You are on page 1of 74

IN THE NAME OF ALLAH,THE MOST MERCIFUL AND BENIFICIAL

COMPUTER AIDED RATE ANALYSIS FOR CIVIL ENGINEERING WORKS


PROJECT ADVISOR: NOOR MUHAMMAD KHAN STUDENTS: 99-CIVIL-886 99-CIVIL-891 (PROFESSOR IN CIVIL ENGG. DEPT. UET LAHORE 99-CIVIL-890 99-CIVIL-909

CONTACT:(Project advisor) maaz_96@hotmail.com Students: emranmalik@hotmail.com , 03334266880@ufone.com ,siddiqui890@hotmail.com

INTRODUCTION

The project is basically final year thesis naming Computer Aided Rate Analysis for Civil Engineering Works(CARACE).It is wholly Microsoft excel based software providing ease not only for educational purpose but also for professional works. Professor Muhammad Noor Khan offered it for the first time. Quite possible that most of quantity surveyors may have their individual sheets for rate analysis but this is a combine network of sheets surrounding maximum civil engineering works. We managed it in the form of a single work book but adding different sheets and linking them with one each other. We used different tools of excel mostly"form tool bar"(visual basic format) which made it more handy like a software to treat it; avoiding the key board and increasing the use of mouse by just clicking and getting results.(For further assistance see manual or contacts.Thanks!)

PAKISTAN WATER AND POWER DEVELOPMENT AUTHORITY

DRAFTING STANDARDS
MATERIAL AND LABOUR Items Fencing Description Materials Jun-98 Units Qty Remark

Providing and fixing barbed wires with 4 horizontal and two cross wires with RCC 1:2:4 posts 5.578ft 6"x12" (8" c/c)reinforced with #4 0.4inch dia vrtical bars and 0.118inch dia stirrups12 inch c/c complete in all respects (a) Without Cement Conc Sand base Cement Crush MS bars Barbed wire Hooks Mazdoor Mason Bahishti (b)In cement conc. Base Sand 1:4:8 Cement Crush MS bars Barbed wire Hooks Mazdoor Mason Bahishti

%cft bags %cft kg lbs lbs No No No %cft bags %cft kg lbs lbs No No No

15.84 6.3 31.68 54 26.6 L.M 5 2 1 39 11 79 54 26.6 L.M 8 2.5 1.25

Hand pipes and Pressure pipes Cutting pipes upto 2" dia (100nos) Mazdoor Black Smith nos nos nos nos 4 4 6.25 8.75

Cutting pipes above 2" dia Mazdoor (100nos) Black Smith Threading pipe ends 1.5" to Mazdoor 4" (100 nos) Black Smith Assembling 1.5" dia pressure pipe

nos nos

4.17 5.2

Mazdoor Fitter

100 lft 100 lft

1.5 1

Boring and fixing 1.5" dia pressure pipe (a) In ordinary Soil (b) In clay

Mazdoor Fitter Mazdoor Fitter

30 rft 30 rft 30 rft 30 rft 1 no

3.5 1 8 1 0.4

Fixing hand pump (Machine Fitter only) Roads 1-EARTH WORK Earth work in all types of soils exept rock for embankment lead upto 500ft and lift upto 5ft including ploughing mixing with blade or disk harrow or other suitable equipment compaction by mechanical means complete at opt. m.c. and dressing to design material sections. desiel mobil oil equipment Tractor Sheep foot roller Tamping roller labour driver Sheep foot roller driver Tamping roller driver Cleaner for SF roller Cleaner for Tamp roller Dresser Mazdoor 2-EARTH WORK

lts lts Hrs Hrs Hrs nos nos nos nos nos nos nos nos

13.5 1.4 1 2 2 0.125 0.125 0.125 0.125 0.125 0.2 7.12

Earth work excavation in all types of soils except rocks for channels, drains, etc.Dressed to design sections grades and profiles and excavated material disposed of and labour dressed lead upto 50ft Dresser Mazdoor SUB BASE COURSE 1-Sub base course of Materials bricks on edge 4.5" thick Burnt bricks Sand Equipement Road Roller Wheel Barrow Labour Supervisor Mason Mazdoor Bahishti 2-Sub base course of bick ballast including compaction to reqd camber Materials and grade Sand Brick ballast Equipement Water tanker Donky pump Road Roller Wheel Barrow labour Supervisor Dresser Mazdoor

nos nos

0.2 7.12

nos cft day nos nos nos nos nos

1400 22 0.01 0.002 0.02 0.5 1 1

cft cft day nos day nos nos nos nos

25 100 0.02 0.001 0.05 0.002 0.02 0.5 1

3-Sub base course of granular material including placing, mixing and compation to reqd camber Materials and grade Pit run gravel Equipment Water tanker donkey pump Road roller Wheell Barrow Labour Supervisor Dressor mazdoor BASE COURSE:base couse of hand crushed stone aggregate including mixing , spreding to required depth and compaction of the base course material filling voids with stone dust with the help of sprinkiling water as materials: specified. hand crushed stone agg stone dust Equipment Water tanker donkey pump Road roller Whell Barrow Labour Supervisor Dressor mazdoor surfacing: surface treatment(TST): a)first coat Materials Crush Bitumen Fuel Wood Basket Equip Tar Boiler Road Roller Labour Spray man Chakri Man Mazdoor b)second coat Materials Crush Bitumen Fuel Wood Basket

cft day nos day nos nos nos nos

125 0.02 0.001 0.05 0.002 0.01 0.5 1

cft cft day nos day nos nos nos nos

115 10 0.04 0.0002 0.08 0.005 0.02 0.75 1.5

cft kg kg nos day day nos nos nos

5.5 20.42 10 0.05 0.015 0.01 0.015 0.015 0.18

cft kg kg nos

9 29.52 14.5 0.081

Equip Tar Boiler Road Roller Labour Spray man Chakri Man Mazdoor c)third coat Materials Crush Bitumen Fuel Wood Basket Equip Tar Boiler Road Roller Labour Spray man Chakri Man Mazdoor PRE MIXED ASPHALT: plant mixed bitumineous carpet includinjg compaction and finishing to required camber grade and density. a)1" thick material Crush Bitumen Fuel Wood Course Sand Filler dust Equip Mixer Tar Boiler Road Rolller Labour Spray Man Dresser Skilled Mazdoor b) 1.5" thick material Crush Bitumen Fuel Wood Course Sand Filler dust Equip Mixer Tar Boiler Road Rolller Labour Spray Man Dresser Skilled Mazdoor material Crush Bitumen Fuel Wood Course Sand Filler dust Equip Mixer Tar Boiler Road Rolller Labour Spray Man Dresser Skilled Mazdoor ROAD EDGING COMPLET For 100 Rft material Bricks Labour Mason Mazdoor CANAL LININGS SUB GRADE PREP Formation, Dressing and Preparing subgrade a) In Bed

day day nos nos nos

0.03 0.02 0.03 0.025 0.28

cft kg kg nos day day nos nos nos

11.5 40.92 20 0.101 0.045 0.03 0.045 0.075 0.33

cft kg kg cft cft day day day nos nos nos

7.3 37.4 20 4.9 0.54 0.03 0.01 0.01 0.1 0.1 2

cft kg kg cft cft day day day nos nos nos

11.6 59.6 30 8 0.86 0.05 0.013 0.01 0.1 0.1 3.2

c) 2" thick cft kg kg cft cft day day day nos nos nos 14.5 70.33 35 1 1.1 0.06 0.016 0.01 0.1 0.1 4

nos nos nos

267 0.5 0.5

b)On Slope

Labour Dresser Mazdoor Labour Dresser Mazdoor

nos nos nos nos

0.33 0.75 0.5 2

LININGS a)-Stabalize layer of c/s ratio 1:30, 2" thick on Slope material Sand Cement Labour Mason Mazdoor Bahishti b) 1-Cement Plaster 0.5" thick ratio 1:3 a) In Bed material Sand

cft bags nos nos nos

18 0.5 0.5 1.5 0.5

cft

2.5

b) on Slope

Cement Labour Mason Mazdoor Bahishti material Sand Cement Labour Mason Mazdoor Bahishti

bags nos nos nos cft bags nos nos nos

0.7 0.33 1 0.5 2.5 0.7 0.5 1.25 0.5

2-Cement plaster 1.5" thick ratio 1:6 a) In Bed material Sand Cement Labour Mason Mazdoor Bahishti b) on Slope material Sand Cement Labour Mason Mazdoor Bahishti 3-Tiles Linings (12"x6"x2") in 1:6 c/s mortar a) In Bed material Tiles Sand Cement Labour Mason Mazdoor Bahishti material Tiles Sand Cement Labour Mason Mazdoor Bahishti

cft bags nos nos nos cft bags nos nos nos

11.7 1.56 0.5 1.25 0.5 11.7 1.56 0.75 1.5 0.5

nos cft bags nos nos nos nos cft bags nos nos nos

1200 25.7 3.44 2.5 5 0.75 1200 25.7 3.44 2.75 6 0.75

b) on Slope

4-Tiles Linings (12"x6"x2") in 1:3 c/s mortar a) In Bed material Tiles Sand Cement Labour Mason Mazdoor Bahishti material Tiles Sand Cement Labour Mason Mazdoor Bahishti

