 RENDIMIENTO 5.00 5.00 4.00 TOTAL MANO OBRA

TOTAL COSTO DIRECTO

53,275

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS CONCRETO CICLOPEO BAJO ZAPATAS
MATERIALES CONCRETO 2500 PSI PIEDRA MEDIA ZONGA UND M3 M3 CANT 0.550 0.45 ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 202,971.62 16,537.50 219,509.12

2.7 - 6.7
VR UNIT 351,466.00 35,000.00 TOTAL MATERIALES

M3
DESPERDICIO % 0.05 0.05

EQUIPO/HERRAMIENTA VIBRADOR HERRAMIENTA MENOR

UND DIA

RENDIMIENTO 6.00

V/UNITARIO 45,000.00

V/TOTAL 7,500.00 200.00 7,700.00

TOTAL EQUIPO TRANSPORTE TRANSPORTE CEMENTO TRANSPORTE ARENA Y TRITURADO Y PIEDRA ZONGA CANT. 0.100 0.100 UNID. KM/TON KM/TON KM. 154.00 12.000 TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE UND JORNAL JORNAL JORNAL CANT 1.00 1.00 2.00 JORNAL 49,690.00 28,158 16,563 % PREST. 42,236.50 25,492 15,637.17 RENDIMIENTO 6.00 5.00 5.00 TOTAL MANO OBRA V/UNITARIO 15,321.08 10,730.00 6,440.10 PRECIO/KM 800.00 3,000.000

VR TOTAL 12,320.00 3,600.00 15,920.00 V/TOTAL 15,321.08 10,730.00 12,880.20 38,931.29

TOTAL COSTO DIRECTO

282,060

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS
ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 381,992.29

ZAPATAS CONCRETO 3000 PSI


MATERIALES CONCRETO 3000 PSI UND M3 CANT 1.030

2.8 - 6.5
VR UNIT 353,206.00

M3
DESPERDICIO % 0.05

TOTAL MATERIALES EQUIPO/HERRAMIENTA VIBRADOR HERRAMIENTA MENOR UND DIA RENDIMIENTO 8.00 V/UNITARIO 45,000.00

381,992.29 V/TOTAL 5,625.00 200.00 5,825.00 PRECIO/KM 800.00 3,000.000 VR TOTAL 12,320.00 3,600.00 15,920.00 V/UNITARIO 13,132.36 7,664.29 7,000.11 V/TOTAL 13,132.36 7,664.29 14,000.22 34,796.86

TOTAL EQUIPO TRANSPORTE TRANSPORTE CEMENTO TRANSPORTE ARENA Y TRITURADO CANT. 0.100 0.100 UNID. KM/TON KM/TON KM. 154.00 12.000 TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE UND JORNAL JORNAL JORNAL CANT 1.00 1.00 2.00 JORNAL 49,690.00 28,158 16,563 % PREST. 42,236.50 25,492 15,637.17 RENDIMIENTO 7.00 7.00 4.60 TOTAL MANO OBRA

TOTAL COSTO DIRECTO

438,534

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS COLUMNAS Y VIGAS CONCRETO 3000 PSI
MATERIALES CONCRETO 3000 PSI PUNTILLA 2" CON CABEZA TABLA .30x.025x3 ORDINAR ANDAMIO TUBULAR (SECC.) MORDAZAS EN PLATINA CON CUA ALQUILADAS PARALES UND M3 LB ML DD UN UN ITEMS 2.9 - 6.9 - 6.10 - 6.12 - 6.13 CANT 1.00 1.00 3.00 5.00 4.00 3.00 VR UNIT 351,466.00 2,937.00 13,500.00 1,500.00 1,500.00 1,000.00 UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 369,039.30 3,083.85 44,550.00 7,500.00 6,000.00 3,000.00

M3
DESPERDICIO % 0.05 0.05 0.10 0.00 0.00 0.00

TOTAL MATERIALES EQUIPO/HERRAMIENTA VIBRADOR HERRAMIENTA MENOR UND DIA RENDIMIENTO 8.00 V/UNITARIO 45,000.00

433,173.15 V/TOTAL 5,625.00 200.00 5,825.00 PRECIO/KM 800.00 3,000.000 VR TOTAL 12,320.00 3,600.00 15,920.00 V/UNITARIO 13,132.36 7,664.29 7,000.11 V/TOTAL 13,132.36 7,664.29 14,000.22 34,796.86

TOTAL EQUIPO TRANSPORTE TRANSPORTE CEMENTO TRANSPORTE ARENA Y TRITURADO CANT. 0.100 0.100 UNID. KM/TON KM/TON KM. 154.00 12.000 TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE UND JORNAL JORNAL JORNAL CANT 1.00 1.00 2.00 JORNAL 49,690.00 28,158 16,563 % PREST. 42,236.50 25,492 15,637.17 RENDIMIENTO 7.00 7.00 4.60 TOTAL MANO OBRA

TOTAL COSTO DIRECTO

489,715

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS CONCRETO CAISSONS CON IMPERMEABILIZANTE ( 2 A 8 MTS DE PROFUNDIDAD)
MATERIALES CONCRETO 3000 PSI TABLA .30x.025x3 ORDINAR MORDAZAS EN PLATINA CON CUA ALQUILADAS (24 IMPERMEABILIZANTE UND M3 ML UN UN CANT 1.00 3.00 4.00 3.000 ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 369,039.30 44,550.00 6,000.00 60,000.00

2.10
VR UNIT 351,466.00 13,500.00 1,500.00 20,000.00

M3
DESPERDICIO % 0.05 0.10 0.00 0.00

TOTAL MATERIALES EQUIPO/HERRAMIENTA FORMALETA METALICA CAISSONS VIBRADOR HERRAMIENTA MENOR UND DIA DIA RENDIMIENTO 0.60 8.00 V/UNITARIO 25,000.00 45,000.00

479,589.30 V/TOTAL 41,666.67 5,625.00 800.00 48,091.67 PRECIO/KM 800.00 3,000.000 VR TOTAL 12,320.00 3,600.00 15,920.00 V/UNITARIO 18,385.30 10,730.00 8,050.13 V/TOTAL 18,385.30 10,730.00 16,100.25 45,215.55

TOTAL EQUIPO TRANSPORTE TRANSPORTE CEMENTO Y FORMALETA METALICA TRANSPORTE ARENA Y TRITURADO CANT. 0.100 0.100 UNID. KM/TON KM/TON KM. 154.00 12.000 TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE UND JORNAL JORNAL JORNAL CANT 1.00 1.00 2.00 JORNAL 49,690.00 28,158 16,563 % PREST. 42,236.50 25,492 15,637.17 RENDIMIENTO 5.00 5.00 4.00 TOTAL MANO OBRA

TOTAL COSTO DIRECTO

588,817

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS
ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 14,058.64 14,000.00 1,468.50 29,527.14

MESONES EN CONCRETO 60 CM X 8 CM
MATERIALES CONCRETO 3000 PSI FORMALETA PUNTILLA DE 2" UND M3 GL LB CANT 0.040 1.00 0.50

2.11
VR UNIT 351,466.00 14,000.00 2,937.00 TOTAL MATERIALES

ML
DESPERDICIO % 0.00 0.00 0.00

EQUIPO/HERRAMIENTA HERRAMIENTA MENOR

UND

RENDIMIENTO

V/UNITARIO

V/TOTAL 400.00 400.00

TOTAL EQUIPO TRANSPORTE TRANSPORTE CEMENTO TRANSPORTE ARENA Y TRITURADO CANT. 0.010 0.010 UNID. KM/TON KM/TON KM. 154.00 12.000 TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 2.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 5.00 5.00 TOTAL MANO OBRA V/UNITARIO 10,730.00 6,440.10 PRECIO/KM 800.00 3,000.000

VR TOTAL 1,232.00 360.00 1,592.00 V/TOTAL 10,730.00 12,880.20 23,610.20

TOTAL COSTO DIRECTO

55,129

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS
ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 3,420.00 4,428.47 3,663.00 5,698.00 17,209.47

ALFAJIAS EN CONCRETO
MATERIALES ALAMBRE NEGRO Cal. 18 CONCRETO 2500 PSI DURMIENTE ORDINARIO 4Mx.04x.04 LISTON EN AMARILLO 8 x.2.2 x3 UND KG M3 ML ML CANT 0.90 0.012 0.37 2.00

2.12
VR UNIT 3,800.00 351,466.00 9,000.00 2,590.00 TOTAL MATERIALES

ML
DESPERDICIO % 0.00 0.05 0.10 0.10

EQUIPO/HERRAMIENTA HERRAMIENTA MENOR

UND

RENDIMIENTO

V/UNITARIO

V/TOTAL 200.00 200.00

TOTAL EQUIPO TRANSPORTE TRANSPORTE CEMENTO TRANSPORTE ARENA Y TRITURADO CANT. 0.007 0.007 UNID. KM/TON KM/TON KM. 154.00 12.000 TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 8.00 8.00 TOTAL MANO OBRA V/UNITARIO 6,706.25 4,025.06 PRECIO/KM 800.00 3,000.000

VR TOTAL 862.40 252.00 1,114.40 V/TOTAL 6,706.25 4,025.06 10,731.31

TOTAL COSTO DIRECTO

29,255

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS DINTELES EN CONCRETO H= 10 CM
MATERIALES CONCRETO 3000 PSI TABLA PUNTILLA DE 2" UND M3 GLOBAL GL CANT 0.01 0.80 0.08 ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 4,649.90 9,240.00 246.71 14,136.60

2.13
VR UNIT 351,466.00 11,000.00 2,937.00 TOTAL MATERIALES

ML
DESPERDICIO % 0.05 0.10 0.05

EQUIPO/HERRAMIENTA HERRAMIENTA MENOR

UND

RENDIMIENTO

V/UNITARIO

V/TOTAL 200.00 200.00

TOTAL EQUIPO TRANSPORTE TRANSPORTE CEMENTO TRANSPORTE ARENA Y TRITURADO TORNILLO PTA BROCA EXTRAPL. EST 8 x 1/2" ( 13mm ) MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 CANT. 0.006 0.006 UNID. KM/TON KM/TON KM. 154.00 12.000 TOTAL TRANSPORTE RENDIMIENTO 10.00 10.00 TOTAL MANO OBRA V/UNITARIO 5,365.00 3,220.05 PRECIO/KM 800.00 3,000.000

VR TOTAL 739.20 216.00 955.20 V/TOTAL 5,365.00 3,220.05 8,585.05

TOTAL COSTO DIRECTO

23,877

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS ACERO DE REFUERZO 60000 PSI
MATERIALES ACERO SEGUETA ALAMBRE NEGRO No 18 UND KG UND KG CANT 1.00 0.50 0.03 ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 3,300.00 302.50 125.40 3,727.90

