You are on page 1of 23

C.

DATOS
fc=
fy=
=
=
de hormign=
qs =
L=
Factores
t=
B=
EP =

210
4200
29
1.9
2.4
1
1

kg/cm2
kg/cm2

12
0.6
12

12 a 10
0,4 a 0,7
12 a 10

Recubrimiento=

0.075

hf
t
L.D

h
m
4.3

H
m
5.5

Fig.
U
1
2
3
4
5

Brazo x
m
1.25
1.452777778
1.65
1.505555556
2.429166667

w
T
3.63
0.957916667
3.63
0.758350694
16.68371528
25.65998264

M. de fuerzas
Verticales
T*m
4.5375
1.391640046
5.9895
1.141739101
40.52752503
53.58790418

Mu
T*m
23.52845364

Mu*Fs
T*m
35.29268046

x
m
2.088384273

e
m
0.43838

EN TALN

T/m2
7.446

E.P

L.T

m
Asumido
hf
m
1.2

C.M
m
0.3

Relleno

T7m3
T/m3
T/m2
m

V
T
12.96767033

Vv
T
19.4515055

Vc
T
25.02540003
O.K

U
DEDO
TALN
Para obtener el clculo de la armadura se divide en tres secciones

t
m
0.458333333

B
m
3.30

PESO PROPIO
P.P (1m)
c.g X
T
m
25.66
2.08838427

CONDICIN
e <= (L/6)
m
0.55
O.k

1
T/m2
12.81

P
T/m2
9.579166667

3
T/m2
2.134

cal

min

0.001751578
0.000736971

0.00333333
0.00333333
3 2 1
, ,
3 3 3

K A=
P1 =
E A1=

Tring
Rectang

Y1 =

TRAMO 3/3 (H)


0.346974031
1.208626209 T/m2
5.539536792 T/m
rea
m2
1.107907358
4.431629434
5.539536792
2.322222222

K A=
P2 =
E A2=

Brazo Y
m
4.277777778
1.833333333

A*Brazo Y
m3
4.739381478
8.124653962
12.86403544
E AT 1 =
Y AT 1=
M. flector 1 =

Tring

Y2 =
11.9
T/m
1.5
m
18.28047142 T*m

TRAMO 2/3 (H)


K A=
P1 =
E A1=

Tring
Rectang

Y1 =

0.346974031
1.208626209 T/m2
3.323722075 T/m
rea
m2
1.107907358
2.215814717
3.323722075
1.425925926

K A=
P2 =
E A2=

Brazo Y
m
2.444444444
0.916666667

A*Brazo Y
m3
2.708217987
2.031163491
4.739381478
EAT 2=
Y AT 2 =
M. flector 2 =

Tring

Y2 =
4.431629434 T/m
1.222222222 m
5.416435975 T*m

TRAMO 1/3 (H)