nos cft bags nos nos nos nos cft bags nos nos nos

1200 22.5 6 2.5 5 0.75 1200 25.7 3.44 2.75 6 0.75

b) on Slope

5-Bricks Linings (9"x41/2"x3") in 1:6 c/s mortar a) In Bed material Bricks Sand Cement Labour Mason Mazdoor Bahishti material Bricks Sand Cement Labour Mason Mazdoor Bahishti

nos cft bags nos nos nos nos cft bags nos nos nos

1350 25.7 3.44 2.5 5 0.75 1350 25.7 3.44 2.75 6 0.75

b) on Slope

6-Bricks Linings (9"x41/2"x3") in 1:3 c/s mortar a) In Bed material Bricks Sand Cement Labour Mason Mazdoor Bahishti

nos cft bags nos nos nos

1350 22.5 6 2.5 5 0.75

b) on Slope

material Bricks Sand Cement Labour Mason Mazdoor Bahishti

nos cft bags nos nos nos

1350 22.5 6 2.75 6 0.75

7-Cement Concrete Linings in 1:3:6 , 4" thick a) In Bed material Stone Ballast 3/4" gauge Sand Cement Labour Mason Mazdoor Bahishti material Stone Ballast 3/4" gauge Sand Cement Labour Mason Mazdoor Bahishti

cft cft bags nos nos nos

92 46 13 1 6 0.5

b) on Slope

cft cft bags nos nos nos

92 46 13 1.25 7 0.5

FLOORING: 1-Topping of cement conc (1:2:4) including surface finishing and dividing int panels a) 25 mm Thick: for 100 square feet Material: Cement Sand Coarse aggregate Labour: Carpenter Mason Coolie Bahishti b)40mm Thick for 100 square feet Material: Cement Sand Coarse aggregate Labour: Carpenter Mason Coolie Bahishti c)50 mm Thick for 100 square feet

bags cft cft nos nos nos nos

1.52 3.7 7.4 0.25 1 0.5 0.1

bags cft cft nos nos nos nos

2.24 5.5 11 0.25 1 1 0.15

Material: Cement Sand Coarse aggregate Labour: Carpenter Mason Coolie Bahishti Material: Cement Sand Coarse aggregate Labour: Carpenter Mason Coolie Bahishti Cement Sand Coarse aggregate Labour: mason mazdoor bhishti mixer operator vibrator operator

bags cft cft nos nos nos nos

3.05 7.4 14.7 0.25 1 1.5 0.15

d)75 mm Thick for 100 square feet

bags cft cft nos nos nos nos bags cft cft day day day day day

4.47 11 22 0.25 1 2 0.25 2.2 5.5 11 0.13 1.36 0.49 0.038 0.038 *Class Notes *Class Notes *Class Notes *Class Notes *Class Notes *Class Notes *Class Notes *Class Notes *Class Notes

P.C.C 1:2:4 1-1/2 inch thick

P.C.C 1:4:8 3 inch thick

Cement Sand Coarse aggregate Labour: mason mazdoor bhishti mixer operator vibrator operator

bags cft cft day day day day day

2.37 11.85 23.69 0.26 2.37 0.98 0.076 0.076

*Class Notes *Class Notes *Class Notes *Class Notes *Class Notes *Class Notes *Class Notes *Class Notes *Class Notes

2-Mosaic flooring consisting of mosaic topping of one part of cement to two parts of marble chips laid over 25 mm thick flooring of 1:2:4 cement conc including rubbing and polishing complete a)10 mm thick mosaic topping (with grey cement) for 100 square feet Material: Cement Sand Coarse aggregate Marble chips Marble powder Wax polish Labour: Mason Coolies Bahishti b)13 mm thick mosaic topping (with grey cement) for 100 square feet Material: Cement Sand Coarse aggregate Marble chips Marble powder Wax polish Labour: Mason Coolies Bahishti c)10 mm thick mosaic topping (with white cement) for 100 square feet Material: Cement Grey Cement white Sand Coarse aggregate Marble chips Marble powder Wax polish Labour: Mason Coolies Bahishti d)13 mm thick mosaic topping (with white cement) for 100 square feet Material: Cement Grey Cement white Sand Coarse aggregate Marble chips Marble powder Wax polish Labour: Mason Coolies Bahishti 3-Flooring comprising of white/coloured glazed tiles 6mm thick laid in white cement mortar 1:2 over 19mm thick cement mortar 1:2 complete a) White glazed tiles for 100 square feet Material: Cement grey Cement white Sand Glazed Tiles Labour: Mason Coolies Bahishti b) Coloured glazed tiles for 100 square feet Material: Cement grey Cement white Sand Glazed Tiles Pigment Labour: Mason Coolies Bahishti 4-Vinyl floor tiles laid with adhesive, 300x300x3 mm size on firm foundation for 100 square feet Material: PVC Tiles Adhesive Labour:

bags cft cft bags bags kg nos nos nos

3.05 3.7 7.4 10 1.5 0.5 2 7.25 0.75

bags cft cft bags bags kg nos nos nos

3.3 3.7 7.4 13 1.8 0.5 2 7.25 0.8

bags bags cft cft bags bags kg nos nos nos

1.52 1.52 3.7 7.4 10 1.5 0.5 2 7.25 0.75

bags bags cft cft bags bags kg nos nos nos

1.5 1.78 3.7 7.4 13 1.8 0.5 2 7.5 0.8

bags bags cft nos nos nos nos

2.2 0.1 5.2 420 2 4 0.5

bags bags cft nos kg nos nos nos

2.2 0.1 5.2 420 0.1 2 4 0.5

sq m litres

9.76 2.5

Tiles layer Skilled Cooly 5-Burnt clay tiles (230x115x40 mm) laid flat in 1:6 cement mortar over a bed of 19 mm thick cement mortar 1:6 for 100 square feet Material: Burnt clay tiles Cement Sand Labour: Mason Coolies Bahishti 6-Burnt clay tiles (230x115x40 mm) laid flat in 1:3 cement mortar over a bed of 20 mm thick cement mortar 1:6 for 100 square feet Material: Burnt clay tiles Cement Sand Labour: Mason Coolies Bahishti 7-Cement conc tiles laid flat in 1:2 cement mortar over 19 mm thick bed of cement mortar 1:2 a)300x300x25 mm for 100 square feet Material: Cement Conc tiles Cement Sand Labour: Mason Coolies Bahishti b)225x225x20mm for 100 square feet Material: Cement Conc tiles Cement Sand Labour: Mason Coolies Bahishti c)200x200x20 mm for 100 square feet Material: Cement Conc tiles Cement Sand Labour: Mason Coolies Bahishti d)150x150x20 mm for 100 square feet Material: Cement Conc tiles Cement Sand Labour: Mason Coolies Bahishti 8-Flat brick flooring laid in 1:6 cement moratar over a bed of 20mm cement mortar 1:6 for 100 square feet Material: Burnt bricks Cement Sand Labour: Mason Coolies Bahishti 9-Brick on edge flooring laid in 1:6 cement moratar over a bed of 19 mm cement mortar 1:6 for 100 square feet Material: Burnt bricks Cement Sand Labour: Mason Coolies Bahishti 10-White marble flooring fine dressed on the surface without winding set in cement mortar 1:2 laid over 19 mm thick cement mortar 1:2 including rubbing and polishing a)19 mm thick flooring

nos nos

1.5 1

nos bags cft nos nos nos

210 1.12 8 0.75 1.5 0.5

nos bags cft nos nos nos

350 1.42 12 1 1.5 0.5

nos bags cft nos nos nos

105 2.64 7 1.5 2 0.33

nos bags cft nos nos nos

186 2.64 7 1.5 2 0.33

nos bags cft nos nos nos

240 2.54 5 1.5 2 0.33

nos bags cft nos nos nos

420 2.64 7 1.5 2 0.33

nos bags cft nos nos nos

350 1.32 10 0.75 1.5 0.5

nos bags cft nos nos nos

525 1.67 13 1 2 0.5

for 100 square feet

Material: Cement grey Cement white Sand Marble tiles Wax polish/Primer Labour: Mason Coolies Bahishti Material: Cement grey Cement white Sand Marble tiles Wax polish/Primer Labour: Mason Coolies Bahishti

bags bags cft Sq ft kg nos nos nos

2.64 0.1 7 105 0.5 5 6 1

b)25 mm thick flooring for 100 square feet

bags bags cft Sq ft kg nos nos nos

2.64 0.1 7 105 0.5 5 6 1

SKIRTING: 1-Tiles skirting laid in 1:2 cement mortar over 19 mm thick cement mortar 1:2 including cement washing and filling joints complete a) Cement Tiles: for 100 square feet Material: Cement tiles Cement grey Sand Pigment Labour: Mason Coolies Bahishti a) Mosaic Tiles: for 100 square feet Material: Mosaic/Glazed tiles Cement white Cement grey Sand Pigment Labour: Mason Coolies Bahishti 2-Grey cement skirting or dado 10mm thick including rounding of corners and straightening of top edge finished to smooth surface after plastering a)Cement sand mortar 1:2 for 100 square feet Material: Cement grey Sand Labour: Mason Coolies Bahishti a)Cement sand mortar 1:3 for 100 square feet Material: Cement grey Sand Labour: Mason Coolies Bahishti 3-White/Coloured glazed tiles dado 6mm thick jonted in white cement and laid over 1:2 cement sand mortar 19mm thick including finishing a)White glazed tiles for 100 square feet Material: Cement grey Sand Mosaic/Glazed tiles Cement white Labour: Mason Coolies Bahishti a)Coloured glazed tiles for 100 square feet Material: Cement grey Sand Mosaic/Glazed tiles Cement white Labour: Mason Coolies Bahishti