2.14 - 6.6
VR UNIT 3,000.00 550.00 3,800.00 TOTAL MATERIALES

KG
DESPERDICIO % 0.10 0.00 0.00

EQUIPO/HERRAMIENTA

UND

RENDIMIENTO

V/UNITARIO

V/TOTAL

TOTAL EQUIPO TRANSPORTE TRANSPORTE ACERO CANT. 0.006 UNID. KM/TON KM. 154.00 PRECIO/KM 800.00 VR TOTAL 739.20

TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 200.00 200.00 TOTAL MANO OBRA V/UNITARIO 268.25 161.00

739.20 V/TOTAL 268.25 161.00 429.25

TOTAL COSTO DIRECTO

4,896

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS VIGAS AEREAS ESTRUCTURA SOPORTE CUBIERTA 0,25 X 0,30
MATERIALES CONCRETO 3000 PSI TABLA 3 MTS PUNTILLA DE 2" UND M3 GL GL ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 370,866.30 52,800.00 4,725.00 428,391.30

2.15 - 612 - 6.13


CANT 1.00 3.00 1.00 VR UNIT 353,206.00 16,000.00 4,500.00 TOTAL MATERIALES

M3
DESPERDICIO % 0.05 0.10 0.05

EQUIPO/HERRAMIENTA FORMALETA

UND DIA

RENDIMIENTO 2.00 TOTAL EQUIPO

V/UNITARIO 5,000.00

V/TOTAL 2,500.00 2,500.00

TRANSPORTE TRANSPORTE CEMENTO TRANSPORTE ARENA Y TRITURADO

CANT. 0.100 0.100

UNID. KM/TON KM/TON

KM. 154.00 12.000 TOTAL TRANSPORTE

PRECIO/KM 800.00 3,000.000

VR TOTAL 12,320.00 3,600.00 15,920.00

MANO DE OBRA MAESTRO OFICIAL AYUDANTE

UND JORNAL JORNAL JORNAL

CANT 1.00 1.00 2.00

JORNAL 49,690.00 28,158 16,563

% PREST. 42,236.50 25,492 15,637.17

RENDIMIENTO 3.00 3.00 2.00 TOTAL MANO OBRA

V/UNITARIO 30,642.17 17,883.34 16,100.25

V/TOTAL 30,642.17 17,883.34 32,200.50 80,726.01

TOTAL COSTO DIRECTO

527,537

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"

MUNICIPIO DE

ANALISIS DE PRECIOS UNITARIOS


ITEM UNIDAD FECHA SEPTIEMBRE DE 2010 VR TOTAL 31,500.00 525.00 32,025.00 V/UNITARIO V/TOTAL 300.00

ANDEN EN ADOQUIN
MATERIALES ADOQUINES ARENA UND M2 M3 CANT 1.000 0.02

2.16
VR UNIT 30,000.00 25,000.00 TOTAL MATERIALES

M2
DESPERDICIO % 0.05 0.05

EQUIPO/HERRAMIENTA HERRAMIENTA MENOR

UND

RENDIMIENTO

TOTAL EQUIPO TRANSPORTE TRANSPORTE ADOQUIN TRANSPORTE ARENA CANT. 0.050 0.100 UNID. KM/TON KM/TON KM. 154.00 12.000 TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 25.00 25.00 TOTAL MANO OBRA V/UNITARIO 2,146.00 1,288.02 PRECIO/KM 800.00 3,000.000 VR TOTAL 6,160.00 3,600.00 9,760.00 V/TOTAL 2,146.00 1,288.02 3,434.02

TOTAL COSTO DIRECTO

45,219

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS
ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 6,600.00

MALLA M - 262 ( 7 mm/ 0,15)


MATERIALES MALLA M - 262 ( 7 mm/ 0,15) UND M2 CANT 1.000

2.17
VR UNIT 6,000.00

M2
DESPERDICIO % 0.10

TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO

6,600.00 V/TOTAL 100.00 100.00 PRECIO/KM 800.00 VR TOTAL 1,232.00

TOTAL EQUIPO TRANSPORTE TRANSPORTE MALLA ACERO CANT. 0.010 UNID. KM/TON KM. 154.00

TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 120.00 120.00 TOTAL MANO OBRA V/UNITARIO 447.08 268.34

1,232.00 V/TOTAL 447.08 268.34 715.42

TOTAL COSTO DIRECTO

8,647

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS
ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 14,162.50 8,250.00 22,412.50

MUROS EN BLOQUE H - 10
MATERIALES LADRILLO BLOQUE H - 10 MORTERO UND UND M3 CANT 12.500 0.03

3.1
VR UNIT 1,030.00 250,000.00 TOTAL MATERIALES

M2
DESPERDICIO % 0.10 0.00

EQUIPO/HERRAMIENTA HERRAMIENTA MENOR

UND

RENDIMIENTO

V/UNITARIO

V/TOTAL 300.00 300.00

TOTAL EQUIPO TRANSPORTE TRANSPORTE LADRILO H - 10 CANT. 0.010 UNID. KM/TON KM. 154.00 PRECIO/KM 800.00

VR TOTAL 1,232.00

TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 24.00 24.00 TOTAL MANO OBRA V/UNITARIO 2,235.42 1,341.69

1,232.00 V/TOTAL 2,235.42 1,341.69 3,577.10

TOTAL COSTO DIRECTO

27,522

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS MUROS EN LADRILLO A LA VISTA MURO FRONTAL TIPO HOLLMAN
MATERIALES LADRILLO A LA VISTA MORTERO UND UND M3 CANT 58.000 0.05 ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 47,850.00 12,500.00 60,350.00

3.2 - 6.14
VR UNIT 750.00 250,000.00 TOTAL MATERIALES

M2
DESPERDICIO % 0.10 0.00

EQUIPO/HERRAMIENTA HERRAMIENTA MENOR

UND

RENDIMIENTO

V/UNITARIO

V/TOTAL 300.00 300.00

TOTAL EQUIPO TRANSPORTE TRANSPORTE LADRILO HOLLMAN CANT. 0.020 UNID. KM/TON KM. 154.00 PRECIO/KM 800.00

VR TOTAL 2,464.00

TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 20.00 24.00 TOTAL MANO OBRA V/UNITARIO 2,682.50 1,341.69

2,464.00 V/TOTAL 2,682.50 1,341.69 4,024.19

TOTAL COSTO DIRECTO

67,138

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS
ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 4,400.00

FRISOS MUROS
MATERIALES MORTERO UND M3 CANT 0.02

3.3 - 6.15
VR UNIT 250,000.00

M2
DESPERDICIO % 0.10

TOTAL MATERIALES EQUIPO/HERRAMIENTA REGLA DE TOLUA HERRAMIENTA MENOR UND UND RENDIMIENTO 500.00 V/UNITARIO 90,000.00

4,400.00 V/TOTAL 180.00 100.00 280.00 PRECIO/KM 800.00 3,000.000 VR TOTAL 1,232.00 360.00 1,592.00 V/UNITARIO 5,961.11 3,220.05 V/TOTAL 5,961.11 3,220.05 9,181.16

TOTAL EQUIPO TRANSPORTE TRANSPORTE CEMENTO TRANSPORTE ARENA CANT. 0.010 0.010 UNID. KM/TON KM/TON KM. 154.00 12.000 TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 9.00 10.00 TOTAL MANO OBRA

TOTAL COSTO DIRECTO

15,453

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS FRISOS IMPERMEABILIZADOS BAOS ( INCLUYE DILATACIONES)
MATERIALES MORTERO 1:3 SIKA-1 UND M3 KG CANT 0.015 0.16 ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 4,070.00 1,936.00 6,006.00

3.4
VR UNIT 250,000.00 11,000.00 TOTAL MATERIALES

M2
DESPERDICIO % 0.10 0.10

EQUIPO/HERRAMIENTA REGLA DE TOLUA HERRAMIENTA MENOR

UND UND

RENDIMIENTO 500.00

V/UNITARIO 90,000.00

V/TOTAL 180.00 100.00 280.00

TOTAL EQUIPO TRANSPORTE TRANSPORTE CEMENTO TRANSPORTE ARENA CANT. 0.010 0.010 UNID. KM/TON KM/TON KM. 154.00 12.000 TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 9.00 10.00 TOTAL MANO OBRA V/UNITARIO 5,961.11 3,220.05 PRECIO/KM 800.00 3,000.000

VR TOTAL 1,232.00 360.00 1,592.00 V/TOTAL 5,961.11 3,220.05 9,181.16

TOTAL COSTO DIRECTO

17,059

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS
ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL

CIELO RASO EN DRY WALL


MATERIALES CINTA PAPEL ( 76.2 ) Mt VINILTEX BASE AGUA MASILLA SUPERMASTIC USG PERFIL CANAL CAL.26 ( 90 mm ) PERFIL OMEGA Cal 26 2.44 Mt. PLACA PANEL REY 12. 7mm RH ( 2.44 x 1.22 ) TORNILLO AUTOPERFORANTE EST. 7/16 " TORNILLO AUTOPERFORANTE YESO 6 x1 TORNILLO PTA BROCA EXTRAPL. EST 8 x 1/2" ( 13mm ) UND CANT

3.5
VR UNIT

M2
DESPERDICIO %

GLOBAL

1.00

65,000.00

0.10

71,500.00

TOTAL MATERIALES EQUIPO/HERRAMIENTA EQUIPO ELECTRICO PERFORACION UND UND RENDIMIENTO 5.00 V/UNITARIO 5,000.00

71,500.00 V/TOTAL 1,000.00

TOTAL EQUIPO TRANSPORTE TRANSPORTE CIELO RASO DRY WALL CANT. 0.005 UNID. KM/TON KM. 154.00 PRECIO/KM 800.00

1,000.00 VR TOTAL 616.00

TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE UND JORNAL JORNAL JORNAL CANT 1.00 1.00 2.00 JORNAL 49,690.00 28,158 16,563 % PREST. 42,236.50 25,492 15,637.17 RENDIMIENTO 30.00 30.00 30.00 TOTAL MANO OBRA V/UNITARIO 3,064.22 1,788.33 1,073.35

616.00 V/TOTAL 3,064.22 1,788.33 2,146.70 6,999.25

TOTAL COSTO DIRECTO

80,115

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS
ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 9,975.00

ESTUCO Y PINTURA INTERIOR


MATERIALES ESTUCO , PINTURA Y LIJA UND GLOBAL CANT 1.000

3.6
VR UNIT 9,500.00

M2
DESPERDICIO % 0.05

TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO

9,975.00 V/TOTAL 300.00 300.00 PRECIO/KM 800.00 VR TOTAL 616.00

TOTAL EQUIPO TRANSPORTE TRANSPORTE ESTUCO Y PINTURA CANT. 0.005 UNID. KM/TON KM. 154.00

TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 2.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 23.00 23.00 TOTAL MANO OBRA V/UNITARIO 2,332.61 1,400.02

