LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Multiple Answer Question Which of the following are important

considerations concerning activity times? Correct Answer Activity time should be obtained from the person responsible for the completion of an activity , Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resources required to carry out the activity are available. Your Answer Activity time should be obtained from the person responsible for the completion of an activity , Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resources required to carry out the activity are available. True/False Question

Independent float either affects the float of preceding activities or that of succeeding activities. Correct Answer False Your Answer False

Multiple Choice Multiple Answer Question Which of the following are assignable cause? Correct Answer Large varaitions in hardness of material , Tool wear , Errors in setting Your Answer Large varaitions in hardness of material , Tool wear , Errors in setting Multiple Choice Single Answer Question What is the reason of excessive friction between parts? Correct Answer Improper or lack of lubrication Your Answer Improper or lack of lubrication

Multiple Choice Single Answer Question Which kind of labour force is required in case of Jobbing Production? Correct Answer Highly Skilled Your Answer Highly Skilled

Multiple Choice Single Answer

Question

What is the location of lower control limit in the X bar-R control chart? Correct Answer 3 standard deviations below central line Your Answer 3 standard deviations below central line

Multiple Choice Single Answer Question Which photographic technique is used to record path of motions of the members of the body during method study? Correct Answer Cyclograph Your Answer Cyclograph

Select The Blank Question The term ________ emplies the foregone profit due to inability of company to produce. Correct Answer Opportunity cost Your Answer True/False Question Opportunity cost

Process Sheets for parts in batch production are not maintained as standard process sheet Correct Answer False Your Answer False

Select The Blank Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________. Correct Answer 0.01 to 10% Your Answer True/False Question 0.01 to 10%

Objective of Work Study is to improve Productivity

Correct Answer True Your Answer True

Multiple Choice Multiple Answer Question Which of the following are activities of corrective maintenance? Correct Answer Overhauling , Emergency repairs , Modifications and improvements

Your Answer

Modifications and improvements , Overhauling , Emergency repairs

True/False Question

Inspection Order can be a verbal order

Correct Answer True Your Answer True

Multiple Choice Single Answer Question Which kind of defect can be called as minor defect? Correct Answer Which does not reduce the usability of the product for its intended use Your Answer Which does not reduce the usability of the product for its intended use Select The Blank Question Capacity decisions have a direct influence on performance of production system in respect of ________ Correct Answer Delivery performance Your Answer Delivery performance

Multiple Choice Multiple Answer Question Which of the following is not the characteristic of Project Production? Correct Answer Continuous flow of material , Highly mechanised material handling , Virtually zero manufacturing cycle time Your Answer Continuous flow of material , Highly mechanised material handling , Virtually zero manufacturing cycle time Select The Blank Question The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________. Correct Answer Overtime working Your Answer Overtime working

Multiple Choice Single Answer Question Which of the following policies is advisable in case of low product variety and large volumes? Correct Answer Low Skilled Labour & Special Purpose Machines Your Answer Low Skilled Labour & Special Purpose Machines

Multiple Choice Multiple Answer

Question

Major contributors in the development of Control Charts, Sampling plan are Correct Answer F H Dodge , H G Roming , Walter Schewhart Your Answer F H Dodge , H G Roming , Walter Schewhart

Multiple Choice Multiple Answer Question Scale model used for layout analysis have following advantages Correct Answer Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown , Models can be shifted easily Your Answer Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown , Models can be shifted easily True/False Question

A network can have more than one starting event but completion event must be only one. Correct Answer False Your Answer False

True/False Question

Since value of p can never be positive, hence" if LCLp works out to be positive, it is taken as zero." Correct Answer False Your Answer False

Multiple Choice Single Answer Question Fixed position layout is adopted when Correct Answer product is very heavy involving assembly of large number of parts Your Answer product is very heavy involving assembly of large number of parts Select The Blank Question OC curve of ideal sampling plan suggests that all lots less than 3% defectives have the probability of acceptance of ________. Correct Answer One Your Answer One

Multiple Choice Single Answer Question What is the reason of fluctuations, if the control chart evaluates that the process is in a state of statistical control? Correct Answer Random variability

Your Answer True/False Question

Random variability

Operation process charts though indicates the sequence of events but do not show movements. Correct Answer True Your Answer True

Multiple Choice Single Answer Question Which kind of gauge consists of electrical contacts operating a series of colloured signal lamps which indicate whether the dimension is correct, oversize or undersize? Correct Answer Multiple gauging Your Answer Multiple gauging

Multiple Choice Multiple Answer Question Which of the following are the objectives of a good maintenance system? Correct Answer Minimisation of wear and tear of machines , Ensuring maximum plant availability , Elimination of unsafe conditions Your Answer Elimination of unsafe conditions , Minimisation of wear and tear of machines , Ensuring maximum plant availability Select The Blank Question The ________ is the defect level for which lots are regarded as bad lots. Correct Answer Lot Tolerance Percentage Defective Your Answer Lot Tolerance Percentage Defective

Multiple Choice Multiple Answer Question What are the advantages of templates over diagrams? Correct Answer Can be conveniently moved on the graph paper , Less laborious , Saves time Your Answer Can be conveniently moved on the graph paper , Less laborious , Saves time Multiple Choice Single Answer Question Inadequate production capacity ultimately leads to Correct Answer Poor Customer Service Your Answer Poor Customer Service

Multiple Choice Single Answer

Question

Inherent Safety' is one of the principle of good layout. In context of layout, this can be achieved by the following Correct Answer Clear gangway, location of material and material handling system Your Answer Clear gangway, location of material and material handling system Multiple Choice Single Answer Question What do you understand by the inspection conducted on all nonreworkable jobs prior to their movement to the scrap yard? Correct Answer Salvage inspection Your Answer Salvage inspection

Multiple Choice Multiple Answer Question Which are major benefits of identifying the critical path? Correct Answer It helps to identify the set of activities and events which are critical and as such must be carefully controlled and monitored , It identifies activities to be given preference in allocation of resources. , It helps to exercise "control by exception". Your Answer It helps to identify the set of activities and events which are critical and as such must be carefully controlled and monitored , It identifies activities to be given preference in allocation of resources. , It helps to exercise "control by exception". Select The Blank Question An ________ history card is the record of all repairs, replacements and engineering changes carried out in the equipment during it's period of service. Correct Answer Equipment history card Your Answer Equipment history card

Multiple Choice Multiple Answer Question In an organization there may not be a formal PPC department if Correct Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large Your Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large Select The Blank Question The ________ are the definitions of the measurable as well as nonmeasurable characteristics of the product. Correct Answer Specifications Your Answer Specifications

True/False Question

Lubrication survey should never be done for a new machine.

Correct Answer False Your Answer False

Multiple Choice Multiple Answer Question Which are three different bases to establish an activity time? Correct Answer Past experience , Judgement , Historical data Your Answer Past experience , Judgement , Historical data

Match The Following Question Information received Change in physical characteristic Addition Consumption of physical effort

Correct Answer Taking dictation Punching Assembly Lifting

Your Answer Taking dictation Punching Assembly Lifting

Multiple Choice Multiple Answer Question Components of Production Management include Correct Answer Capacity Planning , Job Design , Production Planning Your Answer Capacity Planning , Job Design , Production Planning

Match The Following Question Community Facilities Proximity to market Industrial and labour attitude Legislation and taxation

Correct Answer Educational facility Fragile product Productivity of labour Licenses

Your Answer Educational facility Fragile product Productivity of labour Licenses

Multiple Choice Multiple Answer

Question

How many of the following are types of specification?

Correct Answer Material specifications , Dimensional specifications , Performance specifications Your Answer Material specifications , Dimensional specifications , Performance specifications True/False Question

In case of forward pass computation, the earliest event time of a plain event equals the earliest event time of the preceding event plus duration of activity emanating from the preceding event. Correct Answer True Your Answer True

Multiple Choice Multiple Answer Question What are the advantages of three dimensional models? Correct Answer Even non-technical person can use it , Overhead facilities can be shown , Can be shifted easily and quickly Your Answer Even non-technical person can use it , Overhead facilities can be shown , Can be shifted easily and quickly True/False Question

Quality control determines what, when, and how much to inspect while inspection actually conducts examination of goods. Correct Answer True Your Answer True

Multiple Choice Multiple Answer Question Following are some of the Principles of Management advocated by F W Taylor Correct Answer Selection of best worker for each particular task , Division of work between worker and management , Training and development of the workmen Your Answer Selection of best worker for each particular task , Division of work between worker and management , Training and development of the workmen

POM1 LIST OF ATTEMPTED QUESTIONS AND ANSWERS

True/False Question It pays in the long run to inform the customer regarding expected delays in the deliveries. Correct Answer True Your Answer True

Multiple Choice Single Answer Question Fixed position layout is adopted when Correct Answer product is very heavy involving assembly of large number of parts Your Answer product is very heavy involving assembly of large number of parts

Select The Blank Question The ________ is the defect level for which lots are regarded as bad lots. Correct Answer Lot Tolerance Percentage Defective Your Answer Lot Tolerance Percentage Defective

Multiple Choice Multiple Answer Question Which are the advantages of suburban location? Correct Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction Your Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction

Select The Blank Question One detachable ticket is prepared for each ________. Correct Answer Operation Your Answer Worker

Select The Blank Question A good maintenance system is not a luxary but a ________. Correct Answer Necessity Your Answer Necessity

Multiple Choice Multiple Answer Question Following are some of the factors which influence process planning Correct Answer Order Quantity , Process capability of machine , Page 1

POM1 Delivery Dates Your Answer Order Quantity , Delivery Dates , Plant layout

True/False Question Availability of training schools, colleges and management institutes reduces the company's internal training needs. Correct Answer True Your Answer False

Multiple Choice Multiple Answer Question Which of the following are examples of pure materials? Correct Answer Bakeries , Ice factories , Woolen Your Answer Bakeries , Ice factories , Lime stone

Match The Following Question Correct Answer Emerson Efficiency Plan Craft

Your Answer Wage Payment Wage Payment

Facilities Planning

Production Scheduling Sampling Inspection Charting technique

Work Sampling Gantt Chart

Machine utilization Production Scheduling

Match The Following Question Correct Answer

Your Answer Reorder level Stock on hand Over ordering Lead time Price of material

Fixation of inventory level

Symptom of ill planned purchasing Factor influencing material planning Net requirement of material under MRP

Over ordering Lead time Stock on hand

Multiple Choice Multiple Answer Question Which of the following are steps to identify the critical path in a small network? Correct Answer Compare the durations of all paths to identify the longest path. , Sum up the durations of activities along each path. , Enumerate all paths in the network and list down activities on each path. Your Answer Compare the durations of all paths to identify the longest path. , Sum up the durations of activities along each path. , Enumerate all paths in the network and list down activities on each path. Page 2

POM1

Select The Blank Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________. Correct Answer 0.01 to 10% Your Answer 0.01 to 10%

True/False Question Tool breakage has got nearly zero chances in case of eventual breakdown. Correct Answer False Your Answer False

Multiple Choice Multiple Answer Question Which are the three types of float? Correct Answer Total float , Independent float , Free float Your Answer Total float , Dependent float , Free float

Multiple Choice Multiple Answer Question Which of the following are major inputs to scheduling? Correct Answer Overlapping of operations , Effective Capacity per work centre , Performance standards Your Answer Effective Capacity per work centre , Ratio of skilled to unskilled labour , Performance standards

Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory

Select The Blank Question The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Correct Answer Acceptable quality level Your Answer Lot Tolerance Percentage Defective

Select The Blank Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Answer Condition monitoring Your Answer Overhauling

Page 3

POM1 Select The Blank Question OC curve of ideal sampling plan suggests that all lots less than 3% defectives have the probability of acceptance of ________. Correct Answer One Your Answer One

Multiple Choice Single Answer Question How to calculate activity cost slope? Correct Answer Activity cost slope = ( Crash cost - Normal cost ) / ( Normal time - Crash time ) Your Answer Activity cost slope = ( Normal cost - Crash cost ) / ( Normal time - Crash time )

Multiple Choice Multiple Answer Question Which of the following are minimum requirement for a good quality of design? Correct Answer Resonable cost , Resonable procurement time , Resonable manufacturing time Your Answer Resonable cost , Resonable procurement time , Resonable manufacturing time

True/False Question In case of control chart, large smaples such as n=15 or 20 are used if the process standard deviation is small. Correct Answer False Your Answer True

Select The Blank Question Production control work is ________ in case of floor inspection as compared with the centralised inspection. Correct Answer easier Your Answer labourious

Multiple Choice Single Answer Question Production Planning includes Correct Answer Predetermination of manufacturing requirements Your Answer Predetermination of manufacturing requirements

Multiple Choice Single Answer Question How does the control chart of statistical quality control helps the operating personnel? Correct Answer Identify the presence of an assignable cause before it develops Your Answer Reduces chances of rejections

Page 4

POM1 Multiple Choice Single Answer Question What can be the worst effect due to excessive vibration? Correct Answer Breakdown Your Answer Reduced salvage value of machine

Multiple Choice Single Answer Question What do you understand by the metallergical aspects of product which forms the vital part of engineering function? Correct Answer Material specifications Your Answer Performance specifications

Multiple Choice Single Answer Question Which of the following is a cause of plant breakdown? Correct Answer Overloading of machines Your Answer Overloading of machines

Multiple Choice Multiple Answer Question Which of the following possibilities can be explored by using flow process chart? Correct Answer Eliminating the operations or combining the operations with another , Reducing the distance traveled by the workmen or materials , Avoiding the waiting time and thereby reduce production losses Your Answer Reducing the distance traveled by the workmen or materials , Reducing rejections drastically , Avoiding the waiting time and thereby reduce production losses

Multiple Choice Single Answer Question Material Planning is an integral part of Correct Answer Production Planning Your Answer Process Planning

True/False Question Dust gets mixed with lubricants, forms an abrasive substance and causes pre-mature failure of machinery. Correct Answer True Your Answer True

Multiple Choice Multiple Answer Question Which of the following activities are used while recording for method study? Correct Answer Delay , Operation , Inspection Your Answer Operation , Inspection , Production

True/False Question

In case of centralised inspection, inspection rooms generally Page 5

POM1 become bottleneck and cause delay in taking action regarding rejection or rework. Correct Answer True Your Answer True

Select The Blank Question The ________ advocates maintenance procedures whereby the condition of the plant is constantly watched through systematic inspection to unearth unhealthy conditions and preventive Correct Answer Preventive Maintenance Your Answer Preventive Maintenance

True/False Question The problems of congestion, bottlenecks and backtracking can not be visualized by using templates and models. Correct Answer False Your Answer False

Multiple Choice Single Answer Question Which varaible is taken along the abscissa or X axis? Correct Answer Time Your Answer Quality

True/False Question Delay in completion of projects result in unwelcome additions to the fixed manufacturing expenses. Correct Answer True Your Answer True

Select The Blank Question The term ________ emplies the foregone profit due to inability of company to produce. Correct Answer Opportunity cost Your Answer Idle wages

Multiple Choice Single Answer Question Taxes / duties levied is one of the important determinant for location decision as taxes/duties substantially influence Correct Answer Product cost Your Answer Order procurement

Multiple Choice Multiple Answer Question What are the uses of failure statistics analysis? Correct Answer To forecast the defect , To identify causes of major repetative failures , To quantify the frequency of preventive inspection Page 6

POM1 Your Answer To forecast the defect , To identify causes of major repetative failures , To quantify the frequency of preventive inspection

True/False Question Shop order is one of the subsidiary order Correct Answer True Your Answer True

Multiple Choice Single Answer Question Which of the following is the most popular technique for Project Production? Correct Answer PERT & CPM Your Answer PERT & CPM

Select The Blank Question The ________ is the probability that a good lot will be rejected by the sampling plan. Correct Answer Producer's risk Your Answer Lot Tolerance Percentage Defective

True/False Question The component produced on completely automatic machines may be subjected to sampling inspection while parts produced on semi-automatic and completely manual operated machines require cent percent inspection. Correct Answer True Your Answer False

Multiple Choice Multiple Answer Question In an organization there may not be a formal PPC department if Correct Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large Your Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large

Multiple Choice Multiple Answer Question Which of the following selecting or rejecting a particular site view? Correct Answer Labour laws , of licences Your Answer Labour laws , Policies of labour

factors play important role while from legislation and taxation point of Building codes , Policies regarding issue regarding issue of licences , Productivity

Page 7

POM1

Page 8

POM2 LIST OF ATTEMPTED QUESTIONS AND ANSWERS

True/False Question Cent percent inspection is required on WIP prior to the key, critical or costly operation. Correct Answer True Your Answer True

Multiple Choice Multiple Answer Question Which of the following aspects are essential to ensure quality of purchased items? Correct Answer Defining right quality for the job , Vendor performance evaluation , Making sure that suppliers understand the requirements Your Answer Vendor performance evaluation , Making sure that suppliers understand the requirements , Defining right quality for the job

Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory

Multiple Choice Single Answer Question Which of the following technique is event oriented ? Correct Answer Project Evaluation & Review Technique Your Answer Project Evaluation & Review Technique

Select The Blank Question Work study is also called ________ study Correct Answer Time and Motion Your Answer Time and Motion

Multiple Choice Multiple Answer Question Which of the following concepts must be understood for the achievement of quality? Correct Answer Quality of conformance , Purpose of product , Quality of design Your Answer Quality of conformance , Quality of design

Multiple Choice Multiple Answer Question Following are some of the factors considered for evaluation of alternative layouts Correct Answer Flow of Material , Equipment utilization , Ease of supervision Page 1

Your Answer

POM2 Flow of Material , Equipment utilization , Ease of supervision

Match The Following Question Correct Answer Toung Eye Nose Ear Sweet Crack Sweet Crack

Your Answer

Burnout Burnout Impact Impact

Multiple Choice Multiple Answer Question Which of the following are important considerations concerning activity times? Correct Answer Activity time should be obtained from the person responsible for the completion of an activity , Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resources required to carry out the activity are available. Your Answer Activity time should be obtained from the person responsible for the completion of an activity , Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resources required to carry out the activity are available.

Multiple Choice Multiple Answer Question Which are the subtasks of the maintenance phase of the method study? Correct Answer Monitoring and control , Performance appraisal , Audit on savings Your Answer Monitoring and control , Performance appraisal , Audit on savings

Multiple Choice Multiple Answer Question Which of the following are characteristics of an operating characteristics curve? Correct Answer Producer risk , Consumer Risk , Acceptable Quality Level Your Answer Producer risk , Consumer Risk , Acceptable Quality Level

Select The Blank Question The ________ breakdowns usually cost more, partly due to damage done to the adjustment components and partly due to emergency actions. Page 2

POM2 Correct Answer Your Answer Partial Unexpected

Multiple Choice Single Answer Question Why stores issue order should not be issued as soon as it is prepared? Correct Answer Material may or may not be available at the time of preparation Your Answer Inventory investment will increase

Multiple Choice Single Answer Question What is the nature of the sampling plan for critical defects? Correct Answer Tight Your Answer Tight

Select The Blank Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________. Correct Answer 0.01 to 10% Your Answer 0.01 to 10%

Multiple Choice Multiple Answer Question Plant layout facilitates processing of products in most effective manner through the following Correct Answer Shortest possible distance , Shortest processing time , Minimum movement Your Answer Shortest possible distance , Shortest processing time , Minimum movement

True/False Question After goods have been manufactured, route sheets and operation layouts should not be collected back. Correct Answer False Your Answer False

Multiple Choice Single Answer Question Process planning is the process of Correct Answer establishing shortest and most economic path of production Your Answer establishing shortest and most economic path of production

Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Page 3

POM2 Your Answer Operation

Select The Blank Question The ________ is specified to indicate the maximum permissible variability in the dimensions product or parts. Correct Answer Tolerance Your Answer Tolerance

Select The Blank Question Goods after final inspection should accompany ________to enable dispatch department to identify and draw correct reference. Correct Answer Forwarding note Your Answer Forwarding note

Select The Blank Question The ________ includes preventive maintenance activities whose needs are identified through inspection which requires stoppage of machines. Correct Answer Shutdown Maintenance Your Answer Shutdown Maintenance

True/False Question A load chart specifies the work to be carried out by each person of company during shift hours. Correct Answer False Your Answer True

Select The Blank Question The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________. Correct Answer Overtime working Your Answer Overtime working

True/False Question Under MRP system for common items order for procurement is placed based on requirement for each product Correct Answer False Your Answer True

Multiple Choice Single Answer Question What do you understand by the extent the products manufactured conforms to the laid down design? Correct Answer Quality of conformance Your Answer Quality of conformance

Page 4

POM2 Select The Blank Question The ________ is necessary when the job requires detailed of one or more of the job characteristics with the help of special equipment which is not available at the producing company. Correct Answer Inspection order Your Answer Job card

Multiple Choice Multiple Answer Question Which of the following are the basic requirements of quality standard? Correct Answer Deifinite , Undesrstandable , Economically viable Your Answer Deifinite , Undesrstandable , Economically viable

True/False Question In case of forward pass computation, the earliest event time of the first event is zero. Correct Answer True Your Answer True

Multiple Choice Multiple Answer Question Which kind of possible defectives can be reduced due to first off inspection? Correct Answer Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machine set up Your Answer Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machine set up , Due to purposely done mistakes by unsatisfied worker

True/False Question A sampling plan which perfectly discriminates will have vertical OC curve. Correct Answer True Your Answer True

Multiple Choice Multiple Answer Question Which of the following is a part of preparing manufacturing order set as a primary function of dispatching? Correct Answer Operational layouts , Move orders , Pre-filled stores issue orders Your Answer Operational layouts , Rejection reports , Move orders , Pre-filled stores issue orders

Select The Blank Question An ________ history card is the record of all repairs, replacements and engineering changes carried out in the equipment during it's period of service. Page 5

POM2 Correct Answer Equipment history card Your Answer Equipment history card

True/False Question Specifications is the basic tool of inspection. Correct Answer True Your Answer True

Match The Following Question Correct Answer

Your Answer Past consumption analysis

Forcasting requirement for indirect material technique Economic order quantity Inventory control by classification ABC Analysis Structure of the product BOM BOM MRP

ABC Analysis

Material Planning for dependent demand

MRP

Multiple Choice Single Answer Question The document raised by PPC which authorises different functions to take action as per instruction is called Correct Answer Work Order Your Answer Job Instructions

Multiple Choice Single Answer Question Who prepares the daily production report? Correct Answer Shop Supervisor Your Answer Shop Supervisor

True/False Question A lot declared rejected in sampling inspection should not be inspected 100% in any case. Correct Answer False Your Answer True

Multiple Choice Single Answer Question How is the probability of acceptance in case of Acceptable Quality Level (AQL )? Correct Answer Very high Your Answer Average

Multiple Choice Multiple Answer Page 6

POM2 Question Which are the different methods of recording actual progress of work? Correct Answer Display boards , Progress cards , Network updating Your Answer Display boards , Progress cards , Network updating

True/False Question The dispatching function is of very importance in flow and mass production units. Correct Answer False Your Answer True

True/False Question Proper care and storage is not an essential part of a well planned lubrication system. Correct Answer False Your Answer False

Select The Blank Question The ________ pertain to the climatic conditions which the component , product or material should withstand. Correct Answer Environmental specifications Your Answer Environmental specifications

Multiple Choice Single Answer Question Which of the following is the most popular technique for Project Production? Correct Answer PERT & CPM Your Answer PERT & CPM

Select The Blank Question Production Planning is a centralised activity which includes functions such as ________ Correct Answer Scheduling Your Answer Scheduling

Multiple Choice Single Answer Question Which rule is used for numbering of events? Correct Answer Fulkerson's Rule Your Answer Fulkerson's Rule

Page 7

POM3 ASSIGNMENT Q.1) What is Operations Management? What are the objectives of Operations Management? Enlist key elements of Operations Management.

Answer.1) An operation may be defined as the process of changing inputs into outputs thereby adding value to some entity.Right quality, right quantity, right time and right price are the four basic requirements of the customers and as such they determine the extent of customer satisfaction. And if these can be provided at a minimum cost, then the value of goods produced or services rendered increases. Thus the objectives of production management are to produce goods and services of the right quality, in the right quantities, according to the time schedule and a minimum cost. Objectives of production management may be amplified as under: Producing the right kind of goods and services that satisfy customers needs (effectiveness objective). Maximizing output of goods and services with minimum resource inputs (efficiency objective). Ensuring that goods and services produced conform to pre-set quality specifications (quality objective). Minimizing throughput-time- the time that elapses in the conversion process- by reducing delays, waiting time and idle time (lead time objective). Maximizing utilization of manpower, machines, etc. (Capacity utilization objective). Minimizing cost of producing goods or rendering a service (Cost objective). Key elements of Operations Management

1.

Product selection and design

The right kind of products and good designs of the products are crucial for the success of an organizing. A wrong selection of the product and/or poor design of the products can render the companys operation ineffective and non-competitive. Products/services, therefore, must be chosen after detailed evaluation of the product/services alternatives in conformity with the organizations objectives. Techniques like value engineering may be employed in creating alternate designs, which are free from unnecessary features and meet the intended functions at the lowest cost. 2. Process selection and planning Page 1

POM3 Selection of the optimal conversion system is as important as choice of products/services and their design. Process selection decisions include decisions concerning choice of technology, Equipment, machines, material handling systems, mechanization and automation. Process planning involves detailing of processes if resource conversion required and their sequence.

Facilities (Plant) location

Plant location decisions are strategic decisions and once plant is set up at a location, it is comparatively immobile and can be shifted later only at a considerable cost and interruption of production. Although problem of location choice does not fall within preview the production function and it occurs infrequently, yet it is of crucial importance because of its major effect on the performance of every department including production. Therefore, it is important to choose the right location, which will minimize total delivered customer cost (Production and distribution cost). Locational decisions involve evaluation of locational alternatives against multiplicity of relevant factors considering their relative importance to the organization and selecting those, which are operationally advantageous to the organization. 4. Facilities (Plant) layout and materials handling Plant layout is concerned with relative location of one department (Work centre) with another in order to facilitate material flow and processing of a product in the most efficient manner through the shortest possible time. A good layout reduces material handling cost, eliminates delays and congestion, improves co-ordination, provide good housekeeping etc. while a poor layout results in congestion, waste, frustration, inefficiency and loss of profit. 5. Capacity Planning

Capacity planning concerns determination and acquisition of productive resource to ensure that their availability matches the demand. Capacity decisions have a direct Influence on performance of production system in respect of both resource productivity and customer service (i.e. delivery performance). Excess capacity results in low resource productivity while inadequate capacity leads to poor customer service. Capacity planning decisions can be short-term decisions. Long-term capacity planning decisions concern expansion/contraction of major facilities required in the conversion process, economics of multiple shift operation, development of vendors for major components etc. Short term capacity planning decisions concern issues like overtime working, sub-contracting, shift adjustments etc. Break even analysis is a valuable tool for capacity planning. 6. Production Planning and Control (PPC)

Production planning is the system for specifying the production procedure to obtain the desired output in a given time at optimum cost in conformance with specified standard of quality, and control is essential to ensure that Page 2

POM3 manufacturing takes place in the manner stated in the plan. 7. Inventory control

Inventory control deals with determination of optimal inventory levels of raw materials, components, parts, tools; finished goods, spares and supplies to ensure their availability with minimum capital lock up. Material requirement planning (MRP) and just-in-Time (JIT) are the latest techniques that can help the firm to reduce inventory.

8.

Quality assurance and control

Quality is an important aspect of production system and it must ensure that services and products produced by the company conform to the declared quality standards at the minimum cost A total quality assurance system includes such aspects as setting standards of quality, inspection of purchased and sub-contracted parts, control of quality during manufacture and inspection of finished product including performance testing etc. 9. Work study and job design

Work-study, also called time and motion study, is concerned with improvement of productivity in the existing jobs and the maximization of productivity in the design of new jobs. Two principal component of work-study are: (i) (ii) Method study Work measurement

Method study has been defined (BS 3138) as the systematic recording and critical examination of the existing and proposed ways of doing work, as a means of developing and applying easier and more effective methods and reducing costs. Method study when applied to production methods yields one or more of the following benefits: 10. Improved work environment Improved facility layout Better utilization of facilities Greater safety Lesser materials handling Smooth production flow Lower work-in-process Higher earnings for the workmen Maintenance and replacement

Maintenance and replacement involve selection of optimal maintenance Preventive and/or breakdown) policy to ensure higher equipment availability at minimum maintenance and repair cost. Preventive maintenance, which includes Page 3

POM3 preventive inspection, planned lubrication, periodic cleaning and upkeep, planned replacement of parts, condition monitoring of the equipment and machines, etc. is most appropriate for critical machines.

11.

Cost reduction and cost control

Effective production management must ensure minimum cost of production and in this context cost reduction and cost control acquires significant importance. There are large number of tools and techniques available that can help to make a heavy dent on the production cost.

Q.2) What is batch Production? What are its key characteristics? Compare these characteristics with those of project production. Answer.2) Batch production is characterized by the manufacture of a limited number of a product (but many such quantities of different products) produced at periodic intervals and stocked in warehouses as finished goods (or finished parts) awaiting sales (or withdrawal for assembly). Typical examples of batch production are: process industries such as pharmaceuticals, paints, chemicals; medium and heavy engineering industry engaged in the manufacture of electric motors, switch gears, heavy motor vehicles, internal combustion engines; manufacture of ready made garments; manufacture of assembly shops such as machine tools; sub contractors which take on machining of batches of components to the drawings of a large manufacture etc. Characteristics of batch production (a) Short runs:

Short production runs and frequent changes of set also characterize batch production up. The equipment and the assembly set up is used for a limited number of parts or assemblies and is then changed to make a different product. The production is generally made to stock. (b) Skilled labour in specific trades: The labour force is expected to posses skill in one specific manufacturing process, Turning, milling, drilling, welding, grinding, hobbing, fitting etc. The operator may perform simpler machine set-ups but the separate machine tool setter performs those involving complex operations. (c) Supervision to possess knowledge of a specific process The supervision has considerable knowledge of a specific process. Supervisor in the grinding section for example, may not expert in turning and drilling work but s expected to possess a find of knowledge of different types of grinding operations. Page 4

POM3 Similarly a supervisor in the gear shop is expected to have sound knowledge in working of different types of gear cutting machines. (d) Limited span of control: The amount of supervision required in batch production is lower than that of jobbing production. The ration of direct workmen to supervisors is more or less a function of batch size. The smaller the batches, the lower are the ratio of direct workers to supervisors, and vice versa. This is because smaller lots require each supervisor to spend a great deal of his time in allocating new work, giving instructions, follow up on the shop floor for proper movement of materials from and to the machines, identifying delays and interruptions, and arranging, in consultation with planning, work load in his section to keep his men busy. (e) General purpose machines and process type of layout Plant and equipment is procured and arranged to obtain maximum flexibility. General purpose machines and handling equipment capable of performing variety of operations with minimum set up times are installed in lieu of variety of products. The machines are arranged to give process layout-layout by function. Similar machines capable of doing similar types of operations are grouped together and kept at one place. Presses for example, are put together and kept at one place milling machines are placed together at another place, drilling machines are kept at the third place, gear cutting machines are located at the fourth place and so on. Each Group of machines is usually designated as a work centre or a section or a shop. (f) Manual materials handling: Materials handling in batch production as compared to jobbing production are small. Individual components and parts are placed in trolleys and trays and are transported as unit loads. Materials handling may be mechanized by deploying power driven trucks. (g) Manufacturing cycle time affected due to queues: The manufacture cycle time is comparatively smaller than jobbing production but is much more than mass and flow production. The batches of work tend to queue up at different machines due to differing cycles times, batch sizes and sequence of operations. (h) Large work-in-progress: Work in progress is comparatively large due to varying work content of different components, imbalance in manufacturing times, formation of queues between the machines. (i) Flexibility of production schedules: Disruptions due to machine breakdown or absenteeism do not seriously affect production as job can be shifted to another machine or another operator from another machine can be shifted. (j) Need to have production planning and control: Functions of production planning and control in a batch production unit are more complex than those in jobbing production or mass and flow production: Page 5

POM3 Materials control and tools control functions are important. kind of replenishment system needs to be used to ensure routine replenishment Some

Detailed operational layout and route sheets are prepared for each part of the product. Loading and scheduling needs to be more detailed and more sophisticated since every machine requires to be individually scheduled. Progressing function is very important to collect information on progress of work. A separate progress card needs to be maintained to record progress of each component. Expediting is generally necessary since quite often jobs, due to imbalances in work content, tend to lag behind

Q.3) (a) Why are locational decisions important? What factors should be taken into account while deciding location of a unit to manufacture washing machines? Answer.3a) Locational decisions generally arise when: A new manufacturing (or servicing) unit is to be set up. Existing plant operations are difficult to expand due to poor selection of site earlier. The growth of the business makes it advisable to establish additional facilities in new territories. There is emergence of new social (chronic labour problems) political (political instability or economic conditions that suggest a change in the location of the existing plant. The product development has over weighted the advantages of the existing plant. The changes in the industrial Policy of the Government, favoring decentralizing and dispersal of industries to achieve overall development of the country, do not permit expansion of the existing plant

FACTORS GOVERNING PLANT LOCATION Plant location studies are conducted in three phases: (i) (ii) (iii) 1. General territory selection Community selection, and Site selection Proximity to market: Page 6

POM3 Every company is in business to market and it can survive only if their product reaches the consumers on time and at the competitive price. The ratio of selling costs to sales generally increases with distance. Therefore, in the choice of location o the plant, the factor of proximity to the market is given the highest priority. Locating a plant nearer to the market is preferred if: The The The The significantly product is fragile. product is susceptible to spoilage. promptness of service is required. product is relatively inexpensive and transportation costs add to the cost.

Bread, soap factories, etc. require the market to be nearby. If factory cannot be started in Bombay, it may be started in Thane, Kalyan or Poona. If the product is exported, location near ports is desirable. This is particularly important for producers who sell bulky commodities, which incur high transportation costs

Nearness to market not only lowers transportation costs but also gives many other benefits namely: A good many administrative problems, which cause perpetual headaches and add to costs, are avoided. Liaison with dealers or whole sellers can be maintained economically and easily Other costs such as commission to middlemen, which at times run as high as 20 to 50 percent can be reduced significantly. Customers accounts do not remain outstanding for settlement. This recovery is easy and less time saving which itself reduces selling costs. 2. Proximity to source of raw materials:

Since raw materials usually constitute 50 to 60 percent of the total product cost, it is important that the firm gets its requirements of raw materials at the right time and at the reasonable price for which the plant must be located in the neighborhood of some source which can meet the raw materials requirement of the unit Proximity to supply of raw materials factor assumes still greater importance if raw materials are of perishable nature or if they are expensive to transport, or if their weight is substantially reduced by processing. Proximity to sources of raw materials is equally important for small units. This is because usually small units are not considered important customers. Page 7

POM3 They get least priority and in the event of scarcity are the one to be struck off first from the list. The availability of materials to small units to a large extent thus depends on their follow up and personal visits to the suppliers plant which is possible only if the buyers plant is close by. 3. Infrastructural facilities:

Infrastructural facilities consider availability of utilities like power water, disposal of waste etc. These form the life-blood of many types of industries without which there facilities may come to a stand still. Underestimating the need of any one of the utilities can be extremely costly and inconvenient. Certain industries, for example, aluminium, steel, etc are power intensive and must be located close to the sites of power generation failing which the shortage of, or increase in cost of generating power may spell problems for their survival. Similarly, chemical process industries like paper and pulp, cement, steel, sugar laundries, metal plating, food preparation etc. requires perennial source of water. Mineral content of water may also be an important factor. Treatment of water is an expense to be considered while comparing economics of different locations. Drainage facilities are important for process industries otherwise disposal of process waster can create lot of difficulties. 4. Transport facilities:

Transportation cost to the value added is a key determinant of the plant location. The structure of the transportation cost depends on (i) Characteristics of the commodity (ii) average distance of shipment (iii) medium of shipment: rail, road, and air sea. The need for transport arises because raw materials and fuel are to be moved to factory site and finished goods are to be transported from factory to markets. Other things being equal since transport cost has a major effect on product cost, the regions well served by transport facilities are most suitable for industrial locations. 5. Labour and wages:

Plant location should be such that required labour is easily available in the neighbourhood. Importing labour from outside is usually costly and it causes lot of administrative problems. Availability of required labour locally is better since problem of arranging accommodation and other related problems do not arise. Since normally workers with specific skills are required, some sort of training facility should also be available in the neighborhood. Skilled employees are easily available if ITIs, or Engineering colleges are there in the neighbourhood. 6. Legislation and taxation:

Page 8

POM3 The policies of the state Government and Local Bodies relating to issue of licenses, building codes, labour laws, etc. are the factors in selecting/rejecting a particular community/site. In order to disperse industries and ensure balanced economic growth, both Central and State government offer a package of incentives for setting up industries in particular locations. Exemption from excise duty, sales tax and octroi, soft loans from financial institutions, subsidy in electricity charges, etc. are some of the incentives offered. Since taxes and duties levied by the State Government and Local bodies substantially influence product cost, the incidence of such taxes/levies must be taken into account while selecting a community/site. 7. Climatic conditions:

Climatic factors may not have a major influence these days because of modern air conditioning facilities available today. However, it may be important factor for certain industries like textile mills, which require high humidity. 8. Industrial and labour attitudes:

Community attitudes towards supporting hostile trade union activities are an important factor. Locating facilities in a certain region/community may not be desirable as frequent labour problems and interruptions are harmful to the plant in the long run. Political situation in the state and attitude of the government towards labour activities also influences selection of the site for the plant. 9. Safety requirement:

Safety factor may be important for certain industries such as: Nuclear power plants Explosive factories Location of such industries close to border areas is undesirable.

10.

Community facilities (or social infrastructure):

Community facilities imply accommodation, educational, entertainment and transport facilities. Accommodation is needed unless the employees are local residents. Accommodation should be easily available, comparatively cheap and near some public transport stop. The locational area should be fully developed, be accessible by road and should have a convenient and efficient public transport system operating between the area and the township to enable employees, officials, customers and suppliers to make easy trips for their work Page 9

POM3 11. Community attitudes:

Community attitudes towards work (i.e. whether the people in the location are hard working or otherwise) as well as their attitudes towards the incoming entrepreneurs (helpful and cooperative or otherwise) can make or mar an industry. Locational decisions, therefore, must take such factors also into account particularly while setting up labour intensive units.

12.

Supporting industries and services:

Locational factors should also include proximity of services needed by the firm. A firm desirous of getting some or all parts made from outside or some of the operations done from outside must see that such sub-contractors are located in the neighbourhood. Getting a job done from units located at far off places will mean not only additional transportation cost but also time consuming and costly. Also if units are too far off, the control on quality of work done by them cannot be exercised. 13. Suitability of the land:

Site selection should also take into account topography and soil structure of the land. The soil structure must be capable of bearing loads of foundations. Though modern building techniques can overcome the limitations of the soil, but if considerable improvement is required then selection of a low cost and may ultimately turn out to be expensive.

14.

Availability and cost of the land:

Site size (Plot size) must be large enough to accommodate the present production facilities, parking and access facilities but also leave sufficient room for future expansion. As a general rule, a site five times the actual plant size is considered minimum for all these things including future expansion.

ECONOMY SURVEY OF THE SITE SELECTION: An ideal location is one where the cost of obtaining materials and processing them into finished product plus the cost of distributing the finished product to customers is minimum.

Page 10

POM3 One of the most commonly used approaches consists of following steps: Step 1: Prepare a list of all relevant factors.

Step 2: Estimate expenses on materials, transport, wages, power etc for each location on each of the above factors. Step 3: Collect data on intangible factors like community facilities, community attitudes etc. Step 4: Analyse the tangible data for each location and calculate rate of return on investment. Step 5: Select provisionally a locational based on financial data.

Step 6: Compare the intangible data for the different locations and select the optimal location considering intangible data. Q.3) (b) What are objectives of a good layout? Discuss any six principles of a good layout? Answer.3)(b) OBJECTIVE OF A GOOD PLANT LAYOUT Only through an efficient layout, the organization can attain the following objectives: (i) (ii) (iii) (iv) (v) Economy in handling of materials, work-in-process and finished goods. Minimization of product delays. Lesser work-in-progress and minimum manufacturing cycle time. Efficient utilization of available space. Easy supervision and better production control.

(vi) Greater flexibility for changes in product design and for future expansion. (vii) Better working conditions by eliminating causes of excessive noise, objectionable odor smoke etc.

PRINCIPLES OF A GOOD LAYOUT (i) Overall integration of factors: A good layout is one that integrates men, materials, machines and supporting activities and others in a way that the best compromise is obtained No layout can satisfy each and every principle of a good layout. Page 11 Some

POM3 criterion may conflict with some other criterion and as a result no layout can be ideal it has to integrate all factors into the best possible compromise. (ii) Minimum movement: A good layout is one that permits the minimum movement between the operations. The plant and machinery in case of product layout and departments in case of process layout should be arranged as per sequence of operations of most of the products. ? Since straight line is the shortest distance between any two points, men and materials as far as possible should be made to move along the straight path A door may be made in a wall or a hole may be drilled in a ceiling if that eliminates or reduces material handling in place of stairs or a distant door.

(iii) Uni-direction flow: A good layout is one that makes the materials move only in the forward direction, towards stage of completion, with any backtracking. ? Since straight line is the shortest distance between any two, points, materials as far as possible should be made to move on the principle of straight line flow. And when straight line flow is not possible, other flows like U-shaped flow, circular flow or zig zag flow may be adopted, but the layout may ensure that materials move in the forward direction (Fig 4.1) ? To ensure forward flow, equipment if necessary may be duplicated.

(iv) Effective use of available space: A good layout is one that makes effective use of available space both horizontal and vertical Backtracking and duplicated movements consume more time, involve un-necessary materials handling, add to cost and lead to inefficiency. Raw materials, work-in-progress and finished goods should be piled vertically one above another rather than being strewn on the floor. Pallets or equivalents should be made use of to pile up several layers one above another Area below the work tables or in the cupboards built into the wall are welcome since they reduce requirement of space

(v) Maximum visibility: A good layout is one that makes men, machines and materials ready observable Page 12

POM3 at all times.

All departments should be smoothly integrated, convenient to service and easy to supervise Every piece of positioning or screening or partitioning should be scrutinized and carefully planned. Special cupboards, enclosures, offices, partitions etc. should be avoided except when their utility is established beyond doubt. (vi) Maximum accessibility: A good layout is one that makes all servicing and maintenance point readily accessible. Machines should be kept sufficiently apart and with reasonable clearance from The wall so that lubrication, adjustment and replacement of belts, removal of parts at the time of repairs etc can be done conveniently by the maintenance staff. Area in front of electrical panels and fire extinguishers should be kept free from obstructions.

Q.4) How does production planning differ from production control? What are the key functions of production planning and control? Answer.4) Production planning versus production control. Planning (Planning the work) Control (Working the Plan) Planning involves collection and maintenance of data regarding time standards, materials and their specifications, machines and their quantities, tools and their process capabilities, drawings and operational layouts etc. Planning is seeing that requirements tool, machines, men, instructions, authorization and the like-will be available at the right time and in the right quantities and are of proper quality. Planning involves preparations of load charts and fitting various work orders into uncommitted time available on the companys facilities (men or machines). Planning involves preparation of all necessary forms and paper work. Planning involves designing suitable feed back as to what may happen.

Planning involves forwarding thinking regarding the remedial action to be taken if the job falls behind schedule. Planning therefore is a centralized Page 13

POM3 Activity (in the office) and includes such functions as materials control, tools control, process planning and scheduling. Control involves dissemination of data preparation of reports regarding output, machine and labour efficiency, percent defectives etc.

Control is seeing the requirements are actually made available at the right place and in the right quantities.

Control involves actual seeing that the jobs are started and completed as per schedule prepared by the scheduling cell of the PPC. Control involves actual issue of forms and paper work. Control involves keeping track of what is happening and collecting information as to what has happened. Control involves suggesting remedial action when the job is falling behind schedule. Control is thus a diffused activity (in the shops) and includes functions such as dispatching, progressing and expediting.

FUNCTIONS OF PRODUCTION PLANNING AND CONTROL: Production planning and control is normally assigned two sets of functions: (I)Regular functions and (ii) Optional functions. (i) Regular functions are those, which are generally assigned to PPC in most of the organizations through the importance of the function, may vary from industry to industry. (ii) Optional functions are those, which may be assigned to PPC depending upon policy of the management of the firm.

Page 14

POM3 Common (or Regular Functions) Optional Functions

Order Preparation includes activities like making of work orders, converting work orders to shop orders, preparing auxiliary orders and releasing such orders to those concerned to authorize their activities

Materials control concerns preparations of materials estimates, indenting non-stock materials, ascertaining availability of materials purchased to stock, continual follow-up with purchase and stores for timely receipt of materials, and advising stores to allocate required quantities or available materials (alternatively on their receipt) against specific shop orders.

Process planning or Routing concerns fixation of method of manufacture: operations and their sequence, machine tool for each operation, jigs and fixtures, measuring instruments and gauges etc. to enable shops to produce goods of the right quality at the lowest cost. Tools control concerns preparations of estimates of cutting tools (Standards as week As non-standards tools), gauges and measuring instruments, jigs and fixtures etc indenting non-stick tooling: follow up with tool room for timely manufacture of jigs and fixtures; periodical replenishment of worn-out-non-consumable tooling (e.g. work arbors, collets, copying masters, Allen keys, spanners, etc.

Scheduling concerns preparation of machine loads, fixation of calendar dates of various operations to be performed on a job, coordination with sales to confirm delivery dates of new items and periodical preparation of dispatch schedules of regular items.

Dispatching concerns preparation and distribution of shop orders and manufacturing instructions to the concerned department as their authority to perform the work according to the predetermined schedule. Progressing concerns collection of data from manufacturing shops, recording of progress of work, and comparing progress against the plan. Expediting concerns intensive progress chasing to identify delays and interruptions which may hold up production, devising cures from time to time to keep rate of production in line with the schedule, communicating possible failure in delivery commitments to Sales Department. Cost Estimation concerns preparations of Preproduction cost estimates to be used by sales department for quotation purposes (Alternatively this may be assigned to Costing Department Or Industrial Engineering Department)

Page 15

POM3 Work measurement concern fixation of time to be allowed to a qualified workman to carry out a specific task, under specified conditions and at the defined level of performance. Work measurement employs scientific, well-known techniques like time study, work sampling standard data, production study, analytical estimating etc. (Alternatively, work measurement function may be assigned to Industrial Engineering department. Sub-Contract concerns offloading of certain work on outside vendors for economic reasons or to augment the existing manufacturing facilities (Sub-contract work alternatively) be handled by Materials/purchase Department)

Capacity planning concerns estimation of requirements of men and machines as the basis of decision making to meet the firms increased volume of business (Some companies prefer to assign this function to Engineering department.

Demand forecasting concerns making projection of companys product market. Though, long term forecasts are given by Sales Department but short term forecasts required for materials planning, machine loading, sub contracting etc may be prepared by PPC department

Q.12 (a) What is critical path? What does it signify? How is it identified? Answer.2)(a) Critical path analysis, an important aid to planning, scheduling and coordinating the activities if large scale projects. Is a synthesis of two independent techniques: Programme Evaluation and Review Technique (PERT) and Critical Path Method (CPM). Though the two techniques were developed independently, they are only superficially different. The two method have many features in common and are now combined into a technique called Critical Path Analysis (CPA) or Network Analysis. There are three basic different between a PERT network and CPM network: PERT is event oriented while CPM is activity oriented (i.e. PERT prepares network from events while CPM builds if from activities) PERT provides for an allowance for uncertainty while CPM does not (i.e. PERT makes three time estimates for each activity while CPM makes one time estimate)

Page 16

POM3 Activity time in CPM technique are related to costs while it is not so in PERT since it is event oriented Significance of critical path Critical path analysis offers several advantages. It

(i) Forces through pre-planning. Each and every activity compromising the project is identified and recorded. Nothing is left to memory or chance which prevents crises in scheduling (ii) Increases coordination of tasks as technological relationship between the activities suggests which activities can run simultaneously and which should succeed others. (iii) Helps computations of different project durations for different level of resources and thereby select a plan that minimizes total project cost. (iv) Indicates optimal start and finish times of each activity of the project. (v) Defines areas of responsibility of different departmental heads for timely execution of the project. (vi) Facilitates progress reporting and limits unnecessary discussion at the progress meetings. (vii) Identifies troubles spot often in advance and apply remedial measures. (viii) Enables the plan to be revised in accordance with changes/changing circumstances. (ix) Helps to exercise control by exception and prevents cost overruns. A Project comprises a series of activities and the identification of the individual activities requires knowledge and experience of the men responsible for the planning of the project. Even the preliminaries-mere listing of the activities-make the operating personnel: Think of details about the project well in advance.

Observe critically the way in which the various activities interact or compete for scarce resources Improve upon the original plans even before network is formally drawn and analyzed. A project, therefore, must be torn into a set of identifiable activities. are no set rules but general guidelines are as under: There

An activity should represent the smallest unit of the operation or set of operations over which management desires control. An activity should represent an operation or set of operations, which can be performed using a particular kind of equipment or a special skill. For example in construction project, plumbing is considered as one activity while wiring can be considered as another activity since the first activity requires plumbers and the second activity needs electricians.

Page 17

POM3

Q.12) (b) Activity 1-2 1-3 1-4 2-5 3-5 4-5 4-6 5-6 Optimistic 02 03 02 04 02 06 01 01 04 05 02 03 02 05 03 05 Most Likely 10 06 10 01 12 04 08 13 Pessimistic

Answer:

Page 18

POM3 (a) Expected time of an activity can be obtained from the three time estimates using the formula: te = a + 4m +b 6 where a m b a m b te = = = = = = = Optimistic time most likely time pessimistic time 2 3 10

For activity (1-2)

2 + 4 x 3 + 10 6 24 6 = 4

te

Expected times of all activities of the network, calculated on above lines, are tabulated below. Activity 1-2 1-3 1-4 2-5 3-5 4-5 4-6 5-6 Three time estimates 02-03-10 4 02-04-06 4 02-06-10 6 01-01-01 1 04-05-12 6 02-03-04 3 02-05-08 5 03-05-13 6 Expected time

6 6

4 4

6 1

Page 19

POM3 Critical path is 1-3,3-5,5-6 and the duration for the project is 16 weeks (4+6+6) Variance is

Vi

(b a) X (b a) 6 6 4 9 16 9 25 9

V1-3

V3-5

V5-6

V V

= =

V1-3 + V3-5 + V5-6 5 = T - Tcp

Standard deviation Z ? = ?5 19 -16

= 2.236 = 1.34

The approximate probability value when Z = 1.34 is 0.9099 ?The probability of completion of critical path by the schedule time of 19 weeks = 91% Q.5) What is preventive maintenance? Why it is better than Breakdown Maintenance? What are the key activities of Preventive Maintenance? Answer.5) Preventive maintenance anticipates failures and adopts necessary actions to check failures before they occur. It includes activities like inspection, lubrication cleaning and unkeeps, minor adjustments and replacements found necessary at the time of inspection etc. Preventive maintenance can be either: running maintenance or shut down maintenance. Running maintenance includes maintenance activities (e.g. minor adjustments In machines revealed through inspections, lubrication, cleaning and unkeep etc.) Which are carried out when the machine is still running. Shutdown maintenance includes preventive maintenance activities such as minor component replacement whose needs are identified through inspections, which require stoppage of Machines. Page 20

POM3 Preventive inspection is one of the key activities of preventive maintenance which is usually performed by making use of human senses watch) eye), listen (ear), Touch (hand, leg, body) smell (nose) and taste (tongue) but the trend is Changing towards use of condition monitoring instruments. Such maintenance. Practice is known as predictive maintenance or condition based maintenance.

Q.10) (a) What are X-R Charts? How are they made and used in controlling a process? Answer.10) X-R chart is a pair of chart consisting of a average (called X chart) and a range Chart (called R chart) placed one below another on a piece of graph paper. The X chart is used to control the mean value of the characteristic an R-chart is used to restrict the range of variations in the values. X-R charts are drawn when the characteristics are measurable. Each chart consists of three values: a central line, upper control limit and lower control limit. The central line represents the arithmetic average of the sample means which equals the mean of the population, u. The upper and lower control limits are located at three standard deviation on either side of the central line. Samples of fixed size are drawn at regular intervals and measurements are taken. The samples wise values of the mean and range are plotted in their respective X and R charts. The spread of sample points in the charts is studied to decide the remedial action (if any) to be taken. The X chart analyses whether or not the mean of the quality Characteristics is within control while R-chart analyses whether or not the variability is within control. STEPS TO PREPARE X-R CHART A pre-requisite to the preparation of the chart is the decision on the following aspects: Quality Characteristics refer to the property of the product, which is to be assessed. The quality characteristics must be capable of being measured. In case of more than quality characteristics, separate chart is made for each quality characteristic. Sample size refers to number of pieces comprising each sample. Sample size is an important decision. It is a common practice to use sample of n = 4 or 5 to have low appraisal cost. Large samples such as n = 15 or 20 are used if the process standard deviation is large. Sample Population refers to the number of samples to be collected to construct a control chart. The number of samples must be sufficient. Usually, 20 samples each of size 4 or 5 are enough to have good estimates of the process average (X) and dispersion (R). Time Interval measures the time gap between consecutive samples. Time interval, as a genera rule, should be proportional to the average frequency of out-of-control conditions. It is a fairly complex decision since a number of factors such as cost economy, susceptibility of the process to Page 21

POM3 disturbances; convenience of the inspector etc. requires to be considered. The making of X-R Charts involves the following Steps: Step 1: Collect Data

(a) Collect sufficient samples spread over a reasonable period. Each sample must be of equal size. (b) Measure each component comprising the sample for the given quality characteristic (c) Record individual measurements on a work data sheet. Step 2: Calculate mean (X) and Range (R) of each sample

A The mean which is written as X (X bar) is average of each sample and is Obtained by totaling the individual measurements of the units comprising the sample and dividing the total by the sample size (number of units in each sample) B The range, which is written as R, is obtained as the difference between the highest and the lowest measurement of a sample. C The values of X and R are recorded sample wise either on the extreme right of the individual measurements on the data sheet or in a separate table.

Step 3: Calculate grand Average (X) and mean Range (R) A The grand average, which is written as, X (X double bar) is the average of the sample averages and is obtained by dividing the total of the averages of all the samples by the total number of samples. B The mean range, which is written as, R (R bar) is the average of the ranges and is obtained by dividing the total of the ranges of the samples by the total number of samples.

Step 4:

Set up Control chart for the average

A Set up a control chart with the central line drawn at X (X double bar), upper control limit located X + A2R (R bar) and the lower control limit set up at X-A2R. B Plot the averages to see whether the process was under control when samples were drawn. C If all points fall within the control limits, the process is said to be under control D If process is not under control (indicated by some points falling outside the control limits), eliminate points outside the control limits and compute new trial control limits for the remaining points. E Repeat step 4 (d) until all points fall within the control limits F Control limits in a particular situation should be revised from time to time as additional data is accumulated. Step 5: Calculate control limits of the range chart Page 22

POM3 A The control chart for range chart is set up with central line as R, upper control limit (UCLR) located at D4R above the central line and lower control limit (LCL) at D3R below the central line B Plot the value of the range of each sample. C If all points fall within the control limits no modification is necessary unless it is desired to reduce the process dispersion D if range chart exhibits lack of control indicated by some points falling outside the control limits, eliminate those points out of control and compute new trial control limits E Repeat step 5 (d) until all points fall within the control limits. F Control limits in a practical situation should be revised time to time as additional data is accumulated.

Step 6: Use control chart A Collect samples of fixed size at specified intervals of time. B Measure each unit of the sample for the quality characteristics, calculate mean and the range of each sample. C charts D action Plot the values of X and R of each sample in their respective Study the trend of the points to interpret and suggest remedial

Q10 (b) ABC company produces a solvent, which must contain 3 percent of alcohol. It tries to maintain the actual percentage at 3 + 0.3 percent. It tests hourly in samples of five. The following table shows the results of last five samples. Set up a control chart for mean and examine whether the process is under control. A) Solution: (i) Collect data (ii) Calculate mean (X bar) and range(R bar)

Page 23

Sample No. 1 2 3 4 5 (iii) X(X bar) 2.92 2.98 3.06 3 3

POM3 Arithmetic Mean (X bar) Range(R) 0.3 0.1 0.1 0 0.2

Calculate grand average and the mean range = 2.92 + 2.98 + 3.06 + 3 + 3 5 = 2.992

0.3 + 0.1 + 0.1 + 0 + 0.2 5 = 0.14

(iv)

Set Up control chart for the average = = 2.992 UCLx = X (X bar) + A2.R(R bar)

Central Line = CLx = X(X bar) Upper Control Limit = = 2.992 + 0.5768 x 0.14 3.476

Lower Control Limit = = 2.992 - 0.5768 x 0.14 2.507

UCLx = X (X bar) - A2.R(R bar)

(v)

Set up a range chart = R(R bar) = LCLR = = 0.14 D3.R (R

Central line CLR Lower control limit bar)

0 x 0.14

Page 24

POM3 = Lower control limit bar) = 0 UCLR = D4.R (R

= =

2.114 x 0.14 0.29596

Q.6) What is method study? Describe the procedural steps to develop easier and effective methods. Answer.6) Method study is the systematic recording and critical examination of existing and proposed ways of doing work, as a means of developing and applying easier and more effective methods and reducing costs. Method study is an organized approach and its investigation rests on the following six basic steps outlined in the block diagram Select the work to be analyzed. Record all facts relating to the existing method. Examine the recorded facts critically but impartially. Develop the most economical method commensurate with plant Requirements Install the new method as standard practice. Maintain the new method.

Selection of the job Selections of the jobs to be studied for methods improvement by the method study practioner is a managerial responsibility and it (selection) may be based on economic technical or human consideration. Economic consideration justifies selection based on the economic worth (i.e. money saving potential) of the job. Technical consideration identifies jobs, which require studies to overcome manufacturing difficulties (excessive rejection, relaxation in prefixed performance standards, inability if the shops to stick to specified machining parameters such as speeds, feeds, depth of cut etc., inconsistent quality etc.) Human consideration in job selection is usually given weightage while introducing method study practices for the first time. Recording of facts Systematic recording is the most crucial step in method improvement. Since recording by long hand (or by descriptive method) has its limitations, it is not recommended for use in method study. Instead, five symbols and eight charting conventions are used to record facts relating to the job under study. Page 25

POM3 Five typical symbols are O, ||, ?, D and V and eight charting conventions concern composition of the chart, reject, rework, repletion, change of state, introducing of new material, combined events and numbering of events. The document on which details of the process are recorded by the above referred symbols and conventions is called chart. There are four basic types of chart: (i) operation process chart (ii) Flow process chart (iii) multiple activity charts and (iv) two handed process chart. Besides charts, two types of diagrams-flow diagram and string diagram are drawn when recording details of an existing layout. Travel chart is another typical chart, which is used to record frequency of movements (weight x distance) between work centres/departments.

Repetitive short cycle operation which involves quick hand/feel motions (i.e. microscopic motions) may be studied with micro motion study. Glibreth, founder father of micro motion study, also developed photographic techniques called cyclograph and chronocylegraph to record path of the motions of the members of the body. Critical examination Critical examination aims to analyze the facts critically and thereby give rise to alternatives, which form the basis of selection and development of easier, and effective methods. Critical examination is conducted through a systematic and methodical questioning process. Each activity recorded on the chart, whether it relates to processing or inspection, or material handling, or to any other aspect, is picked up one at a time and is examined minutely. The questioning process is considered under five major heads, namely the purpose, the place, the sequence, the person and the means. These five aspects in critical examination are referred to as five governing considerations. Development and selection: Development and selection stage concerns short listing of ideas generated at the critical examination stage, testing each short listed idea for its technical and economic feasibility, and making selection among the alternatives wherever choice exists. To develop ideas and to ascertain their technical and economical feasibility, the method study practioner needs to solicit the cooperation of personnel from different departments of the company. Various techniques available for the development and selection purpose are: cost benefit analysis, break even analysis, investment analysis and critical path analysis. Installation Installation (or implementation) of the proposed method involves preparation of project report on recommendations making oral presentation to the top Page 26

POM3 management, securing approval of the decision maker, assisting line management during implementation, arranging training of workmen, and getting jobs (operations) retime after implementation, arranging training of workmen, and getting jobs (operations) retimed after implementation. Maintenance Maintenance phase is the follow up phase after implementation, which serves as a monitoring and control mechanism. It helps to ensure that the revised methods are set into concrete and workmen do not revert back to old methods. It also provides an opportunity to the practitioner to assess the effectiveness of the approach followed by him and makes changes in the methodology (if required).

Q.9) (a) What desirable conditions need to be present to be present to guarantee success of an incentive scheme? Answer.9) A good wage incentive plan should have the following characteristics. Administrative simplicity: The incentive system should be simple and must be easily understood by the workers and their representatives. An incentives scheme, which can be understood, only by engineers and mathematicians or a scheme which involves the use of complex formulate or references and cross-references is sure to fail. The incentive scheme should be such that workmen can calculate their own earnings easily and quickly. Minimum clerical work: The system should fit into existing system of production and cost control. should not involve any significant addition to the clerical work.

It

Maximum coverage: The system should cover as many workmen as possible. A scheme if applied to a few workmen creates a demoralizing effect on the morale of those not covered by the scheme. Direct Incentive payments should increase at least in direct proportion to the increase in output by the operator. There are two reasons: Firstly because it is more difficult to producer extra units and secondly because saving in the overheads are far greater at higher levels of production. Period of Payment The period of payment should be as short as possible Adequate guaranteed minimum hourly rate The scheme must ensure adequate guaranteed minimum hourly rate to all Page 27

POM3 incentive workers regardless of their output. Such an hourly guaranteed rate is normally referred to as the guaranteed base rate. The guaranteed base rate must be realistic and should be at least equal to the hourly rate payable to a non-incentive worker doing similar job in the industry. Incentive earnings of the workers should never be regarded as a substitute for poor wages. Accurate and yet attainable performance standards Performance standards should be set through systematic work measurement studies. The experts to that there is no dispute or malpractice and yet the standards are attainable so that a worker working at normal pace can attain them should base the standards of measurement on the assessment.

Further the incentive plan should be such that it provides an opportunity to all average workers to earn reasonable earnings. Consistency of the standards Standards once fixed should not be changed unless there is a permanent change in methods, or change in equipment, or change in material and plan should provide for the provisions to modify the performance standards. Inbuilt check on process rejections A good incentive scheme should exercise a check on the operator against achieving higher bonus by poor workmanship. Payment should be made only for pieces declared acceptable by the inspection department and a workman constantly producing substandard pieces should be liable for disciplinary action. Payment of partially completed jobs The problem of payment for the incomplete work arises only in case of long cycle jobs. Situations do arise when the jobs are of very long cycle duration and cannot be finished within the bonus period. Similarly, a semi-finished job may require to be handed over by one operator to another at the end of shift, or prior to having a holiday. The scheme should clearly spell out as how assessment of work done by the workmen on the same job will be carried out and how disputes arising out of such assessment would be resolved. Payment of Idle Time Adequate safeguards must be provided to compensate the operator for the time lost due to reasons beyond his control. A good incentive scheme should ensure that an operator does not suffer financial loss for reasons attributable to the managerial weakness, e.g.: lack of material due to bad buying, breakdowns of the machines due to poor maintenance practices, non-availability of work etc. Thus an operator rendered idle because of factors attributable to the management should be given a lieu bonus.

Page 28

POM3 Safeguards The scheme should be fair not only to the employees but also to the employer. Safeguarding clauses as under should be incorporated to protect. a. Managements right to change a standard when there are changes in methods. Materials and machines b. Managements right to withdraw or discontinue temporarily a scheme during bad period. c. Managements right to initiate disciplinary action against operators who continually produce sub-standard articles. d. Managements right to initiate disciplinary action against employees who, time and again, do not achieve minimum standard of production even in the presence of fair and accurate standards. e. Managements right to initiate disciplinary action against employees who, time and again are found using speeds and feeds higher than those recommended in the process sheet (or operational layouts) Maximum ceiling on the earnings The system should have built-in-control against higher earnings beyond a certain limit. Firstly, the system should discourage workers to work beyond a certain limit otherwise too attractive an incentive scheme may induce the worker to work more and more and thereby adversely affect his health. Secondly, the system should ensure that in case of loose standards the company does not lose financially. Consistency of Plan The plan should be consistent over a period of time. Frequent changes in the plan make its functioning difficult. Faith in plan is lost if there are frequent revisions. Acceptance of Labour Body The scheme should finally have acceptance of the labour body. The body of workers representatives to prevent any misunderstanding and ill-feeling later on must accept the basic incentive plan and its provisions. Continuous Use The scheme should be in continuous use. The temporary use of the scheme in good times and its discontinuation in bad times makes its functioning difficult. Define End Results The plan must result in reduction in per unit labor cost.

Page 29

POM3

Q 13) Answer 13) i) Average Cycle time = 0.22 + 0.24 + 0.28 + 0.26 + 0.25 5 = Normal Time = 0.25

Observed time x Rating 100 = 0.25 x 80 100 0.2

Similarly, average cycle time and normal time for all the elements are calculated and tabulated as below Element A B C D E Avg. cycle time 0.25 80 0.15 100 0.35 120 0.102 90 0.12 100 Rating 0.2 0.15 0.42 0.0918 0.12 Normal time

Total Normal time

= Page 30

0.2 + 0.15 + 0.42 + 0.0918 +

POM3 0.12 Total Normal time = 0.9818

ii)

Relaxation Allowance

15 100 =

0.9818

0.1473 x 0.9818

Contingency Allowance

5 100 0.0491

?Standard time

Normal time + Relaxation Allowance + Contingency Allowance = ?Standard time 0.9818 + 0.1473 + 0.0491 = 1.1782

Page 31

POM4 LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Multiple Choice Multiple Answer Question Which of the following aspects are essential to ensure quality of purchased items? Correct Answer Defining right quality for the job , Vendor performance evaluation , Making sure that suppliers understand the requirements Your Answer Defining right quality for the job , Vendor performance evaluation , Making sure that suppliers understand the requirements

Select The Blank Question The ________ breakdowns usually cost more, partly due to damage done to the adjustment components and partly due to emergency actions. Correct Answer Unexpected Your Answer Unexpected

True/False Question After goods have been manufactured, route sheets and operation layouts should not be collected back. Correct Answer False Your Answer False

True/False Question In case of centralised inspection, inspection rooms generally become bottleneck and cause delay in taking action regarding rejection or rework. Correct Answer True Your Answer True

Multiple Choice Single Answer Question MRP is based on the concept of inventory demand which is of following type Correct Answer Dependent and independent Your Answer Dependent and independent

Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory

Multiple Choice Multiple Answer Page 1

POM4 Question Components of Production Management include Correct Answer Capacity Planning , Job Design , Production Planning Your Answer Capacity Planning , Job Design , Production Planning

Multiple Choice Single Answer Question Which of the following is the criteria for the percentage defectives in the zone of the indecision? Correct Answer Lots having the percentage defective more than AQL but less than LPTD Your Answer Lots having the percentage defective more than AQL but less than LPTD

Multiple Choice Multiple Answer Question Which of the following are examples of addition during recording for method study? Correct Answer Brazing , Welding , Riveting Your Answer Brazing , Welding , Riveting

Select The Blank Question The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________. Correct Answer Overtime working Your Answer Overtime working

Select The Blank Question An Ideal OC curve is ________ shaped curve that accpets all the lots with quality equal to or better than AQL . Correct Answer Rectangular Your Answer Rectangular

Multiple Choice Multiple Answer Question Which of the following causes can be responsible for derailing the production schedule in a factory? Correct Answer Errors in drawings , Delay in receipt of material from vendor , Excessive absenteeism Your Answer Errors in drawings , Delay in receipt of material from vendor , Excessive absenteeism

Multiple Choice Multiple Answer Question Which of the following situations demand the economic consideration while selecting a job for method study? Correct Answer Unorderly movement of men and materials , Excessive process defectives , Too many suggestions received for improvement from a department or section Your Answer Unorderly movement of men and materials , Excessive process defectives , Inconsistent quality Page 2

POM4

True/False Question During set up of X bar-R control chart, control limts should be practically revised from time to time as additional data is accumulated. Correct Answer True Your Answer False

Multiple Choice Multiple Answer Question Which of the following are the basic requirements of quality standard? Correct Answer Deifinite , Undesrstandable , Economically viable Your Answer Absolute uniformity , Undesrstandable , Economically viable

Match The Following Question Correct Answer Toung Eye Nose Ear Sweet Crack Sweet Crack

Your Answer

Burnout Burnout Impact Roughness

Select The Blank Question The ________ is the defect level for which lots are regarded as bad lots. Correct Answer Lot Tolerance Percentage Defective Your Answer Acceptable quality level

True/False Question Floor inspection delays the identification of faults which can not be rectified immediately before large lots are spoiled. Correct Answer False Your Answer False

True/False Question Cent percent inspection is required on WIP prior to the key, critical or costly operation. Correct Answer True Your Answer True

Multiple Choice Single Answer Question The document which incorporates details of process planning Page 3

POM4 for a job is called Correct Answer Route Sheet Your Answer Route Sheet

True/False Question Repetitive movements between work stations which are difficult to be traced on string diagrams can be conveniently shown on flow diagrams. Correct Answer False Your Answer True

Multiple Choice Single Answer Question Which of the following is the most popular technique for Project Production? Correct Answer PERT & CPM Your Answer PERT & CPM

Multiple Choice Single Answer Question Technique of Value Engineering can be effectively employed in design of a product to Correct Answer To meet the intended function at lowest cost Your Answer To meet the intended function at lowest cost

Multiple Choice Single Answer Question What can be the worst effect due to excessive vibration? Correct Answer Breakdown Your Answer Breakdown

Multiple Choice Single Answer Question What is the relation between duration of an activity and length of an arrow? Correct Answer No relation Your Answer No relation

Multiple Choice Single Answer Question What is the nature of the sampling plan for critical defects? Correct Answer Tight Your Answer Tight

Select The Blank Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Answer Condition monitoring Your Answer Condition monitoring

Page 4

POM4 Multiple Choice Multiple Answer Question Which of the following are important considerations concerning activity times? Correct Answer Activity time should be obtained from the person responsible for the completion of an activity , Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resources required to carry out the activity are available. Your Answer Activity time should be obtained from the person responsible for the completion of an activity , Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resources required to carry out the activity are available.

Multiple Choice Single Answer Question Which of the following techniques is used by industrial engineering department to obtain the utilisation index? Correct Answer Work Sampling Studies Your Answer Break Even Analysis

Multiple Choice Multiple Answer Question Which of the following selecting or rejecting a particular site view? Correct Answer Labour laws , of licences Your Answer Labour laws , Building licences

factors play important role while from legislation and taxation point of Building codes , Policies regarding issue codes , Policies regarding issue of

Multiple Choice Multiple Answer Question Which of the following cases can be referred as operation in method study recording? Correct Answer Change in physical characteristic , Consumption of physical effort , Change in chemical characteristic Your Answer Change in physical characteristic , Consumption of physical effort , Movement of material

True/False Question An activity can share the same tail event and same head event with any other activity. Correct Answer False Your Answer True

Select The Blank Question The ________ must ensure that the product satisfy the functional requirements of it's usage. Correct Answer Quality of design Page 5

POM4 Your Answer Quality of design

Multiple Choice Multiple Answer Question Which of the following are examples of pure materials? Correct Answer Bakeries , Ice factories , Woolen Your Answer Bakeries , Ice factories , Woolen

Select The Blank Question The ________ are the definitions of the measurable as well as nonmeasurable characteristics of the product. Correct Answer Specifications Your Answer Specifications

Multiple Choice Single Answer Question Site factors for plant location include Correct Answer Suitability of land Your Answer Suitability of land

Select The Blank Question The ________ is the probability that a good lot will be rejected by the sampling plan. Correct Answer Producer's risk Your Answer Producer's risk

Multiple Choice Multiple Answer Question Which of the following defects can be observed during preventive inspection by using human senses? Correct Answer Deviation from normal sound , Excessive Vibration , Leakage of a gas Your Answer Deviation from normal sound , Excessive Vibration , Leakage of a gas

Select The Blank Question The ________ includes preventive maintenance activities whose needs are identified through inspection which requires stoppage of machines. Correct Answer Shutdown Maintenance Your Answer Working Maintenance

True/False Question Independent float either affects the float of preceding activities or that of succeeding activities. Correct Answer False Your Answer False

Page 6

POM4 Multiple Choice Multiple Answer Question Lack of material planning results in the following Correct Answer Over ordering , under ordering , stockouts Your Answer Over ordering , under ordering , stockouts

True/False Question F W Taylor devised a system for classifying motions into basic divisions called Therbligs Correct Answer False Your Answer False

Select The Blank Question Work study is also called ________ study Correct Answer Time and Motion Your Answer Time and Motion

Match The Following Question Correct Answer

Your Answer Technique for evolving and

Factor Analysis Method to evaluate layouts analysis of layouts

Minimization of production delays Objective of good layout layout Maximum visibility Scale model

Objective of good

Principles of good layout Principles of good layout Method to evaluate layouts

Layout analysis

Multiple Choice Single Answer Question Following is one of the techniques used for Material Planning for high value material Correct Answer MRP Your Answer MRP

Multiple Choice Single Answer Question What do you understand by totality of features and characteristics of a product or service that bears on it's ability to satisfy the customer? Correct Answer Quality Your Answer Quality

Select The Blank Question One detachable ticket is prepared for each ________. Correct Answer Operation Page 7

POM4 Your Answer Worker

Page 8

POM5 LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Multiple Choice Single Answer Question One of the sophisticated operations research techniques used in material planning is Correct Answer Dynamic programming Your Answer Dynamic programming

True/False Question Job life is one of the factors that influence Process Planning Correct Answer True Your Answer True

Multiple Choice Multiple Answer Question Following are some of the Principles of Management advocated by F W Taylor Correct Answer Selection of best worker for each particular task , Division of work between worker and management , Training and development of the workmen Your Answer Selection of best worker for each particular task , Division of work between worker and management , Training and development of the workmen

Multiple Choice Single Answer Question Product layout is employed for manufacturing following products Correct Answer refrigirators Your Answer ships

Select The Blank Question Work study is also called ________ study Correct Answer Time and Motion Your Answer Job

Multiple Choice Multiple Answer Question Which of the following situations demand the technical consideration while selecting a job for method study? Correct Answer Jobs having inconsistent quality , Operations inviting frequent requests from supervisors for relaxation in allowed time because of variations in materials and tool performance , Jobs in which too many man-hours are spend in checking and rechecking work Your Answer Jobs having inconsistent quality , Operations inviting frequent requests from supervisors for relaxation in allowed time because of variations in materials and tool performance , Jobs in which too many man-hours are spend in checking and rechecking work Page 1

POM5

True/False Question Quality control determines what, when, and how much to inspect while inspection actually conducts examination of goods. Correct Answer True Your Answer True

Select The Blank Question The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Correct Answer Acceptable quality level Your Answer Producer's risk

Select The Blank Question The term ________ emplies the foregone profit due to inability of company to produce. Correct Answer Opportunity cost Your Answer Opportunity cost

True/False Question All activities must not be tied up into the network Correct Answer False Your Answer False

True/False Question F W Taylor devised a system for classifying motions into basic divisions called Therbligs Correct Answer False Your Answer True

Multiple Choice Multiple Answer Question Which of the following may be the objectives of project crashing? Correct Answer To achieve uniformity in requirement of resources , To complete the project in the least possible time , To reduce project cost below it's normal cost Your Answer To complete the project in the least possible time , To achieve uniformity in requirement of resources , To improve the labour efficiency

Multiple Choice Multiple Answer Question What is indicated by the hugging points lying close to mean of the process in X bar-R- control chart? Correct Answer Biases in measurements , Recording done without actual measurements , Improper selection of samples Page 2

POM5 Your Answer Recording done without actual measurements , Improper selection of samples

Multiple Choice Single Answer Question Following is one of the techniques used for Material Planning for high value material Correct Answer MRP Your Answer MRP

Select The Blank Question The ________ is the probability that a good lot will be rejected by the sampling plan. Correct Answer Producer's risk Your Answer Producer's risk

Multiple Choice Single Answer Question One of the characterstic of layout is about the flow of material / personnel. In a good layout the flow should be Correct Answer Unidirectional Your Answer Unidirectional

True/False Question The event numbers as far as possible reflect the logical relationships of the activities. Correct Answer True Your Answer False

Multiple Choice Multiple Answer Question Material Requirement Planning is very useful in following situations Correct Answer Long Lead time for procurement , Several levels of assemblies in product , Long manufacturing cycle Your Answer Long Lead time for procurement , Several levels of assemblies in product , Long manufacturing cycle

True/False Question Cent percent inspection is often more practical and economical than sampling inspection. Correct Answer False Your Answer False

Select The Blank Question The ________ must ensure that the product satisfy the functional requirements of it's usage. Correct Answer Quality of design Page 3

Your Answer

POM5 Quality of conformance

True/False Question Both, preventive and breakdown maintenance work must be assigned to the same team. Correct Answer False Your Answer False

Multiple Choice Single Answer Question Following is one of the tasks of Production Control Correct Answer Actual issue of forms and documents Your Answer Actual issue of forms and documents

Multiple Choice Single Answer Question Process Engineer does not get sufficient time for designing tooling for most economic production run when Correct Answer Delivery time is less Your Answer Delivery time is less

Multiple Choice Multiple Answer Question Components of Production Management include Correct Answer Capacity Planning , Job Design , Production Planning Your Answer Capacity Planning , Production Planning , Manpower Planning

Multiple Choice Multiple Answer Question Which of the following products should be produced by using mass production? Correct Answer Refrigerator , Tyre for automobile , Television Set Your Answer Refrigerator , Tyre for automobile , Television Set

Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Manufacturing

Select The Blank Question A good maintenance system is not a luxary but a ________. Correct Answer Necessity Your Answer Necessity

Multiple Choice Single Answer Question What is the specific name for the Gantt chart when it shows at a glance the scheduling of various operations involved in a job? Page 4

POM5 Correct Answer Job Schedule Your Answer Load Chart

Select The Blank Question A set of activities to keep an equipment in the specified condition is called as ________. Correct Answer Maintenance Your Answer Maintenance

Multiple Choice Single Answer Question What do you mean by lowest possible direct cost required to complete an activity within it's crashed time? Correct Answer Crash cost Your Answer Crash cost

Multiple Choice Multiple Answer Question Which of the following factors decide the choice between the cent percent and sampling inspection? Correct Answer Nature of inspection , Natural tolerance versus design tolerance , Vendor's quality rating Your Answer Nature of inspection , Natural tolerance versus design tolerance , Vendor's quality rating

Select The Blank Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Answer Condition monitoring Your Answer Condition monitoring

Multiple Choice Multiple Answer Question Which of the following are examples of attributes? Correct Answer Cracks , Burrs , Texture Your Answer Cracks , Burrs , Texture

Multiple Choice Single Answer Question Which of the following is the criteria for the percentage defectives in the zone of the indecision? Correct Answer Lots having the percentage defective more than AQL but less than LPTD Your Answer Lots having the percentage defective more than AQL but less than LPTD

Multiple Choice Single Answer Question In mass/batch production organizations where goods are produced for stocking, Work Order is raised on the basis of Page 5

POM5 Correct Answer Sales Programme Your Answer Sales Order

Match The Following Question Correct Answer Fixed Position Layout Product Layout Process Layout

Your Answer Project Layout Functional Layout

Line Layout

Project Layout

Functional Layout job layout Mixed Layout

Combined Layout Mixed Layout

Multiple Choice Single Answer Question What do you understand by the measurement of work to establish allowed time for a job for the defined method? Correct Answer Work measurement Your Answer Work measurement

Select The Blank Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________. Correct Answer 0.01 to 10% Your Answer 0.01 to 10%

True/False Question Objective of Work Study is to improve Productivity Correct Answer True Your Answer False

Multiple Choice Multiple Answer Question Which are the distinct functions of scientific quality control? Correct Answer Acceptance function , Preventive function , Assurance function Your Answer Acceptance function , Feedback function , Preventive function

Match The Following Question Correct Answer

Your Answer Preventive maintenance Preventive

Interruption for machine utilisation maintenance Input for scheduling

Overlapping of operations Strings

Page 6

Technique of scheduling Scheduling Device Strings

POM5 Critical Path Analysis Blackboard

Critical Path Analysis

Select The Blank Question An Ideal OC curve is ________ shaped curve that accpets all the lots with quality equal to or better than AQL . Correct Answer Rectangular Your Answer Rectangular

True/False Question Breakdown of machines, absenteeism of worker does not dislocate the manufacturing activity in process layout Correct Answer True Your Answer True

True/False Question Since value of c can never be negativee, hence" if LCLp works out to be negative, it is taken as zero." Correct Answer True Your Answer True

Multiple Choice Single Answer Question Who prepares the daily production report? Correct Answer Shop Supervisor Your Answer Worker

True/False Question The dispatching function is of very importance in flow and mass production units. Correct Answer False Your Answer True

Multiple Choice Multiple Answer Question Which are major benefits of identifying the critical path? Correct Answer It helps to identify the set of activities and events which are critical and as such must be carefully controlled and monitored , It identifies activities to be given preference in allocation of resources. , It helps to exercise "control by exception". Your Answer It helps to identify the set of activities and events which are critical and as such must be carefully controlled and monitored , It helps to exercise "control by exception".

