Professional Documents
Culture Documents
Ru1
Christchurch 2010
Future Christchuch
Ru1
Strength vS duCtility
Christchurch 2010
Future Christchuch
earthquakeS eFFeCt
F6 F6
Christchurch 2010
Future Christchuch
Ru1
Destroyed
Structural damaged
Minor damage
Destroyed
Structural damaged
Minor damage
Destroyed
Structural damaged
Minor damage
Ru1 Ru1
Ru1
F6
Ru4 Ru3 Ru3 Ru4 Ru4 Ru1 Ru4 Ru4 B1 B2 Ru3 Ru4 Ru4 Ru4 Ru4 L1 L3 Ru3 L3 Ru4 Ru4 Ru3 L1 L1 L3 Ru3 L1 L1 L1 B1 L3 Ru3 L1 B4 Ru3 L1 L1 B4 B4 L1 B4 B5 Ru3 B5 B4 Ru3 Cu3 Ru1 Ru3
Seismic Force
F5
F5
F5
L1
B1
Ru3
F4
F4
F4
L1
B4
B1
Ru3
Ru5
RU3
Ru1
Ru1
L1 Ru5 L1 L1 L1L1 Ru3 RU3 SP Ru5 B6 Ru5 L1 B4 B1 L1 L1 CU3 CU3 RU3 RU3 L1 Ru5 CU3 RU3 L1 B1 Ru6 Ru6 B1 Ru5 Living 1 (L1) Ru5 SP L1 CU3 Ru6 L1 B2 Business B4 Ru5 B4 CU3 PS CU3 PS B1 L5 L5 Ru6 Ru6 Ru2 Ru5 Ru5 Ru2 CU3 CU3 L1 CU3 B2 CU3 CU3 SP (Hosp) CU3 L1 L1 L1 CU3 CU3 Ru5 Ru5 Ru2 Ru5 Ru2 B1 L1 CU3 Ru5 L1 CU3 Ru5 Ru2 SP (Hos) Ru5 B4 B4 B1 CU3 B4 B5 B5 B4 B4 L1 B4 B5 B5 L1 B4 B4 B5 B1 CU3 L1 Ru5 B4 B5 B5 B7 L1 L1 Ru2 B4 L1 L1 L3 L3 B1 CU3 B1 CU3 L3 L1 L1 CU3 B1 L1 CU3 B1 L1 L1 L1 B1 SP (Hosp) B1 L1 Ru2 L1 CU3 LH LH SP (Hosp) CU3 L1 B1 L1 LH B1 CU3 B1 SP (Hosp) L1 B1 B1 CU3 L2 B2 B1 B2 B1 B1 CU3 CU3 L1 L1 L1 L2 B1 B1 L3 B4 L5 L3 B4 B1 B4 L1 CU3 CU3 L1 CU3 L2 B2 B1 CU3 CU3 CU3 SP (Hosp) L1 CU3 B5 B5 B4 B5 L1 Ru2 B4 B4 L1 L2 CU3 Ru5 B4 Ru2 CU3 L1 B1 L1 A B1 B4 B2 CU3 B5 B4 B4 L3 B4 B3 B4 B1 B2 L3 CU3 B3 B3 CU3 L1 SP (Hosp) L2 L1 B1 CU3 B4 L2 CU3 CU3 B2 B1 CU3 B1 LH CU3 LH L1 LH B1 B4 B1 L3 B4 L2 L3 L2 CU3 B1 L1 B4 B5 CU3 B4 L1 B5 B4 B4 B4 B4 B4 B5 B4 B4 LH L1 CU3 CU3 LH LH CU3 LH LH B4 SP LH L1 LH RuH L1 CU3 LH RuH Ru7 LHA CU3 RuH RuH RuH L1 RuH LH Ru2 Ru2 L1 CU3 Ru2 RuH LHA RuH SP LHA RuH LHA RuH LHA RuH LH RuH RuH RuH RuH Ru2 RuH RuH RuH RuH RuH LHA RuH LH RuH LHA RuH CU3 LH B1 RuH LHA Ru7 L1 LH LHA LHB LHA LHA CU3 LH LH LH CU3 LH B4 B5 B1 B4 LH L1 LH B1 B2 L1 LH CU3 L1 L3 L2 B4 B4 L5 L1 L1 CU4 L1 CU4 B1 CU3 SP (Hosp) CU3 B1 L1 L1 B1 B2 L3 SP (Hosp) L5 B4 L5 L4 L3 L1 CU3 L1 CU3 L2 L3 B3 L4 L3 B1 B2 L2 CU3 L1 L2 B1 SP (Hosp) L5 L2 B2 B1 CU3 PS L1 L3 B1 CU3 L1 L1 CU3 L4 L4 L3 B1 L3 B3 L4 L4 L3 L5 L2 L2 CU3 L1 SP (Hosp) SP (Hosp) B2 B1 B1 B2 L2 L3 CU3 B1 CU3 L5 B1 B1 B1 CU3 CU3 B2 L3 CU4 C2 B1 CU3 B4 B2 L3 CU3 B1 CU2 B1 CU3 CU3 L1 L1 L2 L1 SP (Hosp) L1 CU3 CU3 CU3 B1 CU3 L1 B1 Ru5 L5 B1 CU3 B1 CU3 B2 PS CU3 L3 L2 SP (Hosp) L1 L1 B4 CU3 B1 B1 CU3 L1 CU3 B4 CU3 SP CU3 (Hosp) CU3 B4 B1 CU3 CU3 L1 L1 B2 L5 CU3 L1 CU3 L1 CU3 B1 B4 B1 SP (Hosp) B1 L1 B4 B4 CU3 L1 L1 CU3 B4 L1 B1 SP Hosp CU3 CU3 B4 B4 CU3 CU3 L1 CU3 B2 B2 L3 L1 B4 L1 B4 L1 L1 L1 L1 L1 L3 CU3 L1 CU3 B1 B1 B1 CU3 B1 CU3 L1 L1 B1 L5 CU3 L3 L1 L1 B1 CU3 B1 B4 CU3 B1 RU3 Ru3 L1 CU3 L1 RU3 Ru3 L1 SP L1 B1 Ru1 Ru3 L1 Ru1 L1
Small cracks
Steel reinforcement is still in the elastic range
Cracks widen
Steel reinforcement is in inelastic range
F3
F3
F3
F2
F2
F2
Ru5 Ru6
F_elastic is the maximum force the building could resist without strength lost 1.0 Future Christchurch seismic coefficient needs to change, therefore increase buildings strength Seismic Force Seismic Force
CU3 B2 L1
F1
F1
F1
CU3 Sch B4 B4 B5
L1
B1
L1
=1 0.8 Permanent deformation, need repair Seismic Coefficient (%g) Collapse point Seismic Force
L2 B2 CU3 B1 L2 L3
L1
L2 SP B4 (Hosp)
L1 L1
L2
L1
1.25 2 3 5 4 F3 F3 F3 Current code (may be lower), building failed safe and demolished at post - quake
B1
0.6
CU3
B1
CU3 PS B1 L1
CU3 PS
B2
Ru2
2 1
Ductility range Fail safe,demolished High cost to repair if possible Elastic range, no damage occur
0.4
0.2 8 0 1.0
B1
B3
B3
Lateral deflection
3.0
CU3 L3 L4B B3 B3 B3 B3 B3 B2
4.0
F2
F2
F2
B3
CU3 B3
L2 L1 B4
L1 B5
B1 CU3
B4 B4 B4 B4 B1
L3
SP (Hos)
B1 CU3 L2
CU3 L1
Elastic displacement
B3
B3 B3
B3
CU3 B1 B4 B2 B1 L3 CU3 L2 B4 B4 B2 L1
Inelastic displacement
F1
F1
F1
CU3
CU4
B4
B4
B1
B1
B7
L1
L3
Ru2 L1 Ru2
L3
B1
B1 CU3
B1
LHA
CU3 L1 B1 Ru2
LH
L1
Ru2
Ru2
Mode of Displacement I
Mode of Displacement II
Ru2
V_base is the force at the base of the building Force (F) = Mass (m) x Acceleration (A) The shorter and lighter the building is the less of the V_base forces.
LHB
LHA RuH
RuH
Ru2
RuH
RuH
Soil types: good soil reasonable soil moderate liquefaction high liquefaction Severe liquefaction
Gravity Force