616.00 V/TOTAL 2,332.61 2,800.04 5,132.65

TOTAL COSTO DIRECTO

16,024

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS PINTURA EXTERIOR VINILO KORAZA SOBRE PAETE
MATERIALES PINTURA PARA EXTERIORES UND GAL CANT 0.080 ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 6,160.00

3.7
VR UNIT 70,000.00

M2
DESPERDICIO % 0.10

TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO

6,160.00 V/TOTAL 500.00 500.00 PRECIO/KM 800.00 VR TOTAL 616.00

TOTAL EQUIPO TRANSPORTE TRANSPORTE PINTURA CANT. 0.005 UNID. KM/TON KM. 154.00

TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 2.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 24.00 24.00 TOTAL MANO OBRA V/UNITARIO 2,235.42 1,341.69

616.00 V/TOTAL 2,235.42 2,683.38 4,918.79

TOTAL COSTO DIRECTO

12,195

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS
ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 13,750.00

MORTERO DE NIVELACION 4 CM
MATERIALES MORTERO DE NIVELACION 4 CM UND M3 CANT 0.050

3.8
VR UNIT 250,000.00

M2
DESPERDICIO % 0.10

TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO

13,750.00 V/TOTAL 300.00 300.00 PRECIO/KM 800.00 3,000.000 VR TOTAL 1,232.00 360.00 1,592.00 V/UNITARIO 3,576.67 2,146.70 V/TOTAL 3,576.67 4,293.40 7,870.07

TOTAL EQUIPO TRANSPORTE TRANSPORTE CEMENTO TRANSPORTE ARENA CANT. 0.010 0.010 UNID. KM/TON KM/TON KM. 154.00 12.000 TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 2.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 15.00 15.00 TOTAL MANO OBRA

TOTAL COSTO DIRECTO

23,512

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"

MUNICIPIO DE

ANALISIS DE PRECIOS UNITARIOS


ITEM UNIDAD FECHA SEPTIEMBRE DE 2010 VR TOTAL 24,200.00 5,500.00 29,700.00 V/UNITARIO V/TOTAL 600.00 600.00 PRECIO/KM 800.00 VR TOTAL 2,464.00

PISOS BAOS CERAMICA ANTIDESLIZANTE


MATERIALES CERAMICA PEGACOR UND M2 KG CANT 1.000 2.00

3.9
VR UNIT 22,000.00 2,500.00 TOTAL MATERIALES

M2
DESPERDICIO % 0.10 0.10

EQUIPO/HERRAMIENTA HERRAMIENTA MENOR

UND

RENDIMIENTO

TOTAL EQUIPO TRANSPORTE TRANSPORTE CERAMICA Y PEGACOR CANT. 0.020 UNID. KM/TON KM. 154.00

TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 2.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 15.00 15.00 TOTAL MANO OBRA V/UNITARIO 3,576.67 2,146.70

2,464.00 V/TOTAL 3,576.67 4,293.40 7,870.07

TOTAL COSTO DIRECTO

40,634

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS
ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 24,200.00 5,500.00 29,700.00

PARED BAOS EN CERAMICA


MATERIALES CERAMICA PEGACOR UND M2 KG CANT 1.000 2.00

3.10
VR UNIT 22,000.00 2,500.00 TOTAL MATERIALES

M2
DESPERDICIO % 0.10 0.10

EQUIPO/HERRAMIENTA HERRAMIENTA MENOR

UND

RENDIMIENTO

V/UNITARIO

V/TOTAL 600.00 600.00

TOTAL EQUIPO TRANSPORTE TRANSPORTE CERAMICA Y PEGACOR CANT. 0.015 UNID. KM/TON KM. 154.00 PRECIO/KM 800.00

VR TOTAL 1,848.00

TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 2.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 25.00 25.00 TOTAL MANO OBRA V/UNITARIO 2,146.00 1,288.02

1,848.00 V/TOTAL 2,146.00 2,576.04 4,722.04

TOTAL COSTO DIRECTO

36,870

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS
ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 5,280.00

ESQUINEROS EN ALUMINIO
MATERIALES ESQUINERA , CEMENTO BLANCO UND GL CANT 1.000

3.11
VR UNIT 4,800.00

ML
DESPERDICIO % 0.10

TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO

5,280.00 V/TOTAL 100.00 100.00 PRECIO/KM VR TOTAL

TOTAL EQUIPO TRANSPORTE CANT. UNID. KM.

TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 2.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 30.00 30.00 TOTAL MANO OBRA V/UNITARIO 1,788.33 1,073.35 V/TOTAL 1,788.33 2,146.70 3,935.03

TOTAL COSTO DIRECTO

9,315

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS
PISOS INTERIOR ( CERAMICA 30.5 X 30.5 INCLUYE BOQUILLA COLOR) DURO PISO O SIMILAR TRAFICO PESADO
MATERIALES CERAMICA PEGACOR UND M2 KG CANT 1.000 2.00 ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 24,200.00 5,500.00 29,700.00

3.12
VR UNIT 22,000.00 2,500.00 TOTAL MATERIALES

M2
DESPERDICIO % 0.10 0.10

EQUIPO/HERRAMIENTA HERRAMIENTA MENOR

UND

RENDIMIENTO

V/UNITARIO

V/TOTAL 100.00 100.00

TOTAL EQUIPO TRANSPORTE TRANSPORTE CERAMICA Y PEGACOR CANT. 0.015 UNID. KM/TON KM. 154.00 PRECIO/KM 800.00

VR TOTAL 1,848.00

TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 2.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 15.00 15.00 TOTAL MANO OBRA V/UNITARIO 3,576.67 2,146.70

1,848.00 V/TOTAL 3,576.67 4,293.40 7,870.07

TOTAL COSTO DIRECTO

39,518

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS GUARDAESCOBAS EN CERAMICA H = 10 CMS
MATERIALES CERAMICA PEGACOR UND M2 KG CANT 1.000 1.00 ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 8,800.00 2,750.00 11,550.00

3.13
VR UNIT 8,000.00 2,500.00 TOTAL MATERIALES

ML
DESPERDICIO % 0.10 0.10

EQUIPO/HERRAMIENTA HERRAMIENTA MENOR

UND

RENDIMIENTO

V/UNITARIO

V/TOTAL 100.00 100.00

TOTAL EQUIPO TRANSPORTE TRANSPORTE CERAMICA Y PEGACOR CANT. 0.006 UNID. KM/TON KM. 154.00 PRECIO/KM 800.00

VR TOTAL 739.20

TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 2.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 40.00 40.00 TOTAL MANO OBRA V/UNITARIO 1,341.25 805.01

739.20 V/TOTAL 1,341.25 1,610.03 2,951.28

TOTAL COSTO DIRECTO

15,340

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS
ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 70,000.00 440.00 1,942.50 72,382.50

PUERTAS METALICAS
MATERIALES PUERTA Metalica lamina cold rolled cal.18 panel ANTICORROSIVO Sobre lamina llena THINER UND m2 GAL GAL CANT 1.00 0.01 0.10

3.14
VR UNIT 70,000.00 40,000.00 18,500.00 TOTAL MATERIALES

M2
DESPERDICIO % 0.00 0.10 0.05

EQUIPO/HERRAMIENTA HERRAMIENTA MENOR

UND

RENDIMIENTO

V/UNITARIO

V/TOTAL 600.00 600.00

TOTAL EQUIPO TRANSPORTE TRANSPORTE PUERTA CANT. 0.070 UNID. KM/TON KM. 154.00 PRECIO/KM 800.00

VR TOTAL 8,624.00

TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 2.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 5.00 5.00 TOTAL MANO OBRA V/UNITARIO 10,730.00 6,440.10

8,624.00 V/TOTAL 10,730.00 12,880.20 23,610.20

TOTAL COSTO DIRECTO

105,217

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS PORTON METALICO ENTRADA PRINCIPAL
MATERIALES PORTON METALICO UND UND CANT 1.000 ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 2,120,000.00

3.15
VR UNIT 2,120,000.00

UND
DESPERDICIO % 0.00

TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO

2,120,000.00 V/TOTAL 400.00 400.00 PRECIO/KM 800.00 VR TOTAL 73,920.00

TOTAL EQUIPO TRANSPORTE TRANSPORTE PORTON METALICO CANT. 0.600 UNID. KM/TON KM. 154.00

TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE UND JORNAL JORNAL JORNAL CANT 1.00 1.00 1.00 JORNAL 49,690.00 28,158 16,563 % PREST. 42,236.50 25,492 15,637.17 RENDIMIENTO 0.30 0.30 0.30 TOTAL MANO OBRA V/UNITARIO 306,421.67 178,833.39 107,335.00

73,920.00 V/TOTAL 306,421.67 178,833.39 107,335.00 592,590.06

TOTAL COSTO DIRECTO

2,786,910

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS
ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 55,000.00 4,400.00 8,140.00 67,540.00

VENTANAS METALICAS
MATERIALES VENTANA Metalica lamina cold rolled cal.18 panel ANTICORROSIVO Sobre lamina llena THINER UND m2 GL GAL CANT 1.00 0.10 0.40

3.16
VR UNIT 55,000.00 40000 18,500.00 TOTAL MATERIALES

M2
DESPERDICIO % 0.00 0.10 0.10

EQUIPO/HERRAMIENTA HERRAMIENTA MENOR

UND

RENDIMIENTO

V/UNITARIO

V/TOTAL 500.00 500.00

TOTAL EQUIPO TRANSPORTE TRANSPORTE VENTANA METALICA CANT. 0.070 UNID. KM/TON KM. 154.00 PRECIO/KM 800.00

VR TOTAL 8,624.00

TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 15.00 15.00 TOTAL MANO OBRA V/UNITARIO 3,576.67 2,146.70

8,624.00 V/TOTAL 3,576.67 2,146.70 5,723.37

TOTAL COSTO DIRECTO

82,387

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"

MUNICIPIO DE

ANALISIS DE PRECIOS UNITARIOS VIDRIOS VENTANAS Y PUERTAS 4 MM


MATERIALES VIDRIO 4 m.m. , INSUMOS, ELEMENTOS DE FIJACION, SILICONA, TORNILLOS UND M2 CANT 1.000 ITEM UNIDAD FECHA SEPTIEMBRE DE 2010 VR TOTAL 23,430.00

3.17
VR UNIT 21,300.00

M2
DESPERDICIO % 0.10

TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO

23,430.00 V/TOTAL 500.00 500.00 PRECIO/KM 800.00 VR TOTAL 4,928.00

TOTAL EQUIPO TRANSPORTE TRANSPORTE VIDRIOS CANT. 0.040 UNID. KM/TON KM. 154.00

TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 6.00 6.00 TOTAL MANO OBRA V/UNITARIO 8,941.67 5,366.75

4,928.00 V/TOTAL 8,941.67 5,366.75 14,308.42

TOTAL COSTO DIRECTO

43,166

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"