Page 7

POM6 LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Select The Blank Question A ________ is another form of subcontracting. Correct Answer Hiring capacity Your Answer Open purchase order

True/False Question An ideal OC curve is never possible only with cent percent inspection. Correct Answer False Your Answer True

Match The Following Question Correct Answer Table lubrication Weekly

Your Answer Six monthly Yearly Yearly

Draining and refilling of oil reserviors of plunger pump Parts lubricated with oil nipple Tools and slideways Daily Weekly

two to three times a day Daily

True/False Question The operator should not stop production if first piece is not approved by the inspector. Correct Answer False Your Answer False

Multiple Choice Multiple Answer Question Which of the following causes can be responsible for derailing the production schedule in a factory? Correct Answer Errors in drawings , Delay in receipt of material from vendor , Excessive absenteeism Your Answer Errors in drawings , Delay in receipt of material from vendor , Excessive absenteeism

True/False Question For p-chart, the central line of fraction defectives is determined by average percentage defectives. Correct Answer True Your Answer True

Page 1

POM6 Multiple Choice Multiple Answer Question Expediting function is concerned with following activities Correct Answer Progress chasing to identify delays which may hold up production , Communicating possible delays in delivery date commitment to sales department , Devising cures to keep rate of production in line with schedule Your Answer Recording progress of work , Communicating possible delays in delivery date commitment to sales department , Devising cures to keep rate of production in line with schedule

Multiple Choice Single Answer Question When should operator or supervisor is supposed to sign the perforated route sheet? Correct Answer After completion of operation Your Answer After completion of operation

Select The Blank Question The ________ is necessary when the job requires detailed of one or more of the job characteristics with the help of special equipment which is not available at the producing company. Correct Answer Inspection order Your Answer Move order

Multiple Choice Multiple Answer Question What are the benefits of reconditioning? Correct Answer Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps to plan requirement of replacement spares Your Answer Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps to plan requirement of replacement spares

Multiple Choice Multiple Answer Question Which of the following processes or activities are denoted by using symbols while recording in method study? Correct Answer Transport , Delay , Storage Your Answer Transport , Rejection , Storage

Multiple Choice Single Answer Question Which is the zone beyond LTPD in case of Oc curve of a general plan? Correct Answer Zone of rejection Your Answer Zone of rejection

True/False Question

A properly designed sampling plan can control sampling Page 2

POM6 errors and completely eliminate them. Correct Answer False Your Answer True

Select The Blank Question The ________ includes preventive maintenance activities whose needs are identified through inspection which requires stoppage of machines. Correct Answer Shutdown Maintenance Your Answer Shutdown Maintenance

Select The Blank Question The ________ pertain to the climatic conditions which the component , product or material should withstand. Correct Answer Environmental specifications Your Answer Environmental specifications

True/False Question Grouping of machines gives a lot of flexibility in loading and scheduling Correct Answer True Your Answer True

True/False Question A lot declared rejected in sampling inspection should not be inspected 100% in any case. Correct Answer False Your Answer False

Multiple Choice Multiple Answer Question Which of the following are the basic requirements of quality standard? Correct Answer Deifinite , Undesrstandable , Economically viable Your Answer Absolute uniformity , Undesrstandable , Economically viable

True/False Question The plotting of activities - critical, non-critical and dummy activities- is strictly according to their precedence relationship. Correct Answer True Your Answer True

Multiple Choice Multiple Answer Question Which of the following are activities of corrective maintenance? Correct Answer Modifications and improvements , Overhauling , Emergency repairs Your Answer Modifications and improvements , Overhauling , Lubrication as Page 3

POM6 per schedule

Multiple Choice Single Answer Question Following is not a function of PPC Correct Answer Product Planning Your Answer Order Processing

Multiple Choice Multiple Answer Question Which of the following three methods used to select the qualified supplier? Correct Answer By vendor plant surveys , By reputation , By experience Your Answer By vendor plant surveys , By the perofrmance of first lot , By experience

Select The Blank Question The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable. Correct Answer Quality control Your Answer Quality control

Match The Following Question Correct Answer Pessimistic time b Expected time Optimistic time Most likely time Te a m

Your Answer p Te o m

Multiple Choice Multiple Answer Question Which are the different methods of recording actual progress of work? Correct Answer Display boards , Progress cards , Network updating Your Answer Display boards , Job cards , Progress cards

Multiple Choice Single Answer Question One of the characterstic of layout is about the flow of material / personnel. In a good layout the flow should be Correct Answer Unidirectional Your Answer Unidirectional

Page 4

POM6 Multiple Choice Multiple Answer Question What is indicated by the hugging points lying close to mean of the process in X bar-R- control chart? Correct Answer Biases in measurements , Recording done without actual measurements , Improper selection of samples Your Answer Biases in measurements , Recording done without actual measurements , Improper selection of samples

Multiple Choice Multiple Answer Question Operation Layout generally contains following information Correct Answer Part Sketch , Standard Time , Jigs and fixtures Your Answer Sequence of operations , Standard Time , Jigs and fixtures

Multiple Choice Single Answer Question What do you mean by the graphical representation of the project which is composed as series of connected arrows and circles to describe the interrelationship of the activities involved? Correct Answer Network Your Answer Flow chart

Multiple Choice Single Answer Question Where does the SPC exercises the control to prevent the occurances of defectives? Correct Answer On manufacturing process Your Answer On manufacturing process

Multiple Choice Single Answer Question Which photographic technique is used to record path of motions of the members of the body during method study? Correct Answer Cyclograph Your Answer Pictograph

Select The Blank Question An Ideal OC curve is ________ shaped curve that accpets all the lots with quality equal to or better than AQL . Correct Answer Rectangular Your Answer Bell

True/False Question In Gantt Chart, the horizontal lines devide vertical lines into sections which represents either operations or work centres. Correct Answer True Your Answer True

Page 5

POM6 Select The Blank Question Goods after final inspection should accompany ________to enable dispatch department to identify and draw correct reference. Correct Answer Forwarding note Your Answer Forwarding note

Select The Blank Question Capacity decisions have a direct influence on performance of production system in respect of ________ Correct Answer Delivery performance Your Answer Quality

True/False Question Floor inspection promotes tendency of machines to drift out of limits and produce defectives. Correct Answer False Your Answer False

True/False Question A sampling plan which perfectly discriminates will have vertical OC curve. Correct Answer True Your Answer True

Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Manufacturing

Multiple Choice Multiple Answer Question Which are the different methods to record details of the existing method during method study? Correct Answer Charts , Diagrams , Templates or models Your Answer Control plans , Charts , Templates or models

Select The Blank Question The ________ breakdowns usually cost more, partly due to damage done to the adjustment components and partly due to emergency actions. Correct Answer Unexpected Your Answer Unexpected

Multiple Choice Single Answer Question Gross requirement of products is determined on the basis of Page 6

POM6 Correct Answer Both forecast and pending orders Your Answer Past sales

Select The Blank Question The ________ is the probability that a bad lot will be accepted by the sampling plan. Correct Answer Consumer's risk Your Answer Acceptable quality level

Select The Blank Question The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________. Correct Answer Overtime working Your Answer Overtime working

Multiple Choice Single Answer Question What do you mean by lowest possible direct cost required to complete an activity within it's normal time? Correct Answer Normal cost Your Answer Normal cost

Multiple Choice Single Answer Question What do you mean by lowest possible direct cost required to complete an activity within it's crashed time? Correct Answer Crash cost Your Answer Total cost

Multiple Choice Single Answer Question What do you understand by the extent the products manufactured conforms to the laid down design? Correct Answer Quality of conformance Your Answer Quality of design

Multiple Choice Multiple Answer Question Which kind of possible defectives can be reduced due to first off inspection? Correct Answer Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machine set up Your Answer Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machine set up

Page 7

POM7 LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Select The Blank Question A ________ is another form of subcontracting. Correct Answer Hiring capacity Your Answer Open purchase order

True/False Question An ideal OC curve is never possible only with cent percent inspection. Correct Answer False Your Answer True

Match The Following Question Correct Answer Table lubrication Weekly

Your Answer Six monthly Yearly Yearly

Draining and refilling of oil reserviors of plunger pump Parts lubricated with oil nipple Tools and slideways Daily Weekly

two to three times a day Daily

True/False Question The operator should not stop production if first piece is not approved by the inspector. Correct Answer False Your Answer False

Multiple Choice Multiple Answer Question Which of the following causes can be responsible for derailing the production schedule in a factory? Correct Answer Errors in drawings , Delay in receipt of material from vendor , Excessive absenteeism Your Answer Errors in drawings , Delay in receipt of material from vendor , Excessive absenteeism

True/False Question For p-chart, the central line of fraction defectives is determined by average percentage defectives. Correct Answer True Your Answer True

Page 1

POM7 Multiple Choice Multiple Answer Question Expediting function is concerned with following activities Correct Answer Progress chasing to identify delays which may hold up production , Communicating possible delays in delivery date commitment to sales department , Devising cures to keep rate of production in line with schedule Your Answer Recording progress of work , Communicating possible delays in delivery date commitment to sales department , Devising cures to keep rate of production in line with schedule

Multiple Choice Single Answer Question When should operator or supervisor is supposed to sign the perforated route sheet? Correct Answer After completion of operation Your Answer After completion of operation

Select The Blank Question The ________ is necessary when the job requires detailed of one or more of the job characteristics with the help of special equipment which is not available at the producing company. Correct Answer Inspection order Your Answer Move order

Multiple Choice Multiple Answer Question What are the benefits of reconditioning? Correct Answer Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps to plan requirement of replacement spares Your Answer Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps to plan requirement of replacement spares

Multiple Choice Multiple Answer Question Which of the following processes or activities are denoted by using symbols while recording in method study? Correct Answer Transport , Delay , Storage Your Answer Transport , Rejection , Storage

Multiple Choice Single Answer Question Which is the zone beyond LTPD in case of Oc curve of a general plan? Correct Answer Zone of rejection Your Answer Zone of rejection

True/False Question

A properly designed sampling plan can control sampling Page 2

POM7 errors and completely eliminate them. Correct Answer False Your Answer True

Select The Blank Question The ________ includes preventive maintenance activities whose needs are identified through inspection which requires stoppage of machines. Correct Answer Shutdown Maintenance Your Answer Shutdown Maintenance

Select The Blank Question The ________ pertain to the climatic conditions which the component , product or material should withstand. Correct Answer Environmental specifications Your Answer Environmental specifications

True/False Question Grouping of machines gives a lot of flexibility in loading and scheduling Correct Answer True Your Answer True

True/False Question A lot declared rejected in sampling inspection should not be inspected 100% in any case. Correct Answer False Your Answer False

Multiple Choice Multiple Answer Question Which of the following are the basic requirements of quality standard? Correct Answer Deifinite , Undesrstandable , Economically viable Your Answer Absolute uniformity , Undesrstandable , Economically viable

True/False Question The plotting of activities - critical, non-critical and dummy activities- is strictly according to their precedence relationship. Correct Answer True Your Answer True

Multiple Choice Multiple Answer Question Which of the following are activities of corrective maintenance? Correct Answer Modifications and improvements , Overhauling , Emergency repairs Your Answer Modifications and improvements , Overhauling , Lubrication as Page 3

POM7 per schedule

Multiple Choice Single Answer Question Following is not a function of PPC Correct Answer Product Planning Your Answer Order Processing

Multiple Choice Multiple Answer Question Which of the following three methods used to select the qualified supplier? Correct Answer By vendor plant surveys , By reputation , By experience Your Answer By vendor plant surveys , By the perofrmance of first lot , By experience

Select The Blank Question The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable. Correct Answer Quality control Your Answer Quality control

Match The Following Question Correct Answer Pessimistic time b Expected time Optimistic time Most likely time Te a m

Your Answer p Te o m

Multiple Choice Multiple Answer Question Which are the different methods of recording actual progress of work? Correct Answer Display boards , Progress cards , Network updating Your Answer Display boards , Job cards , Progress cards

Multiple Choice Single Answer Question One of the characterstic of layout is about the flow of material / personnel. In a good layout the flow should be Correct Answer Unidirectional Your Answer Unidirectional

Page 4

POM7 Multiple Choice Multiple Answer Question What is indicated by the hugging points lying close to mean of the process in X bar-R- control chart? Correct Answer Biases in measurements , Recording done without actual measurements , Improper selection of samples Your Answer Biases in measurements , Recording done without actual measurements , Improper selection of samples

Multiple Choice Multiple Answer Question Operation Layout generally contains following information Correct Answer Part Sketch , Standard Time , Jigs and fixtures Your Answer Sequence of operations , Standard Time , Jigs and fixtures

Multiple Choice Single Answer Question What do you mean by the graphical representation of the project which is composed as series of connected arrows and circles to describe the interrelationship of the activities involved? Correct Answer Network Your Answer Flow chart

Multiple Choice Single Answer Question Where does the SPC exercises the control to prevent the occurances of defectives? Correct Answer On manufacturing process Your Answer On manufacturing process

Multiple Choice Single Answer Question Which photographic technique is used to record path of motions of the members of the body during method study? Correct Answer Cyclograph Your Answer Pictograph

Select The Blank Question An Ideal OC curve is ________ shaped curve that accpets all the lots with quality equal to or better than AQL . Correct Answer Rectangular Your Answer Bell

True/False Question In Gantt Chart, the horizontal lines devide vertical lines into sections which represents either operations or work centres. Correct Answer True Your Answer True

Page 5

POM7 Select The Blank Question Goods after final inspection should accompany ________to enable dispatch department to identify and draw correct reference. Correct Answer Forwarding note Your Answer Forwarding note

Select The Blank Question Capacity decisions have a direct influence on performance of production system in respect of ________ Correct Answer Delivery performance Your Answer Quality

True/False Question Floor inspection promotes tendency of machines to drift out of limits and produce defectives. Correct Answer False Your Answer False

True/False Question A sampling plan which perfectly discriminates will have vertical OC curve. Correct Answer True Your Answer True

Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Manufacturing

Multiple Choice Multiple Answer Question Which are the different methods to record details of the existing method during method study? Correct Answer Charts , Diagrams , Templates or models Your Answer Control plans , Charts , Templates or models

Select The Blank Question The ________ breakdowns usually cost more, partly due to damage done to the adjustment components and partly due to emergency actions. Correct Answer Unexpected Your Answer Unexpected

Multiple Choice Single Answer Question Gross requirement of products is determined on the basis of Page 6

POM7 Correct Answer Both forecast and pending orders Your Answer Past sales

Select The Blank Question The ________ is the probability that a bad lot will be accepted by the sampling plan. Correct Answer Consumer's risk Your Answer Acceptable quality level

Select The Blank Question The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________. Correct Answer Overtime working Your Answer Overtime working

Multiple Choice Single Answer Question What do you mean by lowest possible direct cost required to complete an activity within it's normal time? Correct Answer Normal cost Your Answer Normal cost

Multiple Choice Single Answer Question What do you mean by lowest possible direct cost required to complete an activity within it's crashed time? Correct Answer Crash cost Your Answer Total cost

Multiple Choice Single Answer Question What do you understand by the extent the products manufactured conforms to the laid down design? Correct Answer Quality of conformance Your Answer Quality of design

Multiple Choice Multiple Answer Question Which kind of possible defectives can be reduced due to first off inspection? Correct Answer Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machine set up Your Answer Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machine set up

Page 7

POM8 LIST OF ATTEMPTED QUESTIONS AND ANSWERS

True/False Question Floor inspection delays the identification of faults which can not be rectified immediately before large lots are spoiled. Correct Answer False Your Answer False

Multiple Choice Single Answer Question Management often fails to realize the importance of efficient layout due to following reason Correct Answer losses resulting from poor layout are not directly shown in the financial statements Your Answer losses resulting from poor layout are not directly shown in the financial statements

Select The Blank Question The ________ is the defect level for which lots are regarded as bad lots. Correct Answer Lot Tolerance Percentage Defective Your Answer Lot Tolerance Percentage Defective

Multiple Choice Single Answer Question Which method of critical path determination begins with the end event and moves backward to the start event of the project network? Correct Answer Backward pass computation Your Answer Backward pass computation

True/False Question Complexity and difficulty of Planning is influenced by types of layout Correct Answer True Your Answer False

True/False Question For p-chart, p bar is the ratio of total number of units inspected to the total number of units defectives. Correct Answer False Your Answer True

Multiple Choice Single Answer Question What is represented by an arrow in a network? Correct Answer Activity Your Answer Activity Page 1

POM8

Multiple Choice Multiple Answer Question MRP utilises the following information Correct Answer Master production schedule , Product structure , Lead time for procurement/manufacturing Your Answer Master production schedule , Lead time for procurement/manufacturing , list of machines

Multiple Choice Single Answer Question Which is the ideal place to write a description of an activity in a network? Correct Answer Above the arrow Your Answer Above the arrow

Select The Blank Question The ________ breakdowns usually cost more, partly due to damage done to the adjustment components and partly due to emergency actions. Correct Answer Unexpected Your Answer Unexpected

Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory

True/False Question Systematic maintenance system can completely eliminate the wear and tear of machines. Correct Answer False Your Answer True

Multiple Choice Multiple Answer Question Which of the following are types of non-destructive testing? Correct Answer Visual Testing , Eddy current , Magnetic flow detectors Your Answer Visual Testing , Eddy current , Magnetic flow detectors

Select The Blank Question Work study is also called ________ study Correct Answer Time and Motion Your Answer Time and Motion

Page 2

POM8 Multiple Choice Single Answer Question Providing flexibility in plant layout means Correct Answer Layout can be changed without much cost if required Your Answer Layout can be changed without much cost if required

Multiple Choice Multiple Answer Question Which of the following aspects are essential to ensure quality of purchased items? Correct Answer Defining right quality for the job , Vendor performance evaluation , Making sure that suppliers understand the requirements Your Answer Defining right quality for the job , Vendor performance evaluation , Making sure that suppliers understand the requirements

Multiple Choice Multiple Answer Question Which of the following are scheduling techniques? Correct Answer Critical Path Analysis , Index Method , Johnson's two machine algorithm Your Answer Critical Path Analysis , Index Method , Johnson's two machine algorithm

Select The Blank Question The ________ advocates maintenance procedures whereby the condition of the plant is constantly watched through systematic inspection to unearth unhealthy conditions and preventive Correct Answer Preventive Maintenance Your Answer Preventive Maintenance

True/False Question A network should be progression of activities always moving forward. Correct Answer True Your Answer True

Multiple Choice Multiple Answer Question In an organization there may not be a formal PPC department if Correct Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large Your Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large

Select The Blank Question The ________ is necessary when the job requires detailed of one or more of the job characteristics with the help of special equipment Page 3

POM8 which is not available at the producing company. Correct Answer Inspection order Your Answer Inspection order

Multiple Choice Multiple Answer Question Order preparation process for products manufatured to order requires following documents Correct Answer Sales Order , Work order , Shop order Your Answer Sales Order , Work order , Shop order

Multiple Choice Single Answer Question What do you understand by the selection of the job for the method study on the basis of money saving potential of the job? Correct Answer Economic consideration Your Answer Economic consideration

Select The Blank Question Production Planning is a centralised activity which includes functions such as ________ Correct Answer Scheduling Your Answer Scheduling

Multiple Choice Multiple Answer Question Scale model used for layout analysis have following advantages Correct Answer Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown , Models can be shifted easily Your Answer Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown , Models can be shifted easily

Multiple Choice Single Answer Question Which is the ideal place to inspect jigs and fixtures in a mass manufacturing unit? Correct Answer Separate inspection room Your Answer Separate inspection room

Multiple Choice Single Answer Question How to reveal the capability of the sampling plan to discriminate between good lots and bad lots? Correct Answer Operating characteristics curve ( OC ) Your Answer Operating characteristics curve ( OC )

True/False Question It would not affect the project completion time if non-critical activities take little loner time than planned. Correct Answer True Page 4

POM8 Your Answer True

Select The Blank Question The ________ includes preventive maintenance activities whose needs are identified through inspection which requires stoppage of machines. Correct Answer Shutdown Maintenance Your Answer Shutdown Maintenance

Match The Following Question Correct Answer

Your Answer

Forcasting requirement for indirect material Past consumption analysis technique Past consumption analysis technique Inventory control by classification ABC Analysis Structure of the product BOM BOM MRP MRP ABC Analysis

Material Planning for dependent demand

True/False Question The dispatching function is of very importance in flow and mass production units. Correct Answer False Your Answer True

Multiple Choice Multiple Answer Question Which features should be covered by the specifications of materials while defining the qualitative requirement? Correct Answer Material composition , Dimensions , Any heat treatment if required Your Answer Material composition , Dimensions , Cost of material

Select The Blank Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Answer Condition monitoring Your Answer Condition monitoring

Select The Blank Question One detachable ticket is prepared for each ________. Correct Answer Operation Your Answer Operation

Page 5

POM8 Multiple Choice Single Answer Question Which of the following is the most popular technique for Project Production? Correct Answer PERT & CPM Your Answer PERT & CPM

Select The Blank Question A good maintenance system is not a luxary but a ________. Correct Answer Necessity Your Answer Necessity

Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Operation

True/False Question An activity should represent an operation or set of operations which can be performed using a particular kind of equipment or a special skill. Correct Answer True Your Answer False

Multiple Choice Multiple Answer Question Which of the following are types of sampling plan? Correct Answer Single sampling plan , Double sampling plan , Multiple sampling plan Your Answer Single sampling plan , Double sampling plan , Multiple sampling plan

True/False Question In case of forward pass computation, the earliest event time of a plain event equals the earliest event time of the preceding event plus duration of activity emanating from the preceding event. Correct Answer True Your Answer False

Multiple Choice Multiple Answer Question Which of the following are ideal situations for the preventive inspection? Correct Answer Weekly off and holidays , Non-production hours , Stand-up equipment Your Answer Weekly off and holidays , Non-production hours , Stand-up equipment

Page 6

POM8 Multiple Choice Single Answer Question What do you mean by the chart on which the major activities and entry points of materials are recorded to have graphic view of operations and inspections involved in the process? Correct Answer Operation process chart Your Answer Flow Process chart

Match The Following Question Correct Answer

Your Answer Reorder level Reorder level Over ordering Lead time Stock on hand

Fixation of inventory level

Symptom of ill planned purchasing Factor influencing material planning Net requirement of material under MRP

Over ordering Lead time Stock on hand

Multiple Choice Single Answer Question Taxes / duties levied is one of the important determinant for location decision as taxes/duties substantially influence Correct Answer Product cost Your Answer Product cost

Multiple Choice Single Answer Question Which kind of gauge consists of electrical contacts operating a series of colloured signal lamps which indicate whether the dimension is correct, oversize or undersize? Correct Answer Multiple gauging Your Answer Multiple gauging

Multiple Choice Multiple Answer Question Which of the following are minimum requirement for a good quality of design? Correct Answer Resonable cost , Resonable procurement time , Resonable manufacturing time Your Answer Resonable cost , Resonable procurement time , Resonable manufacturing time

Select The Blank Question OC curve of ideal sampling plan suggests that all lots less than 3% defectives have the probability of acceptance of ________. Correct Answer One Your Answer One

Page 7

POM8

Page 8

POM9 LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Multiple Choice Single Answer Question MRP is based on the concept of inventory demand which is of following type Correct Answer Dependent and independent Your Answer Dependent and independent

Multiple Choice Single Answer Question Main objective of a good plant layout is Correct Answer Reduce material handling cost Your Answer Reduce material handling cost

True/False Question As a general rule, the number of tail event of an activity is more than that of it's head event. Correct Answer False Your Answer False

Select The Blank Question The ________ is the probability that a good lot will be rejected by the sampling plan. Correct Answer Producer's risk Your Answer Producer's risk

Multiple Choice Multiple Answer Question Which of the following are important considerations concerning activity times? Correct Answer Activity time should be obtained from the person responsible for the completion of an activity , Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resources required to carry out the activity are available. Your Answer Activity time should be obtained from the person responsible for the completion of an activity , Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resources required to carry out the activity are available.

Select The Blank Question The ________ pertain to the climatic conditions which the component , product or material should withstand. Correct Answer Environmental specifications Your Answer Environmental specifications

Page 1

POM9 Multiple Choice Multiple Answer Question Following are some of the factors considered for evaluation of alternative layouts Correct Answer Flow of Material , Equipment utilization , Ease of supervision Your Answer Flow of Material , Ease of supervision , Delivery performance

Multiple Choice Multiple Answer Question Which of the following are assignable cause? Correct Answer Large varaitions in hardness of material , Tool wear , Errors in setting Your Answer Large varaitions in hardness of material , Tool wear , Errors in setting

True/False Question All activities must not be tied up into the network Correct Answer False Your Answer False

Select The Blank Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________. Correct Answer 0.01 to 10% Your Answer 0.01 to 10%

True/False Question In case of X bar, if the process is not under control indicated by some points falling outside the control limits, such points outside the control limits are eliminated and new trial control limits for the remaining points are computed. Correct Answer True Your Answer True

Multiple Choice Single Answer Question What is the base for considering activity time as single time estimate or three time estimate? Correct Answer Level of uncertainty Your Answer Availability of labour

Select The Blank Question The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Correct Answer Acceptable quality level Your Answer Acceptable quality level Page 2

POM9

Multiple Choice Single Answer Question What do you mean by lowest possible direct cost required to complete an activity within it's normal time? Correct Answer Normal cost Your Answer Normal cost

Select The Blank Question A good maintenance system is not a luxary but a ________. Correct Answer Necessity Your Answer Necessity

Select The Blank Question A ________helps to avoid crowding of jobs at a particular machine by change of route of some of the jobs or by diverting work to other machine. Correct Answer Control board Your Answer Move order

Select The Blank Question The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable. Correct Answer Quality control Your Answer Quality control

Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory

Match The Following Question Correct Answer Emerson Efficiency Plan Craft

Your Answer Wage Payment Wage Payment

Facilities Planning

Facilities Planning Machine utilization Production Scheduling

Work Sampling Gantt Chart

Machine utilization Production Scheduling

Select The Blank Page 3

POM9 Question A ________ is another form of subcontracting. Correct Answer Hiring capacity Your Answer Hiring capacity

Multiple Choice Multiple Answer Question In an organization there may not be a formal PPC department if Correct Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large Your Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large

Multiple Choice Multiple Answer Question Which of the following cases can be treated as delay during recording of method study? Correct Answer Operators awaiting instructions from supervisor , Worker waiting for his turn at tools stores , Jobs awaiting at the machines for their turn Your Answer Operators awaiting instructions from supervisor , Worker waiting for his turn at tools stores , Jobs awaiting at the machines for their turn

True/False Question Inspection order is must even for simple jobs which can be inspected by shop inspector with the tooling available on shop. Correct Answer False Your Answer False

Multiple Choice Multiple Answer Question Order preparation process for products manufatured to order requires following documents Correct Answer Sales Order , Work order , Shop order Your Answer Sales Order , Work order , Purchase order

Multiple Choice Single Answer Question Technique of Value Engineering can be effectively employed in design of a product to Correct Answer To meet the intended function at lowest cost Your Answer Reduce lead time

True/False Question Cent percent inspection is often more practical and economical than sampling inspection. Correct Answer False Your Answer False Page 4

POM9

Multiple Choice Multiple Answer Question Scale model used for layout analysis have following advantages Correct Answer Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown , Models can be shifted easily Your Answer Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown , Models can be shifted easily

Multiple Choice Single Answer Question Which of the following technique is event oriented ? Correct Answer Project Evaluation & Review Technique Your Answer Project Evaluation & Review Technique

Multiple Choice Single Answer Question What is the meaning of " Product features" according to J.M.Juran? Correct Answer Quality of design Your Answer Quality of design

Match The Following Question Correct Answer

Your Answer Cc Tn Tc Cn Cn Tn

Crash cost of an activity Cc Normal time of an activity Crash time of activity Tc

Normal cost of an activity

Multiple Choice Multiple Answer Question What are uses of diagrams in method study? Correct Answer Study different plant layouts and select the most optimum one , Study the extent of traffic over the different routes of the plant , Identify the extent of backtracking, cross traffic and obstacles encountered during the movement of material. Your Answer Study different plant layouts and select the most optimum one , Study the extent of traffic over the different routes of the plant , Identify the extent of backtracking, cross traffic and obstacles encountered during the movement of material.

True/False Question A load chart specifies the work to be carried out by each person of company during shift hours. Correct Answer False Page 5

POM9 Your Answer True

Multiple Choice Multiple Answer Question Route Sheet generally contains following information Correct Answer Material Specification , Sequence of operation , Skill of Labour Your Answer Material Specification , Sequence of operation , Skill of Labour

True/False Question Cellular layout is based on the concept of Group Technology Correct Answer True Your Answer True

Multiple Choice Single Answer Question Which varaible is taken along the abscissa or X axis? Correct Answer Time Your Answer Standard deviation

Multiple Choice Multiple Answer Question Which are the advantages of suburban location? Correct Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction Your Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction

Select The Blank Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Answer Condition monitoring Your Answer Condition monitoring

Multiple Choice Multiple Answer Question Expediting function is concerned with following activities Correct Answer Progress chasing to identify delays which may hold up production , Communicating possible delays in delivery date commitment to sales department , Devising cures to keep rate of production in line with schedule Your Answer Recording progress of work , Progress chasing to identify delays which may hold up production , Communicating possible delays in delivery date commitment to sales department

Select The Blank Page 6

POM9 Question Production control work is ________ in case of floor inspection as compared with the centralised inspection. Correct Answer easier Your Answer time consuming

Select The Blank Question The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________. Correct Answer Overtime working Your Answer Overtime working

True/False Question In case of forward pass computation, the earliest event time of the first event is zero. Correct Answer True Your Answer True

Multiple Choice Single Answer Question What is represented by an arrow in a network? Correct Answer Activity Your Answer Activity

True/False Question As a general rule, a site five times the actual plant size is considered minimum for parking, access facilities and future expansion. Correct Answer True Your Answer True

True/False Question Independent float either affects the float of preceding activities or that of succeeding activities. Correct Answer False Your Answer False

Multiple Choice Single Answer Question The document raised by PPC which authorises different functions to take action as per instruction is called Correct Answer Work Order Your Answer Work Order

Multiple Choice Single Answer Question A good layout makes effective use of space. Utilization of space for a department like Stores can be measured by Correct Answer Proportion of Cubic volume space utilized Your Answer Ratio of area utilised to area available Page 7

POM9

Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Operation

Page 8

POM10 LIST OF ATTEMPTED QUESTIONS AND ANSWERS

True/False Question Site selection should also take into account topography and soil structure of the land. Correct Answer True Your Answer True

Multiple Choice Single Answer Question Which manufacturing method is ideal for the use of air gauges as inspection device? Correct Answer Mass Your Answer Batch

True/False Question Kanban system is essentially a computer based system for production scheduling and control Correct Answer False Your Answer False

Multiple Choice Multiple Answer Question Which are three different bases to establish an activity time? Correct Answer Past experience , Judgement , Historical data Your Answer Past experience , Judgement , Historical data

True/False Question Inspection order is must even for simple jobs which can be inspected by shop inspector with the tooling available on shop. Correct Answer False Your Answer False

Multiple Choice Single Answer Question Which of the following policies is advisable in case of low product variety and large volumes? Correct Answer Low Skilled Labour & Special Purpose Machines Your Answer Semiskilled Labour & General Purpose Machines

Select The Blank Question Capacity decisions have a direct influence on performance of production system in respect of ________ Correct Answer Delivery performance Your Answer Delivery performance

Page 1

POM10 True/False Question In case of X bar, if the process is not under control indicated by some points falling outside the control limits, such points outside the control limits are eliminated and new trial control limits for the remaining points are computed. Correct Answer True Your Answer True

Select The Blank Question The ________ pertain to the climatic conditions which the component , product or material should withstand. Correct Answer Environmental specifications Your Answer Environmental specifications

Select The Blank Question The ________ is necessary when the job requires detailed of one or more of the job characteristics with the help of special equipment which is not available at the producing company. Correct Answer Inspection order Your Answer Job card

Match The Following Question Correct Answer

Your Answer Cc Tn Tc Cn Tn Cn

Crash cost of an activity Cc Normal time of an activity Crash time of activity Tc

Normal cost of an activity

True/False Question Lubrication survey should never be done for a new machine. Correct Answer False Your Answer False

Multiple Choice Single Answer Question A good plant layout helps in Correct Answer Reducing handling costs Your Answer Reducing handling costs

Multiple Choice Single Answer Question Out of two basic criteria for the selection of a manufacturing method, one is, it must be able to meet the specifications of final product and Page 2

POM10 the other is, it must be Correct Answer Cost effective method Your Answer Cost effective method

Multiple Choice Multiple Answer Question Which of the following is a part of preparing manufacturing order set as a primary function of dispatching? Correct Answer Operational layouts , Move orders , Pre-filled stores issue orders Your Answer Operational layouts , Move orders , Pre-filled stores issue orders

Select The Blank Question A ________ is another form of subcontracting. Correct Answer Hiring capacity Your Answer Hiring capacity

Multiple Choice Multiple Answer Question Which are the major types of defects? Correct Answer Minor , Major , Critical Your Answer Minor , Critical , General

Multiple Choice Single Answer Question Which kind of labour force is required in case of Jobbing Production? Correct Answer Highly Skilled Your Answer Highly Skilled

Multiple Choice Multiple Answer Question Which are the sources of information to update the progress card daily? Correct Answer Detachable ticket , Daily production report , Job Card Your Answer Detachable ticket , Daily production report , Job Card

True/False Question In case of forward pass computation, the earliest event time of the first event is zero. Correct Answer True Your Answer True

Multiple Choice Multiple Answer Question Which are the distinct functions of scientific quality control? Correct Answer Acceptance function , Preventive function , Assurance function Page 3

Your Answer

POM10 Acceptance function , Preventive function , Assurance function

Multiple Choice Multiple Answer Question Which of the following are examples of specifications? Correct Answer Commercial standards , Assembly and testing instructions , Bill of material Your Answer Production schedule , Commercial standards , Bill of material

Multiple Choice Single Answer Question Technique which can help an organization to reduce inventory is called Correct Answer MRP Your Answer MRP

Multiple Choice Single Answer Question In case of Batch Production which kind of labour is expected? Correct Answer Skilled in one specific Manufacturing Process Your Answer Semiskilled

Multiple Choice Multiple Answer Question Major contributors in the development of Control Charts, Sampling plan are Correct Answer F H Dodge , H G Roming , Walter Schewhart Your Answer F H Dodge , H G Roming , Walter Schewhart

Multiple Choice Single Answer Question What is represented by an arrow in a network? Correct Answer Activity Your Answer Event

True/False Question Feasibility of time schedule requires that an activity be scheduled before any of it's predecessors are scheduled. Correct Answer False Your Answer True

Multiple Choice Single Answer Question Which method of critical path determination begins with the end event and moves backward to the start event of the project network? Correct Answer Backward pass computation Your Answer Backward pass computation

True/False Question

Operation process charts though indicates the sequence of Page 4

POM10 events but do not show movements. Correct Answer True Your Answer True

Multiple Choice Single Answer Question Which kind of relationship exists between those activities which can be carried out simultaneously and both activities require definite time to finish? Correct Answer Concurrent activities Your Answer Concurrent activities

True/False Question One major difference between CPM and PERT is the former's adaptability for the projects where high degree of uncertainty prevails and activity times during performance are expected to vary considerably for certain activities. Correct Answer False Your Answer False

Multiple Choice Multiple Answer Question Following are some of the Principles of Management advocated by F W Taylor Correct Answer Selection of best worker for each particular task , Division of work between worker and management , Training and development of the workmen Your Answer Selection of best worker for each particular task , Division of work between worker and management , Training and development of the workmen

Multiple Choice Single Answer Question Inadequate production capacity ultimately leads to Correct Answer Poor Customer Service Your Answer Poor Machine Utilization

Multiple Choice Multiple Answer Question Which of the following schedules are recommended to prepare and follow as a part of preventive maintenance system? Correct Answer Preventive inspection schedule , Cleaning and upkeep schedule , Lubrication schedule Your Answer Preventive inspection schedule , Cleaning and upkeep schedule , Lubrication schedule

Multiple Choice Single Answer Question What is the reason of fluctuations, if the control chart evaluates that the process is in a state of statistical control? Correct Answer Random variability Page 5

POM10 Your Answer Random variability

True/False Question Even in a small set up wherein maintenance of a machine is looked after by a mechanic cum worker, he should report directly to the person responsible for the manufacturing operations. Correct Answer True Your Answer True

Multiple Choice Single Answer Question What do you mean by the chart on which the major activities and entry points of materials are recorded to have graphic view of operations and inspections involved in the process? Correct Answer Operation process chart Your Answer Operation process chart

Multiple Choice Single Answer Question Plant Layout decisions are considered to be Correct Answer Strategic Your Answer Strategic

Multiple Choice Multiple Answer Question What are the uses of the instruction manual provided by the manufacturer of a machine? Correct Answer It gives instructions regarding installation and operation of the equipment , It contains note on common troubles with causes and remedies for troubleshooting , It enlists points, frequency and type of lubrication Your Answer It gives instructions regarding installation and operation of the equipment , It contains note on common troubles with causes and remedies for troubleshooting , It enlists points, frequency and type of lubrication

Multiple Choice Single Answer Question When should operator or supervisor is supposed to sign the perforated route sheet? Correct Answer After completion of operation Your Answer After completion of operation

Multiple Choice Multiple Answer Question Which of the following situations demand that the human consideration should be given preference over other considerations? Correct Answer Inconsistent earnings where the earnings are tied to output , Poor morale evidenced by petty or trivial complaints , Repeated cases of accidents and health hazards Your Answer Excessive rejections , Poor morale evidenced by petty or trivial complaints , Repeated cases of accidents and health hazards Page 6

POM10

True/False Question A network can have more than one starting event but completion event must be only one. Correct Answer False Your Answer True

Multiple Choice Single Answer Question Which is the ideal place to write a description of an activity in a network? Correct Answer Above the arrow Your Answer Above the arrow

Multiple Choice Multiple Answer Question Which features should be covered by the specifications of materials while defining the qualitative requirement? Correct Answer Material composition , Dimensions , Any heat treatment if required Your Answer Material composition , Dimensions , Any heat treatment if required

Match The Following Question Correct Answer When to inspect What to inspect How to inspect

Your Answer Stages of inspection

Stages of inspection Specification

Specification Inspection devices Sampling or

Inspection devices

How much to inspect cent percent inspection

Sampling or cent percent inspection

Multiple Choice Multiple Answer Question How the concept of float is helpful to planners? Correct Answer To decide priorities in allocation of resources , To minimize the requirement of resources , To prevent peaks and valleys in requirement of resources Your Answer To decide priorities in allocation of resources , To minimize the requirement of resources , To prevent peaks and valleys in requirement of resources

Page 7

POM11 LIST OF ATTEMPTED QUESTIONS AND ANSWERS

True/False Question It pays in the long run to inform the customer regarding expected delays in the deliveries. Correct Answer True Your Answer True

Multiple Choice Single Answer Question Fixed position layout is adopted when Correct Answer product is very heavy involving assembly of large number of parts Your Answer product is very heavy involving assembly of large number of parts

Select The Blank Question The ________ is the defect level for which lots are regarded as bad lots. Correct Answer Lot Tolerance Percentage Defective Your Answer Lot Tolerance Percentage Defective

Multiple Choice Multiple Answer Question Which are the advantages of suburban location? Correct Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction Your Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction

Select The Blank Question One detachable ticket is prepared for each ________. Correct Answer Operation Your Answer Worker

Select The Blank Question A good maintenance system is not a luxary but a ________. Correct Answer Necessity Your Answer Necessity

Multiple Choice Multiple Answer Question Following are some of the factors which influence process planning Correct Answer Order Quantity , Process capability of machine , Page 1

POM11 Delivery Dates Your Answer Order Quantity , Delivery Dates , Plant layout

True/False Question Availability of training schools, colleges and management institutes reduces the company's internal training needs. Correct Answer True Your Answer False

Multiple Choice Multiple Answer Question Which of the following are examples of pure materials? Correct Answer Bakeries , Ice factories , Woolen Your Answer Bakeries , Ice factories , Lime stone

Match The Following Question Correct Answer Emerson Efficiency Plan Craft

Your Answer Wage Payment Wage Payment

Facilities Planning

Production Scheduling Sampling Inspection Charting technique

Work Sampling Gantt Chart

Machine utilization Production Scheduling

Match The Following Question Correct Answer

Your Answer Reorder level Stock on hand Over ordering Lead time Price of material

Fixation of inventory level

Symptom of ill planned purchasing Factor influencing material planning Net requirement of material under MRP

Over ordering Lead time Stock on hand

Multiple Choice Multiple Answer Question Which of the following are steps to identify the critical path in a small network? Correct Answer Compare the durations of all paths to identify the longest path. , Sum up the durations of activities along each path. , Enumerate all paths in the network and list down activities on each path. Your Answer Compare the durations of all paths to identify the longest path. , Sum up the durations of activities along each path. , Enumerate all paths in the network and list down activities on each path. Page 2

POM11

Select The Blank Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________. Correct Answer 0.01 to 10% Your Answer 0.01 to 10%

True/False Question Tool breakage has got nearly zero chances in case of eventual breakdown. Correct Answer False Your Answer False

Multiple Choice Multiple Answer Question Which are the three types of float? Correct Answer Total float , Independent float , Free float Your Answer Total float , Dependent float , Free float

Multiple Choice Multiple Answer Question Which of the following are major inputs to scheduling? Correct Answer Overlapping of operations , Effective Capacity per work centre , Performance standards Your Answer Effective Capacity per work centre , Ratio of skilled to unskilled labour , Performance standards

Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory

Select The Blank Question The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Correct Answer Acceptable quality level Your Answer Lot Tolerance Percentage Defective

Select The Blank Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Answer Condition monitoring Your Answer Overhauling

Page 3

POM11 Select The Blank Question OC curve of ideal sampling plan suggests that all lots less than 3% defectives have the probability of acceptance of ________. Correct Answer One Your Answer One

Multiple Choice Single Answer Question How to calculate activity cost slope? Correct Answer Activity cost slope = ( Crash cost - Normal cost ) / ( Normal time - Crash time ) Your Answer Activity cost slope = ( Normal cost - Crash cost ) / ( Normal time - Crash time )

Multiple Choice Multiple Answer Question Which of the following are minimum requirement for a good quality of design? Correct Answer Resonable cost , Resonable procurement time , Resonable manufacturing time Your Answer Resonable cost , Resonable procurement time , Resonable manufacturing time

True/False Question In case of control chart, large smaples such as n=15 or 20 are used if the process standard deviation is small. Correct Answer False Your Answer True

Select The Blank Question Production control work is ________ in case of floor inspection as compared with the centralised inspection. Correct Answer easier Your Answer labourious

Multiple Choice Single Answer Question Production Planning includes Correct Answer Predetermination of manufacturing requirements Your Answer Predetermination of manufacturing requirements

Multiple Choice Single Answer Question How does the control chart of statistical quality control helps the operating personnel? Correct Answer Identify the presence of an assignable cause before it develops Your Answer Reduces chances of rejections

Page 4

POM11 Multiple Choice Single Answer Question What can be the worst effect due to excessive vibration? Correct Answer Breakdown Your Answer Reduced salvage value of machine

Multiple Choice Single Answer Question What do you understand by the metallergical aspects of product which forms the vital part of engineering function? Correct Answer Material specifications Your Answer Performance specifications

Multiple Choice Single Answer Question Which of the following is a cause of plant breakdown? Correct Answer Overloading of machines Your Answer Overloading of machines

Multiple Choice Multiple Answer Question Which of the following possibilities can be explored by using flow process chart? Correct Answer Eliminating the operations or combining the operations with another , Reducing the distance traveled by the workmen or materials , Avoiding the waiting time and thereby reduce production losses Your Answer Reducing the distance traveled by the workmen or materials , Reducing rejections drastically , Avoiding the waiting time and thereby reduce production losses

Multiple Choice Single Answer Question Material Planning is an integral part of Correct Answer Production Planning Your Answer Process Planning

True/False Question Dust gets mixed with lubricants, forms an abrasive substance and causes pre-mature failure of machinery. Correct Answer True Your Answer True

Multiple Choice Multiple Answer Question Which of the following activities are used while recording for method study? Correct Answer Delay , Operation , Inspection Your Answer Operation , Inspection , Production

True/False Question

In case of centralised inspection, inspection rooms generally Page 5

POM11 become bottleneck and cause delay in taking action regarding rejection or rework. Correct Answer True Your Answer True

Select The Blank Question The ________ advocates maintenance procedures whereby the condition of the plant is constantly watched through systematic inspection to unearth unhealthy conditions and preventive Correct Answer Preventive Maintenance Your Answer Preventive Maintenance

True/False Question The problems of congestion, bottlenecks and backtracking can not be visualized by using templates and models. Correct Answer False Your Answer False

Multiple Choice Single Answer Question Which varaible is taken along the abscissa or X axis? Correct Answer Time Your Answer Quality

True/False Question Delay in completion of projects result in unwelcome additions to the fixed manufacturing expenses. Correct Answer True Your Answer True

Select The Blank Question The term ________ emplies the foregone profit due to inability of company to produce. Correct Answer Opportunity cost Your Answer Idle wages

Multiple Choice Single Answer Question Taxes / duties levied is one of the important determinant for location decision as taxes/duties substantially influence Correct Answer Product cost Your Answer Order procurement

Multiple Choice Multiple Answer Question What are the uses of failure statistics analysis? Correct Answer To forecast the defect , To identify causes of major repetative failures , To quantify the frequency of preventive inspection Page 6

POM11 Your Answer To forecast the defect , To identify causes of major repetative failures , To quantify the frequency of preventive inspection

True/False Question Shop order is one of the subsidiary order Correct Answer True Your Answer True

Multiple Choice Single Answer Question Which of the following is the most popular technique for Project Production? Correct Answer PERT & CPM Your Answer PERT & CPM

Select The Blank Question The ________ is the probability that a good lot will be rejected by the sampling plan. Correct Answer Producer's risk Your Answer Lot Tolerance Percentage Defective

True/False Question The component produced on completely automatic machines may be subjected to sampling inspection while parts produced on semi-automatic and completely manual operated machines require cent percent inspection. Correct Answer True Your Answer False

Multiple Choice Multiple Answer Question In an organization there may not be a formal PPC department if Correct Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large Your Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large

Multiple Choice Multiple Answer Question Which of the following selecting or rejecting a particular site view? Correct Answer Labour laws , of licences Your Answer Labour laws , Policies of labour

factors play important role while from legislation and taxation point of Building codes , Policies regarding issue regarding issue of licences , Productivity

Page 7

POM11

Page 8

pom 12 LIST OF ATTEMPTED QUESTIONS AND ANSWERS True/False Question Kanban system is essentially a computer based system for production scheduling and control Correct Answer False Your Answer False Select The Blank Question The ________ is one of the best known statistical relationship regarding process control. Correct Answer Normal distribution Your Answer Normal distribution True/False Question Floor inspection promotes tendency of machines to drift out of limits and produce defectives. Correct Answer False Your Answer False True/False Question In case of two handed process chart, inspection symbol is used when check by touch or feel is involved. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Which are reason due to which the progress of work is rarely in line with it's plan? Correct Answer Absenteeism , Machine breakdowns , Substandard performance against prefixed production standards Your Answer Absenteeism , Change in operation sequence , Machine breakdowns Multiple Choice Single Answer Question Which rule is used for numbering of events? Correct Answer Fulkerson's Rule Your Answer Fulkerson's Rule Match The Following Question Correct Answer Your Answer Combined Layout Mixed Layout Mixed Layout Fixed Position Layout Project Layout Project Layout Product Layout Line Layout Line Layout Process Layout Functional Layout Functional Layout

Multiple Choice Single Answer Page 1

pom 12 Question What does the points falling outside the control limits indicate? Correct Answer Presence of assignable causes Your Answer Presence of assignable causes Multiple Choice Single Answer Question A good plant layout helps in Correct Answer Reducing handling costs Your Answer Reducing handling costs Multiple Choice Multiple Answer Question Which of the following cases can be treated as delay during recording of method study? Correct Answer Operators awaiting instructions from supervisor , Worker waiting for his turn at tools stores , Jobs awaiting at the machines for their turn Your Answer Operators awaiting instructions from supervisor , Worker waiting for his turn at tools stores , Jobs awaiting at the machines for their turn Multiple Choice Multiple Answer Question Material Requirement Planning is very useful in following situations Correct Answer Long Lead time for procurement , Several levels of assemblies in product , Long manufacturing cycle Your Answer Long Lead time for procurement , Several levels of assemblies in product , Long manufacturing cycle Select The Blank Question Principle underlying the Moving Average mrthod is that future demand shall be ________ past demand. Correct Answer Average of Your Answer Higher than Multiple Choice Single Answer Question The ratio of output to input of a production system is commonly known as Correct Answer Productivity Your Answer Productivity True/False Question Complexity and difficulty of Planning is influenced by types of layout Correct Answer True Your Answer True Multiple Choice Single Answer Question Which phase of method study is concerned with analyzing the facts critically, generating alternatives which form the basis for selection and development of improved methods? Correct Answer Critical examination Your Answer Development and selection

Page 2

pom 12 Multiple Choice Multiple Answer Question Which of the following is a part of preparing manufacturing order set as a primary function of dispatching? Correct Answer Operational layouts , Move orders , Pre-filled stores issue orders Your Answer Operational layouts , Move orders , Pre-filled stores issue orders Select The Blank Question The wage payable to the workman is calculated by ________ the quantity produced by him by the specified rate per piece, in the straight piece rate method. Correct Answer Multiplying Your Answer Dividing True/False Question F W Taylor devised a system for classifying motions into basic divisions called Therbligs Correct Answer False Your Answer False Multiple Choice Single Answer Question How to reveal the capability of the sampling plan to discriminate between good lots and bad lots? Correct Answer Operating characteristics curve ( OC ) Your Answer Operating characteristics curve ( OC ) Multiple Choice Single Answer Question Technique which can help an organization to reduce inventory is called Correct Answer MRP Your Answer MRP Multiple Choice Multiple Answer Question Which of the following are examples of addition during recording for method study? Correct Answer Brazing , Welding , Riveting Your Answer Brazing , Welding , Riveting Multiple Choice Multiple Answer Question Which are the subtasks of the maintenance phase of the method study? Correct Answer Monitoring and control , Performance appraisal , Audit on savings Your Answer Monitoring and control , Performance appraisal , Audit on savings True/False Question Only skilled worker can use the fixed limit gauge. Correct Answer False Your Answer False

Page 3

pom 12 Multiple Choice Multiple Answer Question Which of the following are steps to identify the critical path in a small network? Correct Answer Compare the durations of all paths to identify the longest path. , Sum up the durations of activities along each path. , Enumerate all paths in the network and list down activities on each path. Your Answer Compare the durations of all paths to identify the longest path. , Sum up the durations of activities along each path. , Enumerate all paths in the network and list down activities on each path. Multiple Choice Single Answer Question What do you understand by the metallergical aspects of product which forms the vital part of engineering function? Correct Answer Material specifications Your Answer Material specifications Select The Blank Question We can say that ________ occurs when there is a distinct change in the physical or chemical characteristic of an object. Correct Answer Operation Your Answer Manufacturing True/False Question There is no need for progressing when the customers do the follow-up on their own to know the status of their jobs. Correct Answer False Your Answer False True/False Question The component produced on completely automatic machines may be subjected to sampling inspection while parts produced on semi-automatic and completely manual operated machines require cent percent inspection. Correct Answer True Your Answer True True/False Question In case of two handed process chart, the simultaneous activities of both hands are recorded opposite to each other on the chart. Correct Answer True Your Answer False Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Operation Multiple Choice Single Answer Question Material control function of PPC is concerned with Correct Answer Preparation of material estimates Your Answer indenting all required material

Page 4

pom 12 Multiple Choice Multiple Answer Question Order preparation process for products manufatured to order requires following documents Correct Answer Sales Order , Work order , Shop order Your Answer Sales Order , Work order , Shop order Select The Blank Question The ________ is necessary when the job requires detailed of one or more of the job characteristics with the help of special equipment which is not available at the producing company. Correct Answer Inspection order Your Answer Inspection order Match The Following Question Correct Answer Your Answer Emerson Efficiency Plan Wage Payment Wage Payment Craft Facilities Planning Facilities Planning Work Sampling Machine utilization Machine utilization Gantt Chart Production Scheduling Production Scheduling

Multiple Choice Multiple Answer Question Which of the following are examples of specifications? Correct Answer Commercial standards , Assembly and testing instructions , Bill of material Your Answer Commercial standards , Assembly and testing instructions , Bill of material Multiple Choice Multiple Answer Question Route Sheet generally contains following information Correct Answer Material Specification , Sequence of operation , Skill of Labour Your Answer Material Specification , Sequence of operation , Skill of Labour

Select The Blank Question The design of any layout is governed by large number of factors and the best layout is expected to ________ all these factors. Correct Answer Optimise Your Answer Consider Multiple Choice Single Answer Question How should a dummy activity be represented in a network? Correct Answer By dotted line Your Answer By circle Select The Blank Question Production Planning is a centralised activity which includes Page 5

pom 12 functions such as ________ Correct Answer Scheduling Your Answer Scheduling Multiple Choice Single Answer Question Technique of Value Engineering can be effectively employed in design of a product to Correct Answer To meet the intended function at lowest cost Your Answer To meet the intended function at lowest cost True/False Question Cellular layout is based on the concept of Group Technology Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Which of the following are types of sampling plan? Correct Answer Single sampling plan , Double sampling plan , Multiple sampling plan Your Answer Single sampling plan , Double sampling plan , Multiple sampling plan Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory Multiple Choice Single Answer Question What is the base for considering activity time as single time estimate or three time estimate? Correct Answer Level of uncertainty Your Answer Level of uncertainty Select The Blank Question In Gantt Chart, the vertical lines devide horizontal lines into small squares which represents ________. Correct Answer Units of measurement Your Answer No. of Jobs Select The Blank Question Activities comprising of a project are of two types, deterministic and ________. Correct Answer Variable Your Answer Variable Select The Blank Question A ________ is another form of subcontracting. Correct Answer Hiring capacity Your Answer Hiring capacity

Page 6

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

True/False Question Correct Answer Your Answer

It pays in the long run to inform the customer regarding expected delays in the deliveries. True True

Multiple Choice Single Answer Question Fixed position layout is adopted when Correct Answer product is very heavy involving assembly of large number of parts Your Answer product is very heavy involving assembly of large number of parts

Select The Blank Question The ________ is the defect level for which lots are regarded as bad lots. Correct Answer Lot Tolerance Percentage Defective Your Answer Lot Tolerance Percentage Defective

Multiple Choice Multiple Answer Question Which are the advantages of suburban location? Correct Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction Your Answer Avaialability of adequat e land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction

Select The Blank Question One detachable ticket is prepared for each ________. Correct Answer Operation Your Answer Worker

Select The Blank Question A good maintenance system is not a luxary but a ________. Correct Answer Necessity Your Answer Necessity

Multiple Choice Multiple Answer Question Following are some of the factors which influence process planning Correct Answer Order Quantity , Process capability of machine , Delivery Dates Your Answer Order Quantity , Delivery Dates , Plant layout

True/False Question needs.

Availability of training schools, colleges and management institutes reduces the company's internal training

Correct Answer Your Answer

True False

Multiple Choice Multiple Answer Question Which of the following are examples of pure materials? Correct Answer Bakeries , Ice factories , Woolen Your Answer Bakeries , Ice factories , Lime stone

Match The Following Question Correct Answer

Your Answer Wage Payment

Emerson Efficiency Plan Wage Payment Craft Facilities Planning Work Sampling

Production Scheduling Sampling Inspection

Machine utilization

Gantt Chart Production Scheduling

Charting technique

Match The Following Question Correct Answer Fixation of inventory level

Your Answer Reorder level Stock on hand Over ordering Lead time Price of material

Symptom of ill planned purchasing Factor influencing material planning

Over ordering Lead time

Net requirement of material under MRP

Stock on hand

Multiple Choice Multiple Answer Question Which of the following are steps to identify the critical path in a small network? Correct Answer Compare the durations of all paths to identify the longest path. , Sum up the durations of activities along each path. , Enumerate all paths in the network and list down activities on each path . Your Answer Compare the durations of all paths to identify the longest path. , Sum up the durations of activities along each path. , Enumerate all paths in the network and list down activities on each path.

Select The Blank Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________. Correct Answer 0.01 to 10% Your Answer 0.01 to 10%

True/False

Question Correct Answer Your Answer

Tool breakage has got nearly zero chances in case of eventual breakdown. False False

Multiple Choice Multiple Answer Question Which are the three types of float? Correct Answer Total float , Independent float , Free float Your Answer Total float , Dependent float , Free float

Multiple Choice Multiple Answer Question Which of the following are major inputs to scheduling? Correct Answer Overlapping of operations , Effective Capacity per work centre , Performance standards Your Answer Effective Capacity per work centre , Ratio of skilled to unskilled labour , Performance standards

Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory

Select The Blank Question The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Correct Answer Acceptable quality level Your Answer Lot Tolerance Percentage Defective

Select The Blank Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Answer Condition monitoring Your Answer Overhauling

Select The Blank Question OC curve of ideal sampling plan suggests that all lots less than 3% defectives have the probability of acceptance of ________. Correct Answer One Your Answer One

Multiple Choice Single Answer Question How to calculate activity cost slope? Correct Answer Activity cost slope = ( Crash cost - Normal cost ) / ( Normal time - Crash time ) Your Answer Activity cost slope = ( Normal cost - Crash cost ) / ( Normal time - Crash time )

Multiple Choice Multiple Answer

Question Correct Answer Your Answer

Which of the following are minimum requirement for a good quality of design? Resonable cost , Resonable procurement time , Resonable manufacturing time Resonable cost , Resonable procurement time , Resonable manufacturing time

True/False Question small. Correct Answer Your Answer

In case of control chart, large smaples such as n=15 or 20 are used if the process standard deviation is False True

Select The Blank Question Production control work is ________ in case of floor inspection as compared with the centralised inspection. Correct Answer easier Your Answer labourious

Multiple Choice Single Answer Question Production Planning includes Correct Answer Predetermination of manufacturing requirements Your Answer Predetermination of manufacturing requirements

Multiple Choice Single Answer Question How does the control chart of statistical quality control helps the operating personnel? Correct Answer Identify the presence of an assignable cause before it develops Your Answer Reduces chances of rejections

Multiple Choice Single Answer Question What can be the worst effect due to excessive vibration? Correct Answer Breakdown Your Answer Reduced salvage value of machine

Multiple Choice Single Answer Question What do you understand by the metallergical aspects of product which forms the vital part of engineering function? Correct Answer Material specifications Your Answer Performance specifications

Multiple Choice Single Answer Question Which of the following is a cause of plant breakdown? Correct Answer Overloading of machines Your Answer Overloading of machines

Multiple Choice Multiple Answer Question Which of the following possibilities can be explored by using flow process chart?

Correct Answer Eliminating the operations or combining the operations with another , Reducing the distance traveled by the workmen or materials , Avoiding the waiting time and thereby reduce production losses Your Answer Reducing the distance traveled by the workmen or materials , Reducing rejections drastically , Avoiding the waiting time and thereby reduce production losses

Multiple Choice Single Answer Question Material Planning is an integral part of Correct Answer Production Planning Your Answer Process Planning

True/False Question Correct Answer Your Answer

Dust gets mixed with lubricants, forms an abrasive substance and causes pre-mature failure of machinery. True True

Multiple Choice Multiple Answer Question Which of the following activities are used while recording for method study? Correct Answer Delay , Operation , Inspection Your Answer Operation , Inspection , Production

True/False Question In case of centralised inspection, inspection rooms generally become bottleneck and cause delay in taking action regarding rejection or rework. Correct Answer True Your Answer True

Select The Blank Question The ________ advocates maintenance procedures whereby the condition of the plant is constantly watched through systematic inspection to unearth unhealthy conditions and preventive Correct Answer Preventive Maintenance Your Answer Preventive Maintenance

True/False Question Correct Answer Your Answer

The problems of congestion, bottlenecks and backtracking can not be visualized by using templates and models. False False

Multiple Choice Single Answer Question Which varaible is taken along the abscissa or X axis? Correct Answer Time Your Answer Quality

True/False

Question Correct Answer Your Answer

Delay in completion of projects result in unwelcome additions to the fixed manufacturing expenses. True True

Select The Blank Question The term ________ emplies the foregone profit due to inability of company to produce. Correct Answer Opportunity cost Your Answer Idle wages

Multiple Choice Single Answer Question Taxes / duties levied is one of the important determinant for location decision as taxes/duties substantially influence Correct Answer Product cost Your Answer Order procurement

Multiple Choice Multiple Answer Question What are the uses of failure statistics analysis? Correct Answer To forecast the defect , To identify causes of major repetative failures , To quantify the frequency of preventive inspection Your Answer To forecast the defect , To identify causes of ma jor repetative failures , To quantify the frequency of preventive inspection

True/False Question Correct Answer Your Answer

Shop order is one of the subsidiary order True True

Multiple Choice Single Answer Question Which of the following is the most popular technique for Project Production? Correct Answer PERT & CPM Your Answer PERT & CPM

Select The Blank Question The ________ is the probability that a good lot will be rejected by the sampling plan. Correct Answer Producer's risk Your Answer Lot Tolerance Percentage Defective

True/False Question The component produced on completely automatic machines may be subjected to sampling inspection while parts produced on semi-automatic and completely manual operated machines require cent percent inspection. Correct Answer True Your Answer False

Multiple Choice Multiple Answer Question In an organization there may not be a formal PPC department if Correct Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large Your Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large

Multiple Choice Multiple Answer Question Which of the following factors play important role while selecting or rejecting a particular site from legislation and taxation point of view? Correct Answer Labour laws , Building codes , Policies regarding issue of licences Your Answer Labour laws , Policies regarding issue of licences , Productivity of labour

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

True/False Question Correct Answer Your Answer

It pays in the long run to inform the customer regarding expected delays in the deliveries. True True

Multiple Choice Single Answer Question Fixed position layout is adopted when Correct Answer product is very heavy involving assembly of large number of parts Your Answer product is very heavy involving assembly of large number of parts

Select The Blank Question The ________ is the defect level for which lots are regarded as bad lots. Correct Answer Lot Tolerance Percentage Defective Your Answer Lot Tolerance Percentage Defective

Multiple Choice Multiple Answer Question Which are the advantages of suburban location? Correct Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction Your Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for buildi ng and construction

Select The Blank Question One detachable ticket is prepared for each ________. Correct Answer Operation Your Answer Worker

Select The Blank

Question Correct Answer Your Answer

A good maintenance system is not a luxary but a ________. Necessity Necessity

Multiple Choice Multiple Answer Question Following are some of the factors which influence process planning Correct Answer Order Quantity , Process capability of machine , Delivery Dates Your Answer Order Quantity , Delivery Dates , Plant layout

True/False Question needs. Correct Answer Your Answer

Availability of training schools, colleges and management institutes reduces the company's internal training True False

Multiple Choice Multiple Answer Question Which of the following are examples of pure materials? Correct Answer Bakeries , Ice factories , Woolen Your Answer Bakeries , Ice factories , Lime stone

Match The Following Question Correct Answer

Your Answer Wage Payment

Emerson Efficiency Plan Wage Payment Craft Facilities Planning Work Sampling

Production Scheduling Sampling Inspection

Machine utilization

Gantt Chart Production Scheduling

Charting technique

Match The Following Question Correct Answer Fixation of inventory level

Your Answer Reorder level Stock on hand Over ordering Lead time Price of material

Symptom of ill planned purchasing Factor influencing material planning

Over ordering Lead time

Net requirement of material under MRP

Stock on hand

Multiple Choice Multiple Answer

Question Which of the following are steps to identify the critical path in a small network? Correct Answer Compare the durations of all paths to identify the longest path. , Sum up the d urations of activities along each path. , Enumerate all paths in the network and list down activities on each path. Your Answer Compare the durations of all paths to identify the longest path. , Sum up the durations of activities along each path. , Enumerate all paths in the network and list down activities on each path.

Select The Blank Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________. Correct Answer 0.01 to 10% Your Answer 0.01 to 10%

True/False Question Correct Answer Your Answer

Tool breakage has got nearly zero chances in case of eventual breakdown. False False

Multiple Choice Multiple Answer Question Which are the three types of float? Correct Answer Total float , Independent float , Free float Your Answer Total float , Dependent float , Free float

Multiple Choice Multiple Answer Question Which of the following are major inputs to scheduling? Correct Answer Overlapping of operations , Effective Capacity per work centre , Performance standards Your Answer Effective Capacity per work centre , Ratio of skilled to unskilled labour , Performance standards

Multiple Choice Single Answer Question Any premise in which persons a re employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory

Select The Blank Question The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Correct Answer Acceptable quality level Your Answer Lot Tolerance Percentage Defective

Select The Blank Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Answer Condition monitoring Your Answer Overhauling

Select The Blank Question OC curve of ideal sampling plan suggests that all lots less than 3% defectives have the probability of acceptance of ________. Correct Answer One Your Answer One

Multiple Choice Single Answer Question How to calculate activity cost slope? Correct Answer Activity cost slope = ( Crash cost - Normal cost ) / ( Normal time - Crash time ) Your Answer Activity cost slope = ( Normal cost - Crash cost ) / ( Normal time - Crash time )

Multiple Choice Multiple Answer Question Which of the following are minimum requirement for a good quality of design? Correct Answer Resonable cost , Resonable procurement time , Resonable manufacturing time Your Answer Resonable cost , Resonable procurement time , Resonable manufacturing time

True/False Question small. Correct Answer Your Answer

In case of control chart, large smaples such as n=15 or 20 are used if the pro cess standard deviation is False True

Select The Blank Question Production control work is ________ in case of floor inspection as compared with the centralised inspection. Correct Answer easier Your Answer labourious

Multiple Choice Single Answer Question Production Planning includes Correct Answer Predetermination of manufacturing requirements Your Answer Predetermination of manufacturing requirements

Multiple Choice Single Answer Question How does the control chart of statistical quality control helps the operating personnel? Correct Answer Identify the presence of an assignable cause before it develops Your Answer Reduces chances of rejections

Multiple Choice Single Answer Question What can be the worst effect due to excessive vibration? Correct Answer Breakdown Your Answer Reduced salvage value of machine

Multiple Choice Single Answer

Question function? Correct Answer Your Answer

What do you understand by the metallergical aspects of product which forms the vital part of engineering Material specifications Performance specifications

Multiple Choice Single Answer Question Which of the following is a cause of plant breakdown? Correct Answer Overloading of machines Your Answer Overloading of machines

Multiple Choice Multiple Answer Question Which of the following possibilities can be explored by using flow process chart? Correct Answer Eliminating the operations or combining the operations with another , Reducing the distance traveled by the workmen or materials , Avoiding the waiting time and thereby reduce production losses Your Answer Reducing the distance traveled by the workmen or materials , Reducing rejections drastically , Avoiding the waiting time and thereby reduce production losses

Multiple Choice Single Answer Question Material Planning is an integral part of Correct Answer Production Planning Your Answer Process Planning

True/False Question Correct Answer Your Answer

Dust gets mixed with lubricants, forms an abrasive substance and causes pre-mature failure of machinery. True True

Multiple Choice Multiple Answer Question Which of the following activities are used while recording for method study? Correct Answer Delay , Operation , Inspection Your Answer Operation , Inspection , Production

True/False Question In case of centralised inspection, inspection rooms generally become bott leneck and cause delay in taking action regarding rejection or rework. Correct Answer True Your Answer True

Select The Blank Question The ________ advocates maintenance procedures whereby the condition of the plant is constantly watched through systematic inspection to unearth unhealthy conditions and preventive Correct Answer Preventive Maintenance Your Answer Preventive Maintenance

True/False Question Correct Answer Your Answer

The problems of congestion, bottlenecks and backtracking can not be visualized by using templates and models. False False

Multiple Choice Single Answer Question Which varaible is taken along the abscissa or X axis? Correct Answer Time Your Answer Quality

True/False Question Correct Answer Your Answer

Delay in completion of projects result in unwelcome additions to the fixed manufacturing expenses. True True

Select The Blank Question The term ________ emplies the foregone profit due to inability of co mpany to produce. Correct Answer Opportunity cost Your Answer Idle wages

Multiple Choice Single Answer Question Taxes / duties levied is one of the important determinant for location decision as taxes/duties substantially influence Correct Answer Product cost Your Answer Order procurement

Multiple Choice Multiple Answer Question What are the uses of failure statistics analysis? Correct Answer To forecast the defect , To identify causes of major repetative failures , To quantify the frequency of preventive inspection Your Answer To forecast the defect , To identify causes of major repetative failures , To quantify the frequency of preventive inspection

True/False Question Correct Answer Your Answer

Shop order is one of the subsidiary order True True

Multiple Choice Single Answer Question Which of the following is the most popular technique for Project Production? Correct Answer PERT & CPM Your Answer PERT & CPM

Select The Blank Question The ________ is the probability that a good lot will be rejected by the sampling plan. Correct Answer Producer's risk Your Answer Lot Tolerance Percentage Defective

True/False Question The component produced on completely automatic machines may be subjected to sampling inspection while parts produced on semi-automatic and completely manual operated machines require cent percent inspection. Correct Answer True Your Answer False

Multiple Choice Multiple Answer Question In an organization there may not be a formal PPC department if Correct Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large Your Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large

Multiple Choice Multiple Answer Question Which of the following factors play important role while selecting or rejecting a particular site f rom legislation and taxation point of view? Correct Answer Labour laws , Building codes , Policies regarding issue of licences Your Answer Labour laws , Policies regarding issue of licences , Productivity of labour LIST OF ATTEMPTED QUESTIONS AND ANSWERS

True/False Question Correct Answer Your Answer

Cent percent inspection is required on WIP prior to the key, critical or costly operation. True True

Multiple Choice Multiple Answer Question Which of the following a spects are essential to ensure quality of purchased items? Correct Answer Defining right quality for the job , Vendor performance evaluation , Making sure that suppliers understand the requirements Your Answer Vendor performance evaluation , Making sure that suppliers understand the requirements , Defining right quality for the job

Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory

Multiple Choice Single Answer Question Which of the following technique is event oriented ? Correct Answer Project Evaluation & Review Technique Your Answer Project Evaluation & Review Technique

Select The Blank Question Work study is also called ________ study Correct Answer Time and Motion Your Answer Time and Motion

Multiple Choice Multiple Answer Question Which of the following concepts must be understood for the achievement of quality? Correct Answer Quality of conformance , Purpose of product , Quality of design Your Answer Quality of conformance , Quality of design

Multiple Choice Multiple Answer Question Following are some of the factors considered for evaluation of alte rnative layouts Correct Answer Flow of Material , Equipment utilization , Ease of supervision Your Answer Flow of Material , Equipment utilization , Ease of supervision

Match The Following Question Correct Answer Toung Sweet Sweet Eye Nose Ear Crack Crack Burnout Impact Burnout Impact

Your Answer

Multiple Choice Multiple Answer Question Which of the following are important considerations concerning activity times? Correct Answer Activity time should be obtained from the person responsible for the completion of an activity , Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resources required to carry out the activity are available. Your Answer Activity time should be obtained from the person responsible for the completion of an activity , Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activ ity time may assume that just the normal quantity of resources required to carry out the activity are available.

Multiple Choice Multiple Answer Question Which are the subtasks of the maintenance phase of the method study? Correct Answer Monitoring and control , Performance appraisal , Audit on savings Your Answer Monitoring and control , Performance appraisal , Audit on savings

Multiple Choice Multiple Answer Question Which of the following are characteristics of an operating c haracteristics curve? Correct Answer Producer risk , Consumer Risk , Acceptable Quality Level Your Answer Producer risk , Consumer Risk , Acceptable Quality Level

Select The Blank Question The ________ breakdowns usually cost more, partl y due to damage done to the adjustment components and partly due to emergency actions. Correct Answer Unexpected Your Answer Partial

Multiple Choice Single Answer Question Why stores issue order should not be issued as soon as it is prepar ed? Correct Answer Material may or may not be available at the time of preparation Your Answer Inventory investment will increase

Multiple Choice Single Answer Question What is the nature of the sampling plan for critical defects? Correct Answer Tight Your Answer Tight

Select The Blank Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________. Correct Answer 0.01 to 10% Your Answer 0.01 to 10%

Multiple Choice Multiple Answer Question Plant layout facilitates processing of products in most effective manner through the following Correct Answer Shortest possible distance , Shortest processing time , Minimum movement Your Answer Shortest possible distance , Shortest processing time , Minimum movement

True/False Question Correct Answer Your Answer

After goods have been manufactured, route sheets and operation layouts should not be collected back. False False

Multiple Choice Single Answer Question Process planning is the process of Correct Answer establishing shortest and most economic path of production Your Answer establishing shortest and most economic path of production

Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Operation

Select The Blank Question The ________ is specified to indicate the maximum permissible variability in t he dimensions product or parts. Correct Answer Tolerance Your Answer Tolerance

Select The Blank Question Goods after final inspection should accompany ________to enable dispatch department to identify and draw correct reference. Correct Answer Forwarding note Your Answer Forwarding note

Select The Blank Question The ________ includes preventive maintenance activities whose needs are identified through inspection which requires stoppage of machines. Correct Answer Shutdo wn Maintenance Your Answer Shutdown Maintenance

True/False Question Correct Answer Your Answer

A load chart specifies the work to be carried out by each person of company during shift hours. False True

Select The Blank Question The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________. Correct Answer Overtime working Your Answer Overtime working

True/False Question Correct Answer Your Answer

Under MRP system for common items order for procurement is placed based on requirement for each product False True

Multiple Choice Single Answer Question What do you understand by the extent the products manufactured conforms to the laid dow n design? Correct Answer Quality of conformance Your Answer Quality of conformance

Select The Blank Question The ________ is necessary when the job requires detailed of one or more of the job characteristics with the help of special equipment which is not available at the producing company. Correct Answer Inspection order Your Answer Job card

Multiple Choice Multiple Answer Question Which of the following are the basic requirements of quality standard? Correct Answer Deifinite , Undesrstandable , Economically viable Your Answer Deifinite , Undesrstandable , Economically viable

True/False Question Correct Answer Your Answer

In case of forward pass computation, the earliest event time of the first event is zero. True True

Multiple Choice Multiple Answer Question Which kind of possible defectives can be reduced due to first off inspection? Correct Answer Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machi ne set up Your Answer Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machine set up , Due to purposely done mistakes by unsatisfied worker

True/False Question Correct Answer Your Answer

A sampling plan which perfectly discriminates wi ll have vertical OC curve. True True

Multiple Choice Multiple Answer Question Which of the following is a part of preparing manufacturing order set as a primary function of dispatching? Correct Answer Operational layouts , Move orders , Pre-filled stores issue orders Your Answer Operational layouts , Rejection reports , Move orders , Pre-filled stores issue orders

Select The Blank Question An ________ history card is the record of all repairs, replacements and engineering changes carried out in the equipment during it's period of service. Correct Answer Equipment history card Your Answer Equipment history card

True/False Question Correct Answer Your Answer

Specifications is the basic tool of inspection. True True

Match The Following Question Correct Answer

Your Answer Past consumption analysis technique Economic order quantity ABC Analysis

Forcasting requirement for indirect material Inventory control by classification ABC Analysis Structure of the product BOM BOM MRP

Material Planning for dependent demand

MRP

Multiple Choice Single Answer Question The document raised by PPC which authorises different functions to take action as per instruction is called Correct Answer Work Order Your Answer Job Instructions

Multiple Choice Single Answer Question Who prepares the daily production report? Correct Answer Shop Supervisor Your Answer Shop Supervisor

True/False Question Correct Answer Your Answer

A lot declared rejected in sampling inspection should not be inspected 100% in any case. False True

Multiple Choice Single Answer Question How is the probability of acceptance in case of Acceptable Quality Level (AQL )? Correct Answer Very high Your Answer Average

Multiple Choice Multiple Answer Question Which are the different methods of recording actual progress of work? Correct Answer Display boards , Progress cards , Network updating Your Answer Display boards , Progress cards , Network updating

True/False Question Correct Answer Your Answer

The dispatching function is of very importance in flow and mass production units. False True

True/False Question

Proper care and storage is not an essential part of a well planned lubrication system.

Correct Answer Your Answer

False False

Select The Blank Question The ________ pertain to the climatic conditions which the component , product or material should withstand. Correct Answer Environmental specifications Your Answer Environmental specifications

Multiple Choice Single Answer Question Which of the following is the most popular technique for Project Production? Correct Answer PERT & CPM Your Answer PERT & CPM

Select The Blank Question Production Planning is a centralised activity which includes functions such as ________ Correct Answer Scheduling Your Answer Scheduling

Multiple Choice Single Answer Question Which rule is used for numbering of events? Correct Answer Fulkerson's Rule Your Answer Fulkerson's Rule

ASSIGNMENT Q.1) What is Operations Management? What are the objectives of Operations Management? Enlist key elements of Operations Management.

Answer.1) An operation may be defined as the process of changing inputs into outputs thereby adding value to some entity.Right quality, right quantity, right time and right price are the four basic requirements of the customers and as such they determine the extent of customer satisfaction. And if these can be provided at a minimum cost, then the value of goods produced or services rendered increases. Thus the objectives of production management are to produce goods and services of the right quality, in the right quantities, according to the time schedule and a minimum cost. Objectives of production management may be amplified as under: Producing the right kind of goods and services that satisfy customers needs (effectiveness objective). Maximizing output of goods and services with minimum resource inputs (efficiency objective). Ensuring that goods and services produced conform to pre-set quality specifications (quality objective).

Minimizing throughput-time- the time that elapses in the conversion process- by reducing delays, waiting time and idle time (lead time objective). Maximizing utilization of manpower, machines, etc. (Capacity utilization objective). Minimizing cost of producing goods or rendering a service (Cost ob jective).

Key elements of Operations Management

1.

Product selection and design

The right kind of products and good designs of the products are crucial for the success of an organizing. A wrong selection of the product and/or poor design of the products can render the companys operation ineffective and non-competitive. Products/services, therefore, must be chosen after detailed evaluation of the product/services alternatives in conformity with the organizations objectives. Techniques like value engineering may be employed in creating alternate designs, which are free from unnecessary features and meet the intended functions at the lowest cost. 2. Process selection and planning

Selection of the optimal conversion system is as important as choice of products/services and their design. Process selection decisions include decisions concerning choice of technology, Equipment, machines, material handling systems, mechanization and automation. Process planning involves detailing of processes if resource conversion required and their sequence. 3 Facilities (Plant) location

Plant location decisions are strategic decisions and once plant is set up at a location, it is comparatively immobile and can be shifted later only at a considerable cost and interruption of production. Although problem of location choice does not fall within preview the production function and it occurs infrequently, yet it is of crucial importance because of its major effect on the performance of every department including production. Therefore, it is important to choose the right location, which will minimize total delivered customer cost (Production and distribution cost). Locational dec isions involve evaluation of locational alternatives against multiplicity of relevant factors considering their relative importance to the organization and selecting those, which are operationally advantageous to the organization. 4. Facilities (Plant) layout and materials handling Plant layout is concerned with relative location of one department (Work centre) with another in order to facilitate material flow and processing of a product in the most efficient manner through the shortest possible time. A good layout reduces material handling cost, eliminates delays and congestion, improves co-ordination, provide good housekeeping etc. while a poor layout results in congestion, waste, frustration, inefficiency and loss of profit. 5. Capacity Planning

Capacity planning concerns determination and acquisition of productive resource to ensure that their availability matches the demand. Capacity decisions have a direct Influence on performance of production system in respect of both resource productivity and customer service (i.e. delivery performance). Excess capacity results in low resource productivity while inadequate capacity leads to poor customer service. Capacity planning decisions can be short-term decisions. Long-term capacity planning decisions concern expansion/contraction of major facilities required in the conversion process, economics of multiple shift operation, development of vendors for major

components etc. Short term capacity planning decisions concern issues like overtime working, sub -contracting, shift adjustments etc. Break even analysis is a valuable tool for capacity planning. 6. Production Planning and Control (PPC)

Production planning is the system for specifying the production procedure to obtain the desired output in a given t ime at optimum cost in conformance with specified standard of quality, and control is essential to ensure that manufacturing takes place in the manner stated in the plan. 7. Inventory control

Inventory control deals with determination of optimal inventory levels of raw materials, components, parts, tools; finished goods, spares and supplies to ensure their availability with minimum capital lock up. Material requirement planning (MRP) and just-in-Time (JIT) are the latest techniques that can help the firm to reduce inventory.

8.

Quality assurance and control

Quality is an important aspect of production system and it must ensure that services and products produced by the company conform to the declared quality standards at the minimum cost A total quality assurance system includes such aspects as setting standards of quality, inspection of purchased and sub-contracted parts, control of quality during manufacture and inspection of finished product including performance testing etc. 9. Work study and job design

Work-study, also called time and motion study, is concerned with improvement of productivity in the existing jobs and the maximization of productivity in the design of new jobs. Two principal component of work-study are: (i) (ii) Method study Work measurement

Method study has been defined (BS 3138) as the systematic recording and critical examination of the existing and proposed ways of doing work, as a means of developing and applying easier and more effective methods and reducing costs. Method study when applied to production methods yields one or more of the following benefits: 10. Improved work environment Improved facility layout Better utilization of facilities Greater safety Lesser materials handling Smooth production flow Lower work-in-process Higher earnings for the workmen Maintenance and replacement

Maintenance and replacement involve selection of optimal maintenance Preventive and/or breakdown) policy to ensure higher equipment availability at minimum maintenance and repair cost. Preventive maintenance, which includes preventive inspection,

planned lubrication, periodic cleaning and upkeep, planned replacement of parts, condition monitoring of the equipment and machines, etc. is most appropriate for critical machines.

11.

Cost reduction and cost control

Effective production management must ensure minimum cost of production and in this context cost reduction and cost control acquires significant importance. There are large number of tools and techniques available that can help to make a heavy dent on the production cost.

Q.2) What is batch Production? What are its key characteristics? Compare these characteristics with those of project production. Answer.2) Batch production is characterized by the manufacture of a limited number of a product (but many such quantities of different products) produced at periodic intervals and stocked in warehouses as finished goods (or finished parts) awaiting sales (or withdrawal for assembly). Typic al examples of batch production are: process industries such as pharmaceuticals, paints, chemicals; medium and heavy engineering industry engaged in the manufacture of electric motors, switch gears, heavy motor vehicles, internal combustion engines; manufacture of ready made garments; manufacture of assembly shops such as machine tools; sub contractors which take on machining of batches of components to the drawings of a large manufacture etc. Characteristics of batch production (a) Short runs: Short production runs and frequent changes of set also characterize batch production up. The equipment and the assembly set up is used for a limited number of parts or assemblies and is then changed to make a different product. The production is generally made to stock. (b) Skilled labour in specific trades: The labour force is expected to posses skill in one specific manufacturing process, Turning, milling, drilling, welding, grinding, hobbing, fitting etc. The operator may perform simpler machine set-ups but the separate machine tool setter performs those involving complex operations. (c) Supervision to possess knowledge of a specific process The supervision has considerable knowledge of a specific process. Supervisor in the grinding section for example, may not expert in turning and drilling work but s expected to possess a find of knowledge of different types of grinding operations. Similarly a supervisor in the gear shop is expected to have sound knowledge in working of different types of gear cutting machines. (d) Limited span of control: The amount of supervision required in batch production is lower than that of jobbing production. The ration of direct workmen to supervisors is more or less a function of batch size. The smaller the batches, the lower are the ratio of direct workers to supervisors, and vice versa. This is because smaller lots require each supervisor to spend a grea t deal of his time in allocating new work, giving instructions, follow up on the shop floor for proper movement of materials from and to the

machines, identifying delays and interruptions, and arranging, in consultation with planning, work load in his sect ion to keep his men busy. (e) General purpose machines and process type of layout Plant and equipment is procured and arranged to obtain maximum flexibility. General purpose machines and handling equipment capable of performing variety of operations with minimum set up times are installed in lieu of variety of products. The machines are arranged to give process layout-layout by function. Similar machines capable of doing similar types of operations are grouped together and kept at o ne place. Presses for example, are put together and kept at one place milling machines are placed together at another place, drilling machines are kept at the third place, gear cutting machines are located at the fourth place and so on. Each Group of machines is usually designated as a work centre or a section or a shop. (f) Manual materials handling: Materials handling in batch production as compared to jobbing production are small. Individual components and parts are placed in trolleys and trays and are transported as unit loads. Materials handling may be mechanized by deploying power driven trucks. (g) Manufacturing cycle time affected due to queues: The manufacture cycle time is comparatively smaller than jobbing production but is much more than mass and flow production. The batches of work tend to queue up at different machines due to differing cycles times, batch sizes and sequence of operations. (h) Large work-in-progress: Work in progress is comparatively large due to varying work content of d ifferent components, imbalance in manufacturing times, formation of queues between the machines. (i) Flexibility of production schedules: Disruptions due to machine breakdown or absenteeism do not seriously affect production as job can be shifted to anoth er machine or another operator from another machine can be shifted. (j) Need to have production planning and control: Functions of production planning and control in a batch production unit are more complex than those in jobbing production or mass and flow production: Materials control and tools control functions are important. ensure routine replenishment Some kind of replenishment system needs to be used to

Detailed operational layout and route sheets are prepared for each part of the produc t.

Loading and scheduling needs to be more detailed and more sophisticated since every machine requires to be individually scheduled. Progressing function is very important to collect information on progress of work. maintained to record progress of each component. A separate progress card needs t o be

Expediting is generally necessary since quite often jobs, due to imbalances in work content, tend to lag behind

Q.3) (a) Why are locational decisions important? What factors should be taken into account while deciding location of a unit to manufacture washing machines?

Answer.3a) Locational decisions generally arise when: A new manufacturing (or servicing) unit is to be set up. Existing plant operations are difficult to expand due to poor selection of site earlier. The growth of the business makes it advisable to establish additional facilities in new territories. There is emergence of new social (chronic labour problems) political (political instability or economic conditions that suggest a change in the location of the existing plant. The product development has over weighted the advantages of the existing plant. The changes in the industrial Policy of the Government, favoring decentralizing and dispersal of industries to achieve overall development of the country, do not permit expansion of the existing plant

FACTORS GOVERNING PLANT LOCATION Plant location studies are conducted in three phases: (i) General territory selection (ii) Community selection, and (iii) Site selection 1. Proximity to market:

Every company is in business to market and it can survive only if their product reaches the consumers on time and at the competitive price. The ratio of selling costs to sales generally increases with distance. Therefore, i n the choice of location o the plant, the factor of proximity to the market is given the highest priority. Locating a plant nearer to the market is preferred if: The The The The product is product is promptness product is fragile. susceptible to spoilage. of service is required. relatively inexpensive and transportation costs add significantly to the cost.

Bread, soap factories, etc. require the market to be nearby. If factory cannot be started in Bombay, it may be started in Thane, Kalyan or Poona. If the product is exported, location near ports is desirable. This is particularly important for producers who sell bulky commodities, which incur high transportation costs

Nearness to market not only lowers transportation costs but also g ives many other benefits namely: A good many administrative problems, which cause perpetual headaches and add to costs, are avoided. Liaison with dealers or whole sellers can be maintained economically and easily Other costs such as commission to mi ddlemen, which at times run as high as 20 to 50 percent can be reduced significantly.

Customers accounts do not remain outstanding for settlement. reduces selling costs. 2. Proximity to source of raw materials:

This recovery is easy and less time saving which itself

Since raw materials usually constitute 50 to 60 percent of the total product cost, it is important that the firm gets its requirements of raw materials at the right time and at the reasonable price for which the plant must be located in th e neighborhood of some source which can meet the raw materials requirement of the unit Proximity to supply of raw materials factor assumes still greater importance if raw materials are of perishable nature or if they are expensive to transport, or if their weight is substantially reduced by processing. Proximity to sources of raw materials is equally important for small units. This is because usually small units are not considered important customers. They get least priority and in the event of scarcit y are the one to be struck off first from the list. The availability of materials to small units to a large extent thus depends on their follow up and personal visits to the suppliers plant which is possible only if the buyers plant is close by. 3. Infrastructural facilities:

Infrastructural facilities consider availability of utilities like power water, disposal of waste etc. These form the life blood of many types of industries without which there facilities may come to a stand still. Underestimating the need of any one of the utilities can be extremely costly and inconvenient. Certain industries, for example, aluminium, steel, etc are power intensive and must be located close to the sites of power generation failing which the shortage of, or increase in cost of generating power may spell problems for their survival. Similarly, chemical process industries like paper and pulp, cement, steel, sugar laundries, metal plating, food preparation etc. requires perennial source of water. Mineral content of water may also be an important factor. Treatment of water is an expense to be considered while comparing economics of different locations. Drainage facilities are important for process industries otherwise disposal of process waster can create lot of di fficulties. 4. Transport facilities:

Transportation cost to the value added is a key determinant of the plant location. The structure of the transportation cost depends on (i) Characteristics of the commodity (ii) average distance of shipment (iii) medi um of shipment: rail, road, and air sea. The need for transport arises because raw materials and fuel are to be moved to factory site and finished goods are to be transported from factory to markets. Other things being equal since transport cost has a m ajor effect on product cost, the regions well served by transport facilities are most suitable for industrial locations. 5. Labour and wages:

Plant location should be such that required labour is easily available in the neighbourhood. Importing labour from outside is usually costly and it causes lot of administrative problems. Availability of required labour locally is better since problem of arranging accommodation and other related problems do not arise. Since normally workers with specific skills are required, some sort of training facility should also be available in the neighborhood. Skilled employees are easily available if ITIs, or Engineering colleges are there in the neighbourhood. 6. Legislation and taxation:

The policies of the state Government and Local Bodies relating to issue of licenses, building codes, labour laws, etc. are the factors in selecting/rejecting a particular community/site. In order to disperse industries and ensure balanced economic growth, both Central and State government offer a package of incentives for setting up industries in particular locations. Exemption from excise duty, sales tax and octroi, soft loans from financial institutions, subsidy in electricity charges, etc. are some of the incentives offered. Since taxes and duties levied by the State Government and Local bodies substantially influence product cost, the incidence of such taxes/levies must be taken into account while selecting a community/site. 7. Climatic conditions:

Climatic factors may not have a major influence these days because of modern air conditioning facilities available today. However, it may be important factor for certain industries like textile mills, which require high humidity. 8. Industrial and labour attitudes:

Community attitudes towards supporting hostile trade union activities are an important factor. Locating facilities in a certain region/community may not be desirable as frequent labour problems and interruptions are harmful to the plant in the long run. Political situation in the state and attitude of the government towards labour activities also influences selection of the site for the plant. 9. Safety requirement:

Safety factor may be important for certain industries such as: Nuclear power plants Explosive factories Location of such industries close to border areas is undesirable.

10.

Community facilities (or social infrastructure):

Community facilities imply accommodation, educational, entertainment and transport facilities. Accommodation is needed unless the employees are local residents. Accommodation should be easily available, comparatively cheap and near some public transport stop. The locational area should be fully developed, be accessible by road and should have a convenient and efficient public transport system operating between the area and the township to enable employees, officials, customers and suppliers to make easy trips for their work 11. Community attitudes:

Community attitudes towards work (i.e. whether the people in the location are hard working or otherwise) as well as their attitudes towards the incoming entrepreneurs (helpful and cooperative or otherwise) can make or mar an industry. Locational decisions, therefore, must take such factors also into account particularly while setting u p labour intensive units.

12.

Supporting industries and services:

Locational factors should also include proximity of services needed by the firm. A firm desirous of getting some or all parts made from outside or some of the operations done from outsid e must see that such sub-contractors are located in the neighbourhood. Getting a job done from units located at far off places will mean not only additional transportation cost but also time consuming and costly. Also if units are too far off, the control on quality of work done by them cannot be exercised. 13. Suitability of the land:

Site selection should also take into account topography and soil structure of the land. The soil structure must be capable of bearing loads of foundations. Though mode rn building techniques can overcome the limitations of the soil, but if considerable improvement is required then selection of a low cost and may ultimately turn out to be expensive.

14.

Availability and cost of the land:

Site size (Plot size) must be large enough to accommodate the present production facilities, parking and access facilities but also leave sufficient room for future expansion. As a general rule, a site five times the actual plant size is considered minimum for all these things including future expansion.

ECONOMY SURVEY OF THE SITE SELECTION: An ideal location is one where the cost of obtaining materials and processing them into finished product plus the cost of distributing the finished product to customers is minimum. One of the most commonly used approaches consists of following steps: Step 1: Step 2: Step 3: Step 4: Step 5: Step 6: data. Prepare a list of all relevant factors. Estimate expenses on materials, transport, wages, power etc for each location on each of the above factors. Collect data on intangible factors like community facilities, community attitudes etc. Analyse the tangible data for each location and calculate rate of return on investment. Select provisionally a locational based on financial data. Compare the intangible data for the different locations and select the optimal location considering intangible

Q.3) (b) What are objectives of a good layout? Discuss any six principles of a good layout?

Answer.3)(b) OBJECTIVE OF A GOOD PLANT LAYOUT Only through an efficient layout, the organization can attain the following objectives: (i) (ii) Economy in handling of materials, work-in-process and finished goods. Minimization of product delays.

(iii) Lesser work-in-progress and minimum manufacturing cycle time. (iv) (v) (vi) Efficient utilization of available space. Easy supervision and better production control. Greater flexibility for changes in product design and for future expansion.

(vii) Better working conditions by eliminating causes of excessive noise, objectionable odor smoke etc.

PRINCIPLES OF A GOOD LAYOUT (i) Overall integration of factors: A good layout is one that integrates men, materials, machines and supporting activities and others in a way that the best compromise is obtained No layout can satisfy each and every principle of a good layout. Some criterion may conflict with some other criterion and as a result no layout can be ideal it has to integrate all factors into the best possible compromise. (ii) Minimum movement: A good layout is one that permits the minimum movement between the operations. The plant and machinery in case of product layout and departments sequence of operations of most of the products. in case of process layout should be arranged as per

? Since straight line is the shortest distance between any two points, men and materials as far as possible should be made to move along the straight path A door may be made in a wall or a hole may be drilled in a ceiling if that eliminates or reduces material handling in place of stairs or a distant door.

(iii) Uni-direction flow: A good layout is one that makes the materials move only in the forward direction, towards stage of completion, with any backtracking.

? Since straight line is the sho rtest distance between any two, points, materials as far as possible should be made to move on the principle of straight line flow. And when straight line flow is not possible, other flows like U -shaped flow, circular flow or zig zag flow may be adopted, but the layout may ensure that materials move in the forward direction (Fig 4.1) ? To ensure forward flow, equipment if necessary may be duplicated.

(iv) Effective use of available space: A good layout is one that makes effective use of available space b oth horizontal and vertical Backtracking and duplicated movements consume more time, involve un -necessary materials handling, add to cost and lead to inefficiency. Raw materials, work-in-progress and finished goods should be piled vertically one above another rather than being strewn on the floor. Pallets or equivalents should be made use of to pile up several layers one above another Area below the work tables or in the cupboards built into the wall are welcome since they reduce requirement of space

(v) Maximum visibility: A good layout is one that makes men, machines and materials ready observable at all

times.

All departments should be smoothly integrated, convenient to service and easy to supervise Every piece of positioning or screening or partitioning should be scrutinized and carefully planned.

Special cupboards, enclosures, offices, partitions etc. should be avoided except when their utility is established beyond doubt. (vi) Maximum accessibility: A good layout is one that makes all servicing and maintenance point readily

accessible.

Machines should be kept sufficiently apart and with reasonable clearance from The wall so that lubrication, adjustment and replacement of belts, removal of parts at the time of repairs etc can be done conveniently by the maintenance staff. Area in front of electrical panels and fire extinguishers should be kept free from obstructions.

Q.4) How does production planning differ from production control? What are the key functions of production planning and control? Answer.4) Production planning versus production control. Planning (Planning the work) Control (Working the Plan) Planning involves collection and maintenance of data regarding time standards, materials and their specifications, machines and their quantities, tools and their process capabilities, drawings and operational layouts etc.

Planning is seeing that requirements tool, machines, men, instructions, authorization and the like -will be available at the right time and in the right quantities and are of proper quality. Planning involves preparations of load charts and fitting various work orders into uncommitted time available on the companys facilities (men or machines). Planning involves preparation of all necessary forms and paper work. Planning involves designing suitable feed back as to what may happen.

Planning involves forwarding thinking regarding the remedial action to be taken if the job falls behind schedule. Planning therefore is a centralized Activity (in the office) and includes such functions as materials control, tools control, process planning and scheduling. Control involves dissemination of data preparation of reports regarding output, machine and labour efficiency, percent defectives etc.

Control is seeing the requirements are actually made available at the right place and in the right quantities.

Control involves actual seeing that the jobs are started and completed as per schedule prepared by the scheduling cell of the PPC. Control involves actual issue of forms and paper work. Control involves keeping track of what is happening and collecting information as to what has happened. Control involves suggesting remedial action when the job is falling behind schedule. Control is thus a diffused activity (in the shops) and includes functions such as dispatching, progressing and expediting.

FUNCTIONS OF PRODUCTION PLANNING AND CONTROL: Production planning and control is normally assigned two sets of functions:

(I)Regular functions and (ii) Optional functions. (i) Regular functions are those, which are generally assigned to PPC in most of the organizations through the importance of the function, may vary from industry to industry. (ii) Optional functions are those, which may be assigned to PPC depending upon policy of the management of the firm.

Common (or Regular Functions) Optional Functions Order Preparation includes activities like making of work orders, converting work orders to shop orders, preparing auxiliary orders and releasing such orders to those concerned to authorize their activities

Materials control concerns preparations of materials estimates, indenting non-stock materials, ascertaining availability of materials purchased to stock, continual follow-up with purchase and stores for timely receipt of materials, and advising stores to allocate required quantities or available materials (alternatively on their receipt) against specific shop orders.

Process planning or Routing concerns fixation of method of manufacture: operations and their sequence, machine tool for each operation, jigs and fixtures, measuring instruments and gauges etc. to enable shops to produce goods of the right quality at the lowest cost. Tools control concerns preparations of estimates of cutting tools (Standards as week As non-standards tools), gauges and measuring instruments, jigs and fixtures etc indenting non-stick tooling: follow up with tool room for timely manufacture of jigs and fixtures; periodical replenishment of worn-out-non-consumable tooling (e.g. work arbors, collets, copying masters, Allen keys, spanners, etc.