Shear wall Gravity Force Tension Force Shear Force at Base Raft foundation Soils friction & cohesion stop the foundation slide Horizontal soil pressure Compression force transmits to the raft foundation Soil bearing capacity stops the shear wall turn over Compression Force Tension Force
Gravity Force
F3
F3
F3
F3
Compression Force Shear Force at Base Horizontal soil pressure Compression force transmits to pile Soil bearing capacity stop the shear wall turn over
F2
F2
F2
F2
Foundation
F1
F1
F1
F1
Moment frame
Shear wall
Moment frame
Damper
Raft foundation
Earthquake forces transmit from the shear wall to the raft foundation
Piles
Shear wall
Shear wall
F6
F6
Build area
F5
F5
F4 Gravity Force Gravity Force F3 Building envelope: 6+ level - living inner city, living central city, medium density, business district centre, 3 - 5 level - general industrial, school, special purpose,hospital, living inner suburban 3 - 5 level - inner city industrial, business local centre 1 - 2 level - school, hospital, sub urban industrial, general industrial 1 - 2 level - business local centre, school, hospital, living inner city 1 level - living inner city, living suburban, business local centre, business district centre Single storey - school, hospital, general industrial Single storey - school, hospital, business local centre, living inner city, living inner suburban, general industrial Tension Force Cellular raft foundation Large soils friction & cohesion area stops the foundation lift up or settle down Void space to reduce soils overburden pressure Soils friction & cohesion stop the foundation slide Shear Force at Base Horizontal soil pressure Compression force transmits to the cellular raft Large soils bearing capacity area stops the shear wall turn over Compression Force Tension Force Cellular raft foundation Large soils friction & cohesion area stops the foundation lift up or settle down Soils friction & cohesion stop the foundation slide Soils weight, friction & cohesion stop the pile uplift Compression Force Shear Force at Base Horizontal soil pressure Void space to reduce soils overburden pressure Horizontal soil pressure Compression force transmits to pile Soil bearing capacity stop the shear wall turn over F1 F2
F4
F3
F2
F1
Frame
Seismic forces transmit from the shear wall to the cellular raft
Cellular raft
Raft + Piles
Seismic forces transmit from the shear wall to the cellular raft + Piles
F3 Gravity Force F2
F3 Increased damping from isolation 25% Reduction response from increased damping F2 Gravity Force
F1
Compression Force Shear Force at Base Horizontal soil pressure Void space to reduce soils overburden pressure Horizontal soil pressure Compression force transmits to pile Soil bearing capacity stop the shear wall turn over
Build area
0.5
1.0
1.5
2.0
Piston Cylinder
Single Storey
1. Raft 2E. Steel - CBF 2F. Timber shearwall 1. Raft 2E. Steel - CBF 2F. Timber shearwall 1. Raft 1. Raft 1. Raft 1. Raft 2E. Steel - CBF 2E. Steel - CBF 2E. Steel - CBF 2E. Steel - CBF 2F. Timber shearwall 2F. Timber shearwall 2F. Timber shearwall 2F. Timber shearwall Steel reinforcing Steel reinforcing Steel reinforcing Steel reinforcing Steel reinforcing Steel reinforcing
1. Raft 1. Raft 2E. Steel - CBF 2E. Steel - CBF 2F. Timber shearwall 2F. Timber shearwall
2F. Timber shearwall Steel reinforcing Steel reinforcing Steel reinforcing Steel reinforcing
1. Raft 2E. Steel - CBF 2E. Steel - CBF Strengthening 2F. Timber shearwall
1. Raft 1. Raft 2E. Steel - CBF 2E. Steel - CBF 2F. Timber shearwall 2F. Timber shearwall
Lead extrusion damper - Wellington central police station ( Robinson seismic, 2011)
F4
Steel reinforcing Steel reinforcing Steel reinforcing Steel reinforcing Steel reinforcing Steel reinforcing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing Metal/ Precast Metal/ Precast Metal/ Precast Metal/ Precast Metal/ Precast Metal/ Precast conc claddings conc claddings conc claddings conc claddings conc claddings conc claddings 4. 88 mm Gap 4. 88 mm Gap 1.Cellular raft 2E. Steel - CBF 2E. Steel - CBF Strengthening 2F. Timber shearwall 1.Cellular raft 2E. Steel - CBF 2F. Timber shearwall 4. 88 mm Gap 1. Raft 2E. Steel - CBF 2F. Timber shearwall 4. 88 mm Gap 1. Raft 2E. Steel - CBF 2F. Timber shearwall 4. 88 mm Gap 4. 88 mm Gap 1. Raft 2F. Timber shearwall 1. Raft 2F. Timber shearwall