MUNICIPIO DE

ANALISIS DE PRECIOS UNITARIOS


ITEM UNIDAD FECHA SEPTIEMBRE DE 2010 VR TOTAL 5,445.00 4,070.00 9,515.00 V/UNITARIO V/TOTAL 600.00 600.00 PRECIO/KM 800.00 VR TOTAL 369.60

PINTURA EXTERIOR GRADERIAS


MATERIALES ESMALTE THINER UND GL GALON CANT 0.11 0.20

3.18
VR UNIT 45,000.00 18,500.00 TOTAL MATERIALES

M2
DESPERDICIO % 0.10 0.10

EQUIPO/HERRAMIENTA HERRAMIENTA MENOR

UND

RENDIMIENTO

TOTAL EQUIPO TRANSPORTE TRANSPORTE ESMALTE Y THINER CANT. 0.003 UNID. KM/TON KM. 154.00

TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 40.00 40.00 TOTAL MANO OBRA V/UNITARIO 1,341.25 805.01

369.60 V/TOTAL 1,341.25 805.01 2,146.26

TOTAL COSTO DIRECTO

12,631

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS ESPEJOS PARA BAOS PUBLICOS 3 MM
MATERIALES ESPEJOS CRISTAL DE 4 m.m.INCOLORO MATERIALES, INSUMOS UND M2 GLOBAL CANT 1.00 1.00 ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 57,200.00 11,000.00 68,200.00

3.19
VR UNIT 52,000.00 10,000.00 TOTAL MATERIALES

M2
DESPERDICIO % 0.10 0.10

EQUIPO/HERRAMIENTA HERRAMIENTA MENOR

UND

RENDIMIENTO

V/UNITARIO

V/TOTAL 600.00 600.00

TOTAL EQUIPO TRANSPORTE TRANSPORTE ESPEJOS CANT. 0.018 UNID. KM/TON KM. 154.00 PRECIO/KM 800.00

VR TOTAL 2,217.60

TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 12.00 12.00 TOTAL MANO OBRA V/UNITARIO 4,470.83 2,683.38

2,217.60 V/TOTAL 4,470.83 2,683.38 7,154.21

TOTAL COSTO DIRECTO

78,172

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS PINTURA EN ESMALTE CARPINT. METALICA PUERTAS, VENTANAS, REJAS CERRAMIENTO.
MATERIALES LIJA, ANTICORROSIVO, ESMALTE, THINER UND GLOBAL CANT 1.05 ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 23,100.00

3.20
VR UNIT 22,000.00

M2
DESPERDICIO % 0.00

TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO

23,100.00 V/TOTAL 600.00 600.00 PRECIO/KM 800.00 VR TOTAL 369.60

TOTAL EQUIPO TRANSPORTE TRANSPORTE ESMALTE Y THINER CANT. 0.003 UNID. KM/TON KM. 154.00

TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 32.00 32.00 TOTAL MANO OBRA V/UNITARIO 1,676.56 1,006.27

369.60 V/TOTAL 1,676.56 1,006.27 2,682.83

TOTAL COSTO DIRECTO

26,752

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"

MUNICIPIO DE

ANALISIS DE PRECIOS UNITARIOS


ITEM UNIDAD FECHA SEPTIEMBRE DE 2010 VR TOTAL 28,350.00

PUNTO HIDRAULICO PVC DE 1/2" PRESION


MATERIALES tubo, limpiador, soldadura, accesorios, regata UND GL CANT 1.00

4.1
VR UNIT 27,000.00

UND
DESPERDICIO % 0.05

TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO

28,350.00 V/TOTAL 100.00 100.00 PRECIO/KM 800.00 VR TOTAL 123.20

TOTAL EQUIPO TRANSPORTE TRANSPORTE CANT. 0.001 UNID. KM/TON KM. 154.00

TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 15.00 15.00 TOTAL MANO OBRA V/UNITARIO 3,576.67 2,146.70

123.20 V/TOTAL 3,576.67 2,146.70 5,723.37

TOTAL COSTO DIRECTO

34,297

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS
ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 30,450.00

PUNTO HIDRAULICO DE PVC 1" PRESION


MATERIALES tubo, limpiador, soldadura, accesorios, regata UND GL CANT 1.00

4.2
VR UNIT 29,000.00

UND
DESPERDICIO % 0.05

TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO

30,450.00 V/TOTAL 100.00 100.00 PRECIO/KM 800.00 VR TOTAL 123.20

TOTAL EQUIPO TRANSPORTE TRANSPORTE CANT. 0.001 UNID. KM/TON KM. 154.00

TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 15.00 15.00 TOTAL MANO OBRA V/UNITARIO 3,576.67 2,146.70

123.20 V/TOTAL 3,576.67 2,146.70 5,723.37

TOTAL COSTO DIRECTO

36,397

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS
ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 6,193.00

TUBERIA PVC DE 1/2" PRESION


MATERIALES TUBERIA, ACCESORIOS UND UND CANT 1.00

4.3
VR UNIT 5,630.00

ML
DESPERDICIO % 0.10

TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO

6,193.00 V/TOTAL 100.00 100.00 PRECIO/KM 800.00 VR TOTAL 369.60

TOTAL EQUIPO TRANSPORTE TRANSPORTE TUBERIA CANT. 0.003 UNID. KM/TON KM. 154.00

TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 60.00 60.00 TOTAL MANO OBRA V/UNITARIO 894.17 536.68

369.60 V/TOTAL 894.17 536.68 1,430.84

TOTAL COSTO DIRECTO

8,093

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"

MUNICIPIO DE

ANALISIS DE PRECIOS UNITARIOS


ITEM UNIDAD FECHA SEPTIEMBRE DE 2010 VR TOTAL 7,480.00

TUBERIA PVC DE 3/4" PRESION


MATERIALES TUBERIA, ACCESORIOS UND UND CANT 1.00

4.4
VR UNIT 6,800.00

ML
DESPERDICIO % 0.10

TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO

7,480.00 V/TOTAL 100.00 100.00 PRECIO/KM 800.00 VR TOTAL 369.60

TOTAL EQUIPO TRANSPORTE TRANSPORTE TUBERIA CANT. 0.003 UNID. KM/TON KM. 154.00

TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 40.00 40.00 TOTAL MANO OBRA V/UNITARIO 1,341.25 805.01

369.60 V/TOTAL 1,341.25 805.01 2,146.26

TOTAL COSTO DIRECTO

10,096

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS
ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 10,230.00

TUBERIA PVC DE 1" PRESION


MATERIALES TUBERIA, ACCESORIOS UND UND CANT 1.00

4.5
VR UNIT 9,300.00

ML
DESPERDICIO % 0.10

TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO

10,230.00 V/TOTAL 100.00 100.00 PRECIO/KM 800.00 VR TOTAL 369.60

TOTAL EQUIPO TRANSPORTE TRANSPORTE TUBERIA CANT. 0.003 UNID. KM/TON KM. 154.00

TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 40.00 40.00 TOTAL MANO OBRA V/UNITARIO 1,341.25 805.01

369.60 V/TOTAL 1,341.25 805.01 2,146.26

TOTAL COSTO DIRECTO

12,846

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS
ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 12,650.00

TUBERIA PVC DE 1 Y 1/4" PRESION


MATERIALES TUBERIA, ACCESORIOS UND UND CANT 1.00

4.6
VR UNIT 11,500.00

ML
DESPERDICIO % 0.10

TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO

12,650.00 V/TOTAL 100.00 100.00 PRECIO/KM 800.00 VR TOTAL 369.60

TOTAL EQUIPO TRANSPORTE TRANSPORTE TUBERIA CANT. 0.003 UNID. KM/TON KM. 154.00

TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 55.00 55.00 TOTAL MANO OBRA V/UNITARIO 975.45 585.46

369.60 V/TOTAL 975.45 585.46 1,560.92

TOTAL COSTO DIRECTO

14,681

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS
ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 15,400.00

TUBERIA PVC DE 1 Y 1/2" PRESION


MATERIALES TUBERIA, ACCESORIOS UND UND CANT 1.00

4.7
VR UNIT 14,000.00

ML
DESPERDICIO % 0.10

TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO

15,400.00 V/TOTAL 100.00 100.00 PRECIO/KM 800.00 VR TOTAL 369.60

TOTAL EQUIPO TRANSPORTE TRANSPORTE TUBERIA CANT. 0.003 UNID. KM/TON KM. 154.00

TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 35.00 35.00 TOTAL MANO OBRA V/UNITARIO 1,532.86 920.01

369.60 V/TOTAL 1,532.86 920.01 2,452.87

TOTAL COSTO DIRECTO

18,322

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS
ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 16,720.00

TUBERIA PVC DE 2" PRESION


MATERIALES TUBERIA, ACCESORIOS UND UND CANT 1.00

4.8
VR UNIT 15,200.00

ML
DESPERDICIO % 0.10

TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO

16,720.00 V/TOTAL 100.00 100.00 PRECIO/KM 800.00 VR TOTAL 369.60

TOTAL EQUIPO TRANSPORTE TRANSPORTE TUBERIA CANT. 0.003 UNID. KM/TON KM. 154.00

TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 35.00 35.00 TOTAL MANO OBRA V/UNITARIO 1,532.86 920.01

369.60 V/TOTAL 1,532.86 920.01 2,452.87

TOTAL COSTO DIRECTO

19,642

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS
ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 48,000.00 65,000.00 65,000.00 178,000.00

MEDIDOR ROSCADO DE 1/2" CON CAJA CONCRETO Y TAPA METALICA


MATERIALES MEDIDOR ROSCADO DE 1/2" BAR METERS ACCESORIOS, VALVULA DE CORTE 1/2" CAJA DE CONCRETO CON TAPA METALICA UND UND UND UND CANT 1.00 1.00 1.00

4.9
VR UNIT 48,000.00 65,000.00 65,000.00 TOTAL MATERIALES

UND
DESPERDICIO % 0.00 0.00 0.00

EQUIPO/HERRAMIENTA HERRAMIENTA MENOR

UND

RENDIMIENTO

V/UNITARIO

V/TOTAL 100.00 100.00

TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.025 UNID. KM/TON KM. 154.00 PRECIO/KM 800.00

VR TOTAL 3,080.00

TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 3.00 3.00 TOTAL MANO OBRA V/UNITARIO 17,883.34 10,733.50

3,080.00 V/TOTAL 17,883.34 10,733.50 28,616.84

TOTAL COSTO DIRECTO

209,797

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS
ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 55,000.00 65,000.00 65,000.00 185,000.00

MEDIDOR ROSCADO DE 3/4" CON CAJA CONCRETO Y TAPA METALICA


MATERIALES MEDIDOR ROSCADO DE 3/4" BAR METERS ACCESORIOS, VALVULA DE CORTE 3/4" CAJA DE CONCRETO CON TAPA METALICA UND UND UND UND CANT 1.00 1.00 1.00