nos bags cft kg nos nos nos

240 2.49 6 As Rqd 1.5 2.5 0.33

nos bags cft kg nos nos nos

420 0.08 2.49 6 As Rqd 2 2.5 0.25

bags cft nos nos nos

1.27 3 2.5 1.5 0.33

bags cft nos nos nos

1.02 3.5 2.5 1.5 0.33

bags cft nos bags nos nos nos

2.2 5.2 420 0.1 2.5 5 0.5

bags cft nos bags nos nos nos

2.2 5.2 420 0.1 2.5 5 0.5

RAILWAY

TRACK

Laying ,linking of BG track (including packing straigt- Mazdoor ening and levelling) Black Smith Laying and crossings complete with fastening Mazdoor Fitter

%ft %ft Each Each

6 1 7 0.5

SHUNTING Hand shunting loaded wagon or trucks a)Upto 1/2 km b)Upto 1 km c)Upto Next each km Hand shunting empty wagon or trucks a)Upto 1/2 km b)Upto 1 km c)Upto next each km Fixing street lamp posts

Mazdoor Mazdoor Mazdoor

Each Each Each

2.4 4.2 7.14

Mazdoor Mazdoor Mazdoor Mazdoor

Each Each Each Nos

0.8 0.98 1.4 8

Binding ends of sleepers and timber of all sizes and Mazdoor kinds including spreading Fitter and restacking JUNGLE CLEARANCE cutting and removing trees with a distance of 31m a)Upto762mm girth Mzdoor Carpenter b)From 762mm to 1.8m Mzdoor girht Carpenter EXPANTION JOINT Filling Expansion joints 13mm thick for 102 to 152mm deep slabs with bitumen mixed with sand and saw dust Saw dust Bitumen sand Mazdoor P/F Aluminium joint cover (gole)3" size on expansion joint Alum angle iron Nails Mazdoor SURVEYING Supplying jamboo bundles 3m to 3.7m ith iron shoes and flags 381square Bamboo with flags Iron shoes Mazdoor carpenter Supplying wooden pegs for levelling 38mm dia.152mm long Wood Mazdoor Carpenter Supplying wooden pegs for aligniment 51to 76mm dia 152mm long

Nos. Nos.

15 4

Nos. Nos. Nos. Nos.

15 0.15 25 0.25

Cft No

8 50 1 1.5

M M No

3.28 2.4 3.28

No No No No

1 1 0.02 0.04

No No No

0.82 0.5 0.25

Wood Mazdoor Carpenter

No No No

2.26 1 0.5

ROOF INSULATION Providing and laying of water proofing and roof insulation as per drawing and following detail a)1st coat @.0.75Kg per Bitumen square meter and blinded Sand with sand at 0.012 cum per Mazdoor sqm Mason b)Polythene sheet (2 layer Polythene sheet each 0.02mm thick) Mazdoor

Cft No No Sqft No

5 6 2 0.5 30 2

c)75mm earth filling including ud plaster M 25mm thick mud plaster Earth filling Mazdoor Mason d)Single layer brick tile (230mm*115mm*38mm jointed grouted and flush pointed in cement morter of 1:3

Sq ft Sq ft No No

10 8 2 0.5

Brick tiles a) A Class b)B Class c) C Class Cement Sand Mazdoor Mason

Sq ft 1000 1000 1000 Bag Cft No No

40 2.6 2.2 2 3 9 3 1

Bahishti INTERNAL SUI GAS FOR HOUSE 1) S/F Tubes water quality GI ith all fitting that is Socket Sockets,bends,Tees,elbow bends where required and laid tees complete in trenches or fixed elbows to wall with 15mm dia. Mazdoor Fitter

No

0.5

No No No No No No

25 20 10 15 1 2

2)Brass valve,ball type screwed both ends Brass valve complete with steel handle Steel handle 20mm dia. Screw Mazdoor Fitter 3)S/F Brass cock for gas type,screwed both end complete with chutki handle Brass cock nut 50mm dia complete Screw best quality including plug chutki handle nut plug Mazdoor Fitter

No No No No No

5 3 4 0.5 1

No No No No No No No

1 2 2 2 2 0.25 1

4)Supplying and fixing 4"dia ACpipe for flume AC pipe Fitter

No No

1 1

CIRCUITS WIRING Wiring for light circuit with 2.5sqmm(standard,7strads) PVCinsulated 300/500 Wire grade wires and including PVC pipe heavy duty PVC conduit Earthwire pipe Galaco/shavyl as Mazdoor approved recessed in walls Fitter columns,ceiling complete conduit accessories and 5sqmm wire for earthing in all respects. BRICK WORK

ft ft ft No No

10 4 3 1 2

Brick Work either,half or full 1 cft Mason Mazdoor Bahishti LABOUR for 1 sft Mason Mazdoor Labour for mixing Bahishti Bahishti for Mixing mason mazdoor bhishti bar bender helper mixer operator vibrator operator LABOUR for 1 cft * From Class Notes

days days days

0.0266 0.051 0.00765 0.00743 0.00929 0.021 0.00929 0.00198

PPOINTING

P.C.C & R.C.C

days days days days days days days

0.0068 * From Class Notes 0.0708 * From Class Notes 0.0255 * From Class Notes 0.033 * From Class Notes 0.033 * From Class Notes 0.00198 * From Class Notes 0.00198 * From Class Notes

PLASTERING

BRICK WORK MORTAR

mason Mazdoor Labour for mixing Bahishti Bahishti for Mixing Material

days days days days days

0.007435 0.00929 0.021 0.00929 0.00198

EMULSION & PAINTING

Prime Coat gal Paint (ready Mixed) gal Turpentine Oil gal Labour Painter Mazdoor D.P.C 1.5 inch thick Materials Cement Bags Vol of Sand Margalla Crush Bitumen Polythene sheet Labour Mason Mazdoor Carpenter Bahishti

0.123 0.204 0.061

nos nos

0.37 0.37

bags cft cft kg ft2

2.29 5.5 11 20 100

day day day day

0.15 2 0.15 0.25

2.0 inches thick

Materials Cement Bags Vol of Sand Margalla Crush Bitumen Polythene sheet Labour Mason Mazdoor Carpenter Bahishti

bags cft cft kg ft2

2.98 7.5 15 20 100

day day day day

0.5 2 0.15 0.25

3.0 inches thick

Materials Cement Bags Vol of Sand Margalla Crush Bitumen Polythene sheet Labour Mason Mazdoor Carpenter Bahishti

bags cft cft kg ft2

4.6 11 15 20 100

day day day day bags cft kg day day day

0.5 2 0.25 0.25 1.82 4.07 20 0.5 2 0.25

Vertical D.P.C (1:2) 3/4 inch thick

Cement Sand Bitumen Labour Mason Carpenter Bahishti Material Chalk Distemper Powder Sand Paper Brush Lime Unslaked Gum Labour Painter Mazdoor Material Chalk Distemper Powder Sand Paper Brush Lime Unslaked Gum Labour Painter Mazdoor

DISTEMPERING

One Coat

kg kg ft2 nos kg nos day day

2.25 1.5 0.25 0.02 0.37 L.S 0.25 0.25

Two Coat kg kg ft2 nos kg nos day day kg L.S L.S days kg days kg days 2.25 3 0.25 0.03 0.37 L.S 0.37 0.37 18 1 1 0.12 0 26 0.2 37 0.3

WHITE WASHING

First Coat

Second Coat Third Coat EARTHWORK Earthwork excavation undressed lead upto a single throw of kassi, phaorah or shovel

Unslaked Lime Blue Pigments Glue Powder White Washer Mazdoor Unslaked Lime Mazdoor Unslaked Lime Mazdoor