3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing Metal/ Precast Metal/ Precast Metal/ Precast Metal/ Precast Metal/ Precast Metal/ Precast Metal/ Precast Metal/ Precast Metal/ Precast Metal/ Precast conc claddings conc claddings conc claddings conc claddings conc claddings conc claddings conc claddings conc claddings conc claddings conc claddings 4. 88 mm Gap 4. 88 mm Gap 1. Raft 2E. Steel - CBF 2F. Timber shearwall 1. Raft 2E. Steel - CBF 2F. Timber shearwall 4. 88 mm Gap 1. Raft 2F. Timber shearwall 4. 88 mm Gap 4. 88 mm Gap 4. 88 mm Gap 1. Raft 2F. Timber shearwall 1. Raft 2F. Timber shearwall 1. Raft 2F. Timber shearwall 4. 88 mm Gap 1. Raft 2E. Steel - CBF 2F. Timber shearwall 4. 88 mm Gap 4. 88 mm Gap 1. Raft 2E. Steel - CBF 2F. Timber shearwall 4. 88 mm Gap 1. Piles 2E. Steel - CBF 2F. Timber shearwall 3.Timber/Glazing Metal claddings 4. 88 mm Gap 1.Cellular raft 2F. Timber shearwall 1. Piles 2E. Steel - CBF 2F. Timber shearwall
F3 Gravity Force F2
2E. Steel - CBF 2E. Steel - CBF 2E. Steel - CBF 2E. Steel - CBF
3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings 4. 88 mm Gap 4. 88 mm Gap 1.Cellular raft 2E. Steel - CBF 2F. Timber shearwall 1.Cellular raft 2E. Steel - CBF 2F. Timber shearwall 4. 88 mm Gap 1.Cellular raft 2F. Timber shearwall 4. 88 mm Gap 4. 88 mm Gap 4. 88 mm Gap 1.Cellular raft 2F. Timber shearwall 1.Cellular raft 2F. Timber shearwall 1.Cellular raft 2F. Timber shearwall 4. 88 mm Gap 1.Cellular raft 2E. Steel - CBF 2F. Timber shearwall 4. 88 mm Gap 1.Cellular raft 2F. Timber shearwall
3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings 4. 88 mm Gap 4. 88 mm Gap 1.Cellular raft 2E. Steel - CBF 2E. Steel - CBF Strengthening 2F. Timber shearwall 1.Cellular raft 2E. Steel - CBF 2F. Timber shearwall 4. 88 mm Gap 1.Cellular raft 2E. Steel - CBF 2F. Timber shearwall 4. 88 mm Gap 4. 88 mm Gap 4. 88 mm Gap
F3
Gravity Force
F1
F2
2E. Steel - CBF 2E. Steel - CBF 2E. Steel - CBF 2E. Steel - CBF
Introduce base isolation reduces the acceleration and increases the period of vibration, which changes the impact of the forces by the spread it over time
F1
Compression Force Shear Force at Base Horizontal soil pressure Void space to reduce soils overburden pressure Horizontal soil pressure Compression force transmits to pile Soil bearing capacity stop the shear wall turn over
Void space to reduce soils overburden pressure Horizontal soil pressure Compression force transmits to pile Soil bearing capacity stop the shear wall turn over
3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings 4. 88 mm Gap 4. 88 mm Gap 1.Cellular raft 2E. Steel - CBF 2F. Timber shearwall 1.Cellular raft 2E. Steel - CBF 2F. Timber shearwall 4. 88 mm Gap 1.Cellular raft 2F. Timber shearwall 4. 88 mm Gap 4. 88 mm Gap 4. 88 mm Gap 1.Cellular raft 2F. Timber shearwall 1.Cellular raft 2F. Timber shearwall 1.Cellular raft 2F. Timber shearwall 4. 88 mm Gap 1.Cellular raft 2E. Steel - CBF 2F. Timber shearwall 4. 88 mm Gap 4. 88 mm Gap 1.Cellular raft 2F. Timber shearwall 1.Cellular raft 2F. Timber shearwall 4. 88 mm Gap
3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing Metal claddings Metal claddings Metal claddings 4. 88 mm Gap 4. 88 mm Gap 1.Cellular raft 2E. Steel - CBF 2E. Steel - CBF Strengthening 2F. Timber shearwall 1.Cellular raft 2E. Steel - CBF 2F. Timber shearwall 4. 88 mm Gap 1.Cellular raft 2E. Steel - CBF 2F. Timber shearwall
Displaced position
2E. Steel - CBF 2E. Steel - CBF 2E. Steel - CBF 2E. Steel - CBF
3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings 4. 88 mm Gap 4. 88 mm Gap 1.Cellular raft 2E. Steel - CBF 2F. Timber shearwall 1.Cellular raft 2E. Steel - CBF 2F. Timber shearwall 4. 88 mm Gap 1.Cellular raft 2F. Timber shearwall 4. 88 mm Gap 4. 88 mm Gap 4. 88 mm Gap 1.Cellular raft 2F. Timber shearwall 1.Cellular raft 2F. Timber shearwall 4. 88 mm Gap 1.Cellular raft 2E. Steel - CBF 2F. Timber shearwall 4. 88 mm Gap 4. 88 mm Gap 1.Cellular raft 2F. Timber shearwall 1.Cellular raft 2F. Timber shearwall
3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing Metal claddings Metal claddings Metal claddings 4. 88 mm Gap 4. 88 mm Gap 1.Cellular raft 2E. Steel - CBF 2E. Steel - CBF Strengthening 2F. Timber shearwall 1.Cellular raft 2E. Steel - CBF 2F. Timber shearwall 4. 88 mm Gap 1.Cellular raft 2E. Steel - CBF 2F. Timber shearwall