4.10
VR UNIT 55,000.00 65,000.00 65,000.00 TOTAL MATERIALES

UND
DESPERDICIO % 0.00 0.00 0.00

EQUIPO/HERRAMIENTA HERRAMIENTA MENOR

UND

RENDIMIENTO

V/UNITARIO

V/TOTAL 100.00 100.00

TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.025 UNID. KM/TON KM. 154.00 PRECIO/KM 800.00

VR TOTAL 3,080.00

TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 3.00 3.00 TOTAL MANO OBRA V/UNITARIO 17,883.34 10,733.50

3,080.00 V/TOTAL 17,883.34 10,733.50 28,616.84

TOTAL COSTO DIRECTO

216,797

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"

MUNICIPIO DE

ANALISIS DE PRECIOS UNITARIOS


ITEM UNIDAD FECHA SEPTIEMBRE DE 2010 VR TOTAL 85,000.00 72,000.00 65,000.00 222,000.00 V/UNITARIO V/TOTAL 100.00 100.00 PRECIO/KM 800.00 VR TOTAL 3,080.00

MEDIDOR ROSCADO DE 1" CON CAJA CONCRETO Y TAPA METALICA


MATERIALES MEDIDOR ROSCADO DE 1" BAR METERS ACCESORIOS, VALVULA DE CORTE 1" CAJA DE CONCRETO CON TAPA METALICA UND UND UND UND CANT 1.00 1.00 1.00

4.11
VR UNIT 85,000.00 72,000.00 65,000.00 TOTAL MATERIALES

UND
DESPERDICIO % 0.00 0.00 0.00

EQUIPO/HERRAMIENTA HERRAMIENTA MENOR

UND

RENDIMIENTO

TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.025 UNID. KM/TON KM. 154.00

TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 3.00 3.00 TOTAL MANO OBRA V/UNITARIO 17,883.34 10,733.50

3,080.00 V/TOTAL 17,883.34 10,733.50 28,616.84

TOTAL COSTO DIRECTO

253,797

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"

MUNICIPIO DE

ANALISIS DE PRECIOS UNITARIOS


ITEM UNIDAD FECHA

MEDIDOR ROSCADO DE (1 Y 1/2)" CON CAJA CONCRETO Y TAPA METALICA


MATERIALES MEDIDOR ROSCADO DE (1 Y 1/2)" BAR METERS ACCESORIOS, VALVULA DE CORTE (1 Y 1/2)" CAJA DE CONCRETO CON TAPA METALICA UND UND UND UND CANT 1.00 1.00 1.00

4.12
VR UNIT 92,000.00 89,000.00 65,000.00 TOTAL MATERIALES

UND
DESPERDICIO % 0.00 0.00 0.00

SEPTIEMBRE DE 2010 VR TOTAL 92,000.00 89,000.00 65,000.00 246,000.00

EQUIPO/HERRAMIENTA HERRAMIENTA MENOR

UND

RENDIMIENTO

V/UNITARIO

V/TOTAL 100.00 100.00

TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.025 UNID. KM/TON KM. 154.00 PRECIO/KM 800.00

VR TOTAL 3,080.00

TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 3.00 3.00 TOTAL MANO OBRA V/UNITARIO 17,883.34 10,733.50

3,080.00 V/TOTAL 17,883.34 10,733.50 28,616.84

TOTAL COSTO DIRECTO

277,797

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"

MUNICIPIO DE

ANALISIS DE PRECIOS UNITARIOS


ITEM UNIDAD FECHA SEPTIEMBRE DE 2010 VR TOTAL 217,000.00 12,000.00 55,000.00 284,000.00 V/UNITARIO V/TOTAL 100.00 100.00 PRECIO/KM 800.00 VR TOTAL 3,080.00

VALVULA DE CORTE RED WHITE DE 2"


MATERIALES VALVULA RED WHITE DE 2" ACCESORIOS CAJA DE CONCRETO CON TAPA METALICA UND UND UND UND CANT

4.13
VR UNIT 1.00 1.00 1.00 217,000.00 12,000.00 55,000.00 TOTAL MATERIALES

UND
DESPERDICIO % 0.00 0.00 0.00

EQUIPO/HERRAMIENTA HERRAMIENTA MENOR

UND

RENDIMIENTO

TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.025 UNID. KM/TON KM. 154.00

TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 3.00 3.00 TOTAL MANO OBRA V/UNITARIO 17,883.34 10,733.50

3,080.00 V/TOTAL 17,883.34 10,733.50 28,616.84

TOTAL COSTO DIRECTO

315,797

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS
ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 48,825.00

PUNTO DE PVC 2" SANITARIO


MATERIALES TUBO, ACCESORIOS, LIMPIADOR, ACCESORIOS, SOLDADURA , 2" UND GL CANT 1.00

5.1
VR UNIT 46,500.00

UND
DESPERDICIO % 0.05

TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO

48,825.00 V/TOTAL 100.00 100.00 PRECIO/KM 800.00 VR TOTAL 985.60

TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.008 UNID. KM/TON KM. 154.00

TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 7.00 7.00 TOTAL MANO OBRA V/UNITARIO 7,664.29 4,600.07

985.60 V/TOTAL 7,664.29 4,600.07 12,264.36

TOTAL COSTO DIRECTO

62,175

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS
ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 60,900.00

PUNTO DE PVC 3" SANITARIO


MATERIALES TUBO, ACCESORIOS, LIMPIADOR, ACCESORIOS, SOLDADURA , 3" UND GL CANT 1.00

5.2
VR UNIT 58,000.00

UND
DESPERDICIO % 0.05

TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO

60,900.00 V/TOTAL 100.00 100.00 PRECIO/KM 800.00 VR TOTAL 985.60

TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.008 UNID. KM/TON KM. 154.00

TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 7.00 7.00 TOTAL MANO OBRA V/UNITARIO 7,664.29 4,600.07

985.60 V/TOTAL 7,664.29 4,600.07 12,264.36

TOTAL COSTO DIRECTO

74,250

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"

MUNICIPIO DE

ANALISIS DE PRECIOS UNITARIOS


ITEM UNIDAD FECHA SEPTIEMBRE DE 2010 VR TOTAL 87,150.00

PUNTO DE PVC 4" SANITARIO


MATERIALES TUBO, ACCESORIOS, LIMPIADOR, ACCESORIOS, SOLDADURA , 4" UND GL CANT 1.00

5.3
VR UNIT 83,000.00

UND
DESPERDICIO % 0.05

TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO

87,150.00 V/TOTAL 100.00 100.00 PRECIO/KM 800.00 VR TOTAL 985.60

TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.008 UNID. KM/TON KM. 154.00

TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 7.00 7.00 TOTAL MANO OBRA V/UNITARIO 7,664.29 4,600.07

985.60 V/TOTAL 7,664.29 4,600.07 12,264.36

TOTAL COSTO DIRECTO

100,500

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS
ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 10.50 1,050.00 12,650.00 1,840.00 15,550.50

TUBERIA DE PVC 2" SANITARIA


MATERIALES LIMPIADOR REM.PVC 760 gr. ( Pavco ) SOLDADURA PVC LQUIDA TUBO PVC SANITARIO 2`` Pavco UNIN SANITARIA 2`` PVC UND un GALON ml un CANT 0.02 0.02 1.00 0.16

5.4
VR UNIT 500.00 50,000.00 11,500.00 11,500.00 TOTAL MATERIALES

ML
DESPERDICIO % 0.05 0.05 0.10 0.00

EQUIPO/HERRAMIENTA HERRAMIENTA MENOR

UND

RENDIMIENTO

V/UNITARIO

V/TOTAL 50.00 50.00

TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.009 UNID. KM/TON KM. 154.00 PRECIO/KM 800.00

VR TOTAL 1,108.80

TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 25.00 25.00 TOTAL MANO OBRA V/UNITARIO 2,146.00 1,288.02

1,108.80 V/TOTAL 2,146.00 1,288.02 3,434.02

TOTAL COSTO DIRECTO

20,143

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS
ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 10.50 1,050.00 19,800.00 2,080.00 22,930.00

TUBERIA DE PVC 3" SANITARIA


MATERIALES LIMPIADOR REM.PVC 760 gr. ( Pavco ) SOLDADURA PVC LQUIDA TUBO PVC SANITARIO 3`` Pavco UNIN SANITARIA 3`` PVC UND un GALON ml un CANT 0.02 0.02 1.00 0.16

5.5
VR UNIT 500.00 50,000.00 18,000.00 13,000.00 TOTAL MATERIALES

ML
DESPERDICIO % 0.05 0.05 0.10 0.00

EQUIPO/HERRAMIENTA HERRAMIENTA MENOR

UND

RENDIMIENTO

V/UNITARIO

V/TOTAL 50.00 50.00

TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.009 UNID. KM/TON KM. 154.00 PRECIO/KM 800.00

VR TOTAL 1,108.80

TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 28.00 28.00 TOTAL MANO OBRA V/UNITARIO 1,916.07 1,150.02

1,108.80 V/TOTAL 1,916.07 1,150.02 3,066.09

TOTAL COSTO DIRECTO

27,155

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"

MUNICIPIO DE

ANALISIS DE PRECIOS UNITARIOS


ITEM UNIDAD FECHA SEPTIEMBRE DE 2010 VR TOTAL 10.50 1,050.00 28,930.00 2,400.00 32,380.00 V/UNITARIO V/TOTAL 100.00 100.00 PRECIO/KM 800.00 VR TOTAL 5,544.00

TUBERIA DE PVC 4" SANITARIA


MATERIALES LIMPIADOR REM.PVC 760 gr. ( Pavco ) SOLDADURA PVC LQUIDA TUBO PVC SANITARIO 4`` Pavco UNIN SANITARIA 4`` PVC UND un GALON ml un CANT 0.02 0.02 1.00 0.16

5.6
VR UNIT 500.00 50,000.00 26,300.00 15,000.00 TOTAL MATERIALES

ML
DESPERDICIO % 0.05 0.05 0.10 0.00

EQUIPO/HERRAMIENTA HERRAMIENTA MENOR

UND

RENDIMIENTO

TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.045 UNID. KM/TON KM. 154.00

TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 20.00 20.00 TOTAL MANO OBRA V/UNITARIO 2,682.50 1,610.03

5,544.00 V/TOTAL 2,682.50 1,610.03 4,292.53

TOTAL COSTO DIRECTO

42,317

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS
ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 26,402.54 66,792.00 13,125.00 304.00 2,646.00 18,216.00 127,485.54

CAJA DE INSPECCION DE 80 X 80 CMS


MATERIALES CONCRETO 2,000 PSI LADRILLO PRECOCIDO COMUN 12x24x6 Dep. MORTERO ALAMBRE NEGRO Cal. 18 CEMENTO GRIS ACERO DE REFUERZO UND M3 UN M3 KG KG KG CANT 0.08 75.90 0.05 0.08 6.00 4.14