Scheduling concerns preparation of machine loads, fixation of calendar dates of various operations to be performed on a job, coordination with sales to confirm delivery dates of new items and periodical preparation of dispatch schedules of regular items.

Dispatching concerns preparation and distribution of shop orders and manufacturing instructions to the concerned department as their authority to perform the work according to the predetermined schedule. Progressing concerns collection of data from manufacturing shops, recording of progress of work, and comparing progress against the plan. Expediting concerns intensive progress chasing to identify delays and interruptions which may hold up production, devising cures from time to time to keep rate of production in line with the schedule, communicating possible failure in delivery commitments to Sales Department. Cost Estimation concerns preparations of Preproduction cost estimates to be used by sales department for quotation purposes (Alternatively this may be assigned to Costing Department Or Industrial Engineering Department)

Work measurement concern fixation of time to be allowed to a qualified workman to carry out a specific task, under specified conditions and at the defined level of performance. Work measurement employs scientific, well-known techniques like time study, work sampling standard data, production study, analytical estimating etc. (Alternatively, work measurement function may be assigned to Industrial Engineering department. Sub-Contract concerns offloading of certain work on outside vendors for economic reasons or to augment the existing manufacturing facilities (Sub-contract work alternatively) be handled by Materials/purchase Department)

Capacity planning concerns estimation of requirements of men and machines as the basis of decision making to meet the firms increased volume of business (Some companies prefer to assign this function to Engineering department.

Demand forecasting concerns making projection of companys product market. Though, long term forecasts are given by Sales Department but short term forecasts required for materials planning, machine loading, sub contract ing etc may be prepared by PPC department

Q.12 (a) What is critical path? What does it signify? How is it identified? Answer.2)(a) Critical path analysis, an important aid to planning, scheduling and coordinating the activities if large scale proje cts. Is a synthesis of two independent techniques: Programme Evaluation and Review Technique (PERT) and Critical Path Method (CPM). Though the two techniques were developed independently, they are only superficially different. The two method have many features in common and are now combined into a technique called Critical Path Analysis (CPA) or Network Analysis. There are three basic different between a PERT network and CPM network: PERT is event oriented while CPM is activity oriented (i.e. PERT pr epares network from events while CPM builds if from activities) PERT provides for an allowance for uncertainty while CPM does not (i.e. PERT makes three time estimates for each activity while CPM makes one time estimate) Activity time in CPM technique are related to costs while it is not so in PERT since it is event oriented

Significance of critical path Critical path analysis offers several advantages. It

(i) Forces through pre-planning. Each and every activity compromising the project is identified and recorded. Nothing is left to memory or chance which prevents crises in scheduling (ii) Increases coordination of tasks as technological relationship between the activities suggests which activities can run simultaneously and which should succeed others.

(iii) Helps computations of different project durations for different level of resources and thereby select a plan that minimizes total project cost. (iv) Indicates optimal start and finish times of each activity of the project. (v) Defines areas of responsibility of different departmental heads for timely execution of the project. (vi) Facilitates progress reporting and limits unnecessary discussion at the progress meetings. (vii) Identifies troubles spot often in advance and apply remedial measures. (viii) Enables the plan to be revised in accordance with changes/changing circumstances. (ix) Helps to exercise control by exception and prevents cost overruns. A Project comprises a series of activities and the identification of the individual activities requires knowledge and experience of the men responsible for the planning of the project. Even the preliminaries -mere listing of the activities-make the operating personnel: Think of details about the project well in advance. Observe critically the way in which the various activities interact or compete for scarce resources Improve upon the original plans even before network is formally drawn and analyzed. There are no set rules but general guidelines are as

A project, therefore, must be torn into a set of identifiable activities. under:

An activity should represent the smallest unit of the operation or set of operations over which management desires control. An activity should represent an operation or set of operations, which can be performed using a particular kind of equipment or a special skill. For example in construction project, plumbing is considered as one activity while wiring can be considered as another activity since the first activity requires plumbers and the second activity needs electricians.

Q.12) (b) Activity 1-2 02 1-3 02 1-4 02 2-5 01 3-5 04 4-5 02 4-6 02 5-6 03 Optimistic 03 10 04 06 06 10 01 01 05 12 03 04 05 08 05 13 Most Likely Pessimistic

Answer: (a) Expected time of an activity can be obtained from the three time estimates using the formula: te = a + 4m +b 6 where m b For activity (1-2) a m b te = = = = 2 3 10 a = = = Optimistic time most likely time pessimistic time

2 + 4 x 3 + 10 6 24 6 = 4

te

Expected times of all activities of the network, calculated on above lines, are tabulated below. Activity Three 1-2 02-03-10 1-3 02-04-06 1-4 02-06-10 2-5 01-01-01 3-5 04-05-12 4-5 02-03-04 4-6 02-05-08 5-6 03-05-13 time estimates 4 4 6 1 6 3 5 6 Expected time

6 6

4 4

6 1

Critical path is 1-3,3-5,5-6 and the duration for the project is 16 weeks (4+6+6) Variance is Vi = (b a) X (b a) 6 6 4 9 16 9 25 9

V1-3

V3-5

V5-6

V V

= =

V1-3 + V3-5 + V5-6 5

Standard deviation Z ? = 19 -16 ?5

T - Tcp

= 2.236 = 1.34

The approximate probability value when Z = 1.34 is 0.9099 ?The probability of completion of critical path by the schedule time of 19 weeks = 91% Q.5) What is preventive maintenance? Why it is better than Breakdown Maintenance? What are the key activities of Preventive Maintenance? Answer.5) Preventive maintenance anticipates failures and adopts necessary actions to check failures before they occur. It includes activities like inspection, lubrication cleaning and unkeeps, minor adjustments and replacements found necessary at the time of inspection etc. Preventive maintenance can be either: running maintenance or shut down maintenance. Running maintenance includes maintenance activities (e.g. minor adjustments In machines revealed through inspections, lubrication, cleaning and unkeep etc.) Which are carried out when the machine is still r unning. Shutdown maintenance includes preventive maintenance activities such as minor component replacement whose needs are identified through inspections, which require stoppage of Machines. Preventive inspection is one of the key activities of preventiv e maintenance which is usually performed by making use of human senses watch) eye), listen (ear), Touch (hand, leg, body) smell (nose) and taste (tongue) but the trend is Changing towards use of condition monitoring instruments. Such maintenance. Pra ctice is known as predictive maintenance or condition based maintenance.

Q.10) (a) What are X-R Charts? How are they made and used in controlling a process? Answer.10) X-R chart is a pair of chart consisting of a average (called X chart) and a range Chart (called R chart) placed one below another on a piece of graph paper. The X chart is used to control the mean value of the characteristic an R-chart is used to restrict the range of variations in the values. X -R charts are drawn when the characteristics are measurable. Each chart consists of three values: a central line, upper control limit and lower control limit. The central line represents the arithmetic average of the sample means which equals the mean of the population, u. The upper and lower control limits are located at three standard deviation on either side of the central line. Samples of fixed size are drawn at regular intervals and measurements are taken. The samples wise values of the mean and range are plotted in their respective X and R charts. The spread of sample points in the charts is studied to decide the remedial action (if any) to be taken. The X chart analyses whether or not the mean of the quality Characteristics is within control while R-chart analyses whether or not the variability is within control. STEPS TO PREPARE X-R CHART A pre-requisite to the preparation of the chart is the decision on the following aspects:

Quality Characteristics refer to the property of the product, which is to be assessed. The quality characteristics must be capable of being measured. In case of more than quality characteristics, separate chart is made for each quality characteristic. Sample size refers to number of pieces comprising each sample. Sample size is an important decision. It is a common practice to use sample of n = 4 or 5 to have low appraisal cost. Large samples such as n = 15 or 20 are used if the process standard deviation is large. Sample Population refers to the number of samples to be collected to construct a control chart. The number of samples must be sufficient. Usually, 20 samples each of size 4 or 5 are enough to have good estimates of the process average (X) and dispersion (R). Time Interval measures the time gap between consecutive samples. Time interval, as a genera rule, should be proportional to the average frequency of out-of-control conditions. It is a fairly complex decision since a number of factors such as cost economy, susceptibility of the process to disturbances; convenience of the inspector etc. requires to be considered. The making of X-R Charts involves the following Steps: Step 1: (a) (b) (c) Collect Data

Collect sufficient samples spread over a reasonable period. Each sample must be of equal size. Measure each component comprising the sample for the given quality characteristic Record individual measurements on a work data sheet. Calculate mean (X) and Range (R) of each sample

Step 2:

A The mean which is written as X (X bar) is average of each sample and is Obtained by totaling the individual measurements of the units comprising the sample and dividing the total by the sample size (number of units in each sample) B The range, which is written as R, is obtained as the difference between the highest and th e lowest measurement of a sample. C The values of X and R are recorded sample wise either on the extreme right of the individual measurements on the data sheet or in a separate table.

Step 3:

Calculate grand Average (X) and mean Range (R)

A The grand average, which is written as, X (X double bar) is the average of the sample averages and is obtained by dividing the total of the averages of all the samples by the total number of samples. B The mean range, which is written as, R (R bar) is the average of the ranges and is obtained by dividing the total of the ranges of the samples by the total number of samples.

Step 4:

Set up Control chart for the average

A Set up a control chart with the central line drawn at X (X double bar), upper control limit located X + A2R (R bar) and the lower control limit set up at X-A2R. B Plot the averages to see whether the process was under control when samples were drawn. C If all points fall within the control limits, the process is said to be under control D If process is not under control (indicated by some points falling outside the control limits), eliminate points outside the control limits and compute new trial control limits for the remaining points. E Repeat step 4 (d) until all points fall within the control limits F Control limits in a particular situation should be revised from time to time as additional data is accumulated.

Step 5: Calculate control limits of the range chart A The control chart for range chart is set up with central line as R, upper cont rol limit (UCLR) located at D4R above the central line and lower control limit (LCL) at D3R below the central line B Plot the value of the range of each sample. C If all points fall within the control limits no modification is necessary unless it is desired to reduce the process dispersion D if range chart exhibits lack of control indicated by some points falling outside the control limits, eliminate those points out of control and compute new trial control limits E Repeat step 5 (d) until all points fall within the control limits. F Control limits in a practical situation should be revised time to time as additional data is accumulated.

Step 6: Use control chart A B C D Collect samples of fixed size at specified intervals of time. Measure each unit of the sample for the quality characteristics, calculate mean and the range of each sample. Plot the values of X and R of each sample in their respective charts Study the trend of the points to interpret and suggest remedial action

Q10 (b) ABC company produces a solvent, which must contain 3 percent of alcohol. It tries to maintain the actual percentage at 3 + 0.3 percent. It tests hourly in samples of five. The following table shows the results of last five samples. Set up a control chart for mean and examine whether the process is under control. A) Solution: (i) Collect data (ii) Calculate mean (X bar) and range(R bar) Sample No. 1 2 3 2.92 2.98 3.06 Arithmetic Mean (X bar) 0.3 0.1 0.1 Range(R)

4 5

3 3

0 0.2

(iii) Calculate grand average and the mean range X(X bar) = 2.92 + 2.98 + 3.06 + 3 + 3 5 = R = 2.992

0.3 + 0.1 + 0.1 + 0 + 0.2 5 = 0.14

(iv)

Set Up control chart for the average = = 2.992

Central Line = CLx = X(X bar) Upper Control Limit = = 2.992 + 0.5768 x 0.14 3.476 =

UCLx = X (X bar) + A2.R(R bar)

Lower Control Limit = = 2.992 - 0.5768 x 0.14 2.507

UCLx = X (X bar) - A2.R(R bar)

(v)

Set up a range chart = R(R bar) = = = LCLR = = 0.14 D3.R (R bar)

Central line CLR Lower control limit

0 x 0.14 0 = UCLR = D4.R (R bar)

Lower control limit =

2.114 x 0.14

0.29596

Q.6) What is method study? Describe the procedural steps to develo p easier and effective methods. Answer.6) Method study is the systematic recording and critical examination of existing and proposed ways of doing work, as a means of developing and applying easier and more effective methods and reducing costs. Method study is an organized approach and its investigation rests on the following six basic steps outlined in the block diagram Select the work to be analyzed. Record all facts relating to the existing method. Examine the recorded facts critically but impartially. Develop the most economical method commensurate with plant Requirements Install the new method as standard practice. Maintain the new method.

Selection of the job Selections of the jobs to be studied for methods improvement by the method study practioner is a managerial responsibility and it (selection) may be based on economic technical or human consideration. Economic consideration justifies selection based on the economic worth (i.e. money saving potential) of the job. Technical consideration identifies jobs, which require studies to overcome manufacturing difficulties (excessive rejection, relaxation in prefixed performance standards, inability if the shops to stick to specified machining parameters such as speeds, feeds, depth of cut etc., inconsistent quality etc.) Human consideration in job selection is usually given weightage while introducing method study practices for the first time. Recording of facts Systematic recording is the mo st crucial step in method improvement. Since recording by long hand (or by descriptive method) has its limitations, it is not recommended for use in method study. Instead, five symbols and eight charting conventions are used to record facts relating to the job under study. Five typical symbols are O, ||, ?, D and V and eight charting conventions concern composition of the chart, reject, rework, repletion, change of state, introducing of new material, combined events and numbering of events. The document on which details of the process are recorded by the above referred symbols and conventions is called chart. There are four basic types of chart: (i) operation process chart (ii) Flow process chart (iii) multiple activity charts and (iv) two handed process chart. Besides charts, two types of diagrams-flow diagram and string diagram are drawn when recording details of an existing layout. Travel chart is another typical chart, which is used to record frequency of movements (weight x distance) between work centres/departments.

Repetitive short cycle operation which involves quick hand/feel motions (i.e. microscopic motions) may be studied with micro motion study. Glibreth, founder father of micro motion study, also developed photographic techniques cal led cyclograph and chronocylegraph to record path of the motions of the members of the body. Critical examination Critical examination aims to analyze the facts critically and thereby give rise to alternatives, which form the basis of selection and development of easier, and effective methods. Critical examination is conducted through a systematic and methodical questioning process. Each activity recorded on the chart, whether it relates to processing or inspection, or material handling, or to any oth er aspect, is picked up one at a time and is examined minutely. The questioning process is considered under five major heads, namely the purpose, the place, the sequence, the person and the means. These five aspects in critical examination are referred to as five governing considerations. Development and selection: Development and selection stage concerns short listing of ideas generated at the critical examination stage, testing each short listed idea for its technical and economic feasibility, and making selection among the alternatives wherever choice exists. To develop ideas and to ascertain their technical and economical feasibility, the method study practioner needs to solicit the cooperation of personnel from different departments of the company. Various techniques available for the development and selection purpose are: cost benefit analysis, break even analysis, investment analysis and critical path analysis. Installation Installation (or implementation) of the proposed method involves preparation of project report on recommendations making oral presentation to the top management, securing approval of the decision maker, assisting line management during implementation, arranging training of workmen, and getting jobs (operations) retime after implementation, arranging training of workmen, and getting jobs (operations) retimed after implementation. Maintenance Maintenance phase is the follow up phase after implementation, which serves as a monitoring and control mechanism . It helps to ensure that the revised methods are set into concrete and workmen do not revert back to old methods. It also provides an opportunity to the practitioner to assess the effectiveness of the approach followed by him and makes changes in the methodology (if required).

Q.9) (a) What desirable conditions need to be present to be present to guarantee success of an incentive scheme? Answer.9) A good wage incentive plan should have the following characteristics. Administrative simplicity: The incentive system should be simple and must be easily understood by the workers and their representatives. An incentives scheme, which can be understood, only by engineers and mathematicians or a scheme which involves the use of complex formulate or references and cross -references is sure to fail. The incentive scheme should be such that workmen can calculate their own earnings easily and quickly.

Minimum clerical work: The system should fit into existing system of production and cost control. the clerical work. Maximum coverage: The system should cover as many workmen as possible. morale of those not covered by the scheme.

It should not involve any significant addition to

A scheme if applied to a few workmen creates a demoralizing effect on the

Direct Incentive payments should increase at least in direct proportion to the increase in output by the operator. There are two reasons: Firstly because it is more difficult to producer extra units and secondly because saving in the overheads are far greater at higher levels of production. Period of Payment The period of payment should be as short as possible Adequate guaranteed minimum hourly rate The scheme must ensure adequate guaranteed minimum hourly rate to all incentive workers regardless of their output. Such an hourly guaranteed rate is normally referred to as the guaranteed base rate. The guaranteed base rate must be realistic and should be at least equal to the hourly rate payable to a non-incentive worker doing similar job in the industry. Incentive earnings of the workers should never be regarded as a substitute for poor wages. Accurate and yet attainable performance standards Performance standards should be set through systematic work measurement studies. The experts to that there is no dispute or malpractice and yet the standards are attainable so that a worker working at normal pace can attain them should base the standards of measurement on the assessment.

Further the incentive plan should be such that it provides an opportunity to all average workers to earn reasonable earnings. Consistency of the standards Standards once fixed should not be changed unless there is a permanent change in methods, or change in equipment, or change in material and plan should provide for the provisions to modify the performance standards. Inbuilt check on process rejections A good incentive scheme should exercise a check on the operator against achieving higher bonus by poor workmanship. Payment should be made only for pieces declared acceptable by the inspection department and a workman constantly producing substandard pieces should be liable for disciplinary action. Payment of partially completed jobs The problem of payment for the incomplete work arises only in case of long cycle jobs. Situations do arise when the jobs are of very long cycle duration and cannot be finished within the bonus period. Similarly, a semi-finished job may require to be handed over by one operator to another at the end of shift, or prior to having a holiday. The scheme should clearly spell out

as how assessment of work done by the workmen on the same job will be carried out and how disputes arising out of such assessment would be resolved. Payment of Idle Time Adequate safeguards must be provided to compensate the operator for the time lost due to reasons beyond his control. A good incentive scheme should ensure that an operator does not suffer financial loss for reasons attributable to the managerial weakness, e.g.: lack of material due to bad buying, breakdowns of the machines due to poor maintenance practices, non availability of work etc. Thus an operator rendered idle because of factors attributable to the management should be given a lieu bonus. Safeguards The scheme should be fair not only to the employees but also to the employer. incorporated to protect.

Safeguarding clauses as under should be

a. Managements right to change a standard when there are changes in methods. Materials and machines b. Managements right to withdraw or discontinue temporarily a scheme during bad period. c. Managements right to initiate disciplinary action against operators who continually produce sub -standard articles. d. Managements right to initiate disciplinary action against employees who, time and again, do not achieve minimum standard of production even in the presence of fair and accurate standards. e. Managements right to initiate disciplinary action against employees who, time and again are found using speeds and feeds higher than those recommended in the process sheet (or operational layouts) Maximum ceiling on the earnings The system should have built-in-control against higher earnings beyond a certain limit. Firstly, the system should discourage workers to work beyond a certain limit otherwise too attractive an incentive scheme may induce the worker to work more and more and thereby adversely affect his health. Secondly, the system should ensure that in case of loose standards the company does not lose financially. Consistency of Plan The plan should be consistent over a period of time. plan is lost if there are frequent revisions.

Frequent changes in the plan make its functioning difficult.

Faith in

Acceptance of Labour Body The scheme should finally have acceptance of the labour body. The body of workers representatives to prevent any misunderstanding and ill-feeling later on must accept the basic incentive plan and its provisions. Continuous Use The scheme should be in continuous use. makes its functioning difficult.

The temporary use of the scheme in good times and its discontinuation in bad times

Define End Results The plan must result in reduction in per unit labor cost.

Q 13) Answer 13) i) Average Cycle time = 0.22 + 0.24 + 0.28 + 0.26 + 0.25 5 0.25

= Normal Time =

Observed time x Rating 100 = 0.25 x 80 100 0.2

Similarly, average cycle time and normal time for all the elements are calculated and tabulated a s below Element A 0.25 B 0.15 C 0.35 D 0.102 E 0.12 Avg. cycle time 80 0.2 100 0.15 120 0.42 90 0.0918 100 0.12 Rating Normal time

Total Normal time Total Normal time

= =

0.2 + 0.15 + 0.42 + 0.0918 + 0.12 0.9818

ii)

Relaxation Allowance 100 = Contingency Allowance = 100 =

15

0.9818

0.1473 5 x 0.9818

?Standard time

0.0491

Normal time + Relaxation Allowance + Contingency Allowance = ?Standard time 0.9818 + 0.1473 + 0.0491 = 1.1782

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Multiple Choice Multiple Answer Question Which of the following aspects are essential to ensure quality of purchased items? Correct Answer Defining right quality for the job , Vendor performance evaluation , Making sure that suppliers understand the requirements Your Answer Defining right quality for the job , Vendor performance evaluation , Making sure that suppliers understand the requirements

Select The Blank Question The ________ breakdowns usually cost more, partly due to damage done to the adjustment components and partly due to emergency actions. Correct Answer Unexpected Your Answer Unexpected

True/False Question Correct Answer Your Answer

After goods have been manufactured, route sheets and operation layouts should not be collected back. False False

True/False Question In case of centralised inspection, inspection rooms generally become bottleneck and cause delay in taking action regarding rejection or rework. Correct Answer True

Your Answer

True

Multiple Choice Single Answer Question MRP is based on the concept of inventory demand which is of following type Correct Answer Dependent and independent Your Answer Dependent and independent

Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory

Multiple Choice Multiple Answer Question Components of Production Management include Correct Answer Capacity Planning , Job Design , Production Planning Your Answer Capacity Planning , Job Design , Production Planning

Multiple Choice Single Answer Question Which of the following is the criteria for the percentage defectives in the zone of the indecision? Correct Answer Lots having the percentage defective more than AQL but less than LPTD Your Answer Lots having the percentage defective more than AQL but less than LPTD

Multiple Choice Multiple Answer Question Which of the following are examples of addition during recording for method study? Correct Answer Brazing , Welding , Riveting Your Answer Brazing , Welding , Riveting

Select The Blank Question The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________. Correct Answer Overtime working Your Answer Overtime working

Select The Blank Question An Ideal OC curve is ________ shaped curve that accpets all the lots with quality equal to or better than AQL . Correct Answer Your Answer Rectangular Rectangular

Multiple Choice Multiple Answer Question Which of the following causes can be responsible for derailing the production sc hedule in a factory? Correct Answer Errors in drawings , Delay in receipt of material from vendor , Excessive absenteeism Your Answer Errors in drawings , Delay in receipt of material from vendor , Excessive absenteeism

Multiple Choice Multiple Answer Question Which of the following situations demand the economic consideration while selecting a job for method study? Correct Answer Unorderly movement of men and materials , Excessive process defectives , Too many suggestions received for improvement from a department or section Your Answer Unorderly movement of men and materials , Excessive process defectives , Inconsistent quality

True/False Question During set up of X bar-R control chart, control limts should be practically revised from time to time as additional data is accumulated. Correct Answer True Your Answer False

Multiple Choice Multiple Answer Question Which of the following are the basic requirements of quality standard? Correct Answer Deifinite , Undesrstandable , Economically viable Your Answer Absolute uniformity , Undesrstandable , Economically viable

Match The Following Question Correct Answer Toung Sweet Sweet Eye Nose Ear Crack Crack Burnout Impact Burnout Roughness

Your Answer

Select The Blank Question The ________ is the defect level for which lots are regarded as bad lots. Correct Answer Lot Tolerance Percentage Defective Your Answer Acceptable quality level

True/False Question are spoiled. Correct Answer Your Answer

Floor inspection delays the identification of faults which can not be rectified immediately before large lots False False

True/False Question Correct Answer

Cent percent inspection is required on WIP prior to the key, critical or costly operation. True

Your Answer

True

Multiple Choice Single Answer Question The document which incorporates details of process planning for a job is called Correct Answer Route Sheet Your Answer Route Sheet

True/False Question Repetitive movements between work stations which are difficult to be traced on string diagrams can be conveniently shown on flow diagrams. Correct Answer False Your Answer True

Multiple Choice Single Answer Question Which of the following is the most popular technique for Project Production? Correct Answer PERT & CPM Your Answer PERT & CPM

Multiple Choice Single Answer Question Technique of Value Engineering can be effectively employed in design of a product to Correct Answer To meet the intended function at lowest cost Your Answer To meet the intended function at lowest cost

Multiple Choice Single Answer Question What can be the worst effect due to excessive vibration? Correct Answer Breakdown Your Answer Breakdown

Multiple Choice Single Answer Question What is the relation between duration of an activity and length of an arrow? Correct Answer No relation Your Answer No relation

Multiple Choice Single Answer Question What is the nature of the sampling plan for critical defects? Correct Answer Tight Your Answer Tight

Select The Blank Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Answer Condition monitoring Your Answer Condition monitoring

Multiple Choice Multiple Answer Question Which of the following are important considerations concerning activity times? Correct Answer Activity time should be obtained from the person responsible for the completion of an activity , Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resources required to carry out the activity are available. Your Answer Activity time should be obtained from the person responsible for the completion of an activity , Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resources required to carry out the activity are available.

Multiple Choice Single Answer Question Which of the following techniques is used by industrial engineering department to obtain the utilisation index? Correct Answer Work Sampling Studies Your Answer Break Even Analysis

Multiple Choice Multiple Answer Question Which of the following factors play important role while selecting or rejecting a particular site from legislation and taxation point of view? Correct Answer Labour laws , Building codes , Policies regarding issue of licences Your Answer Labour laws , Building codes , Policies regarding issue of licences

Multiple Choice Multiple Answer Question Which of the following cases can be referred as operation in method study recording? Correct Answer Change in physical characteristic , Consumption of physical effort , Change in chemical characteristic Your Answer Change in physical characteristic , Consumption of physical effort , Movement of material

True/False Question Correct Answer Your Answer

An activity can share the same tail event and same head event with any other activity. False True

Select The Blank Question The ________ must ensure that the product satisfy the functional requirements of it's usage. Correct Answer Quality of design Your Answer Quality of design

Multiple Choice Multiple Answer Question Which of the following are examples of pure materials? Correct Answer Bakeries , Ice factories , Woolen Your Answer Bakeries , Ice factories , Woolen

Select The Blank

Question Correct Answer Your Answer

The ________ are the definitions of the measurable as well as nonmeasurable characteristics of the product. Specifications Specifications

Multiple Choice Single Answer Question Site factors for plant location include Correct Answer Suitability of land Your Answer Suitability of land

Select The Blank Question The ________ is the probability that a good lot will be rejected by the sampling plan. Correct Answer Producer's risk Your Answer Producer's risk

Multiple Choice Multiple Answer Question Which of the following defects can be observed during preventive inspection by using human senses? Correct Answer Deviation from normal sound , Excessive Vibration , Leakage of a gas Your Answer Deviation from normal sound , Excessive Vibration , Leakage of a gas

Select The Blank Question The ________ includes preventive maintenance activities whose needs are identified through inspection which requires stoppage of machines. Correct Answer Shutdown Maintenance Your Answer Working Maintenance

True/False Question Correct Answer Your Answer

Independent float either affects the float of preceding activities or that of succeeding activities. False False

Multiple Choice Multiple Answer Question Lack of material planning results in the following Correct Answer Over ordering , under ordering , stockouts Your Answer Over ordering , under ordering , stockouts

True/False Question Correct Answer Your Answer

F W Taylor devised a system for classifying motions into basic divisions called Therbligs False False

Select The Blank Question Work study is also called ________ study Correct Answer Time and Motion

Your Answer

Time and Motion

Match The Following Question Correct Answer Factor Analysis

Your Answer Technique for evolving and analysis of layouts Objective of good layout

Method to evaluate layouts

Minimization of production delays Maximum visibility

Objective of good layout

Principles of good layout

Principles of good layout

Scale model Layout analysis

Method to evaluate layouts

Multiple Choice Single Answer Question Following is one of the techniques used for Material Planning for high value material Correct Answer MRP Your Answer MRP

Multiple Choice Single Answer Question What do you understand by totality of features and characteristics of a product or service that bears on it's ability to satisfy the customer? Correct Answer Quality Your Answer Quality

Select The Blank Question One detachable ticket is prepared for each ________. Correct Answer Operation Your Answer Worker

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Multiple Choice Single Answer Question One of the sophisticated operations research techniques used in material planning is Correct Answer Dynamic programming Your Answer Dynamic programming

True/False Question Correct Answer Your Answer

Job life is one of the factors that influence Process Planning True True

Multiple Choice Multiple Answer Question Following are some of the Principles of Management advocated by F W Taylor Correct Answer Selection of best worker for each particular task , Division of work between worker and management , Training and development of the workmen Your Answer Selection of best worker for each particular task , Division of work between worker and management , Training and development of the workmen

Multiple Choice Single Answer Question Product layout is employed for manufacturing following products Correct Answer refrigirators Your Answer ships

Select The Blank Question Work study is also called ________ study Correct Answer Time and Motion Your Answer Job

Multiple Choice Multiple Answer Question Which of the following situations demand the technical consideration while selecting a job for method study? Correct Answer Jobs having inconsistent quality , Operations inviting frequent requests from supervisors f or relaxation in allowed time because of variations in materials and tool performance , Jobs in which too many man -hours are spend in checking and rechecking work Your Answer Jobs having inconsistent quality , Operations inviting frequent requests from supervisors for relaxation in allowed time because of variations in materials and tool performance , Jobs in which too many man -hours are spend in checking and rechecking work

True/False Question of goods. Correct Answer Your Answer

Quality control determines what, when, and how m uch to inspect while inspection actually conducts examination True True

Select The Blank Question The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Correct Answer Acceptable quality level Your Answer Producer's risk

Select The Blank Question The term ________ emplies the foregone profit due to inability of company to produce. Correct Answer Opportunity cost Your Answer Opportunity cost

True/False

Question Correct Answer Your Answer

All activities must not be tied up into the network False False

True/False Question Correct Answer Your Answer

F W Taylor devised a system for classifying motions into basic divisions called Therbligs False True

Multiple Choice Multiple Answer Question Which of the following may be the objectives of project crashing? Correct Answer To achieve uniformity in requirement of resources , To complete the project in the least possible time , To reduce project cost below it's normal cost Your Answer To complete the project in the least possible time , To achieve uniformity in requirement of resources , To improve the labour efficiency

Multiple Choice Multiple Answer Question What is indicated by the hugging points lying close to mean of the process in X bar-R- control chart? Correct Answer Biases in measurements , Recording done without actual measurement s , Improper selection of samples Your Answer Recording done without actual measurements , Improper selection of samples

Multiple Choice Single Answer Question Following is one of the techniques used for Material Planning for high value material Correct Answer MRP Your Answer MRP

Select The Blank Question The ________ is the probability that a good lot will be rejected by the sampling plan. Correct Answer Producer's risk Your Answer Producer's risk

Multiple Choice Single Answer Question One of the characterstic of layout is about the flow of material / personnel. In a good layout the flow should be Correct Answer Unidirectional Your Answer Unidirectional

True/False Question Correct Answer Your Answer

The event numbers as far as possible reflect the logical relationships of the activities. True False

Multiple Choice Multiple Answer

Question Correct Answer Your Answer

Material Requirement Planning is very useful in following situations Long Lead time for procurement , Several levels of assemblies in product , Long manufacturing cycle Long Lead time for procurement , Several levels of assemblies in product , Long manufacturing cycle

True/False Question Correct Answer Your Answer

Cent percent inspection is often more practical and economical than sampling inspection. False False

Select The Blank Question The ________ must ensure that the product satisfy the functional requirements of it's usage. Correct Answer Quality of design Your Answer Quality of conformance

True/False Question Correct Answer Your Answer

Both, preventive and breakdown maintenance work must be assigned to the same team. False False

Multiple Choice Single Answer Question Following is one of the tasks of Production Control Correct Answer Actual issue of forms and documents Your Answer Actual issue of forms and documents

Multiple Choice Single Answer Question Process Engineer does no t get sufficient time for designing tooling for most economic production run when Correct Answer Delivery time is less Your Answer Delivery time is less

Multiple Choice Multiple Answer Question Components of Production Management include Correct Answer Capacity Planning , Job Design , Production Planning Your Answer Capacity Planning , Production Planning , Manpower Planning

Multiple Choice Multiple Answer Question Which of the following products should be produced by using mass production? Correct Answer Refrigerator , Tyre for automobile , Television Set Your Answer Refrigerator , Tyre for automobile , Television Set

Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Manufacturing

Select The Blank Question A good maintenance system is not a luxary but a ________. Correct Answer Necessity Your Answer Necessity

Multiple Choice Single Answer Question What is the specific name for the Gantt chart when it shows at a glance the scheduling of various operations involved in a job? Correct Answer Job Schedule Your Answer Load Chart

Select The Blank Question A set of activities to keep an equipment in the specified condition is called as ________. Correct Answer Maintenance Your Answer Maintenance

Multiple Choice Single Answer Question What do you mean by lowest possible direct cost required to complete an activity within it's crashed time? Correct Answer Crash cost Your Answer Crash cost

Multiple Choice Multiple Answer Question Which of the following factors decide the choice between the cent percent and sampli ng inspection? Correct Answer Nature of inspection , Natural tolerance versus design tolerance , Vendor's quality rating Your Answer Nature of inspection , Natural tolerance versus design tolerance , Vendor's quality rating

Select The Blank Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Answer Condition monitoring Your Answer Condition monitoring

Multiple Choice Multiple Answer Question Which of the following are examples of attributes? Correct Answer Cracks , Burrs , Texture Your Answer Cracks , Burrs , Texture

Multiple Choice Single Answer Question Which of the following is the criteria for the pe rcentage defectives in the zone of the indecision? Correct Answer Lots having the percentage defective more than AQL but less than LPTD Your Answer Lots having the percentage defective more than AQL but less than LPTD

Multiple Choice Single Answer Question In mass/batch production organizations where goods are produced for stocking, Work Order is raised on the basis of Correct Answer Sales Programme Your Answer Sales Order

Match The Following Question Correct Answer Fixed Position Layout Product Layout Process Layout Combined Layout

Your Answer Functional Layout

Project Layout

Line Layout Project Layout Functional Layout job layout Mixed Layout Mixed Layout

Multiple Choice Single Answer Question What do you understand by the measurement of work to establish allowed time for a job for the defined method? Correct Answer Work measurement Your Answer Work measurement

Select The Blank Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________. Correct Answer 0.01 to 10% Your Answer 0.01 to 10%

True/False Question Correct Answer Your Answer

Objective of Work Study is to improve Productivity True False

Multiple Choice Multiple Answer Question Which are the distinct functions of scientific quality control? Correct Answer Acceptance function , Preventive function , Assurance function Your Answer Acceptance function , Feedback function , Preventive function

Match The Following Question Correct Answer

Your Answer Preventive maintenance Strings Preventive maintenance

Interruption for machine utilisation Input for scheduling

Overlapping of operations

Technique of scheduling Critical Path Analysis Scheduling Device Strings Blackboard

Critical Path Analysis

Select The Blank Question An Ideal OC curve is ________ shaped curve that accpets all the lots with quality equal to or better than AQL . Correct Answer Your Answer Rectangular Rectangular

True/False Question Correct Answer Your Answer

Breakdown of machines, absenteeism of worker does not dislocate the manufacturing activity in process layout True True

True/False Question Correct Answer Your Answer

Since value of c can never be negativee, hence" if LCLp works out to be negative, it is taken as zero." True True

Multiple Choice Single Answer Question Who prepares the daily production report? Correct Answer Shop Supervisor Your Answer Worker

True/False Question Correct Answer Your Answer

The dispatching function is of very importance in flow and mass production units. False True

Multiple Choice Multiple Answer Question Which are major benefits of identifying the critical path? Correct Answer It helps to identify the set of activities and events which are critical and as such must be carefully controlled and monitored , It identifies activities to be given preference in allocation of resources. , It helps to exercise "control by exception". Your Answer It helps to identify the set of activities and events which are critical and as such must be carefully controlled and monitored , It helps to exercise "control by exception".

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Select The Blank Question A ________ is another form of subcontracting. Correct Answer Hiring capacity Your Answer Open purchase order

True/False Question Correct Answer Your Answer

An ideal OC curve is never possible only with cent percent inspection. False True

Match The Following Question Correct Answer Table lubrication Weekly

Your Answer Six monthly Yearly Yearly

Draining and refilling of oil reserviors of plunger pump Parts lubricated with oil nipple Tools and slideways Daily Weekly Daily

two to three times a day

True/False Question Correct Answer Your Answer

The operator should not stop production if first piece is not approved by the inspector. False False

Multiple Choice Multiple Answer Question Which of the following causes can be responsible for derailing the production schedule in a factory? Correct Answer Errors in drawings , Delay in receipt of material from vendor , Excessive absenteeism Your Answer Errors in drawings , Delay in receipt of material from vendor , Excessive absenteeism

True/False Question Correct Answer Your Answer

For p-chart, the central line of fraction defectives is determined by average percentage defectives. True True

Multiple Choice Multiple Answer Question Expediting function is concerned with following activities Correct Answer Progress chasing to identify delays which may hold up production , Communicating possible delays in delivery date commitment to sales departme nt , Devising cures to keep rate of production in line with schedule Your Answer Recording progress of work , Communicating possible delays in delivery date commitment to sales department , Devising cures to keep rate of production in line with schedule

Multiple Choice Single Answer Question When should operator or supervisor is supposed to sign the perforated route sheet? Correct Answer After completion of operation Your Answer After completion of operation

Select The Blank Question The ________ is necessary when the job requires detailed of one or more of the job characteristics with the help of special equipment which is not available at the producing company. Correct Answer Inspection order Your Answer Move order

Multiple Choice Multiple Answer Question What are the benefits of reconditioning? Correct Answer Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps to plan requirement of replacement spares Your Answer Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps to plan requirement of replacement spares

Multiple Choice Multiple Answer Question Which of the following processes or activities are denoted by using symbols while recording in method study? Correct Answer Transport , Delay , Storage Your Answer Transport , Rejection , Storage

Multiple Choice Single Answer Question Which is the zone beyond LTPD in case of Oc curve of a general plan? Correct Answer Zone of rejection Your Answer Zone of rejection

True/False Question Correct Answer Your Answer

A properly designed sampling plan can control sampling errors and completely eliminate them. False True

Select The Blank Question The ________ includes preventive maintenance activities whose needs are identified through inspection which requires stoppage of machines. Correct Answer Shutdown Maintenance Your Answer Shutdown Maintenance

Select The Blank Question The ________ pertain to the climatic conditions which the component , product or material should withstand. Correct Answer Environmental specifications Your Answer Environmental specifications

True/False Question Correct Answer Your Answer

Grouping of machines gives a lot of flexibility in loading and scheduling True True

True/False Question Correct Answer Your Answer

A lot declared rejected in sampling inspection should not be inspected 100% in any case. False False

Multiple Choice Multiple Answer Question Which of the following are the basic requirements of quality standard? Correct Answer Deifinite , Undesrstandable , Economically viable Your Answer Absolute uniformity , Undesrstandable , Ec onomically viable

True/False Question The plotting of activities - critical, non-critical and dummy activities- is strictly according to their precedence relationship. Correct Answer True Your Answer True

Multiple Choice Multiple Answer Question Which of the following are activities of corrective maintenance? Correct Answer Modifications and improvements , Overhauling , Emergency repairs Your Answer Modifications and improvements , Overhauling , Lubrication as per schedul e

Multiple Choice Single Answer Question Following is not a function of PPC Correct Answer Product Planning Your Answer Order Processing

Multiple Choice Multiple Answer Question Which of the following three methods used to select the qualified supplier? Correct Answer By vendor plant surveys , By reputation , By experience Your Answer By vendor plant surveys , By the perofrmance of first lot , By experience

Select The Blank Question The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable. Correct Answer Quality control Your Answer Quality control

Match The Following Question Correct Answer Pessimistic time Expected time Optimistic time Most likely time b Te a m p Te o m

Your Answer

Multiple Choice Multiple Answer Question Which are the different methods of recording actual progress of work? Correct Answer Display boards , Progress cards , Network updating Your Answer Display boards , Job cards , Progress cards

Multiple Choice Single Answer Question One of the characterstic of layout is about the flow of material / personnel. In a good layout the flow should be Correct Answer Unidirectional Your Answer Unidirectional

Multiple Choice Multiple Answer Question What is indicated by the hugging points lying close to mean of the process in X bar-R- control chart? Correct Answer Biases in measurements , Recording done without actual measurements , Improper selection of samples Your Answer Biases in measurements , Recording done without actual measurements , Improper selection of samples

Multiple Choice Multiple Answer Question Operation Layout generally contains following information Correct Answer Part Sketch , Standard Time , Jigs and fixtures Your Answer Sequence of operations , Standard Time , Jigs and fixtures

Multiple Choice Single Answer Question What do you mean by the graphical representation of the project which is composed as series of connected arrows and circles to describe the interrelationship of the activities involved? Correct Answer Network Your Answer Flow chart

Multiple Choice Single Answer Question Where does the SPC exercises the control to prevent the occurances of defectives? Correct Answer On manufacturing process Your Answer On manufacturing process

Multiple Choice Single Answer Question Which photographic technique is used to record path of motions of the members of the body during method study? Correct Answer Cyclograph Your Answer Pictograph

Select The Blank Question An Ideal OC curve is ________ shaped curve that accpets all the lot s with quality equal to or better than AQL . Correct Answer Your Answer Rectangular Bell

True/False Question or work centres. Correct Answer Your Answer

In Gantt Chart, the horizontal lines devide vertical lines into sections which represents either operations True True

Select The Blank Question Goods after final inspection should accompany ________to enable dispatch department to identify and draw correct reference. Correct Answer Forwarding note Your Answer Forwarding note

Select The Blank Question Capacity decisions have a direct influence on performance of production system in respect of ________ Correct Answer Delivery performance Your Answer Quality

True/False Question Correct Answer Your Answer

Floor inspection promotes tendency of machines to drift out of limits and produce defectives. False False

True/False Question Correct Answer Your Answer

A sampling plan which perfectly discriminates will have vertical OC curve. True True

Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Manufacturing

Multiple Choice Multiple Answer Question Which are the different methods to record details of the existing method during method study? Correct Answer Charts , Diagrams , Templates or models Your Answer Control plans , Charts , Templates or models

Select The Blank Question The ________ breakdowns usually cost more, partly due to damage done to the adjustment components and partly due to emergency actions. Correct Answer Unexpected Your Answer Unexpected

Multiple Choice Single Answer Question Gross requirement of products is determined on the basis of Correct Answer Both forecast and pending orders Your Answer Past sales

Select The Blank Question The ________ is the probability that a bad lot will be accepted by the sampling plan. Correct Answer Consumer's risk Your Answer Acceptable quality level

Select The Blank Question The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________. Correct Answer Overtime working Your Answer Overtime working

Multiple Choice Single Answer Question What do you mean by lowest possible direct cost required to complete an activity within it's normal time? Correct Answer Normal cost Your Answer Normal cost

Multiple Choice Single Answer Question What do you mean by lowest possible direct cost required to complete an activity within it's crashed time? Correct Answer Crash cost Your Answer Total cost

Multiple Choice Single Answer Question What do you understand by the extent the products manufactured conforms to the laid down design? Correct Answer Quality of conformance Your Answer Quality of design

Multiple Choice Multiple Answer Question Which kind of possible defectives can be reduced due to first off inspection? Correct Answer Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machine set up Your Answer Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machine set up

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Select The Blank Question A ________ is another form of subcontracting. Correct Answer Hiring capacity Your Answer Open purchase order

True/False Question Correct Answer Your Answer

An ideal OC curve is never possible only with cent percent inspection. False True

Match The Following Question Correct Answer Table lubrication Weekly

Your Answer Six monthly Yearly Yearly

Draining and refilling of oil reserviors of plunger pump Parts lubricated with oil nipple Tools and slideways Daily Weekly Daily

two to three times a day

True/False Question Correct Answer Your Answer

The operator should not stop production if first piece is not approved by the inspector. False False

Multiple Choice Multiple Answer Question Which of the following causes can be responsible for derailing the production schedule in a factory? Correct Answer Errors in drawings , Delay in receipt of material from vendor , Excessive absenteeism Your Answer Errors in drawings , Delay in receipt of material from vendor , Excessive absenteeism

True/False Question Correct Answer Your Answer

For p-chart, the central line of fraction defectives is determined by average percentage defectives. True True

Multiple Choice Multiple Answer Question Expediting function is concerned with following activities Correct Answer Progress chasing to identify delays which may hold up production , Communicating possible delays in delivery date commitment to sales department , Devising cures to keep rate of production in line with schedule Your Answer Recording progress of work , Communicating possible delays in delivery date commitment to sales department , Devising cures to keep rate of production in line with schedule

Multiple Choice Single Answer Question When should operator or supervisor is supposed to sign the perforated route sheet? Correct Answer After completion o f operation Your Answer After completion of operation

Select The Blank Question The ________ is necessary when the job requires detailed of one or more of the job characteristics with the help of special equipment which is not available at the producing company. Correct Answer Inspection order Your Answer Move order

Multiple Choice Multiple Answer Question What are the benefits of reconditioning? Correct Answer Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps to plan requirement of replacement spares Your Answer Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps to plan requirement of replacement spares

Multiple Choice Multiple Answer Question Which of the following processes or activities are denoted by using symbols while recording in method study? Correct Answer Transport , Delay , Storage Your Answer Transport , Rejection , Storage

Multiple Choice Single Answer Question Which is the zone beyond LTPD in case of Oc curve of a general plan? Correct Answer Zone of rejection Your Answer Zone of rejection

True/False Question Correct Answer Your Answer

A properly designed sampling plan can control sampling errors and completely eli minate them. False True

Select The Blank Question The ________ includes preventive maintenance activities whose needs are identified through inspection which requires stoppage of machines.

Correct Answer Your Answer

Shutdown Maintenance Shutdown Maintenance

Select The Blank Question The ________ pertain to the climatic conditions which the component , product or material should withstand. Correct Answer Environmental specifications Your Answer Environmental specifications

True/False Question Correct Answer Your Answer

Grouping of machines gives a lot of flexibility in loading and scheduling True True

True/False Question Correct Answer Your Answer

A lot declared rejected in sampling inspection should not be inspected 100% in any case. False False

Multiple Choice Multiple Answer Question Which of the following are the basic requirements of quality standard? Correct Answer Deifinite , Undesrstandable , Economically viable Your Answer Absolute uniformity , Undesrstandable , Economically viable

True/False Question The plotting of activities - critical, non-critical and dummy activities- is strictly according to their precedence relationship. Correct Answer True Your Answer True

Multiple Choice Multiple Answer Question Which of the following are activities of corrective maintenance? Correct Answer Modifications and improvements , Overhauling , Emergency repairs Your Answer Modifications and improvements , Overhauling , Lubrication as per schedule

Multiple Choice Single Answer Question Following is not a function of PPC Correct Answer Product Planning Your Answer Order Processing

Multiple Choice Multiple Answer Question Which of the following three methods used to select the qualified supplier? Correct Answer By vendor plant surveys , By reputation , By experience Your Answer By vendor plant surveys , By the perofrmance of first l ot , By experience

Select The Blank Question The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable. Correct Answer Quality control Your Answer Quality control

Match The Following Question Correct Answer Pessimistic time Expected time Optimistic time Most likely time b Te a m p Te o m

Your Answer

Multiple Choice Multiple Answer Question Which are the different methods of recording actual progress of work? Correct Answer Display boards , Progress cards , Network updating Your Answer Display boards , Job cards , Progress cards

Multiple Choice Single Answer Question One of the characterstic of layout is about the flow of material / personnel. In a good layout the flow should be Correct Answer Unidirectional Your Answer Unidirectional

Multiple Choice Multiple Answer Question What is indicated by the hugging points lying cl ose to mean of the process in X bar-R- control chart? Correct Answer Biases in measurements , Recording done without actual measurements , Improper selection of samples Your Answer Biases in measurements , Recording done without actual measurement s , Improper selection of samples

Multiple Choice Multiple Answer Question Operation Layout generally contains following information Correct Answer Part Sketch , Standard Time , Jigs and fixtures Your Answer Sequence of operations , Standard Time , Jigs and fixtures

Multiple Choice Single Answer Question What do you mean by the graphical representation of the project which is composed as series of connected arrows and circles to describe the interrelationship of the activities i nvolved? Correct Answer Network

Your Answer

Flow chart

Multiple Choice Single Answer Question Where does the SPC exercises the control to prevent the occurances of defectives? Correct Answer On manufacturing process Your Answer On manufacturing process

Multiple Choice Single Answer Question Which photographic technique is used to record path of motions of the members of the body during method study? Correct Answer Cyclograph Your Answer Pictograph

Select The Blank Question An Ideal OC curve is ________ shaped curve that accpets all the lots with quality equal to or better than AQL . Correct Answer Your Answer Rectangular Bell

True/False Question or work centres. Correct Answer Your Answer

In Gantt Chart, the horizontal lines devide vertical lines into sections which represents either operations True True

Select The Blank Question Goods after final inspection should accompany ________to enable dispatch department to identify a nd draw correct reference. Correct Answer Forwarding note Your Answer Forwarding note

Select The Blank Question Capacity decisions have a direct influence on performance of production system in respect of ________ Correct Answer Delive ry performance Your Answer Quality

True/False Question Correct Answer Your Answer

Floor inspection promotes tendency of machines to drift out of limits and produce defectives. False False

True/False Question

A sampling plan wh ich perfectly discriminates will have vertical OC curve.

Correct Answer Your Answer

True True

Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Manufacturing

Multiple Choice Multiple Answer Question Which are the different methods to record details of the existing method during method study? Correct Answer Charts , Diagrams , Templates or models Your Answer Control plans , Charts , Templates or models

Select The Blank Question The ________ breakdowns usually cost more, partly due to damage done to the adjustment components and partly due to emergency actions. Correct Answer Unexpe cted Your Answer Unexpected

Multiple Choice Single Answer Question Gross requirement of products is determined on the basis of Correct Answer Both forecast and pending orders Your Answer Past sales

Select The Blank Question The ________ is the probability that a bad lot will be accepted by the sampling plan. Correct Answer Consumer's risk Your Answer Acceptable quality level

Select The Blank Question The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________. Correct Answer Overtime working Your Answer Overtime working

Multiple Choice Single Answer Question What do you mean by lowest possible direct cost required to complete an a ctivity within it's normal time? Correct Answer Normal cost Your Answer Normal cost

Multiple Choice Single Answer Question What do you mean by lowest possible direct cost required to complete an activity within it's crashed time? Correct Answer Crash cost

Your Answer

Total cost

Multiple Choice Single Answer Question What do you understand by the extent the products manufactured conforms to the laid down design? Correct Answer Quality of conformance Your Answer Quality of design

Multiple Choice Multiple Answer Question Which kind of possible defectives can be reduced due to first off inspection? Correct Answer Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machine set up Your Answer Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machine set up

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

True/False Question are spoiled. Correct Answer Your Answer

Floor inspection delays the identification of faults which can not be rectified immediately before large lots False False

Multiple Choice Single Answer Question Management often fails to realize the importance of efficient layout due to following reason Correct Answer losses resulting from poor layout are not directly shown in the financial statements Your Answer losses resulting from poor layout are not directly shown in the financial statements

Select The Blank Question The ________ is the defect level for which lots are regarded as bad lots. Correct Answer Lot Tolerance Percentage Defective Your Answer Lot Tolerance Percentage Defective

Multiple Choice Single Answer Question Which method of critical path determination begins with the end event and moves backward to the start event of the project network? Correct Answer Backward pass computation Your Answer Backward pass computation

True/False Question Correct Answer Your Answer

Complexity and difficulty of Planning is influenced by types of layout True False

True/False

Question Correct Answer Your Answer

For p-chart, p bar is the ratio of total number of units inspected to the total number of units defectives. False True

Multiple Choice Single Answer Question What is represented by an arrow in a network? Correct Answer Activity Your Answer Activity

Multiple Choice Multiple Answer Question MRP utilises the following information Correct Answer Master production schedule , Product structure , Lead time for procurement/manufacturing Your Answer Master production schedule , Lead time for procurement/manufacturing , list of machines

Multiple Choice Single Answer Question Which is the ideal place to wr ite a description of an activity in a network? Correct Answer Above the arrow Your Answer Above the arrow

Select The Blank Question The ________ breakdowns usually cost more, partly due to damage done to the adjustment components and partly due to emergency actions. Correct Answer Unexpected Your Answer Unexpected

Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory

True/False Question Correct Answer Your Answer

Systematic maintenance system can completely eliminate the wear and tear of machines. False True

Multiple Choice Multiple Answer Question Which of the following are types of non-destructive testing? Correct Answer Visual Testing , Eddy current , Magnetic flow detectors Your Answer Visual Testing , Eddy current , Magnetic flow detectors

Select The Blank Question Work study is also called ________ study Correct Answer Time and Motion

Your Answer

Time and Motion

Multiple Choice Single Answer Question Providing flexibility in plant layout means Correct Answer Layout can be changed without much cost if required Your Answer Layout can be changed without much cost if required

Multiple Choice Multiple Answer Question Which of the following aspects are essential to ensure quality of purchased items? Correct Answer Defining right quality for the job , Vendor performance evalu ation , Making sure that suppliers understand the requirements Your Answer Defining right quality for the job , Vendor performance evaluation , Making sure that suppliers understand the requirements

Multiple Choice Multiple Answer Question Which of the following are scheduling techniques? Correct Answer Critical Path Analysis , Index Method , Johnson's two machine algorithm Your Answer Critical Path Analysis , Index Method , Johnson's two machine algorithm

Select The Blank Question The ________ advocates maintenance procedures whereby the condition of the plant is constantly watched through systematic inspection to unearth unhealthy conditions and preventive Correct Answer Preventive Maintenance Your Answer Preventive Maintenance

True/False Question Correct Answer Your Answer

A network should be progression of activities always moving forward. True True

Multiple Choice Multiple Answer Question In an organization there may not be a formal PPC department if Correct Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large Your Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large

Select The Blank Question The ________ is necessary when the job requires detailed of one or more of the job characteristics with the help of special equipment which is not available at the producing company. Correct Answer Inspection order Your Answer Inspection order

Multiple Choice Multiple Answer Question Order preparation process for products manufatured to order requires following documents Correct Answer Sales Order , Work order , Shop order Your Answer Sales Order , Work order , Shop order

Multiple Choice Single Answer Question What do you understand by the selection of the job for the method study on the basis of money saving potential of the job? Correct Answer Economic consideration Your Answer Economic consideration

Select The Blank Question Production Planning is a centralised activity which includes functions such as ________ Correct Answer Scheduling Your Answer Scheduling

Multiple Choice Multiple Answer Question Scale model used for layout analysis have following advantages Correct Answer Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown , Models can be shifted easily Your Answer Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown , Models can be shifted easily

Multiple Choice Single Answer Question Which is the ideal place to inspect jigs and fixtures in a mass manufacturing unit? Correct Answer Separate inspection room Your Answer Separate inspection room

Multiple Choice Single Answer Question How to reveal the capability of the sampling plan to discriminate between good lots and bad lots? Correct Answer Operating ch aracteristics curve ( OC ) Your Answer Operating characteristics curve ( OC )

True/False Question planned. Correct Answer Your Answer

It would not affect the project completion time if non -critical activities take little loner time than True True

Select The Blank Question The ________ includes preventive maintenance activities whose needs are identified through inspection which requires stoppage of machines. Correct Answer Shutdown Maintenance Your Answer Shutdown Maintenance

Match The Following Question Correct Answer

Your Answer Past consumption analysis technique Past consumption analysis technique ABC Analysis

Forcasting requirement for indirect material Inventory control by classification ABC Analysis Structure of the product BOM BOM MRP

Material Planning for dependent demand

MRP

True/False Question Correct Answer Your Answer

The dispatching function is of very importance in flow and mass production units. False True

Multiple Choice Multiple Answer Question Which features should be covered by the specifications of materials while defining the qualitative requirement? Correct Answer Material composition , Dimensions , Any heat treatment if required Your Answer Material composition , Dimensions , Cost of material

Select The Blank Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Answer Condition monitoring Your Answer Condition monitoring

Select The Blank Question One detachable ticket is prepared for each ________. Correct Answer Operation Your Answer Operation

Multiple Choice Single Answer Question Which of the following is the most popular technique for Project Production? Correct Answer PERT & CPM Your Answer PERT & CPM

Select The Blank Question A good maintenance system is not a luxary but a ________. Correct Answer Necessity Your Answer Necessity

Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Operation

True/False Question An activity should represent an operation or set of operations which can be performed using a particular kind of equipment or a special skill. Correct Answer True Your Answer False

Multiple Choice Multiple Answer Question Which of the following are types of sampling plan ? Correct Answer Single sampling plan , Double sampling plan , Multiple sampling plan Your Answer Single sampling plan , Double sampling plan , Multiple sampling plan

True/False Question In case of forward pass computation, the earliest event time of a plain event equals the earliest event time of the preceding event plus duration of activity emanating from the preceding event. Correct Answer True Your Answer False

Multiple Choice Multiple Answer Question Which of the following are ideal situations for the preventive inspection? Correct Answer Weekly off and holidays , Non-production hours , Stand-up equipment Your Answer Weekly off and holidays , Non-production hours , Stand-up equipment

Multiple Choice Single Answer Question What do you mean by the chart on which the major activities and entry points of materials are recorded to have graphic view of operations and inspections involved in the process? Correct Answer Operation process chart Your Answer Flow Process chart

Match The Following Question Correct Answer Fixation of inventory level

Your Answer Reorder level Reorder level Over ordering Lead time Stock on hand

Symptom of ill planned purchasing Factor influencing material planning

Over ordering Lead time

Net requirement of material under MRP

Stock on hand

Multiple Choice Single Answer Question Taxes / duties levied is one of the important determinant for location decision as taxes/duties substantially influence Correct Answer Product cost Your Answer Product cost

Multiple Choice Single Answer Question Which kind of gauge consists of electrical contacts operating a series of colloured signal lamps which indicate whether the dimension is correct, oversize or undersize? Correct Answer Multiple gauging Your Answer Multiple gauging

Multiple Choice Multiple Answer Question Which of the following are minimum requirement for a good quality of design? Correct Answer Resonable cost , Resonable procurement time , Resonable manufacturing time Your Answer Resonable cost , Resonable procurement time , Resonable manufacturing time

Select The Blank Question OC curve of ideal sampling plan suggests that all lots less than 3% defectives have the probability of acceptance of ________. Correct Answer One Your Answer One

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Multiple Choice Single Answer Question MRP is based on the concept of inventory demand which is of following type Correct Answer Dependent and independent Your Answer Dependent and independent

Multiple Choice Single Answer Question Main objective of a good plant layout is Correct Answer Reduce material handling cost Your Answer Reduce material handling cost

True/False Question Correct Answer Your Answer

As a general rule, the number of tail event of an activity is more than that of it's head event. False False

Select The Blank Question The ________ is the probability that a good lot will be rejected by the sampling plan. Correct Answer Producer's risk Your Answer Producer's risk

Multiple Choice Multiple Answer Question Which of the following are important considerations concerning activity times? Correct Answer Activity time should be obtained from the person responsible for the completion of an activity , Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resources required to carry out the activity are available. Your Answer Activity time should be obtained from the person responsible for the completion of an activity , Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resources required to carry out the activity are available.

Select The Blank Question The ________ pertain to the climatic conditions which the component , product or material should withstand. Correct Answer Environmental specifications Your Answer Environmental specifications

Multiple Choice Multiple Answer Question Following are some of the factors considered for evaluation of alternative layouts Correct Answer Flow of Material , Equipment utilization , Ease of supervision Your Answer Flow of Material , Ease of supervision , Delivery performance

Multiple Choice Multiple Answer Question Which of the following are assignable cause? Correct Answer Large varaitions in hardness of material , Tool wear , Errors in setting Your Answer Large varaitions in hardness of material , Tool wear , Errors in setting

True/False Question Correct Answer Your Answer

All activities must not be tied up into the network False False

Select The Blank Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________. Correct Answer 0.01 to 10% Your Answer 0.01 to 10%

True/False Question In case of X bar, if the process is not under control indicated by some points falling outside the control limits, such points outside the control limits are eliminated and new trial control limits for the remaining points are computed. Correct Answer True

Your Answer

True

Multiple Choice Single Answer Question What is the base for considering activity time as single time estimate or three time estimate? Correct Answer Level of uncertainty Your Answer Availability of labour

Select The Blank Question The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Correct Answer Acceptable quality level Your Answer Acceptable quality level

Multiple Choice Single Answer Question What do you mean by lowest possible direct cost required to complete an activity within it's normal time? Correct Answer Normal cost Your Answer Normal cost

Select The Blank Question A good maintenance system is not a luxary but a ________. Correct Answer Necessity Your Answer Necessity

Select The Blank Question A ________helps to avoid crowding of jobs at a particular machine by change of route of some of the jobs or by diverting work to other machine. Correct Answer Control board Your Answer Move order

Select The Blank Question The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable. Correct Answer Quality control Your Answer Quality control

Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory

Match The Following Question Correct Answer

Your Answer

Emerson Efficiency Plan Wage Payment Craft Facilities Planning Work Sampling

Wage Payment

Facilities Planning Machine utilization

Machine utilization

Gantt Chart Production Scheduling

Production Scheduling

Select The Blank Question A ________ is another form of subcontracting. Correct Answer Hiring capacity Your Answer Hiring capacity

Multiple Choice Multiple Answer Question In an organization there may not be a formal PPC department if Correct Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large Your Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large

Multiple Choice Multiple Answer Question Which of the following cases can be treated as delay du ring recording of method study? Correct Answer Operators awaiting instructions from supervisor , Worker waiting for his turn at tools stores , Jobs awaiting at the machines for their turn Your Answer Operators awaiting instructions from supervisor , Worker waiting for his turn at tools stores , Jobs awaiting at the machines for their turn

True/False Question Inspection order is must even for simple jobs which can be inspected by shop inspector with the tooling available on shop. Correct Answer False Your Answer False

Multiple Choice Multiple Answer Question Order preparation process for products manufatured to order requires following documents Correct Answer Sales Order , Work order , Shop order Your Answer Sales Order , Work order , Purchase order

Multiple Choice Single Answer Question Technique of Value Engineering can be effectively employed in design of a product to Correct Answer To meet the intended function at lowest cost Your Answer Reduce lead time

True/False Question Correct Answer Your Answer

Cent percent inspection is often more practical and economical than sampling inspection. False False

Multiple Choice Multiple Answer Question Scale model used for layout analysis have following advantages Correct Answer Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown , Models can be shifted easily Your Answer Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown , Models can be shifted easily

Multiple Choice Single Answer Question Which of the following technique is event oriented ? Correct Answer Project Evaluation & Review Technique Your Answer Project Evaluation & Review Technique

Multiple Choice Single Answer Question What is the meaning of " Product features" according to J.M.Juran? Correct Answer Quality of design Your Answer Quality of design

Match The Following Question Correct Answer Crash cost of an activity Normal time of an activity Crash time of activity Tc

Your Answer Cc Tn Tc Cn Cn Cc Tn

Normal cost of an activity

Multiple Choice Multiple Answer Question What are uses of diagrams in method study? Correct Answer Study different plant la youts and select the most optimum one , Study the extent of traffic over the different routes of the plant , Identify the extent of backtracking, cross traffic and obstacles encountered during the movement of material. Your Answer Study different plant layouts and select the most optimum one , Study the extent of traffic over the different routes of the plant , Identify the extent of backtracking, cross traffic and obstacles encountered during the movement of material.

True/False Question

A load chart specifies the work to be carried out by each person of company during shift hours.

Correct Answer Your Answer

False True

Multiple Choice Multiple Answer Question Route Sheet generally contains following information Correct Answer Material Specification , Sequence of operation , Skill of Labour Your Answer Material Specification , Sequence of operation , Skill of Labour

True/False Question Correct Answer Your Answer

Cellular layout is based on the concept of Group Technology True True

Multiple Choice Single Answer Question Which varaible is taken along the abscissa or X axis? Correct Answer Time Your Answer Standard deviation

Multiple Choice Multiple Answer Question Which are the advantages of suburban location? Correct Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction Your Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction

Select The Blank Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Answer Condition monitoring Your Answer Condition monitoring

Multiple Choice Multiple Answer Question Expediting function is concerned with following activities Correct Answer Progress chasing to identify delays which may hold up production , Communicating possible delays in delivery date commitment to sales department , Devising cures to keep rate of production in line with sch edule Your Answer Recording progress of work , Progress chasing to identify delays which may hold up production , Communicating possible delays in delivery date commitment to sales department

Select The Blank Question Production control work is ________ in case of floor inspection as compared with the centralised inspection. Correct Answer easier Your Answer time consuming

Select The Blank Question The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________. Correct Answer Overtime working Your Answer Overtime working

True/False Question Correct Answer Your Answer

In case of forward pass computation, the earliest event time of the first event is zero. True True

Multiple Choice Single Answer Question What is represented by an arrow in a network? Correct Answer Activity Your Answer Activity

True/False Question As a general rule, a site five times the actual plant s ize is considered minimum for parking, access facilities and future expansion. Correct Answer True Your Answer True

True/False Question Correct Answer Your Answer

Independent float either affects the float of preceding activities or that of succeeding activities. False False

Multiple Choice Single Answer Question The document raised by PPC which authorises different functions to take action as per instruction is called Correct Answer Work Order Your Answer Work Order

Multiple Choice Single Answer Question A good layout makes effective use of space. Utilization of space for a department like Stores can be measured by Correct Answer Proportion of Cubic volume space utilized Your Answer Ratio of area utilised to area available

Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Operation

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

True/False Question Correct Answer Your Answer

Site selection should also take into account topography and soil structure of the land. True True

Multiple Choice Single Answer Question Which manufacturing meth od is ideal for the use of air gauges as inspection device? Correct Answer Mass Your Answer Batch

True/False Question Correct Answer Your Answer

Kanban system is essentially a computer based system for production scheduling and control False False

Multiple Choice Multiple Answer Question Which are three different bases to establish an activity time? Correct Answer Past experience , Judgement , Historical data Your Answer Past experience , Judgement , Historical data

True/False Question Inspection order is must even for simple jobs which can be inspected by shop inspector with the tooling available on shop. Correct Answer False Your Answer False

Multiple Choice Single Answer Question Which of the following policies is advisable in case of low product variety and large volumes? Correct Answer Low Skilled Labour & Special Purpose Machines Your Answer Semiskilled Labour & General Purpose Machines

Select The Blank Question Capacity decisions have a direct influence on performance of production system in respect of ________ Correct Answer Delivery performance Your Answer Delivery performance

True/False Question In case of X bar, if the process is not under control indicated by some points falling outside the control limits, such points outside the control limits are eliminated and new trial control limits for the remaining points are computed. Correct Answer True

Your Answer

True

Select The Blank Question The ________ pertain to the climatic conditions which the component , product or material should withstand. Correct Answer Environmental specifications Your Answer Environmental specifications

Select The Blank Question The ________ is necessary when the job requires detailed of one or more of the job characteristics with the help of special equipment which is not available at the producing company. Correct Answer Inspection order Your Answer Job card

Match The Following Question Correct Answer Crash cost of an activity Normal time of an activity Crash time of activity Tc

Your Answer Cc Tn Tc Cn Tn Cc Cn

Normal cost of an activity

True/False Question Correct Answer Your Answer

Lubrication survey should never be done for a new machine. False False

Multiple Choice Single Answer Question A good plant layout helps in Correct Answer Reducing handling costs Your Answer Reducing handling costs

Multiple Choice Single Answer Question Out of two basic criteria for the selection of a manufacturing method, one is, it must be able to meet the specifications of final product and the other is, it must be Correct Answer Cost effective method Your Answer Cost effective method

Multiple Choice Multiple Answer Question Which of the following is a part of preparing manufacturing order set as a primary function of dispatching? Correct Answer Operational layouts , Move orders , Pre-filled stores issue orders

Your Answer

Operational layouts , Move orders , Pre-filled stores issue orders

Select The Blank Question A ________ is another form of subcontracting. Correct Answer Hiring capacity Your Answer Hiring capacity

Multiple Choice Multiple Answer Question Which are the major types of defects? Correct Answer Minor , Major , Critical Your Answer Minor , Critical , General

Multiple Choice Single Answer Question Which kind of labour force is required in case of Jobbing Production? Correct Answer Highly Skilled Your Answer Highly Skilled

Multiple Choice Multiple Answer Question Which are the sources of information to update the progress card daily? Correct Answer Detachable ticket , Daily production report , Job Card Your Answer Detachable ticket , Daily production report , Job Card

True/False Question Correct Answer Your Answer

In case of forward pass computation, the earliest event time of the first event is zero. True True

Multiple Choice Multiple Answer Question Which are the distinct functions of scientific quality control? Correct Answer Acceptance function , Preventive function , Assurance function Your Answer Acceptance function , Preventive function , Assurance function

Multiple Choice Multiple Answer Question Which of the following are examples of specifications? Correct Answer Commercial standards , Assembly and testing instructions , Bill of material Your Answer Production schedule , Commercial standards , Bill of material

Multiple Choice Single Answer Question Technique which can help an organization to reduce inventory is called Correct Answer MRP Your Answer MRP

Multiple Choice Single Answer Question In case of Batch Production which kind of labour is expected? Correct Answer Skilled in one specific Manufacturing Process Your Answer Semiskilled

Multiple Choice Multiple Answer Question Major contributors in the development of Control Charts, Sampling plan a re Correct Answer F H Dodge , H G Roming , Walter Schewhart Your Answer F H Dodge , H G Roming , Walter Schewhart

Multiple Choice Single Answer Question What is represented by an arrow in a network? Correct Answer Activity Your Answer Event

True/False Question scheduled. Correct Answer Your Answer

Feasibility of time schedule requires that an activity be scheduled before any of it's predecessors are False True

Multiple Choice Single Answer Question Which method of critical path determination begins with the end event and moves backward to the start event of the project network? Correct Answer Backward pass computation Your Answer Backward pass computation

True/False Question Correct Answer Your Answer

Operation process charts though indicates the sequence of events but do not show movements. True True

Multiple Choice Single Answer Question Which kind of relationship exists between those activities which can be carried out s imultaneously and both activities require definite time to finish? Correct Answer Concurrent activities Your Answer Concurrent activities

True/False Question One major difference between CPM and PERT is the former's adaptability for the projects where high degree of uncertainty prevails and activity times during performance are expected to vary considerably for certain activities. Correct Answer False Your Answer False

Multiple Choice Multiple Answer Question Following are some of the Principles of Management advocated by F W Taylor Correct Answer Selection of best worker for each particular task , Division of work between worker and management , Training and development of the workmen Your Answer Selection of best worker for each particular task , Division of work between worker and management , Training and development of the workmen

Multiple Choice Single Answer Question Inadequate production capacity ultimately leads to Correct Answer Poor Customer Service Your Answer Poor Machine Utilization

Multiple Choice Multiple Answer Question Which of the following schedules are recommended to prepare and follow as a part of preventive maintenance system? Correct Answer Preventive inspection schedule , Cleaning and upkeep schedule , Lubrication schedule Your Answer Preventive inspection schedule , Cleaning and upkeep schedule , Lubrication schedule

Multiple Choice Single Answer Question What is the reason of fluctuations, if the control chart evaluates that the process is in a state of statistical control? Correct Answer Random variability Your Answer Random variability

True/False Question Even in a small set up wherein maintenance of a machine is looked after by a mechanic cum worker, he should report directly to the person responsible for the manufacturing operations. Correct Answer True Your Answer True

Multiple Choice Single Answer Question What do you mean by the chart on which the major activ ities and entry points of materials are recorded to have graphic view of operations and inspections involved in the process? Correct Answer Operation process chart Your Answer Operation process chart

Multiple Choice Single Answer Question Plant Layout decisions are considered to be Correct Answer Strategic Your Answer Strategic

Multiple Choice Multiple Answer Question What are the uses of the instruction manual provided by the manufacturer of a machine?

Correct Answer It gives instructions regarding installation and operation of the equipment , It contains note on common troubles with causes and remedies for troubleshooting , It enlists points, frequency and type of lubrication Your Answer It gives instructions regarding installation and operation of the equipment , It contains note on common troubles with causes and remedies for troubleshooting , It enlists points, frequency and type of lubrication

Multiple Choice Single Answer Question When should operator or supervisor is supposed to sign the perforated route sheet? Correct Answer After completion of operation Your Answer After completion of operation

Multiple Choice Multiple Answer Question Which of the following situations demand that the human consideration should be given preference over other considerations? Correct Answer Inconsistent earnings where the earnings are tied to output , Poor morale evidenced by petty or trivial complaints , Repeated cases of accidents and health hazards Your Answer Excessive rejections , Poor morale evidenced by petty or trivial complaints , Repeated cases of accidents and health hazards

True/False Question Correct Answer Your Answer

A network can have more than one starting event but completion event must be onl y one. False True

Multiple Choice Single Answer Question Which is the ideal place to write a description of an activity in a network? Correct Answer Above the arrow Your Answer Above the arrow

Multiple Choice Multiple Answer Question Which features should be covered by the specifications of materials while defining the qualitative requirement? Correct Answer Material composition , Dimensions , Any heat treatment if required Your Answer Material composition , Dimensions , Any heat treatment if required

Match The Following Question Correct Answer When to inspect What to inspect How to inspect

Your Answer Stages of inspection

Stages of inspection Specification Inspection devices

Specification Inspection devices

How much to inspect

Sampling or cent percent inspection Sampling or cent percent inspection

Multiple Choice Multiple Answer Question How the concept of float is helpful to planners? Correct Answer To decide priorities in allocation of resources , To minimize the requirement of resources , To prevent peaks and valleys in requirement of resources Your Answer To decide priorities in allocation of resources , To minimize the requirement of resources , To prevent peaks and valleys in requirement of resources

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

True/False Question Correct Answer Your Answer

It pays in the long run to inform the customer regarding expected delays in the deliveries. True True

Multiple Choice Single Answer Question Fixed position layout is adopted when Correct Answer product is very heavy involving assembly of large number of parts Your Answer product is very heavy involving assembly of large number of p arts

Select The Blank Question The ________ is the defect level for which lots are regarded as bad lots. Correct Answer Lot Tolerance Percentage Defective Your Answer Lot Tolerance Percentage Defective

Multiple Choice Multiple Answer Question Which are the advantages of suburban location? Correct Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction Your Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction

Select The Blank Question One detachable ticket is prepared for each ________. Correct Answer Operation Your Answer Worker

Select The Blank Question A good maintenance system is not a luxary but a ________. Correct Answer Necessity Your Answer Necessity

Multiple Choice Multiple Answer Question Following are some of the factors which influence process planning Correct Answer Order Quantity , Process capability of machine , Delivery Dates Your Answer Order Quantity , Delivery Dates , Plant layout

True/False Question needs. Correct Answer Your Answer

Availability of training schools, colleges and management institutes reduces the company's internal training True False

Multiple Choice Multiple Answer Question Which of the following are examples of pure materials? Correct Answer Bakeries , Ice factories , Woolen Your Answer Bakeries , Ice factories , Lime stone

Match The Following Question Correct Answer

Your Answer Wage Payment

Emerson Efficiency Plan Wage Payment Craft Facilities Planning Work Sampling

Production Scheduling Sampling Inspection

Machine utilization

Gantt Chart Production Scheduling

Charting technique

Match The Following Question Correct Answer Fixation of inventory level

Your Answer Reorder level Stock on hand Over ordering Lead time Price of material

Symptom of ill planned purchasing Factor influencing material planning

Over ordering Lead time

Net requirement of material under MRP

Stock on hand

Multiple Choice Multiple Answer Question Which of the following are steps to identify the critical path in a small network? Correct Answer Compare the durations of all paths to identify the longest path. , Sum up the durations of activities along each path. , Enumerate all paths in the network and list down activities on each path. Your Answer Compare the durations of all paths to identify the longest path. , Sum up the durations of activities along each path. , Enumerate all paths in the network and list down activities on eac h path.

Select The Blank Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________. Correct Answer 0.01 to 10% Your Answer 0.01 to 10%

True/False Question Correct Answer Your Answer

Tool breakage has got nearly zero chances in case of eventual breakdown. False False

Multiple Choice Multiple Answer Question Which are the three types of float? Correct Answer Total float , Independent float , Free float Your Answer Total float , Dependent float , Free float

Multiple Choice Multiple Answer Question Which of the following are major inputs to scheduling? Correct Answer Overlapping of operations , Effective Capacity per work centre , Performance standards Your Answer Effective Capacity per work centre , Ratio of skilled to unskilled labour , Performance standards

Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory

Select The Blank Question The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Correct Answer Acceptable quality level Your Answer Lot Tolerance Percentage Defective

Select The Blank Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Answer Condition monitoring Your Answer Overhauling

Select The Blank Question OC curve of ideal sampling plan suggests that all lots less than 3% defectives have the probability of acceptance of ________. Correct Answer One Your Answer One

Multiple Choice Single Answer Question How to calculate activity cost slope? Correct Answer Activity cost slope = ( Crash cost - Normal cost ) / ( Normal time - Crash time ) Your Answer Activity cost slope = ( Normal cost - Crash cost ) / ( Normal time - Crash time )

Multiple Choice Multiple Answer Question Which of the following are minimum requirement for a good quality of design? Correct Answer Resonable cost , Resonable procurement time , Resonable manufacturing time Your Answer Resonable cost , Resonable procurement time , Resonable manufacturing time

True/False Question small. Correct Answer Your Answer

In case of control chart, large smaples such as n=15 or 20 are used if the process standard deviation is False True

Select The Blank Question Production control work is ________ in case of floor inspection as compared with the centralised inspection. Correct Answer easier Your Answer labourious

Multiple Choice Single Answer Question Production Planning includes Correct Answer Predetermination of manufacturing requirements Your Answer Predetermination of manufacturing requirements

Multiple Choice Single Answer Question How does the control chart of statistical quality control helps the operating personnel? Correct Answer Identify the presence of an assignable cause before it develops Your Answer Reduces chances of rejections

Multiple Choice Single Answer Question What can be the worst effect due to excessive vibration? Correct Answer Breakdown Your Answer Reduced salvage value of machine

Multiple Choice Single Answer Question What do you understand by the metallergical aspects of product which forms the vital part of engineering function? Correct Answer Material specifications Your Answer Performance specifications

Multiple Choice Single Answer Question Which of the following is a cause of plant breakdown? Correct Answer Overloading of machines Your Answer Overloading of machines

Multiple Choice Multiple Answer Question Which of the following possibilities can be explored by using flow process chart? Correct Answer Eliminating the operations or combining the operations with another , Reducing the distance traveled by the workmen or materials , Avoiding the waiting time and thereby reduce production losses Your Answer Reducing the distance traveled by the workmen or materials , Reducing rejections drastically , Avoiding the waiting time and thereby reduce production losses

Multiple Choice Single Answer Question Material Planning is an integral part of Correct Answer Production Planning Your Answer Process Planning

True/False Question Correct Answer Your Answer

Dust gets mixed with lubricants, forms an abrasive substance and causes pre-mature failure of machinery. True True

Multiple Choice Multiple Answer Question Which of the following activities are used while recording for method study? Correct Answer Delay , Operation , Inspection Your Answer Operation , Inspection , Production

True/False Question In case of centralised inspection, inspection rooms generally become bottleneck and cause delay in taking action regarding rejection or rework. Correct Answer True Your Answer True

Select The Blank Question The ________ advocates maintenance procedures whereby the condition of the plant is constantly watched through systematic inspection to unearth unhealthy conditions and preventive Correct Answer Preventive Maintenance Your Answer Preventive Maintenance

True/False Question Correct Answer Your Answer

The problems of congestion, bottlenecks and backtracking can not be visualized by using templates and models. False False

Multiple Choice Single Answer Question Which varaible is taken along the abscissa or X axis? Correct Answer Time Your Answer Quality

True/False Question Correct Answer Your Answer

Delay in completion of projects result in unwelcome add itions to the fixed manufacturing expenses. True True

Select The Blank Question The term ________ emplies the foregone profit due to inability of company to produce. Correct Answer Opportunity cost Your Answer Idle wages

Multiple Choice Single Answer Question Taxes / duties levied is one of the important determinant for location decision as taxes/duties substantially influence Correct Answer Product cost Your Answer Order procurement

Multiple Choice Multiple Answer Question What are the uses of failure statistics analysis? Correct Answer To forecast the defect , To identify causes of major repetative failures , To quantify the frequency of preventive inspection Your Answer To forecast the defect , To identify causes of major repetative failures , To quantify the frequency of preventive inspection

True/False Question Correct Answer Your Answer

Shop order is one of the subsidiary order True True

Multiple Choice Single Answer Question Which of the following is the most popular technique for Project Production? Correct Answer PERT & CPM Your Answer PERT & CPM

Select The Blank Question The ________ is the probability that a good lot will be rejected by the sampling plan. Correct Answer Producer's risk Your Answer Lot Tolerance Percentage Defective

True/False Question The component produced on completely automatic machines may be subjected to sampling inspection while par ts produced on semi-automatic and completely manual operated machines require cent percent inspection. Correct Answer True Your Answer False

Multiple Choice Multiple Answer Question In an organization there may not be a formal PPC department if Correct Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large Your Answer Work is highly repetitive in nature , Planning activities are performed by the line st aff , Number of workmen is not very large

Multiple Choice Multiple Answer Question Which of the following factors play important role while selecting or rejecting a particular site from legislation and taxation point of view? Correct Answer Labour laws , Building codes , Policies regarding issue of licences Your Answer Labour laws , Policies regarding issue of licences , Productivity of labour

LIST OF ATTEMPTED QUESTIONS AND ANSWERS True/False Question

Kanban system is essentially a computer based system for production scheduling and

control Correct Answer False Your Answer False Select The Blank Question The ________ is one of the best known statistical relationship regarding process control. Correct Answer Normal distribution Your Answer Normal distribution True/False Question

Floor inspection promotes tendency of machines to drift out of limits and produce

defectives. Correct Answer False Your Answer False True/False Question

In case of two handed process chart, inspection symbol is used when check by touch

or feel is involved.

Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Which are reason due to which the progress of work is rarely in line with it's plan? Correct Answer Absenteeism , Machine breakdowns , Substandard performance against prefixed production standards Your Answer Absenteeism , Change in operation sequence , Machine breakdowns Multiple Choice Single Answer Question Which rule is used for numbering of events? Correct Answer Fulkerson's Rule Your Answer Fulkerson's Rule Match The Following Question Correct Answer Your Answer Combined Layout Mixed Layout Mixed Layout Fixed Position Layout Project Layout Project Layout Product Layout Line Layout Line Layout Process Layout Functional Layout Functional Layout

Multiple Choice Single Answer Question What does the points falling outside the control limits indicate? Correct Answer Presence of assignable causes Your Answer Presence of assignable causes Multiple Choice Single Answer Question A good plant layout helps in Correct Answer Reducing handling costs Your Answer Reducing handling costs Multiple Choice Multiple Answer Question Which of the following cases can be treated as delay during recording of method study? Correct Answer

Operators awaiting instructions from supervisor , Worker waiting for his turn

at tools stores , Jobs awaiting at the machines for their turn Your Answer Operators awaiting instructions from supervisor , Worker waiting for his turn at tools stores , Jobs awaiting at the machines for their turn Multiple Choice Multiple Answer Question Material Requirement Planning is very useful in following situations

Correct Answer

Long Lead time for procurement , Several levels of assemblies in product ,

Long manufacturing cycle Your Answer Long Lead time for procurement , Several levels of assemblies in product , Long manufacturing cycle Select The Blank Question Principle underlying the Moving Average mrthod is that future demand shall be ________ past demand. Correct Answer Average of Your Answer Higher than Multiple Choice Single Answer Question The ratio of output to input of a production system is commonly known as Correct Answer Productivity Your Answer Productivity True/False Question Complexity and difficulty of Planning is influenced by types of layout Correct Answer True Your Answer True Multiple Choice Single Answer Question Which phase of method study is concerned with analyzing the facts critically, generating alternatives which form the basis for selection and development of improved methods? Correct Answer Critical examination Your Answer Development and selection Multiple Choice Multiple Answer Question Which of the following is a part of preparing manufacturing order set as a primary function of dispatching? Correct Answer Operational layouts , Move orders , Pre-filled stores issue orders Your Answer Operational layouts , Move orders , Pre-filled stores issue orders Select The Blank Question The wage payable to the workman is calculated by ________ the quantity produced by him by the specified rate per piece, in the straight piece rate method. Correct Answer Multiplying Your Answer Dividing True/False Question F W Taylor devised a system for classifying motions into basic divisions called Therbligs Correct Answer False Your Answer False Multiple Choice Single Answer

Question

How to reveal the capability of the sampling plan to discriminate between good lots

and bad lots? Correct Answer Operating characteristics curve ( OC ) Your Answer Operating characteristics curve ( OC ) Multiple Choice Single Answer Question Technique which can help an organization to reduce inventory is called Correct Answer MRP Your Answer MRP Multiple Choice Multiple Answer Question Which of the following are examples of addition during recording for method study? Correct Answer Brazing , Welding , Riveting Your Answer Brazing , Welding , Riveting Multiple Choice Multiple Answer Question Which are the subtasks of the maintenance phase of the method study? Correct Answer Monitoring and control , Performance appraisal , Audit on savings Your Answer Monitoring and control , Performance appraisal , Audit on savings True/False Question Only skilled worker can use the fixed limit gauge. Correct Answer False Your Answer False Multiple Choice Multiple Answer Question Which of the following are steps to identify the critical path in a small network? Correct Answer Compare the durations of all paths to identify the longest path. , Sum up the durations of activities along each path. , Enumerate all paths in the network and list down activities on each path. Your Answer Compare the durations of all paths to identify the longest path. , Sum up the durations of activities along each path. , Enumerate all paths in the network and list down activities on each path. Multiple Choice Single Answer Question What do you understand by the metallergical aspects of product which forms the vital part of engineering function? Correct Answer Material specifications Your Answer Material specifications Select The Blank Question We can say that ________ occurs when there is a distinct change in the physical or chemical characteristic of an object. Correct Answer Operation

Your Answer True/False Question

Manufacturing

There is no need for progressing when the customers do the follow-up on their own

to know the status of their jobs. Correct Answer False Your Answer False True/False Question

The component produced on completely automatic machines may be subjected to

sampling inspection while parts produced on semi -automatic and completely manual operated machines require cent percent inspection. Correct Answer True Your Answer True True/False Question

In case of two handed process chart, the simultaneous activities of both hands are

recorded opposite to each other on the chart. Correct Answer True Your Answer False Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Operation Multiple Choice Single Answer Question Material control function of PPC is concerned with Correct Answer Preparation of material estimates Your Answer indenting all required material Multiple Choice Multiple Answer Question Order preparation process for products manufatured to order requires following documents Correct Answer Sales Order , Work order , Shop order Your Answer Sales Order , Work order , Shop order Select The Blank Question The ________ is necessary when the job requires detailed of one or more of the job characteristics with the help of special equipment which is not available at the producing company. Correct Answer Inspection order Your Answer Inspection order

Match The Following Question Correct Answer Your Answer Emerson Efficiency Plan Wage Payment Wage Payment Craft Facilities Planning Facilities Planning Work Sampling Machine utilization Machine utilization Gantt Chart Production Scheduling Production Scheduling

Multiple Choice Multiple Answer Question Which of the following are examples of specifications? Correct Answer Commercial standards , Assembly and testing instructions , Bill of material Your Answer Commercial standards , Assembly and testing instructions , Bill of material Multiple Choice Multiple Answer Question Route Sheet generally contains following information Correct Answer Material Specification , Sequence of operation , Skill of Labour Your Answer Material Specification , Sequence of operation , Skill of Labour Select The Blank Question The design of any layout is governed by large number of factors and the best layout is expected to ________ all these factors. Correct Answer Optimise Your Answer Consider Multiple Choice Single Answer Question How should a dummy activity be represented in a network? Correct Answer By dotted line Your Answer By circle Select The Blank Question Production Planning is a centralised activity which includes functions such as ________ Correct Answer Scheduling Your Answer Scheduling Multiple Choice Single Answer Question Technique of Value Engineering can be effectively employed in design of a product to Correct Answer To meet the intended function at lowest cost Your Answer To meet the intended function at lowest cost True/False Question Cellular layout is based on the concept of Group Technology Correct Answer True Your Answer True

Multiple Choice Multiple Answer Question Which of the following are types of sampling plan? Correct Answer Single sampling plan , Double sampling plan , Multiple sampling plan Your Answer Single sampling plan , Double sampling plan , Multiple sampling plan Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory Multiple Choice Single Answer Question What is the base for considering activity time as single time estimate or three time estimate? Correct Answer Level of uncertainty Your Answer Level of uncertainty Select The Blank Question In Gantt Chart, the vertical lines devide horizontal lines into small squares which represents ________. Correct Answer Units of measurement Your Answer No. of Jobs Select The Blank Question Activities comprising of a project are of two types, deterministic and ________. Correct Answer Variable Your Answer Variable Select The Blank Question A ________ is another form of subcontracting. Correct Answer Hiring capacity Your Answer Hiring capacity

POM assgn : Parmeet True/False Question Correct Answer Your Answer Objective of Work Study is to improve Productivity True True

True/False Question Correct Answer Your Answer

After goods have been manufactured, route sheets and operation layouts should not be collected back. False False

Multiple Choice Single Answer Question How is the probability of acceptance in case of Acceptable Quality Level (AQL )? Correct Answer Very high Your Answer True/False Question Correct Answer Your Answer Very high

For p-chart, p bar is the ratio of total number of units inspected to the total number of units defectives. False False

Select The Blank Question Correct Answer Your Answer

The ________ is specified to indicate the maximum permissible variability in the dimensions product or parts. Tolerance Tolerance

Multiple Choice Single Answer Question Which varaible is taken along the abscissa or X axis? Correct Answer Your Answer Time Time

Multiple Choice Single Answer Question Which kind of labour force is required in case of Jobbing Production? Correct Answer Your Answer Highly Skilled Highly Skilled

Multiple Choice Multiple Answer

Question Correct Answer

Your Answer

Which are the general principles underlying probability aspects of project planning? Statistically three time estimate of an activity conform to Beta distribution. , Expected time divides the area under the curve into two equal parts. , Expected time of an activity is located at one third of the distance between "m" and mid-range { (a+b)/2 } away from the most likely time. Statistically three time estimate of an activity conform to Beta distribution. , Expected time divides the area under the curve into two equal parts. , Expected time of an activity is located at one third of the distance between "m" and mid-range { (a+b)/2 } away from the most likely time.