1000cft

a) In ashes sand,soft soilor Mazdoor site clearance b) In ordianary soil Mazdoor Earthwork excavation in ashes ,sand and soft soil or silt clearance undressed lead upto15 to 20 meters. Borrow pit excavation undressed lead upto 31m a) Ordinary soil b) Hard soil Excavation in shingle or gravel formation and rock not requiring blasting undressed lead upto31m a) Dry b) Wet c) In flowing water Mazdoor Mazdoor Mazdoor Mazdoor Mazdoor Mazdoor

nos nos

3.75 4.5

nos

5.5

1000cft nos nos 7 8

1000cft nos nos nos 19 22 28

Excavation in rock dressed to designed section ,grades and profiles, excavated material disposed off within 31m and lift upto 1.5 m Soft rock slate,shale,schitst or laterite work with pick and crow bar Blacksmith Dresser Bahishti Digger Extra for every 15-20 m additional lead or part there of a) For soft ordinary hard Mazdoor and very hard b) For gravel shingle or Mazdoor rock Earthwok in ordinary soil for embankment lead upto 31m including ploughing and mixing with blade or disc harrow or other suitable. a) 95% to 100% maximum modified AASHTO dry density Tractor trolly Water carrier Compactor roller Grader with driver Rammer machine Lab test Mazdoor Dresser b) 90% maximum modified AASHTO dry density Tractor trolly Water carrier Compactor roller Grader with driver Rammer machine Lab test Mazdoor Dresser c) 85% maximum modified AASHTO dry density Tractor trolly Water carrier Compactor roller Grader with driver Rammer machine Lab test Mazdoor Dresser EARTHWORK BY MECHANICAL MEANS Earthwork by mechanical means in drains and irrigation channels in all kind of soil under following conditions dressed to designed secton,grades,profiles / with excavated material,disposed off within 15-20 m lead and dressed as directly by the Engineer a) Dry Crane with bucket and boom of 90' to 110' length Tractor Trolly Dredger Grader b) Dry and wet Crane with bucket and boom of 90' to 110' length Tractor Trolly Dredger Grader c) Wet and slush Crane with bucket and boom of 90' to 110' length Tractor Trolly nos nos nos nos nos nos nos nos 0.09 0.08 0.09 0.2 0.4 1 1.25 0.5 nos nos nos nos nos nos nos nos 0.09 0.08 0.09 0.2 0.4 1 1.25 0.5 nos nos nos nos nos nos nos nos 0.09 0.08 0.09 0.2 0.4 1 1.25 0.5 nos nos nos nos 1 9 1 14 1000 cft

nos nos

0.18 0.21

6000cft

hrs hrs hrs hrs

2.25 2.25 2.25 2.25

hrs hrs hrs hrs

2.45 2.45 2.45 2.45

hrs hrs

2.63 2.63

Dredger Grader d) Slush Crane with bucket and boom of 90' to 110' length Tractor Trolly Dredger Grader e) Dry and wet to that of slush (1:2) Crane with bucket and boom of 90' to 110' length Tractor Trolly Dredger Grader f)Under water Crane with bucket and boom of 90' to 110' length Tractor Trolly Dredger Grader SHUTTERING 100 sft LABOUR Black Smith/ Carpenter ROOFING First class roofing consisting of 100mm earth and 25 mm mud plaster with gobri leeping over 13 mm thick cement plaster 1:6 with 1.66 kg of hot bitumen coating sand % Sft blinded provided over 2 layers of burnt clay tiles 305x152x32 mm laid in 1:6 cement mortar including 1:2 cement pointing underneath of tiles complete including curing etc. Cement Sand Earth Bitumen Fuel Wood Clay Bhoosa Cow dung Burnt clay tiles Labour Mason Mazdoor Bahishti Second class roofing consisting of 100mm(4") earth and 25 mm(1") mud plaster with gobri leeping over 13 mm (0.5")thick cement plaster 1:6 with 1.66 kg of hot bitumen coating sand blinded provided over 1 layer of burnt clay tiles 305x152x51 (12"x6"x2") mm laid in 1:6 cement mortar including 1:2 cement pointing underneath of tiles complete including curing etc. Cement Sand Earth Bitumen Fuel Wood Clay Bhoosa Cow dung Burnt clay tiles Labour Mason Mazdoor Bahishti Jack arch roofing 114mm (4.5") thick laid in 1:5 cement mortar including an average depth of 100mm (4") cement concrete in haunches and over crown with 75 mm (3") earth and 25 mm (1") plaster ,soffits of arches cement plastered %Sft 1:6 ,1/2" thick Cement concrete in haunches 1:6:12

hrs hrs

2.63 2.63

hrs hrs hrs hrs

3.02 3.02 3.02 3.02

hrs hrs hrs hrs

2.83 2.83 2.83 2.83

hrs hrs hrs hrs

4.1 4.1 4.1 4.1

nos

bags cft cft kg kg cft sr cft nos nos nos nos

1.79 13 55 74.936 8 0.75 17 0.75 400 3.65 6 1.25

bags cft cft kg kg cft sr cft nos nos nos nos

1.2 9 55 74.936 8 0.75 17 0.75 200 2.5 5 1

Cement Sand Earth Bitumen Fuel Wood Clay Bhoosa Cow dung Burnt Bricks Stone aggts Labour Mason Mazdoor Bahishti Carpenter Cement concrete in haunches 1:3:6 Cement Sand Earth Bitumen Fuel Wood Clay Bhoosa Cow dung Burnt Bricks Stone aggts Labour Mason Mazdoor Bahishti Carpenter Jack arch roofing 114mm (4.5") thick laid in 1:5 cement mortar including an average depth of 100mm (4") cement concrete in haunches and over crown with 13mm (1/2") cemenent plaster ,1:6 on top (exept earth filling mud plaster and gobri) soffit of arches cement plastered.The rate also includes bitumen coating ,centring ,laying skew bricks in cement sand mortar (1:3) with fine cement concrete using ston aggts. Cement concrete in haunches 1:6:12 Cement Sand Bitumen Fuel Wood Burnt Bricks Stone aggts Labour Mason Mazdoor Bahishti Carpenter Cement concrete in haunches 1:3:6 Cement Sand Bitumen Fuel Wood Burnt Bricks Stone aggts Labour Mason Mazdoor Bahishti Carpenter

bags cft cft kg kg cft sr cft nos cft nos nos nos nos

4.85 32 45 34 8 0.75 17 0.75 550 35 3.5 7 1 0.5

bags cft cft kg kg cft sr cft nos cft nos nos nos nos

6.98 31 55 34 8 0.75 17 0.75 550 34 3.5 7 1 0.5

bags cft kg kg nos cft nos nos nos nos

5.36 36 34 8 550 35 2.75 5.5 1 0.5

bags cft kg kg nos cft nos nos nos nos

7.5 36 34 8 550 34 2.75 5.5 1 0.5

ZERO

no units

0 dont disturb this column please!

RATE ANALYSIS FOR FLOORING

PROVIDE REQUIRED DIMENSIONS Floor Dimensions: Length 35 ft Width 3 ft Area 105.0 sft

Earth Filling Sand Filling

Thick: (in) Thick:(in)

3 1

EARTH FILLING: Material: Earth Labour: Mazdoor Unit cft nos Qty 26.25 0.19 Rate 3 125 COST Amount 78.75 23.44 102.1875

FLOORING WITH TILE FLOORING WITH BRI

FLOORING WITH CEM FLOORING WITH MO FLOORING WITH MAR

SAND FILLING: Material sand Labour: mazdoor Unit cft nos Qty 8.75 0.0625 Rate 13 Amount 113.75

125 7.8125 COST 121.5625 3" THICK (1:4:8) PLAIN CEMENT CONCRETE ITEM UNITS QTY RATE Cement bags 2.37 230 Sand cft 11.85 13 Coarse aggregate cft 23.69 19 Labour: mason day 0.26 250 mazdoor day 2.37 125 bhishti day 0.98 100 mixer operator day 0.076 150 vibrator operator day 0.076 150 Sum

AMOUNT 545.1 154.05 450.11 65 296.25 98 11.4 11.4 1631.31

1-1/2" THICK (1:2:4) PLAIN CEMENT CONCRETE ITEM UNITS QTY RATE AMOUNT Cement bags 2.2 230 506 Sand cft 5.5 13 71.5 Coarse aggregate cft 11 19 209 Labour: mason day 0.13 250 32.5 mazdoor day 1.36 125 170 bhishti day 0.49 100 49 mixer operator day 0.038 150 5.7 vibrator operator day 0.038 150 5.7 SUM 1049.4 CONTRACTOR'S PROFIT 2% 20.988 SUM 1070.388 TOTAL COST = 3060.533 (For Earth,Sand Filling and P.C.C

FLOORING WITH TILES


USING BURNT CLAY TILES 4 OF TYPE/SIZE 230x115x40 mm (c/s 1:6) 1 Burnt clay tiles laid in 1:6 cement mortar over a bed of 19mm thick cement mortar 1:6 ITEM UNITS QTY RATE AMOUNT Material: Burnt clay tiles nos 220.5 1.80 396.90 Cement grey bags 1.176 230 270.48 sand cft 8.4 7 58.8 --0 430 0 --0 20 0 --0 1 0 Labour: 0 Mason nos 0.7875 250 196.875 Cooly nos 1.575 125 196.875 Bahishti nos 0.525 100 52.5 -0 200 0 COST= 1172.43 Cost Including Earthwork,Sand Filling and P.C.C = 4232.96

FLOORING WITH BRICKS


SELECT TYPE OF FLOORING Brick on edge flooring 2 Brick on edge flooring laid in 1:6 cement mortar over a bed of 19mm thick cement mortar 1:6 ITEM UNITS QTY RATE AMOUNT Material: Burnt bricks nos 551.25 1.5 826.875 Cement bags 1.7535 230 403.305 Sand cft 13.65 7 95.55 Labour: Mason nos 1.05 250 262.5 Coolies nos 2.1 125 262.5 Bahishti nos 0.525 100 52.5 COST= 1903.23 Cost Including Earthwork,Sand Filling and P.C.C = 4963.76