5.7
VR UNIT 314,316.00 800.00 250,000.00 3,800.00 420.00 4,000.00 TOTAL MATERIALES

UND
DESPERDICIO % 0.05 0.10 0.05 0.00 0.05 0.10

EQUIPO/HERRAMIENTA HERRAMIENTA MENOR

UND

RENDIMIENTO

V/UNITARIO

V/TOTAL 500.00 500.00

TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.100 UNID. KM/TON KM. 154.00 PRECIO/KM 800.00

VR TOTAL 12,320.00

TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 2.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 1.00 1.00 TOTAL MANO OBRA V/UNITARIO 53,650.02 32,200.50

12,320.00 V/TOTAL 53,650.02 64,401.00 118,051.02

TOTAL COSTO DIRECTO

258,357

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS
ITEM UNIDAD

MUNICIPIO DE

FECHA

SANITARIO CONVENCIONAL ACUACER CON GRIFERIA


MATERIALES PEGACOR BLANCO SANITARIO ACUACER Blanco. Ref. 30038 UND kg un CANT 1.00 1.00

5.8
VR UNIT 2,500.00 237,000.00

UND
DESPERDICIO % 0.05 0.00

SEPTIEMBRE DE 2010 VR TOTAL 2,500.00 248,850.00

TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO

251,350.00 V/TOTAL 200.00 200.00 PRECIO/KM 800.00 VR TOTAL 3,080.00

TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.025 UNID. KM/TON KM. 154.00

TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 3.00 3.00 TOTAL MANO OBRA V/UNITARIO 17,883.34 10,733.50

3,080.00 V/TOTAL 17,883.34 10,733.50 28,616.84

TOTAL COSTO DIRECTO

283,247

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS
ITEM UNIDAD

MUNICIPIO DE

FECHA

SANITARIO DE FLUXOMETRO
MATERIALES SANITARIO (TAZA) ACCESORIOS MENORES, REGATA FLUXOMETRO GRIVAL DE PALANCA UND GL GL GL CANT 1.00 1.00 1.00

5.9
VR UNIT 220,000.00 15,000.00 550,000.00 TOTAL MATERIALES

UND
DESPERDICIO % 0.00 0.00 0.00

SEPTIEMBRE DE 2010

VR TOTAL 220,000.00 15,000.00 550,000.00 785,000.00

EQUIPO/HERRAMIENTA HERRAMIENTA MENOR

UND

RENDIMIENTO

V/UNITARIO

V/TOTAL 500.00 500.00

TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.025 UNID. KM/TON KM. 154.00 PRECIO/KM 800.00

VR TOTAL 3,080.00

TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 2.00 2.00 TOTAL MANO OBRA V/UNITARIO 26,825.01 16,100.25

3,080.00 V/TOTAL 26,825.01 16,100.25 42,925.26

TOTAL COSTO DIRECTO

831,505

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS
ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 2,625.00 95,000.00

LAVAMANOS DE COLGAR ACUACER CON GRIFERIA


MATERIALES PEGACOR BLANCO LAVAMANOS CON GRIFERA UNA LLAVE GRIVAL UND kg un CANT 1.00 1.00

5.10
VR UNIT 2,500.00 95,000.00

UND
DESPERDICIO % 0.05 0.00

TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO

97,625.00 V/TOTAL 300.00 300.00 PRECIO/KM 800.00 VR TOTAL 2,587.20

TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.021 UNID. KM/TON KM. 154.00

TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 3.00 3.00 TOTAL MANO OBRA V/UNITARIO 17,883.34 10,733.50

2,587.20 V/TOTAL 17,883.34 10,733.50 28,616.84

TOTAL COSTO DIRECTO

129,129

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS
ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 1,837.50 41,000.00 5,250.00 35,000.00 81,250.00

DUCHAS, INCLUYE GRIFERA GRIVAL


MATERIALES PEGACOR BLANCO DUCHA PRISMA SENCILLA GRIVAL OTROS INSUMOS, REGATA, MORTERO INCLUYE GRIFERIA GRIVAL UNA LLAVE UND kg un GL UN CANT 0.70 1.00 1.00 1.00

5.11
VR UNIT 2,500.00 41,000.00 5,000.00 35,000.00 TOTAL MATERIALES

UND
DESPERDICIO % 0.05 0.00 0.05 0.00

EQUIPO/HERRAMIENTA HERRAMIENTA MENOR

UND

RENDIMIENTO

V/UNITARIO

V/TOTAL 100.00 100.00

TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.004 UNID. KM/TON KM. 154.00 PRECIO/KM 800.00

VR TOTAL 492.80

TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 7.00 7.00 TOTAL MANO OBRA V/UNITARIO 7,664.29 4,600.07

492.80 V/TOTAL 7,664.29 4,600.07 12,264.36

TOTAL COSTO DIRECTO

94,107

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"

MUNICIPIO DE

ANALISIS DE PRECIOS UNITARIOS


ITEM UNIDAD FECHA SEPTIEMBRE DE 2010 VR TOTAL 4,500.00

REJILLAS DE 3X2 PARA SIFONES DE PISO


MATERIALES REJILLAS 3X2 EN ALUMINIO UND UN CANT 1.00

5.12
VR UNIT 4,500.00

UND
DESPERDICIO % 0.00

TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO

4,500.00 V/TOTAL 50.00 50.00 PRECIO/KM 800.00 VR TOTAL 492.80

TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.004 UNID. KM/TON KM. 154.00

TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 30.00 30.00 TOTAL MANO OBRA V/UNITARIO 1,788.33 1,073.35

492.80 V/TOTAL 1,788.33 1,073.35 2,861.68

TOTAL COSTO DIRECTO

7,904

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS
ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 8,000.00

REJILLAS DE 4X3 PARA SIFONES DE PISO


MATERIALES REJILLAS 4X3 EN ALUMINIO UND UN CANT 1.00

5.13
VR UNIT 8,000.00

UND
DESPERDICIO % 0.00

TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO

8,000.00 V/TOTAL 50.00 50.00 PRECIO/KM 800.00 VR TOTAL 246.40

TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.002 UNID. KM/TON KM. 154.00

TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 35.00 35.00 TOTAL MANO OBRA V/UNITARIO 1,532.86 920.01

246.40 V/TOTAL 1,532.86 920.01 2,452.87

TOTAL COSTO DIRECTO

10,749

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS CERCHAS PRINCIPALES ( EN ELEMENTOS RECTANGULARES)
MATERIALES CERCHAS PRINCIPALES SOLDADURA DE 1/8 ANTICORROSIVO ROJO OXIDO DE HIERRO THINER LIJA DE AGUA UND UND KG GLN GLN UND CANT 1.00 0.30 0.04 0.02 0.20 ITEM UNIDAD

MUNICIPIO DE

FECHA

8.1
VR UNIT 780,000.00 12,000.00 40,000.00 15,000.00 2,000.00

ML
DESPERDICIO % 0.00 0.10 0.05 0.05 0.05

SEPTIEMBRE DE 2010 VR TOTAL 780,000.00 3,960.00 1,680.00 315.00 420.00

TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR EQUIPO SOLDADURA ELECTRICA ANDAMIO TUBULAR (SECC) UND DIA DIA DIA RENDIMIENTO 10.00 20.00 3.00 TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.200 UNID. KM/TON KM. 154.00 PRECIO/KM 800.00 V/UNITARIO 5,000.00 50,000.00 1,300.00

786,375.00 V/TOTAL 500.00 2,500.00 433.33 3,433.33 VR TOTAL 24,640.00

TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE UND JORNAL JORNAL JORNAL CANT 1.00 1.00 3.00 JORNAL 49,690.00 28,158 16,563 % PREST. 42,236.50 25,492 15,637.17 RENDIMIENTO 3.00 3.00 3.00 V/UNITARIO 30,642.17 17,883.34 10,733.50

24,640.00 V/TOTAL 30,642.17 17,883.34 32,200.50

TOTAL MANO OBRA

80,726.01

TOTAL COSTO DIRECTO

895,174

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS CERCHA - RIOSTRA
MATERIALES CERCHAS RIOSTRA SOLDADURA DE 1/8 ANTICORROSIVO ROJO OXIDO DE HIERRO THINER LIJA DE AGUA UND UND KG GLN GLN UND CANT 1.00 0.30 0.04 0.02 0.20 ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 240,000.00 3,960.00 1,680.00 315.00 420.00 246,375.00

8.2
VR UNIT 240,000.00 12,000.00 40,000.00 15,000.00 2,000.00 TOTAL MATERIALES

ML
DESPERDICIO % 0.00 0.10 0.05 0.05 0.05

EQUIPO/HERRAMIENTA HERRAMIENTA MENOR EQUIPO SOLDADURA ELECTRICA ANDAMIO TUBULAR (SECC)

UND DIA DIA DIA

RENDIMIENTO 10.00 20.00 3.00 TOTAL EQUIPO

V/UNITARIO 5,000.00 50,000.00 1,300.00

V/TOTAL 500.00 2,500.00 433.33 3,433.33

TRANSPORTE TRANSPORTE MATERIALES

CANT. 0.160

UNID. KM/TON

KM. 154.00

PRECIO/KM 800.00

VR TOTAL 19,712.00

TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE UND JORNAL JORNAL JORNAL CANT 1.00 1.00 3.00 JORNAL 49,690.00 28,158 16,563 % PREST. 42,236.50 25,492 15,637.17 RENDIMIENTO 2.00 2.00 2.00 TOTAL MANO OBRA V/UNITARIO 45,963.25 26,825.01 16,100.25

19,712.00 V/TOTAL 45,963.25 26,825.01 48,300.75 121,089.01

TOTAL COSTO DIRECTO

390,609

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS CORREA TIPO (EN PERFIL 100 X 50 X 2 MM)
MATERIALES CORREA TIPO (EN PERFIL 100 X 50 X 2 MM) SOLDADURA DE 1/8 ANTICORROSIVO ROJO OXIDO DE HIERRO THINER LIJA DE AGUA UND UND KG GLN GLN UND CANT 1.00 0.30 0.04 0.02 0.20 ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 61,000.00 3,960.00 1,680.00 315.00 420.00

8.3
VR UNIT 61,000.00 12,000.00 40,000.00 15,000.00 2,000.00

ML
DESPERDICIO % 0.00 0.10 0.05 0.05 0.05

TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR EQUIPO SOLDADURA ELECTRICA ANDAMIO TUBULAR (SECC) UND DIA DIA DIA RENDIMIENTO 10.00 20.00 3.00 TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.160 UNID. KM/TON KM. 154.00 PRECIO/KM 800.00 V/UNITARIO 5,000.00 50,000.00 1,300.00