2D SeiSmiC gap
F6
3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings 4. 88 mm Gap 4. 88 mm Gap 4. 88 mm Gap 4. 88 mm Gap 4. 88 mm Gap
3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing Metal claddings Metal claddings Metal claddings 4. 88 mm Gap 4. 88 mm Gap 4. 88 mm Gap
3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing Metal claddings Metal claddings Metal claddings 4. 88 mm Gap 4. 88 mm Gap 4. 88 mm Gap
Ru2-Templeton - Halswell
Ru4 - Waimakariri
B5-General Industrial
Soil Types
L2-Inner Suburban
L4-Central City
L1-Living Suburban
LH-Hills
Ru1, Ru3
Ru5, Ru6
F5 Beam F4 Column Infill panel F3 F2 Separated panel Diagonal Crack Compression strut Beam and column region likely to be damaged Moment frame with out infill panel
F3
F3
F3
F2
F2
F2
F1
1 level
1. Raft 2E. Steel - CBF 2F. Timber shearwall Steel reinforcing 1. Raft 2E. Steel - CBF 2F. Timber shearwall Steel reinforcing 1. Raft 2E. Steel - CBF 2F. Timber shearwall Steel reinforcing 1. Raft 2E. Steel - CBF 2F. Timber shearwall Steel reinforcing 3.Timber/Glazing Metal/ Precast conc claddings 4. 176 mm Gap 1. Cellular raft 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing Metal/ Precast Metal/ Precast Metal/ Precast conc claddings conc claddings conc claddings 4. 176 mm Gap 4. 176 mm Gap 4. 176 mm Gap 1. Cellular raft 2E. Steel - CBF 2F. Timber shearwall 1. Cellular raft 1. Cellular raft
1. Raft
1. Raft
1. Raft
1. Raft
1. Raft
1. Raft
1. Raft
1. Raft
1. Raft
2E. Steel - CBF 2F. Timber 2F. Timber 2F. Timber shearwall shearwall shearwall Steel reinforcing Steel reinforcing Steel reinforcing 3.Timber/Glazing Metal/ Precast conc claddings 4. 176 mm Gap 1. Cellular raft 3.Timber/Glazing 3.Timber/Glazing Metal/ Precast Metal/ Precast conc claddings conc claddings 4. 176 mm Gap 4. 176 mm Gap 1. Raft 1. Raft 2E. Steel - CBF 2F. Timber shearwall
2E. Steel - CBF 2E. Steel - CBF 2E. Steel - CBF Strengthening 2F. Timber 2F. Timber shearwall shearwall Steel reinforcing Steel reinforcing 3.Timber/Glazing 3.Timber/Glazing Metal/ Precast Metal/ Precast conc claddings conc claddings 4. 176 mm Gap 4. 176 mm Gap 1. Cellular raft 2E. Steel - CBF 2E. Steel - CBF Strengthening 2F. Timber shearwall 1. Cellular raft
2E. Steel - CBF 2E. Steel - CBF 2E. Steel - CBF 2E. Steel - CBF 2F. Timber 2F. Timber 2F. Timber 2F. Timber shearwall shearwall shearwall shearwall Steel reinforcing Steel reinforcing Steel reinforcing Steel reinforcing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing Metal/ Precast Metal/ Precast Metal/ Precast conc claddings conc claddings conc claddings 4. 176 mm Gap 4. 176 mm Gap 4. 176 mm Gap 1. Raft 1. Raft 2E. Steel - CBF 2F. Timber shearwall 1. Raft 2E. Steel - CBF 2F. Timber shearwall 3.Timber/Glazing Metal/ Precast conc claddings 4. 176 mm Gap 1. Raft 2E. Steel - CBF 2F. Timber shearwall
Kinematics of deformation
3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing Metal/ Precast Metal/ Precast Metal/ Precast conc claddings conc claddings conc claddings 4. 176 mm Gap 4. 176 mm Gap 4. 176 mm Gap 1. Raft 2E. Steel - CBF 2F. Timber shearwall Piles 2E. Steel - CBF 2F. Timber shearwall 3.Timber/Glazing Metal claddings 4. 176 mm Gap 1. Cellular raft Piles
A 20 mm Min 50 mm Min
Beam
Column Sealant
F2
2E. Steel - CBF 2E. Steel - CBF 2F. Timber shearwall 2F. Timber shearwall
2E. Steel - CBF 2E. Steel - CBF 2E. Steel - CBF 2F. Timber shearwall 2F. Timber shearwall 2F. Timber shearwall
2E. Steel - CBF 2E. Steel - CBF 2F. Timber shearwall 2F. Timber shearwall
Recess form in beam 200 mm @ 2m spacing Steel dowell or flat plate cast into wall
3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings 4. 176 mm Gap 4. 176 mm Gap 4. 176 mm Gap 4. 176 mm Gap 4. 176 mm Gap 4. 176 mm Gap 4. 176 mm Gap 4. 176 mm Gap 1. Cellular raft 2E. Steel - CBF 2F. Timber shearwall 1. Cellular raft 1. Cellular raft 2F. Timber shearwall 1. Cellular raft 2F. Timber shearwall 1. Cellular raft 2F. Timber shearwall 1. Cellular raft 1. Cellular raft 2E. Steel - CBF 2F. Timber shearwall 1. Cellular raft