Select The Blank Question Correct Answer Your Answer

A ________ is another form of subcontracting. Hiring capacity Hiring capacity

Select The Blank Question Correct Answer Your Answer

The ________ pertain to the climatic conditions which the component , product or material should withstand. Environmental specifications Environmental specifications

Match The Following Question Bottom compartment of control board Control board

Correct Answer

Your Answer

Bunch of work orders arranged in Bunch of work orders arranged in a a sequence in which they are to sequence in which they are to be be processed. processed. Pictorial view of machine loading activity Pictorial view of machine loading activity Work order of item currently being worked on the machine Work order of item to be processed next on the machine

Top compartment of control board Work order of item currently being worked on the machine Middle compartment of control board Select The Blank Question Correct Answer Your Answer Work order of item to be processed next on the machine

OC curve of ideal sampling plan suggests that all lots less than 3% defectives have the probability of acceptance of ________. One One

Multiple Choice Single Answer Question Which is the right time to prepare stores issue order? Correct Answer Your Answer When route sheet is ready When route sheet is ready

Multiple Choice Single Answer

Question Correct Answer Your Answer

What is the reason of excessive friction between parts? Improper or lack of lubrication Improper or lack of lubrication

True/False Question Correct Answer Your Answer

Cellular layout is based on the concept of Group Technology True True

Multiple Choice Single Answer Question How does the control chart of statistical quality control helps the operating personnel? Correct Answer Identify the presence of an assignable cause before it develops Your Answer Identify the presence of an assignable cause before it develops

Multiple Choice Multiple Answer Question Which are different ways to show critical path in a network? Correct Answer Your Answer Thick Line , Red Line , Double Line Thick Line , Double Line

True/False Question Correct Answer Your Answer

The control chart for number of defectives is more convenient to make than control chart for fraction defectives sincethe fugure of number of defectives units can be directly taken from the inspection report. True True

Select The Blank Question Correct Answer Your Answer

The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Acceptable quality level Acceptable quality level

Multiple Choice Multiple Answer Question Order preparation process for products manufatured to order requires following documents Correct Answer Sales Order , Work order , Shop order Your Answer Sales Order , Work order , Shop order

Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as

Correct Answer Your Answer

Operation Operation

Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory

Multiple Choice Single Answer Question Inherent Safety' is one of the principle of good layout. In context of layout, this can be achieved by the following Correct Answer Clear gangway, location of material and material handling system Your Answer Safety training

Match The Following Question Toung Eye Nose Ear

Correct Answer Sweet Crack Burnout Impact

Your Answer Sweet Crack Burnout Impact

Multiple Choice Single Answer Question How much time does the dummy activity take? Correct Answer Your Answer Zero Time Zero Time

Select The Blank Question Correct Answer Your Answer

The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Condition monitoring Condition monitoring

Multiple Choice Single Answer Question What does tail of an arrow represent? Correct Answer Your Answer Select The Blank Start of an activity Start of an activity

Question Correct Answer Your Answer

The ________ is the probability that a good lot will be rejected by the sampling plan. Producer's risk Producer's risk

Select The Blank Question Correct Answer Your Answer

The ________ is the probability that a bad lot will be accepted by the sampling plan. Consumer's risk Consumer's risk

Multiple Choice Multiple Answer Question Which of the following are the most suitable cases where we can use CPA as effective technique of scheduling? Correct Answer Overhauling of a CNC machine , Purchase and installation of a newly imported special purpose machine , Design, production and testing of prototype of a fighter aircraft. Your Answer Overhauling of a CNC machine , Purchase and installation of a newly imported special purpose machine , Design, production and testing of prototype of a fighter aircraft. Multiple Choice Single Answer Question Which kind of relationship exists between those activities which can be carried out simultaneously and both activities require definite time to finish? Correct Answer Concurrent activities Your Answer Concurrent activities

Select The Blank Question Correct Answer Your Answer

The ________ are the definitions of the measurable as well as nonmeasurable characteristics of the product. Specifications Specifications

Select The Blank Question Correct Answer Your Answer

Goods after final inspection should accompany ________to enable dispatch department to identify and draw correct reference. Forwarding note Forwarding note

True/False Question Correct Answer Your Answer

The steeper the OC curve, the better is the discrimination between good and bad lots. True True

Multiple Choice Multiple Answer

Question Correct Answer Your Answer

Which of the following are types of non-destructive testing? Visual Testing , Eddy current , Magnetic flow detectors Visual Testing , Eddy current , Magnetic flow detectors

Multiple Choice Multiple Answer Question Which are the different types of flow process charts used for method study? Correct Answer Your Answer Equipment type , Man type , Material type Equipment type , Man type , Material type

Multiple Choice Single Answer Question Which photographic technique is used to record path of motions of the members of the body during method study? Correct Answer Cyclograph Your Answer Cyclograph

Multiple Choice Multiple Answer Question Which of the following is not the characteristic of Project Production? Correct Answer Your Answer Continuous flow of material , Highly mechanised material handling , Virtually zero manufacturing cycle time Continuous flow of material , Highly mechanised material handling , Virtually zero manufacturing cycle time

True/False Question Correct Answer Your Answer

Use of accurate measuring instruments and better supervision for inspectors is not possible in case of floor inspection as co mpared to centralised inspection system. True True

True/False Question Correct Answer Your Answer

Dust gets mixed with lubricants, forms an abrasive substance and causes pre-mature failure of machinery. True True

Select The Blank Question

Correct Answer Your Answer

The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable. Quality control Quality control

Multiple Choice Multiple Answer

Question Correct Answer Your Answer

Which of the following aspects are essential to ensure quality of purchased items? Defining right quality for the job , Vendor performance evaluation , Making sure that suppliers understand the requirements Defining right quality for the job , Vendor performance evaluation , Making sure that suppliers understand the requirements

True/False Question Correct Answer Your Answer

Process Planning is concerned with decisions regarding requirement of machines and manpower for meeting customer demand False True

True/False Question Correct Answer Your Answer

All activities lying on the non-critical paths must have total float and free float. False False

Multiple Choice Multiple Answer Question Which of the following method can be adopted to overcome the problem of rushing up a job for it's timely completion? Correct Answer Use of optimum speeds and feeds , Subcontracting , Job splitting Your Answer Use of optimum speeds and feeds , Subcontracting , Job splitting

Multiple Choice Single Answer Question Which of the following data is unnecessary for scheduling process? Correct Answer Your Answer Cost breakup of products Cost breakup of products

Multiple Choice Multiple Answer Question Which of the following are the major steps of making of the X bar-R control chart? Correct Answer Collection of data , Claculation of mean,range,grand average and mean range , Set up control chart for average and calculate control limits of range chart Your Answer Collection of data , Claculation of mean,range,grand average and mean range , Set up control chart for average and calculate control limits of range chart

POM assgn : Parmeet Multiple Choice Multiple Answer Question What is indicated by the hugging points lying close to mean of the process in X bar-R- control chart? Correct Answer Recording done without actual measurements , Improper selection of samples , Biases in measurements Your Answer Improper selection of samples , Biases in measurements , Recording done without actual measurements Multiple Choice Multiple Answer Question Which of the following are the basic requirements of quality standard? Correct Answer Your Answer Deifinite , Undesrstandable , Economically viable Deifinite , Undesrstandable , Economically viable

Match The Following Question Fixation of inventory level Symptom of ill planned purchasing Factor influencing material planning

Correct Answer Reorder level Over ordering Lead time

Your Answer Reorder level Over ordering Lead time Stock on hand

Net requirement of material under Stock on hand MRP

Multiple Choice Multiple Answer Question What are the benefits of inspection and quality control? Correct Answer Adequate maintenance of quality , Ensures parts are within specified limits of accuracy , Gives economy in production through reduction of defective work Adequate maintenance of quality , Ensures parts are within specified limits of accuracy , Gives economy in production through reduction of defective work The ________ advocates maintenance procedures whereby the condition of the plant is constantly watched through systematic inspection to unearth unhealthy conditions and preventive Preventive Maintenance Preventive Maintenance

Your Answer

Select The Blank Question

Correct Answer Your Answer

Multiple Choice Single Answer Question What do you mean by design modifications made to reduce time and effort required in carrying out maintenance work ? Correct Answer Design-in Maintenance Your Answer Design-in Maintenance

True/False

Question Correct Answer Your Answer

Even in a small set up wherein maintenance of a machine is looked after by a mechanic cum worker, he should report directly to the person responsible for the manufacturing operations. True True

Multiple Choice Single Answer Question Which of the following technique makes three time estimates for each activity? Correct Answer Project Evaluation & Review Technique Your Answer Project Evaluation & Review Technique

Select The Blank Question Correct Answer Your Answer

A set of activities to keep an equipment in the specified condition is called as ________. Maintenance Maintenance

Multiple Choice Multiple Answer Question Which of the following are characteristics of an operating characteristics curve? Correct Answer Producer risk , Consumer Risk , Acceptable Quality Level Your Answer Producer risk , Consumer Risk , Acceptable Quality Level

Multiple Choice Multiple Answer Question Which three of the following are causes of continuous upward pattern of Xbar-R control chart? Correct Answer Wear of tool , Abnormal rise in temperature , Accumulation of dirt Your Answer True/False Question Wear of tool , Untrained operator , Abnormal rise in temperature

Correct Answer Your Answer

Inspection should be conducted on all incoming materials, semifinished items, bought out components, subcontract items prior to any operation, assembly. True True

Select The Blank Question Correct Answer Your Answer

The ________ is necessary when the job requires detailed of one or more of the job characteristics with the help of special equipment which is not available at the producing company. Inspection order Inspection order

Multiple Choice Multiple Answer

Question Correct Answer Your Answer

Lack of material planning results in the following Over ordering , under ordering , stockouts Over ordering , under ordering , stockouts

True/False Question Correct Answer Your Answer

Since value of c can never be negativee, hence" if LCLp works out to be negative, it is taken as zero." True False

Multiple Choice Single Answer Question What do you understand by the quality specified by the designer on behalf the customer? Correct Answer Quality of design Your Answer Quality of design

Select The Blank Question Correct Answer Your Answer

The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________. Overtime working Overtime working

Select The Blank Question Correct Answer Your Answer

Work study is also called ________ study Time and Motion Time and Motion

True/False Question Correct Answer Your Answer

Maintenance function must be decentralised apart from a size of a manufacturing organisation for it's better functioning. False False

True/False Question Correct Answer Your Answer

Repetitive movements between work stations which are difficult to be traced on string diagrams can be conveniently shown on flow diagrams. False False

Multiple Choice Single Answer Question Which method is used to trace especially those movements which are too fast for human eye to pursue?

Correct Answer Your Answer

Cyclegraph Cyclegraph

Match The Following Question Template REL chart Flow diagram Travel chart

Correct Answer Two dimensional cutouts Degree of closeness Tracing movements Distance and frequency of movements

Your Answer Two dimensional cutouts Degree of closeness Tracing movements Distance and frequency of movements

Select The Blank Question Correct Answer Your Answer

An Ideal OC curve is ________ shaped curve that accpets all the lots with quality equal to or better than AQL . Rectangular Rectangular

Multiple Choice Single Answer Question What does the points falling outside the control limits indicate? Correct Answer Your Answer Presence of assignable causes Presence of chance causes

Multiple Choice Multiple Answer Question Which information is recorded in an equipment card? Correct Answer Your Answer Date of commissioning , Equipment specifications , Name and address of manufacturer Date of commissioning , Equipment specifications , Name and address of manufacturer

True/False Question Correct Answer Your Answer

Inspection should be avoided prior to long run of a manufacturing stage as it becomes duplication of work and cost. False False

True/False Question Correct Answer Your Answer

Delay in completion of projects result in unwelcome additions to the fixed manufacturing expenses. True True

Multiple Choice Single Answer Question Material Planning is an integral part of Correct Answer Your Answer Production Planning Production Planning

Multiple Choice Single Answer Question Which of the following policies is advisable in case of low product variety and large volumes? Correct Answer Low Skilled Labour & Special Purpose Machines Your Answer Low Skilled Labour & Special Purpose Machines

Select The Blank Question Correct Answer Your Answer

In case of an OC curve, the risk of rejecting a good quality lot may vary between ________. 0.01 to 10% 0.01 to 10%

Multiple Choice Single Answer Question MRP is based on the concept of inventory demand which is of following type Correct Answer Your Answer Dependent and independent Dependent and independent

True/False Question

Correct Answer Your Answer

In case of X bar, if the process is not under control indicated by some points falling outside the control limits, such points outside the control limits are eliminated and new trial control limits for the remaining points are computed. True True

Multiple Choice Multiple Answer Question Plant Layout is concerned with optimum arrangement of the following Correct Answer Your Answer Storage space , Machines , Material Handling Equipment Storage space , Machines , Material Handling Equipment

Multiple Choice Single Answer Question What is the location of upper control limit in the X bar-R control chart? Correct Answer Your Answer 3 standard deviations above central line 3 standard deviations above central line

Select The Blank

Question Correct Answer Your Answer True/False Question Correct Answer Your Answer

The ________ is the defect level for which lots are regarded as bad lots. Lot Tolerance Percentage Defective Lot Tolerance Percentage Defective

While numbering as per Fulkerson's rule, arrows emerging from the initial event are deleted so as to create one or more initial events. True False

Multiple Choice Single Answer Question Why stores issue order should not be issued as soon as it is prepared? Correct Answer Your Answer Material may or may not be available at the time of preparation Material may or may not be available at the time of preparation

Multiple Choice Single Answer Question Which characteristics are verified in cent percent sampling? Correct Answer Your Answer All important characteristics Only characteristics related to performance

Select The Blank Question

Correct Answer Your Answer

An ________ history card is the record of all repairs, replacements and engineering changes carried out in the equipment during it's period of service. Equipment history card Equipment history card

Multiple Choice Multiple Answe r Question Features of Cellular layout are Correct Answer Your Answer It is a type of mixed layout , Uses concept of Group Technology , Facilities are grouped in to cells It is a type of mixed layout , Uses concept of Group Technology , Facilities are grouped in to cells

Multiple Choice Single Answer Question Inadequate production capacity ultimately leads to Correct Answer Your Answer Poor Customer Service Poor Customer Service

Multiple Choice Multiple Answer Question Which of the following factors affect the quality control function?

Correct Answer Your Answer

Quality of workmanship , Production aids , Manufacturing facilities Quality of workmanship , Competitive prices , Manufacturing facilities

Multiple Choice Multiple Answer Question Which of the following situations demand the economic consideration while selecting a job for method study? Correct Answer Unorderly movement of men and materials , Excessive process defectives , Too many suggestions received for improvement from a department or section Your Answer Unorderly movement of men and materials , Excessive process defectives , Too many suggestions received for improvement from a department or section True/False Question Correct Answer Your Answer

Systematic maintenance system can completely eliminate the wear and tear of machines. False False

Select The Blank Question Correct Answer Your Answer

Capacity decisions have a direct influence on performance of production system in respect of ________ Delivery performance Delivery performance

Select The Blank Question Correct Answer Your Answer

The ________ must ensure that the product satisfy the functional requirements of it's usage. Quality of design Quality of design

Multiple Choice Multiple Answer Question Which of the following can be subtypes of corrective maintenance? Correct Answer Your Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance

LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Single Answer Question Where does the central line is located in case of p-chart? Correct Answer at p bar Your Answer at p bar Multiple Choice Single Answer Question The product layout has following disadvantage Correct Answer Layout is not flexible Your Answer Layout is not flexible Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Production Select The Blank Question Production Planning is a centralised activity which includes functions such as ________ Correct Answer Scheduling Your Answer Scheduling Select The Blank Question OC curve of ideal sampling plan suggests that all lots less than 3% defectives have the probability of acceptance of ________. Correct Answer One Your Answer One Multiple Choice Single Answer Question The document which incorporates details of process planning for a job is called Correct Answer Route Sheet Your Answer Route Sheet Multiple Choice Multiple Answer Question Which of the following are types of non-destructive testing? Correct Answer Visual Testing , Eddy current , Magnetic flow detectors Your Answer Visual Testing , Eddy current , Magnetic flow detectors Multiple Choice Single Answer Question What do you understand by the difference between the

specification limits within which manufacturing process is expected to produce? Correct Answer Design tolerance Your Answer Design tolerance Multiple Choice Single Answer Question Technique of Value Engineering can be effectively employed in design of a product to Correct Answer To meet the intended function at lowest cost Your Answer To meet the intended function at lowest cost True/False Question Inspection Order can be a verbal order Correct Answer True Your Answer False Multiple Choice Single Answer Question The ratio of output to input of a production system is commonly known as Correct Answer Productivity Your Answer Productivity True/False Question The plotting of activities - critical, non-critical and dummy activities- is strictly according to their precedence relationship. Correct Answer True Your Answer False Select The Blank Question A ________ is another form of subcontracting. Correct Answer Hiring capacity Your Answer Hiring capacity Multiple Choice Single Answer Question A good plant layout helps in Correct Answer Reducing handling costs Your Answer Reducing handling costs Match The Following Question Correct Answer Your Answer Combined Layout Mixed Layout Mixed Layout Fixed Position Layout Project Layout Project Layout

Product Layout Line Layout Line Layout Process Layout Functional Layout Functional Layout

Select The Blank Question A set of activities to keep an equipment in the specified condition is called as ________. Correct Answer Maintenance Your Answer Maintenance Multiple Choice Single Answer Question How to claculate the producer risk in the OC Curve? Correct Answer Probability that a good lot will be rejected by the sampling Your Answer Probability that a good lot will be rejected by the sampling Multiple Choice Single Answer Question How non-critical activities are shown in the time chart during project scheduling? Correct Answer Thin lines Your Answer Thin lines Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory True/False Question Fixed cost is lower in case of continuous production than intermittent production. Correct Answer False Your Answer False Multiple Choice Single Answer Question Inadequate production capacity ultimately leads to Correct Answer Poor Customer Service Your Answer Low Productivity True/False Question Floor inspection promotes tendency of machines to drift out of limits and produce defectives.

Correct Answer False Your Answer False Select The Blank Question Capacity decisions have a direct influence on performance of production system in respect of ________ Correct Answer Delivery performance Your Answer Delivery performance Multiple Choice Single Answer Question Technique which can help an organization to reduce inventory is called Correct Answer MRP Your Answer MRP Select The Blank Question The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable. Correct Answer Quality control Your Answer Quality control Match The Following Question Correct Answer Your Answer Temperature of motor Body Body Exhaust gas Smell Smell Air leakage Listen Listen Corrosion Watch Watch

Multiple Choice Single Answer Question Which characteristics are verified in cent percent sampling? Correct Answer All important characteristics Your Answer All important characteristics Multiple Choice Multiple Answer Question What are the benefits of inspection and quality control? Correct Answer Gives economy in production through reduction of defective work , Adequate maintenance of quality , Ensures parts are

within specified limits of accuracy Your Answer Adequate maintenance of quality , Ensures parts are within specified limits of accuracy , Gives economy in production through reduction of defective work Multiple Choice Single Answer Question In mass/batch production organizations where goods are produced for stocking, Work Order is raised on the basis of Correct Answer Sales Programme Your Answer Sales Programme True/False Question While making X bar-R-chart, values of X bar and R are recoded samplewise either on the extreme right of the individual measurements on the data sheet or in a separate sheet. Correct Answer True Your Answer False Multiple Choice Single Answer Question What is the meaning of surplus material in context with stores issue order? Correct Answer Materials issued are not fully consumed Your Answer Materials issued are not fully consumed True/False Question Cent percent inspection is often more practical and economical than sampling inspection. Correct Answer False Your Answer False Multiple Choice Multiple Answer Question What are the benefits of reconditioning? Correct Answer Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps to plan requirement of replacement spares Your Answer Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps to plan requirement of replacement spares Select The Blank Question Work study is also called ________ study Correct Answer Time and Motion Your Answer Time and Motion

True/False Question In case of X bar, if the process is not under control indicated by some points falling outside the control limits, such points outside the control limits are eliminated and new trial control limits for the remaining points are computed. Correct Answer True Your Answer False Select The Blank Question The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________. Correct Answer Overtime working Your Answer Overtime working True/False Question A sampling plan which perfectly discriminates will have vertical OC curve. Correct Answer True Your Answer True Multiple Choice Single Answer Question Which of the following is the most popular technique for Project Production? Correct Answer PERT & CPM Your Answer PERT & CPM Multiple Choice Multiple Answer Question Which of the following are the most suitable cases where we can use CPA as effective technique of scheduling? Correct Answer Overhauling of a CNC machine , Purchase and installation of a newly imported special purpose machine , Design, production and testing of prototype of a fighter aircraft. Your Answer Overhauling of a CNC machine , Purchase and installation of a newly imported special purpose machine , Design, production and testing of prototype of a fighter aircraft. True/False Question Sample sizes for the construction of p-chart are typicaly larger that for Xbar-R-charts. Correct Answer True

Your Answer

True

Select The Blank Question The ________ advocates maintenance procedures whereby the condition of the plant is constantly watched through systematic inspection to unearth unhealthy conditions and preventive Correct Answer Preventive Maintenance Your Answer Preventive Maintenance True/False Question It would not affect the project completion time if non-critical activities take little loner time than planned. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Which of the following are the basic requirements of quality standard? Correct Answer Deifinite , Undesrstandable , Economically viable Your Answer Deifinite , Undesrstandable , Economically viable Multiple Choice Single Answer Question What is the location of lower control limit in the X bar-R control chart? Correct Answer 3 standard deviations below central line Your Answer 3 standard deviations below central line Multiple Choice Multiple Answer Question Which of the following is not the characteristic of Project Production? Correct Answer Continuous flow of material , Highly mechanised material handling , Virtually zero manufacturing cycle time Your Answer Continuous flow of material , Highly mechanised material handling , Virtually zero manufacturing cycle time Multiple Choice Multiple Answer Question Which of the following may be the objectives of project crashing? Correct Answer To complete the project in the least possible time , To reduce project cost below it's normal cost , To achieve uniformity in requirement of resources Your Answer To complete the project in the least possible time , To reduce project cost below it's normal cost , To achieve uniformity in requirement of resources

Multiple Choice Single Answer Question What is the basic philosophy of statistical process control? Correct Answer Prevention is better than cure Your Answer Prevention is better than cure

LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Multiple Answer Question Which of the following concepts must be understood for the achievement of quality? Correct Answer Quality of design , Quality of conformance , Purpose of product Your Answer Quality of conformance , Quality of design

Multiple Choice Single Answer Question What do you mean by the graphical representation of the project which is composed as series of connected arrows and circles to describe the interrelationship of the activities involved? Correct Answer Network Your Answer Network

Multiple Choice Multiple Answer Question Which of the following cases indicates change in physical characteristic? Correct Answer Turning , Grinding , Drilling Your Answer Turning , Grinding , Drilling

Multiple Choice Single Answer Question What do you mean by the verification of object against predetermined standards of quality or quantity or both? Correct Answer Inspection Your Answer Quality assurance

Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory

Your Answer

Factory

Select The Blank Question The ________ advocates maintenance procedures whereby the condition of the plant is constantly watched through systematic inspection to unearth unhealthy conditions and preventive Correct Answer Preventive Maintenance Your Answer Preventive Maintenance

Select The Blank Question The ________ is the defect level for which lots are regarded as bad lots. Correct Answer Lot Tolerance Percentage Defective Your Answer Lot Tolerance Percentage Defective

Multiple Choice Single Answer Question How non-critical activities are shown in the time chart during project scheduling? Correct Answer Thin lines Your Answer Thin lines

Select The Blank Question An ________ history card is the record of all repairs, replacements and engineering changes carried out in the equipment during it's period of service. Correct Answer Equipment history card Your Answer Equipment history card

Multiple Choice Single Answer Question Who prepares the daily production report? Correct Answer Shop Supervisor Your Answer Shop Supervisor

Select The Blank Question Work study is also called ________ study Correct Answer Time and Motion Your Answer True/False Motion

Question

Every network does not necessarily have a critical path.

Correct Answer False Your Answer False

Select The Blank Question Production Planning is a centralised activity which includes functions such as ________ Correct Answer Scheduling Your Answer Scheduling

Multiple Choice Single Answer Question Which method of critical path determination begins with the end event and moves backward to the start event of the project network? Correct Answer Backward pass computation Your Answer Backward pass computation

True/False Question

Scrap allowance is added to net requirement of material while ordering for material Correct Answer True Your Answer True

True/False Question

Dust gets mixed with lubricants, forms an abrasive substance and causes pre-mature failure of machinery. Correct Answer True Your Answer True

Multiple Choice Single Answer Question A good plant layout helps in Correct Answer Reducing handling costs Your Answer Reducing handling costs

True/False Question

It would not affect the project completion time if non-critical activities take little loner time than planned. Correct Answer True

Your Answer

True

Select The Blank Question The ________ is the process of withdrawing the equipment from the production line, dismantling it unitwise, visualising defects, effecting adjustments, replacing worn-out parts and finally building it up to get desired accuracies. Correct Answer Reconditioning Your Answer Reconditioning

True/False Question

Flow process charts do record movements as well as visual pictures. Correct Answer False Your Answer False

True/False Question

Process Planning is concerned with decisions regarding requirement of machines and manpower for meeting customer demand Correct Answer False Your Answer False

Multiple Choice Single Answer Question What is the meaning of " Product features" according to J.M.Juran? Correct Answer Quality of design Your Answer Quality of design

Multiple Choice Single Answer Question Technique which can help an organization to reduce inventory is called Correct Answer MRP Your Answer MRP

Multiple Choice Multiple Answer Question Which of the following are examples of consumption of physical effort during recording for method study? Correct Answer Bending , Positioning , Unloading Your Answer Bending , Positioning , Drilling

True/False Question

Objective of Work Study is to improve Productivity

Correct Answer True Your Answer True

Multiple Choice Multiple Answer Question Which three of the following options can be used to reduce the duration of activity during project crashing? Correct Answer Allocating more manpower and machines than originally planned for. , Working additional shifts or overtime. , Awarding work to vendors who charge extra but expedite deliveries. Your Answer Allocating more manpower and machines than originally planned for. , Working additional shifts or overtime. , Awarding work to vendors who charge extra but expedite deliveries. Multiple Choice Single Answer Question Which is the next stage to the inspection based quality control in the historical development of quality management. Correct Answer Quality assurance Your Answer Quality assurance

Match The Following Question Bottom compartment of control board

Correct Answer Bunch of work orders arranged in a sequence in which they are to be processed. Pictorial view of machine loading activity

Your Answer Bunch of work orders arranged in a sequence in which they are to be processed. Pictorial view of machine loading activity

Control board Top compartment of control board Middle compartment of control board

Work order of item Work order of item currently being worked on currently being worked on the machine the machine Work order of item to be processed next on the machine Work order of item to be processed next on the machine

Select The Blank Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Answer Condition monitoring Your Answer Condition monitoring

Select The Blank Question The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________. Correct Answer Overtime working Your Answer Overtime working

Multiple Choice Multiple Answer Question Following are some of the Principles of Management advocated by F W Taylor Correct Answer Selection of best worker for each particular task , Division of work between worker and management , Training and development of the workmen Your Answer Selection of best worker for each particular task , Division of work between worker and management , Training and development of the workmen Multiple Choice Multiple Answer Question How the concept of float is helpful to planners? Correct Answer To decide priorities in allocation of resources , To minimize the requirement of resources , To prevent peaks and valleys in requirement of resources Your Answer To decide priorities in allocation of resources , To minimize the requirement of resources Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Operation

Multiple Choice Single Answer Question Which kind of defect can be called as minor defect? Correct Answer Which does not reduce the usability of the product for its intended use Your Answer Which does not reduce the usability of the product for its intended use Select The Blank Question The ________ is specified to indicate the maximum permissible variability in the dimensions product or parts. Correct Answer Tolerance Your Answer Tolerance

True/False Question

Sampling inspection is best suited when cost of inspection is much higher than the loss arising from the acceptance of a defective part. Correct Answer True Your Answer False

Multiple Choice Single Answer Question Which element of a network represents a task which has got a definite beginning and definite end? Correct Answer Activity Your Answer Activity

Multiple Choice Multiple Answer Question Following are the commonly used factors considered for evaluation of layout in factor analysis method Correct Answer Flow of material , Equipment utilization , Working condition Your Answer Flow of material , Equipment utilization , Working condition

Select The Blank Question A good maintenance system is not a luxary but a ________. Correct Answer Necessity Your Answer Necessity

Select The Blank Question The ________ are the definitions of the measurable as well as nonmeasurable characteristics of the product. Correct Answer Specifications Your Answer Standards

Multiple Choice Multiple Answer Question Which features should be covered by the specifications of materials while defining the qualitative requirement? Correct Answer Material composition , Dimensions , Any heat treatment if required Your Answer Material composition , Dimensions , Any heat treatment if required Multiple Choice Single Answer Question The ratio of output to input of a production system is commonly known as

Correct Answer Productivity Your Answer Productivity

True/False Question

F W Taylor devised a system for classifying motions into basic divisions called Therbligs Correct Answer False Your Answer False

Multiple Choice Single Answer Question Which portion of the perforated route sheet should be signed by the operator or supervisor? Correct Answer Lower portion Your Answer Lower portion

True/False Question

In case of X bar, if the process is not under control indicated by some points falling outside the control limits, such points outside the control limits are eliminated and new trial control limits for the remaining points are computed. Correct Answer True Your Answer True

Match The Following Question Scale model Factor Analysis

Correct Answer Layout analysis Method to evaluate layouts

Your Answer Modelling approach to layouts Technique for evolving and analysis of layouts Objective of good layout Principles of good layout

Minimization of production Objective of good layout delays Maximum visibility Principles of good layout

True/False Question

Maintenance function must be decentralised apart from a size of a manufacturing organisation for it's better functioning. Correct Answer False Your Answer True

LIST OF ATTEMPTED QUESTIONS AND ANSWERS True/False Question

Process Sheets for parts in batch production are not maintained as standard process sheet Correct Answer False Your Answer False

True/False Question

Theoretical capacity equals number of normal working hours of that machine. Correct Answer True Your Answer True

Multiple Choice Multiple Answer Question Which are the basic requirements of the " Quality of Design "? Correct Answer Identification of right product , Selection of appropriate features , Ensure that product renders satisfactory service to customer Your Answer Identification of right product , Selection of appropriate features , Ensure that product renders satisfactory service to customer Match The Following Question Change in chemical characteristic Consumption of effort Information given Subtraction

Correct Answer Chemical reaction Posting a ledger Giving directions or instructions

Your Answer Chemical reaction Welding Posting a ledger

Removal of worn-out part Removal of worn-out part from a machine from a machine

Multiple Choice Multiple Answer Question Which of the following aspects are essential to ensure quality of purchased items? Correct Answer Defining right quality for the job , Vendor performance evaluation , Making sure that suppliers understand the requirements Your Answer Defining right quality for the job , Vendor performance evaluation , Making sure that suppliers understand the requirements Select The Blank Question The ________ is necessary when the job requires detailed of one or more of the job characteristics with the help of special

equipment which is not available at the producing company. Correct Answer Inspection order Your Answer Move order

Select The Blank Question The term ________ emplies the foregone profit due to inability of company to produce. Correct Answer Opportunity cost Your Answer Idle wages

Multiple Choice Multiple Answer Question Which of the following factors play important role while selecting or rejecting a particular site from legislation and taxation point of view? Correct Answer Labour laws , Building codes , Policies regarding issue of licences Your Answer Labour laws , Policies regarding issue of licences True/False Question

Skill of labour force in a product type layout is usually higher than in the process type of layout Correct Answer False Your Answer False

Multiple Choice Single Answer Question What is the base for considering activity time as single time estimate or three time estimate? Correct Answer Level of uncertainty Your Answer Level of uncertainty

Multiple Choice Single Answer Question Product layout is employed for manufacturing following products Correct Answer refrigirators Your Answer True/False Question automobile components

Diversified labour is adequately available in rural area as compared to urban area. Correct Answer False Your Answer False

Match The Following Question

Correct Answer

Your Answer Single source of supply Over ordering Reorder level Stock on hand

Fixation of inventory level Reorder level Symptom of ill planned purchasing Over ordering

Factor influencing material Lead time planning Net requirement of material under MRP True/False Question Stock on hand

In case of backward pass computation, the latest event time of the end event equals to the earliest event time minus duration of that activity. Correct Answer False Your Answer True

Select The Blank Question The ________ is the probability that a good lot will be rejected by the sampling plan. Correct Answer Producer's risk Your Answer Producer's risk

Multiple Choice Single Answer Question Which of the following technique makes three time estimates for each activity? Correct Answer Project Evaluation & Review Technique Your Answer True/False Question Project Evaluation & Review Technique

Suburban location provides the compromise netween rural and urban locations. Correct Answer True Your Answer True

Multiple Choice Single Answer Question Which time is determined by the backward pass computation method of determination of critical path ? Correct Answer Latest allowable time for each event Your Answer Latest allowable time for each event

Multiple Choice Single Answer Question What do you understand by the measurement of work to establish allowed time for a job for the defined method? Correct Answer Work measurement Your Answer Motion economy

True/False Question

Even in a small set up wherein maintenance of a machine is looked after by a mechanic cum worker, he should report directly to the person responsible for the manufacturing operations. Correct Answer True Your Answer True

Multiple Choice Single Answer Question Out of two basic criteria for the selection of a manufacturing method, one is, it must be able to meet the specifications of final product and the other is, it must be Correct Answer Cost effective method Your Answer Cost effective method

True/False Question

Kanban system is essentially a computer based system for production scheduling and control Correct Answer False Your Answer True

Multiple Choice Multiple Answer Question Which of the following symbols are used in flow process chart but not used in operation process chart? Correct Answer Storage , Delay , Transport Your Answer Storage , Delay

Multiple Choice Single Answer Question In case of Batch Production which kind of labour is expected? Correct Answer Skilled in one specific Manufacturing Process Your Answer Skilled in one specific Manufacturing Process

Multiple Choice Multiple Answer

Question

Which of the following are the major steps of making of the X bar-R control chart? Correct Answer Collection of data , Claculation of mean,range,grand average and mean range , Set up control chart for average and calculate control limits of range chart Your Answer Claculation of mean,range,grand average and mean range , Set up control chart for average and calculate control limits of range chart , Calculate the coefficient of deviation True/False Question

For p-chart, p bar is the ratio of total number of units inspected to the total number of units defectives. Correct Answer False Your Answer True

Multiple Choice Single Answer Question Which of the following is the most popular technique for Project Production? Correct Answer PERT & CPM Your Answer Break Even Analysis

Multiple Choice Single Answer Question Which kind of preventive inspection detects some maintenance related characteristics by making use of human senses, when equipment is in operation? Correct Answer Extrernal inspection Your Answer Internal inspection

Multiple Choice Single Answer Question Process Engineer does not get sufficient time for designing tooling for most economic production run when Correct Answer Delivery time is less Your Answer Delivery time is less

Multiple Choice Single Answer Question How dummy activities are shown in the time chart during project scheduling? Correct Answer Vertical lines Your Answer Dotted lines

True/False Question

The control chart for number of defectives is more convenient to make than control chart for fraction defectives sincethe fugure of

number of defectives units can be directly taken from the inspection report. Correct Answer True Your Answer True

Multiple Choice Multiple Answer Question Which are the advantages of suburban location? Correct Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction Your Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Availability of excellent transportation and communication facilities Multiple Choice Multiple Answer Question Which utilities are considered as infrastructural requirements? Correct Answer Disposal of waste , Power , Water Your Answer Power , Labour , Water

Multiple Choice Single Answer Question What do you understand by the timeframe for the maintenance needs of the equipment? Correct Answer Maintenance inspection schedule Your Answer Maintenance inspection schedule

Multiple Choice Multiple Answer Question Which of the following are assignable cause? Correct Answer Large varaitions in hardness of material , Tool wear , Errors in setting Your Answer Large varaitions in hardness of material , Tool wear , Errors in setting Multiple Choice Single Answer Question Which of the following policies is advisable in case of low product variety and large volumes? Correct Answer Low Skilled Labour & Special Purpose Machines Your Answer Low Skilled Labour & Special Purpose Machines

Multiple Choice Single Answer Question Which phase of method study is concerned with analyzing the facts critically, generating alternatives which form the basis for selection and development of improved methods?

Correct Answer Critical examination Your Answer Critical examination

Select The Blank Question A ________ is another form of subcontracting. Correct Answer Hiring capacity Your Answer Collaboration

Select The Blank Question The ________ must ensure that the product satisfy the functional requirements of it's usage. Correct Answer Quality of design Your Answer Quality of conformance

Multiple Choice Multiple Answer Question Gross requirement of finished product is determined on the basis of following Correct Answer Forecasted sales , Pending sales order , Management decision to stock Your Answer Pending sales order , Management decision to stock , Gross Market requirement Select The Blank Question The ________ includes preventive maintenance activities whose needs are identified through inspection which requires stoppage of machines. Correct Answer Shutdown Maintenance Your Answer Working Maintenance

Select The Blank Question A set of activities to keep an equipment in the specified condition is called as ________. Correct Answer Maintenance Your Answer Maintenance

Multiple Choice Single Answer Question Which kind of labour force is required in case of Jobbing Production? Correct Answer Highly Skilled Your Answer Highly Skilled

Select The Blank Question One detachable ticket is prepared for each ________. Correct Answer Operation Your Answer Operation

Select The Blank Question The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable. Correct Answer Quality control Your Answer Quality control

Select The Blank Question The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Correct Answer Acceptable quality level Your Answer Lot Tolerance Percentage Defective

Multiple Choice Multiple Answer Question Which of the following products should be produced by using mass production? Correct Answer Refrigerator , Tyre for automobile , Television Set Your Answer Refrigerator , Tyre for automobile , Television Set

LIST OF ATTEMPTED QUESTIONS AND ANSWERS True/False Question

Flow process charts do record movements as well as visual pictures. Correct Answer False Your Answer False

True/False Question

The OC curve is based on the assumption that if the lot is large in comparison to the sample, the probabilities of the OC curve will follow a poisson distribution. Correct Answer False Your Answer True

Multiple Choice Single Answer Question The ratio of output to input of a production system is commonly known as Correct Answer Productivity Your Answer Productivity

Multiple Choice Multiple Answer Question Order preparation process for products manufatured to order requires following documents Correct Answer Sales Order , Work order , Shop order Your Answer Work order , Purchase order

Select The Blank Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Answer Condition monitoring Your Answer Preventive maintenance

Match The Following Question

Correct Answer

Your Answer

Scheduling of interrelated Critical Path Analysis activities of small projects with consideration of uncertainty of duration of activities. Two machines & Johnson's Two Machine processing time depends Algorithm on sequence of job loading Sufficient orders and resonable choice of machines Index Method

Critical Path Analysis

Johnson's Two Machine Algorithm

Index Method

Time relationship between Critical Ratio Scheduling when a product is required and when it can be made available

Time series

Select The Blank Question Production control work is ________ in case of floor inspection as compared with the centralised inspection. Correct Answer easier Your Answer easier

Match The Following Question When to inspect What to inspect How to inspect How much to inspect

Correct Answer Stages of inspection Specification Inspection devices

Your Answer Specification Standard Tools & Jigs

Sampling or cent percent Stages of inspection inspection

Multiple Choice Single Answer Question Material Planning is an integral part of Correct Answer Production Planning Your Answer Process Planning

Select The Blank Question An Ideal OC curve is ________ shaped curve that accpets all the lots with quality equal to or better than AQL . Correct Answer Rectangular

Your Answer

Rectangular

Multiple Choice Single Answer Question Technique of Value Engineering can be effectively employed in design of a product to Correct Answer To meet the intended function at lowest cost Your Answer Reduce lead time

Multiple Choice Single Answer Question Material control function of PPC is concerned with Correct Answer Preparation of material estimates Your Answer Preparation of material estimates

Multiple Choice Single Answer Question Main objective of a good plant layout is Correct Answer Reduce material handling cost Your Answer Reduce material handling cost

True/False Question

In case of X bar-R charts, statistical limits are calculated from averages of samples of n (4,5,) instead of single sample of large size to reduce the spread of natural variability. Correct Answer True Your Answer True

Multiple Choice Multiple Answer Question Which of the following is not the characteristic of Project Production? Correct Answer Continuous flow of material , Highly mechanised material handling , Virtually zero manufacturing cycle time Your Answer Fixed position layout , Virtually zero manufacturing cycle time

Multiple Choice Single Answer Question A good plant layout helps in Correct Answer Reducing handling costs Your Answer Reducing handling costs

Multiple Choice Single Answer

Question

Inadequate production capacity ultimately leads to

Correct Answer Poor Customer Service Your Answer Low Productivity

Select The Blank Question Production Planning is a centralised activity which includes functions such as ________ Correct Answer Scheduling Your Answer Scheduling

Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory

Multiple Choice Multiple Answer Question What are the uses of the instruction manual provided by the manufacturer of a machine? Correct Answer It gives instructions regarding installation and operation of the equipment , It contains note on common troubles with causes and remedies for troubleshooting , It enlists points, frequency and type of lubrication Your Answer It gives instructions regarding installation and operation of the equipment , It contains note on common troubles with causes and remedies for troubleshooting Multiple Choice Multiple Answer Question MRP utilises the following information Correct Answer Master production schedule , Product structure , Lead time for procurement/manufacturing Your Answer Master production schedule , Product structure , Lead time for procurement/manufacturing Select The Blank Question A good maintenance system is not a luxary but a ________. Correct Answer Necessity Your Answer Necessity

True/False Question

Shape od an OC curve is a function of sample size and the acceptance number.

Correct Answer True Your Answer False

Multiple Choice Multiple Answer Question Which of the following can be subtypes of corrective maintenance? Correct Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance Your Answer Predictive Maintenance , Shutdown Maintenance

True/False Question

For p-chart, "Inspection by variables" is much faster than "Inspection by attributes" Correct Answer False Your Answer True

Multiple Choice Single Answer Question Site factors for plant location include Correct Answer Suitability of land Your Answer Suitability of land

Select The Blank Question The ________ breakdowns usually cost more, partly due to damage done to the adjustment components and partly due to emergency actions. Correct Answer Unexpected Your Answer Partial

True/False Question

Cent percent inspection is a must if the inspection is of destructive nature. Correct Answer False Your Answer False

True/False Question

Since value of p can never be positive, hence" if LCLp works out to be positive, it is taken as zero." Correct Answer False Your Answer True

Multiple Choice Single Answer Question Which varaible is taken along the abscissa or X axis? Correct Answer Time Your Answer Standard deviation

Multiple Choice Multiple Answer Question Which of the following are examples of specifications? Correct Answer Commercial standards , Assembly and testing instructions , Bill of material Your Answer Production schedule , Commercial standards , Assembly and testing instructions Multiple Choice Multiple Answer Question Which of the following products should be produced by using mass production? Correct Answer Refrigerator , Tyre for automobile , Television Set Your Answer Refrigerator , Tyre for automobile , Television Set

Multiple Choice Single Answer Question Which of the following techniques is used by industrial engineering department to obtain the utilisation index? Correct Answer Work Sampling Studies Your Answer Method Study

True/False Question

An ideal OC curve is never possible only with cent percent inspection. Correct Answer False Your Answer False

Select The Blank Question The ________ is the probability that a bad lot will be accepted by the sampling plan. Correct Answer Consumer's risk Your Answer Producer's risk

Select The Blank Question The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________.

Correct Answer Overtime working Your Answer Overtime working

True/False Question

The operator should not stop production if first piece is not approved by the inspector. Correct Answer False Your Answer False

Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Conversion

Multiple Choice Single Answer Question Which kind of relationship exists between those activities which can be carried out simultaneously and both activities require definite time to finish? Correct Answer Concurrent activities Your Answer Concurrent activities

Multiple Choice Multiple Answer Question Which are different ways to show critical path in a network? Correct Answer Thick Line , Red Line , Double Line Your Answer Dotted line

Select The Blank Question A ________helps to avoid crowding of jobs at a particular machine by change of route of some of the jobs or by diverting work to other machine. Correct Answer Control board Your Answer Control board

Multiple Choice Single Answer Question What do you understand by PERT ? Correct Answer Project Evaluation & Review Technique Your Answer Project Evaluation & Review Technique

Multiple Choice Multiple Answer Question Which of the following factors play important role while selecting or rejecting a particular site from legislation and taxation point of view? Correct Answer Labour laws , Building codes , Policies regarding issue of licences Your Answer Labour laws , Policies regarding issue of licences

Multiple Choice Multiple Answer Question Which of the following concepts must be understood for the achievement of quality? Correct Answer Quality of conformance , Purpose of product , Quality of design Your Answer Purpose of product , Process specifications , Quality of design

Select The Blank Question The ________ is the probability that a good lot will be rejected by the sampling plan. Correct Answer Producer's risk Your Answer Producer's risk

Multiple Choice Single Answer Question What do you mean by the project duration for which the total cost is minimum? Correct Answer Optimum duration Your Answer Optimum duration

True/False Question

Originating process of raw material influence Process Planning

Correct Answer True Your Answer True

LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Single Answer Question Which phase of method study is concerned with analyzing the facts critically, generating alternatives which form the basis for selection and development of improved methods? Correct Answer Critical examination Your Answer Development and selection

Select The Blank Question The ________ advocates maintenance procedures whereby the condition of the plant is constantly watched through systematic inspection to unearth unhealthy conditions and preventive Correct Answer Preventive Maintenance Your Answer Design-in Maintenance

Select The Blank Question The term ________ emplies the foregone profit due to inability of company to produce. Correct Answer Opportunity cost Your Answer True/False Question Down time cost

A network should employ only those dummy activities which are absolutely necessary. Correct Answer True Your Answer True

Select The Blank Question A set of activities to keep an equipment in the specified condition is called as ________. Correct Answer Maintenance Your Answer True/False Question Maintenance

While making X bar-R-chart, values of X bar and R are recoded samplewise either on the extreme right of the individual measurements on the data sheet or in a separate sheet. Correct Answer True Your Answer False

Select The Blank Question The ________ must ensure that the product satisfy the functional requirements of it's usage. Correct Answer Quality of design Your Answer True/False Question Quality of inspection

Even if any activity on the critical path is delayed, project completes on the scheduled time. Correct Answer False Your Answer False

Multiple Choice Single Answer Question Which is the alternative way of indicating the load other than numerical way, in case of Gantt chart ? Correct Answer Graphical approach Your Answer Symbolic pproach

Multiple Choice Multiple Answer Question Which of the following are types of sampling plan? Correct Answer Single sampling plan , Double sampling plan , Multiple sampling plan Your Answer Single sampling plan , Double sampling plan , Multiple sampling plan Multiple Choice Multiple Answer Question Which of the following are major inputs to scheduling? Correct Answer Overlapping of operations , Effective Capacity per work centre , Performance standards Your Answer Overlapping of operations , Effective Capacity per work centre , Performance standards Select The Blank Question The ________ is necessary when the job requires detailed of one or more of the job characteristics with the help of special equipment which is not available at the producing company. Correct Answer Inspection order Your Answer Stores issue order

Select The Blank Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking.

Correct Answer Condition monitoring Your Answer True/False Question Condition monitoring

Diversified labour is adequately available in rural area as compared to urban area. Correct Answer False Your Answer False

Multiple Choice Multiple Answer Question Which of the following cases indicated that the operation has occurred? Correct Answer Movement of components to assembly section , Raw material movement , A worker's trip to grinder to sharpen the tools Your Answer Movement of components to assembly section , A worker's trip to grinder to sharpen the tools , Tools kept in rack of tool crib Multiple Choice Single Answer Question What is the reason of fluctuations, if the control chart evaluates that the process is in a state of statistical control? Correct Answer Random variability Your Answer Set up variability

Select The Blank Question The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Correct Answer Acceptable quality level Your Answer Acceptable quality level

Multiple Choice Single Answer Question Product layout is suitable when Correct Answer Products have reasonable stable demand Your Answer Products are not required in large quantities

Multiple Choice Multiple Answer Question Which of the following charts are used for the recording of data during the method study? Correct Answer Operation process chart , Multiple activity chart , Flow process chart Your Answer Operation process chart , Multiple activity chart , Flow process chart

True/False Question

The operator should not stop production if first piece is not approved by the inspector. Correct Answer False Your Answer False

Multiple Choice Single Answer Question Need for change in layout can occur due to following reason Correct Answer introduction of new product Your Answer introduction of new product

Multiple Choice Single Answer Question What do you mean by a single event which represents the joint completion of more than one activities? Correct Answer Merge event Your Answer True/False Question Merge event

The control chart for number of defectives is more convenient to make than control chart for fraction defectives sincethe fugure of number of defectives units can be directly taken from the inspection report. Correct Answer True Your Answer True

Multiple Choice Single Answer Question Which rule is used for numbering of events? Correct Answer Fulkerson's Rule Your Answer True/False Question Juran's Rule

In case of two handed process chart, the simultaneous activities of both hands are recorded opposite to each other on the chart. Correct Answer True Your Answer True

True/False Question

All activities lying on the non-critical paths must have total float and free float. Correct Answer False

Your Answer

True

Multiple Choice Multiple Answer Question Which of the following is not the characteristic of Project Production? Correct Answer Continuous flow of material , Highly mechanised material handling , Virtually zero manufacturing cycle time Your Answer Continuous flow of material , Highly mechanised material handling , Virtually zero manufacturing cycle time Multiple Choice Multiple Answer Question Which of the following is not the characteristic of Project Production? Correct Answer Continuous flow of material , Highly mechanised material handling , Virtually zero manufacturing cycle time Your Answer Fixed position layout Select The Blank Question The ________ are the definitions of the measurable as well as nonmeasurable characteristics of the product. Correct Answer Specifications Your Answer Specifications

Multiple Choice Single Answer Question How industry has responded to the fact of existence of inherant variability of the manufacturing process? Correct Answer Inclusion of certain tolerance on the basic dimensions in the drawing Your Answer Inclusion of certain tolerance on the basic dimensions in the drawing Select The Blank Question Work study is also called ________ study Correct Answer Time and Motion Your Answer Time and Motion

Multiple Choice Multiple Answer Question Which are the different methods of recording actual progress of work? Correct Answer Display boards , Progress cards , Network updating Your Answer True/False Question Job cards , Progress cards , Network updating

In case of backward pass computation, the latest event time of the end event equals to the earliest event time minus duration of

that activity. Correct Answer False Your Answer True

Multiple Choice Multiple Answer Question Which of the following products should be produced by using mass production? Correct Answer Refrigerator , Tyre for automobile , Television Set Your Answer Refrigerator , Tyre for automobile , Television Set

Multiple Choice Multiple Answer Question Which of the following are examples of attributes? Correct Answer Cracks , Burrs , Texture Your Answer Cracks , Burrs , Texture

Match The Following Question Scheduling Device Interruption for machine utilisation Input for scheduling Technique of scheduling

Correct Answer Strings Preventive maintenance

Your Answer Strings Preventive maintenance

Overlapping of operations Critical Path Analysis Critical Path Analysis JIT

Multiple Choice Multiple Answer Question Which are the three distinct parts of the chart? Correct Answer Summary , Introduction , Body Your Answer Summary , Introduction , Analysis

Match The Following Question Combined Layout Fixed Position Layout Product Layout

Correct Answer Mixed Layout Project Layout Line Layout

Your Answer Mixed Layout Project Layout Line Layout

Process Layout

Functional Layout

Functional Layout

Multiple Choice Multiple Answer Question Following are the commonly used factors considered for evaluation of layout in factor analysis method Correct Answer Flow of material , Equipment utilization , Working condition Your Answer Flow of material , Equipment utilization , Working condition

Multiple Choice Single Answer Question Fixed position layout is adopted when Correct Answer product is very heavy involving assembly of large number of parts Your Answer product is very heavy involving assembly of large number of parts Select The Blank Question The ________ is the defect level for which lots are regarded as bad lots. Correct Answer Lot Tolerance Percentage Defective Your Answer Acceptable quality level

Multiple Choice Multiple Answer Question Which of the following are examples of specifications? Correct Answer Commercial standards , Assembly and testing instructions , Bill of material Your Answer Commercial standards , Assembly and testing instructions , Bill of material Multiple Choice Single Answer Question Process Engineer does not get sufficient time for designing tooling for most economic production run when Correct Answer Delivery time is less Your Answer Delivery time is less

Multiple Choice Single Answer Question What do you mean by the graphical representation of the project which is composed as series of connected arrows and circles to describe the interrelationship of the activities involved? Correct Answer Network Your Answer True/False Flow chart

Question

Latest finishing date is the latest event time of the tail event.

Correct Answer False Your Answer True

Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory

Select The Blank Question The ________ is the probability that a bad lot will be accepted by the sampling plan. Correct Answer Consumer's risk Your Answer Consumer's risk

LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Multiple Answer Question Why graphical method of recording is preferred over the descriptive method during method study? Correct Answer It segregates effective part form ineffective parts , It reduces effort involved in writing , Critical examinations easier and more effective Your Answer Critical examinations easier and more effective , It segregates effective part form ineffective parts , It reduces effort involved in writing Multiple Choice Multiple Answer Question Which are the subfactors of community facilities or social infrastructure? Correct Answer Accomodation , Educational , Entertainment Your Answer Accomodation , Educational , Entertainment Select The Blank Question The ________ is the probability that a bad lot will be accepted by the sampling plan. Correct Answer Consumer's risk Your Answer Consumer's risk Multiple Choice Multiple Answer Question Which of the following are examples of consumption of physical effort during recording for method study? Correct Answer Bending , Positioning , Unloading Your Answer Bending , Positioning , Unloading Multiple Choice Single Answer Question How to claculate the producer risk in the OC Curve? Correct Answer Probability that a good lot will be rejected by the sampling Your Answer Probability that a good lot will be rejected by the sampling Select The Blank Question The ________ are the definitions of the measurable as well as nonmeasurable characteristics of the product. Correct Answer Specifications Your Answer Specifications Select The Blank Question The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable. Correct Answer Quality control Your Answer Quality control True/False

Question Expediting action is necessary if the delays and interruptions are abnormal and hence any subsequent delay is bound to extend the promised delivery date. Correct Answer True Your Answer True Multiple Choice Single Answer Question Process Engineer does not get sufficient time for designing tooling for most economic production run when Correct Answer Delivery time is less Your Answer Delivery time is less Select The Blank Question The ________ includes preventive maintenance activities whose needs are identified through inspection which requires stoppage of machines. Correct Answer Shutdown Maintenance Your Answer Shutdown Maintenance True/False Question Breakdown of machines, absenteeism of worker does not dislocate the manufacturing activity in process layout Correct Answer True Your Answer True Select The Blank Question The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Correct Answer Acceptable quality level Your Answer Acceptable quality level Multiple Choice Single Answer Question What do you mean by lowest possible direct cost required to complete an activity within it's crashed time? Correct Answer Crash cost Your Answer Crash cost Multiple Choice Multiple Answer Question Which are the first three steps of Critical Path Analysis technique? Correct Answer Activity relationships , Activity identification , Network construction Your Answer Activity relationships , Activity identification , Network construction True/False Question Dust gets mixed with lubricants, forms an abrasive substance and causes premature failure of machinery. Correct Answer True Your Answer True

Multiple Choice Multiple Answer Question Which of the following can be subtypes of corrective maintenance? Correct Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance Your Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance Select The Blank Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Answer Condition monitoring Your Answer Condition monitoring Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Production Match The Following Question Correct Answer Your Answer Toung Sweet Sweet Eye Crack Crack Nose Burnout Burnout Ear Impact Impact

Select The Blank Question The ________ is a set of tools and techniques by which products are made to comply with the specifications at minimum cost to the firm. Correct Answer Quality control system Your Answer Quality control system Multiple Choice Single Answer Question What is the meaning of " Product features" according to J.M.Juran? Correct Answer Quality of design Your Answer Quality of design Multiple Choice Multiple Answer Question Which of the following method can be used to record the facts during the method study? Correct Answer Micromotion study , Cyclegraph , Chronocyclegraph

Your Answer Micromotion study , Photograph , Cyclegraph , Chronocyclegraph True/False Question All activities must not be tied up into the network Correct Answer False Your Answer False Multiple Choice Multiple Answer Question Which of the following are types of sampling plan? Correct Answer Single sampling plan , Double sampling plan , Multiple sampling plan Your Answer Single sampling plan , Double sampling plan , Multiple sampling plan Multiple Choice Multiple Answer Question How many of the following are types of specification? Correct Answer Material specifications , Dimensional specifications , Performance specifications Your Answer Material specifications , Dimensional specifications , Performance specifications Multiple Choice Multiple Answer Question Plant layout facilitates processing of products in most effective manner through the following Correct Answer Shortest possible distance , Shortest processing time , Minimum movement Your Answer Shortest possible distance , Minimum movement Select The Blank Question Work study is also called ________ study Correct Answer Time and Motion Your Answer Time and Motion True/False Question Operation Process Chart provides information on time and distances Correct Answer False Your Answer False Multiple Choice Multiple Answer Question Plant Layout is concerned with optimum arrangement of the following Correct Answer Storage space , Machines , Material Handling Equipment Your Answer Storage space , Machines , Sequence of operation Multiple Choice Single Answer Question Management often fails to realize the importance of efficient layout due to following reason Correct Answer losses resulting from poor layout are not directly shown in the financial statements

Your Answer losses resulting from poor layout are not directly shown in the financial statements True/False Question Inspection order is must even for simple jobs which can be inspected by shop inspector with the tooling available on shop. Correct Answer False Your Answer True True/False Question Feasibility of time schedule requires that an activity be scheduled before any of it's predecessors are scheduled. Correct Answer False Your Answer True Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory True/False Question Planned lubrication is said to be the nervous system of the equipment. Correct Answer True Your Answer True Multiple Choice Single Answer Question What is the basic philosophy of statistical process control? Correct Answer Prevention is better than cure Your Answer Prevention is better than cure Multiple Choice Single Answer Question How does the control chart of statistical quality control helps the operating personnel? Correct Answer Identify the presence of an assignable cause before it develops Your Answer Identify the presence of an assignable cause before it develops Multiple Choice Single Answer Question Where does the central line is located in case of p-chart? Correct Answer at p bar Your Answer at p bar Multiple Choice Multiple Answer Question Which of the following may be the objectives of project crashing? Correct Answer To complete the project in the least possible time , To reduce project cost below it's normal cost , To achieve uniformity in requirement of resources

Your Answer To complete the project in the least possible time , To reduce project cost below it's normal cost , To achieve uniformity in requirement of resources Select The Blank Question The ________ advocates maintenance procedures whereby the condition of the plant is constantly watched through systematic inspection to unearth unhealthy conditions and preventive Correct Answer Preventive Maintenance Your Answer Preventive Maintenance True/False Question A network should be progression of activities always moving forward. Correct Answer True Your Answer True Multiple Choice Single Answer Question Which is the ideal place to write a description of an activity in a network? Correct Answer Above the arrow Your Answer Above the arrow Select The Blank Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________. Correct Answer 0.01 to 10% Your Answer 0.01 to 10% True/False Question For p-chart, the central line of fraction defectives is determined by average percentage defectives. Correct Answer True Your Answer True Multiple Choice Single Answer Question Which phase of method study is concerned with analyzing the facts critically, generating alternatives which form the basis for selection and development of improved methods? Correct Answer Critical examination Your Answer Critical examination Multiple Choice Single Answer Question Which of the following policies is advisable in case of low product variety and large volumes? Correct Answer Low Skilled Labour & Special Purpose Machines Your Answer Low Skilled Labour & Special Purpose Machines Multiple Choice Single Answer

Question Which kind of inspection is followed in case of product layout? Correct Answer Pilot inspection Your Answer Pilot inspection Match The Following Question Correct Answer Your Answer Emerson Efficiency Plan Wage Payment Wage Payment Craft Facilities Planning Facilities Planning Work Sampling Machine utilization Sampling Inspection Gantt Chart Production Scheduling Production Scheduling

LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Multiple Answer Question Why graphical method of recording is preferred over the descriptive method during method study? Correct Answer It segregates effective part form ineffective parts , It reduces effort involved in writing , Critical examinations easier and more effective Your Answer Critical examinations easier and more effective , It segregates effective part form ineffective parts , It reduces effort involved in writing Multiple Choice Multiple Answer Question Which are the subfactors of community facilities or social infrastructure? Correct Answer Accomodation , Educational , Entertainment Your Answer Accomodation , Educational , Entertainment Select The Blank Question The ________ is the probability that a bad lot will be accepted by the sampling plan. Correct Answer Consumer's risk Your Answer Consumer's risk Multiple Choice Multiple Answer Question Which of the following are examples of consumption of physical effort during recording for method study? Correct Answer Bending , Positioning , Unloading Your Answer Bending , Positioning , Unloading Multiple Choice Single Answer Question How to claculate the producer risk in the OC Curve? Correct Answer Probability that a good lot will be rejected by the sampling Your Answer Probability that a good lot will be rejected by the sampling Select The Blank Question The ________ are the definitions of the measurable as well as nonmeasurable characteristics of the product. Correct Answer Specifications Your Answer Specifications Select The Blank Question The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable. Correct Answer Quality control Your Answer Quality control True/False

Question Expediting action is necessary if the delays and interruptions are abnormal and hence any subsequent delay is bound to extend the promised delivery date. Correct Answer True Your Answer True Multiple Choice Single Answer Question Process Engineer does not get sufficient time for designing tooling for most economic production run when Correct Answer Delivery time is less Your Answer Delivery time is less Select The Blank Question The ________ includes preventive maintenance activities whose needs are identified through inspection which requires stoppage of machines. Correct Answer Shutdown Maintenance Your Answer Shutdown Maintenance True/False Question Breakdown of machines, absenteeism of worker does not dislocate the manufacturing activity in process layout Correct Answer True Your Answer True Select The Blank Question The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Correct Answer Acceptable quality level Your Answer Acceptable quality level Multiple Choice Single Answer Question What do you mean by lowest possible direct cost required to complete an activity within it's crashed time? Correct Answer Crash cost Your Answer Crash cost Multiple Choice Multiple Answer Question Which are the first three steps of Critical Path Analysis technique? Correct Answer Activity relationships , Activity identification , Network construction Your Answer Activity relationships , Activity identification , Network construction True/False Question Dust gets mixed with lubricants, forms an abrasive substance and causes premature failure of machinery. Correct Answer True Your Answer True

Multiple Choice Multiple Answer Question Which of the following can be subtypes of corrective maintenance? Correct Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance Your Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance Select The Blank Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Answer Condition monitoring Your Answer Condition monitoring Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Production Match The Following Question Correct Answer Your Answer Toung Sweet Sweet Eye Crack Crack Nose Burnout Burnout Ear Impact Impact

Select The Blank Question The ________ is a set of tools and techniques by which products are made to comply with the specifications at minimum cost to the firm. Correct Answer Quality control system Your Answer Quality control system Multiple Choice Single Answer Question What is the meaning of " Product features" according to J.M.Juran? Correct Answer Quality of design Your Answer Quality of design Multiple Choice Multiple Answer Question Which of the following method can be used to record the facts during the method study? Correct Answer Micromotion study , Cyclegraph , Chronocyclegraph

Your Answer Micromotion study , Photograph , Cyclegraph , Chronocyclegraph True/False Question All activities must not be tied up into the network Correct Answer False Your Answer False Multiple Choice Multiple Answer Question Which of the following are types of sampling plan? Correct Answer Single sampling plan , Double sampling plan , Multiple sampling plan Your Answer Single sampling plan , Double sampling plan , Multiple sampling plan Multiple Choice Multiple Answer Question How many of the following are types of specification? Correct Answer Material specifications , Dimensional specifications , Performance specifications Your Answer Material specifications , Dimensional specifications , Performance specifications Multiple Choice Multiple Answer Question Plant layout facilitates processing of products in most effective manner through the following Correct Answer Shortest possible distance , Shortest processing time , Minimum movement Your Answer Shortest possible distance , Minimum movement Select The Blank Question Work study is also called ________ study Correct Answer Time and Motion Your Answer Time and Motion True/False Question Operation Process Chart provides information on time and distances Correct Answer False Your Answer False Multiple Choice Multiple Answer Question Plant Layout is concerned with optimum arrangement of the following Correct Answer Storage space , Machines , Material Handling Equipment Your Answer Storage space , Machines , Sequence of operation Multiple Choice Single Answer Question Management often fails to realize the importance of efficient layout due to following reason Correct Answer losses resulting from poor layout are not directly shown in the financial statements

Your Answer losses resulting from poor layout are not directly shown in the financial statements True/False Question Inspection order is must even for simple jobs which can be inspected by shop inspector with the tooling available on shop. Correct Answer False Your Answer True True/False Question Feasibility of time schedule requires that an activity be scheduled before any of it's predecessors are scheduled. Correct Answer False Your Answer True Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory True/False Question Planned lubrication is said to be the nervous system of the equipment. Correct Answer True Your Answer True Multiple Choice Single Answer Question What is the basic philosophy of statistical process control? Correct Answer Prevention is better than cure Your Answer Prevention is better than cure Multiple Choice Single Answer Question How does the control chart of statistical quality control helps the operating personnel? Correct Answer Identify the presence of an assignable cause before it develops Your Answer Identify the presence of an assignable cause before it develops Multiple Choice Single Answer Question Where does the central line is located in case of p-chart? Correct Answer at p bar Your Answer at p bar Multiple Choice Multiple Answer Question Which of the following may be the objectives of project crashing? Correct Answer To complete the project in the least possible time , To reduce project cost below it's normal cost , To achieve uniformity in requirement of resources

Your Answer To complete the project in the least possible time , To reduce project cost below it's normal cost , To achieve uniformity in requirement of resources Select The Blank Question The ________ advocates maintenance procedures whereby the condition of the plant is constantly watched through systematic inspection to unearth unhealthy conditions and preventive Correct Answer Preventive Maintenance Your Answer Preventive Maintenance True/False Question A network should be progression of activities always moving forward. Correct Answer True Your Answer True Multiple Choice Single Answer Question Which is the ideal place to write a description of an activity in a network? Correct Answer Above the arrow Your Answer Above the arrow Select The Blank Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________. Correct Answer 0.01 to 10% Your Answer 0.01 to 10% True/False Question For p-chart, the central line of fraction defectives is determined by average percentage defectives. Correct Answer True Your Answer True Multiple Choice Single Answer Question Which phase of method study is concerned with analyzing the facts critically, generating alternatives which form the basis for selection and development of improved methods? Correct Answer Critical examination Your Answer Critical examination Multiple Choice Single Answer Question Which of the following policies is advisable in case of low product variety and large volumes? Correct Answer Low Skilled Labour & Special Purpose Machines Your Answer Low Skilled Labour & Special Purpose Machines Multiple Choice Single Answer

Question Which kind of inspection is followed in case of product layout? Correct Answer Pilot inspection Your Answer Pilot inspection Match The Following Question Correct Answer Your Answer Emerson Efficiency Plan Wage Payment Wage Payment Craft Facilities Planning Facilities Planning Work Sampling Machine utilization Sampling Inspection Gantt Chart Production Scheduling Production Scheduling

POM assgn Multiple Choice Single Answer Question Which phase of method study is concerned with analyzing the facts critically, generating alternatives which form the basis for selection and development of improved methods? Correct Answer Critical examination Your Answer Development and selection

Select The Blank Question The ________ advocates maintenance procedures whereby the condition of the plant is constantly watched through systematic inspection to unearth unhealthy conditions and preventive Correct Answer Preventive Maintenance Your Answer Design-in Maintenance

Select The Blank Question The term ________ emplies the foregone profit due to inability of company to produce. Correct Answer Opportunity cost Your Answer True/False Question Correct Answer Your Answer Down time cost

A network should employ only those dummy activities which are absolutely necessary. True True

Select The Blank Question A set of activities to keep an equipment in the specified condition is called as ________. Correct Answer Maintenance Your Answer True/False Question Maintenance

Correct Answer Your Answer

While making X bar-R-chart, values of X bar and R are recoded samplewise either on the extreme right of the individual measurements on the data sheet or in a separate sheet. True False

Select The Blank Question The ________ must ensure that the product satisfy the functional requirements of it's usage. Correct Answer Quality of design Your Answer Quality of inspection

True/False Question Correct Answer Your Answer

Even if any activity on the critical path is delayed, project completes on the scheduled time. False False

Multiple Choice Single Answer Question Which is the alternative way of indicating the load other than numerical way, in case of Gantt chart ? Correct Answer Graphical approach Your Answer Symbolic pproach

Multiple Choice Multiple Answer Question Which of the following are types of sampling plan? Correct Answer Your Answer Single sampling plan , Double sampling plan , Multiple sampling plan Single sampling plan , Double sampling plan , Multiple sampling plan

Multiple Choice Multiple Answer Question Which of the following are major inputs to scheduling? Correct Answer Your Answer Overlapping of operations , Effective Capacity per work centre , Performance standards Overlapping of operations , Effective Capacity per work centre , Performance standards

Select The Blank Question The ________ is necessary when the job requires detailed of one or more of the job characteristics with the help of special equipment which is not available at the producing company. Correct Answer Inspection order Your Answer Stores issue order

Select The Blank Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Answer Condition monitoring Your Answer True/False Question Correct Answer Your Answer Condition monitoring

Diversified labour is adequately available in rural area as compared to urban area. False False

Multiple Choice Multiple Answer Question Which of the following cases indicated that the operation has occurred?

Correct Answer Your Answer

Movement of components to assembly section , Raw material movement , A worker's trip to grinder to sharpen the tools Movement of components to assembly section , A worker's trip to grinder to sharpen the tools , Tools kept in rack of tool crib

Multiple Choice Single Answer Question What is the reason of fluctuations, if the control chart evaluates that the process is in a state of statistical control? Correct Answer Random variability Your Answer Set up variability

Select The Blank Question The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Correct Answer Acceptable quality level Your Answer Acceptable quality level

Multiple Choice Single Answer Question Product layout is suitable when Correct Answer Your Answer Products have reasonable stable demand Products are not required in large quantities

Multiple Choice Multiple Answer Question Which of the following charts are used for the recording of data during the method study? Correct Answer Operation process chart , Multiple activity chart , Flow process chart Your Answer True/False Question Correct Answer Your Answer Operation process chart , Multiple activity chart , Flow process chart

The operator should not stop production if first piece is not approved by the inspector. False False

Multiple Choice Single Answer Question Need for change in layout can occur due to following reason Correct Answer Your Answer introduction of new product introduction of new product

Multiple Choice Single Answer Question What do you mean by a single event which represents the joint completion of more than one activities? Correct Answer Merge event Your Answer Merge event

True/False Question

Correct Answer Your Answer

The control chart for number of defectives is more convenient to make than control chart for fraction defectives sincethe fugure of number of defectives units can be directly taken from the inspection report. True True

Multiple Choice Single Answer Question Which rule is used for numbering of events? Correct Answer Your Answer True/False Question Correct Answer Your Answer True/False Question Correct Answer Your Answer Fulkerson's Rule Juran's Rule

In case of two handed process chart, the simultaneous activities of both hands are recorded opposite to each other on the chart. True True

All activities lying on the non-critical paths must have total float and free float. False True

Multiple Choice Multiple Answer Question Which of the following is not the characteristic of Project Production? Correct Answer Your Answer Continuous flow of material , Highly mechanised material handling , Virtually zero manufacturing cycle time Continuous flow of material , Highly mechanised material handling , Virtually zero manufacturing cycle time

Multiple Choice Multiple Answer Question Which of the following is not the characteristic of Project Production? Correct Answer Your Answer Continuous flow of material , Highly mechanised material handling , Virtually zero manufacturing cycle time Fixed position layout

Select The Blank Question The ________ are the definitions of the measurable as well as nonmeasurable characteristics of the product. Correct Answer Specifications Your Answer Specifications

Multiple Choice Single Answer Question How industry has responded to the fact of existence of inherant variability of the manufacturing process?

Correct Answer Your Answer

Inclusion of certain tolerance on the basic dimensions in the drawing Inclusion of certain tolerance on the basic dimensions in the drawing

Select The Blank Question Work study is also called ________ study Correct Answer Your Answer Time and Motion Time and Motion

Multiple Choice Multiple Answer Question Which are the different methods of recording actual progress of work? Correct Answer Your Answer True/False Question Correct Answer Your Answer Display boards , Progress cards , Network updating Job cards , Progress cards , Network updating

In case of backward pass computation, the latest event time of the end event equals to the earliest event time minus duration of that activity. False True

Multiple Choice Multiple Answer Question Which of the following products should be produced by using mass production? Correct Answer Your Answer Refrigerator , Tyre for automobile , Television Set Refrigerator , Tyre for automobile , Television Set

Multiple Choice Multiple Answer Question Which of the following are examples of attributes? Correct Answer Your Answer Cracks , Burrs , Texture Cracks , Burrs , Texture

Match The Following Question Scheduling Device Interruption for machine utilisation Input for scheduling Technique of scheduling

Correct Answer Strings Preventive maintenance Overlapping of operations Critical Path Analysis

Your Answer Strings Preventive maintenance Critical Path Analysis JIT

Multiple Choice Multiple Answer Question Which are the three distinct parts of the chart?

Correct Answer Your Answer

Summary , Introduction , Body Summary , Introduction , Analysis

Match The Following Question Combined Layout Fixed Position Layout Product Layout Process Layout

Correct Answer Mixed Layout Project Layout Line Layout Functional Layout

Your Answer Mixed Layout Project Layout Line Layout Functional Layout

Multiple Choice Multiple Answer Question Following are the commonly used factors considered for evaluation of layout in factor analysis method Correct Answer Flow of material , Equipment utilization , Working condition Your Answer Flow of material , Equipment utilization , Working condition

Multiple Choice Single Answer Question Fixed position layout is adopted when Correct Answer Your Answer product is very heavy involving assembly of large number of parts product is very heavy involving assembly of large number of parts

Select The Blank Question The ________ is the defect level for which lots are regarded as bad lots. Correct Answer Your Answer Lot Tolerance Percentage Defective Acceptable quality level

Multiple Choice Multiple Answer Question Which of the following are examples of specifications? Correct Answer Your Answer Commercial standards , Assembly and testing instructions , Bill of material Commercial standards , Assembly and testing instructions , Bill of material

Multiple Choice Single Answer Question Process Engineer does not get sufficient time for designing tooling for most economic production run when Correct Answer Delivery time is less Your Answer Delivery time is less

Multiple Choice Single Answer Question What do you mean by the graphical representation of the project which is composed as series of connected arrows and circles to describe the interrelationship of the activities

involved? Correct Answer Your Answer True/False Question Correct Answer Your Answer Network Flow chart

Latest finishing date is the latest event time of the tail event. False True

Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory

Select The Blank Question The ________ is the probability that a bad lot will be accepted by the sampling plan. Correct Answer Your Answer Consumer's risk Consumer's risk

POM assgn True/False Question Correct Answer Your Answer Flow process charts do record movements as well as visual pictures. False False

True/False Question Correct Answer Your Answer

The OC curve is based on the assumption that if the lot is large in comparison to the sample, the probabilities of the OC curve will follow a poisson distribution. False True

Multiple Choice Single Answer Question The ratio of output to input of a production system is commonly known as Correct Answer Your Answer Productivity Productivity

Multiple Choice Multiple Answer Question Order preparation process for products manufatured to order requires following documents Correct Answer Sales Order , Work order , Shop order Your Answer Work order , Purchase order

Select The Blank Question Correct Answer Your Answer

The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Condition monitoring Preventive maintenance

Match The Following Question Scheduling of interrelated activities of small projects with consideration of uncertainty of duration of activities. Two machines & processing time depends on sequence of job loading Sufficient orders and resonable choice of machines

Correct Answer Critical Path Analysis

Your Answer Critical Path Analysis

Johnson's Two Machine Algorithm Johnson's Two Machine Algorithm

Index Method

Index Method Time series

Time relationship between when a Critical Ratio Scheduling product is required and when it can be made available

Select The Blank Question Correct Answer Your Answer

Production control work is ________ in case of floor inspection as compared with the centralised inspection. easier easier

Match The Following Question When to inspect What to inspect How to inspect How much to inspect

Correct Answer Stages of inspection Specification Inspection devices Sampling or cent percent inspection

Your Answer Specification Standard Tools & Jigs Stages of inspection

Multiple Choice Single Answer Question Material Planning is an integral part of Correct Answer Your Answer Production Planning Process Planning

Select The Blank Question Correct Answer Your Answer

An Ideal OC curve is ________ shaped curve that accpets all the lots with quality equal to or better than AQL . Rectangular Rectangular

Multiple Choice Single Answer Question Technique of Value Engineering can be effectively employed in design of a product to Correct Answer To meet the intended function at lowest cost Your Answer Reduce lead time

Multiple Choice Single Answer Question Material control function of PPC is concerned with Correct Answer Your Answer Preparation of material estimates Preparation of material estimates

Multiple Choice Single Answer Question Main objective of a good plant layout is Correct Answer Reduce material handling cost

Your Answer

Reduce material handling cost

True/False Question Correct Answer Your Answer

In case of X bar-R charts, statistical limits are calculated from averages of samples of n (4,5,) instead of single sample of large size to reduce the spread of natural variability. True True

Multiple Choice Multiple Answer Question Which of the following is not the characteristic of Project Production? Correct Answer Your Answer Continuous flow of material , Highly mechanised material handling , Virtually zero manufacturing cycle time Fixed position layout , Virtually zero manufacturing cycle time

Multiple Choice Single Answer Question A good plant layout helps in Correct Answer Your Answer Reducing handling costs Reducing handling costs

Multiple Choice Single Answer Question Inadequate production capacity ultimately leads to Correct Answer Your Answer Poor Customer Service Low Productivity

Select The Blank Question Correct Answer Your Answer

Production Planning is a centralised activity which includes functions such as ________ Scheduling Scheduling

Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory

Multiple Choice Multiple Answer Question What are the uses of the instruction manual provided by the manufacturer of a machine? Correct Answer It gives instructions regarding installation and operation of the equipment , It contains note on common troubles with causes and remedies for troubleshooting , It enlists points, frequency and type of lubrication

Your Answer

It gives instructions regarding installation and operation of the equipment , It contains note on common troubles with causes and remedies for troubleshooting

Multiple Choice Multiple Answer Question MRP utilises the following information Correct Answer Your Answer Master production schedule , Product structure , Lead time for procurement/manufacturing Master production schedule , Product structure , Lead time for procurement/manufacturing

Select The Blank Question Correct Answer Your Answer

A good maintenance system is not a luxary but a ________. Necessity Necessity

True/False Question Correct Answer Your Answer

Shape od an OC curve is a function of sample size and the acceptance number. True False

Multiple Choice Multiple Answer Question Which of the following can be subtypes of corrective maintenance? Correct Answer Your Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance Predictive Maintenance , Shutdown Maintenance

True/False Question Correct Answer Your Answer

For p-chart, "Inspection by variables" is much faster than "Inspection by attributes" False True

Multiple Choice Single Answer Question Site factors for plant location include Correct Answer Your Answer Suitability of land Suitability of land

Select The Blank Question Correct Answer Your Answer

The ________ breakdowns usually cost more, partly due to damage done to the adjustment components and partly due to emergency actions. Unexpected Partial

True/False Question Correct Answer Your Answer

Cent percent inspection is a must if the inspection is of destructive nature. False False

True/False Question Correct Answer Your Answer

Since value of p can never be positive, hence" if LCLp works out to be positive, it is taken as zero." False True

Multiple Choice Single Answer Question Which varaible is taken along the abscissa or X axis? Correct Answer Your Answer Time Standard deviation

Multiple Choice Multiple Answer Question Which of the following are examples of specifications? Correct Answer Your Answer Commercial standards , Assembly and testing instructions , Bill of material Production schedule , Commercial standards , Assembly and testing instructions

Multiple Choice Multiple Answer Question Which of the following products should be produced by using mass production? Correct Answer Your Answer Refrigerator , Tyre for automobile , Television Set Refrigerator , Tyre for automobile , Television Set

Multiple Choice Single Answer Question Which of the following techniques is used by industrial engineering department to obtain the utilisation index? Correct Answer Work Sampling Studies Your Answer Method Study

True/False Question Correct Answer Your Answer

An ideal OC curve is never possible only with cent percent inspection. False False

Select The Blank Question

The ________ is the probability that a bad lot will be accepted by the sampling plan.

Correct Answer Your Answer

Consumer's risk Producer's risk

Select The Blank Question Correct Answer Your Answer

The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________. Overtime working Overtime working

True/False Question Correct Answer Your Answer

The operator should not stop production if first piece is not approved by the inspector. False False

Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Conversion

Multiple Choice Single Answer Question Which kind of relationship exists between those activities which can be carried out simultaneously and both activities require definite time to finish? Correct Answer Concurrent activities Your Answer Concurrent activities

Multiple Choice Multiple Answer Question Which are different ways to show critical path in a network? Correct Answer Your Answer Thick Line , Red Line , Double Line Dotted line

Select The Blank Question Correct Answer Your Answer

A ________helps to avoid crowding of jobs at a particular machine by change of route of some of the jobs or by diverting work to other machine. Control board Control board

Multiple Choice Single Answer Question What do you understand by PERT ? Correct Answer Your Answer Project Evaluation & Review Technique Project Evaluation & Review Technique

Multiple Choice Multiple Answer Question Which of the following factors play important role while selecting or rejecting a particular site from legislation and taxation point of view? Correct Answer Labour laws , Building codes , Policies regarding issue of licences Your Answer Labour laws , Policies regarding issue of licences

Multiple Choice Multiple Answer Question Which of the following concepts must be understood for the achievement of quality? Correct Answer Quality of conformance , Purpose of product , Quality of design Your Answer Purpose of product , Process specifications , Quality of design

Select The Blank Question Correct Answer Your Answer

The ________ is the probability that a good lot will be rejected by the sampling plan. Producer's risk Producer's risk

Multiple Choice Single Answer Question What do you mean by the project duration for which the total cost is minimum? Correct Answer Your Answer Optimum duration Optimum duration

True/False Question Correct Answer Your Answer

Originating process of raw material influence Process Planning True True

POM assgn Multiple Choice Multiple Answer Question Why graphical method of recording is preferred over the descriptive method during method study? Correct Answer It segregates effective part form ineffective parts , It reduces effort involv ed in writing , Critical examinations easier and more effective Your Answer Critical examinations easier and more effective , It segregates effective part form ineffective parts , It reduces effort involved in writing Multiple Choice Multiple Answer Question Which are the subfactors of community facilities or social infrastructure? Correct Answer Accomodation , Educational , Entertainment Your Answer Accomodation , Educational , Entertainment Select The Blank Question The ________ is the probability that a bad lot will be accepted by the sampling plan. Correct Answer Consumer's risk Your Answer Consumer's risk Multiple Choice Multiple Answer Question Which of the following are examples of consumption of physical effort during recording for method study? Correct Answer Bending , Positioning , Unloading Your Answer Bending , Positioning , Unloading Multiple Choice Single Answer Question How to claculate the producer risk in the OC Curve? Correct Answer Probability that a good lot will be rejected by the sampling Your Answer Probability that a good lot will be rejected by the sampling Select The Blank Question The ________ are the definitions of the measurabl e as well as nonmeasurable characteristics of the product. Correct Answer Specifications Your Answer Specifications Select The Blank Question The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable. Correct Answer Quality control Your Answer Quality control True/False Question Expediting action is necessary if the delays and interruptions are abnormal and hence any subsequent delay is bound to extend the promised delivery date. Correct Answer True Your Answer True Multiple Choice Single Answer Question Process Engineer does not get sufficient time for designing tooling for most economic production run when Correct Answer Delivery time is less Your Answer Delivery time is less Select The Blank Question The ________ includes preventive maintenance activities whose needs are identified through inspection which requires stoppage of machines. Correct Answer Shutdown Maintenance Your Answer Shutdown Maintenance

True/False Question Breakdown of machines, absenteeism of worker does not dislocate the manufacturing activity in process layout Correct Answer True Your Answer True Select The Blank Question The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Correct Answer Acceptable quality level Your Answer Acceptable quality level Multiple Choice Single Answer Question What do you mean by lowest possible direct cost required to complete an activity within it's crashed time? Correct Answer Crash cost Your Answer Crash cost Multiple Choice Multiple Answer Question Which are the first three steps of Critical Path Analysis technique? Correct Answer Activity relationships , Activity identification , Network construction Your Answer Activity relationships , Activity identification , Network construction True/False Question Dust gets mixed with lubricants, forms an abrasive substance and causes pre-mature failure of machinery. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Which of the following can be subtypes of corrective maintenance? Correct Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance Your Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance Select The Blank Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Answer Condition monitoring Your Answer Condition monitoring Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Production Match The Following Question Correct Answer Your Answer Toung Sweet Sweet Eye Crack Crack Nose Burnout Burnout Ear Impact Impact

Select The Blank Question The ________ is a set of tools and techniques by which products are made to comply with the specifications at minimum cost to the firm. Correct Answer Quality control system Your Answer Quality control system Multiple Choice Single Answer Question What is the meaning of " Product features" according to J.M.Juran? Correct Answer Quality of design Your Answer Quality of design Multiple Choice Multiple Answer Question Which of the following method can be used to record the facts during the method study? Correct Answer Micromotion study , Cyclegraph , Chronocyclegraph Your Answer Micromotion study , Photograph , Cyclegraph , Chronocyclegraph True/False Question All activities must not be tied up into the network Correct Answer False Your Answer False Multiple Choice Multiple Answer Question Which of the following are types of sampling plan? Correct Answer Single sampling plan , Double sampling plan , Multiple sampling plan Your Answer Single sampling plan , Double sampling plan , Multiple sampling plan Multiple Choice Multiple Answer Question How many of the following are types of specification? Correct Answer Material specifications , Dimensional specifications , Performance specifications Your Answer Material specifications , Dimensional specifications , Performance specifications Multiple Choice Multiple Answer Question Plant layout facilitates processing of products in most effective manner through the following Correct Answer Shortest possible distance , Shortest processing time , Minimum movement Your Answer Shortest possible distance , Minimum movement Select The Blank Question Work study is also called ________ study Correct Answer Time and Motion Your Answer Time and Motion True/False Question Operation Process Chart provides information on time and distances Correct Answer False Your Answer False Multiple Choice Multiple Answer Question Plant Layout is concerned with optimum arrangement of the following Correct Answer Storage space , Machines , Material Handling Equipment Your Answer Storage space , Machines , Sequence of operation Multiple Choice Single Answer Question Management often fails to realize the importance of efficient layout due to following reason Correct Answer losses resulting from poor layout are not directly shown in the financial statements Your Answer losses resulting from poor layout are not directly shown in the financial statements True/False Question Inspection order is must even for simple jobs which can be inspected by shop inspector with the tooling available on shop.

Correct Answer False Your Answer True True/False Question Feasibility of time schedule requires that an activity be scheduled before any of it's predecessors are scheduled. Correct Answer False Your Answer True Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is call ed Correct Answer Factory Your Answer Factory True/False Question Planned lubrication is said to be the nervous system of the equipment. Correct Answer True Your Answer True Multiple Choice Single Answer Question What is the basic philosophy of statistical process control? Correct Answer Prevention is better than cure Your Answer Prevention is better than cure Multiple Choice Single Answer Question How does the control chart of statistical quality control helps the operating personnel? Correct Answer Identify the presence of an assignable cause before it develops Your Answer Identify the presence of an assignable cause before it develops Multiple Choice Single Answer Question Where does the central line is located in case of p-chart? Correct Answer at p bar Your Answer at p bar Multiple Choice Multiple Answer Question Which of the following may be the objectives of project crashing? Correct Answer To complete the project in the least possible time , To reduce project cost below it's normal cost , To achieve uniformity in requirement of resources Your Answer To complete the project in the least possible time , To reduce project cost below it's normal cost , To achieve uniformity in requirement of resources Select The Blank Question The ________ advocates maintenance procedures whereby the condition of the plant is constantly watched through systematic inspection to unearth unhealthy conditions and preventive Correct Answer Preventive Maintenance Your Answer Preventive Maintenance True/False Question A network should be progression of activities always moving forward. Correct Answer True Your Answer True Multiple Choice Single Answer Question Which is the ideal place to write a description of an activity in a network? Correct Answer Above the arrow Your Answer Above the arrow Select The Blank Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________.

Correct Answer 0.01 to 10% Your Answer 0.01 to 10% True/False Question For p-chart, the central line of fraction defectives is determined by average percentage defectives. Correct Answer True Your Answer True Multiple Choice Single Answer Question Which phase of method study is concerned with analyzing the facts critically, generating alternatives which form the basis for selection and development of improved methods? Correct Answer Critical examination Your Answer Critical examination Multiple Choice Single Answer Question Which of the following policies is advisable in case of low product variety and large volumes? Correct Answer Low Skilled Labour & Special Purpose Machines Your Answer Low Skilled Labour & Special Purpose Machines Multiple Choice Single Answer Question Which kind of inspection is followed in case of product layout? Correct Answer Pilot inspection Your Answer Pilot inspection Match The Following Question Correct Answer Your Answer Emerson Efficiency Plan Wage Payment Wage Payment Craft Facilities Planning Facilities Planning Work Sampling Machine utilization Sampling Inspection Gantt Chart Production Scheduling Production Scheduling

POM assgn Multiple Choice Single Answer Question MRP is based on the concept of inventory demand which is of following type Correct Answer Your Answer Dependent and independent Dependent and independent

Multiple Choice Single Answer Question Main objective of a good plant layout is Correct Answer Your Answer Reduce material handling cost Reduce material handling cost

True/False Question Correct Answer Your Answer

As a general rule, the number of tail event of an activity is more than that of it's head event. False False

Select The Blank Question The ________ is the probability that a good lot will be rejected by the sampling plan. Correct Answer Your Answer Producer's risk Producer's risk

Multiple Choice Multiple Answer Question Which of the following are important considerations concerning activity times? Correct Answer Your Answer Activity time should be obtained from the person responsible for the completion of an activity , Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resources required to carry out the activity are available. Activity time should be obtained from the person responsible for the completion of an activity , Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resources required to carry out the activity are available.