FLOORING WITH CEMENT CONCRETE


3 SELECT THICKNESS OF FLOORING inches thick 4 Topping of cement conc (1:2:4) including surface finishing & dividing into panels. ITEM UNITS QTY RATE AMOUNT Material: Cement bags 4.6935 230 1079.505 Sand cft 11.55 7 80.85 Coarse aggregate cft 23.1 14 323.4 Labour: Carpenter nos 0.2625 200 52.5 Mason nos 1.05 250 262.5 Coolie nos 2.1 125 262.5 Bahishti nos 0.2625 100 26.25 COST= 2087.505 Cost Including Earthwork,Sand Filling and P.C.C = 5148.04

FLOORING WITH MOSAIC


13mm thick;white cement 4 SELECT THICKNESS & TYPE OF CEMENT Mosaic flooring consisting of mosaic topping of one part of cement to two parts of marble chips laid over 25 mm thick flooring of 1:2:4 cement conc including rubbing and polishing complete. ITEM UNITS QTY RATE AMOUNT Material: Cement bags 1.575 230 362.25 Sand cft 3.885 7 27.195 Coarse aggregate cft 7.77 14 108.78 White cement bags 1.869 430 803.67 Marble chips bags 13.65 300 4095 Marble powder bags 1.89 30 56.7 Wax polish kg 0.525 200 105 Labour: Mason nos 2.1 250 525 Coolies nos 7.875 125 984.375 Bahishti nos 0.84 100 84 COST= 7151.97 Cost Including Earthwork,Sand Filling and P.C.C = 10212.50

FLOORING WITH MARBLE


SELECT THICKNESS OF MARBLE 1" thick flooring 2 White marble flooring fine dressed on the surface without winding set in cement mortar 1:2 laid over 19mm thick cement mortar 1:2 including rubbing and polishing ITEM UNITS QTY RATE AMOUNT Material: Cement grey bags 2.772 230 637.56 Cement white bags 0.105 430 45.15 Sand cft 7.35 7 51.45 Marble tiles Sq ft 110.25 100 11025 Wax polish/Primer kg 0.525 200 105 Labour: Mason nos 5.25 250 1312.5 Mazdoor nos 6.3 125 787.5 Bahishti nos 1.05 100 105 COST= 14069.16 Cost Including Earthwork,Sand Filling and P.C.C = 17129.69

TRUE TRUE 4 Caution , dont disturb it please

CEMENT CONCRETE TILES GLAZED TILES VINYL TILES BURNT CLAY TILES 230x115x40 mm (c/s 1:6) 230x115x40 mm (c/s 1:3) Flat brick flooring Brick on edge flooring 1 inch thick 1.5 inch thick 2 inches thick 3 inches thick 10mm thick;grey cement 13mm thick;grey cement 10mm thick;white cement 13mm thick;white cement 3/4" thick flooring 1" thick flooring

TRUE TRUE TRUE TRUE

FALSE

RATE ANALYSIS FOR ROOFING

ROOFING WITH TILES


2 SECOND CLASS ROOFING

Materials Cement Sand Earth Bitumen Fuel Wood Clay Bhoosa Cow dung Burnt clay tiles Labour Mason Mazdoor Bahishti Water 1.5% Sundries 7.5% C.P 10%

units bags cft cft kg kg cft sr cft nos nos nos nos

Qty 1.2 9 55 74.94 8 0.75 17 0.75 200 2.5 5 1

Rate 230 13 3 2 1.5 3 20 10 1.6 250 125 100 SUM

Cost 276 117 165 149.87 12 2.25 340 7.5 320 625 625 100 2739.622 41.09 205.47 0.00

Cost For

sft of Area

59.72 Rupees

0%

JACK ARCH ROOFING


2 JACK ARCH ROOFING WITHOUT EARTHFILLING
Cement concrete in haunches 1:6:12

Materials Cement Sand -Bitumen Fuel Wood ---Burnt Bricks Stone aggts Labour Mason Mazdoor Bahishti Carpenter Water 1.5% Sundries 7.5% C.P 10%

units bags cft -kg kg ---nos cft nos nos nos nos

Qty 5.36 36 0 34 8 0 0 0 550 35 2.75 5.5 1 0.5

Rate 230 13 0 2 1.5 0 0 0 1 19 250 125 100 250 SUM

Cost 1232.8 468 0 68 12 0 0 0 550 665 687.5 687.5 100 125 4595.8 68.94 344.69 0.00

Cost For

sft of Area

50.09 Rupees

0%

Jack arch roofin g 114m m (4.5") thick laid in 1:5 ceme nt mort ar inclu ding an avera ge depth of 100m m (4") ceme nt concr ete in haun ches and %Sft over Cem ent concr ete in haun ches 1:6:1 2 Cement bags Sand cft Earth cft Bitumen kg Fuel Wood kg Clay cft Bhoosa sr Cow dung cft Burnt Bricks nos Stone aggts cft Labour Mason nos Mazdoor nos Bahishti nos Carpenter nos Cem ent concr ete in haun ches 1:3:6 Cement bags Sand cft Earth cft Bitumen kg Fuel Wood kg Clay cft Bhoosa sr Cow dung cft Burnt Bricks nos Stone aggts cft Labour

4.85 32 45 34 8 0.75 17 0.75 550 35 3.5 7 1 0.5

6.98 31 55 34 8 0.75 17 0.75 550 34

Mason Mazdoor Bahishti Carpenter Jack arch roofin g 114m m (4.5") thick laid in 1:5 ceme nt mort ar inclu ding an avera ge depth of 100m m (4") ceme nt concr ete in haun ches and over Cem ent concr ete in haun ches 1:6:1 2

nos nos nos nos

3.5 7 1 0.5

Cement bags Sand cft Bitumen kg Fuel Wood kg Burnt Bricks nos Stone aggts cft Labour Mason nos Mazdoor nos Bahishti nos Carpenter nos Cem ent concr ete in haun ches 1:3:6 Cement bags Sand cft Bitumen kg Fuel Wood kg Burnt Bricks nos Stone aggts cft Labour Mason nos Mazdoor nos Bahishti nos Carpenter nos

5.36 36 34 8 550 35 2.75 5.5 1 0.5

7.5 36 34 8 550 34 2.75 5.5 1 0.5

FIRST CLASS ROOFING SECOND CLASS ROOFING

Cement concrete in haunches 1:6:12

Cement concrete in haunches 1:3:6 JACK ARCH ROOFING WITH EARTH FILLING JACK ARCH ROOFING WITHOUT EARTHFILLING

RATE ANALYSIS FOR SHUTTERING


SELECT TYPE OF SHUTTERING PROVIDE REQUIRED DATA LENGTH 2.00 ft WIDTH 1.00 ft Height 1.00 ft AREA 2 ft2 WOODEN SHUTTERING Items Units Qty Materials Wooden Planks cft 0.17 --0 PROPS no 0.42 0.00 Labour Carpenter no 0.08 Sundries 7.5% Sum Labour For Erection 2 WOODEN SHUTTERING WOODEN PLANK SIZE LENGTH 12 ft WIDTH 12 inch THICK 1 inch

Rate 450 0 40 0 250 Sum

Amount 74.97 0.00 16.80 0 20 111.77 8.38 120.15 3.60

COST

9.61 Rs

STEEL SHUTTERING WOODEN SHUTTERING VOL 1

RATES UPDATED 15-JAN-2003

Item No. Material:

Description Cement Bag Gray Cement Bag White Sand Ravi Sand Chenab Sand Lawrencepur Earth Aggregates Margala Aggregates Sargodha Aggregates Sakhi Sarwar Bhoosa Cow Dung Brick A Class Brick B Class Brick C Class Brick Tiles A Class Brick Tiles A Class Brick Tiles A Class Brick Gutka A Class Brick Gutka B Class Brick Gutka C Class

Units Bags Bags ft3 ft


3 3

Rs. / Unit 230 430 7 13 17 3 19 14 15 20 10 2000 1500 1000 2200 1800 1600 2500 2200 1900

Remark

ft ft3 ft3 ft ft
3 3

Sr ft3 1000 1000 1000 1000 1000 1000 1000 1000 1000

Tuff Pavers 2" thick colored Tuff Pavers 2" thick Grey color 4" thick wall with IBM concrete blocks (Iz 8" thick wall with IBM concrete blocks (Iz 8" thick wall with IBM concrete Cavity blo Steel G-60 Steel made from Billets G-40 Steel MS Plates/ strip Square Bar Stainless Steel Pipe 1 1/2" dia Stainless Steel Pipe 1/2" dia Stainless Steel Plate

ft2 ft
2

31 28 27 40 26 21500 19000 22 19.5 150 75 300

ft2 ft ft
2 2

ton ton Kg Kg Rft Rft sft

Tile/Marble

Boticina Marble 12"x12"x3/4" Boticina Marble Slab Boticina for Skirting 4" high, 1/2" thick Granite Granite for Skiritng 4" high Granite Marble Slab Ceramic Tiles Master 8"x10" Glazed Text Ceramic Tiles Master 12"x12" Matt Finish Cement conc Tiles Venyle Floor Tiles

no ft Rft ft2 Rft ft2 m2 m m2 m2


2 2

80 130 20 800 400 1100 570 450 1 800 10 20 15 70 50 700 1 1000 1100 375 1060 23.5 30