67,375.00 V/TOTAL 500.00 2,500.00 433.33 3,433.33 VR TOTAL 19,712.00

TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE UND JORNAL JORNAL JORNAL CANT 1.00 1.00 1.00 JORNAL 49,690.00 28,158 16,563 % PREST. 42,236.50 25,492 15,637.17 RENDIMIENTO 5.00 5.00 5.00 TOTAL MANO OBRA V/UNITARIO 18,385.30 10,730.00 6,440.10

19,712.00 V/TOTAL 18,385.30 10,730.00 6,440.10 35,555.40

TOTAL COSTO DIRECTO

126,076

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS TIRANTES ( PLATINA 2" E= 1/8" )
MATERIALES TIRANTES ( PLATINA 2" E= 1/8" ) SOLDADURA DE 1/8 ANTICORROSIVO ROJO OXIDO DE HIERRO THINER LIJA DE AGUA UND UND KG GLN GLN UND CANT 1.00 0.05 0.01 0.01 0.20 ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 18,000.00 660.00 420.00 157.50 420.00

8.4
VR UNIT 18,000.00 12,000.00 40,000.00 15,000.00 2,000.00

ML
DESPERDICIO % 0.00 0.10 0.05 0.05 0.05

TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR EQUIPO SOLDADURA ELECTRICA ANDAMIO TUBULAR (SECC) UND DIA DIA DIA RENDIMIENTO 50.00 50.00 3.00 TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.044 UNID. KM/TON KM. 154.00 PRECIO/KM 800.00 V/UNITARIO 5,000.00 50,000.00 1,300.00

19,657.50 V/TOTAL 100.00 1,000.00 433.33 1,533.33 VR TOTAL 5,420.80

TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE UND JORNAL JORNAL JORNAL CANT 1.00 1.00 1.00 JORNAL 49,690.00 28,158 16,563 % PREST. 42,236.50 25,492 15,637.17 RENDIMIENTO 20.00 20.00 20.00 TOTAL MANO OBRA V/UNITARIO 4,596.33 2,682.50 1,610.03

5,420.80 V/TOTAL 4,596.33 2,682.50 1,610.03 8,888.85

TOTAL COSTO DIRECTO

35,500

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS CONTRAVIENTOS ( CABLE METALICO DIAM=3/8" INCLUYE SUJETADORES) FY MAYOR O IGUAL A 7000 KG/CM2
MATERIALES CONTRAVIENTOS ( CABLE METALICO DIAM=3/8" INCLUYE SUJETADORES) FY MAYOR O IGUAL A 7000 KG/CM2 SOLDADURA DE 1/8 ANTICORROSIVO ROJO OXIDO DE HIERRO THINER LIJA DE AGUA UND UND KG GLN GLN UND CANT 1.00 0.05 0.01 0.01 0.20 ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 16,000.00 660.00 420.00 157.50 420.00

8.5
VR UNIT 16,000.00 12,000.00 40,000.00 15,000.00 2,000.00

ML
DESPERDICIO % 0.00 0.10 0.05 0.05 0.05

TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR EQUIPO SOLDADURA ELECTRICA ANDAMIO TUBULAR (SECC) UND DIA DIA DIA RENDIMIENTO 50.00 50.00 3.00 TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.055 UNID. KM/TON KM. 154.00 PRECIO/KM 800.00 V/UNITARIO 5,000.00 50,000.00 1,300.00

17,657.50 V/TOTAL 100.00 1,000.00 433.33 1,533.33 VR TOTAL 6,776.00

TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE UND JORNAL JORNAL JORNAL CANT 1.00 1.00 1.00 JORNAL 49,690.00 28,158 16,563 % PREST. 42,236.50 25,492 15,637.17 RENDIMIENTO 20.00 20.00 20.00 TOTAL MANO OBRA V/UNITARIO 4,596.33 2,682.50 1,610.03

6,776.00 V/TOTAL 4,596.33 2,682.50 1,610.03 8,888.85

TOTAL COSTO DIRECTO

34,856

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS PLATINAS DE APOYO DE CERCHA ( INCLUYE ANCLAJES) E= 3/8" A= 0,3375 M2
MATERIALES PLATINAS DE APOYO DE CERCHA ( INCLUYE ANCLAJES) E= 3/8" A= 0,3375 M2 SOLDADURA DE 1/8 ANTICORROSIVO ROJO OXIDO DE HIERRO THINER LIJA DE AGUA UND UND KG GLN GLN UND CANT 1.00 0.30 0.01 0.01 0.60 ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 220,000.00 3,960.00 420.00 157.50 1,260.00

8.6
VR UNIT 220,000.00 12,000.00 40,000.00 15,000.00 2,000.00

UN
DESPERDICIO % 0.00 0.10 0.05 0.05 0.05

TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR EQUIPO SOLDADURA ELECTRICA ANDAMIO TUBULAR (SECC) UND DIA DIA DIA RENDIMIENTO 10.00 20.00 2.00 TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.100 UNID. KM/TON KM. 154.00 PRECIO/KM 800.00 V/UNITARIO 5,000.00 50,000.00 1,300.00

225,797.50 V/TOTAL 500.00 2,500.00 650.00 3,650.00 VR TOTAL 12,320.00

TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE UND JORNAL JORNAL JORNAL CANT 1.00 1.00 2.00 JORNAL 49,690.00 28,158 16,563 % PREST. 42,236.50 25,492 15,637.17 RENDIMIENTO 3.00 3.00 2.00 TOTAL MANO OBRA V/UNITARIO 30,642.17 17,883.34 16,100.25

12,320.00 V/TOTAL 30,642.17 17,883.34 32,200.50 80,726.01

TOTAL COSTO DIRECTO

322,494

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS PLATINA PARA FIJACION DE CONTRAVIENTOS ( EN MENSULA INCLUYE ANCLAJES) E= 3/8" A= 500 CM2
MATERIALES PLATINA PARA FIJACION DE CONTRAVIENTOS ( EN MENSULA INCLUYE ANCLAJES) E= 3/8" A= 500 CM2 SOLDADURA DE 1/8 ANTICORROSIVO ROJO OXIDO DE HIERRO THINER LIJA DE AGUA UND UND KG GLN GLN UND CANT 1.00 0.20 0.01 0.01 0.40 ITEM UNIDAD

MUNICIPIO DE

FECHA

8.7
VR UNIT 90,000.00 12,000.00 40,000.00 15,000.00 2,000.00

UN
DESPERDICIO % 0.00 0.10 0.05 0.05 0.05

SEPTIEMBRE DE 2010 VR TOTAL 90,000.00 2,640.00 420.00 157.50 840.00

TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR EQUIPO SOLDADURA ELECTRICA ANDAMIO TUBULAR (SECC) UND DIA DIA DIA RENDIMIENTO 10.00 20.00 2.00 TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.055 UNID. KM/TON KM. 154.00 PRECIO/KM 800.00 V/UNITARIO 5,000.00 50,000.00 1,300.00

94,057.50 V/TOTAL 500.00 2,500.00 650.00 3,650.00 VR TOTAL 6,776.00

TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE UND JORNAL JORNAL JORNAL CANT 1.00 1.00 1.00 JORNAL 49,690.00 28,158 16,563 % PREST. 42,236.50 25,492 15,637.17 RENDIMIENTO 5.00 3.00 3.00 TOTAL MANO OBRA V/UNITARIO 18,385.30 17,883.34 10,733.50

6,776.00 V/TOTAL 18,385.30 17,883.34 10,733.50 47,002.14

TOTAL COSTO DIRECTO

151,486

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS PLATINA PARA FIJACION DE CONTRAVIENTOS ( CENTRO CERCHA ) E= 3/8" A= 125 CM2
MATERIALES PLATINA PARA FIJACION DE CONTRAVIENTOS ( CENTRO CERCHA ) E= 3/8" A= 125 CM2 SOLDADURA DE 1/8 ANTICORROSIVO ROJO OXIDO DE HIERRO THINER LIJA DE AGUA UND UND KG GLN GLN UND CANT 1.00 0.20 0.01 0.01 0.40 ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 95,000.00 2,640.00 420.00 157.50 840.00

8.8
VR UNIT 95,000.00 12,000.00 40,000.00 15,000.00 2,000.00

UN
DESPERDICIO % 0.00 0.10 0.05 0.05 0.05

TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR EQUIPO SOLDADURA ELECTRICA ANDAMIO TUBULAR (SECC) UND DIA DIA DIA RENDIMIENTO 20.00 35.00 2.00 TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.055 UNID. KM/TON KM. 154.00 PRECIO/KM 800.00 V/UNITARIO 5,000.00 50,000.00 1,300.00

99,057.50 V/TOTAL 250.00 1,428.57 650.00 2,328.57 VR TOTAL 6,776.00

TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE UND JORNAL JORNAL JORNAL CANT 1.00 1.00 1.00 JORNAL 49,690.00 28,158 16,563 % PREST. 42,236.50 25,492 15,637.17 RENDIMIENTO 4.00 4.00 4.00 V/UNITARIO 22,981.63 13,412.50 8,050.13

6,776.00 V/TOTAL 22,981.63 13,412.50 8,050.13

TOTAL MANO OBRA

44,444.25

TOTAL COSTO DIRECTO

152,606

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS PLATINA PARA FIJACION DE CONTRAVIENTOS ( EXTREMO CERCHA ) E= 3/8" A= 390 CM2
MATERIALES PLATINA PARA FIJACION DE CONTRAVIENTOS ( EXTREMO CERCHA ) E= 3/8" A= 390 CM2 SOLDADURA DE 1/8 ANTICORROSIVO ROJO OXIDO DE HIERRO THINER LIJA DE AGUA UND UND KG GLN GLN UND CANT 1.00 0.20 0.01 0.01 0.40 ITEM UNIDAD

MUNICIPIO DE

FECHA

8.9
VR UNIT 145,000.00 12,000.00 40,000.00 15,000.00 2,000.00

UN
DESPERDICIO % 0.00 0.10 0.05 0.05 0.05

SEPTIEMBRE DE 2010 VR TOTAL 145,000.00 2,640.00 420.00 157.50 840.00

TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR EQUIPO SOLDADURA ELECTRICA ANDAMIO TUBULAR (SECC) UND DIA DIA DIA RENDIMIENTO 20.00 35.00 2.00 TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.055 UNID. KM/TON KM. 154.00 PRECIO/KM 800.00 V/UNITARIO 5,000.00 50,000.00 1,300.00

149,057.50 V/TOTAL 250.00 1,428.57 650.00 2,328.57 VR TOTAL 6,776.00

TOTAL TRANSPORTE

6,776.00

MANO DE OBRA MAESTRO OFICIAL AYUDANTE

UND JORNAL JORNAL JORNAL

CANT 1.00 1.00 1.00

JORNAL 49,690.00 28,158 16,563

% PREST. 42,236.50 25,492 15,637.17

RENDIMIENTO 3.00 3.00 3.00 TOTAL MANO OBRA

V/UNITARIO 30,642.17 17,883.34 10,733.50

V/TOTAL 30,642.17 17,883.34 10,733.50 59,259.01

TOTAL COSTO DIRECTO

217,421

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS
ITEM UNIDAD

MUNICIPIO DE

FECHA

PLATINAS DE APOYO POSTERIOR DE CERCHA E= 3/8" A= 0,09 M2 (0,30 X 0,30)