Select The Blank Question The ________ pertain to the climatic conditions which the component , product or material should withstand. Correct Environmental specifications Answer Your Answer Environmental specifications

Multiple Choice Multiple Answer Question Following are some of the factors considered for evaluation of alternative layouts Correct Answer Flow of Material , Equipment utilization , Ease of supervision

Your Answer

Flow of Material , Ease of supervision , Delivery performance

Multiple Choice Multiple Answer Question Which of the following are assignable cause? Correct Answer Your Answer Large varaitions in hardness of material , Tool wear , Errors in setting Large varaitions in hardness of material , Tool wear , Errors in setting

True/False Question Correct Answer Your Answer

All activities must not be tied up into the network False False

Select The Blank Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________. Correct 0.01 to 10% Answer Your Answer 0.01 to 10%

True/False Question

Correct Answer Your Answer

In case of X bar, if the process is not under control indicated by some points falling outside the control limits, such points outside the control limits are eliminated and new trial control limits for the remaining points are computed. True True

Multiple Choice Single Answe r Question What is the base for considering activity time as single time estimate or three time estimate? Correct Level of uncertainty Answer Your Answer Availability of labour

Select The Blank Question The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Correct Acceptable quality level Answer Your Answer Acceptable quality level

Multiple Choice Single Answer Question What do you mean by lowest possible direct cost required to complete an activity within it's normal time? Correct Normal cost Answer

Your Answer

Normal cost

Select The Blank Question A good maintenance system is not a luxary but a ________. Correct Answer Your Answer Necessity Necessity

Select The Blank Question A ________helps to avoid crowding of jobs at a particular machine by change of route of some of the jobs or by diverting work to other machine. Correct Control board Answer Your Answer Move order

Select The Blank Question The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable. Correct Quality control Answer Your Answer Quality control

Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Factory Answer Your Answer Factory

Match The Following Question Emerson Efficiency Plan Craft Work Sampling Gantt Chart

Correct Answer Wage Payment Facilities Planning Machine utilization Production Scheduling

Your Answer Wage Payment Facilities Planning Machine utilization Production Scheduling

Select The Blank Question A ________ is another form of subcontracting. Correct Answer Your Answer Hiring capacity Hiring capacity

Multiple Choice Multiple Answer

Question Correct Answer Your Answer

In an organization there may not be a formal PPC department if Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large

Multiple Choice Multiple Answer Question Which of the following cases can be treated as delay during recording of method study? Correct Answer Your Answer Operators awaiting instructions from supervisor , Worker waiting for his turn at tools stores , Jobs awaiting at the machines for their turn Operators awaiting instructions from supervisor , Worker waiting for his turn at tools stores , Jobs awaiting at the machines for their turn

True/False Question Correct Answer Your Answer

Inspection order is must even for simple jobs which can be inspected by shop inspector with the tooling available on shop. False False

Multiple Choice Multiple Answer Question Order preparation process for products manufatured to order requires following documents Correct Sales Order , Work order , Shop order Answer Your Answer Sales Order , Work order , Purchase order

Multiple Choice Single Answer Question Technique of Value Engineering can be effectively employed in design of a product to Correct Answer Your Answer To meet the intended function at lowest cost Reduce lead time

True/False Question Correct Answer Your Answer

Cent percent inspection is often more practical and economical than sampling inspection. False False

Multiple Choice Multiple Answer Question Scale model used for layout analysis have following advantages Correct Answer Your Answer Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown , Models can be shifted easily Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown , Models can be shifted easily

Multiple Choice Single Answer Question Which of the following technique is event oriented ?

Correct Answer Your Answer

Project Evaluation & Review Technique Project Evaluation & Review Technique

Multiple Choice Single Answer Question What is the meaning of " Product features" according to J.M.Juran? Correct Answer Your Answer Quality of design Quality of design

Match The Following Question Crash cost of an activity Normal time of an activity Crash time of activity Normal cost of an activity

Correct Answer Cc Tn Tc Cn

Your Answer Cc Tn Tc Cn

Multiple Choice Multiple Answer Question What are uses of diagrams in method study? Correct Answer Your Answer Study traffic traffic Study traffic traffic different plant layouts and select the most optimum one , Study the extent of over the different routes of the plant , Identify the extent of backtracking, cross and obstacles encountered during the movement of material. different plant layouts and select the most optimum one , Study the extent of over the different routes of the plant , Identify the extent of backtracking, cross and obstacles encountered during the movement of material.

True/False Question Correct Answer Your Answer

A load chart specifies the work to be carried out by each person of company during shift hours. False True

Multiple Choice Multiple Answer Question Route Sheet generally contains following information Correct Answer Your Answer Material Specification , Sequence of operation , Skill of Labour Material Specification , Sequence of operation , Skill of Labour

True/False Question Correct Answer

Cellular layout is based on the concept of Group Technology True

Your Answer

True

Multiple Choice Single Answer Question Which varaible is taken along the abscissa or X axis? Correct Answer Your Answer Time Standard deviation

Multiple Choice Multiple Answer Question Which are the advantages of suburban location? Correct Answer Your Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction

Select The Blank Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Condition monitoring Answer Your Answer Condition monitoring

Multiple Choice Multiple Answer Question Expediting function is concerned with following activities Correct Answer Your Answer Progress chasing to identify delays which may hold up production , Communicating possible delays in delivery date commitment to sales department , Devising cures to keep rate of production in line with schedule Recording progress of work , Progress chasing to identify delays which may hold up production , Communicating possible delays in delivery date commitment to sales department

Select The Blank Question Production control work is ________ in case of floor inspection as compared with the centralised inspection. Correct easier Answer Your Answer time consuming

Select The Blank Question The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________. Correct Overtime working Answer Your Answer Overtime working

True/False Question

In case of forward pass computation, the earliest event time of the first event is zero.

Correct Answer Your Answer

True True

Multiple Choice Single Answer Question What is represented by an arrow in a network? Correct Answer Your Answer Activity Activity

True/False Question Correct Answer Your Answer

As a general rule, a site five times the actual plant size is considered minimum for parking, access facilities and future expansion. True True

True/False Question Correct Answer Your Answer

Independent float either affects the float of preceding activities or that of succeeding activities. False False

Multiple Choice Single Answer Question The document raised by PPC which authorises different functions to take action as per instruction is called Correct Work Order Answer Your Answer Work Order Multiple Choice Single Answer Question A good layout makes effective use of space. Utilization of space for a department like Stores can be measured by Correct Proportion of Cubic volume space utilized Answer Your Answer Ratio of area utilised to area available

Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Operation Answer Your Answer Operation

POM assgn Multiple Choice Single Answer Question MRP is based on the concept of inventory demand which is of following type Correct Answer Your Answer Dependent and independent Dependent and independent

Multiple Choice Single Answer Question Main objective of a good plant layout is Correct Answer Your Answer Reduce material handling cost Reduce material handling cost

True/False Question Correct Answer Your Answer

As a general rule, the number of tail event of an activity is more than that of it's head event. False False

Select The Blank Question The ________ is the probability that a good lot will be rejected by the sampling plan. Correct Answer Your Answer Producer's risk Producer's risk

Multiple Choice Multiple Answer Question Which of the following are important considerations concerning activity times? Correct Answer Activity time should be obtained from the person responsible for the completion of an activity , Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resources required to carry out the activity are available. Activity time should be obtained from the person responsible for the completion of an activity , Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resources required to carry out the activity are available.

Your Answer

Select The Blank Question The ________ pertain to the climatic conditions which the component , product or material should withstand. Correct Answer Environmental specifications Your Answer Environmental specifications

Multiple Choice Multiple Answer Question Following are some of the factors considered for evaluation of alternative layouts Correct Answer Flow of Material , Equipment utilization , Ease of supervision

Your Answer

Flow of Material , Ease of supervision , Delivery performance

Multiple Choice Multiple Answer Question Which of the following are assignable cause? Correct Answer Your Answer Large varaitions in hardness of material , Tool wear , Errors in setting Large varaitions in hardness of material , Tool wear , Errors in setting

True/False Question Correct Answer Your Answer

All activities must not be tied up into the network False False

Select The Blank Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________. Correct Answer 0.01 to 10% Your Answer 0.01 to 10%

True/False Question

Correct Answer Your Answer

In case of X bar, if the process is not under control indicated by some points falling outside the control limits, such points outside the control limits are eliminated and new trial control limits for the remaining points are computed. True True

Multiple Choice Single Answe r Question What is the base for considering activity time as single time estimate or three time estimate? Correct Answer Level of uncertainty Your Answer Availability of labour

Select The Blank Question The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Correct Answer Acceptable quality level Your Answer Acceptable quality level

Multiple Choice Single Answer Question What do you mean by lowest possible direct cost required to complete an activity within it's normal time? Correct Answer Normal cost Your Answer Normal cost

Select The Blank Question A good maintenance system is not a luxary but a ________. Correct Answer Your Answer Necessity Necessity

Select The Blank Question A ________helps to avoid crowding of jobs at a particular machine by change of route of some of the jobs or by diverting work to other machine. Correct Answer Control board Your Answer Move order

Select The Blank Question The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable. Correct Answer Quality control Your Answer Quality control

Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory

Match The Following Question Emerson Efficiency Plan Craft Work Sampling Gantt Chart

Correct Answer Wage Payment Facilities Planning Machine utilization Production Scheduling

Your Answer Wage Payment Facilities Planning Machine utilization Production Scheduling

Select The Blank Question A ________ is another form of subcontracting. Correct Answer Your Answer Hiring capacity Hiring capacity

Multiple Choice Multiple Answer Question In an organization there may not be a formal PPC department if

Correct Answer Your Answer

Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large

Multiple Choice Multiple Answer Question Which of the following cases can be treated as delay during recording of method study? Correct Answer Operators awaiting instructions from supervisor , Worker waiting for his turn at tools stores , Jobs awaiting at the machines for their turn Your Answer Operators awaiting instructions from supervisor , Worker waiting for his turn at tools stores , Jobs awaiting at the machines for their turn True/False Question Correct Answer Your Answer

Inspection order is must even for simple jobs which can be inspected by shop inspector with the tooling available on shop. False False

Multiple Choice Multiple Answer Question Order preparation process for products manufatured to order requires following documents Correct Answer Sales Order , Work order , Shop order Your Answer Sales Order , Work order , Purchase order

Multiple Choice Single Answer Question Technique of Value Engineering can be effectively employed in design of a product to Correct Answer Your Answer To meet the intended function at lowest cost Reduce lead time

True/False Question Correct Answer Your Answer

Cent percent inspection is often more practical and economical than sampling inspection. False False

Multiple Choice Multiple Answer Question Scale model used for layout analysis have following advantages Correct Answer Your Answer Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown , Models can be shifted easily Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown , Models can be shifted easily

Multiple Choice Single Answer Question Which of the following technique is event oriented ? Correct Answer Project Evaluation & Review Technique

Your Answer

Project Evaluation & Review Technique

Multiple Choice Single Answer Question What is the meaning of " Product features" according to J.M.Juran? Correct Answer Your Answer Quality of design Quality of design

Match The Following Question Crash cost of an activity Normal time of an activity Crash time of activity Normal cost of an activity

Correct Answer Cc Tn Tc Cn

Your Answer Cc Tn Tc Cn

Multiple Choice Multiple Answer Question What are uses of diagrams in method study? Correct Answer Your Answer Study different plant layouts and select the most optimum one , Study the extent of traffic over the different routes of the plant , Identify the extent of backtracking, cross traffic and obstacles encountered during the movement of material. Study different plant layouts and select the most optimum one , Study the extent of traffic over the different routes of the plant , Identify the extent of backtracking, cross traffic and obstacles encountered during the movement of material.

True/False Question Correct Answer Your Answer

A load chart specifies the work to be carried out by each person of company during shift hours. False True

Multiple Choice Multiple Answer Question Route Sheet generally contains following information Correct Answer Your Answer Material Specification , Sequence of operation , Skill of Labour Material Specification , Sequence of operation , Skill of Labour

True/False Question Correct Answer Your Answer

Cellular layout is based on the concept of Group Technology True True

Multiple Choice Single Answer

Question Correct Answer Your Answer

Which varaible is taken along the abscissa or X axis? Time Standard deviation

Multiple Choice Multiple Answer Question Which are the advantages of suburban location? Correct Answer Your Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction

Select The Blank Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Answer Condition monitoring Your Answer Condition monitoring

Multiple Choice Multiple Answer Question Expediting function is concerned with following activities Correct Answer Your Answer Progress chasing to identify delays which may hold up production , Communicating possible delays in delivery date commitment to sales department , Devising cures to keep rate of production in line with schedule Recording progress of work , Progress chasing to identify delays which may hold up production , Communicating possible delays in delivery date commitment to sales department

Select The Blank Question Production control work is ________ in case of floor inspection as compared with the centralised inspection. Correct Answer easier Your Answer time consuming

Select The Blank Question The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________. Correct Answer Overtime working Your Answer Overtime working

True/False Question Correct Answer Your Answer

In case of forward pass computation, the earliest event time of the first event is zero. True True

Multiple Choice Single Answer Question What is represented by an arrow in a network? Correct Answer Your Answer Activity Activity

True/False Question Correct Answer Your Answer

As a general rule, a site five times the actual plant size is considered minimum for parking, access facilities and future expansion. True True

True/False Question Correct Answer Your Answer

Independent float either affects the float of preceding activities or that of succeeding activities. False False

Multiple Choice Single Answer Question The document raised by PPC which authorises different functions to take action as per instruction is called Correct Answer Work Order Your Answer Work Order

Multiple Choice Single Answer Question A good layout makes effective use of space. Utilization of space for a department like Stores can be measured by Correct Answer Proportion of Cubic volume space utilized Your Answer Ratio of area utilised to area available

Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Operation

POM - Aish LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Multiple Choice Single Answer Question What do you mean by the project duration for which the total cost is minimum? Correct Answer Optimum duration Your Answer Optimum duration

Multiple Choice Multiple Answer Question Lack of material planning results in the following Correct Answer Over ordering , under ordering , stockouts Your Answer under ordering , stockouts , Over ordering

Multiple Choice Single Answer Question Which kind of defect can be called as minor defect? Correct Answer Which does not reduce the usability of the product for its intended use Your Answer Which does not reduce the usability of the product for its intended use

Multiple Choice Single Answer Question What does CPA stand for? Correct Answer Critical Path Analysis Your Answer Critical Project Analysis

True/False Question Grouping of machines gives a lot of flexibility in loading and scheduling Correct Answer True Your Answer True

True/False Question Fixed cost is lower in case of continuous production than intermittent production. Correct Answer False Your Answer False

Select The Blank Question Function concerned with fixation of time allowed to qualified worker for a job is called ________. Correct Answer Work Measurement Your Answer Time Measurement

Select The Blank Page 1

POM - Aish Question The design of any layout is governed by large number of factors and the best layout is expected to ________ all these factors. Correct Answer Optimise Your Answer Consider

Multiple Choice Multiple Answer Question Which of the following is not the characteristic of Project Production? Correct Answer Continuous flow of material , Highly mechanised material handling , Virtually zero manufacturing cycle time Your Answer Continuous flow of material , Highly mechanised material handling , Virtually zero manufacturing cycle time

Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Operation

Multiple Choice Multiple Answer Question Which of the following cases can be treated as delay during recording of method study? Correct Answer Operators awaiting instructions from supervisor , Worker waiting for his turn at tools stores , Jobs awaiting at the machines for their turn Your Answer Operators awaiting instructions from supervisor , Worker waiting for his turn at tools stores , Jobs awaiting at the machines for their turn

True/False Question Root cause of most of the breakdowns is failure of the lubrication system. Correct Answer True Your Answer True

Multiple Choice Multiple Answer Question Which of the following are steps to identify the critical path in a small network? Correct Answer Compare the durations of all paths to identify the longest path. , Sum up the durations of activities along each path. , Enumerate all paths in the network and list down activities on each path. Your Answer Compare the durations of all paths to identify the longest path. , Sum up the durations of activities along each path. , Enumerate all paths in the network and list down activities on each path.

Match The Following Page 2

Question Correct Answer Emerson Efficiency Plan Craft

POM - Aish Your Answer Wage Payment Wage Payment

Facilities Planning

Facilities Planning Machine utilization Production Scheduling

Work Sampling Gantt Chart

Machine utilization Production Scheduling

Multiple Choice Multiple Answer Question What are the benefits of overhauling? Correct Answer It increases useful life of an equipment and it's parts , Advance planning allows to attend equipment without disturbing the production programme , Advance planning allows to prepare and keep ready the list of replacement spares Your Answer It increases useful life of an equipment and it's parts , Advance planning allows to attend equipment without disturbing the production programme , Advance planning allows to prepare and keep ready the list of replacement spares

True/False Question The event numbers as far as possible reflect the logical relationships of the activities. Correct Answer True Your Answer True

Multiple Choice Single Answer Question Technique of Value Engineering can be effectively employed in design of a product to Correct Answer To meet the intended function at lowest cost Your Answer To meet the intended function at lowest cost

True/False Question Proper care and storage is not an essential part of a well planned lubrication system. Correct Answer False Your Answer False

Multiple Choice Single Answer Question A good plant layout helps in Correct Answer Reducing handling costs Your Answer Reducing handling costs

Multiple Choice Multiple Answer Page 3

POM - Aish Question Scale model used for layout analysis have following advantages Correct Answer Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown , Models can be shifted easily Your Answer Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown , Models can be shifted easily

Multiple Choice Single Answer Question The ratio of output to input of a production system is commonly known as Correct Answer Productivity Your Answer Productivity

Multiple Choice Multiple Answer Question Which of the following products should be produced by using mass production? Correct Answer Refrigerator , Tyre for automobile , Television Set Your Answer Refrigerator , Tyre for automobile , Television Set

True/False Question Theoretical capacity equals number of normal working hours of that machine. Correct Answer True Your Answer True

True/False Question It is not necessary to know spare time available on the non-critical path to allow a little delay for noncritical activity. Correct Answer False Your Answer False

Select The Blank Question Production Planning is a centralised activity which includes functions such as ________ Correct Answer Scheduling Your Answer Scheduling

True/False Question In case of X bar-R charts,it is ensured that the assignable causes are detected before the tolerances are violated, upper and lower statistical limits are worked out and inserted into a chart. Correct Answer True Your Answer True

Select The Blank Question The ________ is the process of assigning calender dates to Page 4

POM - Aish the various operations of a job. Correct Answer Scheduling Your Answer Scheduling

Select The Blank Question An Ideal OC curve is ________ shaped curve that accpets all the lots with quality equal to or better than AQL . Correct Answer Rectangular Your Answer Rectangular

Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory

Multiple Choice Multiple Answer Question Which of the following cases indicates change in physical characteristic? Correct Answer Turning , Grinding , Drilling Your Answer Turning , Grinding , Drilling

Match The Following Question Correct Answer

Your Answer Mixed Layout Project Layout

Combined Layout Mixed Layout Fixed Position Layout Product Layout Process Layout

Project Layout

Line Layout

Line Layout

Functional Layout Functional Layout

Select The Blank Question Two welknown timing methods are cumulative method and ________. Correct Answer Fly back method Your Answer Continuous method

Multiple Choice Single Answer Question How many types of charts are used for the purpose of method study? Correct Answer Four Your Answer Eight

Page 5

POM - Aish True/False Question Sampling inspection suffice to check the work of line inspectors and stage inspectors. Correct Answer True Your Answer True

Multiple Choice Single Answer Question Where the ignorance towards the degradation of machine leads to? Correct Answer Eventual breakdown Your Answer Eventual breakdown

Multiple Choice Single Answer Question One of the sophisticated operations research techniques used in material planning is Correct Answer Dynamic programming Your Answer Dynamic programming

Multiple Choice Single Answer Question Which of the following policies is advisable in case of low product variety and large volumes? Correct Answer Low Skilled Labour & Special Purpose Machines Your Answer Low Skilled Labour & Special Purpose Machines

True/False Question It pays in the long run to inform the customer regarding expected delays in the deliveries. Correct Answer True Your Answer True

Select The Blank Question The ________ is a set of tools and techniques by which products are made to comply with the specifications at minimum cost to the firm. Correct Answer Quality control system Your Answer Quality control system

Select The Blank Question A ________ is another typical chart which is used to record frequency of movements between work centers. Correct Answer Travel chart Your Answer Frequency chart

True/False Page 6

POM - Aish Question Cent percent inspection does not mean inspection of component for 100% quality characteristics. Correct Answer True Your Answer False

Multiple Choice Multiple Answer Question Route Sheet generally contains following information Correct Answer Material Specification , Sequence of operation , Skill of Labour Your Answer Material Specification , Sequence of operation , Skill of Labour

Select The Blank Question Any incentive scheme must achieve the ________ of the organisation. Correct Answer Objectives Your Answer Tax goals

Multiple Choice Single Answer Question Document raised by Sales department for goods manufactured to stock is called Correct Answer Shipment order Your Answer Stock order

Multiple Choice Single Answer Question What do you understand by the timeframe for the maintenance needs of the equipment? Correct Answer Maintenance inspection schedule Your Answer Maintenance inspection schedule

True/False Question Three time estimates are transformed into expected time before using it into a network. Correct Answer True Your Answer True

Multiple Choice Single Answer Question What do you mean by planned corrective manitenance which provides an opportunity to undertake design modifications in the equipment to eliminate or reduce frequency of breakdowns. Correct Answer Design-out Maintenance Your Answer Design-in Maintenance

Page 7

POM assgn : Mayur True/False Question Correct Answer Your Answer For p-chart, fraction defective units in each sample is calculated by dividing number of defectives by the number of pieces in the sample. True True

Multiple Choice Multiple Answer Question Which of the following possibilities can be explored by using flow process chart? Correct Answer Eliminating the operations or combining the operations with another , Reducing the distance traveled by the workmen or materials , Avoiding the waiting time and thereby reduce production losses Your Answer Reducing the distance traveled by the workmen or materials , Avoiding the waiting time and thereby reduce production losses , Eliminating the operations or combining the operations with another Select The Blank Question Correct Answer Your Answer

The ________ is specified to indicate the maximum permissible variability in the dimensions product or parts. Tolerance Tolerance

Multiple Choice Multiple Answer Question Which of the following can be subtypes of corrective maintenance? Correct Answer Your Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance

Multiple Choice Single Answer Question Technique of Value Engineering can be effectively employed in design of a product to Correct Answer To meet the intended function at lowest cost Your Answer To meet the intended function at lowest cost

Multiple Choice Single Answer Question A good plant layout helps in Correct Answer Your Answer Select The Blank Question Correct Answer Your Answer Reducing handling costs Reducing handling costs

The ________ is the probability that a bad lot will be accepted by the sampling plan. Consumer's risk Consumer's risk

Multiple Choice Single Answer Question Which element of a network represents a task which has got a definite beginning and definite end? Correct Answer Activity Your Answer Activity

Multiple Choice Single Answer Question Inadequate production capacity ultimately leads to Correct Answer Your Answer Poor Customer Service Poor Customer Service

Multiple Choice Multiple Answer Question Which are the advantages of suburban location? Correct Answer Avaialability of adequate land at lower cost , Both labour can be available , Plant expansion is easier restriction for building and construction Avaialability of adequate land at lower cost , Both labour can be available , Plant expansion is easier restriction for building and construction skilled and unskilled due to less or no skilled and unskilled due to less or no

Your Answer

Select The Blank Question Correct Answer Your Answer

The ________ are the definitions of the measurable as well as nonmeasurable characteristics of the product. Specifications Specifications

Multiple Choice Multiple Answer Question Which are the first three steps of Critical Path Analysis technique? Correct Answer Your Answer Activity relationships , Activity identification , Network construction Activity relationships , Activity identification , Network construction

Select The Blank Question Correct Answer Your Answer Select The Blank Question Correct Answer Your Answer

Capacity decisions have a direct influence on performance of production system in respect of ________ Delivery performance Delivery performance

The ________ pertain to the climatic conditions which the component , product or material should withstand. Environmental specifications Environmental specifications

Multiple Choice Single Answer

Question Correct Answer Your Answer

How to calculate activity cost slope? Activity cost slope = ( Crash cost - Normal cost ) / ( Normal time - Crash time ) Activity cost slope = ( Crash cost - Normal cost ) / ( Normal time - Crash time )

Select The Blank Question Correct Answer Your Answer

One detachable ticket is prepared for each ________. Operation Operation

Multiple Choice Single Answer Question Which phase of method study is concerned with analyzing the facts critically, generating alternatives which form the basis for selection and development of improved methods? Correct Answer Critical examination Your Answer Critical examination

True/False Question Correct Answer Your Answer

During set up of X bar-R control chart, control limts should be practically revised from time to time as additional data is accumulated. True True

Multiple Choice Multiple Ans wer Question Operation Layout generally contains following information Correct Answer Your Answer Part Sketch , Standard Time , Jigs and fixtures Part Sketch , Standard Time , Jigs and fixtures

True/False Question Correct Answer Your Answer Select The Blank Question Correct Answer Your Answer

Every network does not necessarily have a critical path. False False

An ________ history card is the record of all repairs, replacements and engineering changes carried out in the equipment during it's period of service. Equipment history card Equipment history card

Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as

Correct Answer Your Answer

Operation Operation

Multiple Choice Single Answer Question Technique which can help an organization to reduce inventory is called Correct Answer Your Answer True/False Question Correct Answer Your Answer MRP MRP

In case of two handed process chart, inspection symbol is used when check by touch or feel is involved. True True

Multiple Choice Multiple Answer Question Components of Production Management include Correct Answer Your Answer Capacity Planning , Job Design , Production Planning Capacity Planning , Job Design , Production Planning

Multiple Choice Multiple Answer Question Which of the following is a part of preparing manufacturing order set as a primary function of dispatching? Correct Answer Operational layouts , Move orders , Pre-filled stores issue orders Your Answer Operational layouts , Move orders , Pre-filled stores issue orders

Multiple Choice Multiple Answer Question Following are some of the Principles of Management advocated by F W Taylor Correct Answer Selection of best worker for each particular task , Division of work between worker and management , Training and development of the workmen Your Answer Selection of best worker for each particular task , Division of work between worker and management , Training and development of the workmen True/False Question The OC curve is based on the assumption that if the lot is large in comparison to the sample, the probabilities of the OC curve will follow a poisson distribution. False False

Correct Answer Your Answer True/False Question Correct Answer

Inspection order is must even for simple jobs which can be inspected by shop inspector with the tooling available on shop. False

Your Answer

False

Multiple Choice Single Answer Question What can be the worst effect due to excessive vibration? Correct Answer Your Answer Breakdown Breakdown

True/False Question Correct Answer Your Answer

Cent percent inspection is often more practical and economical than sampling inspection. False False

Multiple Choice Single Answer Question Which rule is used for numbering of events? Correct Answer Your Answer Select The Blank Question Correct Answer Your Answer Fulkerson's Rule Fulkerson's Rule

The term ________ emplies the foregone profit due to inability of company to produce. Opportunity cost Opportunity cost

Multiple Choice Multiple Answer Question Which of the following causes can be responsible for derailing the production schedule in a factory? Correct Answer Errors in drawings , Delay in receipt of material from vendor , Excessive absenteeism Your Answer Errors in drawings , Delay in receipt of material from vendor , Excessive absenteeism Multiple Choice Multiple Answer Question Which are the subfactors of community facilities or social infrastructure? Correct Answer Your Answer Accomodation , Educational , Entertainment Accomodation , Educational , Entertainment

Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer True/False Factory

Question Correct Answer Your Answer Select The Blank Question Correct Answer Your Answer Select The Blank Question Correct Answer Your Answer

Only skilled worker can use the fixed limit gauge. False False

The ________ advocates maintenance procedures whereby the condition of the plant is constantly watched through systematic inspection to unearth unhealthy conditions and preventive Preventive Maintenance Preventive Maintenance

Goods after final inspection should accompany ________to enable dispatch department to identify and draw correct reference. Forwarding note Forwarding note

Multiple Choice Single Answer Question The ratio of output to input of a production system is commonly known as Correct Answer Your Answer Productivity Productivity

Multiple Choice Single Answer Question What do you understand by totality of features and characteristics of a product or service that bears on it's ability to satisfy the customer? Correct Answer Quality Your Answer Quality

Multiple Choice Single Answer Question What do you mean by a single event which represents the joint completi on of more than one activities? Correct Answer Merge event Your Answer Merge event

True/False Question Correct Answer Your Answer

All activities lying on the non-critical paths must have total float and free float. False False

Match The Following Question

Correct Answer

Your Answer

Emerson Efficiency Plan Craft Work Sampling Gantt Chart

Wage Payment Facilities Planning Machine utilization Production Scheduling

Wage Payment Facilities Planning Machine utilization Production Scheduling

Select The Blank Question

Correct Answer Your Answer Match The Following Question Subtraction

The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable. Quality control Quality control

Correct Answer Removal of worn-out part from a machine

Your Answer Removal of worn-out part from a machine Chemical reaction Posting a ledger Giving directions or instructions

Change in chemical characteristic Chemical reaction Consumption of effort Information given Posting a ledger Giving directions or instructions

Multiple Choice Single Answer Question Product layout is employed for manufacturing following products Correct Answer Your Answer refrigirators refrigirators

POM assgn : Meena

Multiple Choice Single Answer Question MRP is based on the concept of inventory demand which is of following type Correct Answer Your Answer Dependent and independent Dependent and independent

Multiple Choice Single Answer Question Main objective of a good plant layout is Correct Answer Your Answer Reduce material handling cost Reduce material handling cost

True/False Question Correct Answer Your Answer

As a general rule, the number of tail event of an activity is more than that of it's head event. False False

Select The Blank Question Correct Answer Your Answer

The ________ is the probability that a good lot will be rejected by the sampling plan. Producer's risk Producer's risk

Multiple Choice Multiple Answer Question Which of the following are important considerations concerning activity times? Correct Answer Activity time should be obtained from the person responsible for the completion of an activity , Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resources required to carry out the activity are available. Activity time should be obtained from the person responsible for the completion of an activity , Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resources required to carry out the activity are available.

Your Answer

Select The Blank Question Correct Answer Your Answer

The ________ pertain to the climatic conditions which the component , product or material should withstand. Environmental specifications Environmental specifications

Multiple Choice Multiple Answer Question Following are some of the factors considered for evaluation of alternative layouts Correct Answer Flow of Material , Equipment utilization , Ease of supervision

Your Answer

Flow of Material , Ease of supervision , Delivery performance

Multiple Choice Multiple Answer Question Which of the following are assignable cause? Correct Answer Your Answer Large varaitions in hardness of material , Tool wear , Errors in setting Large varaitions in hardness of material , Tool wear , Errors in setting

True/False Question Correct Answer Your Answer

All activities must not be tied up into the network False False

Select The Blank Question Correct Answer Your Answer

In case of an OC curve, the risk of rejecting a good quality lot may vary between ________. 0.01 to 10% 0.01 to 10%

True/False Question Correct Answer Your Answer

In case of X bar, if the process is not under control indicated by some points falling outside the control limits, such points outside the control limits are eliminated and new trial control limits for the remaining points are computed. True True

Multiple Choice Single Answer Question What is the base for considering activity time as single time estimate or three time estimate? Correct Answer Level of uncertainty Your Answer Availability of labour

Select The Blank Question Correct Answer Your Answer

The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Acceptable quality level Acceptable quality level

Multiple Choice Single Answer Question What do you mean by lowest possible direct cost required to complete an activity within it's normal time? Correct Answer Normal cost Your Answer Normal cost

Select The Blank Question Correct Answer Your Answer

A good maintenance system is not a luxary but a ________. Necessity Necessity

Select The Blank Question Correct Answer Your Answer

A ________helps to avoid crowding of jobs at a particular machine by change of route of some of the jobs or by diverting work to other machine. Control board Move order

Select The Blank Question Correct Answer Your Answer

The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable. Quality control Quality control

Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory

Match The Following Question Emerson Efficiency Plan Craft Work Sampling Gantt Chart

Correct Answer Wage Payment Facilities Planning Machine utilization Production Scheduling

Your Answer Wage Payment Facilities Planning Machine utilization Production Scheduling

Select The Blank Question Correct Answer Your Answer

A ________ is another form of subcontracting. Hiring capacity Hiring capacity

Multiple Choice Multiple Answer Question In an organization there may not be a formal PPC department if

Correct Answer Your Answer

Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large

Multiple Choice Multiple Answer Question Which of the following cases can be treated as delay during recording of method study? Correct Answer Operators awaiting instructions from supervisor , Worker waiting for his turn at tools stores , Jobs awaiting at the machines for their turn Your Answer Operators awaiting instructions from supervisor , Worker waiting for his turn at tools stores , Jobs awaiting at the machines for their turn True/False Question Correct Answer Your Answer

Inspection order is must even for simple jobs which can be inspected by shop inspector with the tooling available on shop. False False

Multiple Choice Multiple Answer Question Order preparation process for products manufatured to order requires following documents Correct Answer Sales Order , Work order , Shop order Your Answer Sales Order , Work order , Purchase order

Multiple Choice Single Answer Question Technique of Value Engineering can be effectively employed in design of a product to Correct Answer To meet the intended function at lowest cost Your Answer Reduce lead time

True/False Question Correct Answer Your Answer

Cent percent inspection is often more practical and economical than sampling inspection. False False

Multiple Choice Multiple Answer Question Scale model used for layout analysis have following advantages Correct Answer Your Answer Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown , Models can be shifted easily Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown , Models can be shifted easily

Multiple Choice Single Answer Question Which of the following technique is event oriented ? Correct Answer Project Evaluation & Review Technique

Your Answer

Project Evaluation & Review Technique

Multiple Choice Single Answer Question What is the meaning of " Product features" according to J.M.Juran? Correct Answer Your Answer Quality of design Quality of design

Match The Following Question Crash cost of an activity Normal time of an activity Crash time of activity Normal cost of an activity

Correct Answer Cc Tn Tc Cn

Your Answer Cc Tn Tc Cn

Multiple Choice Multiple Answer Question What are uses of diagrams in method study? Correct Answer Your Answer Study different plant layouts and select the most optimum one , Study the extent of traffic over the different routes of the plant , Identify the extent of backtracking, cross traffic and obstacles encountered during the movement of material. Study different plant layouts and select the most optimum one , Study the extent of traffic over the different routes of the plant , Identify the extent of backtracking, cross traffic and obstacles encountered during the movement of material.

True/False Question Correct Answer Your Answer

A load chart specifies the work to be carried out by each person of company during shift hours. False True

Multiple Choice Multiple Answer Question Route Sheet generally contains following information Correct Answer Your Answer Material Specification , Sequence of operation , Skill of Labour Material Specification , Sequence of operation , Skill of Labour

True/False Question Correct Answer Your Answer

Cellular layout is based on the concept of Group Technology True True

Multiple Choice Single Answer

Question Correct Answer Your Answer

Which varaible is taken along the abscissa or X axis? Time Standard deviation

Multiple Choice Multiple Answer Question Which are the advantages of suburban location? Correct Answer Your Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction

Select The Blank Question Correct Answer Your Answer

The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Condition monitoring Condition monitoring

Multiple Choice Multiple Answer Question Expediting function is concerned with following activities Correct Answer Progress chasing to identify delays which may hold up production , Communicating possible delays in delivery date commitment to sales department , Devising cures to keep rate of production in line with schedule Recording progress of work , Progress chasing to identify delays which may hold up production , Communicating possible delays in delivery date commitment to sales department

Your Answer

Select The Blank Question Correct Answer Your Answer

Production control work is ________ in case of floor inspection as compared with the centralised inspection. easier time consuming

Select The Blank Question Correct Answer Your Answer

The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________. Overtime working Overtime working

True/False Question Correct Answer Your Answer

In case of forward pass computation, the earliest event time of the first event is zero. True True

Multiple Choice Single Answer Question What is represented by an arrow in a network? Correct Answer Your Answer Activity Activity

True/False Question Correct Answer Your Answer

As a general rule, a site five times the actual plant size is considered minimum for parking, access facilities and future expansion. True True

True/False Question Correct Answer Your Answer

Independent float either affects the float of preceding activities or that of succeeding activities. False False

Multiple Choice Single Answer Question The document raised by PPC which authorises different functions to take action as per instruction is called Correct Answer Work Order Your Answer Work Order

Multiple Choice Single Answer Question A good layout makes effective use of space. Utilization of space for a department like Stores can be measured by Correct Answer Proportion of Cubic volume space utilized Your Answer Ratio of area utilised to area available

Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Operation

POM assgn : GS Kumars

Multiple Choice Single Answer Question MRP is based on the concept of inventory demand which is of following type Correct Answer Your Answer Dependent and independent Dependent and independent

Multiple Choice Single Answer Question Main objective of a good plant layout is Correct Answer Your Answer Reduce material handling cost Reduce material handling cost

True/False Question Correct Answer Your Answer

As a general rule, the number of tail event of an activity is more than that of it's head event. False False

Select The Blank Question Correct Answer Your Answer

The ________ is the probability that a good lot will be rejected by the sampling plan. Producer's risk Producer's risk

Multiple Choice Multiple Answer Question Which of the following are important considerations concerning activity times? Correct Answer Activity time should be obtained from the person responsible for the completion of an activity , Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resources required to carry out the activity are available. Activity time should be obtained from the person responsible for the completion of an activity , Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resources required to carry out the activity are available.

Your Answer

Select The Blank Question Correct Answer Your Answer

The ________ pertain to the climatic conditions which the component , product or material should withstand. Environmental specifications Environmental specifications

Multiple Choice Multiple Answer Question Following are some of the factors considered for evaluation of alternative layouts Correct Answer Flow of Material , Equipment utilization , Ease of supervision

Your Answer

Flow of Material , Ease of supervision , Delivery performance

Multiple Choice Multiple Answer Question Which of the following are assignable cause? Correct Answer Your Answer Large varaitions in hardness of material , Tool wear , Errors in setting Large varaitions in hardness of material , Tool wear , Errors in setting

True/False Question Correct Answer Your Answer

All activities must not be tied up into the network False False

Select The Blank Question Correct Answer Your Answer

In case of an OC curve, the risk of rejecting a good quality lot may vary between ________. 0.01 to 10% 0.01 to 10%

True/False Question Correct Answer Your Answer

In case of X bar, if the process is not under control indicated by some points falling outside the control limits, such points outside the control limits are eliminated and new trial control limits for the remaining points are computed. True True

Multiple Choice Single Answer Question What is the base for considering activity time as single time estimate or three time estimate? Correct Answer Level of uncertainty Your Answer Availability of labour

Select The Blank Question Correct Answer Your Answer

The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Acceptable quali ty level Acceptable quality level

Multiple Choice Single Answer Question What do you mean by lowest possible direct cost required to complete an activity within it's normal time? Correct Answer Normal cost Your Answer Normal cost

Select The Blank Question Correct Answer Your Answer

A good maintenance system is not a luxary but a ________. Necessity Necessity

Select The Blank Question Correct Answer Your Answer

A ________helps to avoid crowding of jobs at a particular machine by change of route of some of the jobs or by diverting work to other machine. Control board Move order

Select The Blank Question Correct Answer Your Answer

The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable. Quality control Quality control

Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory

Match The Following Question Emerson Efficiency Plan Craft Work Sampling Gantt Chart

Correct Answer Wage Payment Facilities Planning Machine utilization Production Scheduling

Your Answer Wage Payment Facilities Planning Machine utilization Production Scheduling

Select The Blank Question Correct Answer Your Answer

A ________ is another form of subcontracting. Hiring capacity Hiring capacity

Multiple Choice Multiple Answer Question In an organization there may not be a formal PPC department if

Correct Answer Your Answer

Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large

Multiple Choice Multiple Answer Question Which of the following cases can be treated as delay during recording of method study? Correct Answer Operators awaiting instructions from supervisor , Worker waiting for his turn at tools stores , Jobs awaiting at the machines for their turn Your Answer Operators awaiting instructions from supervisor , Worker waiting for his turn at tools stores , Jobs awaiting at the machines for their turn True/False Question Correct Answer Your Answer

Inspection order is must even for simple jobs which can be inspected by shop inspector with the tooling available on shop. False False

Multiple Choice Multiple Answer Question Order preparation process for products manufatured to order requires following documents Correct Answer Sales Order , Work order , Shop order Your Answer Sales Order , Work order , Purchase order

Multiple Choice Single Answer Question Technique of Value Engineering can be effectively employed in design of a product to Correct Answer To meet the intended function at lowest cost Your Answer Reduce lead time

True/False Question Correct Answer Your Answer

Cent percent inspection is often more practical and economical than sampling inspection. False False

Multiple Choice Multiple Answer Question Scale model used for layout analysis have following advantages Correct Answer Your Answer Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown , Models can be shifted easily Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown , Models can be shifted easily

Multiple Choice Single Answer Question Which of the following technique is event oriented ? Correct Answer Project Evaluation & Review Technique

Your Answer

Project Evaluation & Review Technique

Multiple Choice Single Answer Question What is the meaning of " Product features" according to J.M.Juran? Correct Answer Your Answer Quality of design Quality of design

Match The Following Question Crash cost of an activity Normal time of an activity Crash time of activity Normal cost of an activity

Correct Answer Cc Tn Tc Cn

Your Answer Cc Tn Tc Cn

Multiple Choice Multiple Answer Question What are uses of diagrams in method study? Correct Answer Your Answer Study different plant layouts and select the most optimum one , Study the extent of traffic over the different routes of the plant , Identify the extent of backtracking, cross traffic and obstacles encountered during the movement of material. Study different plant layouts and select the most optimum one , Study the extent of traffic over the different routes of the plant , Identify the extent of backtracking, cross traffic and obstacles encountered during the movement of material.

True/False Question Correct Answer Your Answer

A load chart specifies the work to be carried out by each person of company during shift hours. False True

Multiple Choice Multiple Answer Question Route Sheet generally contains following information Correct Answer Your Answer Material Specification , Sequence of operation , Skill of Labour Material Specification , Sequence of operation , Skill of Labour

True/False Question Correct Answer Your Answer

Cellular layout is based on the concept of Group Technology True True

Multiple Choice Single Answer

Question Correct Answer Your Answer

Which varaible is taken along the abscissa or X axis? Time Standard deviation

Multiple Choice Multiple Answer Question Which are the advantages of suburban location? Correct Answer Your Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction

Select The Blank Question Correct Answer Your Answer

The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Condition monitoring Condition monitoring

Multiple Choice Multiple Answer Question Expediting function is concerned with following activities Correct Answer Progress chasing to identify delays which may hold up production , Communicating possible delays in delivery date commitment to sales department , Devising cures to keep rate of production in line with schedule Recording progress of work , Progress chasing to identify delays which may hold up production , Communicating possible delays in delivery date commitment to sales department

Your Answer

Select The Blank Question Correct Answer Your Answer

Production control work is ________ in case of floor inspection as compared with the centralised inspection. easier time consuming

Select The Blank Question Correct Answer Your Answer

The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________. Overtime working Overtime working

True/False Question Correct Answer Your Answer

In case of forward pass computation, the earliest event time of the first event is zero. True True

Multiple Choice Single Answer Question What is represented by an arrow in a network? Correct Answer Your Answer Activity Activity

True/False Question Correct Answer Your Answer

As a general rule, a site five times the actual plant size is considered minimum for parking, access facilities and future expansion. True True

True/False Question Correct Answer Your Answer

Independent float either affects the float of preceding activities or that of succeeding activities. False False

Multiple Choice Single Answer Question The document raised by PPC which authorises different functions to take action as per instruction is called Correct Answer Work Order Your Answer Work Order

Multiple Choice Single Answer Question A good layout makes effective use of space. Utilization of space for a department like Stores can be measured by Correct Answer Proportion of Cubic volume space utilized Your Answer Ratio of area utilised to area available

Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Operation

POM assgn Multiple Choice Multiple Answer Question Why graphical method of recording is preferred over the descriptive method during method study? Correct Answer It segregates effective part form ineffective parts , It reduces effort involv ed in writing , Critical examinations easier and more effective Your Answer Critical examinations easier and more effective , It segregates effective part form ineffective parts , It reduces effort involved in writing Multiple Choice Multiple Answer Question Which are the subfactors of community facilities or social infrastructure? Correct Answer Accomodation , Educational , Entertainment Your Answer Accomodation , Educational , Entertainment Select The Blank Question The ________ is the probability that a bad lot will be accepted by the sampling plan. Correct Answer Consumer's risk Your Answer Consumer's risk Multiple Choice Multiple Answer Question Which of the following are examples of consumption of physical effort during recording for method study? Correct Answer Bending , Positioning , Unloading Your Answer Bending , Positioning , Unloading Multiple Choice Single Answer Question How to claculate the producer risk in the OC Curve? Correct Answer Probability that a good lot will be rejected by the sampling Your Answer Probability that a good lot will be rejected by the sampling Select The Blank Question The ________ are the definitions of the measurabl e as well as nonmeasurable characteristics of the product. Correct Answer Specifications Your Answer Specifications Select The Blank Question The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable. Correct Answer Quality control Your Answer Quality control True/False Question Expediting action is necessary if the delays and interruptions are abnormal and hence any subsequent delay is bound to extend the promised delivery date. Correct Answer True Your Answer True Multiple Choice Single Answer Question Process Engineer does not get sufficient time for designing tooling for most economic production run when Correct Answer Delivery time is less Your Answer Delivery time is less Select The Blank Question The ________ includes preventive maintenance activities whose needs are identified through inspection which requires stoppage of machines. Correct Answer Shutdown Maintenance Your Answer Shutdown Maintenance

True/False Question Breakdown of machines, absenteeism of worker does not dislocate the manufacturing activity in process layout Correct Answer True Your Answer True Select The Blank Question The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Correct Answer Acceptable quality level Your Answer Acceptable quality level Multiple Choice Single Answer Question What do you mean by lowest possible direct cost required to complete an activity within it's crashed time? Correct Answer Crash cost Your Answer Crash cost Multiple Choice Multiple Answer Question Which are the first three steps of Critical Path Analysis technique? Correct Answer Activity relationships , Activity identification , Network construction Your Answer Activity relationships , Activity identification , Network construction True/False Question Dust gets mixed with lubricants, forms an abrasive substance and causes pre-mature failure of machinery. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Which of the following can be subtypes of corrective maintenance? Correct Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance Your Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance Select The Blank Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Answer Condition monitoring Your Answer Condition monitoring Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Production Match The Following Question Correct Answer Your Answer Toung Sweet Sweet Eye Crack Crack Nose Burnout Burnout Ear Impact Impact

Select The Blank Question The ________ is a set of tools and techniques by which products are made to comply with the specifications at minimum cost to the firm. Correct Answer Quality control system Your Answer Quality control system Multiple Choice Single Answer Question What is the meaning of " Product features" according to J.M.Juran? Correct Answer Quality of design Your Answer Quality of design Multiple Choice Multiple Answer Question Which of the following method can be used to record the facts during the method study? Correct Answer Micromotion study , Cyclegraph , Chronocyclegraph Your Answer Micromotion study , Photograph , Cyclegraph , Chronocyclegraph True/False Question All activities must not be tied up into the network Correct Answer False Your Answer False Multiple Choice Multiple Answer Question Which of the following are types of sampling plan? Correct Answer Single sampling plan , Double sampling plan , Multiple sampling plan Your Answer Single sampling plan , Double sampling plan , Multiple sampling plan Multiple Choice Multiple Answer Question How many of the following are types of specification? Correct Answer Material specifications , Dimensional specifications , Performance specifications Your Answer Material specifications , Dimensional specifications , Performance specifications Multiple Choice Multiple Answer Question Plant layout facilitates processing of products in most effective manner through the following Correct Answer Shortest possible distance , Shortest processing time , Minimum movement Your Answer Shortest possible distance , Minimum movement Select The Blank Question Work study is also called ________ study Correct Answer Time and Motion Your Answer Time and Motion True/False Question Operation Process Chart provides information on time and distances Correct Answer False Your Answer False Multiple Choice Multiple Answer Question Plant Layout is concerned with optimum arrangement of the following Correct Answer Storage space , Machines , Material Handling Equipment Your Answer Storage space , Machines , Sequence of operation Multiple Choice Single Answer Question Management often fails to realize the importance of efficient layout due to following reason Correct Answer losses resulting from poor layout are not directly shown in the financial statements Your Answer losses resulting from poor layout are not directly shown in the financial statements True/False Question Inspection order is must even for simple jobs which can be inspected by shop inspector with the tooling available on shop.

Correct Answer False Your Answer True True/False Question Feasibility of time schedule requires that an activity be scheduled before any of it's predecessors are scheduled. Correct Answer False Your Answer True Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is call ed Correct Answer Factory Your Answer Factory True/False Question Planned lubrication is said to be the nervous system of the equipment. Correct Answer True Your Answer True Multiple Choice Single Answer Question What is the basic philosophy of statistical process control? Correct Answer Prevention is better than cure Your Answer Prevention is better than cure Multiple Choice Single Answer Question How does the control chart of statistical quality control helps the operating personnel? Correct Answer Identify the presence of an assignable cause before it develops Your Answer Identify the presence of an assignable cause before it develops Multiple Choice Single Answer Question Where does the central line is located in case of p-chart? Correct Answer at p bar Your Answer at p bar Multiple Choice Multiple Answer Question Which of the following may be the objectives of project crashing? Correct Answer To complete the project in the least possible time , To reduce project cost below it's normal cost , To achieve uniformity in requirement of resources Your Answer To complete the project in the least possible time , To reduce project cost below it's normal cost , To achieve uniformity in requirement of resources Select The Blank Question The ________ advocates maintenance procedures whereby the condition of the plant is constantly watched through systematic inspection to unearth unhealthy conditions and preventive Correct Answer Preventive Maintenance Your Answer Preventive Maintenance True/False Question A network should be progression of activities always moving forward. Correct Answer True Your Answer True Multiple Choice Single Answer Question Which is the ideal place to write a description of an activity in a network? Correct Answer Above the arrow Your Answer Above the arrow Select The Blank Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________.

Correct Answer 0.01 to 10% Your Answer 0.01 to 10% True/False Question For p-chart, the central line of fraction defectives is determined by average percentage defectives. Correct Answer True Your Answer True Multiple Choice Single Answer Question Which phase of method study is concerned with analyzing the facts critically, generating alternatives which form the basis for selection and development of improved methods? Correct Answer Critical examination Your Answer Critical examination Multiple Choice Single Answer Question Which of the following policies is advisable in case of low product variety and large volumes? Correct Answer Low Skilled Labour & Special Purpose Machines Your Answer Low Skilled Labour & Special Purpose Machines Multiple Choice Single Answer Question Which kind of inspection is followed in case of product layout? Correct Answer Pilot inspection Your Answer Pilot inspection Match The Following Question Correct Answer Your Answer Emerson Efficiency Plan Wage Payment Wage Payment Craft Facilities Planning Facilities Planning Work Sampling Machine utilization Sampling Inspection Gantt Chart Production Scheduling Production Scheduling

POM assgn : Seema Select The Blank Question The ________ is the process of withdrawing the equipment from the production line, dismantling it unitwise, visualising defects, effecting adjustments, replacing worn-out parts and finally building it up to get desired accuracies. Correct Reconditioning Answer Your Answer Overhauling

Multiple Choice Single Answer Question What do you understand by the measurement of work to establish allowed time for a job for the defined method? Correct Work measurement Answer Your Answer Work measurement

Multiple Choice Single Answer Question The ratio of output to input of a production system is commonly known as Correct Answer Your Answer Productivity Productivity

Multiple Choice Single Answer Question What is the location of lower control limit in the X bar-R control chart? Correct Answer Your Answer 3 standard deviations below central line 2 standard deviations below central line

Match The Following Question Factor Analysis

Correct Answer Method to evaluate layouts

Your Answer Technique for evolving and analysis of layouts Principles of good layout Layout analysis Method to evaluate layouts

Minimization of production delays Objective of good layout Maximum visibility Scale model Principles of good layout Layout analysis

Multiple Choice Single Answer Question What is the name of the document on which details of the process are recorded by the symbols and charting conventions? Correct Chart Answer Your Answer Chart

Multiple Choice Single Answer Question Which kind of inspection is followed in case of process layout?

Correct Answer Your Answer

First off inspection Cent percent inspection

Multiple Choice Multiple Answer Question Which of the following defects can be observed during preventive inspection by using human senses? Correct Deviation from normal sound , Excessive Vibration , Leakage of a gas Answer Your Answer Deviation from normal sound , Excessive Vibration , Leakage of a gas

True/False Question Correct Answer Your Answer

Process Sheets for parts in batch production are not maintained as standard process sheet False True

Select The Blank Question Goods after final inspection should accompany ________to enable dispatch department to identify and draw correct reference. Correct Forwarding note Answer Your Answer Move order Select The Blank Question A set of activities to keep an equipment in the specified condition is called as ________. Correct Answer Your Answer Maintenance Maintenance

Multiple Choice Multiple Answer Question What are the advantages of three dimensional models? Correct Answer Your Answer Overhead facilities can be shown , Can be shifted easily and quickly , Even non-technical person can use it Overhead facilities can be shown , Economical , Can be shifted easily and quickly

Select The Blank Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Condition monitoring Answer Your Answer Preventive maintenance

Multiple Choice Single Answer Question What do you understand by the selection of the job for the method study on the basis of money saving potential of the job? Correct Economic consideration Answer

Your Answer

Economic consideration

Select The Blank Question Capacity decisions have a direct influence on performance of production system in respect of ________ Correct Delivery performance Answer Your Answer Quality

Multiple Choice Multiple Answer Question Which of the following are the objectives of a good maintenance system? Correct Answer Your Answer Elimination of unsafe conditions , Minimisation of wear and tear of machines , Ensuring maximum plant availability Elimination of unsafe conditions , Minimisation of wear and tear of machines , Ensuring maximum plant availability

Match The Following Question First off inspection Critical operation inspection Patrolling inspection Key operation inspection

Correct Answer First piece produced after tool change

Your Answer First piece produced after tool change

After whose no rework is possible Last operation Inspection at the place of actual production Costlier operation Inspection at the place of actual production After whose no rework is possible

True/False Question Correct Answer Your Answer

In case of backward pass computation, the latest event time of a tail event equals to the latest event time of the succeeding ( Head ) event minus duration of the activity converging to the head event.. True True

Multiple Choice Multiple Answer Question Which of the following factors affect the quality control function? Correct Answer Your Answer Quality of workmanship , Production aids , Manufacturing facilities Quality of workmanship , Production aids , Manufacturing facilities

Multiple Choice Multiple Answer Question Which of the following products should be produced by using mass production? Correct Answer Your Answer Refrigerator , Tyre for automobile , Television Set Refrigerator , Tyre for automobile , Television Set

True/False

Question Correct Answer Your Answer

Cent percent inspection does not mean inspection of component for 100% quality characteristics. True True

True/False Question Correct Answer Your Answer

Cellular layout is based on the concept of Group Technology True True

True/False Question Correct Answer Your Answer

A lot declared rejected in sampling inspection should not be inspected 100% in any case. False False

Multiple Choice Single Answer Question Which kind of relationship exists between those activities which can be carried out simultaneously and both activities require definite time to finish? Correct Concurrent activities Answer Your Answer Concurrent activities

True/False Question Correct Answer Your Answer

Recording of movement is not necessary in case of method study in any form. False False

Select The Blank Question The ________ includes preventive maintenance activities whose needs are identified through inspection which requires stoppage of machines. Correct Shutdown Maintenance Answer Your Answer Shutdown Maintenance

Select The Blank Question Production control work is ________ in case of floor inspection as compared with the centralised inspection. Correct easier Answer Your Answer easier

True/False Question

In case of backward pass computation, the latest event time of the burst event equals the smallest of the difference between the latest event time of the head event less

duration of the activity converging on the head event. Correct Answer Your Answer True True

Select The Blank Question The ________ breakdowns usually cost more, partly due to damage done to the adjustment components and partly due to emergency actions. Correct Unexpected Answer Your Answer Unexpected

Multiple Choice Multiple Answer Question Which of the following are examples of addition during recording for method study? Correct Answer Your Answer Brazing , Welding , Riveting Brazing , Welding , Riveting

Multiple Choice Multiple Answer Question Which kind of natural delays and interruptions are considered during estimation of activity time? Correct Shop efficiency , Breakdowns , Absenteeism Answer Your Answer Shop efficiency , Breakdowns , Absenteeism

Multiple Choice Single Answer Question How does the control chart of statistical quality control helps the operating personnel? Correct Answer Your Answer Identify the presence of an assignable cause before it develops Identify the presence of an assignable cause before it develops

True/False Question Correct Answer Your Answer

Inspection Order can be a verbal order True True

Multiple Choice Multiple Answer Question Lack of material planning results in the following Correct Answer Your Answer Over ordering , under ordering , stockouts Over ordering , under ordering , stockouts

Multiple Choice Single Answer Question Inherent Safety' is one of the principle of good layout. In context of layout, this can be achieved by the following

Correct Answer Your Answer

Clear gangway, location of material and material handling system Proper plant location

Multiple Choice Multiple Answer Question What are the benefits of reconditioning? Correct Answer Your Answer Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps to plan requirement of replacement spares Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps to plan requirement of replacement spares

Multiple Choice Multiple Answer Question Which are the general principles underlying probability aspects of project planning? Correct Answer Your Answer Statistically three time estimate of an activity conform to Beta distribution. , Expected time divides the area under the curve into two equal parts. , Expected time of an activity is located at one third of the distance between "m" and mid-range { (a+b)/2 } away from the most likely time. Statistically three time estimate of an activity conform to Beta distribution. , Expected time divides the area under the curve into three equal parts. , Expected time of an activity is located at one third of the distance between "m" and mid-range { (a+b)/2 } away from the most likely time.

Select The Blank Question OC curve of ideal sampling plan suggests that all lots less than 3% defectives have the probability of acceptance of ________. Correct One Answer Your Answer 0.5

True/False Question Correct Answer Your Answer

Grouping of machines gives a lot of flexibility in loading and scheduling True True

Select The Blank Question The ________ is specified to indicate the maximum permissible variability in the dimensions product or parts. Correct Tolerance Answer Your Answer Tolerance Multiple Choice Single Answer Question What is the nature of the sampling plan for critical defects? Correct Answer Your Answer Tight Tight

Multiple Choice Multiple Answer

Question Correct Answer Your Answer

Which are the first three steps of Critical Path Analysis technique? Activity relationships , Activity identification , Network construction Activity relationships , Activity identification , Network construction

Select The Blank Question The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Correct Acceptable quality level Answer Your Answer Lot Tolerance Percentage Defective Multiple Choice Single Answer Question What do you understand by the critical analysis of existing jobs to develop easier and effective method? Correct Method study Answer Your Answer Method study Multiple Choice Multiple Answer Question Which utilities are considered as infrastructural requirements? Correct Answer Your Answer Disposal of waste , Power , Water Power , Labour , Water

True/False Question Correct Answer Your Answer

During set up of X bar-R control chart, control limts should be practically revised from time to time as additional data is accumulated. True False

Multiple Choice Single Answer Question What do you understand by identification of defects in materials, components, machining processes or men to fix responsibility of defectives, thereby preventing or minimising occurance of defectives? Correct Preventive function Answer Your Answer Preventive function

POM assgn : Naresh True/False Question Correct Answer Your Answer Objective of Work Study is to improve Productivity True True

Multiple Choice Single Answer Question What do you mean by the chart on which the major activities and entry points of materials are recorded to have graphic view of operations and inspections involved in the process? Correct Answer Operation process chart Your Answer Flow Process chart

Multiple Choice Multiple Answer Question Which of the following are types of non-destructive testing? Correct Answer Your Answer Visual Testing , Eddy current , Magnetic flow detectors Stress testing , Visual Testing , Magnetic flow detectors

Multiple Choice Single Answer Question What do you mean by the selection of the job for the method study on the basis of manufacturing difficulties? Correct Answer Technical consideration Your Answer True/False Question Correct Answer Your Answer True/False Question Correct Answer Your Answer Manufacturing consideration

After goods have been manufactured, route sheets and operation layouts should not be collected back. False False

Expediting action is necessary if the delays and interruptions are abnormal and hence any subsequent delay is bound to extend the promised delivery date. True True

Multiple Choice Multiple Answer Question Which of the following are important considerations concerning activity times? Correct Answer Activity time should be obtained from the person responsible for the completion of an activity , Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resources required to carry out the activity are available. Your Answer Activity time should be obtained from the person responsible for the completion of an activity , Infinite resources are available to carry out the activity , Activity time may assume that just the normal quantity of resources required to carry out the activity are available. Multiple Choice Multiple Answer

Question Correct Answer Your Answer

Which are the distinguished features of TQM ? Covers all kinds of industries , Gradual removal of interdepartmental barriers , Continuous improvement Covers all kinds of industries , Continuous improvement , Corrective function

Multiple Choice Multiple Answer Question How many of the following are types of specification? Correct Answer Your Answer Select The Blank Question Correct Answer Your Answer Select The Blank Question Correct Answer Your Answer True/False Question Correct Answer Your Answer Match The Following Question Combined Layout Fixed Position Layout Product Layout Process Layout Select The Blank Question Correct Answer Your Answer Material specifications , Dimensional specifications , Performance specifications Cost specifications , Material specifications , Performance specifications

A ________ is another form of subcontracting. Hiring capacity Hiring capacity

A ________helps to avoid crowding of jobs at a particular machine by change of route of some of the jobs or by diverting work to other machine. Control board Control board

Site selection should also take into account topography and soil structure of the land. True True

Correct Answer Mixed Layout Project Layout Line Layout Functional Layout

Your Answer Mixed Layout Project Layout Line Layout Functional Layout

The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________. Overtime working Overtime working

Multiple Choice Single Answer Question Which is the ideal place to write a description of an activity in a network? Correct Answer Your Answer Above the arrow Above the arrow

Select The Blank Question Correct Answer Your Answer

An Ideal OC curve is ________ shaped curve that accpets all the lots with quality equal to or better than AQL . Rectangular Rectangular

Multiple Choice Single Answer Question Which of the following is the most popular technique for Project Production? Correct Answer Your Answer PERT & CPM PERT & CPM

Multiple Choice Single Answer Question What is the purpose of squares used in progress chart? Correct Answer Your Answer Select The Blank Question Correct Answer Your Answer Select The Blank Question Correct Answer Your Answer To record the progress of work for each operation To record the progress of work for each operation

An ________ history card is the record of all repairs, replacements and engineering changes carried out in the equipment during it's period of service. Equipment history card Equipment specification sheet

The ________ includes preventive maintenance activities whose needs are identified through inspection which requires stoppage of machines. Shutdown Maintenance Shutdown Maintenance

Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory

Multiple Choice Single Answer Question What do you understand by the properties which are difficult to measure quantitatively but usually measured by the comarision and then classification into acceptable or unacceptable? Correct Answer Attributes Your Answer Specifications

Multiple Choice Single Answer Question What is the relation between duration of an activity and length of an arrow? Correct Answer Your Answer No relation No relation

True/False Question Correct Answer Your Answer

Independent float either affects the float of preceding activities or that of succeeding activities. False False

Multiple Choice Multiple Answer Question Which of the following activities are used while recording for method study? Correct Answer Your Answer Delay , Operation , Inspection Operation , Inspection , Production

Multiple Choice Single Answer Question What do you mean by lowest possible direct cost required to complete an activity within it's crashed time? Correct Answer Crash cost Your Answer Crash cost

Multiple Choice Multiple Answer Question Which three of the following are causes of continuous upward pattern of Xbar-R control chart? Correct Answer Wear of tool , Abnormal rise in temperature , Accumulation of dirt Your Answer Wear of tool , Abnormal rise in temperature , Accumulation of dirt

Multiple Choice Single Answer Question How is the probability of acceptance in case of Acceptable Quality Level (AQL )? Correct Answer Very high Your Answer Very high

Multiple Choice Multiple Answer Question Which of the following factors related to the labour and wages are considered while deciding the plant location? Correct Answer Prevailing wage pattern , Productivity of labour , Industrial relations Your Answer Prevailing wage pattern , Productivity of labour , Industrial relations

Multiple Choice Single Answer Question Which of the following is the criteria for the percentage defectives in the zone of the indecision? Correct Answer Lots having the percentage defective more than AQL but less than LPTD Your Answer Select The Blank Question Correct Answer Your Answer Select The Blank Question Lots having the percentage defective in AQL is equal to LPTD

Goods after final inspection should accompany ________to enable dispatch department to identify and draw correct reference. Forwarding note Forwarding note

The ________ is necessary when the job requires detailed of one or more of

Correct Answer Your Answer True/False Question Correct Answer Your Answer Select The Blank Question Correct Answer Your Answer True/False Question Correct Answer Your Answer

the job characteristics with the help of special equipment which is not available at the producing company. Inspection order Inspection order

Quality can not be inspected into a product, it must be manufactured into it by the supplier. True False

The ________ is the probability that a good lot will be rejected by the sampling plan. Producer's risk Producer's risk

A properly designed sampling plan can control sampling errors and completely eliminate them. False True

Multiple Choice Single Answer Question When should operator or supervisor is supposed to sign the perforated route sheet? Correct Answer After completion of operation Your Answer At the start of the operation

Multiple Choice Multiple Answer Question Which of the following are assignable cause? Correct Answer Your Answer Large varaitions in hardness of material , Tool wear , Errors in setting Large varaitions in hardness of material , Tool wear , Errors in setting

Multiple Choice Multiple Answer Question What is indicated by the hugging points lying close to mean of the process in X bar-R- control chart? Correct Answer Biases in measurements , Recording done without actual measurements , Improper selection of samples Your Answer Biases in measurements , Defect in materials , Improper selection of samples Multiple Choice Single Answer Question Which is the alternative way of indicating the load other than numerical way, in case of Gantt chart ? Correct Answer Graphical approach Your Answer True/False Graphical approach

Question Correct Answer Your Answer True/False Question Correct Answer Your Answer

Kanban system is essentially a computer based system for production scheduling and control False True

The earliest start time of an activity equals earliest time for the event from which activity arrow originates. True True

Multiple Choice Multiple Answer Question Which of the following situations demand the technical consideration while selecting a job for method study? Correct Answer Jobs having inconsistent quality , Operations inviting frequent requests from supervisors for relaxation in allowed time because of variations in materials and tool performance , Jobs in which too many man-hours are spend in checking and rechecking work Your Answer Jobs having inconsistent quality , Operations inviting frequent requests from supervisors for relaxation in allowed time because of variations in materials and tool performance , Jobs in which too many man-hours are spend in checking and rechecking work Select The Blank Question Correct Answer Your Answer True/False Question Correct Answer Your Answer Match The Following Question

The ________ is specified to indicate the maximum permissible variability in the dimensions product or parts. Tolerance Drawing

Theoretical capacity equals number of normal working hours of that machine. True True

Correct Answer

Your Answer Chemical reaction Posting a ledger Giving directions or instructions Removal of worn-out part from a machine

Change in chemical characteristic Chemical reaction Consumption of effort Information given Subtraction Posting a ledger Giving directions or instructions Removal of worn-out part from a machine

Multiple Choice Multiple Answer Question Which are the factors on which the structure of the transportation cost depends? Correct Answer Average distance of shipment , Characteristics of the commodity , Medium of shipment

Your Answer

Average distance of shipment , Characteristics of the commodity , Medium of shipment

Select The Blank Question Correct Answer Your Answer

The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable. Quality control Quality control

POM assgn : Raj True/False Question Correct Answer Your Answer Flow process charts do record movements as well as visual pictures. False False

True/False Question Correct Answer Your Answer

The OC curve is based on the assumption that if the lot is large in comparison to the sample, the probabilities of the OC curve will follow a poisson distribution. False True

Multiple Choice Single Answer Question The ratio of output to input of a production system is commonly known as Correct Answer Your Answer Productivity Productivity

Multiple Choice Multiple Answer Question Order preparation process for products manufatured to order requires following documents Correct Sales Order , Work order , Shop order Answer Your Answer Work order , Purchase order

Select The Blank Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Condition monitoring Answer Your Answer Preventive maintenance

Match The Following Question Scheduling of interrelated activities of small projects with consideration of uncertainty of duration of activities. Two machines & processing time depends on sequence of job loading Sufficient orders and resonable choice of machines

Correct Answer Critical Path Analysis

Your Answer Critical Path Analysis

Johnson's Two Machine Algorithm Johnson's Two Machine Algorithm

Index Method

Index Method Time series

Time relationship between when a Critical Ratio Scheduling product is required and when it can be made available

Select The Blank Question Production control work is ________ in case of floor inspection as compared with the centralised inspection. Correct easier Answer Your Answer easier

Match The Following Question When to inspect What to inspect How to inspect How much to inspect

Correct Answer Stages of inspection Specification Inspection devices Sampling or cent percent inspection

Your Answer Specification Standard Tools & Jigs Stages of inspection

Multiple Choice Single Answer Question Material Planning is an integral part of Correct Answer Your Answer Production Planning Process Planning

Select The Blank Question An Ideal OC curve is ________ shaped curve that accpets all the lots with quality equal to or better than AQL . Correct Rectangular Answer Your Answer Rectangular

Multiple Choice Single Answer Question Technique of Value Engineering can be effectively employed in design of a product to Correct Answer Your Answer To meet the intended function at lowest cost Reduce lead time

Multiple Choice Single Answer Question Material control function of PPC is concerned with Correct Answer Your Answer Preparation of material estimates Preparation of material estimates

Multiple Choice Single Answer Question Main objective of a good plant layout is Correct Answer Reduce material handling cost

Your Answer

Reduce material handling cost

True/False Question Correct Answer Your Answer

In case of X bar-R charts, statistical limits are calculated from averages of samples of n (4,5,) instead of single sample of large size to reduce the spread of natural variability. True True

Multiple Choice Multiple Answer Question Which of the following is not the characteristic of Project Production? Correct Answer Your Answer Continuous flow of material , Highly mechanised material handling , Virtually zero manufacturing cycle time Fixed position layout , Virtually zero manufacturing cycle time

Multiple Choice Single Answer Question A good plant layout helps in Correct Answer Your Answer Reducing handling costs Reducing handling costs

Multiple Choice Single Answer Question Inadequate production capacity ultimately leads to Correct Answer Your Answer Poor Customer Service Low Productivity

Select The Blank Question Production Planning is a centralised activity which includes functions such as ________ Correct Answer Your Answer Scheduling Scheduling

Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Factory Answer Your Answer Factory

Multiple Choice Multiple Answer Question What are the uses of the instruction manual provided by the manufacturer of a machine? Correct Answer Your Answer It gives instructions regarding installation and operation of the equipment , It contains note on common troubles with causes and remedies for troubleshooting , It enlists points, frequency and type of lubrication It gives instructions regarding installation and operation of the equipment , It contains note on common troubles with causes and remedies for troubleshooting

Multiple Choice Multiple Answer Question MRP utilises the following information Correct Answer Your Answer Master production schedule , Product structure , Lead time for procurement/manufacturing Master production schedule , Product structure , Lead time for procurement/manufacturing

Select The Blank Question A good maintenance system is not a luxary but a ________. Correct Answer Your Answer Necessity Necessity

True/False Question Correct Answer Your Answer

Shape od an OC curve is a function of sample size and the acceptance number. True False

Multiple Choice Multiple Answer Question Which of the following can be subtypes of corrective maintenance? Correct Answer Your Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance Predictive Maintenance , Shutdown Maintenance

True/False Question Correct Answer Your Answer

For p-chart, "Inspection by variables" is much faster than "Inspection by attributes" False True

Multiple Choice Single Answer Question Site factors for plant location include Correct Answer Your Answer Suitability of land Suitability of land

Select The Blank Question The ________ breakdowns usually cost more, partly due to damage done to the adjustment components and partly due to emergency actions. Correct Unexpected Answer Your Answer Partial

True/False

Question Correct Answer Your Answer

Cent percent inspection is a must if the inspection is of destructive nature. False False

True/False Question Correct Answer Your Answer

Since value of p can never be positive, hence" if LCLp works out to be positive, it is taken as zero." False True

Multiple Choice Single Answer Question Which varaible is taken along the abscissa or X axis? Correct Answer Your Answer Time Standard deviation

Multiple Choice Multiple Answer Question Which of the following are examples of specifications? Correct Answer Your Answer Commercial standards , Assembly and testing instructions , Bill of material Production schedule , Commercial standards , Assembly and testing instructions

Multiple Choice Multiple Answer Question Which of the following products should be produced by using mass production? Correct Answer Your Answer Refrigerator , Tyre for automobile , Television Set Refrigerator , Tyre for automobile , Television Set

Multiple Choice Single Answer Question Which of the following techniques is used by industrial engineering department to obtain the utilisation index? Correct Work Sampling Studies Answer Your Answer Method Study

True/False Question Correct Answer Your Answer

An ideal OC curve is never possible only with cent percent inspection. False False

Select The Blank Question The ________ is the probability that a bad lot will be accepted by the sampling plan.

Correct Answer Your Answer

Consumer's risk Producer's risk

Select The Blank Question The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________. Correct Overtime working Answer Your Answer Overtime working

True/False Question Correct Answer Your Answer

The operator should not stop production if first piece is not approved by the inspector. False False

Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Operation Answer Your Answer Conversion

Multiple Choice Single Answer Question Which kind of relationship exists between those activities which can be carried out simultaneously and both activities require definite time to finish? Correct Concurrent activities Answer Your Answer Concurrent activities

Multiple Choice Multiple Answer Question Which are different ways to show critical path in a network? Correct Answer Your Answer Thick Line , Red Line , Double Line Dotted line

Select The Blank Question A ________helps to avoid crowding of jobs at a particular machine by change of route of some of the jobs or by diverting work to other machine. Correct Control board Answer Your Answer Control board

Multiple Choice Single Answer Question What do you understand by PERT ? Correct Answer Project Evaluation & Review Technique

Your Answer

Project Evaluation & Review Technique

Multiple Choice Multiple Answer Question Which of the following factors play important role while selecting or rejecting a particular site from legislation and taxation point of view? Correct Labour laws , Building codes , Policies regarding issue of licences Answer Your Answer Labour laws , Policies regarding issue of licences

Multiple Choice Multiple Answer Question Which of the following concepts must be understood for the achievement of quality? Correct Answer Your Answer Quality of conformance , Purpose of product , Quality of design Purpose of product , Process specifications , Quality of design

Select The Blank Question The ________ is the probability that a good lot will be rejected by the sampling plan. Correct Answer Your Answer Producer's risk Producer's risk

Multiple Choice Single Answer Question What do you mean by the project duration for which the total cost is minimum? Correct Answer Your Answer Optimum duration Optimum duration

True/False Question Correct Answer Your Answer

Originating process of raw material influence Process Planning True True

POM assgn : Raj Multiple Choice Single Answer Question Which of the following data is unnecessary for scheduling process? Correct Answer Your Answer Cost breakup of products Cost breakup of products

Multiple Choice Single Answer Question Management often fails to realize the importance of efficient layout due to following reason Correct Answer losses resulting from poor layout are not directly shown in the financial statements Your Answer losses resulting from poor layout are not directly shown in the financial statements Multiple Choice Multiple Answer Question Which are the distinguished features of TQM ? Correct Answer Your Answer Covers all kinds of industries , Gradual removal of interdepartmental barriers , Continuous improvement Covers all kinds of industries , Continuous improvement , Corrective function

Multiple Choice Multiple Answer Question Which are major benefits of identifying the critical path? Correct Answer Your Answer It helps to identify the set of activities and events which are critical and as such must be carefully controlled and monitored , It identifies activities to be given preference in allocation of resources. , It helps to exercise "control by exception". It helps to identify the set of activities and events which are critical and as such must be carefully controlled and monitored , It identifies activities to be given preference in allocation of resources. , It helps to exercise "control by exception".

True/False Question Correct Answer Your Answer

Process layout is also called line layout False False

Multiple Choice Single Answer Question Document raised by Sales department for goods manufactured to stock is called Correct Answer Your Answer Shipment order Stock order

Multiple Choice Multiple Answer Question Which of the following factors affect the quality control function? Correct Answer Your Answer Quality of workmanship , Production aids , Manufacturing facilities Quality of workmanship , Production aids , Manufacturing facilities

Multiple Choice Single Answer

Question Correct Answer Your Answer Select The Blank Question Correct Answer Your Answer

Which kind of defect can be called as minor defect? Which does not reduce the usability of the product for its intended use Which does not reduce the usability of the product for its intended u se

A ________helps to avoid crowding of jobs at a particular machine by change of route of some of the jobs or by diverting work to other machine. Control board Control board

Multiple Choice Single Answer Question What do you understand by totality of features and characteristics of a product or service that bears on it's ability to satisfy the customer? Correct Answer Quality Your Answer Select The Blank Question Correct Answer Your Answer Match The Following Question Change in physical characteristic Addition Consumption of physical effort Information received Quality

The ________ is the probability that a good lot will be rejected by the sampling plan. Producer's risk Producer's risk

Correct Answer Punching Assembly Lifting Taking dictation

Your Answer Assembly Posting a ledger Lifting Taking dictation

Multiple Choice Multiple Answer Question Expediting function is concerned with following activities Correct Answer Progress chasing to identify delays which may hold up production , Communicating possible delays in delivery date commitment to sales department , Devising cures to keep rate of production in line with schedule Progress chasing to identify delays which may hold up production , Communicating possible delays in delivery date commitment to sales department , Devising cures to keep rate of production in line with schedule

Your Answer

Multiple Choice Multiple Answer Question Material Requirement Planning is very useful in following situations Correct Answer Long Lead time for procurement , Several levels of assemblies in product , Long manufacturing cycle

Your Answer True/False Question Correct Answer Your Answer True/False Question Correct Answer Your Answer Select The Blank Question Correct Answer Your Answer

Demand for the product is not known , Long Lead time for procurement , Long manufacturing cycle

Specifications is the basic tool of inspection. True True

Shop order is one of the subsidiary order True True

A good maintenance system is not a luxary but a ________. Necessity Necessity

Multiple Choice Multiple Answer Question Route Sheet generally contains following information Correct Answer Your Answer Select The Blank Question Correct Answer Your Answer Select The Blank Question Correct Answer Your Answer True/False Question Correct Answer Your Answer Select The Blank Material Specification , Sequence of operation , Skill of Labour Material Specification , Sequence of operation , Skill of Labour

The ________ includes preventive maintenance activities whose needs are identified through inspection which requires stoppage of machines. Shutdown Maintenance Shutdown Maintenance

An ________ history card is the record of all repairs, replacements and engineering changes carried out in the equipment during it's period of service. Equipment history card Equipment history card

Floor inspection promotes tendency of machines to drift out of limits and produce defectives. False False

Question Correct Answer Your Answer

The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________. Overtime working Overtime working

Multiple Choice Multiple Answer Question Which of the following observations are expected from the preventive maintenance person? Correct Answer Wrong allignments , Overheating defects , Excessive play Your Answer Select The Blank Question Correct Answer Your Answer Wrong allignments , Overheating defects , Excessive play

The ________ is a set of tools and techniques by which products are made to comply with the specifications at minimum cost to the firm. Quality control system Design system

Multiple Choice Multiple Answer Question Which are the first three steps of Critical Path Analysis technique? Correct Answer Your Answer Activity identification , Network construction , Activity relationships Activity relationships , Activity identification , Network construction

Multiple Choice Multiple Answer Question What are the benefits of inspection and quality control? Correct Answer Your Answer Adequate maintenance of quality , Ensures parts are within specified limits of accuracy , Gives economy in production through reduction of defective work Adequate maintenance of quality , Ensures parts are within specified limits of accuracy , Gives economy in production through reduction of defective work

Multiple Choice Multiple Answer Question Gross requirement of finished product is determined on the basis of following Correct Answer Your Answer Forecasted sales , Pending sales order , Management decision to stock Pending sales order , Management decision to stock , Gross Market requirement

Multiple Choice Single Answer Question Where does the SPC exercises the control to prevent the occurances of defectives? Correct Answer Your Answer True/False Question Correct Answer On manufacturing process On manufacturing process

Operation process charts though indicates the sequence of events but do not show movements. True

Your Answer

True

Multiple Choice Single Answer Question What do you mean by planned corrective manitenance which provides an opportunity to undertake design modifications in the equipment to eliminate or reduce frequency of breakdowns. Correct Answer Design-out Maintenance Your Answer Design-in Maintenance

Multiple Choice Single Answer Question Which is the zone beyond LTPD in case of Oc curve of a general plan? Correct Answer Your Answer Select The Blank Question Zone of rejection Zone of rejection

Correct Answer Your Answer

The ________ is the process of withdrawing the equipment from the production line, dismantling it unitwise, visualising defects, effecting adjustments, replacing worn -out parts and finally building it up to get desired accuracies. Reconditioning Reconditioning

Multiple Choice Single Answer Question Which varaible is taken along the ordinate or Y axis? Correct Answer Your Answer Quality Standard deviation

Multiple Choice Multiple Answer Question What are the benefits of overhauling? Correct Answer Your Answer It increases useful life of an equipment and it's parts , Advance planning allows to attend equipment without disturbing the production programme , Advance planning allows to prepare and keep ready the list of replacement spares It increases useful life of an equipment and it's parts , Advance planning allows to attend equipment without disturbing the production programme , It eliminates the chances of breakdown In case of an OC curve, the risk of rejecting a good quality lot may vary between ________. 0.01 to 10% 0.10 to 10%

Select The Blank Question Correct Answer Your Answer

Multiple Choice Single Answer Question In case of Batch Production which kind of labour is expected? Correct Answer Skilled in one specific Manufacturing Process

Your Answer True/False Question Correct Answer Your Answer True/False Question Correct Answer Your Answer

Skilled in one specific Manufacturing Process

Cent percent inspection is a must if the inspection is of destructive nature. False False

Job life is one of the factors that influence Process Planning True True

Multiple Choice Multiple Answer Question Operation Layout generally contains following information Correct Answer Your Answer Part Sketch , Standard Time , Jigs and fixtures Sequence of operations , Standard Time , Jigs and fixtures

Multiple Choice Single Answer Question Plant Layout decisions are considered to be Correct Answer Your Answer True/False Question Correct Answer Your Answer True/False Question Correct Answer Your Answer Match The Following Question Number of defectives chart Range chart Strategic Strategic

In case of X bar-R charts,it is ensured that the assignable causes are detected before the tolerances are violated, upper and lower statistical limits are worked out and inserted into a chart. True True

Labour turnover rate is higher in case of rural area as compared to urban area. False False

Correct Answer np-chart R chart

Your Answer np-chart X chart

Fraction defective chart Defects chart

p-chart c-chart

p-chart c-chart

Select The Blank Question Correct Answer Your Answer

An Ideal OC curve is ________ shaped curve that accpets all the lots with quality equal to or better than AQL . Rectangular Bell

True/False Question Correct Answer Your Answer

Cent percent inspection is required on WIP prior to the key, critical or costly operation. True True

Multiple Choice Single Answer Question Which of the following policies is advisable in case of low product variety and large volumes? Correct Answer Low Skilled Labour & Special Purpose Machines Your Answer Low Skilled Labour & Special Purpose Machines

Select The Blank Question Correct Answer Your Answer

The ________ is specified to indicate the maximum permissible variability in the dimensions product or parts. Tolerance Tolerance

POM assgn : Senthil Multiple Choice Multiple Answer Question Why graphical method of recording is preferred over the descriptive method during method study? Correct Answer It segregates effective part form ineffective parts , It reduces effort in volved in writing , Critical examinations easier and more effective Your Answer Critical examinations easier and more effective , It segregates effective part form ineffective parts , It reduces effort involved in writing Multiple Choice Multiple Answer Question Which are the subfactors of community facilities or social infrastructure? Correct Answer Accomodation , Educational , Entertainment Your Answer Accomodation , Educational , Entertainment Select The Blank Question The ________ is the probability that a bad lot will be accepted by the sampling plan. Correct Answer Consumer's risk Your Answer Consumer's risk Multiple Choice Multiple Answer Question Which of the following are examples of consumption of physical effort during recording for method study? Correct Answer Bending , Positioning , Unloading Your Answer Bending , Positioning , Unloading Multiple Choice Single Answer Question How to claculate the producer risk in the OC Curve? Correct Answer Probability that a good lot will be rejected by the sampling Your Answer Probability that a good lot will be rejected by the sampling Select The Blank Question The ________ are the definitions of the measurable as well as nonmeasurable characteristics of the product. Correct Answer Specifications Your Answer Specifications Select The Blank Question The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable. Correct Answer Quality control Your Answer Quality control True/False Question Expediting action is necessary if the delays and interruptions are abnormal and hence any subsequent delay is bound to extend the promised delivery date. Correct Answer True Your Answer True Multiple Choice Single Answer Question Process Engineer does not get sufficient time for designing tooling for most economic production run when Correct Answer Delivery time is less Your Answer Delivery time is less Select The Blank Question The ________ includes preventive maintenance activities whose needs are identified through inspection which requires stoppage of machines. Correct Answer Shutdown Maintenance Your Answer Shutdown Maintenance

True/False Question Breakdown of machines, absenteeism of worker does not dislocate the manufacturing activity in process layout Correct Answer True Your Answer True Select The Blank Question The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Correct Answer Acceptable quality level Your Answer Acceptable quality level Multiple Choice Single Answer Question What do you mean by lowest possible direct cost required to complete an activity within it's crashed time? Correct Answer Crash cost Your Answer Crash cost Multiple Choice Multiple Answer Question Which are the first three steps of Critical Path Analysis technique? Correct Answer Activity relationships , Activity identification , Network construction Your Answer Activity relationships , Activity identification , Network construction True/False Question Dust gets mixed with lubricants, forms an abrasive substance and causes pre-mature failure of machinery. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Which of the following can be subtypes of corrective maintenance? Correct Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance Your Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance Select The Blank Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Answer Condition monitoring Your Answer Condition monitoring Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Production Match The Following Question Correct Answer Your Answer Toung Sweet Sweet Eye Crack Crack Nose Burnout Burnout Ear Impact Impact

Select The Blank Question The ________ is a set of tools and techniques by which products are made to comply with the specifications at minimum cost to the firm. Correct Answer Quality control system Your Answer Quality control system Multiple Choice Single Answer Question What is the meaning of " Product features" according to J.M.Juran? Correct Answer Quality of design Your Answer Quality of design Multiple Choice Multiple Answer Question Which of the following method can be used to record the facts during the method study? Correct Answer Micromotion study , Cyclegraph , Chronocyclegraph Your Answer Micromotion study , Photograph , Cyclegraph , Chronocyclegraph True/False Question All activities must not be tied up into the network Correct Answer False Your Answer False Multiple Choice Multiple Answer Question Which of the following are types of sampling plan? Correct Answer Single sampling plan , Double sampling plan , Multiple sampling plan Your Answer Single sampling plan , Double sampling plan , Multiple sampling plan Multiple Choice Multiple Answer Question How many of the following are types of specification? Correct Answer Material specifications , Dimensional specifications , Performance specifications Your Answer Material specifications , Dimensional specifications , Performance specifications Multiple Choice Multiple Answer Question Plant layout facilitates processing of products in most effective manner through the following Correct Answer Shortest possible distance , Shortest processing time , Minimum movement Your Answer Shortest possible distance , Minimum movement Select The Blank Question Work study is also called ________ study Correct Answer Time and Motion Your Answer Time and Motion True/False Question Operation Process Chart provides information on time and distances Correct Answer False Your Answer False Multiple Choice Multiple Answer Question Plant Layout is concerned with optimum arrangement of the following Correct Answer Storage space , Machines , Material Handling Equipment Your Answer Storage space , Machines , Sequence of operation Multiple Choice Single Answer Question Management often fails to realize the importance of efficient layout due to following reason Correct Answer losses resulting from poor layout are not directly shown in the financial statements Your Answer losses resulting from poor layout are not directly shown in the financial statements True/False Question Inspection order is must even for simple jobs which can be inspected by shop inspector with the tooling available on shop.

Correct Answer False Your Answer True True/False Question Feasibility of time schedule requires that an activity be scheduled before any of it's predecessors are scheduled. Correct Answer False Your Answer True Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory True/False Question Planned lubrication is said to be the nervous system of the equipment. Correct Answer True Your Answer True Multiple Choice Single Answer Question What is the basic philosophy of statistical process control? Correct Answer Prevention is better than cure Your Answer Prevention is better than cure Multiple Choice Single Answer Question How does the control chart of statistical quality control helps the operating personnel? Correct Answer Identify the presence of an assignable cause before it develops Your Answer Identify the presence of an assignable cause before it develops Multiple Choice Single Answer Question Where does the central line is located in case of p-chart? Correct Answer at p bar Your Answer at p bar Multiple Choice Multiple Answer Question Which of the following may be the objectives of project crashing? Correct Answer To complete the project in the least possible time , To reduce project cost below it's normal cost , To achieve uniformity in requirement of resources Your Answer To complete the project in the least possible time , To reduce project cost below it's normal cost , To achieve uniformity in requirement of resources Select The Blank Question The ________ advocates maintenance procedures whereby the condition of the plant is constantly watched through systematic inspection to unearth unhealthy conditions and preventive Correct Answer Preventive Maintenance Your Answer Preventive Maintenance True/False Question A network should be progression of activities always moving forward. Correct Answer True Your Answer True Multiple Choice Single Answer Question Which is the ideal place to write a description of an activity in a network? Correct Answer Above the arrow Your Answer Above the arrow Select The Blank Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________.