3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings 4. 176 mm Gap 4. 176 mm Gap 4. 176 mm Gap 4. 176 mm Gap 4. 176 mm Gap 4. 176 mm Gap 1. Cellular raft Strengthening 2F. Timber shearwall 1. Cellular raft 2E. Steel - CBF 2F. Timber shearwall 1. Cellular raft 2E. Steel - CBF 2F. Timber shearwall
Seismic gap
2E. Steel - CBF 2E. Steel - CBF 2E. Steel - CBF 2F. Timber shearwall
2E. Steel - CBF 2E. Steel - CBF 2F. Timber shearwall 2F. Timber shearwall
2E. Steel - CBF 2E. Steel - CBF 2E. Steel - CBF 2F. Timber shearwall
Kinematics of deformation
Solution to inelastic deformation: Viscous damper within a stiff bracing (Caravasilis, 2011)
3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings 4. 176 mm Gap 4. 176 mm Gap 4. 176 mm Gap 4. 176 mm Gap 4. 176 mm Gap 4. 176 mm Gap 4. 176 mm Gap 4. 176 mm Gap 4. 176 mm Gap 1. Cellular raft 2E. Steel - CBF 2F. Timber shearwall 1. Cellular raft 1. Cellular raft 2F. Timber shearwall 1. Cellular raft 2F. Timber shearwall 1. Cellular raft 2F. Timber shearwall 1. Cellular raft 1. Cellular raft 2E. Steel - CBF 2F. Timber shearwall 1. Cellular raft 1. Cellular raft 4. 176 mm Gap
3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing Metal claddings Metal claddings Metal claddings 4. 176 mm Gap 4. 176 mm Gap 4. 176 mm Gap 1. Cellular raft 2E. Steel - CBF 2E. Steel - CBF Strengthening 2F. Timber shearwall 1. Cellular raft 1. Cellular raft
Moment frame
Seismic gap
Structural detail that resist out of plane force, while allow for the movement between infill panel and moment resisting frame (Charleson, 2008)
Section A - A
Section B - B
Compression failure of reinforced wall (Kam, 2011)
2E. Steel - CBF 2E. Steel - CBF 2E. Steel - CBF 2F. Timber shearwall
2E. Steel - CBF 2E. Steel - CBF 2F. Timber shearwall 2F. Timber shearwall
2E. Steel - CBF 2E. Steel - CBF 2F. Timber shearwall 2F. Timber shearwall
3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings 4. 176 mm Gap 4. 176 mm Gap 4. 176 mm Gap 4. 176 mm Gap 4. 176 mm Gap 4. 176 mm Gap 4. 176 mm Gap 4. 176 mm Gap 4. 176 mm Gap 1. Cellular raft 2E. Steel - CBF 2F. Timber shearwall 1. Cellular raft 1. Cellular raft 1. Cellular raft 1. Cellular raft 1. Cellular raft 2E. Steel - CBF 2F. Timber shearwall 1. Cellular raft 1. Cellular raft
3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing Metal claddings Metal claddings Metal claddings 4. 176 mm Gap 4. 176 mm Gap 4. 176 mm Gap 1. Cellular raft 2E. Steel - CBF 2E. Steel - CBF Strengthening 2F. Timber shearwall 1. Cellular raft 2E. Steel - CBF 2F. Timber shearwall 1. Cellular raft 2E. Steel - CBF 2F. Timber shearwall
2E. Steel - CBF 2E. Steel - CBF 2F. Timber shearwall 2F. Timber shearwall
2E. Steel - CBF 2E. Steel - CBF 2F. Timber shearwall 2F. Timber shearwall
2E. Steel - CBF 2E. Steel - CBF 2F. Timber shearwall 2F. Timber shearwall
3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings 4. 176 mm Gap 4. 176 mm Gap 4. 176 mm Gap 4. 176 mm Gap 4. 176 mm Gap
3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing Metal claddings Metal claddings Metal claddings 4. 176 mm Gap 4. 176 mm Gap 4. 176 mm Gap
3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing Metal claddings Metal claddings Metal claddings 4. 176 mm Gap 4. 176 mm Gap 4. 176 mm Gap
Ru2-Templeton - Halswell
Ru4 - Waimakariri
B5-General Industrial
Soil Types
L2-Inner Suburban
L4-Central City
L1-Living Suburban
LH-Hills
Ru1, Ru3
Ru5, Ru6
Flexual distortion
2 level
1. Piles 1. Piles 1. Piles 1. Piles 2H. PRESSS Steel reinforcing 3.Timber/Glazing Metal/ Precast conc claddings 4. 264 mm Gap 2H. PRESSS 3.Timber/Glazing Metal/ Precast conc claddings 4. 264 mm Gap 2H. PRESSS 3.Timber/Glazing Metal/ Precast conc claddings 4. 264 mm Gap 2H. PRESSS Steel reinforcing 3.Timber/Glazing Metal/ Precast conc claddings 4. 264 mm Gap Steel reinforcing Steel reinforcing
Comparison of performance of Midply and standard shearwalls ( Ni, Popovski, and Karacabeyli et al, 2010)
The Midply walls have the average lateral load capacity three times stronger than the standard shear wall
Installation of LVL post-tensioned and coupled shear panels (Pampanin et al., 2005)