DOOR FITTINGSCatcher Handle Hinge Normal Steel Hinges 4"or 5" Lock 888 Yale Lock Nails BOARD MDF/Lasani Board 1/2" thick MDF/Lasani Board 3/4" thick Formica Formite Cladding/Lamination Diar Ply PU (Poly Urethane)Coated Deodar Ply

No No No No No No No Sheet of 4'x8' Sheet of 4'x8' Sheet of 4'x8' Sheet of 4'x8' sft sft

WOOD

Deodar in Bulk without Ganth Deodar in Bulk with Ganth Partal Wood SHESHAM OAK TEAK Saw dust ICI Enamel Matt. Finish ICI Enamel ICI Plastic Emulsion Unslaked Lime Blue Pigments Sand Paper Chalk Distemper Powder Paint Brush Turpentine Oil Glue Powder Glass Clear 12mm thick imported Glass 12mm thick imported Green Glass 5mm thick imported Green Glass Block 8"x8" Looking Glass Verticle Blinds 4" wide Aluminium Doors/Windows Delux Sectio WC Europian ICL/IFO WC Indian ICL Cistern / tank CP Flush pipe CP Brass Flexible Conenction PVC Flexible inlet Brass Nuts, washers Chrome Plaetd Bottle Trap CP Brass Waste T-Cock single T-Cock double WashBasin with Pedistal (ICL) Mixer for Wash Basin Mixer for Sink Mixer for Shower Master Muslim Shower Master Sink Stainless steel (ASIA) 48"x20" Sink Stainless steel (ASIA) 22"x20" Pipe 1/2" dia

ft3 ft ft ft
3 3 3

1000 700 450 750 2700 3500 250 750 635 720 4 20 7 10 140 120 65 1 110 110 40 100 80 125 275 3600 924 300 150 35 35 50 450 166 276 500 2000 1050 1050 2200 300 1500 1200 295

ft3 ft3 Gallon Gallon Gallon kg L.S Sheet kg kg Gallon L.S sft sft sft No sft sft sft No No No No No No No No No No No No No No No No No No Length of 20' THICKNESS 2.0mm 2.3mm 2.6mm 2.6mm 2.9mm 2.9mm 3.2mm 3.2mm 3.65mm 2.6mm 2.6mm 3.2mm 3.2mm 3.2mm 3.6mm 3.6mm 4.0mm 4.5mm 4.9mm

PAINT

White Washing

GLASS

PLUMBING

GI Pipes LIGHT

SIZE diameter 1/2" 3/4" 1" 1.25" 1.5" 2" 2.5" 3" 4"

14 21 28 37 44 55 74 86 156 17 23 32 41 47 68 83 107 179 280

per RFT per RFT per RFT per RFT per RFT per RFT per RFT per RFT per RFT per RFT per RFT per RFT per RFT per RFT per RFT per RFT per RFT per RFT per RFT

MEDIUM

1/2" 3/4" 1" 1.25" 1.5" 2" 2.5" 3" 4" 6"

False Cieling

Imported Textured Gypsum Board 3/8" th Carpet Continentle

4 sft sft

75 30

Labour: supervisor Mason Labour/Mazdoor Bahishti Mixer Operator Mix Vibrator Mate Black Smith Steel Shuttering P/F Wood Shuttering P/F Marine Ply Shuttering Fixing Marble/Boticina Fixing Granite Fixing Ceramic Tiles days days days days days days days days ft2 ft
2

300 250 125 100 150 150 200 200 10 6 25 12 20 5 10-12 15-20 NM 10-15

ft2 sft sft sft

Floor Polishing Chemical/Italian Floor Polishing Granite Brick Work 4.5" or 9" Plaster at Cieling Plaster at Walls Making Ply Doors Solid Door/Panel Doors Cabnits/Dressings Kitchen Cabnits Steel Cutting, Bending, Placing, fixing Glass Fixing Sand Blasting on Glass MDF Fixing MDF with Formica fixing Skriting placing Wooden Partition Wall Laying Loading and Diposal for lead more than 10 Km by Truck of 450 CFt Diesel Mobel Oil Tractor Sheep Foot Roller Tamping Roller Tractor driver Sheep Foot Roller driver Tamping Roller driver Cleaner for SF roller Cleaner for Tamping roller Dressor Pit run gravel Brick ballast Road Roller Wheel Barrow Water Tanker Donkey Pump hand crushed aggts stone dust Bitumen Fuel Wood Filler dust Mixer Tar boiler Spray Man Skilled Mazdoor MS bars Marble Chips Marble Powder Wax Polish Botinica Marble 12"x12"x1" Barbed wire Basket Chakri man Bamboo with flag Iron shoes

sft sft sft sft sft sft sft sft sft Ton sft sft sft sft sft sft

15 30 6 4 3 25 75 80 80 1000 2 12 65 95 15 30

12-15

5-6 3.5-4

15-25 35-55 45-50 800-1000

Roads

per Cft/Km per liters per liters per hrs per hrs per hrs per day per day per day per day per day per day cft cft day nos day nos cft cft kg kg cft day day day day kg bags bags kg nos lbs nos nos No No

0.06 25.00 100.00 400 700 500 200 200 200 100 100 150 5 5 1000 30 2000 200 10 12 2 1.5 7 800 800 200 250 21 300 30 200 100 18 10 200 325 275

Wood Bardard wire Hooks polythene sheet Mud plaster Earth filling Socket Bend tees Elbow Brass valve Screw Chutki handle Nut Plug AC pipe Brass cock Steel Handle Wire PVC pipe Earthwire Angle iron Lab test crane Steel Sheets (G 12) Steel Angles Pipes Bolts Planks (12X1X3/4)ft

No Lbs Ls sqm sqm sqm No No No No No No No No No ft No No m m m kg no hr kg kg No No No

175 90 50 60 10 7 4 4 5 3 10 3 5 10 7 5 10 6 300 200 175 1 1000 1000 20 20 40 5 300

ZERO

no units

dont disturb this column please!

RATE ANALYSIS FOR EARTHWORK

GIVE THE REQUIRED DIMENSIONS

LENGTH WIDTH HEIGHT VOLUME

10 ft 10 ft 1 ft 100 cft 5000 ft

Select Lead Distance

EXCAVATION TYPE

SOIL TYPE AND OR CONDITIONS

HARD SOIL

Borrow pit excavation undressed lead upto 100 ft

Items Labour Mazdoor Cost with out extra lead

Units nos

Qty 8

Rate 125 Cost

Amount 1000 100.00 COST INCLUDING EXTRA LEAD 300.00

EARTHWORK INCLUDING COMPACTION


Earthwok in ordinary soil for embankment lead upto 31m including ploughing and mixing with blade or disc harrow or other suitable. 85% to 100% maximum modified AASHTO dry density Items Units Qty Rate Amount Labour Tractor trolly nos 0.009 400 3.6 Water carrier nos 0.008 125 1 Compactor roller nos 0.009 500 4.5 Grader with driver nos 0.02 700 14 Rammer machine nos 0.04 700 28 Lab test nos 0.1 1000 100 Mazdoor nos 0.125 125 15.625 Dresser nos 0.05 250 12.5 Cost without extra lead SUM COST 179.225 179.225

COST INCLUDING EXTRA LEAD 379.23

EARTHWORK BY MECHANICAL MEANS


Earthwork by mechanical means in drains and irrigation channels in all kind of soil under following conditions dressed to designed secton,grades,profiles / with excavated material,disposed off within 15-20 m lead and dressed as directly by the Engineer 1 DRY Items Equipments Crane Tractor Trolly Dredger Grader Cost without extra lead Units hrs hrs hrs hrs Qty 0.04 0.04 0.04 0.04 Rate 1000 400 700 500 SUM COST Amount 37.50 15.00 26.25 18.75 97.50 97.50

COST INCLUDING EXTRA LEAD 297.50

1 2 3 4

2 CAUTION 2 CAUTION

1 2 1 2 1 2 3 1 2

DATA FOR EXTRA LEAD Items Labour Mazdoor nos 16 Units Qty

DRY DRY AND WET WET AND SLUSH SLUSH DRY AND WET TO THAT OF SLUSH (1:2) UNDER WATER ORDINARY SOIL HARD SOIL ORDINARY SOIL HARED SOIL DRY WET IN FLOWING WATER DRY DRY AND WET WET AND SLUSH SLUSH DRY AND WET TO THAT OF SLUSH (1:2) UNDER WATER

Rate 125 COST

Amount 2000 200

RATE ANALYSIS FOR BRICKWORK


Rate for 112.5 cft of B. Wall = Rupees 20,298.47

Wall Dimensions
Half Brick Wall Full Brick Wall C/S Mortar Ratio Dry Mortar Qty MATERIAL
A CLASS BRICKS Bricks No Cement Bags Chenab Sand cft

Length 10.0 ft 10.0 ft

Height 10.0 ft 10.0 ft

Area sft 100.0 100.0

Vol. cft 37.5 75.0

1 :4 42.60 Qty. Rs. /Unit 1 1519 6.82 34.08 AMOUNT SUBTOTA (Rs.) L (Rs.) 3037.50 2 230 1567.68 13 443.04 5048.22

LABOUR With Hand Mixing of Mortar MASON LABOUR BAHISHTI

Days 2.99 107.60 0.86 250 748.13 125 13449.47 100 86.06 14283.66

PRIME COST (Rs.):

19331.88

Scafolding @2% of prime cost

Amount 386.64 386.64

Sundries @3% of prime cost

Amount 579.96 579.96

CONTRACTOR PROFIT Contractor Profit 0% 0.00

TOTAL COST (Rs.)