Correct Answer 0.01 to 10% Your Answer 0.01 to 10% True/False Question For p-chart, the central line of fraction defectives is determined by average percentage defectives. Correct Answer True Your Answer True Multiple Choice Single Answer Question Which phase of method study is concerned with analyzing the facts critically, generating alternatives which form the basis for selection and development of improved methods? Correct Answer Critical examination Your Answer Critical examination Multiple Choice Single Answer Question Which of the following policies is advisable in case of low product variety and large volumes? Correct Answer Low Skilled Labour & Special Purpose Machines Your Answer Low Skilled Labour & Special Purpose Machines Multiple Choice Single Answer Question Which kind of inspection is followed in case of product layout? Correct Answer Pilot inspection Your Answer Pilot inspection Match The Following Question Correct Answer Your Answer Emerson Efficiency Plan Wage Payment Wage Payment Craft Facilities Planning Facilities Planning Work Sampling Machine utilization Sampling Inspection Gantt Chart Production Scheduling Production Scheduling

POM assgn : Deepak True/False Question Correct Answer Your Answer Skill of labour force in a product type layout is usually higher than in the process type of layout False False

Multiple Choice Multiple Answer Question Which information is recorded in an equipment card? Correct Answer Your Answer Date of commissioning , Equipment specifications , Name and address of manufacturer Date of commissioning , Equipment specifications , Name and address of manufacturer

True/False Question Correct Answer Your Answer

Suburban location provides the compromise netween rural and urban locations. True True

Multiple Choice Multiple Answer Question Which of the following information is available in summary of part in a chart during methods study? Correct Answer Frequency of each symbol , Total time for each symbol , Total distance travelled by the object Your Answer Frequency of each symbol , Total time for each symbol , Present and proposed method Multiple Choice Multiple Answer Question Which of the following activities can become a part of a preventive maintenance system? Correct Answer Condition monitoring , Planned Lubrication , Preventive inspection Your Answer Planned Lubrication , Overhauling , Preventive inspection

True/False Question Correct Answer Your Answer

In case of two handed process chart, storage symbol is used when either hand is used as grip or vice to hold an object. True False

Select The Blank Question The ________ are the definitions of the measurable as well as nonmeasurable characteristics of the product. Correct Answer Specifications Your Answer Standards

Multiple Choice Single Answer

Question Correct Answer Your Answer

Out of two basic criteria for the selection of a manufacturing method, one is, it must be able to meet the specifications of final product and the other is, it must be Cost effective method Cost effective method

Multiple Choice Single Answer Question The ratio of output to input of a production system is commonly known as Correct Answer Your Answer Productivity Productivity

Multiple Choice Multiple Answer Question Route Sheet generally contains following information Correct Answer Your Answer Material Specification , Sequence of operation , Skill of Labour Material Specification , Sequence of operation , Order Quantity

Select The Blank Question Capacity decisions have a direct influence on performance of production system in respect of ________ Correct Answer Delivery performance Your Answer True/False Question Correct Answer Your Answer True/False Question Correct Answer Your Answer Delivery performance

Activities whose earliest finish times and latest finish times are not equal constitutes the critical path. False False

An ideal OC curve is never possible only with cent percent inspection. False True

Multiple Choice Single Answer Question Which of the following policies is advisable in case of low product variety and large volumes? Correct Answer Low Skilled Labour & Special Purpose Machines Your Answer Semiskilled Labour & General Purpose Machines

Select The Blank Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________. Correct Answer 0.01 to 10%

Your Answer

0.01 to 10%

Select The Blank Question A good maintenance system is not a luxary but a ________. Correct Answer Your Answer True/False Question Correct Answer Your Answer Necessity Necessity

As a general rule, a site five times the actual plant size is considered minimum for parking, access facilities and future expansion. True False

Multiple Choice Single Answer Question A good plant layout helps in Correct Answer Your Answer Reducing handling costs Reducing handling costs

Multiple Choice Multiple Answer Question Which of the following concepts must be understood for the achievement of quality? Correct Answer Your Answer Quality of conformance , Purpose of product , Quality of design Quality of conformance , Purpose of product , Process specifications , Quality of design

Multiple Choice Multiple Answer Question Which of the following industries justify the use of move order? Correct Answer Your Answer Power plant , Steel plant , Heavy machinery manufacturing Power plant , Steel plant , Heavy machinery manufacturing

Multiple Choice Multiple Answer Question Which of the following charts are used for the recording of data during the method study? Correct Answer Operation process chart , Multiple activity chart , Flow process chart Your Answer Single handed process chart , Operation process chart , Flow process chart

Multiple Choice Single Answer Question Inadequate production capacity ultimately leads to Correct Answer Your Answer Poor Customer Service Poor Customer Service

Multiple Choice Single Answer

Question Correct Answer Your Answer

Which document is used for returning the surplus material? Stores Return Note Stores Return Note

Multiple Choice Multiple Answer Question Which kind of natural delays and interruptions are considered during estimation of activity time? Correct Answer Shop efficiency , Breakdowns , Absenteeism Your Answer Breakdowns , Absenteeism , Delay due to shortage of resources

Multiple Choice Single Answer Question Technique of Value Engineering can be effectively employed in design of a product to Correct Answer Your Answer To meet the intended function at lowest cost To meet the intended function at lowest cost

Multiple Choice Multiple Answer Question Components of Production Management include Correct Answer Your Answer Capacity Planning , Job Design , Production Planning Capacity Planning , Production Planning , Manpower Planning

Select The Blank Question The ________ breakdowns usually cost more, partly due to damage done to the adjustment components and partly due to emergency actions. Correct Answer Unexpected Your Answer Unexpected

Select The Blank Question The term ________ emplies the foregone profit due to inability of company to produce. Correct Answer Opportunity cost Your Answer Down time cost

True/False Question Correct Answer Your Answer

Job life is one of the factors that influence Process Planning True False

Multiple Choice Multiple Answer Question Which are the different methods of recording actual progress of work? Correct Answer Display boards , Progress cards , Network updating

Your Answer

Display boards , Job cards , Network updating

Select The Blank Question An ________ history card is the record of all repairs, replacements and engineering changes carried out in the equipment during it's period of service. Correct Answer Equipment history card Your Answer Equipment history card

Multiple Choice Single Answer Question A good layout makes effective use of space. Utilization of space for a department like Stores can be measured by Correct Answer Proportion of Cubic volume space utilized Your Answer Ratio of area utilised to area available

Select The Blank Question A ________ is another form of subcontracting. Correct Answer Your Answer Hiring capacity Open purchase order

Match The Following Question Combined Layout Fixed Position Layout Product Layout Process Layout Correct Answer Mixed Layout Project Layout Line Layout Functional Layout Your Answer Mixed Layout Project Layout Line Layout Functional Layout

Select The Blank Question A ________helps to avoid crowding of jobs at a particular machine by change of route of some of the jobs or by diverting work to other machine. Correct Answer Control board Your Answer Forwarding note

Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory

Multiple Choice Single Answer Question What do you mean by the study of repetitive short cycle operations which involve quick hand / feet motions?

Correct Answer Your Answer

Micromotion study Cycle study

True/False Question Correct Answer Your Answer

The steeper the OC curve, the better is the discrimination between good and bad lots. True True

Multiple Choice Multiple Answer Question Which of the following causes can be responsible for derailing the production schedule in a factory? Correct Answer Errors in drawings , Delay in receipt of material from vendor , Excessive absenteeism Your Answer Delay in receipt of material from vendor , Excessive absenteeism

Multiple Choice Single Answer Question Which is the next stage to the inspection based quality control in the historical development of quality management. Correct Answer Quality assurance Your Answer Quality assurance

Multiple Choice Single Answer Question Which is the most popular scientific tool for project planning? Correct Answer Your Answer True/False Question Correct Answer Your Answer Critical path analysis Critical path analysis

Planned lubrication is said to be the nervous system of the equipment. True True

Multiple Choice Single Answer Question What is the basic philosophy of statistical process control? Correct Answer Your Answer Prevention is better than cure Prevention is better than cure

Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Operation

Multiple Choice Single Answer Question Following is not a function of PPC Correct Answer Your Answer Product Planning Order Processing

Select The Blank Question The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Correct Answer Acceptable quality level Your Answer Acceptable quality level

Match The Following Question Community Facilities Proximity to market Industrial and labour attitude Legislation and taxation

Correct Answer Educational facility Fragile product Productivity of labour Licenses

Your Answer Educational facility Fragile product Productivity of labour Licenses

POM assgn : Deepak Select The Blank Question Correct Answer Your Answer Work study is also called ________ study Time and Motion Time and Motion

Select The Blank Question Correct Answer Your Answer

The ________ includes preventive maintenance activities whose needs are identified through inspection which requires stoppage of machines. Shutdown Maintenance Running Maintenance

Multiple Choice Single Answer Question What is the reason of fluctuations, if the control chart evaluates that the process is not in a state of statistical control? Correct Answer Assignable variability Your Answer Planned variability

Multiple Choice Single Answer Question Which of the following techniques is used by industrial engineering department to obtain the utilisation index? Correct Answer Work Sampling Studies Your Answer Break Even Analysis

Multiple Choice Single Answer Question Process type layout is suitable when Correct Answer Your Answer there is wide variation in processing time of operations Product is required in huge quantity

Multiple Choice Multiple Answer Question What are the advantages of three dimensional models? Correct Answer Your Answer Even non-technical person can use it , Overhead facilities can be shown , Can be shifted easily and quickly Even non-technical person can use it , Overhead facilities can be shown , Economical

Select The Blank Question Correct Answer Your Answer True/False Question

One detachable ticket is prepared for each ________. Operation Operation

Since recording by descriptive method has it's limitations, it is not recommended for use in method study.

Correct Answer Your Answer Match The Following Question Combined Layout Fixed Position Layout Product Layout Process Layout Select The Blank Question Correct Answer Your Answer

True True

Correct Answer Mixed Layout Project Layout Line Layout Functional Layout

Your Answer Mixed Layout Project Layout Line Layout Functional Layout

The ________ pertain to the climatic conditions which the component , product or material should withstand. Environmental specifications Material specifications

Multiple Choice Multiple Answer Question Which of the following situations demand that the human consideration should be given preference over other considerations? Correct Answer Inconsistent earnings where the earnings are tied to output , Poor morale evidenced by petty or trivial complaints , Repeated cases of accidents and health hazards Your Answer Excessive rejections , Poor morale evidenced by petty or trivial complaints , Repeated cases of accidents and health hazards Multiple Choice Multiple Answer Question Which are the different situations in which the process capability studies of the various process are likely to fit? Correct Answer Process variability is just adequate , Good process variability but bad process centering , Good process variability but poor process centering Your Answer Very good process variability but process is off-centre , Good process variability but bad process centering , Good process variability but poor process centering Select The Blank Question Correct Answer Your Answer

A set of activities to keep an equipment in the specified condition is called as ________. Maintenance Maintenance

True/False Question Correct Answer Your Answer

Feasibility of time schedule requires that an activity be scheduled before any of it's predecessors are scheduled. False True

Multiple Choice Single Answer Question How industry has responded to the fact of existence of inherant variability of the manufacturing process? Correct Answer Inclusion of certain tolerance on the basic dimensions in the drawing Your Answer Inclusion of certain tolerance on the basic dimensions in the drawing

Match The Following Question Factor Analysis

Correct Answer Method to evaluate layouts

Your Answer Method to evaluate layouts Principles of good layout Technique for evolving and analysis of layouts Modelling approach to layouts

Minimization of production delays Objective of good layout Maximum visibility Scale model Principles of good layout Layout analysis

Multiple Choice Multiple Answer Question Which of the following are the most suitable cases where we can use CPA as effective technique of scheduling? Correct Answer Overhauling of a CNC machine , Purchase and installation of a newly imported special purpose machine , Design, production and testing of prototype of a fighter aircraft. Your Answer Overhauling of a CNC machine , Purchase and installation of a newly imported special purpose machine , Production of batch of 1000 jobs on two machines True/False Question Correct Answer Your Answer Select The Blank Question Correct Answer Your Answer Select The Blank Question With a general OC curve, probability of acceptance of lots of good quality is never unity. True True

OC curve of ideal sampling plan suggests that all lots less than 3% defectives have the probability of acceptance of ________. One Two

Correct Answer Your Answer

The ________ is necessary when the job requires detailed of one or more of the job characteristics with the help of special equipment which is not available at the producing company. Inspection order Job card

Select The Blank Question

Production Planning is a centralised activity which includes functions such as ________

Correct Answer Your Answer

Scheduling Scheduling

Multiple Choice Multiple Answer Question Which of the following products should be produced by using mass production? Correct Answer Your Answer Refrigerator , Tyre for automobile , Television Set Refrigerator , Tyre for automobile , Television Set

Multiple Choice Single Answer Question Following is not an input information for Process Planning Correct Answer Your Answer True/False Question Correct Answer Your Answer True/False Question Correct Answer Your Answer True/False Question Correct Answer Your Answer Inventory level Standard Time Data

All activities must not be tied up into the network False True

All activities lying on the non-critical paths must have total float and free float. False False

Grouping of machines gives a lot of flexibility in loading and scheduling True True

Multiple Choice Single Answer Question One of the following is not a gross material Correct Answer Your Answer True/False Question Correct Answer Your Answer cotton Timber

Limit gauges are not useful when it is necessary to measure the exact amount of variation. True False

Multiple Choice Single Answer Question What is the relation between duration of an activity and length of an arrow? Correct Answer Your Answer No relation No relation

Multiple Choice Multiple Answer Question Which are different ways to show critical path in a network? Correct Answer Your Answer Thick Line , Red Line , Double Line Thick Line , Dotted line

Multiple Choice Single Answer Question Which manufacturing method is ideal for the use of air gauges as inspection device? Correct Answer Mass Your Answer Process

Multiple Choice Multiple Answer Question Which of the following can be subtypes of corrective maintenance? Correct Answer Your Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance Predictive Maintenance , Design-out Maintenance , Design-in Maintenance

Multiple Choice Multiple Answer Question What are the uses of the instruction manual provided by the manufacturer of a machine? Correct Answer It gives instructions regarding installation and operation of the equipment , It contains note on common troubles with causes and remedies for troubleshooting , It enlists points, frequency and type of lubrication Your Answer It gives instructions regarding installation and operation of the equipment , It contains note on common troubles with causes and remedies for troubleshooting , It enlists points, frequency and type of lubrication Select The Blank Question Correct Answer Your Answer

The ________ is a set of tools and techniques by which products are made to comply with the specifications at minimum cost to the firm. Quality control system Design system

Multiple Choice Single Answer Question Provision of drainage facilities is important for the following type of industry Correct Answer Your Answer Chemical Process Chemical Process

Multiple Choice Multiple Answer

Question Correct Answer Your Answer

Which are three different bases to establish an activity time? Past experience , Judgement , Historical data Actual measurement , Past experience , Historical data

Multiple Choice Single Answer Question Inherent Safety' is one of the principle of good layout. In context of layout, this can be achieved by the following Correct Answer Clear gangway, location of material and material handling system Your Answer Clear gangway, location of material and material handling system

Multiple Choice Multiple Answer Question Which of the following are examples of attributes? Correct Answer Your Answer Cracks , Burrs , Texture Cracks , Hardness , Burrs

True/False Question Correct Answer Your Answer True/False Question Correct Answer Your Answer

Diversified labour is adequately available in rural area as compared to urban area. False True

Fixed cost is lower in case of continuous production than intermittent production. False True

Multiple Choice Multiple Answer Question Why graphical method of recording is preferred over the descriptive method during method study? Correct Answer It segregates effective part form ineffective parts , It reduces effort involved in writing , Critical examinations easier and more effective Your Answer It segregates effective part form ineffective parts , It reduces effort involved in writing , Critical examinations easier and more effective Multiple Choice Single Answer Question Process planning is the process of Correct Answer Your Answer establishing shortest and most economic path of production establishing shortest and most economic path of production

Multiple Choice Multiple Answer Question Which are the different types of flow process charts used for method study? Correct Answer Equipment type , Man type , Material type

Your Answer

Equipment type , Material type , Operator type

True/False Question Correct Answer Your Answer

In case of X bar-R charts, statistical limits are calculated from averages of samples of n (4,5,) instead of single sample of large size to reduce the spread of natural variabilit y. True True

Multiple Choice Single Answer Question How does motion economy prove useful in mass production? Correct Answer Your Answer It improves work bench layout and evolve logical sequence of assembly of parts It improves work bench layout and evolve logical sequence of assembly of parts

Select The Blank Question Correct Answer Your Answer

The ________ is the probability that a bad lot will be accepted by the sampling plan. Consumer's risk Lot Tolerance Percentage Defective

Select The Blank Question Correct Answer Your Answer

Goods after final inspection should accompany ________to enable dispatch department to identify and draw correct reference. Forwarding note Forwarding note

POM assgn : GS Kumars Multiple Choice Multiple Answer Question Why graphical method of recording is preferred over the descriptive method during method study? Correct Answer It segregates effective part form ineffective parts , It reduces effort involved in writing , Critical examinations easier and more effective Your Answer Critical examinations easier and more effective , It segregates effective part form ineffective parts , It reduces effort involved in writing Multiple Choice Multiple Answer Question Which are the subfactors of community facilities or social infrastructure? Correct Answer Accomodation , Educational , Entertainment Your Answer Accomodation , Educational , Entertainment Select The Blank Question The ________ is the probability that a bad lot will be accepted by the sampling plan. Correct Answer Consumer's risk Your Answer Consumer's risk Multiple Choice Multiple Answer Question Which of the following are examples of consumption of physical effort during recording for method study? Correct Answer Bending , Positioning , Unloading Your Answer Bending , Positioning , Unloading Multiple Choice Single Answer Question How to claculate the producer risk in the OC Curve? Correct Answer Probability that a good lot will be rejected by the sampling Your Answer Probability that a good lot will be rejected by the sampling Select The Blank Question The ________ are the definitions of the measurable as well as nonmeasurable characteristics of the product. Correct Answer Specifications Your Answer Specifications Select The Blank Question The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable. Correct Answer Quality control Your Answer Quality control True/False Question Expediting action is necessary if the delays and interruptions are abnormal and hence any subsequent delay is bound to extend the promised delivery date. Correct Answer True Your Answer True Multiple Choice Single Answer Question Process Engineer does not get sufficient time for designing tooli ng for most economic production run when Correct Answer Delivery time is less Your Answer Delivery time is less Select The Blank Question The ________ includes preventive maintenance activities whose needs are identified through inspection which requires stoppage of machines. Correct Answer Shutdown Maintenance Your Answer Shutdown Maintenance

True/False Question Breakdown of machines, absenteeism of worker does not dislocate the manufacturing activity in process layout Correct Answer True Your Answer True Select The Blank Question The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Correct Answer Acceptable quality level Your Answer Acceptable quality level Multiple Choice Single Answer Question What do you mean by lowest possible direct cost required to complete an activity within it's crashed time? Correct Answer Crash cost Your Answer Crash cost Multiple Choice Multiple Answer Question Which are the first three steps of Critical Path Analysis technique? Correct Answer Activity relationships , Activity identification , Network construction Your Answer Activity relationships , Activity identification , Network construction True/False Question Dust gets mixed with lubricants, forms an abrasive substance and causes pre-mature failure of machinery. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Which of the following can be subtypes of corrective maintenance? Correct Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance Your Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance Select The Blank Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Answer Condition monitoring Your Answer Condition monitoring Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Production Match The Following Question Correct Answer Your Answer Toung Sweet Sweet Eye Crack Crack Nose Burnout Burnout Ear Impact Impact

Select The Blank Question The ________ is a set of tools and techniques by which products are made to comply with the specifications at minimum cost to the firm. Correct Answer Quality control system Your Answer Quality control system Multiple Choice Single Answer Question What is the meaning of " Product features" according to J.M.Juran? Correct Answer Quality of design Your Answer Quality of design Multiple Choice Multiple Answer Question Which of the following method can be used to record the facts during the method study? Correct Answer Micromotion study , Cycl egraph , Chronocyclegraph Your Answer Micromotion study , Photograph , Cyclegraph , Chronocyclegraph True/False Question All activities must not be tied up into the network Correct Answer False Your Answer False Multiple Choice Multiple Answer Question Which of the following are types of sampling plan? Correct Answer Single sampling plan , Double sampling plan , Multiple sampling plan Your Answer Single sampling plan , Double sampling plan , Multiple sampling plan Multiple Choice Multiple Answer Question How many of the following are types of specification? Correct Answer Material specifications , Dimensional specifications , Performance specifications Your Answer Material specifications , Dimensional specifications , Performance specifications Multiple Choice Multiple Answer Question Plant layout facilitates processing of products in most effective manner through the following Correct Answer Shortest possible distance , Shortest processing time , Minimum movement Your Answer Shortest possible distance , Minimum movement Select The Blank Question Work study is also called ________ study Correct Answer Time and Motion Your Answer Time and Motion True/False Question Operation Process Chart provides information on time and distances Correct Answer False Your Answer False Multiple Choice Multiple Answer Question Plant Layout is concerned with optimum arrangement of the following Correct Answer Storage space , Machines , Material Handling Equipment Your Answer Storage space , Machines , Sequence of operation Multiple Choice Single Answer Question Management often fails to realize the importance of efficient layout due to following reason Correct Answer losses resulting from poor layout are not directly shown in the financial statements Your Answer losses resulting from poor layout are not directly shown in the financial statements True/False Question Inspection order is must even for simple jobs which can be inspected by shop inspector with the tooling available on shop.

Correct Answer False Your Answer True True/False Question Feasibility of time schedule requires that an activity be scheduled before any of it's predecessors are scheduled. Correct Answer False Your Answer True Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory True/False Question Planned lubrication is said to be the nervous system of the equipment. Correct Answer True Your Answer True Multiple Choice Single Answer Question What is the basic philosophy of statistical process control? Correct Answer Prevention is better than cure Your Answer Prevention is better than cure Multiple Choice Single Answer Question How does the control chart of stati stical quality control helps the operating personnel? Correct Answer Identify the presence of an assignable cause before it develops Your Answer Identify the presence of an assignable cause before it develops Multiple Choice Single Answer Question Where does the central line is located in case of p-chart? Correct Answer at p bar Your Answer at p bar Multiple Choice Multiple Answer Question Which of the following may be the objectives of project crashing? Correct Answer To complete the project in the least possible time , To reduce project cost below it's normal cost , To achieve uniformity in requirement of resources Your Answer To complete the project in the least possible time , To reduce project cost below it's normal cost , To achieve uniformity in requirement of resources Select The Blank Question The ________ advocates maintenance procedures whereby the condition of the plant is constantly watched through systematic inspection to unearth unhealthy conditions and preventive Correct Answer Preventive Maintenance Your Answer Preventive Maintenance True/False Question A network should be progression of activities always moving forward. Correct Answer True Your Answer True Multiple Choice Single Answer Question Which is the ideal place to write a description of an activity in a network? Correct Answer Above the arrow Your Answer Above the arrow Select The Blank Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________.

Correct Answer 0.01 to 10% Your Answer 0.01 to 10% True/False Question For p-chart, the central line of fraction defectives is determined by average percentage defectives. Correct Answer True Your Answer True Multiple Choice Single Answer Question Which phase of method study is concerned with analyzing the facts critically, generating alternatives which form the basis for selection and development of improved methods? Correct Answer Critical examination Your Answer Critical examination Multiple Choice Single Answer Question Which of the following policies is advisable in case of low product variety and large volumes? Correct Answer Low Skilled Labour & Special Purpose Machines Your Answer Low Skilled Labour & Special Purpose Machines Multiple Choice Single Answer Question Which kind of inspection is followed in case of product layout? Correct Answer Pilot inspection Your Answer Pilot inspection Match The Following Question Correct Answer Your Answer Emerson Efficiency Plan Wage Payment Wage Payment Craft Facilities Planning Facilities Planning Work Sampling Machine utilization Sampling Inspection Gantt Chart Production Scheduling Production Scheduling

POM assgn : Raj Multiple Choice Single Answer Question Which phase of method study is concerned with analyzing the facts critically, generating alternatives which form the basis for selection and development of improved methods? Correct Answer Critical examination Your Answer Select The Blank Question Correct Answer Your Answer Select The Blank Question Correct Answer Your Answer True/False Question Correct Answer Your Answer Select The Blank Question Correct Answer Your Answer True/False Question Development and selection

The ________ advocates maintenance procedures whereby the condition of the plant is constantly watched through systematic inspection to unearth unhealthy conditions and preventive Preventive Maintenance Design-in Maintenance

The term ________ emplies the foregone profit due to inability of company to produce. Opportunity cost Down time cost

A network should employ only those dummy activities which are absolutely necessary. True True

A set of activities to keep an equipment in the specified condition is called as ________. Maintenance Maintenance

Correct Answer Your Answer Select The Blank Question Correct Answer Your Answer

While making X bar-R-chart, values of X bar and R are recoded samplewise either on the extreme right of the individual measurements on the data sheet or in a separate sheet. True False

The ________ must ensure that the product satisfy the functional requirements of it's usage. Quality of design Quality of inspection

True/False Question Correct Answer Your Answer

Even if any activity on the critical path is delayed, project completes on the scheduled time. False False

Multiple Choice Single Answer Question Which is the alternative way of indicating the load other than numerical way, in case of Gantt chart ? Correct Answer Graphical approach Your Answer Symbolic pproach

Multiple Choice Multiple Answer Question Which of the following are types of sampling plan? Correct Answer Your Answer Single sampling plan , Double sampling plan , Multiple sampling plan Single sampling plan , Double sampling plan , Multiple sampling plan

Multiple Choice Multiple Answer Question Which of the following are major inputs to scheduling? Correct Answer Your Answer Select The Blank Question Correct Answer Your Answer Select The Blank Question Correct Answer Your Answer True/False Question Correct Answer Your Answer Overlapping of operations , Effective Capacity per work centre , Performance standards Overlapping of operations , Effective Capacity per work centre , Performance standards

The ________ is necessary when the job requires detailed of one or more of the job characteristics with the help of special equipment which is not available at the producing company. Inspection order Stores issue order

The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Condition monitoring Condition monitoring

Diversified labour is adequately available in rural area as compared to urban area. False False

Multiple Choice Multiple Answer Question Which of the following cases indicated that the operation has occurred?

Correct Answer Your Answer

Movement of components to assembly section , Raw material movement , A worker's trip to grinder to sharpen the tool s Movement of components to assembly section , A worker's trip to grinder to sharpen the tools , Tools kept in rack of tool crib

Multiple Choice Single Answer Question What is the reason of fluctuations, if the control chart evaluates that the process is in a state of statistical control? Correct Answer Random variability Your Answer Select The Blank Question Correct Answer Your Answer Set up variability

The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Acceptable quality level Acceptable quality level

Multiple Choice Single Answer Question Product layout is suitable when Correct Answer Your Answer Products have reasonable stable demand Products are not required in large quantities

Multiple Choice Multiple Answer Question Which of the following charts are used for the recording of data during the method study? Correct Answer Operation process chart , Multiple activity chart , Flow process chart Your Answer True/False Question Correct Answer Your Answer Operation process chart , Multiple activity chart , Flow process chart

The operator should not stop production if first piece is not approved by the inspector. False False

Multiple Choice Single Answer Question Need for change in layout can occur due to following reason Correct Answer Your Answer introduction of new product introduction of new product

Multiple Choice Single Answer Question What do you mean by a single event which represents the joint completion of more than one activities? Correct Answer Merge event Your Answer Merge event

True/False Question

Correct Answer Your Answer

The control chart for number of defectives is more convenient to make than control chart for fraction defectives sincethe fugure of number of defectives units can be directly taken from the inspection report. True True

Multiple Choice Single Answer Question Which rule is used for numbering of events? Correct Answer Your Answer True/False Question Correct Answer Your Answer True/False Question Correct Answer Your Answer Fulkerson's Rule Juran's Rule

In case of two handed process chart, the simultaneous activities of both hands are recorded opposite to each other on the chart. True True

All activities lying on the non-critical paths must have total float and free float. False True

Multiple Choice Multiple Answer Question Which of the following is not the characteristic of Project Production? Correct Answer Your Answer Continuous flow of material , Highly mechanised material handling , Virtually zero manufacturing cycle time Continuous flow of material , Highly mechanised material handling , Virtually zero manufacturing cycle time

Multiple Choice Multiple Answer Question Which of the following is not the characteristic of Project Production? Correct Answer Your Answer Select The Blank Question Correct Answer Your Answer Continuous flow of material , Highly mechanised material handling , Virtually zero manufacturing cycle time Fixed position layout

The ________ are the definitions of the measurable as well as nonmeasurable characteristics of the product. Specifications Specifications

Multiple Choice Single Answe r Question How industry has responded to the fact of existence of inherant variability of the manufacturing process?

Correct Answer Your Answer Select The Blank Question Correct Answer Your Answer

Inclusion of certain tolerance on the basic dimensions in the drawing Inclusion of certain tolerance on the basic dimensions in the drawing

Work study is also called ________ study Time and Motion Time and Motion

Multiple Choice Multiple Answer Question Which are the different methods of recording actual progress of work? Correct Answer Your Answer True/False Question Correct Answer Your Answer Display boards , Progress cards , Network updating Job cards , Progress cards , Network updating

In case of backward pass computation, the latest event time of the end event equals to the earliest event time minus duration of that activity. False True

Multiple Choice Multiple Answer Question Which of the following products should be produced by using mass production? Correct Answer Your Answer Refrigerator , Tyre for automobile , Television Set Refrigerator , Tyre for automobile , Television Set

Multiple Choice Multiple Answer Question Which of the following are examples of attributes? Correct Answer Your Answer Match The Following Question Scheduling Device Interruption for machine utilisation Input for scheduling Technique of scheduling Cracks , Burrs , Texture Cracks , Burrs , Texture

Correct Answer Strings Preventive maintenance Overlapping of operations Critical Path Analysis

Your Answer Strings Preventive maintenance Critical Path Analysis JIT

Multiple Choice Multiple Answer Question Which are the three distinct parts of the chart?

Correct Answer Your Answer Match The Following Question Combined Layout Fixed Position Layout Product Layout Process Layout

Summary , Introduction , Body Summary , Introduction , Analysis

Correct Answer Mixed Layout Project Layout Line Layout Functional Layout

Your Answer Mixed Layout Project Layout Line Layout Functional Layout

Multiple Choice Multiple Answer Question Following are the commonly used factors considered for evaluation of layout in factor analysis method Correct Answer Flow of material , Equipment utilization , Working condition Your Answer Flow of material , Equipment utilization , Working condition

Multiple Choice Single Answer Question Fixed position layout is adopted when Correct Answer Your Answer Select The Blank Question Correct Answer Your Answer product is very heavy involving assembly of large number of parts product is very heavy involving assembly of large number of parts

The ________ is the defect level for which lots are regarded as bad lots. Lot Tolerance Percentage Defective Acceptable quality level

Multiple Choice Multiple Answer Question Which of the following are examples of specifications? Correct Answer Your Answer Commercial standards , Assembly and testing instructions , Bill of material Commercial standards , Assembly and testing instructions , Bill of material

Multiple Choice Single Answer Question Process Engineer does not get sufficient time for designing tooling for most economic production run when Correct Answer Delivery time is less Your Answer Delivery time is less

Multiple Choice Single Answer Question What do you mean by the graphical representation of the project which is composed as series of connected arrows and circles to describe the

interrelationship of the activities involved? Correct Answer Your Answer True/False Question Correct Answer Your Answer Network Flow chart

Latest finishing date is the latest event time of the tail event. False True

Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory

Select The Blank Question Correct Answer Your Answer

The ________ is the probability that a bad lot will be accepted by the sampling plan. Consumer's risk Consumer's risk

POM assgn Multiple Choice Multiple Answer Question Why graphical method of recording is preferred over the descriptive method during method study? Correct Answer It segregates effective part form ineffective parts , It reduces effort involv ed in writing , Critical examinations easier and more effective Your Answer Critical examinations easier and more effective , It segregates effective part form ineffective parts , It reduces effort involved in writing Multiple Choice Multiple Answer Question Which are the subfactors of community facilities or social infrastructure? Correct Answer Accomodation , Educational , Entertainment Your Answer Accomodation , Educational , Entertainment Select The Blank Question The ________ is the probability that a bad lot will be accepted by the sampling plan. Correct Answer Consumer's risk Your Answer Consumer's risk Multiple Choice Multiple Answer Question Which of the following are examples of consumption of physical effort during recording for method study? Correct Answer Bending , Positioning , Unloading Your Answer Bending , Positioning , Unloading Multiple Choice Single Answer Question How to claculate the producer risk in the OC Curve? Correct Answer Probability that a good lot will be rejected by the sampling Your Answer Probability that a good lot will be rejected by the sampling Select The Blank Question The ________ are the definitions of the measurabl e as well as nonmeasurable characteristics of the product. Correct Answer Specifications Your Answer Specifications Select The Blank Question The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable. Correct Answer Quality control Your Answer Quality control True/False Question Expediting action is necessary if the delays and interruptions are abnormal and hence any subsequent delay is bound to extend the promised delivery date. Correct Answer True Your Answer True Multiple Choice Single Answer Question Process Engineer does not get sufficient time for designing tooling for most economic production run when Correct Answer Delivery time is less Your Answer Delivery time is less Select The Blank Question The ________ includes preventive maintenance activities whose needs are identified through inspection which requires stoppage of machines. Correct Answer Shutdown Maintenance Your Answer Shutdown Maintenance

True/False Question Breakdown of machines, absenteeism of worker does not dislocate the manufacturing activity in process layout Correct Answer True Your Answer True Select The Blank Question The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Correct Answer Acceptable quality level Your Answer Acceptable quality level Multiple Choice Single Answer Question What do you mean by lowest possible direct cost required to complete an activity within it's crashed time? Correct Answer Crash cost Your Answer Crash cost Multiple Choice Multiple Answer Question Which are the first three steps of Critical Path Analysis technique? Correct Answer Activity relationships , Activity identification , Network construction Your Answer Activity relationships , Activity identification , Network construction True/False Question Dust gets mixed with lubricants, forms an abrasive substance and causes pre-mature failure of machinery. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Which of the following can be subtypes of corrective maintenance? Correct Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance Your Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance Select The Blank Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Answer Condition monitoring Your Answer Condition monitoring Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Production Match The Following Question Correct Answer Your Answer Toung Sweet Sweet Eye Crack Crack Nose Burnout Burnout Ear Impact Impact

Select The Blank Question The ________ is a set of tools and techniques by which products are made to comply with the specifications at minimum cost to the firm. Correct Answer Quality control system Your Answer Quality control system Multiple Choice Single Answer Question What is the meaning of " Product features" according to J.M.Juran? Correct Answer Quality of design Your Answer Quality of design Multiple Choice Multiple Answer Question Which of the following method can be used to record the facts during the method study? Correct Answer Micromotion study , Cyclegraph , Chronocyclegraph Your Answer Micromotion study , Photograph , Cyclegraph , Chronocyclegraph True/False Question All activities must not be tied up into the network Correct Answer False Your Answer False Multiple Choice Multiple Answer Question Which of the following are types of sampling plan? Correct Answer Single sampling plan , Double sampling plan , Multiple sampling plan Your Answer Single sampling plan , Double sampling plan , Multiple sampling plan Multiple Choice Multiple Answer Question How many of the following are types of specification? Correct Answer Material specifications , Dimensional specifications , Performance specifications Your Answer Material specifications , Dimensional specifications , Performance specifications Multiple Choice Multiple Answer Question Plant layout facilitates processing of products in most effective manner through the following Correct Answer Shortest possible distance , Shortest processing time , Minimum movement Your Answer Shortest possible distance , Minimum movement Select The Blank Question Work study is also called ________ study Correct Answer Time and Motion Your Answer Time and Motion True/False Question Operation Process Chart provides information on time and distances Correct Answer False Your Answer False Multiple Choice Multiple Answer Question Plant Layout is concerned with optimum arrangement of the following Correct Answer Storage space , Machines , Material Handling Equipment Your Answer Storage space , Machines , Sequence of operation Multiple Choice Single Answer Question Management often fails to realize the importance of efficient layout due to following reason Correct Answer losses resulting from poor layout are not directly shown in the financial statements Your Answer losses resulting from poor layout are not directly shown in the financial statements True/False Question Inspection order is must even for simple jobs which can be inspected by shop inspector with the tooling available on shop.

Correct Answer False Your Answer True True/False Question Feasibility of time schedule requires that an activity be scheduled before any of it's predecessors are scheduled. Correct Answer False Your Answer True Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is call ed Correct Answer Factory Your Answer Factory True/False Question Planned lubrication is said to be the nervous system of the equipment. Correct Answer True Your Answer True Multiple Choice Single Answer Question What is the basic philosophy of statistical process control? Correct Answer Prevention is better than cure Your Answer Prevention is better than cure Multiple Choice Single Answer Question How does the control chart of statistical quality control helps the operating personnel? Correct Answer Identify the presence of an assignable cause before it develops Your Answer Identify the presence of an assignable cause before it develops Multiple Choice Single Answer Question Where does the central line is located in case of p-chart? Correct Answer at p bar Your Answer at p bar Multiple Choice Multiple Answer Question Which of the following may be the objectives of project crashing? Correct Answer To complete the project in the least possible time , To reduce project cost below it's normal cost , To achieve uniformity in requirement of resources Your Answer To complete the project in the least possible time , To reduce project cost below it's normal cost , To achieve uniformity in requirement of resources Select The Blank Question The ________ advocates maintenance procedures whereby the condition of the plant is constantly watched through systematic inspection to unearth unhealthy conditions and preventive Correct Answer Preventive Maintenance Your Answer Preventive Maintenance True/False Question A network should be progression of activities always moving forward. Correct Answer True Your Answer True Multiple Choice Single Answer Question Which is the ideal place to write a description of an activity in a network? Correct Answer Above the arrow Your Answer Above the arrow Select The Blank Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________.

Correct Answer 0.01 to 10% Your Answer 0.01 to 10% True/False Question For p-chart, the central line of fraction defectives is determined by average percentage defectives. Correct Answer True Your Answer True Multiple Choice Single Answer Question Which phase of method study is concerned with analyzing the facts critically, generating alternatives which form the basis for selection and development of improved methods? Correct Answer Critical examination Your Answer Critical examination Multiple Choice Single Answer Question Which of the following policies is advisable in case of low product variety and large volumes? Correct Answer Low Skilled Labour & Special Purpose Machines Your Answer Low Skilled Labour & Special Purpose Machines Multiple Choice Single Answer Question Which kind of inspection is followed in case of product layout? Correct Answer Pilot inspection Your Answer Pilot inspection Match The Following Question Correct Answer Your Answer Emerson Efficiency Plan Wage Payment Wage Payment Craft Facilities Planning Facilities Planning Work Sampling Machine utilization Sampling Inspection Gantt Chart Production Scheduling Production Scheduling

POM assgn : Rahul Multiple Choice Multiple Answer Question What are the benefits of reconditioning? Correct Answer Your Answer Select The Blank Question Correct Answer Your Answer Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps to plan requirement of replacement spares Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps to plan requirement of replacement spares

Production control work is ________ in case of floor inspection as compared with the centralised inspection. easier time consuming

Multiple Choice Single Answer Question What is the nature of the sampling plan for critical defects? Correct Answer Your Answer Select The Blank Question Correct Answer Your Answer Tight Moderate

Work study is also called ________ study Time and Motion Time and Motion

Multiple Choice Multiple Answer Question Which of the following information is available in summary of part in a chart during methods study? Correct Answer Frequency of each symbol , Total time for each symbol , Total distance travelled by the object Your Answer Frequency of each symbol , Total time for each symbol , Present and proposed method True/False Question Correct Answer Your Answer

Development of a good lubrication programme begins with the identification of lubrication points. True True

Multiple Choice Multiple Answer Question Which of the following are important considerations concerning activity times? Correct Answer Activity time should be obtained from the person responsible for the completion of an activity , Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resources required to carry out the activity are available. Your Answer Activity time should be obtained from the person responsible for the completion of an activity , Infinite resources are available to carry out the

activity , Activity time must be independent of any influence which the preceding or succeeding activity may have on it. Select The Blank Question Correct Answer Your Answer

The ________ includes preventive maintenance activities whose needs are identified through inspection which requires stoppage of machines. Shutdown Maintenance Shutdown Maintenance

True/False Question Correct Answer Your Answer

The operator should not stop production if first piece is not approved by the inspector. False False

True/False Question Correct Answer Your Answer

Sampling inspection suffice to check the work of line inspectors and stage inspectors. True False

True/False Question Correct Answer Your Answer

Feasibility of time schedule requires that an activity be scheduled before any of it's predecessors are scheduled. False True

True/False Question Correct Answer Your Answer

In case of backward pass computation method, the latest event time represents the latest occurrence time of the event. True True

Select The Blank Question Correct Answer Your Answer

Capacity decisions have a direct influence on performance of production system in respect of ________ Delivery performance Quality

Multiple Choice Single Answer Question Which of the following technique is event oriented ? Correct Answer Your Answer Project Evaluation & Review Technique Project Engineering & Resources Technique

Select The Blank Question

Correct Answer Your Answer

An ________ history card is the record of all repairs, replacements and engineering changes carried out in the equipment during it's period of service. Equipment history card Equipment history card

Select The Blank Question Correct Answer Your Answer

The ________ breakdowns usually cost more, partly due to damage done to the adjustment components and partly due to emergency actions. Unexpected Unexpected

Multiple Choice Single Answer Question Which is the ideal place to write a time allotted for an activity in a network? Correct Answer Your Answer Below the arrow Below the arrow

Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory

Multiple Choice Single Answer Question The ratio of output to input of a production system is commonly known as Correct Answer Your Answer Productivity Productivity

Match The Following Question Combined Layout Fixed Position Layout Product Layout Process Layout

Correct Answer Mixed Layout Project Layout Line Layout Functional Layout

Your Answer Mixed Layout Project Layout Line Layout Functional Layout

Select The Blank Question Correct Answer

The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Condition monitoring

Your Answer

Overhauling

Multiple Choice Multiple Answer Question Which of the following factors related to the labour and wages are considered while deciding the plant location? Correct Answer Prevailing wage pattern , Productivity of labour , Industrial relations Your Answer Prevailing wage pattern , Productivity of labour , Industrial relations

Multiple Choice Single Answer Question What do you mean by planned corrective manitenance which provides an opportunity to undertake design modifications in the equipment to eliminate or reduce frequency of breakdowns. Correct Answer Design-out Maintenance Your Answer Design-in Maintenance

True/False Question Correct Answer Your Answer

It pays in the long run to inform the customer regarding expected delays in the deliveries. True True

Select The Blank Question Correct Answer Your Answer

The ________ is a set of tools and techniques by which products are made to comply with the specifications at minimum cost to the firm. Quality control system Quality control system

Multiple Choice Single Answer Question Which kind of labour force is required in case of Jobbing Production? Correct Answer Your Answer Highly Skilled Highly Skilled

Match The Following Question Temperature of motor Exhaust gas Air leakage Corrosion

Correct Answer Body Smell Listen Watch

Your Answer Watch Smell Listen Body

Multiple Choice Single Answer

Question Correct Answer Your Answer

Which is the most popular scientific tool for project planning? Critical path analysis Fishbone diagram

Multiple Choice Single Answer Question One of the sophisticated operations research techniques used in material planning is Correct Answer Dynamic programming Your Answer MAPI method

Select The Blank Question Correct Answer Your Answer

A set of activities to keep an equipment in the specified condition is called as ________. Maintenance Maintenance

True/False Question Correct Answer Your Answer

Cent percent inspection is required on WIP prior to the key, critical or costly operation. True True

Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Manufacturing

Select The Blank Question Correct Answer Your Answer

In case of an OC curve, the risk of rejecting a good quality lot may vary between ________. 0.01 to 10% 0.01 to 10%

Multiple Choice Multiple Answer Question Which of the following can be subtypes of corrective maintenance? Correct Answer Your Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance

Multiple Choice Multiple Answer Question What are uses of diagrams in method study? Correct Answer Study different plant layouts and select the most optimum one , Study the

Your Answer

extent of traffic over the different routes of the plant , Identify the extent of backtracking, cross traffic and obstacles encountered during the movement of material. Study different plant layouts and select the most optimum one , Study the extent of traffic over the different routes of the plant , Identify the extent of backtracking, cross traffic and obstacles encountered during the movement of material.

Multiple Choice Single Answer Question In case of Batch Production which kind of labour is expected? Correct Answer Your Answer Skilled in one specific Manufacturing Process Skilled in one specific Manufacturing Process

Multiple Choice Single Answer Question What do you understand by the inspection conducted on all nonreworkable jobs prior to their movement to the scrap yard? Correct Answer Salvage inspection Your Answer Salvage inspection

True/False Question Correct Answer Your Answer

Cent percent inspection does not mean inspection of component for 100% quality characteristics. True True

Multiple Choice Multiple Answer Question Following are some of the factors considered for evaluation of alternative layouts Correct Answer Flow of Material , Equipment utilization , Ease of supervision Your Answer Flow of Material , Equipment utilization , Delivery performance

True/False Question Correct Answer Your Answer

In a control chart, as a general rule, time interval should be inversely proportional to the average frequency of out of control conditions. False True

Multiple Choice Multiple Answer Question Which of the following situations demand the technical consideration while selecting a job for method study? Correct Answer Jobs having inconsistent quality , Operations inviting frequent requests from supervisors for relaxation in allowed time because of variations in materials and tool performance , Jobs in which too many man-hours are spend in checking and rechecking work Your Answer Excessive overtime , Operations inviting frequent requests from supervisors for relaxation in allowed time because of variations in materials and tool performance , Jobs in which too many man-hours are spend in checking and rechecking work

Multiple Choice Single Answer Question Which kind of relationship exists between those activities which can be carried out simultaneously and both activities require definite time to finish? Correct Answer Concurrent activities Your Answer Concurrent activities

Select The Blank Question Correct Answer Your Answer

An Ideal OC curve is ________ shaped curve that accpets all the lots with quality equal to or better than AQL . Rectangular Oval

Multiple Choice Single Answer Question What is expected from stores department after they receive the stores issue order from dispatcher? Correct Answer Keep material ready for issue to shop when authorized Your Answer Keep material ready for issue to shop when authorized

Multiple Choice Multiple Answer Question Which are the distinct functions of scientific quality control? Correct Answer Your Answer Acceptance function , Preventive function , Assurance function Feedback function , Preventive function , Assurance function

Multiple Choice Multiple Answer Question Which are major benefits of identifying the critical path? Correct Answer It helps to identify the set of activities and events which are critical and as such must be carefully controlled and monitored , It identifies activities to be given preference in allocation of resources. , It helps to exercise "control by exception". It helps to identify the set of activities and events which are critical and as such must be carefully controlled and monitored , It identifies activities to be given preference in allocation of resources. , It helps to exercise "control by exception".

Your Answer

Multiple Choice Multiple Answer Question Material Requirement Planning is very useful in following situations Correct Answer Your Answer Long Lead time for procurement , Several levels of assemblies in product , Long manufacturing cycle Long Lead time for procurement , Several levels of assemblies in product , Demand for the product is not known

LIST OF ATTEMPTED QUESTIONS AND ANSWERS True/False Question

Planned lubrication is said to be the nervous system of the equipment. Correct Answer True Your Answer True

Multiple Choice Multiple Answer Question Features of Cellular layout are Correct Answer It is a type of mixed layout , Uses concept of Group Technology , Facilities are grouped in to cells Your Answer It is a type of mixed layout , Uses concept of Group Technology , Facilities are grouped in to cells Select The Blank Question The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable. Correct Answer Quality control Your Answer Quality control

Multiple Choice Multiple Answer Question What are the advantages of three dimensional models? Correct Answer Even non-technical person can use it , Overhead facilities can be shown , Can be shifted easily and quickly Your Answer Even non-technical person can use it , Overhead facilities can be shown , Can be shifted easily and quickly Multiple Choice Single Answer Question Production Planning includes Correct Answer Predetermination of manufacturing requirements Your Answer Review of progress

Multiple Choice Single Answer Question A good plant layout helps in Correct Answer Reducing handling costs Your Answer Reducing handling costs

Multiple Choice Multiple Answer

Question

Which are the three basic types of control chart by attribute?

Correct Answer p-chart , c-chart , np-chart Your Answer Xbar-R-chart , c-chart , np-chart

Select The Blank Question The term ________ emplies the foregone profit due to inability of company to produce. Correct Answer Opportunity cost Your Answer Opportunity cost

Multiple Choice Multiple Answer Question Which are different ways to show critical path in a network? Correct Answer Thick Line , Red Line , Double Line Your Answer Thick Line , Red Line , Double Line

Multiple Choice Single Answer Question Technique of Value Engineering can be effectively employed in design of a product to Correct Answer To meet the intended function at lowest cost Your Answer To meet the intended function at lowest cost

Multiple Choice Single Answer Question Inadequate production capacity ultimately leads to Correct Answer Poor Customer Service Your Answer Low Productivity

Multiple Choice Single Answer Question What do you understand by the timeframe for the maintenance needs of the equipment? Correct Answer Maintenance inspection schedule Your Answer Material Requirement planning

Multiple Choice Single Answer Question Technique which can help an organization to reduce inventory is called Correct Answer MRP Your Answer MRP

Match The Following Question Scheduling Device Interruption for machine utilisation Input for scheduling Technique of scheduling

Correct Answer Strings Preventive maintenance

Your Answer Critical Path Analysis Overlapping of operations

Overlapping of operations Blackboard Critical Path Analysis JIT

Multiple Choice Multiple Answer Question Plant Layout is concerned with optimum arrangement of the following Correct Answer Storage space , Machines , Material Handling Equipment Your Answer Machines , Material Handling Equipment , Storage space

True/False Question

Independent float either affects the float of preceding activities or that of succeeding activities. Correct Answer False Your Answer True

Multiple Choice Multiple Answer Question Which are the basic requirements of the " Quality of Design "? Correct Answer Identification of right product , Selection of appropriate features , Ensure that product renders satisfactory service to customer Your Answer Identification of right product , Selection of appropriate features , Ensure that product renders satisfactory service to customer Multiple Choice Single Answer Question Material control function of PPC is concerned with Correct Answer Preparation of material estimates Your Answer indenting all required material

Multiple Choice Single Answer Question What do you mean by the verification of object against predetermined standards of quality or quantity or both? Correct Answer Inspection

Your Answer

Inspection

Multiple Choice Multiple Answer Question Which of the following symbols are used in flow process chart but not used in operation process chart? Correct Answer Storage , Delay , Transport Your Answer Delay , Inspection , Transport

Multiple Choice Multiple Answer Question Which are the distinguished features of TQM ? Correct Answer Covers all kinds of industries , Gradual removal of interdepartmental barriers , Continuous improvement Your Answer Covers all kinds of industries , Gradual removal of interdepartmental barriers , Corrective function True/False Question

F W Taylor devised a system for classifying motions into basic divisions called Therbligs Correct Answer False Your Answer True

Multiple Choice Multiple Answer Question Components of Production Management include Correct Answer Capacity Planning , Job Design , Production Planning Your Answer Capacity Planning , Production Planning , Manpower Planning

Multiple Choice Single Answer Question What do you mean by the chart on which the major activities and entry points of materials are recorded to have graphic view of operations and inspections involved in the process? Correct Answer Operation process chart Your Answer Operation process chart

Multiple Choice Single Answer Question Which photographic technique is used to record path of motions of the members of the body during method study? Correct Answer Cyclograph Your Answer Cyclograph

Select The Blank

Question

The ________ must ensure that the product satisfy the functional requirements of it's usage. Correct Answer Quality of design Your Answer Quality of conformance

Select The Blank Question The ________ is the probability that a bad lot will be accepted by the sampling plan. Correct Answer Consumer's risk Your Answer Lot Tolerance Percentage Defective

Select The Blank Question The ________ advocates maintenance procedures whereby the condition of the plant is constantly watched through systematic inspection to unearth unhealthy conditions and preventive Correct Answer Preventive Maintenance Your Answer Design-in Maintenance

True/False Question

In case of forward pass computation, the earliest event time of a plain event equals the earliest event time of the preceding event plus duration of activity emanating from the preceding event. Correct Answer True Your Answer True

Multiple Choice Single Answer Question How to claculate the producer risk in the OC Curve? Correct Answer Probability that a good lot will be rejected by the sampling Your Answer Probability that a bad lot will be accepted by the sampling

True/False Question

An activity can share the same tail event and same head event with any other activity. Correct Answer False Your Answer False

True/False Question

Expediting action is necessary if the delays and interruptions are abnormal and hence any subsequent delay is bound to extend the promised delivery date.

Correct Answer True Your Answer False

Multiple Choice Multiple Answer Question Following are the commonly used factors considered for evaluation of layout in factor analysis method Correct Answer Flow of material , Equipment utilization , Working condition Your Answer Flow of material , Equipment utilization , Working condition

Multiple Choice Multiple Answer Question Which of the following are illustrations of inspection? Correct Answer Physical count of incoming material against the quantity mentioned in delivery challan , A dimensional check with measuring instrument , Visual check of burrs and finish Your Answer A dimensional check with measuring instrument , Visual check of burrs and finish , Check the operator performance True/False Question

Since value of c can never be negativee, hence" if LCLp works out to be negative, it is taken as zero." Correct Answer True Your Answer True

Select The Blank Question One detachable ticket is prepared for each ________. Correct Answer Operation Your Answer Machine

Multiple Choice Single Answer Question How industry has responded to the fact of existence of inherant variability of the manufacturing process? Correct Answer Inclusion of certain tolerance on the basic dimensions in the drawing Your Answer Inclusion of certain tolerance on the basic dimensions in the drawing True/False Question

Job life is one of the factors that influence Process Planning

Correct Answer True Your Answer False

Multiple Choice Multiple Answer Question Which of the following products should be produced by using mass production? Correct Answer Refrigerator , Tyre for automobile , Television Set Your Answer Refrigerator , Tyre for automobile , Television Set

Select The Blank Question A good maintenance system is not a luxary but a ________. Correct Answer Necessity Your Answer Necessity

True/False Question

Process layout is also called line layout

Correct Answer False Your Answer True

Multiple Choice Single Answer Question Which document is used for returning the surplus material? Correct Answer Stores Return Note Your Answer Stores Return Note

Select The Blank Question The ________ pertain to the climatic conditions which the component , product or material should withstand. Correct Answer Environmental specifications Your Answer Environmental specifications

Multiple Choice Multiple Answer Question Which of the following cases can be referred as operation in method study recording? Correct Answer Change in physical characteristic , Consumption of physical effort , Change in chemical characteristic Your Answer Change in physical characteristic , Movement of material , Change in chemical characteristic True/False Question

Breakdown of machines, absenteeism of worker does not dislocate the manufacturing activity in process layout

Correct Answer True Your Answer True

Select The Blank Question A ________helps to avoid crowding of jobs at a particular machine by change of route of some of the jobs or by diverting work to other machine. Correct Answer Control board Your Answer Move order

LIST OF ATTEMPTED QUESTIONS AND ANSWERS True/False Question

Sampling inspection is best suited when cost of inspection is much higher than the loss arising from the acceptance of a defective part. Correct Answer True Your Answer True

Select The Blank Question The ________ advocates maintenance procedures whereby the condition of the plant is constantly watched through systematic inspection to unearth unhealthy conditions and preventive Correct Answer Preventive Maintenance Your Answer Preventive Maintenance

Multiple Choice Single Answer Question Inadequate production capacity ultimately leads to Correct Answer Poor Customer Service Your Answer True/False Question Poor Customer Service

Breakdown is inversly proportional to the investment in W.I.P.

Correct Answer False Your Answer False

Select The Blank Question The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Correct Answer Acceptable quality level Your Answer Acceptable quality level

True/False Question

Inspection Order can be a verbal order

Correct Answer True Your Answer False

Multiple Choice Single Answer Question What do you mean by lowest possible direct cost required to complete an activity within it's normal time? Correct Answer Normal cost Your Answer Normal cost

Multiple Choice Single Answer Question Following is not a function of PPC Correct Answer Product Planning Your Answer Product Planning

Select The Blank Question Work study is also called ________ study Correct Answer Time and Motion Your Answer Time and Motion

Match The Following Question Combined Layout Fixed Position Layout Product Layout Process Layout

Correct Answer Mixed Layout Project Layout Line Layout Functional Layout

Your Answer Mixed Layout Project Layout Line Layout Functional Layout

Select The Blank Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________. Correct Answer 0.01 to 10% Your Answer 0.01 to 10%

True/False Question

Maintenance function must be decentralised apart from a size of a manufacturing organisation for it's better functioning. Correct Answer False Your Answer False

Multiple Choice Multiple Answer Question Which of the following is not the characteristic of Project Production? Correct Answer Continuous flow of material , Highly mechanised material handling , Virtually zero manufacturing cycle time Your Answer Highly mechanised material handling

Select The Blank Question The ________ is a set of tools and techniques by which products are made to comply with the specifications at minimum cost to the firm. Correct Answer Quality control system Your Answer Production system

Multiple Choice Single Answer Question What do you understand by the extent the products manufactured conforms to the laid down design? Correct Answer Quality of conformance Your Answer Quality of conformance

Multiple Choice Multiple Answer Question Which of the following observations are expected from the preventive maintenance person? Correct Answer Wrong allignments , Overheating defects , Excessive play Your Answer Wrong allignments , Overheating defects , Excessive play

Select The Blank Question The ________ are the definitions of the measurable as well as nonmeasurable characteristics of the product. Correct Answer Specifications Your Answer Specifications

Multiple Choice Single Answer Question How industry has responded to the fact of existence of inherant variability of the manufacturing process? Correct Answer Inclusion of certain tolerance on the basic dimensions in the drawing Your Answer Inclusion of certain tolerance on the basic dimensions in the drawing Select The Blank Question The ________ is specified to indicate the maximum permissible

variability in the dimensions product or parts. Correct Answer Tolerance Your Answer Tolerance

Match The Following Question Emerson Efficiency Plan Craft Work Sampling Gantt Chart

Correct Answer Wage Payment Facilities Planning Machine utilization Production Scheduling

Your Answer Wage Payment Facilities Planning Machine utilization Production Scheduling

Select The Blank Question Capacity decisions have a direct influence on performance of production system in respect of ________ Correct Answer Delivery performance Your Answer Delivery performance

Select The Blank Question The ________ is the probability that a bad lot will be accepted by the sampling plan. Correct Answer Consumer's risk Your Answer Consumer's risk

Multiple Choice Multiple Answer Question Which of the following schedules are recommended to prepare and follow as a part of preventive maintenance system? Correct Answer Preventive inspection schedule , Cleaning and upkeep schedule , Lubrication schedule Your Answer Preventive inspection schedule , Cleaning and upkeep schedule , Lubrication schedule Multiple Choice Multiple Answer Question Which are the three distinct parts of the chart? Correct Answer Summary , Introduction , Body Your Answer Summary , Introduction , Analysis

True/False

Question

F W Taylor devised a system for classifying motions into basic divisions called Therbligs Correct Answer False Your Answer False

True/False Question

A properly designed sampling plan can control sampling errors and completely eliminate them. Correct Answer False Your Answer False

True/False Question

Since value of p can never be positive, hence" if LCLp works out to be positive, it is taken as zero." Correct Answer False Your Answer True

Multiple Choice Single Answer Question Which kind of preventive inspection detects some maintenance related characteristics by making use of human senses, when equipment is in operation? Correct Answer Extrernal inspection Your Answer Daily inspection

Multiple Choice Multiple Answer Question Which of the following information is available in summary of part in a chart during methods study? Correct Answer Frequency of each symbol , Total time for each symbol , Total distance travelled by the object Your Answer Frequency of each symbol , Total time for each symbol , Present and proposed method Multiple Choice Single Answer Question Which kind of labour force is required in case of Jobbing Production? Correct Answer Highly Skilled Your Answer Semiskilled

True/False Question

In case of X bar-R charts,it is ensured that the assignable causes are detected before the tolerances are violated, upper and lower statistical limits are worked out and inserted into a chart.

Correct Answer True Your Answer True

Multiple Choice Multiple Answer Question Which are the different methods to record details of the existing method during method study? Correct Answer Charts , Diagrams , Templates or models Your Answer Charts , Diagrams , Templates or models

Multiple Choice Multiple Answer Question Which of the following causes can be responsible for derailing the production schedule in a factory? Correct Answer Errors in drawings , Delay in receipt of material from vendor , Excessive absenteeism Your Answer Errors in drawings , Delay in receipt of material from vendor , Excessive absenteeism Multiple Choice Single Answer Question Technique of Value Engineering can be effectively employed in design of a product to Correct Answer To meet the intended function at lowest cost Your Answer To meet the intended function at lowest cost

Multiple Choice Single Answer Question Product layout is suitable when Correct Answer Products have reasonable stable demand Your Answer Products are not required in large quantities

Multiple Choice Single Answer Question Following is one of the tasks of Production Control Correct Answer Actual issue of forms and documents Your Answer Actual issue of forms and documents

Select The Blank Question A good maintenance system is not a luxary but a ________. Correct Answer Necessity Your Answer Necessity

Multiple Choice Single Answer Question A good plant layout helps in Correct Answer Reducing handling costs Your Answer Reducing handling costs

True/False Question

A lot declared rejected in sampling inspection should not be inspected 100% in any case. Correct Answer False Your Answer False

Multiple Choice Multiple Answer Question Which information is recorded in an equipment card? Correct Answer Date of commissioning , Equipment specifications , Name and address of manufacturer Your Answer Equipment specifications

Multiple Choice Multiple Answer Question Which of the following are illustrations of inspection? Correct Answer Physical count of incoming material against the quantity mentioned in delivery challan , A dimensional check with measuring instrument , Visual check of burrs and finish Your Answer Physical count of incoming material against the quantity mentioned in delivery challan , A dimensional check with measuring instrument , Visual check of burrs and finish Multiple Choice Multiple Answer Question What is the basic minimum requirement for those who are responsible for the quality of design? Correct Answer In depth knowledge about alternative materials and manufacturing processes , access to latest technology and production process adopted by industries in the developed market , Continuous effort in product development Your Answer In depth knowledge about alternative materials and manufacturing processes , access to latest technology and production process adopted by industries in the developed market , Continuous effort in product development Multiple Choice Multiple Answer Question Which of the following cases can be treated as delay during recording of method study? Correct Answer Operators awaiting instructions from supervisor , Worker waiting for his turn at tools stores , Jobs awaiting at the machines for their turn

Your Answer

Operators awaiting instructions from supervisor , Worker waiting for his turn at tools stores , Jobs awaiting at the machines for their turn

True/False Question

Regular lubrication with carefully selected lubricants is an essential factor in the maintenance of high grade machine tools working under continuous load. Correct Answer True Your Answer True

Multiple Choice Single Answer Question Following is not an input information for Process Planning Correct Answer Inventory level Your Answer Drawings

Select The Blank Question OC curve of ideal sampling plan suggests that all lots less than 3% defectives have the probability of acceptance of ________. Correct Answer One Your Answer One

Multiple Choice Single Answer Question Technique which can help an organization to reduce inventory is called Correct Answer MRP Your Answer CPM

LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer True/False Question Factory

Objective of Work Study is to improve Productivity

Correct Answer True Your Answer True/False Question True

The OC curve is based on the assumption that if the lot is large in comparison to the sample, the probabilities of the OC curve will follow a poisson distribution. Correct Answer False Your Answer True

Multiple Choice Multiple Answer Question What are the uses of failure statistics analysis? Correct Answer To forecast the defect , To identify causes of major repetative failures , To quantify the frequency of preventive inspection Your Answer To forecast the defect , To identify causes of major repetative failures , To quantify the frequency of preventive inspection True/False Question

Systematic maintenance system can completely eliminate the wear and tear of machines. Correct Answer False Your Answer False

Select The Blank Question Production control work is ________ in case of floor inspection as compared with the centralised inspection.

Correct Answer easier Your Answer True/False Question time consuming

Originating process of raw material influence Process Planning Correct Answer True Your Answer True

Multiple Choice Single Answer Question What is represented by an arrow in a network? Correct Answer Activity Your Answer Activity

Multiple Choice Single Answer Question What do you mean by the selection of the job for the method study on the basis of manufacturing difficulties? Correct Answer Technical consideration Your Answer Manufacturing consideration

Multiple Choice Single Answer Question Who prepares the daily production report? Correct Answer Shop Supervisor Your Answer True/False Question Shop Supervisor

Fixed cost is lower in case of continuous production than intermittent production. Correct Answer False Your Answer True

Select The Blank Question An ________ history card is the record of all repairs, replacements and engineering changes carried out in the equipment during it's period of service. Correct Answer Equipment history card

Your Answer True/False Question

Equipment history card

Grouping of machines gives a lot of flexibility in loading and scheduling Correct Answer True Your Answer True

Multiple Choice Multiple Answer Question Which are the advantages of suburban location? Correct Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction Your Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction Select The Blank Question The ________ is the probability that a good lot will be rejected by the sampling plan. Correct Answer Producer's risk Your Answer Producer's risk

Multiple Choice Single Answer Question Technique of Value Engineering can be effectively employed in design of a product to Correct Answer To meet the intended function at lowest cost Your Answer To meet the intended function at lowest cost

Multiple Choice Single Answer Question Which kind of preventive inspection detects some maintenance related characteristics by making use of human senses, when equipment is in operation? Correct Answer Extrernal inspection Your Answer Daily inspection

Multiple Choice Multiple Answer Question Route Sheet generally contains following information

Correct Answer Material Specification , Sequence of operation , Skill of Labour Your Answer Material Specification , Sequence of operation , Order Quantity Multiple Choice Single Answer Question Data from Process Sheet can be used to Correct Answer Prepare load and schedule charts Your Answer Prepare load and schedule charts

Multiple Choice Single Answer Question The ratio of output to input of a production system is commonly known as Correct Answer Productivity Your Answer Productivity

Match The Following Question Correct Answer Net requirement of material under MRP Fixation of inventory level Stock on hand Reorder level

Your Answer Stock on hand Reorder level Over ordering Price of material

Symptom of ill planned Over ordering purchasing Factor influencing material planning Lead time

Multiple Choice Multiple Answer Question Which of the following products should be produced by using mass production? Correct Answer Refrigerator , Tyre for automobile , Television Set Your Answer Refrigerator , Tyre for automobile , Television Set

Select The Blank Question The ________ is necessary when the job requires detailed of one or more of the job characteristics with the help of special equipment which is not available at the producing company. Correct Answer Inspection order

Your Answer True/False Question

Job card

Limit gauges are not useful when it is necessary to measure the exact amount of variation. Correct Answer True Your Answer False

Multiple Choice Single Answer Question A good plant layout helps in Correct Answer Reducing handling costs Your Answer Reducing handling costs

Select The Blank Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________. Correct Answer 0.01 to 10% Your Answer 0.10 to 10%

Select The Blank Question The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Correct Answer Acceptable quality level Your Answer Acceptable quality level

Multiple Choice Multiple Answer Question Which of the following is not the characteristic of Project Production? Correct Answer Continuous flow of material , Highly mechanised material handling , Virtually zero manufacturing cycle time Your Answer Continuous flow of material , Virtually zero manufacturing cycle time Select The Blank Question Goods after final inspection should accompany ________to enable dispatch department to identify and draw correct reference. Correct Answer Forwarding note

Your Answer

Move order

Select The Blank Question Production Planning is a centralised activity which includes functions such as ________ Correct Answer Scheduling Your Answer Expediting

Multiple Choice Multiple Answer Question Which of the following are steps to identify the critical path in a small network? Correct Answer Compare the durations of all paths to identify the longest path. , Sum up the durations of activities along each path. , Enumerate all paths in the network and list down activities on each path. Your Answer Compare the durations of all paths to identify the longest path. , Sum up the durations of activities along each path. , Enumerate all paths in the network and list down activities on each path. Select The Blank Question Capacity decisions have a direct influence on performance of production system in respect of ________ Correct Answer Delivery performance Your Answer True/False Question Delivery performance

Floor inspection promotes tendency of machines to drift out of limits and produce defectives. Correct Answer False Your Answer False

True/False Question

Even if any activity on the critical path is delayed, project completes on the scheduled time. Correct Answer False Your Answer False

Multiple Choice Multiple Answer Question Which are different ways to show critical path in a

network? Correct Answer Thick Line , Red Line , Double Line Your Answer Thick Line , Red Line , Double Line

Multiple Choice Single Answer Question Which phase of method study is concerned with analyzing the facts critically, generating alternatives which form the basis for selection and development of improved methods? Correct Answer Critical examination Your Answer True/False Question Development and selection

Operation Process Chart provides information on time and distances Correct Answer False Your Answer False

Multiple Choice Single Answer Question The document which incorporates details of process planning for a job is called Correct Answer Route Sheet Your Answer Route Sheet

Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Manufacturing

Select The Blank Question The ________ are the definitions of the measurable as well as nonmeasurable characteristics of the product. Correct Answer Specifications Your Answer Specifications

Multiple Choice Multiple Answer Question Which of the following method can be adopted to

overcome the problem of rushing up a job for it's timely completion? Correct Answer Use of optimum speeds and feeds , Subcontracting , Job splitting Your Answer Use alternative materials , Subcontracting , Job splitting Multiple Choice Multiple Answer Question What is the basic minimum requirement for those who are responsible for the quality of design? Correct Answer In depth knowledge about alternative materials and manufacturing processes , access to latest technology and production process adopted by industries in the developed market , Continuous effort in product development Your Answer In depth knowledge about alternative materials and manufacturing processes , access to latest technology and production process adopted by industries in the developed market , Continuous effort in product development Multiple Choice Single Answer Question Following is not an input information for Process Planning Correct Answer Inventory level Your Answer Drawings

Multiple Choice Single Answer Question Which kind of inspection is followed in case of product layout? Correct Answer Pilot inspection Your Answer Vendor inspection

Match The Following Question Correct Answer Bottom compartment of Bunch of work orders control board arranged in a sequence in which they are to be processed. Control board Top compartment of control board

Your Answer Bunch of work orders arranged in a sequence in which they are to be processed.

Pictorial view of Pictorial view of machine machine loading activity loading activity Work order of item Work order of item currently being worked currently being worked

on the machine Middle compartment of Work order of item to control board be processed next on the machine

on the machine Work order of item to be processed next on the machine

Select The Blank Question The ________ is the probability that a bad lot will be accepted by the sampling plan. Correct Answer Consumer's risk Your Answer Consumer's risk

Multiple Choice Single Answer Question How to reveal the capability of the sampling plan to discriminate between good lots and bad lots? Correct Answer Operating characteristics curve ( OC ) Your Answer Operating characteristics curve ( OC )

LIST OF ATTEMPTED QUESTIONS AND ANSWERS Select The Blank Question Correct Answer Your Answer An Ideal OC curve is ________ shaped curve that accpets all the lots with quality equal to or better than AQL . Rectangular Rectangular

Multiple Choice Multiple Answer Question How the concept of float is helpful to planners? To decide priorities in allocation of resources , To minimize the requirement of resources , To prevent peaks and valleys in requirement of resources Your Answer To minimize the requirement of resources , To prevent peaks and valleys in requirement of resources , To decide priorities in allocation of resources Multiple Choice Single Answer Question The product layout has following disadvantage Correct Answer Your Answer Layout is not flexible Layout is not flexible Correct Answer

Multiple Choice Single Answer Question What do you understand by the difference between the specification limits within which manufacturing process is expected to produce? Correct Answer Design tolerance Your Answer Design tolerance

Multiple Choice Single Answer Question Which kind of relationship exists between those activities which can be carried out simultaneously and both activities require definite time to finish? Correct Answer Concurrent activities Your Answer True/False Question Correct Answer Your Answer True/False Question Correct Answer Your Answer True/False Question Correct Answer Concurrent activities Complexity and difficulty of Planning is influenced by types of layout True True Dispatching function is not a part of Production Planning True False Sample sizes for the construction of p-chart are typicaly larger that for Xbar-R-charts. True

Your Answer Select The Blank Question Correct Answer Your Answer Select The Blank Question Correct Answer Your Answer

True The ________ must ensure that the product satisfy the functional requirements of it's usage. Quality of design Quality of design The term ________ emplies the foregone profit due to inability of company to produce. Opportunity cost Opportunity cost

Multiple Choice Multiple Answer Question What is indicated by the hugging points lying close to mean of the process in X bar-R- control chart? Correct Answer Biases in measurements , Recording done without actual measurements , Improper selection of samples Your Answer Biases in measurements , Recording done without actual measurements , Improper selection of samples Multiple Choice Multiple Answer Question Which of the following method can be adopted to overcome the problem of rushing up a job for it's timely completion? Correct Answer Job splitting , Use of optimum speeds and feeds , Subcontracting Your Answer Subcontracting , Job splitting Select The Blank Question Correct Answer Your Answer Match The Following Question What to inspect How to inspect How much to inspect When to inspect True/False Question Correct Answer Your Answer True/False Question The ________ is the probability that a bad lot will be accepted by the sampling plan. Consumer's risk Consumer's risk

Correct Answer Specification Inspection devices Sampling or cent percent inspection Stages of inspection

Your Answer Specification Inspection devices Sampling or cent percent inspection Stages of inspection

Flow process charts do record movements as well as visual pictures. False False Originating process of raw material influence Process Planning

Correct Answer Your Answer

True True

Multiple Choice Multiple Answer Question Which of the following variables which operate periodically are the reasons for the cyclic pattern depicting peaks and valleys during Xbar-R control chart? Correct Answer Wornout positions , Fatigue , Roller eccentricity Your Answer Wornout positions , Fatigue , Roller eccentricity

Multiple Choice Multiple Answer Question Which of the following factors play important role while selecting or rejecting a particular site from legislation and taxation point of view? Correct Answer Labour laws , Building codes , Policies regarding issue of licences Your Answer Labour laws , Building codes , Policies regarding issue of licences True/False Question Cent percent inspection is a must if the inspection is of destructive nature. Correct Answer False Your Answer Select The Blank Question Correct Answer Your Answer False One detachable ticket is prepared for each ________. Operation Operation

Multiple Choice Multiple Answer Question Components of Production Management include Correct Answer Your Answer Select The Blank Question Correct Answer Your Answer Capacity Planning , Job Design , Production Planning Capacity Planning , Job Design , Production Planning The ________ breakdowns usually cost more, partly due to damage done to the adjustment components and partly due to emergency actions. Unexpected Unexpected

Multiple Choice Single Answer Question Plant location decisions concern following type of organizations Correct Answer Manufacturing and service organizations Your Answer Manufacturing and service organizations

Multiple Choice Multiple Answer Question Following are some of the Principles of Management advocated by F W Taylor

Correct Answer Your Answer True/False Question Correct Answer Your Answer

Selection of best worker for each particular task , Division of work between worker and management , Training and development of the workmen Selection of best worker for each particular task , Division of work between worker and management , Training and development of the workmen As a general rule, a site five times the actual plant size is considered minimum for parking, access facilities and future expansion. True True

Multiple Choice Multiple Answer Question What is the basic minimum requirement for those who are responsible for the quality of design? Correct Answer In depth knowledge about alternative materials and manufacturing processes , access to latest technology and production process adopted by industries in the developed market , Continuous effort in product development Your Answer In depth knowledge about alternative materials and manufacturing processes , access to latest technology and production process adopted by industries in the developed market , Continuous effort in product development Match The Following Question Correct Answer Your Answer Craft Work Sampling Gantt Chart Emerson Efficiency Plan Facilities Planning Machine utilization Production Scheduling Wage Payment Facilities Planning Machine utilization Production Scheduling Wage Payment

Multiple Choice Single Answer Question What do you understand by inspection conducted on all jobs received back from a customer as defectives? Correct Answer Appraisal inspection Your Answer Appraisal inspection

Multiple Choice Multiple Answer Question Which of the following are the major steps of making of the X bar-R control chart? Correct Answer Collection of data , Claculation of mean,range,grand average and mean range , Set up control chart for average and calculate control limits of range chart Your Answer Collection of data , Claculation of mean,range,grand average and mean range , Set up control chart for average and calculate control limits of range chart Multiple Choice Single Answer Question What do you understand by identification of defects in materials, components, machining processes or men to fix responsibility of defectives, thereby preventing or minimising occurance of defectives?

Correct Answer Your Answer

Preventive function Preventive function

Multiple Choice Single Answer Question What do you mean by planned corrective manitenance which provides an opportunity to undertake design modifications in the equipment to eliminate or reduce frequency of breakdowns. Correct Answer Design-out Maintenance Your Answer Design-out Maintenance

Multiple Choice Single Answer Question What can be the worst effect due to excessive vibration? Correct Answer Your Answer Breakdown Breakdown

Multiple Choice Multiple Answer Question Which of the following schedules are recommended to prepare and follow as a part of preventive maintenance system? Correct Answer Preventive inspection schedule , Cleaning and upkeep schedule , Lubrication schedule Your Answer Preventive inspection schedule , Cleaning and upkeep schedule , Lubrication schedule Multiple Choice Single Answer Question Which is the ideal place to write a description of an activity in a network? Correct Answer Above the arrow Your Answer Above the arrow

Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory Select The Blank Question The ________ is the probability that a good lot will be rejected by the sampling plan. Correct Answer Producer's risk Your Answer Producer's risk Select The Blank Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________. Correct Answer 0.01 to 10% Your Answer 0.01 to 10% Multiple Choice Multiple Answer Question Which are the different methods of recording actual progress of work? Correct Answer Display boards , Progress cards , Network updating Your Answer Display boards , Progress cards , Network updating

Multiple Choice Single Answer Question What does the additional cost incurred to reduce the duration of an activity by one unit of time represent? Correct Answer Activity cost slope Your Answer Activity cost slope

Select The Blank Question Correct Answer Your Answer

The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________. Overtime working Overtime working

Multiple Choice Single Answer Question The ratio of output to input of a production system is commonly known as Correct Answer Productivity Your Answer Productivity

Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Operation

True/False Question Correct Answer Your Answer

An activity can share the same tail event and same head event with any other activity. False False

Multiple Choice Multiple Answer Question What are the benefits of inspection and quality control? Adequate maintenance of quality , Ensures parts are within specified limits of accuracy , Gives economy in production through reduction of defective work Your Answer Adequate maintenance of quality , Ensures parts are within specified limits of accuracy , Gives economy in production through reduction of defective work Multiple Choice Multiple Answer Question Which utilities are considered as infrastructural requirements? Correct Answer Your Answer Select The Blank Disposal of waste , Power , Water Disposal of waste , Power , Water Correct Answer

Question Correct Answer Your Answer

The ________ pertain to the climatic conditions which the component , product or material should withstand. Environmental specifications Environmental specifications

Multiple Choice Single Answer Question A good plant layout helps in Correct Answer Your Answer Reducing handling costs Reducing handling costs

POM assgn Multiple Choice Multiple Answer Question Why graphical method of recording is preferred over the descriptive method during method study? Correct Answer It segregates effective part form ineffective parts , It reduces effort involv ed in writing , Critical examinations easier and more effective Your Answer Critical examinations easier and more effective , It segregates effective part form ineffective parts , It reduces effort involved in writing Multiple Choice Multiple Answer Question Which are the subfactors of community facilities or social infrastructure? Correct Answer Accomodation , Educational , Entertainment Your Answer Accomodation , Educational , Entertainment Select The Blank Question The ________ is the probability that a bad lot will be accepted by the sampling plan. Correct Answer Consumer's risk Your Answer Consumer's risk Multiple Choice Multiple Answer Question Which of the following are examples of consumption of physical effort during recording for method study? Correct Answer Bending , Positioning , Unloading Your Answer Bending , Positioning , Unloading Multiple Choice Single Answer Question How to claculate the producer risk in the OC Curve? Correct Answer Probability that a good lot will be rejected by the sampling Your Answer Probability that a good lot will be rejected by the sampling Select The Blank Question The ________ are the definitions of the measurabl e as well as nonmeasurable characteristics of the product. Correct Answer Specifications Your Answer Specifications Select The Blank Question The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable. Correct Answer Quality control Your Answer Quality control True/False Question Expediting action is necessary if the delays and interruptions are abnormal and hence any subsequent delay is bound to extend the promised delivery date. Correct Answer True Your Answer True Multiple Choice Single Answer Question Process Engineer does not get sufficient time for designing tooling for most economic production run when Correct Answer Delivery time is less Your Answer Delivery time is less Select The Blank Question The ________ includes preventive maintenance activities whose needs are identified through inspection which requires stoppage of machines. Correct Answer Shutdown Maintenance Your Answer Shutdown Maintenance

True/False Question Breakdown of machines, absenteeism of worker does not dislocate the manufacturing activity in process layout Correct Answer True Your Answer True Select The Blank Question The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Correct Answer Acceptable quality level Your Answer Acceptable quality level Multiple Choice Single Answer Question What do you mean by lowest possible direct cost required to complete an activity within it's crashed time? Correct Answer Crash cost Your Answer Crash cost Multiple Choice Multiple Answer Question Which are the first three steps of Critical Path Analysis technique? Correct Answer Activity relationships , Activity identification , Network construction Your Answer Activity relationships , Activity identification , Network construction True/False Question Dust gets mixed with lubricants, forms an abrasive substance and causes pre-mature failure of machinery. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Which of the following can be subtypes of corrective maintenance? Correct Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance Your Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance Select The Blank Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Answer Condition monitoring Your Answer Condition monitoring Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Production Match The Following Question Correct Answer Your Answer Toung Sweet Sweet Eye Crack Crack Nose Burnout Burnout Ear Impact Impact

Select The Blank Question The ________ is a set of tools and techniques by which products are made to comply with the specifications at minimum cost to the firm. Correct Answer Quality control system Your Answer Quality control system Multiple Choice Single Answer Question What is the meaning of " Product features" according to J.M.Juran? Correct Answer Quality of design Your Answer Quality of design Multiple Choice Multiple Answer Question Which of the following method can be used to record the facts during the method study? Correct Answer Micromotion study , Cyclegraph , Chronocyclegraph Your Answer Micromotion study , Photograph , Cyclegraph , Chronocyclegraph True/False Question All activities must not be tied up into the network Correct Answer False Your Answer False Multiple Choice Multiple Answer Question Which of the following are types of sampling plan? Correct Answer Single sampling plan , Double sampling plan , Multiple sampling plan Your Answer Single sampling plan , Double sampling plan , Multiple sampling plan Multiple Choice Multiple Answer Question How many of the following are types of specification? Correct Answer Material specifications , Dimensional specifications , Performance specifications Your Answer Material specifications , Dimensional specifications , Performance specifications Multiple Choice Multiple Answer Question Plant layout facilitates processing of products in most effective manner through the following Correct Answer Shortest possible distance , Shortest processing time , Minimum movement Your Answer Shortest possible distance , Minimum movement Select The Blank Question Work study is also called ________ study Correct Answer Time and Motion Your Answer Time and Motion True/False Question Operation Process Chart provides information on time and distances Correct Answer False Your Answer False Multiple Choice Multiple Answer Question Plant Layout is concerned with optimum arrangement of the following Correct Answer Storage space , Machines , Material Handling Equipment Your Answer Storage space , Machines , Sequence of operation Multiple Choice Single Answer Question Management often fails to realize the importance of efficient layout due to following reason Correct Answer losses resulting from poor layout are not directly shown in the financial statements Your Answer losses resulting from poor layout are not directly shown in the financial statements True/False Question Inspection order is must even for simple jobs which can be inspected by shop inspector with the tooling available on shop.

Correct Answer False Your Answer True True/False Question Feasibility of time schedule requires that an activity be scheduled before any of it's predecessors are scheduled. Correct Answer False Your Answer True Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is call ed Correct Answer Factory Your Answer Factory True/False Question Planned lubrication is said to be the nervous system of the equipment. Correct Answer True Your Answer True Multiple Choice Single Answer Question What is the basic philosophy of statistical process control? Correct Answer Prevention is better than cure Your Answer Prevention is better than cure Multiple Choice Single Answer Question How does the control chart of statistical quality control helps the operating personnel? Correct Answer Identify the presence of an assignable cause before it develops Your Answer Identify the presence of an assignable cause before it develops Multiple Choice Single Answer Question Where does the central line is located in case of p-chart? Correct Answer at p bar Your Answer at p bar Multiple Choice Multiple Answer Question Which of the following may be the objectives of project crashing? Correct Answer To complete the project in the least possible time , To reduce project cost below it's normal cost , To achieve uniformity in requirement of resources Your Answer To complete the project in the least possible time , To reduce project cost below it's normal cost , To achieve uniformity in requirement of resources Select The Blank Question The ________ advocates maintenance procedures whereby the condition of the plant is constantly watched through systematic inspection to unearth unhealthy conditions and preventive Correct Answer Preventive Maintenance Your Answer Preventive Maintenance True/False Question A network should be progression of activities always moving forward. Correct Answer True Your Answer True Multiple Choice Single Answer Question Which is the ideal place to write a description of an activity in a network? Correct Answer Above the arrow Your Answer Above the arrow Select The Blank Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________.

Correct Answer 0.01 to 10% Your Answer 0.01 to 10% True/False Question For p-chart, the central line of fraction defectives is determined by average percentage defectives. Correct Answer True Your Answer True Multiple Choice Single Answer Question Which phase of method study is concerned with analyzing the facts critically, generating alternatives which form the basis for selection and development of improved methods? Correct Answer Critical examination Your Answer Critical examination Multiple Choice Single Answer Question Which of the following policies is advisable in case of low product variety and large volumes? Correct Answer Low Skilled Labour & Special Purpose Machines Your Answer Low Skilled Labour & Special Purpose Machines Multiple Choice Single Answer Question Which kind of inspection is followed in case of product layout? Correct Answer Pilot inspection Your Answer Pilot inspection Match The Following Question Correct Answer Your Answer Emerson Efficiency Plan Wage Payment Wage Payment Craft Facilities Planning Facilities Planning Work Sampling Machine utilization Sampling Inspection Gantt Chart Production Scheduling Production Scheduling

POM assgn Multiple Choice Single Answer Question MRP is based on the concept of inventory demand which is of following type Correct Answer Your Answer Dependent and independent Dependent and independent

Multiple Choice Single Answer Question Main objective of a good plant layout is Correct Answer Your Answer Reduce material handling cost Reduce material handling cost

True/False Question Correct Answer Your Answer

As a general rule, the number of tail event of an activity is more than that of it's head event. False False

Select The Blank Question The ________ is the probability that a good lot will be rejected by the sampling plan. Correct Answer Your Answer Producer's risk Producer's risk

Multiple Choice Multiple Answer Question Which of the following are important considerations concerning activity times? Correct Answer Your Answer Activity time should be obtained from the person responsible for the completion of an activity , Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resources required to carry out the activity are available. Activity time should be obtained from the person responsible for the completion of an activity , Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resources required to carry out the activity are available.

Select The Blank Question The ________ pertain to the climatic conditions which the component , product or material should withstand. Correct Environmental specifications Answer Your Answer Environmental specifications

Multiple Choice Multiple Answer Question Following are some of the factors considered for evaluation of alternative layouts Correct Answer Flow of Material , Equipment utilization , Ease of supervision

Your Answer

Flow of Material , Ease of supervision , Delivery performance

Multiple Choice Multiple Answer Question Which of the following are assignable cause? Correct Answer Your Answer Large varaitions in hardness of material , Tool wear , Errors in setting Large varaitions in hardness of material , Tool wear , Errors in setting

True/False Question Correct Answer Your Answer

All activities must not be tied up into the network False False

Select The Blank Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________. Correct 0.01 to 10% Answer Your Answer 0.01 to 10%

True/False Question

Correct Answer Your Answer

In case of X bar, if the process is not under control indicated by some points falling outside the control limits, such points outside the control limits are eliminated and new trial control limits for the remaining points are computed. True True

Multiple Choice Single Answe r Question What is the base for considering activity time as single time estimate or three time estimate? Correct Level of uncertainty Answer Your Answer Availability of labour

Select The Blank Question The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Correct Acceptable quality level Answer Your Answer Acceptable quality level

Multiple Choice Single Answer Question What do you mean by lowest possible direct cost required to complete an activity within it's normal time? Correct Normal cost Answer

Your Answer

Normal cost

Select The Blank Question A good maintenance system is not a luxary but a ________. Correct Answer Your Answer Necessity Necessity

Select The Blank Question A ________helps to avoid crowding of jobs at a particular machine by change of route of some of the jobs or by diverting work to other machine. Correct Control board Answer Your Answer Move order

Select The Blank Question The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable. Correct Quality control Answer Your Answer Quality control

Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Your Answer Factory Factory

Match The Following Question Emerson Efficiency Plan Craft Work Sampling Gantt Chart

Correct Answer Wage Payment Facilities Planning Machine utilization Production Scheduling

Your Answer Wage Payment Facilities Planning Machine utilization Production Scheduling

Select The Blank Question A ________ is another form of subcontracting. Correct Answer Your Answer Hiring capacity Hiring capacity

Multiple Choice Multiple Answer

Question Correct Answer Your Answer

In an organization there may not be a formal PPC department if Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large

Multiple Choice Multiple Answer Question Which of the following cases can be treated as delay during recording of method study? Correct Answer Your Answer Operators awaiting instructions from supervisor , Worker waiting for his turn at tools stores , Jobs awaiting at the machines for their turn Operators awaiting instructions from supervisor , Worker waiting for his turn at tools stores , Jobs awaiting at the machines for their turn

True/False Question Correct Answer Your Answer

Inspection order is must even for simple jobs which can be inspected by shop inspector with the tooling available on shop. False False

Multiple Choice Multiple Answer Question Order preparation process for products manufatured to order requires following documents Correct Answer Your Answer Sales Order , Work order , Shop order Sales Order , Work order , Purchase order

Multiple Choice Single Answer Question Technique of Value Engineering can be effectively employed in design of a product to Correct Answer Your Answer To meet the intended function at lowest cost Reduce lead time

True/False Question Correct Answer Your Answer

Cent percent inspection is often more practical and economical than sampling inspection. False False

Multiple Choice Multiple Answer Question Scale model used for layout analysis have following advantages Correct Answer Your Answer Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown , Models can be shifted easily Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown , Models can be shifted easily

Multiple Choice Single Answer Question Which of the following technique is event oriented ?