2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2E. Steel - CBF 2B. CBF+Damper 2B. CBF+Damper Strengthening 2G. Hybrid LVL 2G. Hybrid LVL 2G. Hybrid LVL 2G. Hybrid LVL 2G. Hybrid LVL 2G. Hybrid LVL 2G. Hybrid LVL 2G. Hybrid LVL 2G. Hybrid LVL 2G. Hybrid LVL 2G. Hybrid LVL 2H. PRESSS Steel reinforcing 3.Timber/Glazing Metal/ Precast conc claddings 4. 264 mm Gap 2H. PRESSS Steel reinforcing 3.Timber/Glazing Metal/ Precast conc claddings 4. 264 mm Gap 2H. PRESSS Steel reinforcing 3.Timber/Glazing Metal/ Precast conc claddings 4. 264 mm Gap 2H. PRESSS 3.Timber/Glazing Metal/ Precast conc claddings 4. 264 mm Gap 2H. PRESSS 3.Timber/Glazing Metal/ Precast conc claddings 4. 264 mm Gap 2H. PRESSS Steel reinforcing 3.Timber/Glazing Metal/ Precast conc claddings 4. 264 mm Gap 2H. PRESSS Steel reinforcing 3.Timber/Glazing Metal/ Precast conc claddings 4. 264 mm Gap Steel reinforcing Steel reinforcing
1. Cellular raft 1. Cellular raft 1. Cellular raft 1. Cellular raft 1. Cellular raft 1. Cellular raft 1. Cellular raft 1. Cellular raft 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2G. Hybrid LVL 2G. Hybrid LVL 2G. Hybrid LVL 2G. Hybrid LVL 2G. Hybrid LVL 2G. Hybrid LVL 2G. Hybrid LVL 2G. Hybrid LVL 2H. PRESSS 2H. PRESSS 2H. PRESSS 2H. PRESSS 2H. PRESSS 2H. PRESSS 2H. PRESSS 2H. PRESSS
1. Cellular raft 1. Cellular raft 2E. Steel - CBF 2B. CBF+Damper 2B. CBF+Damper Strengthening 2G. Hybrid LVL 2G. Hybrid LVL 2H. PRESSS 2H. PRESSS
3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings 4. 264 mm Gap 1. Cellular raft 4. 264 mm Gap 1. Cellular raft 4. 264 mm Gap 1. Cellular raft 4. 264 mm Gap 1. Cellular raft 4. 264 mm Gap 1. Cellular raft 4. 264 mm Gap 1. Cellular raft 4. 264 mm Gap 1. Cellular raft 4. 264 mm Gap 1. Cellular raft 1. Cellular raft
3.Timber/Glazing 3.Timber/Glazing Metal claddings Metal claddings 4. 264 mm Gap 1. Cellular raft 4. 264 mm Gap 1. Cellular raft
Construction details
2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2E. Steel - CBF 2B. CBF+Damper 2B. CBF+Damper 2G. Hybrid LVL 2G. Hybrid LVL 2G. Hybrid LVL 2G. Hybrid LVL 2G. Hybrid LVL 2G. Hybrid LVL 2G. Hybrid LVL 2G. Hybrid LVL 2G. Hybrid LVL Strengthening 2G. Hybrid LVL 2G. Hybrid LVL 2H. PRESSS 2H. PRESSS 2H. PRESSS 2H. PRESSS 2H. PRESSS 2H. PRESSS 2H. PRESSS 2H. PRESSS 2H. PRESSS 2H. PRESSS 2H. PRESSS 2H. PRESSS 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings 4. 264 mm Gap 1. Cellular raft 4. 264 mm Gap 1. Cellular raft 4. 264 mm Gap 1. Cellular raft 4. 264 mm Gap 1. Cellular raft 4. 264 mm Gap 1. Cellular raft 4. 264 mm Gap 1. Cellular raft 4. 264 mm Gap 1. Cellular raft 4. 264 mm Gap 1. Cellular raft 4. 264 mm Gap 1. Cellular raft 3.Timber/Glazing 3.Timber/Glazing Metal claddings Metal claddings 4. 264 mm Gap 1. Cellular raft 4. 264 mm Gap 1. Cellular raft
3 Cladding typeS
2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2E. Steel - CBF 2B. CBF+Damper 2B. CBF+Damper 2G. Hybrid LVL 2G. Hybrid LVL 2G. Hybrid LVL 2G. Hybrid LVL 2G. Hybrid LVL 2G. Hybrid LVL 2G. Hybrid LVL 2G. Hybrid LVL 2G. Hybrid LVL Strengthening 2G. Hybrid LVL 2G. Hybrid LVL 2H. PRESSS 2H. PRESSS 2H. PRESSS 2H. PRESSS 2H. PRESSS 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings 4. 264 mm Gap 1. Cellular raft 4. 264 mm Gap 1. Cellular raft 4. 264 mm Gap 1. Cellular raft 4. 264 mm Gap 1. Cellular raft 4. 264 mm Gap 1. Cellular raft 4. 264 mm Gap 4. 264 mm Gap 1. Cellular raft 4. 264 mm Gap 1. Cellular raft 4. 264 mm Gap 1. Cellular raft 2G. Hybrid LVL
3.Timber/Glazing 3.Timber/Glazing Metal claddings Metal claddings 4. 264 mm Gap 1. Cellular raft 4. 264 mm Gap 1. Cellular raft
Soil Types
2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2G. Hybrid LVL 2H. PRESSS 2G. Hybrid LVL 2H. PRESSS 2G. Hybrid LVL 2H. PRESSS 2G. Hybrid LVL 2H. PRESSS 2G. Hybrid LVL 2H. PRESSS
2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2E. Steel - CBF 2B. CBF+Damper 2B. CBF+Damper 2G. Hybrid LVL 2G. Hybrid LVL Strengthening 2G. Hybrid LVL 2G. Hybrid LVL
Imposed Rotation Diagonal strut and bond tress transfer joint shear
3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings 4. 264 mm Gap 4. 264 mm Gap 4. 264 mm Gap 4. 264 mm Gap 4. 264 mm Gap
3.Timber/Glazing 3.Timber/Glazing 3.Timber/Glazing Metal claddings Metal claddings Metal claddings 4. 264 mm Gap 4. 264 mm Gap 4. 264 mm Gap
3.Timber/Glazing 3.Timber/Glazing Metal claddings Metal claddings 4. 264 mm Gap 4. 264 mm Gap