K A=
P1 =
E A1=

0.346974031
1.208626209 T/m2
1.107907358 T/m

Tring

Y1 =

rea
m2
1.107907358
1.107907358
0.611111111

Brazo Y
m
0.611111111

A*Brazo Y
m3
0.677054497
0.677054497
EAT =
Y AT 3 =
M. flector 3 =

Ru=
L=

u
1
2
3

M. flector
T*m
18.28047142
5.416435975
0.677054497

39.7
1

M.flecT
T*m
23.52845364
10.6644182
5.925036721

1.107907358 T/m
0.611111111 m
0.677054497 T*m

d
m
25.6614
17.2764
12.8774

CANTIDAD DE ACERO PRINCIPAL


cal
min
0.00812
0.00511
0.00109

0.00333333
0.00333333
0.00333333

As de distanciamiento

cm2
10.41811533
716mm
4.412189671
514mm
2.14623743
312mm

u
1
2
3

As
cm2
20.83623066
8.824379341
4.29247486

CARA INTERNA
As (2/3)
cm2
13.89082044
5.882919561
2.861649907

u
1
2
3

As
cm2
20.83623066
8.824379341
4.29247486

CARA INTERNA
As (2/3)
Distribucin
cm2
6.945410218
5.882919561
2.861649907

@
15
20
25

As (Temperatura)
cm2
9.47916667

LD
m
1.10

EP
m
0.46

Hs
m
0.5

SOBRECARGA
Ws
Xs
T
m
2.20
2.20

EMPUJE ACTIVO TOTAL


YAT
E AT
T/m
m
11.88
1.981

LT
m
1.74

KA
0.346974031

M de fuerzas
horizontales

M. de fuerzas
Verticales

M AT
T*m

Mv
T*m

23.52845364

53.58790418

EMPUJE ACTIVO
EA
YA
T/m
m
9.97
1.833333333

EMPUJE PASIVO
Ep
T/m
2.88206 3.9426582
Kp

Fs. VOLCAMIENTO
F.s
>= 2,0
2.277578671
2

u=
Fs. DESLIZAMIENTO
F.s
1.5789738
O.K

O.K
Para que aumente el
taln se debe aumentar
la base

2
T/m2
1.446912104

EN DEDO

T/m2
9.024

4
T/m2
8.132254562

Vv
T
8.939860821

Vv*Fs
T
13.40979123

As(flexin)

Distribucin

cm2
12.78
12.78

916mm
916mm

3 2 1
, ,
3 3 3

Vc
V
T
T
12.01029426
25.02540003
O.K

Vres
T
29.44164709
O.K

Mcal
T*m
6.988

M cal
T*m
2.975876

cal
Mu*Fs
min
T*m
10.48152076 0.001752 0.0033333
Asumimos 0.0033333

Mu*Fs
T*m
4.46

cal

min

0.000737 0.0033333
Asumimos 0.0033333

0.346974031
2.417252419 T/m2
4.431629434 T/m
rea
m2
4.431629434
4.431629434
1.222222222

Brazo Y
m
1.222222222

A*Brazo Y
m3
5.416435975
5.416435975

0.346974031
1.208626209 T/m2
1.107907358 T/m
rea
m2
1.107907358
1.107907358
0.611111111

Brazo Y
m
0.611111111

A*Brazo Y
m3
0.677054497
0.677054497

30.41
3.8
DE ACERO PRINCIPAL
requerido
0.008119681
0.005107779
0.003333333

As( flexin)
cm2
20.83623066
8.824379341
4.29247486

822mm
716mm
512mm

@
cm
13
15
20

Cara interior
1/3*As(Temp)
cm2
3.159722222

510mm

@
cm
20

Cara exterior
2/3*As(Temp)
cm2
2.106481481

EMPUJE PASIVO
Yp
m

0.577350269
Fs. DESLIZAMIENTO
>= 1,5
1.5
O.K

As
cm2
12.78

As
cm2
12.78

EMPUJE SOBRECARGA
Es
Y ES
T/m
m
2.75
1.9

K A=
P2 =
E A2=
E AT2=

0.346974031
1.208626209 T/m2
3.323722075 T/m
5.2
T/m
rea

Brazo Y

m2

Tring

1.107907358

0.611111111

Rectang

2.215814717

0.916666667

Y2 =

3.323722075
0.814814815

K A=
P3 =
E A3=
E AT3=

0.346974031
1.208626209 T/m2
T/m
T/m

A*Brazo Y
m3

rea

Brazo Y

A*Brazo Y

0.677054497

m2

m3

0.611111111

0.677054497

2.031163491

Tring

1.107907358

2.708217987

Y2 =

1.107907358
0.611111111

0.677054497

VOLUMENES DE OBRA (MURO EN VOLA


CODIGO
0,1
0.2

DESCRIPCION
Excavacin manual del muro
Hormign Simple fc = 210kg/cm2
Base
Corona
Pantalla

0.3

Relleno con material granular

0,4

Acero de refuerzo fy=4200kg/cm2

VOLUMENES DE OBRA (MURO EN VOLADIZO)


UNIDAD
NUMERO
LARGO(m)
ANCHO(m)
m3
1
1.2
3.30
m3
m3
m3

1
1
1

0.458333333
5.041666667
5.041666667

3.30
0.30
0.16

m3

1.90

1.74

ALTURA(m)

5.04

TIPO

DIAMETRO

CANTIDAD

LONGITUD

PROFUNDIDAD(m)
8

CANTIDAD
31.68

8
8
8

12.1
12.1
3.193055556
27.39305556
73.44027778

LONGITUD

LONGITUD
DESARROLLADA

LONGITUD
TOTAL

PESO