Correct Answer Your Answer

Project Evaluation & Review Technique Project Evaluation & Review Technique

Multiple Choice Single Answer Question What is the meaning of " Product features" according to J.M.Juran? Correct Answer Your Answer Quality of design Quality of design

Match The Following Question Crash cost of an activity Normal time of an activity Crash time of activity Normal cost of an activity

Correct Answer Cc Tn Tc Cn

Your Answer Cc Tn Tc Cn

Multiple Choice Multiple Answer Question What are uses of diagrams in method study? Correct Answer Your Answer Study different plant layouts and select the most optimum one , Study the extent of traffic over the different routes of the plant , Identify the extent of backtracking, cross traffic and obstacles encountered during the movement of material. Study different plant layouts and select the most optimum one , Study the extent of traffic over the different routes of the plant , Identify the extent of backtracking, cross traffic and obstacles encountered during the movement of material.

True/False Question Correct Answer Your Answer

A load chart specifies the work to be carried out by each person of company during shift hours. False True

Multiple Choice Multiple Answer Question Route Sheet generally contains following information Correct Answer Your Answer Material Specification , Sequence of operation , Skill of Labour Material Specification , Sequence of operation , Skill of Labour

True/False Question Correct Answer

Cellular layout is based on the concept of Group Technology True

Your Answer

True

Multiple Choice Single Answer Question Which varaible is taken along the abscissa or X axis? Correct Answer Your Answer Time Standard deviation

Multiple Choice Multiple Answer Question Which are the advantages of suburban location? Correct Answer Your Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction

Select The Blank Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Condition monitoring Answer Your Answer Condition monitoring

Multiple Choice Multiple Answer Question Expediting function is concerned with following activities Correct Answer Your Answer Progress chasing to identify delays which may hold up production , Communicating possible delays in delivery date commitment to sales department , Devising cures to keep rate of production in line with schedule Recording progress of work , Progress chasing to identify delays which may hold up production , Communicating possible delays in delivery date commitment to sales department

Select The Blank Question Production control work is ________ in case of floor inspection as compared with the centralised inspection. Correct easier Answer Your Answer time consuming

Select The Blank Question The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________. Correct Overtime working Answer Your Answer Overtime working

True/False Question

In case of forward pass computation, the earliest event time of the first event is zero.

Correct Answer Your Answer

True True

Multiple Choice Single Answer Question What is represented by an arrow in a network? Correct Answer Your Answer Activity Activity

True/False Question Correct Answer Your Answer

As a general rule, a site five times the actual plant size is considered minimum for parking, access facilities and future expansion. True True

True/False Question Correct Answer Your Answer

Independent float either affects the float of preceding activities or that of succeeding activities. False False

Multiple Choice Single Answer Question The document raised by PPC which authorises different functions to take action as per instruction is called Correct Work Order Answer Your Answer Work Order Multiple Choice Single Answer Question A good layout makes effective use of space. Utilization of space for a department like Stores can be measured by Correct Proportion of Cubic volume space utilized Answer Your Answer Ratio of area utilised to area available

Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Operation Answer Your Answer Operation

POM assgn Multiple Choice Multiple Answer Question Which are major benefits of identifying the critical path? Correct Answer Your Answer It identifies activities to be given preference in allocation of resources. , It helps to exercise "control by exception". , It helps to identify the set of activities and events which are critical and as such must be carefully controlled and monitored It helps to identify the set of activities and events which are critical and as such must be carefully controlled and monitored , It identifies activities to be given preference in allocation of resources. , It helps to exercise "control by exception".

Select The Blank Question An Ideal OC curve is ________ shaped curve that accpets all the lots with quality equal to or better than AQL . Correct Answer Rectangular Your Answer Bell

Select The Blank Question The ________ is the probability that a bad lot will be accepted by the sampling plan. Correct Answer Your Answer Consumer's risk Lot Tolerance Percentage Defective

Multiple Choice Single Answer Question Why method study should precede work measurement? Correct Answer Your Answer Time for a job can be accessed accurately only after standardizing the method Time for a job can be accessed accurately only after standardizing the method

Select The Blank Question The ________ is the process of withdrawing the equipment from the production line, dismantling it unitwise, visualising defects, effecting adjustments, replacing worn-out parts and finally building it up to get desired accuracies. Correct Answer Reconditioning Your Answer Reconditioning

Multiple Choice Single Answer Question Which of the following is the most popular technique for Project Production? Correct Answer Your Answer PERT & CPM Break Even Analysis

True/False Question Correct Answer Your Answer

In case of backward pass computation, the latest event time of the end event equals to the earliest event time minus duration of that activity. False True

Match The Following

Question Draining and refilling of oil reserviors of plunger pump Parts lubricated with oil nipple Tools and slideways Table lubrication

Correct Answer Yearly Daily two to three times a day Weekly

Your Answer Hourly Weekly Six monthly two to three times a day

Select The Blank Question The ________ breakdowns usually cost more, partly due to damage done to the adjustment components and partly due to emergency actions. Correct Answer Unexpected Your Answer Unexpected

Multiple Choice Single Answer Question What is expected from stores department after they receive the stores issue order from dispatcher? Correct Answer Keep material ready for issue to shop when authorized Your Answer Keep material ready for issue to shop when authorized

True/False Question Correct Answer Your Answer

Every network does not necessarily have a critical path. False False

Multiple Choice Multiple Answer Question Which are the subfactors of community facilities or social infrastructure? Correct Answer Your Answer Accomodation , Educational , Entertainment Accomodation , Labour laws , Educational , Entertainment

Multiple Choice Single Answer Question One of the following is not a gross material Correct Answer Your Answer cotton Coal

Select The Blank Question The ________ is the defect level for which lots are regarded as bad lots. Correct Answer Your Answer Lot Tolerance Percentage Defective Producer's risk

Multiple Choice Multiple Answer

Question Correct Answer Your Answer

Which of the following are types of non-destructive testing? Visual Testing , Eddy current , Magnetic flow detectors Visual Testing , Eddy current , Magnetic flow detectors

Multiple Choice Multiple Answer Question Which of the following are steps to identify the critical path in a small network? Correct Answer Your Answer Compare the durations of all paths to identify the longest path. , Sum up the durations of activities along each path. , Enumerate all paths in the network and list down activities on each path. Sum up the durations of activities along each path. , Find out the shortest path among all paths. , Enumerate all paths in the network and list down activities on each path. , Compare the durations of all paths to identify the longest path.

Multiple Choice Multiple Answer Question Which of the following factors affect the quality control function? Correct Answer Your Answer Quality of workmanship , Production aids , Manufacturing facilities Quality of workmanship , Production aids , Competitive prices , Manufacturing facilities

True/False Question Correct Answer Your Answer True/False Question Correct Answer Your Answer

The plotting of activities - critical, non-critical and dummy activities- is strictly according to their precedence relationship. True True

Process layout is also called line layout False True

Multiple Choice Multiple Answer Question Which of the following three methods used to select the qualified supplier? Correct Answer Your Answer By vendor plant surveys , By reputation , By experience By vendor plant surveys , By reputation , By the perofrmance of first lot , By experience

Multiple Choice Single Answer Question Which kind of relationship exists between those activities which can be carried out simultaneously and both activities require definite time to finish? Correct Answer Concurrent activities Your Answer Concurrent activities

Select The Blank Question A good maintenance system is not a luxary but a ________. Correct Answer Necessity

Your Answer

Necessity

True/False Question Correct Answer Your Answer

Quality can not be inspected into a product, it must be manufactured into it by the supplier. True True

Multiple Choice Single Answer Question What do you mean by the preventive maintenance by using five human senses? Correct Answer Your Answer Preventive inspection Manual inspection

Multiple Choice Single Answer Question What do you mean by design modifications made to reduce time and effort required in carrying out maintenance work ? Correct Answer Design-in Maintenance Your Answer True/False Question Correct Answer Your Answer Design-in Maintenance

A load chart specifies the work to be carried out by each person of company during shift hours. False True

Multiple Choice Single Answer Question Process type layout is suitable when Correct Answer Your Answer there is wide variation in processing time of operations there is wide variation in processing time of operations

Multiple Choice Single Answer Question Where the ignorance towards the degradation of machine leads to? Correct Answer Your Answer True/False Question Correct Answer Your Answer Eventual breakdown Eventual breakdown

Dispatching function is not a part of Production Planning True True

Match The Following

Question First off inspection Critical operation inspection Patrolling inspection Key operation inspection

Correct Answer First piece produced after tool change

Your Answer First piece produced after tool change

After whose no rework is possible Costlier operation Inspection at the place of actual production Costlier operation Inspection at the place of actual production After whose no rework is possible

Multiple Choice Multiple Answer Question Which three of the following options can be used to reduce the duration of activity during project crashing? Correct Answer Allocating more manpower and machines than originally planned for. , Working additional shifts or overtime. , Awarding work to vendors who charge extra but expedite deliveries. Your Answer Allocating more manpower and machines than originally planned for. , Conduct work study for that activity , Working additional shifts or overtime. , Awarding work to vendors who charge extra but expedite deliveries. Select The Blank Question The ________ is the probability that a good lot will be rejected by the sampling plan. Correct Answer Your Answer Producer's risk Lot Tolerance Percentage Defective

Select The Blank Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________. Correct Answer 0.01 to 10% Your Answer True/False Question Correct Answer Your Answer 0.10 to 10%

Three time estimates are transformed into expected time before using it into a network. True True

Multiple Choice Multiple Answer Question What is indicated by the erratic pattern points falling above and below the control limits in the Xbar-R-control chart? Correct Answer Defects in materials , Poorly trained operators , Frequent adjustments of machines Your Answer Defects in materials , Poorly trained operators , Frequent adjustments of machines , Clogging of fixtures and holes

Select The Blank Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Answer Condition monitoring

Your Answer

Preventive maintenance

Multiple Choice Single Answer Question Which kind of inspection is followed in case of process layout? Correct Answer Your Answer True/False Question Correct Answer Your Answer First off inspection Pilot inspection

Latest finishing date is the latest event time of the tail event. False True

Multiple Choice Multiple Answer Question Following are the commonly used factors considered for evaluation of layout in factor analysis method Correct Answer Flow of material , Equipment utilization , W orking condition Your Answer Flow of information , Flow of material , Equipment utilization , Working condition

Multiple Choice Multiple Answer Question Why graphical method of recording is preferred over the descriptive method during method study? Correct Answer It segregates effective part form ineffective parts , It reduces effort involved in writing , Critical examinations easier and more effective Your Answer It segregates effective part form ineffective parts , It reduces effort involved in writing , It improves morale of workers , Critical examinations easier and more effective Select The Blank Question OC curve of ideal sampling plan suggests that all lots less than 3% defectives have the probability of acceptance of ________. Correct Answer One Your Answer True/False Question Correct Answer Your Answer One

Floor inspection delays the identification of faults which can not be rectified immediately before large lots are spoiled. False False

Multiple Choice Single Answer Question Which kind of preventive inspection detects some defects in moving parts, internal cracks, and others , when machine is under preplanned shutdown? Correct Answer Internal inspection Your Answer Internal inspection

Select The Blank Question Capacity decisions have a direct influence on performance of production system in

respect of ________ Correct Answer Your Answer Delivery performance Delivery performance

Multiple Choice Multiple Answer Question Which of the following are illustrations of inspection? Correct Answer Your Answer Physical count of incoming material against the quantity mentioned in delivery challan , A dimensional check with measuring instrument , Visual check of burrs and finish Physical count of incoming material against the quantity mentioned in delivery challan , A dimensional check with measuring instrument , Visual check of burrs and finish , Check the operator performance

Multiple Choice Multiple Answer Question Which of the following variables which operate periodically are the reasons for the cyclic pattern depicting peaks and valleys during Xbar-R control chart? Correct Answer Wornout positions , Fatigue , Roller eccentricity Your Answer Wornout positions , Intentional mistakes by unsatisfied worker , Fatigue , Roller eccentricity

Multiple Choice Single Answer Question Which portion of the perforated route sheet should be signed by the operator or supervisor? Correct Answer Lower portion Your Answer Top portion

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Multiple Choice Multiple Answer Question Which are major benefits of identifying the critical path? Correct Answer It identifies activities to be given preference in allocation of resources. , It helps to exercise "control by exception". , It helps to identify the set of activities and events which are critical and as such must be carefully controlled and monitored It helps to identify the set of activities and events which are critical and as such must be carefully controlled and monitored , It identifies activities to be given preference in allocation of resources. , It helps to exercise "control by exception".

Your Answer

Select The Blank Question Correct Answer Your Answer

An Ideal OC curve is ________ shaped curve that accpets all the lots with quality equal to or better than AQL . Rectangular Bell

Select The Blank Question Correct Answer Your Answer

The ________ is the probability that a bad lot will be accepted by the sampling plan. Consumer's risk Lot Tolerance Percentage Defective

Multiple Choice Single Answer Question Why method study should precede work measurement? Correct Answer Your Answer Time for a job can be accessed accurately only after standardizing the method Time for a job can be accessed accurately only after standardizing the method

Select The Blank Question

Correct Answer Your Answer

The ________ is the process of withdrawing the equipment from the production line, dismantling it unitwise, visualising defects, effecting adjustments, replacing worn-out parts and finally building it up to get desired accuracies. Reconditioning Reconditioning

Multiple Choice Single Answer Question Which of the following is the most popular technique for Project Production? Correct Answer Your Answer PERT & CPM Break Even Analysis

True/False Question Correct Answer Your Answer

In case of backward pass computation, the latest event time of the end event equals to the earliest event time minus duration of that activity. False True

Match The Following

Question

Correct Answer

Your Answer

Draining and refilling of oil reserviors of plunger pump Parts lubricated with oil nipple

Yearly

Hourly

Daily

Weekly

Tools and slideways

two to three times a day

Six monthly

Table lubrication

Weekly

two to three times a day

Select The Blank Question Correct Answer Your Answer

The ________ breakdowns usually cost more, partly due to damage done to the adjustment components and partly due to emergency actions. Unexpected Unexpected

Multiple Choice Single Answer Question What is expected from stores department after they receive the stores issue order from dispatcher? Correct Answer Your Answer Keep material ready for issue to shop when authorized Keep material ready for issue to shop when authorized

True/False Question Correct Answer Your Answer

Every network does not necessarily have a critical path. False False

Multiple Choice Multiple Answer Question Which are the subfactors of community facilities or social infrastructure? Correct Answer Your Answer Accomodation , Educational , Entertainment Accomodation , Labour laws , Educational , Entertainment

Multiple Choice Single Answer Question One of the following is not a gross material Correct Answer Your Answer cotton Coal

Select The Blank Question Correct Answer Your Answer

The ________ is the defect level for which lots are regarded as bad lots. Lot Tolerance Percentage Defective Producer's risk

Multiple Choice Multiple Answer

Question Correct Answer Your Answer

Which of the following are types of non-destructive testing? Visual Testing , Eddy current , Magnetic flow detectors Visual Testing , Eddy current , Magnetic flow detectors

Multiple Choice Multiple Answer Question Which of the following are steps to identify the critical path in a small network? Correct Answer Your Answer Compare the durations of all paths to identify the longest path. , Sum up the durations of activities along each path. , Enumerate all paths in the network and list down activities on each path. Sum up the durations of activities along each path. , Find out the shortest path among all paths. , Enumerate all paths in the network and list down activities on each path. , Compare the durations of all paths to identify the longest path.

Multiple Choice Multiple Answer Question Which of the following factors affect the quality control function? Correct Answer Your Answer Quality of workmanship , Production aids , Manufacturing facilities Quality of workmanship , Production aids , Competitive prices , Manufacturing facilities

True/False Question Correct Answer Your Answer

The plotting of activities - critical, non-critical and dummy activities- is strictly according to their precedence relationship. True True

True/False Question Correct Answer Your Answer

Process layout is also called line layout False True

Multiple Choice Multiple Answer Question Which of the following three methods used to select the qualified supplier? Correct Answer Your Answer By vendor plant surveys , By reputation , By experience By vendor plant surveys , By reputation , By the perofrmance of first lot , By experience

Multiple Choice Single Answer Question Which kind of relationship exists between those activities which can be carried out simultaneously and both activities require definite time to finish? Correct Answer Your Answer Concurrent activities Concurrent activities

Select The Blank Question Correct Answer Your Answer

A good maintenance system is not a luxary but a ________. Necessity Necessity

True/False Question Correct Answer Your Answer

Quality can not be inspected into a product, it must be manufactured into it by the supplier. True True

Multiple Choice Single Answer Question What do you mean by the preventive maintenance by using five human senses? Correct Answer Your Answer Preventive inspection Manual inspection

Multiple Choice Single Answer Question What do you mean by design modifications made to reduce time and effort required in carrying out maintenance work ? Correct Answer Your Answer Design-in Maintenance Design-in Maintenance

True/False Question Correct Answer Your Answer

A load chart specifies the work to be carried out by each person of company during shift hours. False True

Multiple Choice Single Answer Question Process type layout is suitable when Correct Answer Your Answer there is wide variation in processing time of operations there is wide variation in processing time of operations

Multiple Choice Single Answer Question Where the ignorance towards the degradation of machine leads to? Correct Answer Your Answer Eventual breakdown Eventual breakdown

True/False Question Correct Answer Your Answer

Dispatching function is not a part of Production Planning True True

Match The Following Question Correct Answer Your Answer

First off inspection

First piece produced after tool change

First piece produced after tool change

Critical operation inspection

After whose no rework is possible

Costlier operation

Patrolling inspection

Inspection at the place of actual production

Inspection at the place of actual production

Key operation inspection

Costlier operation

After whose no rework is possible

Multiple Choice Multiple Answer Question Which three of the following options can be used to reduce the duration of activity during project crashing? Correct Answer Your Answer Allocating more manpower and machines than originally planned for. , Working additional shifts or overtime. , Awarding work to vendors who charge extra but expedite deliveries. Allocating more manpower and machines than originally planned for. , Conduct work study for that activity , Working additional shifts or overtime. , Awarding work to vendors who charge extra but expedite deliveries.

Select The Blank Question Correct Answer Your Answer

The ________ is the probability that a good lot will be rejected by the sampling plan. Producer's risk Lot Tolerance Percentage Defective

Select The Blank Question Correct Answer Your Answer

In case of an OC curve, the risk of rejecting a good quality lot may vary between ________. 0.01 to 10% 0.10 to 10%

True/False Question Correct Answer Your Answer

Three time estimates are transformed into expected time before using it into a network. True True

Multiple Choice Multiple Answer Question What is indicated by the erratic pattern points falling above and below the control limits in the Xbar-R-control chart? Correct Answer Your Answer Defects in materials , Poorly trained operators , Frequent adjustments of machines Defects in materials , Poorly trained operators , Frequent adjustments of machines , Clogging of fixtures and holes

Select The Blank Question Cor rect Answer Your Answer

The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Condition monitoring Preventive maintenance

Multiple Choice Single Answer Question Which kind of inspection is followed in case of process layout? Correct Answer Your Answer First off inspection Pilot inspection

True/False Question

Latest finishing date is the latest event time of the tail event.

Correct Answer Your Answer

False True

Multiple Choice Multiple Answer Question Following are the commonly used factors considered for evaluation of layout in factor analysis method Correct Answer Your Answer Flow of material , Equipment utilization , Working condition Flow of information , Flow of material , Equipment utilization , Working condition

Multiple Choice Multiple Answer Question Why graphical method of recording is preferred over the descriptive method during method study? Correct Answer Your Answer It segregates effective part form ineffective parts , It reduces effort involved in writing , Critical examinations easier and more effective It segregates effective part form ineffective parts , It reduces effort involved in writing , It improves morale of workers , Critical examinations easier and more effective

Select The Blank Question Correct Answer Your Answer

OC curve of ideal sampling plan suggests that all lots less than 3% defectives have the probability of acceptance of ________. One One

True/False Question Correct Answer Your Answer

Floor inspection delays the identification of faults which can not be rectified immediately before large lots are spoiled. False False

Multiple Choice Single Answer Question Which kind of preventive inspection detects some defects in moving parts, internal cracks, and others , when machine is under preplanned shutdown? Correct Answer Your Answer Internal inspection Internal inspection

Select The Blank Question Correct Answer Your Answer

Capacity decisions have a direct influence on performance of production system in respect of ________ Delivery performance Delivery performance

Multiple Choice Multiple Answer Question Which of the following are illustrations of inspection? Correct Answer Your Answer Physical count of incoming material against the quantity mentioned in delivery challan , A dimensional check with measuring instrument , Visual check of burrs and finish Physical count of incoming material against the quantity mentioned in delivery challan , A dimensional check with measuring instrument , Visual check of burrs and finish , Check the operator performance

Multi ple Choice Multiple Answer Question Which of the following variables which operate periodically are the reasons for the cyclic pattern depicting peaks and valleys during Xbar-R control chart?

Correct Answer Your Answer

Wornout positions , Fatigue , Roller eccentricity Wornout positions , Intentional mistakes by unsatisfied worker , Fatigue , Roller eccentricity

Multiple Choice Single Answer Qu estion Which portion of the perforated route sheet should be signed by the operator or supervisor? Correct Answer Your Answer Lower portion Top portion

Topic Chapter 1 - Production Manufacturing Function Operation concept of production Production as the conversion process Alteration Transportation Storage Inspection Productivity of conversion process Objectives of Production Management Components of production function Aspects of Management product selection and design Process selection and planning Facilities (Plant) location Facilities (plant) layout and materials handling Capacity planning forecasting production planning and contril (PPC) Inventory Control Quality assurance and control work study and job design Method study work measurement Maintenance and replacement cost reduction and cost control short history of production management Adam smith (1776) Charles Babbage (1883) F.W. Taylor (1859 to 1915) Frank B. Gilbreth (1917) Henry Ford (1913) Henry Gantt (1913) Harington Emerson (1913) F.W. Harris (1914) Walter Shewhart (1924) F.H. Dodge H.G. Roming & W. Shewhart (1931) L.H.C. Tippett (1937) Between 1940-1980 Present day position Prganisation for production Typical organisation structure The responsibilities of a production manager qualities of production manager intelligence enthusiasm and perseverance imagination resourcefulness self control sympathy communication ability flexibility

Page No 1 2 2 2 2 2 3 4 4 5 5 5 6 6 6 7 7 7 8 8 8 8 9 9 9 9 10 10 11 11 11 12 12 12 12 12 12 13 14 15 15 16 16 16 16 16 16 16 16 16

production as a co-ordination function Chapter 2- Manufacturing Methods Definition factors influenceing choice of manufacturing method effect of volume/variety relationship between degree of repetitive and manufacturing method capacity of the plant flexibility lead time efficiency environment Classification of manufacturing methods project production Jobbing production batch production Mass & Flow production process production selection of the manufacturing methods Chapter 3 -Facilities (Plant) Location when does a location decision arise (Necessity) factors governing plant location procimity to market procimity to sources of raw materials gros materials pure material Infrastructureal facilities transport facilities labour wages legisiation and taxation climate conditions Industrial and loaur attitudes safety requirement communtiy facilities (social infrasturcture) community attitudes supporting industries and services waste disposal availability and cost of the land suitability of the land economic survey for the site selection Urban versus rural site location sub urban loaction typical examples on plant location Chapter 4 - Facilities( Plant) Layout objective of a good plant layout principles of a good layout types of layout process or functional layout product or line layout project or fixed position layout comparison between prodcut layout and process layout cost analysis of basic forms of layout combination layout (mixed layout)

17 23 24 24 25 25 25 26 26 26 27 27 29 31 34 35 36 41 42 43 44 45 45 46 46 46 47 47 47 47 48 48 48 49 49 49 49 51 52 53 60 60 64 65 66 68 69 72 73

factors governing plantlayout system layout procedure tools and techniques for layout analysis space determination and area allocation evaluation of layout plans and selection of the optima layout Chapter 5- Production Planning and Control meaning production planning versus production control objective of production control (PC) functions of production planning and control organisation of PPC department status of the PPC department in the company degree of centralisation internal structure Chapter 6 - Production Planning (Order Preparation) work order preparation subsidiary orders Chapter 7 - Prodcution Planning (Material Planning) factors of influencing material planning technique for materials planning bill of materials material requirement planning (MRP) procedural steps in MRP computerised system of MRP past consumption anlaysis technique moving average method exponential smoothing Inventory control other operations research techniques Chapter 8- Production Planning (Process Planning) inputs of process planning factors influencing process planning steps in process planning route sheets processing planning in differece situations documents in process planning Route sheets example Chapter 9- Production Planning (Loading & Scheduling) why scheduling inputs of scheduling gantt charts technique of scheduling Chapter 10- Production control (Dispatching) Function of dispatching how dispatching function is perdormed dispatching under difeerenct situations documents in dispatching Chapter 11- Production Control (Processing or Follow-Up) Functions in progressing documents in progressing Chapter 12- Project Planning & control Critical Path Analysis (PERT/CPM) Meaning of project

74 74 76 79 80 89 90 91 91 93 93 94 94 101 104 109 110 111 113 113 117 117 117 118 119 120 126 127 128 129 131 131 132 137 136 142 147 153 160 161 161 167 175 181

need for systematic approach what is CPA what can CPA give network logic procedural steps activity identification activity relationships network construction node labelling Fulkerson's rule activity time estimation project classification PERT concept of multipe times use of time estimation unit of time etimation network time analysis critical path non critical paths nad float times forward computation (earliest event times) backward pass computation (latest allowable event times) computation for analysis of activity durations activity float analysis types of float probability aspects of project planning cost analysis and crashing of activities time cost relationship graphical representation of project costs procedural steps project crashing project scheduling project monitoring computer applications in project management Chapter 13 - Maintenace of the Plant typical causes of plant breakdown costs association with an eventual breakdown objectives of a good maintenance system types of maintenance elements of a good maintenance system preventive maintenance planned maintenance unplanned maintenance Basic activities of the preventive maintenace Preventive inspection planned lubricants cleaning and upkeep minor adjustments and replacements equipment records corrective maintenance condtional monitoring organisation for maintenance Chapter 14- Quality Management( Inspection and Quality Control) definition of quality

182 183 183 184 189 189 190 193 200 200 202 203 203 206 206 207 207 209 210 212 213 215 215 224 234 234 236 237 238 251 252 255 270 270 271 271 276 277 273 275 279 279 282 285 287 288 293 293 296 304

J.M Juran's views of quality historical development of quality management the achivement of quality quality of design customer's acceptance of the product and its price quality of conformance quality standards meaning of quality control three basic aspects of quality control inspection versus quality control inspection planning what to inspect specification stages of inspection where to inspect places of inspection how to inspect inspection devices how much to inspect sampling or cent percent inspection how to exercise control over qulity quality control of purchased material need for control defining the right quality selecting suppliers for quality ensuring suppliers understanding requirement monitoring suppliers quality defect identificationand defect prevention importance of defect prevention vendor performance evaluation quality control of work done at the home plant organisation for inspection and quality control Chapter 15- Quality Management Acceptance Sampling types of inspection basis of sampling inspection defects and their classification critical defect major defect minor defect operating characterisitc curve Parameter of an OC curve relationship between the parameters OC curve of an ideal plan OC curve of general plan zone of acceptance and rejction zone of indecision 10 specification an operating characheteristic curve acceptable quality level (AQL Lot tolerance percent defectives LTPD producer's risk Alpha consumer risk Beeta types of sampling plans single sampling plan double sampling plan multiple sampling plan comparison of different sampling plan

305 205 306 307 307 308 309 310 310 311 312 313 313 316 319 322 323 324 324 324 325 326 327 328 329 331 331 333 343 344 345 345 345 345 346 347 348 349 349 349 350 351 351 351 352 352 352 353 354 356 358

Chapter 16- Quality Management Statistical Process Control SPC Principles underlying process control control charts as tool for process control types of control charts control charts for variables (X-R charts) Theory steps to prepare X-R chart what are control charts by attributes control charts for fraction defectives P-chart control charts for number defectives nP chart control charts for the number of defects c-Chart Chapter 17 Work Study Method study what is work study introduction to method study Basic procedure of method study selection of the job recording of facts method study symbols operation process chart OPC Flow process chart FPC templates and models three dimensional models critical examination development and selection installation of the proposed method maintenance of the proposed method Chapter -18 Work Study Work Measurement informal standard Elwood S Buffa uses of work measurement data equitable standards control of exception rational basis of incentives sub standard workers techniques of work measurement PMTS - method of time measurement (MTM) TMU time study time study procedure steps in time study select the job to be timed select the operator flyback method rating determine representative time of each element observed time into normal time assess relaxation and other allowance calculate standard time of the job constituents of standard time standard time computation operator efficiency standard time computation involving frequency of elements

353 368 369 370 371 374 383 384 388 390 401 402 404 407 410 411 421 431 431 432 433 435 436 447 447 448 448 449 449 450 451 451 452 452 453 453 453 454 455 455 455 456 456 457 457 458 458 461

standard time computation when stop watch readings are given 462 standard time computation when stop watch readings involved some foreign elements 464 work sampling 467 Morrow 468 Procedure for conducting a work sampling study 468 Master list of work and delay elements 469 Divgi Metalwares Pvt Ltd 469 want of tools 469 want of work 469 interference 470 Duration of the study 471 number of observers 471 accuracy desired 471 cyclical work patterns 472 accuracy 472, 481 confidence 472 activity percentage 472 design the study 473 number of observation 473 total number of rounds and rounds per day 474 average time between the rounds 475 fix up the time required to make a round 476 compare average time per round with time required to make a round 476 prepare the schedule for the rounds 477 datasheet 478 summary of recommendations 482 setting performance standards with work sampling 483 rating index 483 overall time per unit 484 effective time per unit 484 breakdown of effective time 484 normal time per piece 485 standard time per piece 485 adavantage and disadvantage of work sampling over time study 488 random rounds 492 clock time for the random rounds 492 machine controlled time 496 hand controlled time 496 standard time 497 Chapter -19 Financial incentives 509 fear motivation 509 motivation 509 non financial incentives 509 semi financial incentives 510 financial incentives 510 incentive scheme 510,513 individual incentives 511 minimisation of loss of time 511 equitable wage earnings 512 reduction in supervision 512 managerial functions 512 surplus labour , indirect workmen 512

wage incentive plan fair wage structure overtime quality control accurate projection of future busimess labour body training of supervisors good incentive plan safeguards classification of standards incentive plans classification of std wage incentive plans straight piece rate methods characteristic of piece rate system Differential piece rate method taylor differential piece rate method the merrick differential piece rate method gantt task and bonus scheme emerson efficiency plan Halsey system halsey plan halsey weir plan Rowan system incentive bonus bedaux point system barath variable sharing plan earnings Preiestman production plan Productivity bonus unde the plan

513 514 514 514 515 515 515 516 518 519 520 521 521 524 524 524 528 530 531 532 533 534 535 537 538 539 539

POM assgn : Shagun True/False Question Correct Answer Your Answer It pays in the long run to inform the customer regarding expected delays in the deliveries. True True

Multiple Choice Single Answer Question Fixed position layout is adopted when Correct Answer Your Answer Select The Blank Question Correct Answer Your Answer product is very heavy involving assembly of large number of parts product is very heavy involving assembly of large number of parts

The ________ is the defect level for which lots are regarded as bad lots. Lot Tolerance Percentage Defective Lot Tolerance Percentage Defective

Multiple Choice Multiple Answer Question Which are the advantages of suburban location? Correct Answer Your Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction One detachable ticket is prepared for each ________. Operation Worker

Select The Blank Question Correct Answer Your Answer Select The Blank Question Correct Answer Your Answer

A good maintenance system is not a luxary but a ________. Necessity Necessity

Multiple Choice Multiple Answer Question Following are some of the factors which influence process planning Correct Answer Your Answer True/False Order Quantity , Process capability of machine , Delivery Dates Order Quantity , Delivery Dates , Plant layout

Question Correct Answer Your Answer

Availability of training schools, colleges and management institutes reduces the company's internal training needs. True False

Multiple Choice Multiple Answer Question Which of the following are examples of pure materials? Correct Answer Your Answer Match The Following Question Emerson Efficiency Plan Craft Work Sampling Gantt Chart Bakeries , Ice factories , Woolen Bakeries , Ice factories , Lime stone

Correct Answer Wage Payment Facilities Planning Machine utilization Production Scheduling

Your Answer Wage Payment Production Scheduling Sampling Inspection Charting technique

Match The Following Question Fixation of inventory level Symptom of ill planned purchasing Factor influencing material planning

Correct Answer Reorder level Over ordering Lead time

Your Answer Stock on hand Over ordering Lead time Price of material

Net requirement of material under Stock on hand MRP

Multiple Choice Multiple Answer Question Which of the following are steps to identify the critical path in a small network? Correct Answer Compare the durations of all paths to identify the longest path. , Sum up the durations of activities along each path. , Enumerate all paths in the network and list down activities on each path. Your Answer Compare the durations of all paths to identify the longest path. , Sum up the durations of activities along each path. , Enumerate all paths in the network and list down activities on each path. Select The Blank Question Correct Answer Your Answer

In case of an OC curve, the risk of rejecting a good quality lot may vary between ________. 0.01 to 10% 0.01 to 10%

True/False Question Correct Answer Your Answer

Tool breakage has got nearly zero chances in case of eventual breakdown. False False

Multiple Choice Multiple Answer Question Which are the three types of float? Correct Answer Your Answer Total float , Independent float , Free float Total float , Dependent float , Free float

Multiple Choice Multiple Answer Question Which of the following are major inputs to scheduling? Correct Answer Your Answer Overlapping of operations , Effective Capacity per work centre , Performance standards Effective Capacity per work centre , Ratio of skilled to unskilled labour , Performance standards

Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Select The Blank Question Correct Answer Your Answer Select The Blank Question Correct Answer Your Answer Select The Blank Question Correct Answer Your Answer Factory

The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Acceptable quality level Lot Tolerance Percentage Defective

The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Condition monitoring Overhauling

OC curve of ideal sampling plan suggests that all lots less than 3% defectives have the probability of acceptance of ________. One One

Multiple Choice Single Answer Question How to calculate activity cost slope? Correct Answer Activity cost slope = ( Crash cost - Normal cost ) / ( Normal time - Crash time )

Your Answer

Activity cost slope = ( Normal cost - Crash cost ) / ( Normal time - Crash time )

Multiple Choice Multiple Answer Question Which of the following are minimum requirement for a good quality of design? Correct Answer Resonable cost , Resonable procurement time , Resonable manufacturing time Your Answer Resonable cost , Resonable procurement time , Resonable manufacturing time True/False Question Correct Answer Your Answer

In case of control chart, large smaples such as n=15 or 20 are used if the process standard deviation is small. False True

Select The Blank Question Correct Answer Your Answer

Production control work is ________ in case of floor inspection as compared with the centralised inspection. easier labourious

Multiple Choice Single Answer Question Production Planning includes Correct Answer Your Answer Predetermination of manufacturing requirements Predetermination of manufacturing requirements

Multiple Choice Single Answer Question How does the control chart of statistical quality control helps the operating personnel? Correct Answer Identify the presence of an assignable cause before it develops Your Answer Reduces chances of rejections

Multiple Choice Single Answer Question What can be the worst effect due to excessive vibration? Correct Answer Your Answer Breakdown Reduced salvage value of machine

Multiple Choice Single Answer Question What do you understand by the metallergical aspects of product which forms the vital part of engineering function? Correct Answer Material specifications Your Answer Performance specifications

Multiple Choice Single Answer Question Which of the following is a cause of plant breakdown? Correct Answer Your Answer Overloading of machines Overloading of machines

Multiple Choice Multiple Answer Question Which of the following possibilities can be explored by using flow process chart? Correct Answer Eliminating the operations or combining the operations with another , Reducing the distance traveled by the workmen or materials , Avoiding the waiting time and thereby reduce production losses Your Answer Reducing the distance traveled by the workmen or materials , Reducing rejections drastically , Avoiding the waiting time and thereby reduce production losses Multiple Choice Single Answer Question Material Planning is an integral part of Correct Answer Your Answer Production Planning Process Planning

True/False Question Correct Answer Your Answer

Dust gets mixed with lubricants, forms an abrasive substance and causes pre-mature failure of machinery. True True

Multiple Choice Multiple Answer Question Which of the following activities are used while recording for method study? Correct Answer Your Answer Delay , Operation , Inspection Operation , Inspection , Production

True/False Question Correct Answer Your Answer

In case of centralised inspection, inspection rooms generally become bottleneck and cause delay in taking action regarding rejection or rework. True True

Select The Blank Question

Correct Answer Your Answer

The ________ advocates maintenance procedures whereby the condition of the plant is constantly watched through systematic inspection to unearth unhealthy conditions and preventive Preventive Maintenance Preventive Maintenance

True/False Question Correct Answer Your Answer

The problems of congestion, bottlenecks and backtracking can not be visualized by using templates and models. False False

Multiple Choice Single Answer Question Which varaible is taken along the abscissa or X axis? Correct Answer Your Answer Time Quality

True/False Question Correct Answer Your Answer

Delay in completion of projects result in unwelcome additions to the fixed manufacturing expenses. True True

Select The Blank Question Correct Answer Your Answer

The term ________ emplies the foregone profit due to inability of company to produce. Opportunity cost Idle wages

Multiple Choice Single Answer Question Taxes / duties levied is one of the important determinant for location decision as taxes/duties substantially influence Correct Answer Product cost Your Answer Order procurement

Multiple Choice Multiple Answer Question What are the uses of failure statistics analysis? Correct Answer Your Answer To forecast the defect , To identify causes of major repetative failures , To quantify the frequency of preventive inspection To forecast the defect , To identify causes of major repetative failures , To quantify the frequency of preventive inspection

True/False Question Correct Answer Your Answer

Shop order is one of the subsidiary order True True

Multiple Choice Single Answer Question Which of the following is the most popular technique for Project Production?

Correct Answer Your Answer

PERT & CPM PERT & CPM

Select The Blank Question Correct Answer Your Answer

The ________ is the probability that a good lot will be rejected by the sampling plan. Producer's risk Lot Tolerance Percentage Defective

True/False Question Correct Answer Your Answer

The component produced on completely automatic machines may be subjected to sampling inspection while parts produced on semi-automatic and completely manual operated machines require cent percent inspection. True False

Multiple Choice Multiple Answer Question In an organization there may not be a formal PPC department if Correct Answer Your Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large

Multiple Choice Multiple Answer Question Which of the following factors play important role while selecting or rejecting a particular site from legislation and taxation point of view? Correct Answer Labour laws , Building codes , Policies regarding issue of licences Your Answer Labour laws , Policies regarding issue of licences , Productivity of labour

POM assgn : Shagun Select The Blank Question Correct Answer Your Answer True/False Question Correct Answer Your Answer Match The Following Question Table lubrication Draining and refilling of oil reserviors of plunger pump Parts lubricated with oil nipple Tools and slideways A ________ is another form of subcontracting. Hiring capacity Open purchase order

An ideal OC curve is never possible only with cent percent inspection. False True

Correct Answer Weekly Yearly Daily two to three times a day

Your Answer Six monthly Yearly Weekly Daily

True/False Question Correct Answer Your Answer

The operator should not stop production if first piece is not approved by the inspector. False False

Multiple Choice Multiple Answer Question Which of the following causes can be responsible for derailing the production schedule in a factory? Correct Answer Errors in drawings , Delay in receipt of material from vendor , Excessive absenteeism Your Answer Errors in drawings , Delay in receipt of material from vendor , Excessive absenteeism True/False Question Correct Answer Your Answer For p-chart, the central line of fraction defectives is determined by average percentage defectives. True True

Multiple Choice Multiple Answer Question Expediting function is concerned with following activities Correct Answer Progress chasing to identify delays which may hold up production , Communicating possible delays in delivery date commitment to sales department , Devising cures to keep rate of production in line with schedule

Your Answer

Recording progress of work , Communicating possible delays in delivery date commitment to sales department , Devising cures to keep rate of production in line with schedule

Multiple Choice Single Answer Question When should operator or supervisor is supposed to sign the perforated route sheet? Correct Answer After completion of operation Your Answer Select The Blank Question Correct Answer Your Answer After completion of operation

The ________ is necessary when the job requires detailed of one or more of the job characteristics with the help of special equipment which is not available at the producing company. Inspection order Move order

Multiple Choice Multiple Answer Question What are the benefits of reconditioning? Correct Answer Your Answer Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps to plan requirement of replacement spares Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps to plan requirement of replacement spares

Multiple Choice Multiple Answer Question Which of the following processes or activities are denoted by using symbols while recording in method study? Correct Answer Transport , Delay , Storage Your Answer Transport , Rejection , Storage

Multiple Choice Single Answer Question Which is the zone beyond LTPD in case of Oc curve of a general plan? Correct Answer Your Answer True/False Question Correct Answer Your Answer Select The Blank Question Correct Answer Your Answer Zone of rejection Zone of rejection

A properly designed sampling plan can control sampling errors and completely eliminate them. False True

The ________ includes preventive maintenance activities whose needs are identified through inspection which requires stoppage of machines. Shutdown Maintenance Shutdown Maintenance

Select The Blank Question Correct Answer Your Answer True/False Question Correct Answer Your Answer True/False Question Correct Answer Your Answer

The ________ pertain to the climatic conditions which the component , product or material should withstand. Environmental specifications Environmental specifications

Grouping of machines gives a lot of flexibility in loading and scheduling True True

A lot declared rejected in sampling inspection should not be inspected 100% in any case. False False

Multiple Choice Multiple Answer Question Which of the following are the basic requirements of quality standard? Correct Answer Your Answer True/False Question Correct Answer Your Answer Deifinite , Undesrstandable , Economically viable Absolute uniformity , Undesrstandable , Economically viable

The plotting of activities - critical, non-critical and dummy activities- is strictly according to their precedence relationship. True True

Multiple Choice Multiple Answer Question Which of the following are activities of corrective maintenance? Correct Answer Your Answer Modifications and improvements , Overhauling , Emergency repairs Modifications and improvements , Overhauling , Lubrication as per schedule

Multiple Choice Single Answer Question Following is not a function of PPC Correct Answer Your Answer Product Planning Order Processing

Multiple Choice Multiple Answer Question Which of the following three methods used to select the qualified supplier? Correct Answer By vendor plant surveys , By reputation , By experience

Your Answer Select The Blank Question

By vendor plant surveys , By the perofrmance of first lot , By experience

Correct Answer Your Answer Match The Following Question Pessimistic time Expected time Optimistic time Most likely time

The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable. Quality control Quality control

Correct Answer b Te a m

Your Answer p Te o m

Multiple Choice Multiple Answer Question Which are the different methods of recording actual progress of work? Correct Answer Your Answer Display boards , Progress cards , Network updating Display boards , Job cards , Progress cards

Multiple Choice Single Answer Question One of the characterstic of layout is about the flow of material / personnel. In a good layout the flow should be Correct Answer Unidirectional Your Answer Unidirectional

Multiple Choice Multiple Answer Question What is indicated by the hugging points lying close to mean of the process in X bar-R- control chart? Correct Answer Biases in measurements , Recording done without actual measurements , Improper selection of samples Your Answer Biases in measurements , Recording done without actual measurements , Improper selection of samples Multiple Choice Multiple Answer Question Operation Layout generally contains following information Correct Answer Your Answer Part Sketch , Standard Time , Jigs and fixtures Sequence of operations , Standard Time , Jigs and fixtures

Multiple Choice Single Answer Question What do you mean by the graphical representation of the project which is composed as series of connected arrows and circles to describe the

interrelationship of the activities involved? Correct Answer Your Answer Network Flow chart

Multiple Choice Single Answer Question Where does the SPC exercises the control to prevent the occurances of defectives? Correct Answer On manufacturing process Your Answer On manufacturing process

Multiple Choice Single Answer Question Which photographic technique is used to record path of motions of the members of the body during method study? Correct Answer Cyclograph Your Answer Select The Blank Question Correct Answer Your Answer Pictograph

An Ideal OC curve is ________ shaped curve that accpets all the lots with quality equal to or better than AQL . Rectangular Bell

True/False Question Correct Answer Your Answer

In Gantt Chart, the horizontal lines devide vertical lines into sections which represents either operations or work centres. True True

Select The Blank Question Correct Answer Your Answer

Goods after final inspection should accompany ________to enable dispatch department to identify and draw correct reference. Forwarding note Forwarding note

Select The Blank Question Correct Answer Your Answer

Capacity decisions have a direct influence on performance of production system in respect of ________ Delivery performance Quality

True/False Question Correct Answer

Floor inspection promotes tendency of machines to drift out of limits and produce defectives. False

Your Answer

False

True/False Question Correct Answer Your Answer

A sampling plan which perfectly discriminates will have vertical OC curve. True True

Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Manufacturing

Multiple Choice Multiple Answer Question Which are the different methods to record details of the existing method during method study? Correct Answer Charts , Diagrams , Templates or models Your Answer Control plans , Charts , Templates or models

Select The Blank Question Correct Answer Your Answer

The ________ breakdowns usually cost more, partly due to damage done to the adjustment components and partly due to emergency actions. Unexpected Unexpected

Multiple Choice Single Answer Question Gross requirement of products is determined on the basis of Correct Answer Your Answer Both forecast and pending orders Past sales

Select The Blank Question Correct Answer Your Answer

The ________ is the probability that a bad lot will be accepted by the sampling plan. Consumer's risk Acceptable quality level

Select The Blank Question Correct Answer Your Answer

The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________. Overtime working Overtime working

Multiple Choice Single Answer Question What do you mean by lowest possible direct cost required to complete an activity within it's normal time? Correct Answer Normal cost Your Answer Normal cost

Multiple Choice Single Answer Question What do you mean by lowest possible direct cost required to complete an activity within it's crashed time? Correct Answer Crash cost Your Answer Total cost

Multiple Choice Single Answer Question What do you understand by the extent the products manufactured conforms to the laid down design? Correct Answer Quality of conformance Your Answer Quality of design

Multiple Choice Multiple Answer Question Which kind of possible defectives can be reduced due to first off inspection? Correct Answer Your Answer Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machine set up Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machine set up

POM assgn Multiple Choice Single Answer Question Which phase of method study is concerned with analyzing the facts critically, generating alternatives which form the basis for selection and development of improved methods? Correct Answer Critical examination Your Answer Select The Blank Question Correct Answer Your Answer Select The Blank Question Correct Answer Your Answer True/False Question Correct Answer Your Answer Select The Blank Question Correct Answer Your Answer True/False Question Development and selection

The ________ advocates maintenance procedures whereby the condition of the plant is constantly watched through systematic inspection to unearth unhealthy conditions and preventive Preventive Maintenance Design-in Maintenance

The term ________ emplies the foregone profit due to inability of company to produce. Opportunity cost Down time cost

A network should employ only those dummy activities which are absolutely necessary. True True

A set of activities to keep an equipment in the specified condition is called as ________. Maintenance Maintenance

Correct Answer Your Answer Select The Blank Question Correct Answer Your Answer

While making X bar-R-chart, values of X bar and R are recoded samplewise either on the extreme right of the individual measurements on the data sheet or in a separate sheet. True False

The ________ must ensure that the product satisfy the functional requirements of it's usage. Quality of design Quality of inspection

True/False Question Correct Answer Your Answer

Even if any activity on the critical path is delayed, project completes on the scheduled time. False False

Multiple Choice Single Answer Question Which is the alternative way of indicating the load other than numerical way, in case of Gantt chart ? Correct Answer Graphical approach Your Answer Symbolic pproach

Multiple Choice Multiple Answer Question Which of the following are types of sampling plan? Correct Answer Your Answer Single sampling plan , Double sampling plan , Multiple sampling plan Single sampling plan , Double sampling plan , Multiple sampling plan

Multiple Choice Multiple Answer Question Which of the following are major inputs to scheduling? Correct Answer Your Answer Select The Blank Question Correct Answer Your Answer Select The Blank Question Correct Answer Your Answer True/False Question Correct Answer Your Answer Overlapping of operations , Effective Capacity per work centre , Performance standards Overlapping of operations , Effective Capacity per work centre , Performance standards

The ________ is necessary when the job requires detailed of one or more of the job characteristics with the help of special equipment which is not available at the producing company. Inspection order Stores issue order

The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Condition monitoring Condition monitoring

Diversified labour is adequately available in rural area as compared to urban area. False False

Multiple Choice Multiple Answer Question Which of the following cases indicated that the operation has occurred?

Correct Answer Your Answer

Movement of components to assembly section , Raw material movement , A worker's trip to grinder to sharpen the tools Movement of components to assembly section , A worker's trip to grinder to sharpen the tools , Tools kept in rack of tool crib

Multiple Choice Single Answer Question What is the reason of fluctuations, if the control chart evaluates that the process is in a state of statistical control? Correct Answer Random variability Your Answer Select The Blank Question Correct Answer Your Answer Set up variability

The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Acceptable quality level Acceptable quality level

Multiple Choice Single Answer Question Product layout is suitable when Correct Answer Your Answer Products have reasonable stable demand Products are not required in large quantities

Multiple Choice Multiple Answer Question Which of the following charts are used for the recording of data during the method study? Correct Answer Operation process chart , Multiple activity chart , Flow process chart Your Answer True/False Question Correct Answer Your Answer Operation process chart , Multiple activity chart , Flow process chart

The operator should not stop production if first piece is not approved by the inspector. False False

Multiple Choice Single Answer Question Need for change in layout can occur due to following reason Correct Answer Your Answer introduction of new product introduction of new product

Multiple Choice Single Answer Question What do you mean by a single event which represents the joint completion of more than one activities? Correct Answer Merge event Your Answer Merge event

True/False Question

Correct Answer Your Answer

The control chart for number of defectives is more convenient to make than control chart for fraction defectives sincethe fugure of number of defectives units can be directly taken from the inspection report. True True

Multiple Choice Single Answer Question Which rule is used for numbering of events? Correct Answer Your Answer True/False Question Correct Answer Your Answer True/False Question Correct Answer Your Answer Fulkerson's Rule Juran's Rule

In case of two handed process chart, the simultaneous activities of both hands are recorded opposite to each other on the chart. True True

All activities lying on the non-critical paths must have total float and free float. False True

Multiple Choice Multiple Answer Question Which of the following is not the characteristic of Project Production? Correct Answer Your Answer Continuous flow of material , Highly mechanised material handling , Virtually zero manufacturing cycle time Continuous flow of material , Highly mechanised material handling , Virtually zero manufacturing cycle time

Multiple Choice Multiple Answer Question Which of the following is not the characteristic of Project Production? Correct Answer Your Answer Select The Blank Question Correct Answer Your Answer Continuous flow of material , Highly mechanised material handling , Virtually zero manufacturing cycle time Fixed position layout

The ________ are the definitions of the measurable as well as nonmeasurable characteristics of the product. Specifications Specifications

Multiple Choice Single Answer Question How industry has responded to the fact of existence of inherant variability of the manufacturing process?

Correct Answer Your Answer Select The Blank Question Correct Answer Your Answer

Inclusion of certain tolerance on the basic dimensions in the drawing Inclusion of certain tolerance on the basic dimensions in the drawing

Work study is also called ________ study Time and Motion Time and Motion

Multiple Choice Multiple Answer Question Which are the different methods of recording actual progress of work? Correct Answer Your Answer True/False Question Correct Answer Your Answer Display boards , Progress cards , Network updating Job cards , Progress cards , Network updating

In case of backward pass computation, the latest event time of the end event equals to the earliest event time minus duration of that activity. False True

Multiple Choice Multiple Answer Question Which of the following products should be produced by using mass production? Correct Answer Your Answer Refrigerator , Tyre for automobile , Television Set Refrigerator , Tyre for automobile , Television Set

Multiple Choice Multiple Answer Question Which of the following are examples of attributes? Correct Answer Your Answer Match The Following Question Scheduling Device Interruption for machine utilisation Input for scheduling Technique of scheduling Cracks , Burrs , Texture Cracks , Burrs , Texture

Correct Answer Strings Preventive maintenance Overlapping of operations Critical Path Analysis

Your Answer Strings Preventive maintenance Critical Path Analysis JIT

Multiple Choice Multiple Answer Question Which are the three distinct parts of the chart?

Correct Answer Your Answer Match The Following Question Combined Layout Fixed Position Layout Product Layout Process Layout

Summary , Introduction , Body Summary , Introduction , Analysis

Correct Answer Mixed Layout Project Layout Line Layout Functional Layout

Your Answer Mixed Layout Project Layout Line Layout Functional Layout

Multiple Choice Multiple Answer Question Following are the commonly used factors considered for evaluation of layout in factor analysis method Correct Answer Flow of material , Equipment utilization , Working condition Your Answer Flow of material , Equipment utilization , Working condition

Multiple Choice Single Answer Question Fixed position layout is adopted when Correct Answer Your Answer Select The Blank Question Correct Answer Your Answer product is very heavy involving assembly of large number of parts product is very heavy involving assembly of large number of parts

The ________ is the defect level for which lots are regarded as bad lots. Lot Tolerance Percentage Defective Acceptable quality level

Multiple Choice Multiple Answer Question Which of the following are examples of specifications? Correct Answer Your Answer Commercial standards , Assembly and testing instructions , Bill of material Commercial standards , Assembly and testing instructions , Bill of material

Multiple Choice Single Answer Question Process Engineer does not get sufficient time for designing tooling for most economic production run when Correct Answer Delivery time is less Your Answer Delivery time is less

Multiple Choice Single Answer Question What do you mean by the graphical representation of the project which is composed as series of connected arrows and circles to describe the

interrelationship of the activities involved? Correct Answer Your Answer True/False Question Correct Answer Your Answer Network Flow chart

Latest finishing date is the latest event time of the tail event. False True

Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory

Select The Blank Question Correct Answer Your Answer

The ________ is the probability that a bad lot will be accepted by the sampling plan. Consumer's risk Consumer's risk

LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Single Answer Question What is represented by an arrow in a network? Correct Answer Activity Your Answer True/False Question Activity

Skill of labour force in a product type layout is usually higher than in the process type of layout Correct Answer False Your Answer True

Select The Blank Question Production control work is ________ in case of floor inspection as compared with the centralised inspection. Correct Answer easier Your Answer True/False Question easier

In case of X bar, if the process is not under control indicated by some points falling outside the control limits, such points outside the control limits are eliminated and new trial control limits for the remaining points are computed. Correct Answer True Your Answer False

Multiple Choice Single Answer Question Need for change in layout can occur due to following reason Correct Answer introduction of new product Your Answer introduction of new product

Multiple Choice Multiple Answer Question Material Requirement Planning is very useful in following situations Correct Answer Long Lead time for procurement , Several levels of assemblies in product , Long manufacturing cycle Your Answer Long Lead time for procurement , Several levels of assemblies in product , Long manufacturing cycle True/False Question The plotting of activities - critical, non-critical and dummy activities- is strictly according to their precedence relationship.

Correct Answer True Your Answer True

Multiple Choice Single Answer Question Data from Process Sheet can be used to Correct Answer Prepare load and schedule charts Your Answer Monitor progress of work

Multiple Choice Single Answer Question How should a dummy activity be represented in a network? Correct Answer By dotted line Your Answer By dotted line

Select The Blank Question The ________ are the definitions of the measurable as well as nonmeasurable characteristics of the product. Correct Answer Specifications Your Answer Specifications

True/False Question

A load chart specifies the work to be carried out by each person of company during shift hours. Correct Answer False Your Answer False

Match The Following Question

Correct Answer

Your Answer Critical Path Analysis

Scheduling of interrelated Critical Path Analysis activities of small projects with consideration of uncertainty of duration of activities. Two machines & processing Johnson's Two Machine time depends on sequence of Algorithm job loading Sufficient orders and Index Method resonable choice of machines Time relationship between when a product is required and when it can be made Critical Ratio Scheduling

Critical Ratio Scheduling

Johnson's Two Machine Algorithm Time series

available

True/False Question

Systematic maintenance system can completely eliminate the wear and tear of machines. Correct Answer False Your Answer False

Multiple Choice Single Answer Question Providing flexibility in plant layout means Correct Answer Layout can be changed without much cost if required Your Answer Machine allocation can be changed easily

True/False Question

Since value of p can never be positive, hence" if LCLp works out to be positive, it is taken as zero." Correct Answer False Your Answer False

Multiple Choice Multiple Answer Question Which information is recorded in an equipment card? Correct Answer Date of commissioning , Equipment specifications , Name and address of manufacturer Your Answer Price of an equipment , Equipment specifications , Name and address of manufacturer Multiple Choice Multiple Answer Question Which of the following method can be adopted to overcome the problem of rushing up a job for it's timely completion? Correct Answer Use of optimum speeds and feeds , Subcontracting , Job splitting Your Answer Use of optimum speeds and feeds , Subcontracting , Job splitting

Multiple Choice Multiple Answer Question Which of the following method can be used to record the facts during the method study? Correct Answer Micromotion study , Cyclegraph , Chronocyclegraph Your Answer Micromotion study , Cyclegraph , Chronocyclegraph

Multiple Choice Multiple Answer

Question

Which are the sources of information to update the progress card daily?

Correct Answer Detachable ticket , Daily production report , Job Card Your Answer Detachable ticket , Daily production report , Job Card

Multiple Choice Single Answer Question What do you understand by the critical analysis of existing jobs to develop easier and effective method? Correct Answer Method study Your Answer Method study

Select The Blank Question Production Planning is a centralised activity which includes functions such as ________ Correct Answer Scheduling Your Answer Scheduling

Multiple Choice Multiple Answer Question Plant layout facilitates processing of products in most effective manner through the following Correct Answer Shortest possible distance , Shortest processing time , Minimum movement Your Answer Shortest possible distance , Shortest processing time , Minimum movement

Select The Blank Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________. Correct Answer 0.01 to 10% Your Answer 0.01 to 10%

True/False Question

Dispatching function is not a part of Production Planning

Correct Answer True Your Answer False

Select The Blank Question Work study is also called ________ study Correct Answer Time and Motion Your Answer Time and Motion

Multiple Choice Multiple Answer Question Which are the distinct functions of scientific quality control? Correct Answer Acceptance function , Preventive function , Assurance function Your Answer Acceptance function , Preventive function , Assurance function

True/False Question

The component produced on completely automatic machines may be subjected to sampling inspection while parts produced on semi-automatic and completely manual operated machines require cent percent inspection. Correct Answer True Your Answer True

Match The Following Question Draining and refilling of oil reserviors of plunger pump

Correct Answer Yearly

Your Answer Yearly Daily two to three times a day Weekly

Parts lubricated with oil nipple Daily Tools and slideways Table lubrication two to three times a day Weekly

Multiple Choice Multiple Answer Question Which of the following are examples of consumption of physical effort during recording for method study? Correct Answer Bending , Positioning , Unloading Your Answer Positioning , Unloading , Drilling

True/False Question

Labour turnover rate is higher in case of rural area as compared to urban area. Correct Answer False Your Answer True

Select The Blank Question Goods after final inspection should accompany ________to enable dispatch department to identify and draw correct reference. Correct Answer Forwarding note

Your Answer

Forwarding note

Multiple Choice Single Answer Question What does CPA stand for? Correct Answer Critical Path Analysis Your Answer Critical Path Analysis

Select The Blank Question The ________ advocates maintenance procedures whereby the condition of the plant is constantly watched through systematic inspection to unearth unhealthy conditions and preventive Correct Answer Preventive Maintenance Your Answer Preventive Maintenance

Multiple Choice Single Answer Question Following is one of the techniques used for Material Planning for high value material Correct Answer MRP Your Answer Exponential smoothing

Multiple Choice Single Answer Question What is the name of the document on which details of the process are recorded by the symbols and charting conventions? Correct Answer Chart Your Answer Flowsheet

Multiple Choice Multiple Answer Question Which are the general principles underlying probability aspects of project planning? Correct Answer Statistically three time estimate of an activity conform to Beta distribution. , Expected time divides the area under the curve into two equal parts. , Expected time of an activity is located at one third of the distance between "m" and mid-range { (a+b)/2 } away from the most likely time. Your Answer Statistically three time estimate of an activity conform to Beta distribution. , Expected time divides the area under the curve into two equal parts. , Expected time of an activity is located at one third of the distance between "m" and mid-range { (a+b)/2 } away from the most likely time. Multiple Choice Multiple Answer Question Gross requirement of finished product is determined on the basis of following Correct Answer Forecasted sales , Pending sales order , Management decision to stock

Your Answer

Pending sales order , Management decision to stock , Gross Market requirement

Select The Blank Question The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________. Correct Answer Overtime working Your Answer Overtime working

True/False Question

An activity should represent an operation or set of operations which can be performed using a particular kind of equipment or a special skill. Correct Answer True Your Answer True

Multiple Choice Multiple Answer Question How many of the following are types of specification? Correct Answer Material specifications , Dimensional specifications , Performance specifications Your Answer Cost specifications , Material specifications , Dimensional specifications

Select The Blank Question The ________ is specified to indicate the maximum permissible variability in the dimensions product or parts. Correct Answer Tolerance Your Answer Tolerance

Select The Blank Question The ________ pertain to the climatic conditions which the component , product or material should withstand. Correct Answer Environmental specifications Your Answer Environmental specifications

Select The Blank Question The ________ is a set of tools and techniques by which products are made to comply with the specifications at minimum cost to the firm. Correct Answer Quality control system Your Answer Quality control system

Multiple Choice Single Answer

Question

Which chart sets out the sequence of flow of work of a product, or any part of it through the section or department or a factory by recording the events under review using appropriate symbols? Correct Answer Flow process chart Your Answer Operation process chart

Multiple Choice Single Answer Question What do you understand by the measurement of work to establish allowed time for a job for the defined method? Correct Answer Work measurement Your Answer Work measurement

Multiple Choice Multiple Answer Question Which three of the following options can be used to reduce the duration of activity during project crashing? Correct Answer Allocating more manpower and machines than originally planned for. , Working additional shifts or overtime. , Awarding work to vendors who charge extra but expedite deliveries. Your Answer Allocating more manpower and machines than originally planned for. , Working additional shifts or overtime. , Awarding work to vendors who charge extra but expedite deliveries. Multiple Choice Single Answer Question Which photographic technique is used to record path of motions of the members of the body during method study? Correct Answer Cyclograph Your Answer Cyclograph

POM assgn : Amit True/False Question Correct Answer Your Answer The problems of congestion, bottlenecks and backtracking can not be visualized by using templates and models. False False

Multiple Choice Multiple Answer Question Following are some of the factors which influence process planning Correct Answer Your Answer Order Quantity , Process capability of machine , Delivery Dates Process capability of machine , Delivery Dates , Order Quantity

Multiple Choice Single Answer Question Gross requirement of products is determined on the basis of Correct Answer Your Answer Both forecast and pending orders Both forecast and pending orders

True/False Question Correct Answer Your Answer

Skill of labour force in a product type layout is usually higher than in the process type of layout False True

Multiple Choice Single Answer Question In exponential smoothing method,for a stable demand pattern and better smoothing effect, value of fraction( Alpha) selected is Correct Answer 0.05 to 0.10 Your Answer 0.05 to 0.10

True/False Question Correct Answer Your Answer

Recording of movement is not necessary in case of method study in any form. False True

Multiple Choice Multiple Answer Question Which of the following may be the objectives of project crashing? Correct Answer Your Answer To complete the project in the least possible time , To reduce project cost below it's normal cost , To achieve uniformity in requirement of resources To complete the project in the least possible time , To reduce project cost below it's normal cost , To achieve uniformity in requirement of resources

Multiple Choice Single Answer

Question Correct Answer Your Answer

Which is the next stage to the inspection based quality control in the historical development of quality management. Quality assurance Total Quality management

Select The Blank Question Correct Answer Your Answer

The ________ includes preventive maintenance activities whose needs are identified through inspection which requires stoppage of machines. Shutdown Maintenance Shutdown Maintenance

Multiple Choice Single Answer Question Inadequate production capacity ultimately leads to Correct Answer Your Answer Poor Customer Service Low Productivity

Select The Blank Question Correct Answer Your Answer

The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Condition monitoring Condition monitoring

True/False Question

Correct Answer Your Answer

Inspection should be conducted on all incoming materials, semifinished items, bought out components, subcontract items prior to any operation, assembly. True True

Select The Blank Question Correct Answer Your Answer

The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Acceptable quality level Acceptable quality level

Multiple Choice Single Answer Question Production Planning includes Correct Answer Your Answer Predetermination of manufacturing requirements Predetermination of manufacturing requirements

Multiple Choice Multiple Answer Question Expediting function is concerned with following activities

Correct Answer Your Answer

Progress chasing to identify delays which may hold up production , Communicating possible delays in delivery date commitment to sales department , Devising cures to keep rate of production in line with schedule Progress chasing to identify delays which may hold up production , Communicating possible delays in delivery date commitment to sales department , Devising cures to keep rate of production in line with schedule

Select The Blank Question

Correct Answer Your Answer

The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable. Quality control Quality control

True/False Question Correct Answer Your Answer

A load chart specifies the work to be carried out by each person of company during shift hours. False False

Match The Following Question Pessimistic time Expected time Optimistic time Most likely time

Correct Answer b Te a m

Your Answer b Te a m

True/False Question Correct Answer Your Answer

Breakdown is inversly proportional to the investment in W.I.P. False True

Select The Blank Question Correct Answer Your Answer

Production Planning is a centralised activity which includes functions such as ________ Scheduling Scheduling

Select The Blank Question Correct Answer

A set of activities to keep an equipment in the specified condition is called as ________. Maintenance

Your Answer

Maintenance

Multiple Choice Single Answer Question A good plant layout helps in Correct Answer Your Answer Reducing handling costs Reducing handling costs

Select The Blank Question Correct Answer Your Answer

The ________ is the probability that a good lot will be rejected by the sampling plan. Producer's risk Producer's risk

Multiple Choice Multiple Answer Question Components of Production Management include Correct Answer Your Answer Capacity Planning , Job Design , Production Planning Capacity Planning , Job Design , Production Planning

Multiple Choice Single Answer Question Technique of Value Engineering can be effectively employed in design of a product to Correct Answer To meet the intended function at lowest cost Your Answer To meet the intended function at lowest cost

Multiple Choice Multiple Answer Question Which are the subtasks of the maintenance phase of the method study? Correct Answer Your Answer Monitoring and control , Performance appraisal , Audit on savings Monitoring and control , Performance appraisal , Audit on savings

True/False Question Correct Answer Your Answer

short cycle job should be studied for macroscopic motions. False True

Select The Blank Question Correct Answer Your Answer

The ________ is a set of tools and techniques by which products are made to comply with the specifications at minimum cost to the firm. Quality control system Quality control system

True/False Question Correct Answer Your Answer

Inspection Order can be a verbal order True False

Multiple Choice Single Answer Question Need for change in layout can occur due to following reason Correct Answer Your Answer introduction of new product improve quality

Select The Blank Question Correct Answer Your Answer

Goods after final inspection should accompany ________to enable dispatch department to identify and draw correct reference. Forwarding note Forwarding note

Multiple Choice Multiple Answer Question Which are the different methods of recording actual progress of work? Correct Answer Your Answer Display boards , Progress cards , Network updating Display boards , Progress cards , Network updating

Select The Blank Question Correct Answer Your Answer

The term ________ emplies the foregone profit due to inability of company to produce. Opportunity cost Opportunity cost

Multiple Choice Single Answer Question What do you mean by lowest possible direct cost required to complete an activity within it's crashed time? Correct Answer Crash cost Your Answer Normal cost

Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory

Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as

Correct Answer Your Answer

Operation Operation

Multiple Choice Single Answer Question What do you mean by the selection of the job for the method study on the basis of manufacturing difficulties? Correct Answer Technical consideration Your Answer Economic consideration

True/False Question Correct Answer Your Answer

In case of backward pass computation, the latest event time of the end event equals to the earliest event time minus duration of that activity. False True

Match The Following Question Emerson Efficiency Plan Craft Work Sampling Gantt Chart

Correct Answer Wage Payment Facilities Planning Machine utilization Production Scheduling

Your Answer Wage Payment Facilities Planning Machine utilization Production Scheduling

Multiple Choice Multiple Ans wer Question Which of the following are examples of addition during recording for method study? Correct Answer Brazing , Welding , Riveting Your Answer Brazing , Welding , Riveting

Multiple Choice Single Answer Question The ratio of output to input of a production system is commonly known as Correct Answer Your Answer Productivity Productivity

Multiple Choice Single Answer Question In case of Batch Production which kind of labour is expected? Correct Answer Your Answer Skilled in one specific Manufacturing Process Skilled in all Manufacturing Processes

Select The Blank

Question Correct Answer Your Answer

The ________ is necessary when the job requires detailed of one or more of the job characteristics with the help of special equipment which is not available at the producing company. Inspection order Inspection order

Multiple Choice Multiple Answer Question Which are the factors on which the structure of the transportation cost depends? Correct Answer Average distance of shipment , Characteristics of the commodity , Medium of shipment Your Answer Average distance of shipment , Characteristics of the commodity , Medium of shipment Multiple Choice Single Answer Question Which is the ideal place to inspect jigs and fixtures in a mass manufacturing unit? Correct Answer Separate inspection room Your Answer Separate inspection room

True/False Question Correct Answer Your Answer

In Gantt Chart, the horizontal lines devide vertical lines into sections which represents either operations or work centres. True True

POM assgn : Amit Multiple Choice Multiple Answer Question Which of the following are minimum requirement for a good quality of design? Correct Answer Your Answer Resonable cost , Resonable procurement time , Resonable manufacturing time Resonable manufacturing time , Resonable cost , Resonable procurement time

Multiple Choice Single Answer Question Where does the central line is located in case of p-chart? Correct Answer Your Answer at p bar at median

Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory

Multiple Choice Single Answer Question Technique of Value Engineering can be effectively employed in design of a product to Correct Answer To meet the intended function at lowest cost Your Answer To meet the intended function at lowest cost

Select The Blank Question Correct Answer Your Answer

The ________ is the probability that a good lot will be rejected by the sampling plan. Producer's risk Producer's risk

Multiple Choice Multiple Answer Question Material Requirement Planning is very useful in following situations Correct Answer Your Answer Long Lead time for procurement , Several levels of assemblies in product , Long manufacturing cycle Long Lead time for procurement , Long manufacturing cycle , Demand for the product is not known

Select The Blank Question Correct Answer Your Answer

The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable. Quality control Quality control

Select The Blank

Question Correct Answer Your Answer

The ________ is the process of withdrawing the equipment from the production line, dismantling it unitwise, visualising defects, effecting adjustments, replacing worn -out parts and finally building it up to get desired accuracies. Reconditioning Overhauling

Multiple Choice Single Answer Question The ratio of output to input of a production system is commonly known as Correct Answer Your Answer Productivity Productivity

True/False Question Correct Answer Your Answer

In case of two handed process chart, the simultaneous activities of both hands are recorded opposite to each other on the chart. True True

Match The Following Question Emerson Efficiency Plan Craft Work Sampling Gantt Chart

Correct Answer Wage Payment Facilities Planning Machine utilization Production Scheduling

Your Answer Wage Payment Facilities Planning Machine utilization Production Scheduling

Multiple Choice Multiple Answer Question Which of the following factors play important role while selecting or rejecting a particular site from legislation and taxation point of view? Correct Answer Labour laws , Building codes , Policies regarding issue of licences Your Answer Labour laws , Building codes , Policies regarding issue of licences

Multiple Choice Single Answer Question What do you mean by the study of repetitive short cycle operations which involve quick hand / feet motions? Correct Answer Micromotion study Your Answer Macromotion study

True/False Question Correct Answer

An activity should represent an operation or set of operations which can be performed using a particular kind of equipment or a special skill. True

Your Answer

True

Multiple Choice Multiple Answer Question Which of the following products should be produced by using mass production? Correct Answer Your Answer Refrigerator , Tyre for automobile , Television Set Refrigerator , Tyre for automobile , Television Set

True/False Question Correct Answer Your Answer

In case of X bar, if the process is not under control indicated by some points falling outside the c ontrol limits, such points outside the control limits are eliminated and new trial control limits for the remaining points are computed. True True

True/False Question Correct Answer Your Answer

After goods have been manufactured, route sheets and operation layouts should not be collected back. False False

True/False Question Correct Answer Your Answer

Planned lubrication is said to be the nervous system of the equipment. True True

Multiple Choice Single Answer Question What does the points falling outside the control limits indicate? Correct Answer Your Answer Presence of assignable causes Mean = Standard deviation

Multiple Choice Single Answer Question Which industry out of the following industries require maximum consideration for safety factor while selecting plant location? Correct Answer Nuclear power plant Your Answer Nuclear power plant

Multiple Choice Multiple Answer Question Which of the following are assignable cause? Correct Answer Your Answer Large varaitions in hardness of material , Tool wear , Errors in setting Large varaitions in hardness of material , Play in guide rods , Errors in setting

Multiple Choice Single Answer Question A good plant layout helps in Correct Answer Your Answer Reducing handling costs Reducing handling costs

Multiple Choice Multiple Answer Question Which of the following are examples of addition during recording for method study? Correct Answer Brazing , Welding , Riveting Your Answer Brazing , Welding , Riveting

True/False Question Correct Answer Your Answer

An activity can share the same tail event and same head event with any other activity. False True

Select The Blank Question Correct Answer Your Answer

Work study is also called ________ study Time and Motion Time and Motion

Multiple Choice Single Answer Question Which kind of gauge consists of electrical contacts operating a series of colloured signal lamps which indicate whether the dimension is correct, oversize or undersize? Correct Answer Multiple gauging Your Answer Multiple gauging

Multiple Choice Multiple Answer Question Components of Production Management include Correct Answer Your Answer Capacity Planning , Job Design , Production Planning Capacity Planning , Job Design , Production Planning

True/False Question Correct Answer Your Answer

Only skilled worker can use the fixed limit gauge. False False

Multiple Choice Multiple Answer

Question Correct Answer Your Answer

Which are major benefits of identifying the critical path? It helps to identify the set of activities and events which are critical and as such must be carefully controlled and monitored , It identifies activities t o be given preference in allocation of resources. , It helps to exercise "control by exception". It helps to identify the set of activities and events which are critical and as such must be carefully controlled and monitored , It reduces the paperwork , It identifies activities to be given preference in allocation of resources.

Multiple Choice Multiple Answer Question Which are reason due to which the progress of work is rarely in line with it's plan? Correct Answer Your Answer Absenteeism , Machine breakdowns , Substandard performance against prefixed production standards Absenteeism , Machine breakdowns , Substandard performance against prefixed production standards

Select The Blank Question

Correct Answer Your Answer

The ________ is necessary when the job requires detailed of one or more of the job characteristics with the help of special equipment which is not available at the producing company. Inspection order Inspection order

Multiple Choice Multiple Answer Question Which of the following are important considerations concerning activity times? Correct Answer Activity time should be obtained from the person responsible for the completion of an activity , Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resources required to carry out the activity are available. Activity time should be obtained from the person responsible for the completion of an activity , Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resou rces required to carry out the activity are available.

Your Answer

Select The Blank Question Correct Answer Your Answer

Capacity decisions have a direct influence on performance of production system in respect of ________ Delivery performance Delivery performance

True/False Question Correct Answer Your Answer

Breakdown of machines, absenteeism of worker does not dislocate the manufacturing activity in process layout True True

Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity

can be defined as Correct Answer Your Answer Operation Operation

Multiple Choice Multiple Answer Question Which of the following possibilities can be explored by using flow process chart? Correct Answer Your Answer Eliminating the operations or combining the operations with another , Reducing the distance traveled by the workmen or materials , Avoiding the waiting time and thereby reduce production losses Eliminating the operations or combining the operations with another , Reducing the distance traveled by the workmen or materials , Avoiding the waiting time and thereby reduce production losses

Multiple Choice Single Answer Question The document raised by PPC which authorises different functions to take action as per instruction is called Correct Answer Work Order Your Answer Work Order

True/False Question Correct Answer Your Answer

Dust gets mixed with lubricants, forms an abrasive substance and causes premature failure of machinery. True True

Match The Following Question Draining and refilling of oil reserviors of plunger pump Parts lubricated with oil nipple Tools and slideways Table lubrication

Correct Answer Yearly Daily two to three times a day Weekly

Your Answer Yearly Daily two to three times a day Weekly

Select The Blank Question Correct Answer Your Answer

Production control work is ________ in case of floor inspection as compared with the centralised inspection. easier easier

True/False Question

Operation process charts though indicates the sequence of events but do not show movements.

Correct Answer Your Answer

True True

Select The Blank Question Correct Answer Your Answer

The ________ is the probability that a bad lot will be accepted by the sampling plan. Consumer's risk Consumer's risk

Select The Blank Question Correct Answer Your Answer

A ________ is another form of subcontracting. Hiring capacity Hiring capacity

Select The Blank Question Correct Answer Your Answer

The ________ breakdowns usually cost more, partly due to damage done to the adjustment components and partly due to emergency actions. Unexpected Unexpected

Select The Blank Question Correct Answer Your Answer

Production Planning is a centralised activity which includes functions such as ________ Scheduling Scheduling

Multiple Choice Single Answer Question Which is the zone beyond LTPD in case of Oc curve of a general plan? Correct Answer Your Answer Zone of rejection Zone of rejection

Multiple Choice Single Answer Question Where the ignorance towards the degradation of machine leads to? Correct Answer Your Answer Eventual breakdown Eventual breakdown

Production / Operations ManagementPage 1

ASSIGNMENT
Q.1) What is Operations Management? What are the objectives of Operations Management? Enlist key elements of Operations Management.

Answer.1) An operation may be defined as the process of changing inputs into outputs thereby adding value to some entity.Right quality, right quantity, right time and right price are the four basic requirements of the customers and as such they determine the extent of customer satisfaction. And if these can be provided at a minimum cost, then the value of goods produced or services rendered increases. Thus the objectives of production management are to produce goods and services of the right quality, in the right quantities, according to the time schedule and a minimum cost. Objectives of production management may be amplified as under: Producing the right kind of goods and services that satisfy customers needs (effectiveness objective). Maximizing output of goods and services with minimum resource inputs (efficiency objective). Ensuring that goods and services produced conform to pre-set quality specifications (quality objective). Minimizing throughput-time- the time that elapses in the conversion process- by reducing delays, waiting time and idle time (lead time objective). Maximizing utilization of manpower, machines, etc. (Capacity utilization objective). Minimizing cost of producing goods or rendering a service (Cost objective). Key elements of Operations Management

1. Product selection and design The right kind of products and good designs of the products are crucial for the success of an organizing. A wrong selection of the product and/or poor design of the products can render the companys operation ineffective and non-competitive. Products/services, therefore, must be chosen after detailed evaluation of the product/services alternatives in conformity with the organizations objectives. Techniques like value engineering may be employed in creating alternate designs, which are free from unnecessary features and meet the intended functions at the lowest cost. 2. Process selection and planning Selection of the optimal conversion system is as important as choice of products/services and their design. Process selection decisions include decisions concerning choice of technology,

Production / Operations ManagementPage 2


Equipment, machines, material handling systems, mechanization and automation. Process planning involves detailing of processes if resource conversion required and their sequence. 3 Facilities (Plant) location Plant location decisions are strategic decisions and once plant is set up at a location, it is comparatively immobile and can be shifted later only at a considerable cost and interruption of production. Although problem of location choice does not fall within preview the production function and it occurs infrequently, yet it is of crucial importance because of its major effect on the performance of every department including production. Therefore, it is important to choose the right location, which will minimize total delivered customer cost (Production and distribution cost). Locational decisions involve evaluation of locational alternatives against multiplicity of relevant factors considering their relative importance to the organization and selecting those, which are operationally advantageous to the organization. 4. Facilities (Plant) layout and materials handling Plant layout is concerned with relative location of one department (Work centre) with another in order to facilitate material flow and processing of a product in the most efficient manner through the shortest possible time. A good layout reduces material handling cost, eliminates delays and congestion, improves co-ordination, provide good housekeeping etc. while a poor layout results in congestion, waste, frustration, inefficiency and loss of profit. 5. Capacity Planning Capacity planning concerns determination and acquisition of productive resource to ensure that their availability matches the demand. Capacity decisions have a direct Influence on performance of production system in respect of both resource productivity and customer service (i.e. delivery performance). Excess capacity results in low resource productivity while inadequate capacity leads to poor customer service. Capacity planning decisions can be short-term decisions. Long-term capacity planning decisions concern expansion/contraction of major facilities required in the conversion process, economics of multiple shift operation, development of vendors for major components etc. Short term capacity planning decisions concern issues like overtime working, sub-contracting, shift adjustments etc. Break even analysis is a valuable tool for capacity planning. 6. Production Planning and Control (PPC) Production planning is the system for specifying the production procedure to obtain the desired output in a given time at optimum cost in conformance with specified standard of quality, and control is essential to ensure that manufacturing takes place in the manner stated in the plan. 7. Inventory control

Inventory control deals with determination of optimal inventory levels of raw materials, components, parts, tools; finished goods, spares and supplies to ensure their availability with minimum capital lock up. Material requirement planning (MRP) and just -in-Time (JIT) are the latest techniques that can help the firm to reduce inventory.

Production / Operations ManagementPage 3

8. Quality assurance and control Quality is an important aspect of production system and it must ensure that services and products produced by the company conform to the declared quality standards at the minimum cost A total quality assurance system includes such aspects as setting standards of quality, inspection of purchased and sub-contracted parts, control of quality during manufacture and inspection of finished product including performance testing etc. 9. Work study and job design Work-study, also called time and motion study, is concerned with improvement of productivity in the existing jobs and the maximization of productivity in the design of new jobs. Two principal component of work-study are: (i) (ii) Method study Work measurement

Method study has been defined (BS 3138) as the systematic recording and critical examination of the existing and proposed ways of doing work, as a means of developing and applying easier and more effective methods and reducing costs. Method study when applied to production methods yields one or more of the following benefits: Improved work environment Improved facility layout Better utilization of facilities Greater safety Lesser materials handling Smooth production flow Lower work-in-process Higher earnings for the workmen

10. Maintenance and replacement Maintenance and replacement involve selection of optimal maintenance Preventive and/or breakdown) policy to ensure higher equipment availability at minimum maintenance and repair cost. Preventive maintenance, which includes preventive inspection, planned lubrication, periodic cleaning and upkeep, planned replacement of parts, condition monitoring of the equipment and machines, etc. is most appropriate for critical machines.

11. Cost reduction and cost control Effective production management must ensure minimum cost of production and in this context cost reduction and cost control acquires significant importance. There are large number of tools and techniques available that can help to make a heavy dent on the production cost.

Production / Operations ManagementPage 4

Q.2) What is batch Production? What are its key characteristics? Compare these characteristics with those of project production. Answer.2) Batch production is characterized by the manufacture of a limited number of a product (but many such quantities of different products) produced at periodic intervals and stocked in warehouses as finished goods (or finished parts) awaiting sales (or withdrawal for assembly). Typical examples of batch production are: process industries such as pharmaceuticals, paints, chemicals; medium and heavy engineering industry engaged in the manufacture of electric motors, switch gears, heavy motor vehicles, internal combustion engines; manufacture of ready made garments; manufacture of assembly shops such as machine tools; sub contractors which take on machining of batches of components to the drawings of a large manufacture etc. Characteristics of batch production (a) Short runs: Short production runs and frequent changes of set also characterize batch production up. The equipment and the assembly set up is used for a limited number of parts or assemblies and is then changed to make a different product. The production is generally made to stock. (b) Skilled labour in specific trades: The labour force is expected to posses skill in one specific manufacturing process, Turning, milling, drilling, welding, grinding, hobbing, fitting etc. The operator may perform simpler machine set-ups but the separate machine tool setter performs those involving complex operations. (c) Supervision to possess knowledge of a specific process The supervision has considerable knowledge of a specific process. Supervisor in the grinding section for example, may not expert in turning and drilling work but s expected to possess a find of knowledge of different types of grinding operations. Similarly a supervisor in the gear shop is expected to have sound knowledge in working of different types of gear cutting machines. (d) Limited span of control: The amount of supervision required in batch production is lower than that of jobbing production. The ration of direct workmen to supervisors is more or less a function of batch size. The smaller the batches, the lower are the ratio of direct workers to supervisors, and vice versa. This is because smaller lots require each supervisor to spend a great deal of his time in allocating new work, giving instructions, follow up on the shop floor for proper movement of materials from and to the machines, identifying delays and interruptions, and arranging, in consultation with planning, work load in his section to keep his men busy. (e) General purpose machines and process type of layout Plant and equipment is procured and arranged to obtain maximum flexibility. General purpose machines and handling equipment capable of performing variety of operations with minimum set up times are installed in lieu of variety of products. The machines are

Production / Operations ManagementPage 5


arranged to give process layout-layout by function. Similar machines capable of doing similar types of operations are grouped together and kept at one place. Presses for example, are put together and kept at one place milling machines are placed together at another place, drilling machines are kept at the third place, gear cutting machines are located at the fourth place and so on. Each Group of machines is usually designated as a work centre or a section or a shop. (f) Manual materials handling: Materials handling in batch production as compared to jobbing production are small. Individual components and parts are placed in trolleys and trays and are transported as unit loads. Materials handling may be mechanized by deploying power driven trucks. (g) Manufacturing cycle time affected due to queues: The manufacture cycle time is comparatively smaller than jobbing production but is much more than mass and flow production. The batches of work tend to queue up at different machines due to differing cycles times, batch sizes and sequence of operations. (h) Large work-in-progress: Work in progress is comparatively large due to varying work content of different components, imbalance in manufacturing times, formation of queues between the machines. (i) Flexibility of production schedules: Disruptions due to machine breakdown or absenteeism do not seriously affect production as job can be shifted to another machine or another operator from another machine can be shifted. (j) Need to have production planning and control: Functions of production planning and control in a batch production unit are more complex than those in jobbing production or mass and flow production: Materials control and tools control functions are important. Some kind of replenishment system needs to be used to ensure routine replenishment Detailed operational layout and route sheets are prepared for each part of the product. Loading and scheduling needs to be more detailed and more sophisticated since every machine requires to be individually scheduled. Progressing function is very important to collect information on progress of work. A separate progress card needs to be maintained to record progress of each component. Expediting is generally necessary since quite often jobs, due to imbalances in work content, tend to lag behind

Production / Operations ManagementPage 6

Q.3) (a) Why are locational decisions important? What factors should be taken into account while deciding location of a unit to manufacture washing machines? Answer.3a) Locational decisions generally arise when: A new manufacturing (or servicing) unit is to be set up. Existing plant operations are difficult to expand due to poor selection of site earlier. The growth of the business makes it advisable to establish additional facilities in new territories. There is emergence of new social (chronic labour problems) political (political instability or economic conditions that suggest a change in the location of the existing plant. The product development has over weighted the advantages of the existing plant. The changes in the industrial Policy of the Government, favoring decentralizing and dispersal of industries to achieve overall development of the country, do not permit expansion of the existing plant

FACTORS GOVERNING PLANT LOCATION Plant location studies are conducted in three phases: (i) (ii) (iii) 1. General territory selection Community selection, and Site selection

Proximity to market:

Every company is in business to market and it can survive only if their product reaches the consumers on time and at the competitive price. The ratio of selling costs to sales generally increases with distance. Therefore, in the choice of location o the plant, the factor of proximity to the market is given the highest priority. Locating a plant nearer to the market is preferred if: The product is fragile. The product is susceptible to spoilage. The promptness of service is required. The product is relatively inexpensive and transportation costs add significantly to the cost.

Bread, soap factories, etc. require the market to be nearby. If factory cannot be started in Bombay, it may be started in Thane, Kalyan or Poona. If the product is exported, location near ports is desirable. This is particularly important for producers who sell bulky commodities, which incur high transportation costs

Production / Operations ManagementPage 7

Nearness to market not only lowers transportation costs but also gives many other benefits namely: A good many administrative problems, which cause perpetual headaches and add to costs, are avoided. Liaison with dealers or whole sellers can be maintained economically and easily Other costs such as commission to middlemen, which at times run as high as 20 to 50 percent can be reduced significantly. Customers accounts do not remain outstanding for settlement. This recovery is easy and less time saving which itself reduces selling costs. 2. Proximity to source of raw materials: Since raw materials usually constitute 50 to 60 percent of the total product cost, it is important that the firm gets its requirements of raw materials at the right time and at the reasonable price for which the plant must be located in the neighborhood of some source which can meet the raw materials requirement of the unit Proximity to supply of raw materials factor assumes still greater importance if raw materials are of perishable nature or if they are expensive to transport, or if their weight is substantially reduced by processing. Proximity to sources of raw materials is equally important for small units. This is because usually small units are not considered important customers. They get least priority and in the event of scarcity are the one to be struck off first from the list. The availability of materials to small units to a large extent thus depends on their follow up and personal visits to the suppliers plant which is possible only if the buyers plant is close by. 3. Infrastructural facilities: Infrastructural facilities consider availability of utilities like power water, disposal of waste etc. These form the life-blood of many types of industries without which there facilities may come to a stand still. Underestimating the need of any one of the utilities can be extremely costly and inconvenient. Certain industries, for example, aluminium, steel, etc are power intensive and must be located close to the sites of power generation failing which the shortage of, or increase in cost of generating power may spell problems for their survival. Similarly, chemical process industries like paper and pulp, cement, steel, sugar laundries, metal plating, food preparation etc. requires perennial source of water. Mineral content of water may also be an important factor. Treatment of water is an expense to be considered while comparing economics of different locations. Drainage facilities are important for process industries otherwise disposal of process waster can create lot of difficulties. 4. Transport facilities: Transportation cost to the value added is a key determinant of the plant location. The structure of the transportation cost depends on (i) Characteristics of the commodity (ii) average distance of shipment (iii) medium of shipment: rail, road, and air sea.