Frame joint with unbonded post-tensioned cables through concrete members (CCANZ, 2011)
Internal vs external replaceable mild steel dissipaters at the base connections (CCANZ, 2011) Cladding meterials
Light weight cladding material suggests to use in poor ground condition. The lighter cladding material is the better
Soil Types
B5-General Industrial
L2-Inner Suburban
L4-Central City
L1-Living Suburban
Post-tensioned tendons
Metal
U-shape steel plate 4.3 kg/ m2
Metal
4.3 kg/ m2
Timber
6.6 kg/ m2
Glazing
31.2 kg/ m2
U-shape steel plate External replaceable mild steel dissipaters at the base connections (Pampanin, 2011)
3 - 5 level
2H. PRESSS Steel reinforcing 2H. PRESSS Steel reinforcing 2H. PRESSS Steel reinforcing 2H. PRESSS Steel reinforcing 3. Timber/Glazing Metal/ Precast conc claddings 4. 2.5% x Height 1. Cellular raft 2H. PRESSS Steel reinforcing 3. Timber/Glazing Metal/ Precast conc claddings 4. 2.5% x Height 1. Cellular raft 3. Timber/Glazing 3. Timber/Glazing 3. Timber/Glazing Metal/ Precast Metal/ Precast Metal/ Precast conc claddings conc claddings conc claddings 4. 2.5% x Height 4. 2.5% x Height 4. 2.5% x Height 1. Cellular raft 1. Cellular raft 1. Cellular raft
1. Piles 1. Piles 1. Piles 1. Piles 1. Piles 1. Piles 1. Piles 1. Piles 1. Piles 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2G. Hybrid LVL 2G. Hybrid LVL 2G. Hybrid LVL 2G. Hybrid LVL 2G. Hybrid LVL 2G. Hybrid LVL 2G. Hybrid LVL 2G. Hybrid LVL 2G. Hybrid LVL 2H. PRESSS 2H. PRESSS Steel reinforcing Steel reinforcing 2H. PRESSS Steel reinforcing 2H. PRESSS Steel reinforcing
6 - 10 level
1. Piles 1. Piles 1. Piles 1. Piles 1. Piles 1. Piles 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2C. Base Isolation 2C. Base Isolation 2C. Base Isolation 2C. Base Isolation 2C. Base Isolation2C. Base Isolation 2H. PRESSS Steel reinforcing 3. Timber/Glazing Metal/ Precast conc claddings 4. 2.5% x Height 2H. PRESSS Steel reinforcing 3. Timber/Glazing Metal/ Precast conc claddings 4. 2.5% x Height 2H. PRESSS Steel reinforcing 3. Timber/Glazing Metal/ Precast conc claddings 4. 2.5% x Height 2H. PRESSS Steel reinforcing 3. Timber/Glazing Metal/ Precast conc claddings 4. 2.5% x Height 2H. PRESSS Steel reinforcing 3. Timber/Glazing Metal/ Precast conc claddings 4. 2.5% x Height 2H. PRESSS Steel reinforcing 3. Timber/Glazing Metal/ Precast conc claddings 4. 2.5% x Height
4 Building gap
Current code Maximum seismic drift =2.5% * Height (NZS 1170.5 2004) height Property boundary
Stair Failed
3. Timber/Glazing 3. Timber/Glazing 3. Timber/Glazing 3. Timber/Glazing Metal/ Precast Metal/ Precast Metal/ Precast Metal/ Precast conc claddings conc claddings conc claddings conc claddings 4. 2.5% x Height 4. 2.5% x Height 4. 2.5% x Height 4. 2.5% x Height 1. Cellular raft 1. Cellular raft 1. Cellular raft
2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2G. Hybrid LVL 2H. PRESSS 2G. Hybrid LVL 2H. PRESSS 2G. Hybrid LVL 2H. PRESSS 2G. Hybrid LVL 2H. PRESSS 2G. Hybrid LVL 2H. PRESSS 2G. Hybrid LVL 2H. PRESSS
2B. CBF+Damper 2B. CBF+Damper 2G. Hybrid LVL 2H. PRESSS 2G. Hybrid LVL 2H. PRESSS
1. Cellular raft 1. Cellular raft 1. Cellular raft 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2H. PRESSS
1. Cellular raft 1. Cellular raft 2B. CBF+Damper 2B. CBF+Damper 2H. PRESSS 2H. PRESSS
2C. Base Isolation 2C. Base Isolation 2C. Base Isolation 2C. Base Isolation 2C. Base Isolation2C. Base Isolation 2H. PRESSS 2H. PRESSS
Cover
3. Timber/Glazing 3. Timber/Glazing 3. Timber/Glazing 3. Timber/Glazing 3. Timber/Glazing 3. Timber/Glazing Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings 4. 2.5% x Height 4. 2.5% x Height 4. 2.5% x Height 4. 2.5% x Height 4. 2.5% x Height 4. 2.5% x Height 1. Cellular raft+ piles 1. Cellular raft+ piles 1. Cellular raft+ piles 1. Cellular raft+ piles 1. Cellular raft+ piles 1. Cellular raft+ 1. Cellular raft+ piles piles
3. Timber/Glazing 3. Timber/Glazing Metal claddings Metal claddings 4. 2.5% x Height 4. 2.5% x Height 1. Cellular raft+ 1. Cellular raft+ piles piles
3. Timber/Glazing 3. Timber/Glazing 3. Timber/Glazing Metal claddings Metal claddings Metal claddings 4. 2.5% x Height 4. 2.5% x Height 4. 2.5% x Height 1. Cellular raft + piles 1. Cellular raft + piles 2C. Base Isolation 2H. PRESSS 2H. PRESSS 1. Cellular raft + piles 1. Cellular raft + piles