20,298.47

A CLASS BRICKS B CLASS BRICKS C CLASS BRICKS

mason mazdoor bahishti

0.0266 0.051 0.00765

RATE ANALYSIS FOR "CEMENT SAND MORTAR"


C/S Mortar Ratio Wet Volume Dry Volume 1.0 1.3 1 :6 ft
3

Rate per 1 ft3 =Rs.

58.49

ft3 Qty. 0.15 1.11 Days 0.03 0.003 Units Bags f't3 Rs. /Unit 230 17 AMOUNT (Rs.) 34.17 18.94 53.11 SUBTOTAL (Rs.)

MATERIAL CEMENT BAGS + Transportation SAND + Transportation LABOUR With Hand Mixing LABOUR BAHISHTI

125 100

3.41 0.26 3.67

PRIME COST (Rs.):

56.78

SUNDRIES @ 3% of Prime Cost 1.70 CONTRACTOR PROFIT C.P TOTAL COST (Rs.) 0 % 0.00 58.49

RATE ANALYSIS FOR PLATERING


Rates for Given Data = Length of plaster Height of plaster Thickness of plaster Surface area Sand Type Mortar Ratio Dry Mortar Required MATERIAL Cement Bags Sand cft 10 ft 5 ft
0.5 inch 0.5 2

371.95 Rupees

50.0 sft
LAWRENCEPUR 3

1 :5 3.0 cft Qty. 0.49 2.47 Rs. /Unit 230 17 Amount (Rs.) 113.40 41.91 155.31 Sub Total (Rs.)

LABOUR Mason Labour Bahishti

Days 0.37 0.53 0.47

250 125 100

92.94 65.83 47.04 205.80

PRIME COST (Rs.): Scafolding @ 1 % of the prime cost

361.11

3.61 3.61

SUNDRIES @ 2% of cost of Labour+Material 7.22 CONTRACTOR PROFIT Contractor Profit 0% 0.00

TOTAL COST (Rs)

371.95

0.25 inch 0.5 inch 0.75 inch 1.0 inch

RAVI CHENAB LAWRENCEPUR

Struck Pointing
Rate with Given Data = Rupees Surface area Mortar Ratio Dry Mortar Required MATERIAL Cement Bags Sand cft 1 :3 1.0 sft Sand 0.0 cft Qty. 0.01 0.01
CHENAB

5.68

Rs. /Unit

Amount Sub Total (Rs.) (Rs.) 1.38 230 0.10 13 1.48 Amount Sub Total (Rs.) (Rs.) 250 1.86 125 1.24 100 0.93 4.03

LABOUR Mason Labour (including moratr mixing) Bahishti (including moratr mixibg)

Days 0.01 0.01 0.01

Rs. /Unit

PRIME COST (Rs.): SHUTTERING @ 1 % of the prime cost

5.51

0.06 SUNDRIES @ 3% of cost of Labour+Material 0.11 CONTRACTOR PROFIT Contractor Profit 0% 0.00

TOTAL COST (Rs.)=

5.68

RAVI CHENAB

LAWERANCEPUR

RATE ANALYSIS FOR PLAIN CEMENT CONCRETE

PCC Wet Volume Dry Volume

:2

:4

Rate with Given Data = Rupees 3 1.00 ft 1.54 f't


3

93.49

MATERIAL CEMENT BAGS SAND Aggregate


LAWRENCEPUR Margala

Qty. 0.18 3 1 0.44 0.88

Units bags f't f't


3 3

Rs. / Unit 230 17 19

AMOUNT (Rs.) 40.48 7.48 16.72

SUBTOTAL (Rs.)

64.68

LABOUR With Mechanical Mixer & Vibrartor MASON LABOUR BAHISHTI MIXER OPERTOR MIXER VIBRATOR PRIME COST (Rs.): Water Charges 1.5% Sundries 7.5 % Contractor's Profit

Days 0.01 0.11 0.04 0.003 0.003

250 125 100 150 150

2.62 13.63 3.93 0.46 0.46 85.77 1.29 6.432657 0

21.09

0 %

Margala Sargodha Sakhi Sarwar RAVI CHENAB LAWRENCEPUR

RATE ANALYSIS FOR HZ. D.P.C (1:2:4) & VERTICAL C/S 1:2
Select either Horizontal or Vertical D.P.C Please Ignore
3 inches 33

Vertical D.P.C

Area Wet Vol Dry Vol

Select Thickness 100 ft2 25.00 ft3 38.50 ft3 Rate 4.6 11 15 20 100 Sum 230 13 19 2 60 Cost 1058 143 285 40 6000 7526 125 250 31.25 25 431.25 7957.25 119.3588 596.7938 795.725 0 Cost For 1 sft of Area

Materials units Qty Cement Bags bag Vol of Sand (Chenab) cft Margalla Crush Bitumen Polythene sheet Labour Mason Mazdoor Carpenter Bahishti cft kg ft2

9.94 Rupees

0.5 2 0.25 0.25 Sum Total

250 125 125 100

Water 1.5% Sundries 7.5% C.P 10% Cost Vertical D.P.C

Vertical D.P.C (1:2) 3/4 inch thick


Cement Sand Bitumen Labour Mason Carpenter Bahishti Water Charges 1.5% Sundries 7.5% Contractor's Profit bags cft kg day day day 1.82 4.07 20 0.5 2 0.25 Cost 230 13 2 250 125 100 418.6 52.91 40 125 250 25 911.51 13.67265 68.36325 0 993.5459

0% Total Cost

1.5 inch 2 inches 3 inches Horizontal D.P.C Vertical D.P.C

RATE ANALYSIS FOR R.C.C


RATIO WET VOL DRY VOL MATERIALS material cement sand Ravi % 0 crush steel LABOUR category mason mazdoor bhishti bar bender helper mixer operator Vibrator operator SUNDRIES charges @ 7.5 % CONTRACTOR'S PROFIT 1 1.54
FOR COLUMN3

:2

:4

CONCRETE USING

60 GRADE 60 STEEL

unit bags

qty 0.22 0.44 0.9 11.12

rate 230.00 15.00 19.0 21.50 COST= rate 250.00 125.00 125.00 125.00 125.00 125.00 COST=

amount 50.60

FOR Cost is

cft of vol

368.33 Rs. NOTE Steel % by volume of Concrete SLAB 1.50% BEAM 3.00% COULMN 5.00%

Chenab % Lawrencepur % 50 50

ft3 ft3 kg

6.60 16.72 239.00 312.92 amount 2.62 13.63 0.00 6.35 6.35 0.38 0.38 29.71 25.70 0.00

units days days days days days days days

qty 0.01 0.11 0.04 0.05 0.05 0.00 0.00

0% TOTAL COST=

368.329

GRADE 40 STEEL 2 GRADE 60 STEEL 3 FOR SLAB FOR BEAM FOR COLUMN

Sand

Ravi Chenab Lawrence

0 0.5 0.5

4 11 17

RATE ANALYSIS FOR MARBLE SKIRTING


Rate with Given Data = Rupees Marble Type Height = Length = Mortar Ratio = Dry Mortar Required = MATERIAL White Cement Bags = Chenab Sand cft = Marble Qty Rft =
Marble Granite 2

247.49

6 in 1.0 Rft 1 :3

and 1/2 inch thick Area= Mortar Thick. 0.1 cft 0.5 sft 1 in Amount Sub Total (Rs.) (Rs.) 5.09 430 0.19 13 210.00 400 215.28

Qty. 0.01 0.01 0.53

Rs. /Unit

LABOUR Laying Tiles Polishing

20 30

10.00 15.00 25.00

PRIME COST (Rs.): Sundries 3% Contractor's Profit

0% Cost

240.28 7.208419 0 247.49

Code 1 2

Marble Boticina Marble Granite

Code 1 2

RATE ANALYSIS FOR DOOR SOLID


Wood Type=
TEAK

Deodar

Rate with Given Data = Rupees

2,320.75

PLEASE MANUALLY PUT DIMENSIONS OF PANEL, SHUTTER AND WALL Door Dimensions Dolly Vol. = Shutter Vol.= Total= MATERIAL Wood with Ganth cft = Hinges = Door Lock (Yale) = Height 1.0 ft 0.14 cft 0.13 cft 0.27 cft Width 1.0 ft Panel Thick Shutter Thick 0.13 ft 0.13 ft Wall 0.57 ft