MATERIALES PLATINAS DE APOYO POSTERIOR DE CERCHA E= 3/8" A= 0,09 M2 (0,30 X 0,30) SOLDADURA DE 1/8 ANTICORROSIVO ROJO OXIDO DE HIERRO THINER LIJA DE AGUA UND UND KG GLN GLN UND CANT 1.00 0.40 0.05 0.01 0.40

8.10
VR UNIT 70,000.00 12,000.00 40,000.00 15,000.00 2,000.00

UN
DESPERDICIO % 0.00 0.10 0.05 0.05 0.05

SEPTIEMBRE DE 2010

VR TOTAL 70,000.00 5,280.00 2,100.00 157.50 840.00

TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR EQUIPO SOLDADURA ELECTRICA ANDAMIO TUBULAR (SECC) UND DIA DIA DIA RENDIMIENTO 20.00 35.00 2.00 TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.045 UNID. KM/TON KM. 154.00 PRECIO/KM 800.00 V/UNITARIO 5,000.00 50,000.00 1,300.00

78,377.50 V/TOTAL 250.00 1,428.57 650.00 2,328.57 VR TOTAL 5,544.00

TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE UND JORNAL JORNAL JORNAL CANT 1.00 1.00 1.00 JORNAL 49,690.00 28,158 16,563 % PREST. 42,236.50 25,492 15,637.17 RENDIMIENTO 5.00 3.00 3.00 TOTAL MANO OBRA V/UNITARIO 18,385.30 17,883.34 10,733.50

5,544.00 V/TOTAL 18,385.30 17,883.34 10,733.50 47,002.14

TOTAL COSTO DIRECTO

133,252

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS TEJA TERMOACOUSTIC E= 0,27 MM ( SUMINISTRO E INSTALACION) INCLUYE TORNILLOS DE FIJACION
MATERIALES TEJA TERMOACOUSTIC E= 0,27 MM ( SUMINISTRO E INSTALACION) INCLUYE TORNILLOS DE FIJACION UND UND CANT 1.00 ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 36,000.00

8.11
VR UNIT 36,000.00

M2
DESPERDICIO % 0.00

TOTAL MATERIALES EQUIPO/HERRAMIENTA ANDAMIO TUBULAR HERRAMIENTA MENOR TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.050 UNID. KM/TON KM. 154.00 PRECIO/KM 800.00 UND DIA RENDIMIENTO 2.00 V/UNITARIO 2,300.00

36,000.00 V/TOTAL 1,150.00 300.00 1,450.00 VR TOTAL 6,160.00

TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE UND JORNAL JORNAL JORNAL CANT 1.00 1.00 2.00 JORNAL 49,690.00 28,158 16,563 % PREST. 42,236.50 25,492 15,637.17 RENDIMIENTO 40.00 40.00 40.00 TOTAL MANO OBRA V/UNITARIO 2,298.16 1,341.25 805.01

6,160.00 V/TOTAL 2,298.16 1,341.25 1,610.03 5,249.44

TOTAL COSTO DIRECTO

48,859

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS
ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 2,420.00

LIMPIEZA GENERAL DE LA OBRA


MATERIALES INSUMOS DE ASEO UND GL CANT 1.00

9.1
VR UNIT 2,200.00

M2
DESPERDICIO % 0.10

TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO

2,420.00 V/TOTAL 100.00 100.00 PRECIO/KM 800.00 VR TOTAL 1,232.00

TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.010 UNID. KM/TON KM. 154.00

TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 100.00 100.00 TOTAL MANO OBRA V/UNITARIO 536.50 322.01

1,232.00 V/TOTAL 536.50 322.01 858.51

TOTAL COSTO DIRECTO

4,611

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS
ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 99,000.00

INCRUSTACIONES PARA FIGURA BALON EN MARMOL DE LA REGION


MATERIALES MARMOL DE LA REGION UND M2 CANT 1.00

6.16
VR UNIT 90,000.00

M2
DESPERDICIO % 0.10

TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO

99,000.00 V/TOTAL 500.00 500.00 PRECIO/KM 3,000.00 VR TOTAL 7,200.00

TOTAL EQUIPO TRANSPORTE TRANSPORTE MARMOL CANT. 0.200 UNID. KM/TON KM. 12.00

TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE UND JORNAL JORNAL JORNAL CANT 1.00 1.00 1.00 JORNAL 49,690.00 28,158 16,563 % PREST. 42,236.50 25,492 15,637.17 RENDIMIENTO 5.00 5.00 5.00 TOTAL MANO OBRA V/UNITARIO 18,385.30 10,730.00 6,440.10

7,200.00 V/TOTAL 18,385.30 10,730.00 6,440.10 17,170.10

TOTAL COSTO DIRECTO

123,870

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS
ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 28,000.00

SILLETERIA PLASTICA PARA GRADERIAS


MATERIALES SILLAS, TORNILLOS, INSUMOS UND GLOBAL CANT

7.1
1.00 VR UNIT 28,000.00

UND
DESPERDICIO % 0.00

TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO

28,000.00 V/TOTAL 100.00 100.00 PRECIO/KM 800.00 VR TOTAL 3,080.00

TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.025 UNID. KM/TON KM. 154.00

TOTAL TRANSPORTE MANO DE OBRA OFICIAL AYUDANTE UND JORNAL JORNAL CANT 1.00 1.00 JORNAL 28,158 16,563 % PREST. 25,492 15,637.17 RENDIMIENTO 15.00 15.00 TOTAL MANO OBRA V/UNITARIO 3,576.67 2,146.70

3,080.00 V/TOTAL 3,576.67 2,146.70 5,723.37

TOTAL COSTO DIRECTO

36,903

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"


ANALISIS DE PRECIOS UNITARIOS CERRAMIENTO METALICO EN ANGULO Y MALLA PARA LOS CUATRO LADOS DE LAS GRADERIAS
MATERIALES MALLA CERRAMIENTO Eslab.Cal.12 2 1/2 Y LIJA TUBO GALVANIZADO 2" ANGULO 1,5" x 1,5"x 3/16 SOLDADURA ANTICORROSIVO Y WASH PRIMER THINER UND M2 ML ML KG GALON GALON CANT 0.82 0.83 3.00 0.40 0.15 0.10 ITEM UNIDAD

MUNICIPIO DE

FECHA SEPTIEMBRE DE 2010 VR TOTAL 36,080.00 22,825.00 49,500.00 7,920.00 6,600.00 1,650.00 124,575.00

7.2
VR UNIT 40,000.00 25,000.00 15,000.00 18,000.00 40,000.00 15,000.00 TOTAL MATERIALES

ML
DESPERDICIO % 0.10 0.10 0.10 0.10 0.10 0.10

EQUIPO/HERRAMIENTA HERRAMIENTA MENOR

UND

RENDIMIENTO

V/UNITARIO

V/TOTAL 500.00 500.00

TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.055 UNID. KM/TON KM. 154.00 PRECIO/KM 800.00

VR TOTAL 6,776.00

TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE UND JORNAL JORNAL JORNAL CANT 1.00 1.00 1.00 JORNAL 49,690.00 28,158 16,563 % PREST. 42,236.50 25,492 15,637.17 RENDIMIENTO 5.00 3.00 3.00 TOTAL MANO OBRA V/UNITARIO 18,385.30 17,883.34 10,733.50

6,776.00 V/TOTAL 18,385.30 17,883.34 10,733.50 28,616.84

TOTAL COSTO DIRECTO

160,468

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MALAGA"

MUNICIPIO DE

ANALISIS DE PRECIOS UNITARIOS


ITEM UNIDAD FECHA SEPTIEMBRE DE 2010 VR TOTAL 29,700.00

REJILLA PARA CANALETA DE AGUAS LLUVIAS EXISTENTE


MATERIALES HIIERRO 5/8", ANGULOS, BISAGRAS, SOLDADURA. OTROS INSUMOS UND UND CANT 1.00

7.3
VR UNIT 27,000.00

ML
DESPERDICIO % 0.10

TOTAL MATERIALES EQUIPO/HERRAMIENTA HERRAMIENTA MENOR UND RENDIMIENTO V/UNITARIO

29,700.00 V/TOTAL 300.00 300.00 PRECIO/KM 800.00 VR TOTAL 3,080.00

TOTAL EQUIPO TRANSPORTE TRANSPORTE MATERIALES CANT. 0.025 UNID. KM/TON KM. 154.00

TOTAL TRANSPORTE MANO DE OBRA MAESTRO OFICIAL AYUDANTE UND JORNAL JORNAL JORNAL CANT 1.00 1.00 1.00 JORNAL 49,690.00 28,158 16,563 % PREST. 42,236.50 25,492 15,637.17 RENDIMIENTO 6.00 6.00 6.00 TOTAL MANO OBRA V/UNITARIO 15,321.08 8,941.67 5,366.75

3,080.00 V/TOTAL 15,321.08 8,941.67 5,366.75 29,629.50

TOTAL COSTO DIRECTO

62,710

PROYECTO: "CONSTRUCCION CIUDADELA DEPORTIVA PRIMERA ETAPA DEL MUNICIPIO DE MALAGA"


ANALISIS DE PRECIOS UNITARIOS EXCAVACION PARA CAISSONS ( 8 - 9 METROS DE PROFUNDIDAD)
MATERIALES UND CANT ITEM UNIDAD

1.12.1
VR UNIT

M3
DESPERDICIO %

TOTAL MATERIALES EQUIPO/HERRAMIENTA ENTIBADO MOTOBOMBA HERRAMIENTA MENOR UND DIA DIA RENDIMIENTO 2.00 2.00 V/UNITARIO 14,000.00 12,000.00

TOTAL EQUIPO TRANSPORTE TRANSPORTE ENTIBADO CANT. 0.30 UNID. KM/TON KM. 154.000 PRECIO/KM 800.00

TOTAL TRANSPORTE MANO DE OBRA UND MAESTRO JORNAL OFICIAL JORNAL AYUDANTE JORNAL CANT 1.00 1.00 1.00 JORNAL % PREST. 49,690.00 42,236.50 28,158 25,492 16,563 15,637.17 RENDIMIENTO 11.00 10.00 0.75 V/UNITARIO 8,356.95 5,365.00 42,933.04

TOTAL MANO OBRA

TOTAL COSTO DIRECTO

ORTIVA PRIMERA GA"


FECHA

OCTUBRE DE 2011

VR TOTAL

V/TOTAL 7,000.00 6,000.00 600.00 13,600.00 VR TOTAL 36,960.00

36,960.00 V/TOTAL 8,356.95 5,365.00 42,933.04 56,655.00

107,215