3. Timber/Glazing 3. Timber/Glazing Metal claddings Metal claddings 4. 2.5% x Height 4. 2.5% x Height 1. Cellular raft + piles 1. Cellular raft + piles
The precast stair case landing details in Grand Chancellor Hotel (Kam, 2011)
Seismic drift Seismic gap
2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2G. Hybrid LVL 2H. PRESSS 2G. Hybrid LVL 2H. PRESSS 2G. Hybrid LVL 2H. PRESSS 2G. Hybrid LVL 2H. PRESSS 2G. Hybrid LVL 2H. PRESSS 2G. Hybrid LVL 2H. PRESSS 2G. Hybrid LVL 2G. Hybrid LVL 2H. PRESSS 2G. Hybrid LVL 2H. PRESSS
2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2C. Base Isolation2C. Base Isolation
3. Timber/Glazing 3. Timber/Glazing 3. Timber/Glazing 3. Timber/Glazing 3. Timber/Glazing 3. Timber/Glazing Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings
4. 2.5% x Height 4. 2.5% x Height 4. 2.5% x Height 4. 2.5% x Height 4. 2.5% x Height 4. 2.5% x Height 4. 2.5% x Height 4. 2.5% x Height 4. 2.5% x Height 1. Cellular raft+ piles 1. Cellular raft+ piles 1. Cellular raft+ piles 1. Cellular raft+ piles 1. Cellular raft+ piles 1. Cellular raft+ 1. Cellular raft+ piles piles 1. Cellular raft+ 1. Cellular raft+ piles piles
3. Timber/Glazing 3. Timber/Glazing 3. Timber/Glazing 3. Timber/Glazing 3. Timber/Glazing 3. Timber/Glazing Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings 4. 2.5% x Height 4. 2.5% x Height 4. 2.5% x Height 4. 2.5% x Height 4. 2.5% x Height 4. 2.5% x Height 1. Cellular raft + piles 1. Cellular raft + 1. Cellular raft + 1. Cellular raft + 1. Cellular raft + piles piles piles piles 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2C. Base Isolation 2C. Base Isolation2C. Base Isolation 1. Cellular raft + piles
or lower end is sliding over the landing area (Bull and Brunsdon, 2011)
2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2G. Hybrid LVL 2G. Hybrid LVL 2G. Hybrid LVL 2G. Hybrid LVL 2G. Hybrid LVL 2G. Hybrid LVL 2G. Hybrid LVL 2G. Hybrid LVL 2G. Hybrid LVL
3. Timber/Glazing 3. Timber/Glazing 3. Timber/Glazing 3. Timber/Glazing 3. Timber/Glazing 3. Timber/Glazing 3. Timber/Glazing 3. Timber/Glazing 3. Timber/Glazing Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings 4. 2.5% x Height 4. 2.5% x Height 4. 2.5% x Height 4. 2.5% x Height 4. 2.5% x Height 4. 2.5% x Height 4. 2.5% x Height 4. 2.5% x Height 4. 2.5% x Height 1. Cellular raft+ 1. Cellular raft+ 1. Cellular raft+ 1. Cellular raft+ 1. Cellular raft+ 1. Cellular raft+ 1. Cellular raft+ 1. Cellular raft+ 1. Cellular raft+ piles piles piles piles piles piles piles piles piles 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2G. Hybrid LVL 2G. Hybrid LVL 2G. Hybrid LVL 2G. Hybrid LVL 2G. Hybrid LVL 2G. Hybrid LVL 2G. Hybrid LVL 2G. Hybrid LVL 2G. Hybrid LVL
3. Timber/Glazing 3. Timber/Glazing 3. Timber/Glazing 3. Timber/Glazing 3. Timber/Glazing 3. Timber/Glazing Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings 4. 2.5% x Height 4. 2.5% x Height 4. 2.5% x Height 4. 2.5% x Height 4. 2.5% x Height 4. 2.5% x Height 1. Cellular raft + 1. Cellular raft + 1. Cellular raft + 1. Cellular raft + 1. Cellular raft + 1. Cellular raft + piles piles piles piles piles piles 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2B. CBF+Damper 2C. Base Isolation 2C. Base Isolation2C. Base Isolation
3. Timber/Glazing 3. Timber/Glazing 3. Timber/Glazing 3. Timber/Glazing 3. Timber/Glazing 3. Timber/Glazing 3. Timber/Glazing 3. Timber/Glazing 3. Timber/Glazing Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings 4. 2.5% x Height 4. 2.5% x Height 4. 2.5% x Height 4. 2.5% x Height 4. 2.5% x Height 4. 2.5% x Height 4. 2.5% x Height 4. 2.5% x Height 4. 2.5% x Height
3. Timber/Glazing 3. Timber/Glazing 3. Timber/Glazing 3. Timber/Glazing 3. Timber/Glazing 3. Timber/Glazing Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings Metal claddings 4. 2.5% x Height 4. 2.5% x Height 4. 2.5% x Height 4. 2.5% x Height 4. 2.5% x Height 4. 2.5% x Height
B5-General Industrial
Soil Types
Soil Types
L4-Central City
L4-Central City
Beam - column damaged at the level where the tower and the structure are connected (Kam, 2011)
The collapse of internal staircase of the Forsyth Barr building (Kam, 2011)