Wastage %age= 40%

Wood Req.(cft) Qty. 0.37 4.00 1.00

0.37 Rs. /Unit AMOUNT SUBTOTA (Rs.) L (Rs.) 1310.75 3500 280.00 70 700.00 700 2290.75

LABOUR for Manual Excavation Carpenter 1.00 sft 30 30.00

30.00

PRIME COST (Rs.): CONTRACTOR PROFIT

2320.75

Contractor Profit

0%

0.00

TOTAL COST (Rs.)=

2,320.75

DEODAR SHESHAM OAK TEAK

RATE ANALYSIS FOR DISTEMPERING AND WHITE WASHING

Distempering
2

Two Coat over and including cost of one priming coat

Material Chalk Distemper Powder Sand Paper Brush Lime Unslaked Gum Labour Painter Mazdoor

units kg kg ft2 nos kg nos

Qty 2.25 3 0.25 0.03 0.37 L.S

Rates 10 140 7 120 4 1 Cost 250 125 Cost Total

Cost 22.5 420 1.75 3.6 1.48 1 450.33 92.5 46.25 138.75 589.08 8.84 44.18 35.34 677.44 Cost For 1 sft of Area

6.77 Rupees

day day

0.37 0.37

Water Charges 1.5% Sundries 7.5% Contractor's Profit

6% Total

WHITE WASHING
3

3 Three Coat Work

Materials Lime unslaked Glue powder Blue pigment Labour White Washer Mazdoor

Units kg -

Qty (Kg) 37 Lum Sum Lum Sum

Rate 4 1 20 Sum

Cost 148 1 20 169 30 37.5 67.5 236.5

Cost For

sft of Area

7.10 Rupees

days days

0.12 0.3

250 125 Sum Total

1 2

1 2 3

EMULSION AND PAINTING


1 ICI Enamel Matt Finish Cost For Material Prime Coat Paint (ready Mixed) Brush Turpentine Oil Labour Painter Mazdoor Qty gal 0.123 0.204 0.03 0.061 Rate 750 750 120 65 Sum 250 125 Sum Total 0% Cost Cost 92.25 153 3.6 3.965 252.815 92.5 46.25 138.75 391.565 0 391.565 1 ft2 of Area

3.92 Rupees

0.37 0.37

Contractor's Profit

2 3

Rate analysis for Roads

EARTH WORK FOR ROADS:Items Materials desiel mobil oil equipment Tractor Sheep foot roller Tamping roller labour driver Sheep foot roller driver Tamping roller driver Cleaner for SF roller Cleaner for Tamp roller Dresser Mazdoor COST FOR Units lts lts Qty 13.5 1.4 Rate 25.00 100.00 Sum 400 700 500 Sum 200 200 200 100 100 150 125 Sum = Amount 337.5 140 477.5 400 1400 1000 2800 25 25 25 12.5 12.5 30 890 1020 1.02

Hrs Hrs Hrs

1 2 2

nos nos nos nos nos nos nos 1

0.125 0.125 0.125 0.125 0.125 0.2 7.12 cft of Earth work

Sub base Couse


Materials Burnt Bricks Sand Equipement Road Roller Wheel Barrow Labour Supervisor Mazdoor Mason Bahishti COST FOR

1 Sub base course of bricks on edge 4.5 inch thick unit nos cft Hrs nos nos nos nos nos 1 qty 1400 22 0.01 0.002 0 0 0.02 1 0 0.5 1 rate 1 17 1000 30 0 0 Amount 1400 374 10 0.06 0 0 6 125 0 125 100 2140.06 21.40

300 125 0 250 100 Sum cft of Sub base course =

BASE COURSE
materials: hand crushed stone agg stone dust Equipment Water tanker donkey pump Road roller Whell Barrow Labour Supervisor Dressor mazdoor COST FOR unit cft cft day nos day nos nos nos nos 1 qty 115 10 0.04 0.0002 0.08 0.005 0.02 0.75 1.5 cft of Base course rate 10 12 2000 200 1000 30 300 150 125 Sum = Amount 1150 120 5750 80 0.04 80 0.15 6 112.5 187.5 1736.19 17.36

PRE MIXED ASPHALT


PRE MIXED ASPHALT: Items material Crush Bitumen Fuel Wood Course Sand Filler Dust Equipment Mixer Tar Boiler Road Roller Labour Spray Man Mason Skilled Mazdoor COST FOR unit cft kg kg cft cft day day day nos nos nos 1 qty 14.5 70.33 35 1 1.1 0.06 0.016 0.01 0.1 0.1 4 rate 19 2 1.5 17 7 800 800 1000
2 inches thick

Amount 275.5 140.66 52.5 17 7.7 48 12.8 10 20 15 1000 1599.16 15.99

200 150 250 SUM sft of Pre Mixed Asphalt =

TRIPPLE SURFACE TREATMENT


THIRD COAT Materials Crush Bitumen Fuel Wood Basket Equip Tar Boiler Road Roller Labour Spray man Chakri man Mazdoor COST FOR unit cft kg kg nos day hrs nos nos nos 1

3 THIRD COAT qty 11.5 40.92 20 0.101 0.045 0.03 0.045 0.075 0.33 sft of TST rate 19 2 1.5 10 800 1000 200 200 125 SUM = Amount 218.5 81.84 30 1.01 36 30 9 15 41.25 462.6 4.63

ROAD EDGING COMPLETE


For 100 Rft material Bricks Labour Mason Mazdoor COST FOR unit nos nos nos 1 qty 267 0.5 0.5 Rft of edging Sum = rate 1.5 250 125 5.88 Amount 400.5 125 62.5 588

1 inch thick 1.5 inches thick 2 inches thick

1 2 3 PREMIXED CONCRETE TRIPPLE SURFACE TREATMENT FIRST COAT SECOND COAT THIRD COAT

Rate Analysis for Fencing


Select whether you want to estimate " With or Without Cemenet concrete base" With Cement Concrete Base 1:4:8 Items
Materials 2

Cost For Units %cft bags %cft kg lbs lbs No No No Qty 39 11 79 54 26.6 L.M 8 2.5 1.25 Rate 17 230 19 21 18 Amount 663 2530 1501 1134 478.8

Lft of Fencing

Sand Cement Crush MS bars Barbed wire Hooks Labour Mazdoor Mason Bahishti

81.78 Rupees

125 250 100 SUM

1000 625 125 8056.8 120.852 0 8177.652

Sundries @ 1.5% Contractor's Profit

0% Cost

Without Cement concrete base With Cement concrete base 1 2

LININGS OF CANALS

Formation dressing and preparing subgrade ON BED Item Unit Qty Labour: Dresser nos 0.33 Mazdoor nos 0.75 ON SLOPE Labour: Dresser Mazdoor nos nos 0.5 2

Rate 250 125

Amount 82.5 93.75 Cost For 1 sft of Area

=
250 125 COST= 125 250 551.25

120.06 Rupees

Lining Stabalize layer of c/s ratio 1:30, 2" thick on Slope Material: Sand cft 18 17 Cement bags 0.5 230 Labour: Mason nos 0.5 250 Mazdoor nos 1.5 125 Bahishti nos 0.5 100 COST= Exposed surface lining using Concrete CONCRETE
of ratio 1:3:6, 4 in thick

306 115 125 187.5 50 783.5 4 1 RATE 230 17 0.014 AMOUNT 2990 782 1.288

IN BED ITEM MATERIAL: Cement Sand Stone Ballast LABOUR: Mason Mazdoor Bhishti ON SLOPE ITEM MATERIAL: Cement Sand Stone Ballast LABOUR: Mason Mazdoor Bhishti UNITS bags cft cft QTY 13 46 92

nos nos nos

1 6 0.5

250 250 125 750 100 50 COST= 4823.288 RATE 230 17 0.014 AMOUNT 2990 782 1.288

UNITS bags cft cft

QTY 13 46 92

nos nos nos

1.25 7 0.5 TOTAL COST

250 125 100 COST= = 0% COST

Sundries 7.5% Contractor's Profit

312.5 875 50 5010.788 11168.83 837.662 0 12006.49

(9"x4-1/2"x3") in 1:6 c/s morta (9"x4-1/2"x3") in 1:3 c/s mortar in 1:3:6 , 4" thick CEMENT PLASTER TILES BRICKS CONCRETE FALSE FALSE FALSE FALSE of ratio 1:3:6, 4 in thick CLICK AND SELECT

EXPANSION JOINT IN BUILDING


Filling expasion joints13mm thick for 102to 152mm deep slabs with bitumen mixed with sand and saw dust. MATERIAL Saw dust Bitumen Sand LABOUR Mazdoor
RAVI

UNIT kg 1 Cft No

Qty 8 50 1 1.5

RATE 250 2 7 125 SUM

COST 2000 100 7

FOR COST=

9 250.93

Lft EXPANSION JOINT/S

187.5 2294.5

P/F Aluminium joint cover(gole) 3" size on expasion joint. MATERIAL Alum---angle iron kg Nail No LABOUR Mazdoor No

3.28 2.4 3.28

1 1

3.28 2.4 410 412.4 2706.9 81.207 2788.107 Rs.

Contractor's Profit

125 SUM TOTAL SUM 3% TOTAL COST

RAVI CHENAB LAWRENCEPUR