Production / Operations ManagementPage 8


The need for transport arises because raw materials and fuel are to be moved to factory site and finished goods are to be transported from factory to markets. Other things being equal since transport cost has a major effect on product cost, the regions well served by transport facilities are most suitable for industrial locations. 5. Labour and wages: Plant location should be such that required labour is easily available in the neighbourhood. Importing labour from outside is usually costly and it causes lot of administrative problems. Availability of required labour locally is better since problem of arranging accommodation and other related problems do not arise. Since normally workers with specific skills are required, some sort of training facility should also be available in the neighborhood. Skilled employees are easily available if ITIs, or Engineering colleges are there in the neighbourhood. 6. Legislation and taxation: The policies of the state Government and Local Bodies relating to issue of licenses, building codes, labour laws, etc. are the factors in selecting/rejecting a particular community/site. In order to disperse industries and ensure balanced economic growth, both Central and State government offer a package of incentives for setting up industries in particular locations. Exemption from excise duty, sales tax and octroi, soft loans from financial institutions, subsidy in electricity charges, etc. are some of the incentives offered. Since taxes and duties levied by the State Government and Local bodies substantially influence product cost, the incidence of such taxes/levies must be taken into account while selecting a community/site. 7. Climatic conditions: Climatic factors may not have a major influence these days because of modern air conditioning facilities available today. However, it may be important factor for certain industries like textile mills, which require high humidity. 8. Industrial and labour attitudes: Community attitudes towards supporting hostile trade union activities are an important factor. Locating facilities in a certain region/community may not be desirable as frequent labour problems and interruptions are harmful to the plant in the long run. Political situation in the state and attitude of the government towards labour activities also influences selection of the site for the plant. 9. Safety requirement: Safety factor may be important for certain industries such as: Nuclear power plants Explosive factories Location of such industries close to border areas is undesirable.

Production / Operations ManagementPage 9

10. Community facilities (or social infrastructure): Community facilities imply accommodation, educational, entertainment and transport facilities. Accommodation is needed unless the employees are local residents. Accommodation should be easily available, comparatively cheap and near some public transport stop. The locational area should be fully developed, be accessible by road and should have a convenient and efficient public transport system operating between the area and the township to enable employees, officials, customers and suppliers to make easy trips for their work 11. Community attitudes: Community attitudes towards work (i.e. whether the people in the location are hard working or otherwise) as well as their attitudes towards the incoming entrepreneurs (helpful and cooperative or otherwise) can make or mar an industry. Locational decisions, therefore, must take such factors also into account particularly while setting up labour intensive units.

12. Supporting industries and services: Locational factors should also include proximity of services needed by the firm. A firm desirous of getting some or all parts made from outside or some of the operations done from outside must see that such sub-contractors are located in the neighbourhood. Getting a job done from units located at far off places will mean not only additional transportation cost but also time consuming and costly. Also if units are too far off, the control on quality of work done by them cannot be exercised. 13. Suitability of the land: Site selection should also take into account topography and soil structure of the land. The soil structure must be capable of bearing loads of foundations. Though modern building techniques can overcome the limitations of the soil, but if considerable improvement is required then selection of a low cost and may ultimately turn out to be expensive.

14. Availability and cost of the land: Site size (Plot size) must be large enough to accommodate the present production facilities, parking and access facilities but also leave sufficient room for future expansion. As a general rule, a site five times the actual plant size is considered minimum for all these things including future expansion.

Production / Operations ManagementPage 10

ECONOMY SURVEY OF THE SITE SELECTION: An ideal location is one where the cost of obtaining materials and processing them into finished product plus the cost of distributing the finished product to customers is minimum. One of the most commonly used approaches consists of following steps: Step 1: Step 2: Prepare a list of all relevant factors. Estimate expenses on materials, transport, wages, power etc for each location on each of the above factors.

Step 3: Collect data on intangible factors like community facilities, community attitudes etc. Step 4: Step 5: Step 6: Analyse the tangible data for each location and calculate rate of return on investment. Select provisionally a locational based on financial data. Compare the intangible data for the different locations and select the optimal location considering intangible data.

Production / Operations ManagementPage 11


Q.3) (b) What are objectives of a good layout? Discuss any six principles of a good layout? Answer.3)(b) OBJECTIVE OF A GOOD PLANT LAYOUT Only through an efficient layout, the organization can attain the following objectives: (i) (ii) (iii) (iv) (v) (vi) (vii) Economy in handling of materials, work-in-process and finished goods. Minimization of product delays. Lesser work-in-progress and minimum manufacturing cycle time. Efficient utilization of available space. Easy supervision and better production control. Greater flexibility for changes in product design and for future expansion. Better working conditions by eliminating causes of excessive noise, objectionable odor smoke etc.

PRINCIPLES OF A GOOD LAYOUT (i) Overall integration of factors: A good layout is one that integrates men, materials, machines and supporting activities and others in a way that the best compromise is obtained No layout can satisfy each and every principle of a good layout. Some criterion may conflict with some other criterion and as a result no layout can be ideal it has to integrate all factors into the best possible compromise. (ii) Minimum movement: A good layout is one that permits the minimum movement between the operations. The plant and machinery in case of product layout and departments in case of process layout should be arranged as per sequence of operations of most of the products. Since straight line is the shortest distance between any two points, men and materials as far as possible should be made to move along the straight path A door may be made in a wall or a hole may be drilled in a ceiling if that eliminates or reduces material handling in place of stairs or a distant door.

Production / Operations ManagementPage 12


(iii) Uni-direction flow: A good layout is one that makes the materials move only in the forward direction, towards stage of completion, with any backtracking. Since straight line is the shortest distance between any two, points, materials as far as possible should be made to move on the principle of straight line flow. And when straight line flow is not possible, other flows like U-shaped flow, circular flow or zig zag flow may be adopted, but the layout may ensure that materials move in the forward direction (Fig 4.1) To ensure forward flow, equipment if necessary may be duplicated. (iv) Effective use of available space: A good layout is one that makes effective use of available space both horizontal and vertical

Backtracking and duplicated movements consume more time, involve un-necessary materials handling, add to cost and lead to inefficiency. Raw materials, work-in-progress and finished goods should be piled vertically one above another rather than being strewn on the floor. Pallets or equivalents should be made use of to pile up several layers one above another Area below the work tables or in the cupboards built into the wall are welcome since they reduce requirement of space

(v)

Maximum visibility: A good layout is one that makes men, machines and materials ready observable at all times. All departments should be smoothly integrated, convenient to service and easy to supervise Every piece of positioning or screening or partitioning should be scrutinized and carefully planned. Special cupboards, enclosures, offices, partitions etc. should be avoided except when their utility is established beyond doubt.

(vi)

Maximum accessibility: A good layout is one that makes all servicing and maintenance point readily accessible.

Machines should be kept sufficiently apart and with reasonable clearance from The wall so that lubrication, adjustment and replacement of belts, removal of parts at the time of repairs etc can be done conveniently by the maintenance staff. Area in front of electrical panels and fire extinguishers should be kept free from obstructions.

Production / Operations ManagementPage 13

Q.4) How does production planning differ from production control? What are the key functions of production planning and control? Answer.4) Production planning versus production control. Planning (Planning the work) Planning involves collection and maintenance of data regarding time standards, materials and their specifications, machines and their quantities, tools and their process capabilities, drawings and operational layouts etc. Planning is seeing that requirements tool, machines, men, instructions, authorization and the like-will be available at the right time and in the right quantities and are of proper quality. Planning involves preparations of load charts and fitting various work orders into uncommitted time available on the companys facilities (men or machines). Planning involves preparation of all necessary forms and paper work. Planning involves designing suitable feed back as to what may happen. Control (Working the Plan) Control involves dissemination of data preparation of reports regarding output, machine and labour efficiency, percent defectives etc.

Control is seeing the requirements are actually made available at the right place and in the right quantities.

Control involves actual seeing that the jobs are started and completed as per schedule prepared by the scheduling cell of the PPC. Control involves actual issue of forms and paper work. Control involves keeping track of what is happening and collecting information as to what has happened. Control involves suggesting remedial action when the job is falling behind schedule. Control is thus a diffused activity (in the shops) and includes functions such as dispatching, progressing and expediting.

Planning involves forwarding thinking regarding the remedial action to be taken if the job falls behind schedule. Planning therefore is a centralized Activity (in the office) and includes such functions as materials control, tools control, process planning and scheduling.

Production / Operations ManagementPage 14

FUNCTIONS OF PRODUCTION PLANNING AND CONTROL: Production planning and control is normally assigned two sets of functions: (I)Regular functions and (ii) Optional functions. (i) Regular functions are those, which are generally assigned to PPC in most of the organizations through the importance of the function, may vary from industry to industry. Optional functions are those, which may be assigned to PPC depending upon policy of the management of the firm.

(ii)

Common (or Regular Functions) Order Preparation includes activities like making of work orders, converting work orders to shop orders, preparing auxiliary orders and releasing such orders to those concerned to authorize their activities

Optional Functions Cost Estimation concerns preparations of Preproduction cost estimates to be used by sales department for quotation purposes (Alternatively this may be assigned to Costing Department Or Industrial Engineering Department)

Materials control concerns preparations of materials estimates, indenting non-stock materials, ascertaining availability of materials purchased to stock, continual follow-up with purchase and stores for timely receipt of materials, and advising stores to allocate required quantities or available materials (alternatively on their receipt) against specific shop orders.

Process planning or Routing concerns fixation of method of manufacture: operations and their sequence, machine tool for each operation, jigs and fixtures, measuring instruments and gauges etc. to enable shops to produce goods of the right quality at the lowest cost. Tools control concerns preparations of estimates of cutting tools (Standards as week As non-standards tools), gauges and measuring instruments, jigs and fixtures etc indenting nonstick tooling: follow up with tool room for timely manufacture of jigs and fixtures; periodical replenishment of worn-out-nonconsumable tooling (e.g. work arbors, collets, copying masters, Allen keys, spanners, etc.

Work measurement concern fixation of time to be allowed to a qualified workman to carry out a specific task, under specified conditions and at the defined level of performance. Work measurement employs scientific, well-known techniques like time study, work sampling standard data, production study, analytical estimating etc. (Alternatively, work measurement function may be assigned to Industrial Engineering department. Sub-Contract concerns offloading of certain work on outside vendors for economic reasons or to augment the existing manufacturing facilities (Sub-contract work alternatively) be handled by Materials/purchase Department)

Capacity planning concerns estimation of requirements of men and machines as the basis of decision making to meet the firms increased volume of business (Some companies prefer to assign this function to Engineering department.

Production / Operations ManagementPage 15

Scheduling concerns preparation of machine loads, fixation of calendar dates of various operations to be performed on a job, coordination with sales to confirm delivery dates of new items and periodical preparation of dispatch schedules of regular items.

Demand forecasting concerns making projection of companys product market. Though, long term forecasts are given by Sales Department but short term forecasts required for materials planning, machine loading, sub contracting etc may be prepared by PPC department

Dispatching concerns preparation and distribution of shop orders and manufacturing instructions to the concerned department as their authority to perform the work according to the predetermined schedule. Progressing concerns collection of data from manufacturing shops, recording of progress of work, and comparing progress against the plan. Expediting concerns intensive progress chasing to identify delays and interruptions which may hold up production, devising cures from time to time to keep rate of production in line with the schedule, communicating possible failure in delivery commitments to Sales Department.

Production / Operations ManagementPage 16

Q.12 (a) What is critical path? What does it signify? How is it identified? Answer.2)(a) Critical path analysis, an important aid to planning, scheduling and coordinating the activities if large scale projects. Is a synthesis of two independent techniques: Programme Evaluation and Review Technique (PERT) and Critical Path Method (CPM). Though the two techniques were developed independently, they are only superficially different. The two method have many features in common and are now combined into a technique called Critical Path Analysis (CPA) or Network Analysis. There are three basic different between a PERT network and CPM network: PERT is event oriented while CPM is activity oriented (i.e. PERT prepares network from events while CPM builds if from activities) PERT provides for an allowance for uncertainty while CPM does not (i.e. PERT makes three time estimates for each activity while CPM makes one time estimate) Activity time in CPM technique are related to costs while it is not so in PERT since it is event oriented Significance of critical path Critical path analysis offers several advantages. It (i) Forces through pre-planning. Each and every activity compromising the project is identified and recorded. Nothing is left to memory or chance which prevents crises in scheduling Increases coordination of tasks as technological relationship between the activities suggests which activities can run simultaneously and which should succeed others. Helps computations of different project durations for different level of resources and thereby select a plan that minimizes total project cost. Indicates optimal start and finish times of each activity of the project. Defines areas of responsibility of different departmental heads for timely execution of the project. Facilitates progress reporting and limits unnecessary discussion at the progress meetings. Identifies troubles spot often in advance and apply remedial measures. Enables the plan to be revised in accordance with changes/changing circumstances. Helps to exercise control by exception and prevents cost overruns.

(ii) (iii) (iv) (v) (vi) (vii) (viii) (ix)

A Project comprises a series of activities and the identification of the individual activities requires knowledge and experience of the men responsible for the planning of the project. Even the preliminaries-mere listing of the activities-make the operating personnel: Think of details about the project well in advance. Observe critically the way in which the various activities interact or compete for scarce resources

Production / Operations ManagementPage 17


Improve upon the original plans even before network is formally drawn and analyzed. A project, therefore, must be torn into a set of identifiable activities. There are no set rules but general guidelines are as under: An activity should represent the smallest unit of the operation or set of operations over which management desires control. An activity should represent an operation or set of operations, which can be performed using a particular kind of equipment or a special skill. For example in construction project, plumbing is considered as one activity while wiring can be considered as another activity since the first activity requires plumbers and the second activity needs electricians.

Production / Operations ManagementPage 18

Q.12) (b) Activity 1-2 1-3 1-4 2-5 3-5 4-5 4-6 5-6 Optimistic 02 02 02 01 04 02 02 03 Most Likely 03 04 06 01 05 03 05 05 Pessimistic 10 06 10 01 12 04 08 13

Answer: (a) Expected time of an activity can be obtained from the three time estimates using the formula: te = a + 4m +b 6 where a m b a m b te = = = = = = = Optimistic time most likely time pessimistic time 2 3 10

For activity (1-2)

2 + 4 x 3 + 10 6 24 6 = 4

te

Expected times of all activities of the network, calculated on above lines, are tabulated below. Activity 1-2 1-3 1-4 2-5 3-5 4-5 4-6 5-6 Three time estimates 02-03-10 02-04-06 02-06-10 01-01-01 04-05-12 02-03-04 02-05-08 03-05-13 Expected time 4 4 6 1 6 3 5 6

Production / Operations ManagementPage 19

4
6 3

3
4 6

Critical path is 1-3,3-5,5-6 and the duration for the project is 16 weeks (4+6+6) Variance is Vi = (b a) X (b a) 6 6 4 9 16 9 25 9

V1-3 V3-5

= =

V5-6

V V

= =

V1-3 + V3-5 + V5-6 5 = T - Tcp 19 -16 5 3 2.236 1.34

Standard deviation Z

The approximate probability value when Z = 1.34 is 0.9099 The probability of completion of critical path by the schedule time of 19 weeks = 91%

Production / Operations ManagementPage 20


Q.5) What is preventive maintenance? Why it is better than Breakdown Maintenance? What are the key activities of Preventive Maintenance? Answer.5) Preventive maintenance anticipates failures and adopts necessary actions to check failures before they occur. It includes activities like inspection, lubrication cleaning and unkeeps, minor adjustments and replacements found necessary at the time of inspection etc. Preventive maintenance can be either: running maintenance or shut down maintenance. Running maintenance includes maintenance activities (e.g. minor adjustments In machines revealed through inspections, lubrication, cleaning and unkeep etc.) Which are carried out when the machine is still running. Shutdown maintenance includes preventive maintenance activities such as minor component replacement whose needs are identified through inspections, which require stoppage of Machines. Preventive inspection is one of the key activities of preventive maintenance which is usually performed by making use of human senses watch) eye), listen (ear), Touch (hand, leg, body) smell (nose) and taste (tongue) but the trend is Changing towards use of condition monitoring instruments. Such maintenance. Practice is known as predictive maintenance or condition based maintenance.

Production / Operations ManagementPage 21

Q.10) (a) What are X-R Charts? How are they made and used in controlling a process? Answer.10) X-R chart is a pair of chart consisting of a average (called X chart) and a range Chart (called R chart) placed one below another on a piece of graph paper. The X chart is used to control the mean value of the characteristic an R-chart is used to restrict the range of variations in the values. X-R charts are drawn when the characteristics are measurable. Each chart consists of three values: a central line, upper control limit and lower control limit. The central line represents the arithmetic average of the sample means which equals the mean of the population, u. The upper and lower control limits are located at three standard deviation on either side of the central line. Samples of fixed size are drawn at regular intervals and measurements are taken. The samples wise values of the mean and range are plotted in their respective X and R charts. The spread of sample points in the charts is studied to decide the remedial action (if any) to be taken. The X chart analyses whether or not the mean of the quality Characteristics is within control while R-chart analyses whether or not the variability is within control. STEPS TO PREPARE X-R CHART A pre-requisite to the preparation of the chart is the decision on the following aspects: Quality Characteristics refer to the property of the product, which is to be assessed. The quality characteristics must be capable of being measured. In case of more than quality characteristics, separate chart is made for each quality characteristic. Sample size refers to number of pieces comprising each sample. Sample size is an important decision. It is a common practice to use sample of n = 4 or 5 to have low appraisal cost. Large samples such as n = 15 or 20 are used if the process standard deviation is large. Sample Population refers to the number of samples to be collected to construct a control chart. The number of samples must be sufficient. Usually, 20 samples each of size 4 or 5 are enough to have good estimates of the process average (X) and dispersion (R). Time Interval measures the time gap between consecutive samples. Time interval, as a genera rule, should be proportional to the average frequency of out-of-control conditions. It is a fairly complex decision since a number of factors such as cost economy, susceptibility of the process to disturbances; convenience of the inspector etc. requires to be considered. The making of X-R Charts involves the following Steps: Step 1: (a) (b) (c) Step 2: A Collect Data Collect sufficient samples spread over a reasonable period. Each sample must be of equal size. Measure each component comprising the sample for the given quality characteristic Record individual measurements on a work data sheet. Calculate mean (X) and Range (R) of each sample The mean which is written as X (X bar) is average of each sample and is

Production / Operations ManagementPage 22


Obtained by totaling the individual measurements of the units comprising the sample and dividing the total by the sample size (number of units in each sample) The range, which is written as R, is obtained as the difference between the highest and the lowest measurement of a sample. The values of X and R are recorded sample wise either on the extreme right of the individual measurements on the data sheet or in a separate table.

B C

Step 3: A

Calculate grand Average (X) and mean Range (R) The grand average, which is written as, X (X double bar) is the average of the sample averages and is obtained by dividing the total of the averages of all the samples by the total number of samples. The mean range, which is written as, R (R bar) is the average of the ranges and is obtained by dividing the total of the ranges of the samples by the total number of samples. Set up Control chart for the average Set up a control chart with the central line drawn at X (X double bar), upper control limit located X + A2 R (R bar) and the lower control limit set up at X-A2R. Plot the averages to see whether the process was under control when samples were drawn. If all points fall within the control limits, the process is said to be under control If process is not under control (indicated by some points falling outside the control limits), eliminate points outside the control limits and compute new trial control limits for the remaining points. Repeat step 4 (d) until all points fall within the control limits Control limits in a particular situation should be revised from time to time as additional data is accumulated.

Step 4: A

B C D

E F

Step 5: Calculate control limits of the range chart A The control chart for range chart is set up with central line as R, upper control limit (UCLR) located at D4R above the central line and lower control limit (LCL) at D3R below the central line Plot the value of the range of each sample. If all points fall within the control limits no modification is necessary unless it is desired to reduce the process dispersion if range chart exhibits lack of control indicated by some points falling outside the control limits, eliminate those points out of control and compute new trial control limits Repeat step 5 (d) until all points fall within the control limits. Control limits in a practical situation should be revised time to time as additional data is accumulated.

B C D

E F

Production / Operations ManagementPage 23

Step 6: Use control chart A B Collect samples of fixed size at specified intervals of time. Measure each unit of the sample for the quality characteristics, calculate mean and the range of each sample. Plot the values of X and R of each sample in their respective charts Study the trend of the points to interpret and suggest remedial action

C D

Q10 (b) ABC company produces a solvent, which must contain 3 percent of alcohol. It tries to maintain the actual percentage at 3 + 0.3 percent. It tests hourly in samples of five. The following table shows the results of last five samples. Set up a control chart for mean and examine whether the process is under control. A) Solution: (i) Collect data (ii) Calculate mean (X bar) and range(R bar) Sample No. 1 2 3 4 5 (iii) Arithmetic Mean (X bar) 2.92 2.98 3.06 3 3 Range(R) 0.3 0.1 0.1 0 0.2

Calculate grand average and the mean range X(X bar) = 2.92 + 2.98 + 3.06 + 3 + 3 5 2.992 0.3 + 0.1 + 0.1 + 0 + 0.2 5 0.14

= R =

Production / Operations ManagementPage 24

(iv)

Set Up control chart for the average Central Line = CLx = X(X bar) Upper Control Limit = = = = Lower Control Limit = = = 2.992 UCLx = X (X bar) + A2.R(R bar) 2.992 + 0.5768 x 0.14 3.476 UCLx = X (X bar) - A2.R(R bar) 2.992 - 0.5768 x 0.14 2.507

(v)

Set up a range chart Central line CLR Lower control limit = = = = Lower control limit = = = R(R bar) LCLR = 0 x 0.14 0 UCLR = 2.114 x 0.14 0.29596 D4.R (R bar) = 0.14

D3.R (R bar)

Production / Operations ManagementPage 25


Q.6) What is method study? Describe the procedural steps to develop easier and effective methods. Answer.6) Method study is the systematic recording and critical examination of existing and proposed ways of doing work, as a means of developing and applying easier and more effective methods and reducing costs. Method study is an organized approach and its investigation rests on the following six basic steps outlined in the block diagram Select the work to be analyzed. Record all facts relating to the existing method. Examine the recorded facts critically but impartially. Develop the most economical method commensurate with plant Requirements Install the new method as standard practice. Maintain the new method.

Selection of the job Selections of the jobs to be studied for methods improvement by the method study practioner is a managerial responsibility and it (selection) may be based on economic technical or human consideration. Economic consideration justifies selection based on the economic worth (i.e. money saving potential) of the job. Technical consideration identifies jobs, which require studies to overcome manufacturing difficulties (excessive rejection, relaxation in prefixed performance standards, inability if the shops to stick to specified machining parameters such as speeds, feeds, depth of cut etc., inconsistent quality etc.) Human consideration in job selection is usually given weightage while introducing method study practices for the first time. Recording of facts Systematic recording is the most crucial step in method improvement. Since recording by long hand (or by descriptive method) has its limitations, it is not recommended for use in method study. Instead, five symbols and eight charting conventions are used to record facts relating to the job under study. Five typical symbols are O, ||, , D and V and eight charting conventions concern composition of the chart, reject, rework, repletion, change of state, introducing of new material, combined events and numbering of events. The document on which details of the process are recorded by the above referred symbols and conventions is called chart. There are four basic types of chart: (i) operation process chart (ii) Flow process chart (iii) multiple activity charts and (iv) two handed process chart. Besides charts, two types of diagrams-flow diagram and string diagram are drawn when recording details of an existing layout. Travel chart is another typical chart, which is used to record frequency of movements (weight x distance) between work centres/departments.

Production / Operations ManagementPage 26

Repetitive short cycle operation which involves quick hand/feel motions (i.e. microscopic motions) may be studied with micro motion study. Glibreth, founder father of micro motion study, also developed photographic techniques called cyclograph and chronocylegraph to record path of the motions of the members of the body. Critical examination Critical examination aims to analyze the facts critically and thereby give rise to alternatives, which form the basis of selection and development of easier, and effective methods. Critical examination is conducted through a systematic and methodical questioning process. Each activity recorded on the chart, whether it relates to processing or inspection, or material handling, or to any other aspect, is picked up one at a time and is examined minutely. The questioning process is considered under five major heads, namely the purpose, the place, the sequence, the person and the means. These five aspects in critical examination are referred to as five governing considerations. Development and selection: Development and selection stage concerns short listing of ideas generated at the critical examination stage, testing each short listed idea for its technical and economic feasibility, and making selection among the alternatives wherever choice exists. To develop ideas and to ascertain their technical and economical feasibility, the method study practioner needs to solicit the cooperation of personnel from different departments of the company. Various techniques available for the development and selection purpose are: cost benefit analysis, break even analysis, investment analysis and critical path analysis. Installation Installation (or implementation) of the proposed method involves preparation of project report on recommendations making oral presentation to the top management, securing approval of the decision maker, assisting line management during implementation, arranging training of workmen, and getting jobs (operations) retime after implementation, arranging training of workmen, and getting jobs (operations) retimed after implementation. Maintenance Maintenance phase is the follow up phase after implementation, which serves as a monitoring and control mechanism. It helps to ensure that the revised methods are set into concrete and workmen do not revert back to old methods. It also provides an opportunity to the practitioner to assess the effectiveness of the approach followed by him and makes changes in the methodology (if required).

Production / Operations ManagementPage 27

Q.9) (a) What desirable conditions need to be present to be present to guarantee success of an incentive scheme? Answer.9) A good wage incentive plan should have the following characteristics. Administrative simplicity: The incentive system should be simple and must be easily understood by the workers and their representatives. An incentives scheme, which can be understood, only by engineers and mathematicians or a scheme which involves the use of complex formulate or references and cross-references is sure to fail. The incentive scheme should be such that workmen can calculate their own earnings easily and quickly. Minimum clerical work: The system should fit into existing system of production and cost control. It should not involve any significant addition to the clerical work. Maximum coverage: The system should cover as many workmen as possible. A scheme if applied to a few workmen creates a demoralizing effect on the morale of those not covered by the scheme. Direct Incentive payments should increase at least in direct proportion to the increase in output by the operator. There are two reasons: Firstly because it is more difficult to producer extra units and secondly because saving in the overheads are far greater at higher levels of production. Period of Payment The period of payment should be as short as possible Adequate guaranteed minimum hourly rate The scheme must ensure adequate guaranteed minimum hourly rate to all incentive workers regardless of their output. Such an hourly guaranteed rate is normally referred to as the guaranteed base rate. The guaranteed base rate must be realistic and should be at least equal to the hourly rate payable to a non-incentive worker doing similar job in the industry. Incentive earnings of the workers should never be regarded as a substitute for poor wages. Accurate and yet attainable performance standards Performance standards should be set through systematic work measurement studies. The experts to that there is no dispute or malpractice and yet the standards are attainable so that a worker working at normal pace can attain them should base the standards of measurement on the assessment.

Production / Operations ManagementPage 28

Further the incentive plan should be such that it provides an opportunity to all average workers to earn reasonable earnings. Consistency of the standards Standards once fixed should not be changed unless there is a permanent change in methods, or change in equipment, or change in material and plan should provide for the provisions to modify the performance standards. Inbuilt check on process rejections A good incentive scheme should exercise a check on the operator against achieving higher bonus by poor workmanship. Payment should be made only for pieces declared acceptable by the inspection department and a workman constantly producing substandard pieces should be liable for disciplinary action. Payment of partially completed jobs The problem of payment for the incomplete work arises only in case of long cycle jobs. Situations do arise when the jobs are of very long cycle duration and cannot be finished within the bonus period. Similarly, a semi-finished job may require to be handed over by one operator to another at the end of shift, or prior to having a holiday. The scheme should clearly spell out as how assessment of work done by the workmen on the same job will be carried out and how disputes arising out of such assessment would be resolved. Payment of Idle Time Adequate safeguards must be provided to compensate the operator for the time lost due to reasons beyond his control. A good incentive scheme should ensure that an operator does not suffer financial loss for reasons attributable to the managerial weakness, e.g.: lack of material due to bad buying, breakdowns of the machines due to poor maintenance practices, nonavailability of work etc. Thus an operator rendered idle because of factors attributable to the management should be given a lieu bonus. Safeguards The scheme should be fair not only to the employees but also to the employer. Safeguarding clauses as under should be incorporated to protect. a. Managements right to change a standard when there are changes in methods. Materials and machines b. Managements right to withdraw or discontinue temporarily a scheme during bad period. c. Managements right to initiate disciplinary action against operators who continually produce sub-standard articles. d. Managements right to initiate disciplinary action against employees who, time and again, do not achieve minimum standard of production even in the presence of fair and accurate standards. e. Managements right to initiate disciplinary action against employees who, time and again are found using speeds and feeds higher than those recommended in the process sheet (or operational layouts) Maximum ceiling on the earnings The system should have built-in-control against higher earnings beyond a certain limit. Firstly, the system should discourage workers to work beyond a certain limit otherwise too attractive an incentive scheme may induce the worker to work more and more and thereby

Production / Operations ManagementPage 29


adversely affect his health. Secondly, the system should ensure that in case of loose standards the company does not lose financially. Consistency of Plan The plan should be consistent over a period of time. Frequent changes in the plan make its functioning difficult. Faith in plan is lost if there are frequent revisions. Acceptance of Labour Body The scheme should finally have acceptance of the labour body. The body of workers representatives to prevent any misunderstanding and ill-feeling later on must accept the basic incentive plan and its provisions. Continuous Use The scheme should be in continuous use. The temporary use of the scheme in good times and its discontinuation in bad times makes its functioning difficult. Define End Results The plan must result in reduction in per unit labor cost.

Production / Operations ManagementPage 30

Q 13) Answer 13) i) Average Cycle time = 0.22 + 0.24 + 0.28 + 0.26 + 0.25 5 0.25 Observed time x Rating 100 0.25 x 80 100 0.2

= Normal Time =

Similarly, average cycle time and normal time for all the elements are calculated and tabulated as below Element A B C D E Avg. cycle time 0.25 0.15 0.35 0.102 0.12 Rating 80 100 120 90 100 Normal time 0.2 0.15 0.42 0.0918 0.12

Total Normal time Total Normal time

= =

0.2 + 0.15 + 0.42 + 0.0918 + 0.12 0.9818

ii)

Relaxation Allowance =

15 100 =

0.9818

0.1473 x 0.9818

Contingency Allowance = Standard time

5 100 =

0.0491

Normal time + Relaxation Allowance + Contingency Allowance = Standard time = 1.1782 0.9818 + 0.1473 + 0.0491

POM assgn : Sushant Multiple Choice Multiple Answer Question Which of the following products should be produced by using mass production? Correct Answer Refrigerator , Tyre for automobile , Television Set Your Answer Refrigerator , Tyre for automobile , Television Set Multiple Choice Multiple Answer Question What are the benefits of reconditioning? Correct Answer Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps to plan requirement of replacement spares Your Answer Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps to plan requirement of replacement spares Multiple Choice Multiple Answer Question Which kind of natural delays and interruptions are considered during estimation of activity time? Correct Answer Shop efficiency , Breakdowns , Absenteeism Your Answer Breakdowns , Absenteeism , Delay due to shortage of resources Multiple Choice Multiple Answer Question How to exercise control over quality? Correct Answer Periodical analysis of inspecting reports to establish causes of rejections , Preperation of quality standard and specifications , Exercising control over inputs Your Answer Periodical analysi s of inspecting reports to establish causes of rejections , Preperation of quality standard and specifications , Replacing existing measuring instruments by those having smaller least count. , Exercising control over inputs True/False Question In case of forward pass computation, the earliest event time of a plain event equals the earliest event time of the preceding event plus duration of activity emanating from the preceding event. Correct Answer True Your Answer True True/False Question Any proposed change must not be intimated to workers in advance. Correct Answer False Your Answer False Select The Blank Question The ________ are the definitions of the measurable as well as nonmeasurable characteristi cs of the product. Correct Answer Specifications Your Answer Standards Multiple Choice Multiple Answer Question How many of the following are types of specification? Correct Answer Material specifications , Dimensional specificati ons , Performance specifications Your Answer Material specifications , Dimensional specifications , Performance specifications Select The Blank Question A ________ is another form of subcontracting. Correct Answer Hiring capacity Your Answer Collaboration Select The Blank Question The ________ advocates maintenance procedures whereby the condition of the plant is constantly watched through systematic inspection to unearth unhealthy conditions and preventive Correct Answer Preventive Maintenance Your Answer Preventive Maintenance

Multiple Choice Single Answer Question Which phase of method study is concerned with analyzing the facts critically, generating alternatives which form the basis for selection and development of improved methods? Correct Answer Critical examination Your Answer Development and selection Multiple Choice Single Answer Question In exponential smoothing method,for a stable demand pattern and better smoothing e ffect, value of fraction( Alpha) selected is Correct Answer 0.05 to 0.10 Your Answer 0.20 to 0.25 Multiple Choice Single Answer Question Technique of Value Engineering can be effectively employed in design of a product to Correct Answer To meet the intended function at lowest cost Your Answer Reduce process rejections Select The Blank Question The ________ is the probability that a bad lot will be accepted by the sampling plan. Correct Answer Consumer's risk Your Answer Acceptable quality level Multiple Choice Multiple Answer Question Which of the following observations are expected from the preventive maintenance person? Correct Answer Wrong allignments , Overheating defects , Excessive play Your Answer Wrong allignments , Overheating defects , Excessive play Multiple Choice Single Answer Question When should operator or supervisor is supposed to sign the perforated route sheet? Correct Answer After completion of operation Your Answer After completion of operation Select The Blank Question The ________ must ensure that the product satisfy the functional requirements of it's usage. Correct Answer Quality of design Your Answer Quality of conformance Multiple Choice Single Answer Question What do you understand by the properties which are difficult to measure quantitatively but usually measured by the comarision and then classification into acceptable or unacceptable? Correct Answer Attributes Your Answer Attributes Multiple Choice Multiple Answer Question Which of the following may be the objectives of project crashing? Correct Answer To complete the project in the least possible time , To reduce project cost below it's normal cost , To achieve uniformity in requirement of resources Your Answer To complete the project in the least possible time , To reduce project cost below it's normal cost , To achieve uniformity in requirement of resources , To improve the labour efficiency True/False Question Since recording by descriptive method has it's limitations, it is not recommended for use in method study. Correct Answer True Your Answer True Multiple Choice Single Answer

Question What do you mean by the selection of the job for the method study on the basis of manufacturing difficulties? Correct Answer Technical consideration Your Answer Economic consideration Multiple Choice Single Answer Question One of the external factors influencing Material Planning is Correct Answer Price trends Your Answer Price trends Select The Blank Question The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Correct Answer Acceptable quality level Your Answer Lot Tolerance Percentage Defective True/False Question Cent percent inspection is a must if the inspection is of destructive nature. Correct Answer False Your Answer True Select The Blank Question Capacity decisions have a direct influence on performance of production system in respect of ________ Correct Answer Delivery performance Your Answer Delivery performance Multiple Choice Multiple Answer Question Which of the following factors related to the labour and wages are considered while deciding the plant location? Correct Answer Prevailing wage pattern , Productivity of labour , Industrial relations Your Answer Prevailing wage pattern , Productivity of labour , Industrial relations Multiple Choice Single Answer Question Which is the ideal place to write a description of an activity in a network? Correct Answer Above the arrow Your Answer Above the arrow True/False Question If the firm has adopted elaborate planned maintenance system, there is no chance of any unplanned maintenance work. Correct Answer False Your Answer False Match The Following Question Correct Answer Your Answer Change in chemical characteristic Chemical reaction Chemical reaction Consumption of effort Posting a ledger Giving directions or instructions Information given Giving directions or instructions Posting a ledger Subtraction Removal of worn-out part from a machine Removal of worn -out part from a machine

Select The Blank Question OC curve of ideal sampling plan suggests that all lots less than 3% defectives have the probability of acceptance of ________.

Correct Answer One Your Answer One Select The Blank Question A set of activities to keep an equipment in the specified condition is called as ________. Correct Answer Maintenance Your Answer Maintenance Multiple Choice Single Answer Question Site factors for plant location include Correct Answer Suitability of land Your Answer Suitability of land True/False Question Both, preventive and breakdown maintenance work must be assigned to the same team. Correct Answer False Your Answer False Multiple Choice Single Answer Question Product layout is employed for manufacturing following products Correct Answer refrigirators Your Answer automobile components Multiple Choice Single Answer Question What can be the worst effect due to excessive vibration? Correct Answer Breakdown Your Answer Breakdown Multiple Choice Multiple Answer Question What is indicated by the erratic pattern points falling above and below the control limits in the Xbar-R-control chart? Correct Answer Defects in materials , Poorly trained operators , Frequent adjustments of machines Your Answer Defects in materials , Poorly trained operators , Frequent adjustments of machines True/False Question In case of two handed process chart, inspection symbol is used when check by touch or feel is involved. Correct Answer True Your Answer True True/False Question Site selection should also take into account topography and soil structure of the land. Correct Answer True Your Answer False Multiple Choice Single Answer Question The ratio of output to input of a production system is commonly known as Correct Answer Productivity Your Answer Effectiveness Select The Blank Question A ________helps to avoid crowding of jobs at a particular machine by change of route of some of the jobs or by diverting work to other machine. Correct Answer Control board Your Answer Control board Match The Following Question Correct Answer Your Answer

Emerson Efficiency Plan Wage Payment Sampling Inspection Craft Facilities Planning Facilities Planning Work Sampling Machine utilization Production Scheduling Gantt Chart Production Scheduling Charting technique True/False Question Only skilled worker can use the fixed limit gauge. Correct Answer False Your Answer False Multiple Choice Multiple Answer Question Which are the different methods to record details of the existing method during method study? Correct Answer Charts , Diagrams , Templates or models Your Answer Charts , Diagrams Multiple Choice Single Answer Question Which photographic technique is used to record path of motions of the members of the body during method study? Correct Answer Cyclograph Your Answer Flowgraph Select The Blank Question The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable. Correct Answer Quality control Your Answer Inspection True/False Question In case of centralised inspection, inspection rooms generally become bottleneck and cause delay in taking action regarding rejection or rework. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Which of the following are minimum requirement for a good quality of de sign? Correct Answer Resonable cost , Resonable procurement time , Resonable manufacturing time Your Answer Resonable cost , Resonable procurement time , Resonable manufacturing time

POM assgn True/False Question Correct Answer Your Answer Flow process charts do record movements as well as visual pictures. False False

True/False Question Correct Answer Your Answer

The OC curve is based on the assumption that if the lot is large in comparison to the sample, the probabilities of the OC curve will follow a poisson distribution. False True

Multiple Choice Single Answer Question The ratio of output to input of a production system is commonly known as Correct Answer Your Answer Productivity Productivity

Multiple Choice Multiple Answer Question Order preparation process for products manufatured to order requires following documents Correct Answer Sales Order , Work order , Shop order Your Answer Work order , Purchase order

Select The Blank Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Answer Condition monitoring Your Answer Preventive maintenance

Match The Following Question Scheduling of interrelated activities of small projects with consideration of uncertainty of duration of activities. Two machines & processing time depends on sequence of job loading Sufficient orders and resonable choice of machines

Correct Answer Critical Path Analysis

Your Answer Critical Path Analysis

Johnson's Two Machine Algorithm Johnson's Two Machine Algorithm

Index Method

Index Method Time series

Time relationship between when a Critical Ratio Scheduling product is required and when it can be made available

Select The Blank Question Production control work is ________ in case of floor inspection as compared with the centralised inspection. Correct Answer easier Your Answer easier

Match The Following Question When to inspect What to inspect How to inspect How much to inspect

Correct Answer Stages of inspection Specification Inspection devices Sampling or cent percent inspection

Your Answer Specification Standard Tools & Jigs Stages of inspection

Multiple Choice Single Answer Question Material Planning is an integral part of Correct Answer Your Answer Production Planning Process Planning

Select The Blank Question An Ideal OC curve is ________ shaped curve that accpets all the lots with quality equal to or better than AQL . Correct Answer Rectangular Your Answer Rectangular

Multiple Choice Single Answer Question Technique of Value Engineering can be effectively employed in design of a product to Correct Answer Your Answer To meet the intended function at lowest cost Reduce lead time

Multiple Choice Single Answer Question Material control function of PPC is concerned with Correct Answer Your Answer Preparation of material estimates Preparation of material estimates

Multiple Choice Single Answer Question Main objective of a good plant layout is Correct Answer Reduce material handling cost

Your Answer

Reduce material handling cost

True/False Question Correct Answer Your Answer

In case of X bar-R charts, statistical limits are calculated from averages of samples of n (4,5,) instead of single sample of large size to reduce the spread of natural variability. True True

Multiple Choice Multiple Answer Question Which of the following is not the characteristic of Project Production? Correct Answer Your Answer Continuous flow of material , Highly mechanised material handling , Virtually zero manufacturing cycle time Fixed position layout , Virtually zero manufacturing cycle time

Multiple Choice Single Answer Question A good plant layout helps in Correct Answer Your Answer Reducing handling costs Reducing handling costs

Multiple Choice Single Answer Question Inadequate production capacity ultimately leads to Correct Answer Your Answer Poor Customer Service Low Productivity

Select The Blank Question Production Planning is a centralised activity which includes functions such as ________ Correct Answer Your Answer Scheduling Scheduling

Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory

Multiple Choice Multiple Answer Question What are the uses of the instruction manual provided by the manufacturer of a machine? Correct Answer It gives instructions regarding installation and operation of the equipment , It contains note on common troubles with causes and remedies for troubleshooting , It enlists points, frequency and type of lubrication

Your Answer

It gives instructions regarding installation and operation of the equipment , It contains note on common troubles with causes and remedies for troubleshooting

Multiple Choice Multiple Answer Question MRP utilises the following information Correct Answer Your Answer Master production schedule , Product structure , Lead time for procurement/manufacturing Master production schedule , Product structure , Lead time for procurement/manufacturing

Select The Blank Question A good maintenance system is not a luxary but a ________. Correct Answer Your Answer Necessity Necessity

True/False Question Correct Answer Your Answer

Shape od an OC curve is a function of sample size and the acceptance number. True False

Multiple Choice Multiple Answer Question Which of the following can be subtypes of corrective maintenance? Correct Answer Your Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance Predictive Maintenance , Shutdown Maintenance

True/False Question Correct Answer Your Answer

For p-chart, "Inspection by variables" is much faster than "Inspection by attributes" False True

Multiple Choice Single Answer Question Site factors for plant location include Correct Answer Your Answer Suitability of land Suitability of land

Select The Blank Question The ________ breakdowns usually cost more, partly due to damage done to the adjustment components and partly due to emergency actions. Correct Answer Unexpected Your Answer Partial

True/False Question Correct Answer Your Answer

Cent percent inspection is a must if the inspection is of destructive nature. False False

True/False Question Correct Answer Your Answer

Since value of p can never be positive, hence" if LCLp works out to be positive, it is taken as zero." False True

Multiple Choice Single Answer Question Which varaible is taken along the abscissa or X axis? Correct Answer Your Answer Time Standard deviation

Multiple Choice Multiple Answer Question Which of the following are examples of specifications? Correct Answer Your Answer Commercial standards , Assembly and testing instructions , Bill of material Production schedule , Commercial standards , Assembly and testing instructions

Multiple Choice Multiple Answer Question Which of the following products should be produced by using mass production? Correct Answer Your Answer Refrigerator , Tyre for automobile , Television Set Refrigerator , Tyre for automobile , Television Set

Multiple Choice Single Answer Question Which of the following techniques is used by industrial engineering department to obtain the utilisation index? Correct Answer Work Sampling Studies Your Answer Method Study

True/False Question Correct Answer Your Answer

An ideal OC curve is never possible only with cent percent inspection. False False

Select The Blank Question The ________ is the probability that a bad lot will be accepted by the sampling plan.

Correct Answer Your Answer

Consumer's risk Producer's risk

Select The Blank Question The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________. Correct Answer Overtime working Your Answer Overtime working

True/False Question Correct Answer Your Answer

The operator should not stop production if first piece is not approved by the inspector. False False

Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Conversion

Multiple Choice Single Answer Question Which kind of relationship exists between those activities which can be carried out simultaneously and both activities require definite time to finish? Correct Answer Concurrent activities Your Answer Concurrent activities

Multiple Choice Multiple Answer Question Which are different ways to show critical path in a network? Correct Answer Your Answer Thick Line , Red Line , Double Line Dotted line

Select The Blank Question A ________helps to avoid crowding of jobs at a particular machine by change of route of some of the jobs or by diverting work to other machine. Correct Answer Control board Your Answer Control board

Multiple Choice Single Answer Question What do you understand by PERT ? Correct Answer Your Answer Project Evaluation & Review Technique Project Evaluation & Review Technique

Multiple Choice Multiple Answer Question Which of the following factors play important role while selecting or rejecting a particular site from legislation and taxation point of view? Correct Answer Labour laws , Building codes , Policies regarding issue of licences Your Answer Labour laws , Policies regarding issue of licences

Multiple Choice Multiple Answer Question Which of the following concepts must be understood for the achievement of quality? Correct Answer Your Answer Quality of conformance , Purpose of product , Quality of design Purpose of product , Process specifications , Quality of design

Select The Blank Question The ________ is the probability that a good lot will be rejected by the sampling plan. Correct Answer Your Answer Producer's risk Producer's risk

Multiple Choice Single Answer Question What do you mean by the project duration for which the total cost is minimum? Correct Answer Your Answer Optimum duration Optimum duration

True/False Question Correct Answer Your Answer

Originating process of raw material influence Process Planning True True

LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Single Answer Question MRP is based on the concept of inventory demand which is of following type Correct Answer Dependent and independent Your Answer Dependent and independent

Multiple Choice Single Answer Question Main objective of a good plant layout is Correct Answer Reduce material handling cost Your Answer Reduce material handling cost

True/False Question

As a general rule, the number of tail event of an activity is more than that of it's head event. Correct Answer False Your Answer False

Select The Blank Question The ________ is the probability that a good lot will be rejected by the sampling plan. Correct Answer Producer's risk Your Answer Producer's risk

Multiple Choice Multiple Answer Question Which of the following are important considerations concerning activity times? Correct Answer Activity time should be obtained from the person responsible for the completion of an activity , Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resources required to carry out the activity are available. Your Answer Activity time should be obtained from the person responsible for the completion of an activity , Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resources required to carry out the activity are available. Select The Blank

Question

The ________ pertain to the climatic conditions which the component , product or material should withstand. Correct Answer Environmental specifications Your Answer Environmental specifications

Multiple Choice Multiple Answer Question Following are some of the factors considered for evaluation of alternative layouts Correct Answer Flow of Material , Equipment utilization , Ease of supervision Your Answer Flow of Material , Ease of supervision , Delivery performance

Multiple Choice Multiple Answer Question Which of the following are assignable cause? Correct Answer Large varaitions in hardness of material , Tool wear , Errors in setting Your Answer Large varaitions in hardness of material , Tool wear , Errors in setting True/False Question

All activities must not be tied up into the network

Correct Answer False Your Answer False

Select The Blank Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________. Correct Answer 0.01 to 10% Your Answer 0.01 to 10%

True/False Question

In case of X bar, if the process is not under control indicated by some points falling outside the control limits, such points outside the control limits are eliminated and new trial control limits for the remaining points are computed. Correct Answer True Your Answer True

Multiple Choice Single Answer Question What is the base for considering activity time as single time estimate or three time estimate?

Correct Answer Level of uncertainty Your Answer Availability of labour

Select The Blank Question The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Correct Answer Acceptable quality level Your Answer Acceptable quality level

Multiple Choice Single Answer Question What do you mean by lowest possible direct cost required to complete an activity within it's normal time? Correct Answer Normal cost Your Answer Normal cost

Select The Blank Question A good maintenance system is not a luxary but a ________. Correct Answer Necessity Your Answer Necessity

Select The Blank Question A ________helps to avoid crowding of jobs at a particular machine by change of route of some of the jobs or by diverting work to other machine. Correct Answer Control board Your Answer Move order

Select The Blank Question The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable. Correct Answer Quality control Your Answer Quality control

Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory

Your Answer

Factory

Match The Following Question Emerson Efficiency Plan Craft Work Sampling Gantt Chart

Correct Answer Wage Payment Facilities Planning Machine utilization Production Scheduling

Your Answer Wage Payment Facilities Planning Machine utilization Production Scheduling

Select The Blank Question A ________ is another form of subcontracting. Correct Answer Hiring capacity Your Answer Hiring capacity

Multiple Choice Multiple Answer Question In an organization there may not be a formal PPC department if Correct Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large Your Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large Multiple Choice Multiple Answer Question Which of the following cases can be treated as delay during recording of method study? Correct Answer Operators awaiting instructions from supervisor , Worker waiting for his turn at tools stores , Jobs awaiting at the machines for their turn Your Answer Operators awaiting instructions from supervisor , Worker waiting for his turn at tools stores , Jobs awaiting at the machines for their turn True/False Question

Inspection order is must even for simple jobs which can be inspected by shop inspector with the tooling available on shop. Correct Answer False Your Answer False

Multiple Choice Multiple Answer Question Order preparation process for products manufatured to order requires following documents Correct Answer Sales Order , Work order , Shop order Your Answer Sales Order , Work order , Purchase order

Multiple Choice Single Answer Question Technique of Value Engineering can be effectively employed in design of a product to Correct Answer To meet the intended function at lowest cost Your Answer Reduce lead time

True/False Question

Cent percent inspection is often more practical and economical than sampling inspection. Correct Answer False Your Answer False

Multiple Choice Multiple Answer Question Scale model used for layout analysis have following advantages Correct Answer Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown , Models can be shifted easily Your Answer Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown , Models can be shifted easily Multiple Choice Single Answer Question Which of the following technique is event oriented ? Correct Answer Project Evaluation & Review Technique Your Answer Project Evaluation & Review Technique

Multiple Choice Single Answer Question What is the meaning of " Product features" according to J.M.Juran? Correct Answer Quality of design Your Answer Quality of design

Match The Following Question Crash cost of an activity

Correct Answer Cc

Your Answer Cc

Normal time of an activity Tn Crash time of activity Tc

Tn Tc Cn

Normal cost of an activity Cn

Multiple Choice Multiple Answer Question What are uses of diagrams in method study? Correct Answer Study different plant layouts and select the most optimum one , Study the extent of traffic over the different routes of the plant , Identify the extent of backtracking, cross traffic and obstacles encountered during the movement of material. Your Answer Study different plant layouts and select the most optimum one , Study the extent of traffic over the different routes of the plant , Identify the extent of backtracking, cross traffic and obstacles encountered during the movement of material. True/False Question

A load chart specifies the work to be carried out by each person of company during shift hours. Correct Answer False Your Answer True

Multiple Choice Multiple Answer Question Route Sheet generally contains following information Correct Answer Material Specification , Sequence of operation , Skill of Labour Your Answer Material Specification , Sequence of operation , Skill of Labour

True/False Question

Cellular layout is based on the concept of Group Technology

Correct Answer True Your Answer True

Multiple Choice Single Answer Question Which varaible is taken along the abscissa or X axis? Correct Answer Time Your Answer Standard deviation

Multiple Choice Multiple Answer

Question

Which are the advantages of suburban location?

Correct Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction Your Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction Select The Blank Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Answer Condition monitoring Your Answer Condition monitoring

Multiple Choice Multiple Answer Question Expediting function is concerned with following activities Correct Answer Progress chasing to identify delays which may hold up production , Communicating possible delays in delivery date commitment to sales department , Devising cures to keep rate of production in line with schedule Your Answer Recording progress of work , Progress chasing to identify delays which may hold up production , Communicating possible delays in delivery date commitment to sales department Select The Blank Question Production control work is ________ in case of floor inspection as compared with the centralised inspection. Correct Answer easier Your Answer time consuming

Select The Blank Question The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________. Correct Answer Overtime working Your Answer Overtime working

True/False Question

In case of forward pass computation, the earliest event time of the first event is zero. Correct Answer True Your Answer True

Multiple Choice Single Answer Question What is represented by an arrow in a network? Correct Answer Activity Your Answer Activity

True/False Question

As a general rule, a site five times the actual plant size is considered minimum for parking, access facilities and future expansion. Correct Answer True Your Answer True

True/False Question

Independent float either affects the float of preceding activities or that of succeeding activities. Correct Answer False Your Answer False

Multiple Choice Single Answer Question The document raised by PPC which authorises different functions to take action as per instruction is called Correct Answer Work Order Your Answer Work Order

Multiple Choice Single Answer Question A good layout makes effective use of space. Utilization of space for a department like Stores can be measured by Correct Answer Proportion of Cubic volume space utilized Your Answer Ratio of area utilised to area available

Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Operation

LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Single Answer Question MRP is based on the concept of inventory demand which is of following type Correct Answer Dependent and independent Your Answer Dependent and independent

Multiple Choice Single Answer Question Main objective of a good plant layout is Correct Answer Reduce material handling cost Your Answer Reduce material handling cost

True/False Question

As a general rule, the number of tail event of an activity is more than that of it's head event. Correct Answer False Your Answer False

Select The Blank Question The ________ is the probability that a good lot will be rejected by the sampling plan. Correct Answer Producer's risk Your Answer Producer's risk

Multiple Choice Multiple Answer Question Which of the following are important considerations concerning activity times? Correct Answer Activity time should be obtained from the person responsible for the completion of an activity , Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resources required to carry out the activity are available. Your Answer Activity time should be obtained from the person responsible for the completion of an activity , Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resources required to carry out the activity are available. Select The Blank

Question

The ________ pertain to the climatic conditions which the component , product or material should withstand. Correct Answer Environmental specifications Your Answer Environmental specifications

Multiple Choice Multiple Answer Question Following are some of the factors considered for evaluation of alternative layouts Correct Answer Flow of Material , Equipment utilization , Ease of supervision Your Answer Flow of Material , Ease of supervision , Delivery performance

Multiple Choice Multiple Answer Question Which of the following are assignable cause? Correct Answer Large varaitions in hardness of material , Tool wear , Errors in setting Your Answer Large varaitions in hardness of material , Tool wear , Errors in setting True/False Question

All activities must not be tied up into the network

Correct Answer False Your Answer False

Select The Blank Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________. Correct Answer 0.01 to 10% Your Answer 0.01 to 10%

True/False Question

In case of X bar, if the process is not under control indicated by some points falling outside the control limits, such points outside the control limits are eliminated and new trial control limits for the remaining points are computed. Correct Answer True Your Answer True

Multiple Choice Single Answer Question What is the base for considering activity time as single time estimate or three time estimate?

Correct Answer Level of uncertainty Your Answer Availability of labour

Select The Blank Question The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Correct Answer Acceptable quality level Your Answer Acceptable quality level

Multiple Choice Single Answer Question What do you mean by lowest possible direct cost required to complete an activity within it's normal time? Correct Answer Normal cost Your Answer Normal cost

Select The Blank Question A good maintenance system is not a luxary but a ________. Correct Answer Necessity Your Answer Necessity

Select The Blank Question A ________helps to avoid crowding of jobs at a particular machine by change of route of some of the jobs or by diverting work to other machine. Correct Answer Control board Your Answer Move order

Select The Blank Question The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable. Correct Answer Quality control Your Answer Quality control

Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory

Your Answer

Factory

Match The Following Question Emerson Efficiency Plan Craft Work Sampling Gantt Chart

Correct Answer Wage Payment Facilities Planning Machine utilization Production Scheduling

Your Answer Wage Payment Facilities Planning Machine utilization Production Scheduling

Select The Blank Question A ________ is another form of subcontracting. Correct Answer Hiring capacity Your Answer Hiring capacity

Multiple Choice Multiple Answer Question In an organization there may not be a formal PPC department if Correct Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large Your Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large Multiple Choice Multiple Answer Question Which of the following cases can be treated as delay during recording of method study? Correct Answer Operators awaiting instructions from supervisor , Worker waiting for his turn at tools stores , Jobs awaiting at the machines for their turn Your Answer Operators awaiting instructions from supervisor , Worker waiting for his turn at tools stores , Jobs awaiting at the machines for their turn True/False Question

Inspection order is must even for simple jobs which can be inspected by shop inspector with the tooling available on shop. Correct Answer False Your Answer False

Multiple Choice Multiple Answer Question Order preparation process for products manufatured to order requires following documents Correct Answer Sales Order , Work order , Shop order Your Answer Sales Order , Work order , Purchase order

Multiple Choice Single Answer Question Technique of Value Engineering can be effectively employed in design of a product to Correct Answer To meet the intended function at lowest cost Your Answer Reduce lead time

True/False Question

Cent percent inspection is often more practical and economical than sampling inspection. Correct Answer False Your Answer False

Multiple Choice Multiple Answer Question Scale model used for layout analysis have following advantages Correct Answer Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown , Models can be shifted easily Your Answer Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown , Models can be shifted easily Multiple Choice Single Answer Question Which of the following technique is event oriented ? Correct Answer Project Evaluation & Review Technique Your Answer Project Evaluation & Review Technique

Multiple Choice Single Answer Question What is the meaning of " Product features" according to J.M.Juran? Correct Answer Quality of design Your Answer Quality of design

Match The Following Question Crash cost of an activity

Correct Answer Cc

Your Answer Cc

Normal time of an activity Tn Crash time of activity Tc

Tn Tc Cn

Normal cost of an activity Cn

Multiple Choice Multiple Answer Question What are uses of diagrams in method study? Correct Answer Study different plant layouts and select the most optimum one , Study the extent of traffic over the different routes of the plant , Identify the extent of backtracking, cross traffic and obstacles encountered during the movement of material. Your Answer Study different plant layouts and select the most optimum one , Study the extent of traffic over the different routes of the plant , Identify the extent of backtracking, cross traffic and obstacles encountered during the movement of material. True/False Question

A load chart specifies the work to be carried out by each person of company during shift hours. Correct Answer False Your Answer True

Multiple Choice Multiple Answer Question Route Sheet generally contains following information Correct Answer Material Specification , Sequence of operation , Skill of Labour Your Answer Material Specification , Sequence of operation , Skill of Labour

True/False Question

Cellular layout is based on the concept of Group Technology

Correct Answer True Your Answer True

Multiple Choice Single Answer Question Which varaible is taken along the abscissa or X axis? Correct Answer Time Your Answer Standard deviation

Multiple Choice Multiple Answer

Question

Which are the advantages of suburban location?

Correct Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction Your Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction Select The Blank Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Answer Condition monitoring Your Answer Condition monitoring

Multiple Choice Multiple Answer Question Expediting function is concerned with following activities Correct Answer Progress chasing to identify delays which may hold up production , Communicating possible delays in delivery date commitment to sales department , Devising cures to keep rate of production in line with schedule Your Answer Recording progress of work , Progress chasing to identify delays which may hold up production , Communicating possible delays in delivery date commitment to sales department Select The Blank Question Production control work is ________ in case of floor inspection as compared with the centralised inspection. Correct Answer easier Your Answer time consuming

Select The Blank Question The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________. Correct Answer Overtime working Your Answer Overtime working

True/False Question

In case of forward pass computation, the earliest event time of the first event is zero. Correct Answer True Your Answer True

Multiple Choice Single Answer Question What is represented by an arrow in a network? Correct Answer Activity Your Answer Activity

True/False Question

As a general rule, a site five times the actual plant size is considered minimum for parking, access facilities and future expansion. Correct Answer True Your Answer True

True/False Question

Independent float either affects the float of preceding activities or that of succeeding activities. Correct Answer False Your Answer False

Multiple Choice Single Answer Question The document raised by PPC which authorises different functions to take action as per instruction is called Correct Answer Work Order Your Answer Work Order

Multiple Choice Single Answer Question A good layout makes effective use of space. Utilization of space for a department like Stores can be measured by Correct Answer Proportion of Cubic volume space utilized Your Answer Ratio of area utilised to area available

Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Operation

LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Multiple Answer Question Material Requirement Planning is very useful in following situations Correct Answer Long Lead time for procurement , Several levels of assemblies in product , Long manufacturing cycle Your Answer Long Lead time for procurement , Several levels of assemblies in product , Long manufacturing cycle Select The Blank Question The ________ is specified to indicate the maximum permissible variability in the dimensions product or parts. Correct Answer Tolerance Your Answer Standard

Select The Blank Question An ________ history card is the record of all repairs, replacements and engineering changes carried out in the equipment during it's period of service. Correct Answer Equipment history card Your Answer Equipment history card

Multiple Choice Single Answer Question What can be the worst effect due to excessive vibration? Correct Answer Breakdown Your Answer Breakdown

Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory

Multiple Choice Single Answer Question How dummy activities are shown in the time chart during project scheduling? Correct Answer Vertical lines Your Answer Vertical lines

Multiple Choice Single Answer

Question

Which of the following technique makes three time estimates for each activity? Correct Answer Project Evaluation & Review Technique Your Answer Project Evaluation & Review Technique

True/False Question

Expediting action is necessary if the delays and interruptions are abnormal and hence any subsequent delay is bound to extend the promised delivery date. Correct Answer True Your Answer True

Multiple Choice Multiple Answer Question Which features should be covered by the specifications of materials while defining the qualitative requirement? Correct Answer Material composition , Dimensions , Any heat treatment if required Your Answer Material composition , Dimensions , Any heat treatment if required

True/False Question

Limit gauges are not useful when it is necessary to measure the exact amount of variation. Correct Answer True Your Answer False

Select The Blank Question The ________ is the defect level for which lots are regarded as bad lots. Correct Answer Lot Tolerance Percentage Defective Your Answer Lot Tolerance Percentage Defective

Multiple Choice Single Answer Question Technique of Value Engineering can be effectively employed in design of a product to Correct Answer To meet the intended function at lowest cost Your Answer Increase resourse utilization

Multiple Choice Single Answer Question What do you mean by the preventive maintenance by using five human senses? Correct Answer Preventive inspection

Your Answer

Sensitive inspection

Multiple Choice Multiple Answer Question Which of the following are typical examples of limit gauges? Correct Answer Snap gauge , Plug gauge , Ring gauge Your Answer Snap gauge , Plug gauge , Ring gauge

Multiple Choice Multiple Answer Question Which are the major types of defects? Correct Answer Minor , Major , Critical Your Answer Major , Critical

Match The Following Question Emerson Efficiency Plan Craft Work Sampling Gantt Chart

Correct Answer Wage Payment Facilities Planning Machine utilization Production Scheduling

Your Answer Facilities Planning Production Scheduling Sampling Inspection Charting technique

Select The Blank Question The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Correct Answer Acceptable quality level Your Answer Acceptable quality level

Multiple Choice Single Answer Question A good plant layout helps in Correct Answer Reducing handling costs Your Answer Reducing handling costs

Multiple Choice Multiple Answer Question Which of the following charts are used for the recording of data during the method study?

Correct Answer Operation process chart , Multiple activity chart , Flow process chart Your Answer Operation process chart , Multiple activity chart , Flow process chart

Multiple Choice Single Answer Question What do you mean by the selection of the job for the method study on the basis of manufacturing difficulties? Correct Answer Technical consideration Your Answer Human consideration

True/False Question

An activity can share the same tail event and same head event with any other activity. Correct Answer False Your Answer False

Select The Blank Question The ________ is the probability that a good lot will be rejected by the sampling plan. Correct Answer Producer's risk Your Answer Producer's risk

Multiple Choice Single Answer Question Inadequate production capacity ultimately leads to Correct Answer Poor Customer Service Your Answer Poor Customer Service

True/False Question

All activities must not be tied up into the network

Correct Answer False Your Answer True

Multiple Choice Single Answer Question Technique which can help an organization to reduce inventory is called Correct Answer MRP Your Answer CPM

True/False

Question

Dust gets mixed with lubricants, forms an abrasive substance and causes pre-mature failure of machinery. Correct Answer True Your Answer True

Multiple Choice Multiple Answer Question Which of the following situations demand the technical consideration while selecting a job for method study? Correct Answer Jobs having inconsistent quality , Operations inviting frequent requests from supervisors for relaxation in allowed time because of variations in materials and tool performance , Jobs in which too many man-hours are spend in checking and rechecking work Your Answer Jobs having inconsistent quality , Operations inviting frequent requests from supervisors for relaxation in allowed time because of variations in materials and tool performance , Jobs in which too many man-hours are spend in checking and rechecking work Multiple Choice Multiple Answer Question Which of the following are examples of attributes? Correct Answer Cracks , Burrs , Texture Your Answer Cracks , Hardness , Burrs

Select The Blank Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________. Correct Answer 0.01 to 10% Your Answer 0.01 to 10%

Select The Blank Question The ________ must ensure that the product satisfy the functional requirements of it's usage. Correct Answer Quality of design Your Answer Quality of inspection

True/False Question

Delay in completion of projects result in unwelcome additions to the fixed manufacturing expenses. Correct Answer True Your Answer True

Multiple Choice Multiple Answer

Question

Which of the following activities are used while recording for method study? Correct Answer Delay , Operation , Inspection Your Answer Delay , Operation , Inspection

True/False Question

Root cause of most of the breakdowns is failure of the lubrication system. Correct Answer True Your Answer True

Select The Blank Question The term ________ emplies the foregone profit due to inability of company to produce. Correct Answer Opportunity cost Your Answer Opportunity cost

True/False Question

Latest finishing date is the latest event time of the tail event.

Correct Answer False Your Answer False

Multiple Choice Multiple Answer Question What is the basic minimum requirement for those who are responsible for the quality of design? Correct Answer In depth knowledge about alternative materials and manufacturing processes , access to latest technology and production process adopted by industries in the developed market , Continuous effort in product development Your Answer In depth knowledge about alternative materials and manufacturing processes , access to latest technology and production process adopted by industries in the developed market , Continuous effort in product development True/False Question

If the firm has adopted elaborate planned maintenance system, there is no chance of any unplanned maintenance work. Correct Answer False Your Answer False

Multiple Choice Multiple Answer

Question

Which of the following is not the characteristic of Project Production?

Correct Answer Continuous flow of material , Highly mechanised material handling , Virtually zero manufacturing cycle time Your Answer Continuous flow of material , Highly mechanised material handling , Virtually zero manufacturing cycle time Multiple Choice Single Answer Question Which document is used for returning the surplus material? Correct Answer Stores Return Note Your Answer Stores Return Note

Select The Blank Question Work study is also called ________ study Correct Answer Time and Motion Your Answer Time and Motion

Match The Following Question Factor Analysis Minimization of production delays Maximum visibility Scale model

Correct Answer Method to evaluate layouts Objective of good layout Principles of good layout Layout analysis

Your Answer Method to evaluate layouts Objective of good layout Principles of good layout Layout analysis

Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Operation

Multiple Choice Single Answer Question What does the additional cost incurred to reduce the duration of an activity by one unit of time represent? Correct Answer Activity cost slope Your Answer Activity time slope

Select The Blank

Question

Production control work is ________ in case of floor inspection as compared with the centralised inspection. Correct Answer easier Your Answer easier

Select The Blank Question One detachable ticket is prepared for each ________. Correct Answer Operation Your Answer Operation

Multiple Choice Single Answer Question The ratio of output to input of a production system is commonly known as Correct Answer Productivity Your Answer Productivity

Multiple Choice Single Answer Question Which of the following policies is advisable in case of low product variety and large volumes? Correct Answer Low Skilled Labour & Special Purpose Machines Your Answer Low Skilled Labour & Special Purpose Machines

LIST OF ATTEMPTED QUESTIONS AND ANSWERS Select The Blank Question The ________ must ensure that the product satisfy the functional requirements of it's usage. Correct Answer Quality of design Your Answer Quality of design

Multiple Choice Multiple Answer Question Which of the following information is available in summary of part in a chart during methods study? Correct Answer Frequency of each symbol , Total time for each symbol , Total distance travelled by the object Your Answer Frequency of each symbol , Total time for each symbol True/False Question

The event numbers as far as possible reflect the logical relationships of the activities. Correct Answer True Your Answer False

Multiple Choice Single Answer Question Which varaible is taken along the ordinate or Y axis? Correct Answer Quality Your Answer Quality

Multiple Choice Multiple Answer Question Which of the following schedules are recommended to prepare and follow as a part of preventive maintenance system? Correct Answer Preventive inspection schedule , Cleaning and upkeep schedule , Lubrication schedule Your Answer Preventive inspection schedule , Cleaning and upkeep schedule , Lubrication schedule Multiple Choice Single Answer Question Which kind of preventive inspection detects some maintenance related characteristics by making use of human senses, when equipment is in operation? Correct Answer Extrernal inspection

Your Answer

Extrernal inspection

Multiple Choice Multiple Answer Question Which are different ways to show critical path in a network? Correct Answer Thick Line , Red Line , Double Line Your Answer Thick Line , Red Line , Double Line

Multiple Choice Multiple Answer Question What are the benefits of overhauling? Correct Answer It increases useful life of an equipment and it's parts , Advance planning allows to attend equipment without disturbing the production programme , Advance planning allows to prepare and keep ready the list of replacement spares Your Answer It increases useful life of an equipment and it's parts , Advance planning allows to attend equipment without disturbing the production programme , Advance planning allows to prepare and keep ready the list of replacement spares Match The Following Question Combined Layout Fixed Position Layout Product Layout Process Layout

Correct Answer Mixed Layout Project Layout Line Layout Functional Layout

Your Answer Mixed Layout Line Layout Shop layout Functional Layout

Multiple Choice Multiple Answer Question Which of the following factors play important role while selecting or rejecting a particular site from legislation and taxation point of view? Correct Answer Labour laws , Building codes , Policies regarding issue of licences Your Answer Labour laws , Building codes , Policies regarding issue of licences Select The Blank Question The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered

satisfactory as a process average. Correct Answer Acceptable quality level Your Answer Acceptable quality level

Multiple Choice Multiple Answer Question Major contributors in the development of Control Charts, Sampling plan are Correct Answer F H Dodge , H G Roming , Walter Schewhart Your Answer True/False Question F H Dodge , H G Roming , Walter Schewhart

Skill of labour force in a product type layout is usually higher than in the process type of layout Correct Answer False Your Answer True

True/False Question

Repetitive movements between work stations which are difficult to be traced on string diagrams can be conveniently shown on flow diagrams. Correct Answer False Your Answer True

Select The Blank Question The ________ is necessary when the job requires detailed of one or more of the job characteristics with the help of special equipment which is not available at the producing company. Correct Answer Inspection order Your Answer Job card

Multiple Choice Multiple Answer Question Which of the following cases can be referred as operation in method study recording? Correct Answer Change in physical characteristic , Consumption of physical effort , Change in chemical characteristic Your Answer Change in physical characteristic , Consumption of physical effort , Change in chemical characteristic Select The Blank

Question

The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Answer Condition monitoring Your Answer True/False Question Overhauling

All activities lying on the non-critical paths must have total float and free float. Correct Answer False Your Answer False

Select The Blank Question Work study is also called ________ study Correct Answer Time and Motion Your Answer Method

Match The Following Question

Correct Answer

Your Answer Cc Tn Tc Cn

Crash cost of an activity Cc Normal time of an activity Crash time of activity Normal cost of an activity Tn Tc Cn

Multiple Choice Multiple Answer Question Which are the advantages of suburban location? Correct Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction Your Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction True/False

Question

In case of X bar-R charts,it is ensured that the assignable causes are detected before the tolerances are violated, upper and lower statistical limits are worked out and inserted into a chart. Correct Answer True Your Answer False

Multiple Choice Single Answer Question Which of the following is the criteria for the percentage defectives in the zone of the indecision? Correct Answer Lots having the percentage defective more than AQL but less than LPTD Your Answer Lots having the percentage defective less than AQL but more than LPTD Select The Blank Question The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________. Correct Answer Overtime working Your Answer Overtime working

Multiple Choice Single Answer Question What do you mean by lowest possible direct cost required to complete an activity within it's crashed time? Correct Answer Crash cost Your Answer Crash cost

Multiple Choice Single Answer Question In case of Batch Production which kind of labour is expected? Correct Answer Skilled in one specific Manufacturing Process Your Answer Semiskilled

Multiple Choice Multiple Answer Question Which three of the following are causes of continuous upward pattern of Xbar-R control chart? Correct Answer Wear of tool , Abnormal rise in temperature , Accumulation of dirt Your Answer Wear of tool , Abnormal rise in temperature , Accumulation of dirt

True/False Question

Root cause of most of the breakdowns is failure of the lubrication system. Correct Answer True Your Answer True

True/False Question

It is not necessary to know spare time available on the non-critical path to allow a little delay for noncritical activity. Correct Answer False Your Answer False

True/False Question

MRP software generates time periodwise requiremetn of subassemblies Correct Answer True Your Answer True

True/False Question

In case of two handed process chart, the simultaneous activities of both hands are recorded opposite to each other on the chart. Correct Answer True Your Answer True

Multiple Choice Single Answer Question What do you mean by CPM? Correct Answer Critical Path Method Your Answer Critical Path Method

Multiple Choice Multiple Answer Question Which of the following are major inputs to scheduling? Correct Answer Overlapping of operations , Effective Capacity per work centre , Performance standards Your Answer Overlapping of operations , Effective Capacity per work centre , Performance standards Multiple Choice Multiple Answer

Question

Lack of material planning results in the following

Correct Answer Over ordering , under ordering , stockouts Your Answer Over ordering , under ordering , stockouts

Multiple Choice Single Answer Question What do you mean by the verification of object against predetermined standards of quality or quantity or both? Correct Answer Inspection Your Answer Inspection

Multiple Choice Multiple Answer Question What are the advantages of templates over diagrams? Correct Answer Can be conveniently moved on the graph paper , Less laborious , Saves time Your Answer Can be conveniently moved on the graph paper , Less laborious , Unskilled person can do and analyze it True/False Question

It would not affect the project completion time if noncritical activities take little loner time than planned. Correct Answer True Your Answer True

Select The Blank Question The ________ is the probability that a good lot will be rejected by the sampling plan. Correct Answer Producer's risk Your Answer Producer's risk

Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory

Select The Blank Question An Ideal OC curve is ________ shaped curve that accpets all the lots with quality equal to or better than AQL .

Correct Answer Rectangular Your Answer Bell

Multiple Choice Single Answer Question Which is the right time to prepare stores issue order? Correct Answer When route sheet is ready Your Answer When route sheet is ready

Multiple Choice Single Answer Question Which element of a network represents a task which has got a definite beginning and definite end? Correct Answer Activity Your Answer Activity

Multiple Choice Single Answer Question Which kind of preventive inspection detects some defects in moving parts, internal cracks, and others , when machine is under preplanned shutdown? Correct Answer Internal inspection Your Answer Internal inspection

Select The Blank Question Production Planning is a centralised activity which includes functions such as ________ Correct Answer Scheduling Your Answer Dispatching

Select The Blank Question The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable. Correct Answer Quality control Your Answer Quality control

Select The Blank Question Goods after final inspection should accompany ________to enable dispatch department to identify and

draw correct reference. Correct Answer Forwarding note Your Answer Forwarding note

Multiple Choice Single Answer Question Who has introduced the useful concept of control chart in 1931? Correct Answer Walter Shewhart Your Answer Walter Shewhart

POM assgn : Sushant True/False Question Correct Answer Your Answer Cent percent inspection is required on WIP prior to the key, critical or costly operation. True True

Multiple Choice Multiple Answer Question Which of the following aspects are essential to ensure quality of purchased items? Correct Answer Your Answer Defining right quality for the job , Vendor performance evaluation , Making sure that suppliers understand the requirements Vendor performance evaluation , Making sure that suppliers understand the requirements , Defining right quality for the job

Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory

Multiple Choice Single Answer Question Which of the following technique is event oriented ? Correct Answer Your Answer Project Evaluation & Review Technique Project Evaluation & Review Technique

Select The Blank Question Work study is also called ________ study Correct Answer Your Answer Time and Motion Time and Motion

Multiple Choice Multiple Answer Question Which of the following concepts must be understood for the achievement of quality? Correct Answer Your Answer Quality of conformance , Purpose of product , Quality of design Quality of conformance , Quality of design

Multiple Choice Multiple Answer Question Following are some of the factors considered for evaluation of alternative layouts Correct Answer Your Answer Flow of Material , Equipment utilization , Ease of supervision Flow of Material , Equipment utilization , Ease of supervision

Match The Following Question

Correct Answer

Your Answer

Toung Eye Nose Ear

Sweet Crack Burnout Impact

Sweet Crack Burnout Impact

Multiple Choice Multiple Answer Question Which of the following are important considerations concerning activity times? Correct Answer Activity time should be obtained from the person responsible for the completion of an activity , Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resources required to carry out the activity are available. Activity time should be obtained from the person responsible for the completion of an activity , Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resources required to carry out the activity are available.

Your Answer

Multiple Choice Multiple Answer Question Which are the subtasks of the maintenance phase of the method study? Correct Answer Your Answer Monitoring and control , Performance appraisal , Audit on savings Monitoring and control , Performance appraisal , Audit on savings

Multiple Choice Multiple Answer Question Which of the following are characteristics of an operating characteristics curve? Correct Answer Your Answer Producer risk , Consumer Risk , Acceptable Quality Level Producer risk , Consumer Risk , Acceptable Quality Level

Select The Blank Question The ________ breakdowns usually cost more, partly due to damage done to the adjustment components and partly due to emergency actions. Correct Answer Unexpected Your Answer Partial

Multiple Choice Single Answer Question Why stores issue order should not be issued as soon as it is prepared? Correct Answer Your Answer Material may or may not be available at the time of preparation Inventory investment will increase

Multiple Choice Single Answer Question What is the nature of the sampling plan for critical defects? Correct Answer Your Answer Tight Tight

Select The Blank Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________. Correct Answer 0.01 to 10% Your Answer 0.01 to 10%

Multiple Choice Multiple Answer Question Plant layout facilitates processing of products in most effective manner through the following Correct Answer Shortest possible distance , Shortest processing time , Minimum movement Your Answer Shortest possible distance , Shortest processing time , Minimum movement

True/False Question Correct Answer Your Answer

After goods have been manufactured, route sheets and operation layouts should not be collected back. False False

Multiple Choice Single Answer Question Process planning is the process of Correct Answer Your Answer establishing shortest and most economic path of production establishing shortest and most economic path of production

Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Operation

Select The Blank Question The ________ is specified to indicate the maximum permissible variability in the dimensions product or parts. Correct Answer Tolerance Your Answer Tolerance

Select The Blank Question Goods after final inspection should accompany ________to enable dispatch department to identify and draw correct reference. Correct Answer Forwarding note Your Answer Forwarding note

Select The Blank

Question Correct Answer Your Answer

The ________ includes preventive maintenance activities whose needs are identified through inspection which requires stoppage of machines. Shutdown Maintenance Shutdown Maintenance

True/False Question Correct Answer Your Answer

A load chart specifies the work to be carried out by each person of company during shift hours. False True

Select The Blank Question The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________. Correct Answer Overtime working Your Answer Overtime working

True/False Question Correct Answer Your Answer

Under MRP system for common items order for procurement is placed based on requirement for each product False True

Multiple Choice Single Answer Question What do you understand by the extent the products manufactured conforms to the laid down design? Correct Answer Quality of conformance Your Answer Quality of conformance

Select The Blank Question The ________ is necessary when the job requires detailed of one or more of the job characteristics with the help of special equipment which is not available at the producing company. Correct Answer Inspection order Your Answer Job card

Multiple Choice Multiple Answer Question Which of the following are the basic requirements of quality standard? Correct Answer Your Answer Deifinite , Undesrstandable , Economically viable Deifinite , Undesrstandable , Economically viable

True/False Question

In case of forward pass computation, the earliest event time of the first event is zero.

Correct Answer Your Answer

True True

Multiple Choice Multiple Answer Question Which kind of possible defectives can be reduced due to first off inspection? Correct Answer Your Answer Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machine set up Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machine set up , Due to purposely done mistakes by unsatisfied worker

True/False Question Correct Answer Your Answer

A sampling plan which perfectly discriminates will have vertical OC curve. True True

Multiple Choice Multiple Answer Question Which of the following is a part of preparing manufacturing order set as a primary function of dispatching? Correct Answer Operational layouts , Move orders , Pre-filled stores issue orders Your Answer Operational layouts , Rejection reports , Move orders , Pre-filled stores issue orders

Select The Blank Question An ________ history card is the record of all repairs, replacements and engineering changes carried out in the equipment during it's period of service. Correct Answer Equipment history card Your Answer Equipment history card

True/False Question Correct Answer Your Answer

Specifications is the basic tool of inspection. True True

Match The Following Question

Correct Answer

Your Answer Economic order quantity ABC Analysis BOM MRP

Forcasting requirement for indirect Past consumption analysis material technique Inventory control by classification Structure of the product Material Planning for dependent demand ABC Analysis BOM MRP

Multiple Choice Single Answer Question The document raised by PPC which authorises different functions to take action as per instruction is called Correct Answer Work Order Your Answer Job Instructions

Multiple Choice Single Answer Question Who prepares the daily production report? Correct Answer Your Answer Shop Supervisor Shop Supervisor

True/False Question Correct Answer Your Answer

A lot declared rejected in sampling inspection should not be inspected 100% in any case. False True

Multiple Choice Single Answer Question How is the probability of acceptance in case of Acceptable Quality Level (AQL )? Correct Answer Your Answer Very high Average

Multiple Choice Multiple Answer Question Which are the different methods of recording actual progress of work? Correct Answer Your Answer Display boards , Progress cards , Network updating Display boards , Progress cards , Network updating

True/False Question Correct Answer Your Answer

The dispatching function is of very importance in flow and mass production units. False True

True/False Question Correct Answer Your Answer

Proper care and storage is not an essential part of a well planned lubrication system. False False

Select The Blank Question The ________ pertain to the climatic conditions which the component , product or material should withstand.

Correct Answer Your Answer

Environmental specifications Environmental specifications

Multiple Choice Single Answer Question Which of the following is the most popular technique for Project Production? Correct Answer Your Answer PERT & CPM PERT & CPM

Select The Blank Question Production Planning is a centralised activity which includes functions such as ________ Correct Answer Your Answer Scheduling Scheduling

Multiple Choice Single Answer Question Which rule is used for numbering of events? Correct Answer Your Answer Fulkerson's Rule Fulkerson's Rule

POM assgn : Grace True/False Question Correct Answer Your Answer Floor inspection delays the identification of faults which can not be rectified immediately before large lots are spoiled. False False

Multiple Choice Single Answer Question Management often fails to realize the importance of efficient layout due to following reason Correct Answer losses resulting from poor layout are not directly shown in the financial statements Your Answer losses resulting from poor layout are not directly shown in the financial statements Select The Blank Question Correct Answer Your Answer

The ________ is the defect level for which lots are regarded as bad lots. Lot Tolerance Percentage Defective Lot Tolerance Percentage Defective

Multiple Choice Single Answer Question Which method of critical path determination begins with the end event and moves backward to the start event of the project network? Correct Answer Backward pass computation Your Answer Backward pass computation

True/False Question Correct Answer Your Answer

Complexity and difficulty of Planning is influenced by types of layout True False

True/False Question Correct Answer Your Answer

For p-chart, p bar is the ratio of total number of units inspected to the total number of units defectives. False True

Multiple Choice Single Answer Question What is represented by an arrow in a network? Correct Answer Your Answer Activity Activity

Multiple Choice Multiple Answer

Question Correct Answer Your Answer

MRP utilises the following information Master production schedule , Product structure , Lead time for procurement/manufacturing Master production schedule , Lead time for procurement/manufacturing , list of machines

Multiple Choice Single Answer Question Which is the ideal place to write a description of an activity in a network? Correct Answer Your Answer Above the arrow Above the arrow

Select The Blank Question Correct Answer Your Answer

The ________ breakdowns usually cost more, partly due to damage done to the adjustment components and partly due to emergency actions. Unexpected Unexpected

Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory

True/False Question Correct Answer Your Answer

Systematic maintenance system can completely eliminate the wear and tear of machines. False True

Multiple Choice Multiple Answer Question Which of the following are types of non-destructive testing? Correct Answer Your Answer Visual Testing , Eddy current , Magnetic flow detectors Visual Testing , Eddy current , Magnetic flow detectors

Select The Blank Question Correct Answer Your Answer

Work study is also called ________ study Time and Motion Time and Motion

Multiple Choice Single Answer Question Providing flexibility in plant layout means

Correct Answer Your Answer

Layout can be changed without much cost if required Layout can be changed without much cost if required

Multiple Choice Multiple Answer Question Which of the following aspects are essential to ensure quality of purchased items? Correct Answer Defining right quality for the job , Vendor performance evaluation , Making sure that suppliers understand the requirements Your Answer Defining right quality for the job , Vendor performance evaluation , Making sure that suppliers understand the requirements Multiple Choice Multiple Answer Question Which of the following are scheduling techniques? Correct Answer Your Answer Critical Path Analysis , Index Method , Johnson's two machine algorithm Critical Path Analysis , Index Method , Johnson's two machine algorithm

Select The Blank Question

Correct Answer Your Answer

The ________ advocates maintenance procedures whereby the condition of the plant is constantly watched through systematic inspection to unearth unhealthy conditions and preventive Preventive Maintenance Preventive Maintenance

True/False Question Correct Answer Your Answer

A network should be progression of activities always moving forward. True True

Multiple Choice Multiple Answer Question In an organization there may not be a formal PPC department if Correct Answer Your Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large

Select The Blank Question Correct Answer Your Answer

The ________ is necessary when the job requires detailed of one or more of the job characteristics with the help of special equipment which is not available at the producing company. Inspection order Inspection order

Multiple Choice Multiple Answer Question Order preparation process for products manufatured to order requires following documents

Correct Answer Your Answer

Sales Order , Work order , Shop order Sales Order , Work order , Shop order

Multiple Choice Single Answer Question What do you understand by the selection of the job for the method study on the basis of money saving potential of the job? Correct Answer Economic consideration Your Answer Economic consideration

Select The Blank Question Correct Answer Your Answer

Production Planning is a centralised activity which includes functions such as ________ Scheduling Scheduling

Multiple Choice Multiple Answer Question Scale model used for layout analysis have following advantages Correct Answer Your Answer Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown , Models can be shifted easily Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown , Models can be shifted easily

Multiple Choice Single Answer Question Which is the ideal place to inspect jigs and fixtures in a mass manufacturing unit? Correct Answer Separate inspection room Your Answer Separate inspection room

Multiple Choice Single Answer Question How to reveal the capability of the sampling plan to discriminate between good lots and bad lots? Correct Answer Operating characteristics curve ( OC ) Your Answer Operating characteristics curve ( OC )

True/False Question Correct Answer Your Answer

It would not affect the project completion time if non-critical activities take little loner time than planned. True True

Select The Blank Question Correct Answer

The ________ inclu des preventive maintenance activities whose needs are identified through inspection which requires stoppage of machines. Shutdown Maintenance

Your Answer

Shutdown Maintenance

Match The Following Question Forcasting requirement for indirect material

Correct Answer Past consumption analysis technique

Your Answer Past consumption analysis technique ABC Analysis BOM MRP

Inventory control by classification ABC Analysis Structure of the product Material Planning for dependent demand True/False Question Correct Answer Your Answer BOM MRP

The dispatching function is of very importance in flow and mass production units. False True

Multiple Choice Multiple Answer Question Which features should be covered by the specifications of materials while defining the qualitative requirement? Correct Answer Material composition , Dimensions , Any heat treatment if required Your Answer Material composition , Dimensions , Cost of material

Select The Blank Question Correct Answer Your Answer

The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Condition monitoring Condition monitoring

Select The Blank Question Correct Answer Your Answer

One detachable ticket is prepared for each ________. Operation Operation

Multiple Choice Single Answer Question Which of the following is the most popular technique for Project Production? Correct Answer Your Answer PERT & CPM PERT & CPM

Select The Blank

Question Correct Answer Your Answer

A good maintenance system is not a luxary but a ________. Necessity Necessity

Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Operation

True/False Question Correct Answer Your Answer

An activity should represent an operation or set of operations which can be performed using a particular kind of equipment or a special skill. True False

Multiple Choice Multiple Answer Question Which of the following are types of sampling plan? Correct Answer Your Answer Single sampling plan , Double sampling plan , Multiple sampling plan Single sampling plan , Double sampling plan , Multiple sampling plan

True/False Question Correct Answer Your Answer

In case of forward pass computation, the earliest event time of a plain event equals the earliest event time of the preceding event plus duration of activity emanating from the preceding event. True False

Multiple Choice Multiple Answer Question Which of the following are ideal situations for the preventive inspection? Correct Answer Your Answer Weekly off and holidays , Non-production hours , Stand-up equipment Weekly off and holidays , Non-production hours , Stand-up equipment

Multiple Choice Single Answer Question What do you mean by the chart on which the major activities and entry points of materials are recorded to have graphic view of operations and inspections involved in the process? Correct Answer Operation process chart Your Answer Flow Process chart

Match The Following

Question Fixation of inventory level Symptom of ill planned purchasing Factor influencing material planning

Correct Answer Reorder level Over ordering Lead time

Your Answer Reorder level Over ordering Lead time Stock on hand

Net requirement of material under Stock on hand MRP

Multiple Choice Single Answer Question Taxes / duties levied is one of the important determinant for location decision as taxes/duties substantially influence Correct Answer Product cost Your Answer Product cost

Multiple Choice Single Answer Question Which kind of gauge consists of electrical contacts operating a series of colloured signal lamps which indicate whether the dimension is correct, oversize or undersize? Correct Answer Multiple gauging Your Answer Multiple gauging

Multiple Choice Multiple Answer Question Which of the following are minimum requirement for a good quality of design? Correct Answer Your Answer Resonable cost , Resonable procurement time , Resonable manufacturing time Resonable cost , Resonable procurement time , Resonable manufacturing time

Select The Blank Question Correct Answer Your Answer

OC curve of ideal sampling plan suggests that all lots less than 3% defectives have the probability of acceptance of ________. One One

LIST OF ATTEMPTED QUESTIONS AND ANSWERS Select The Blank Question An ________ history card is the record of all repairs, replacements and engineering changes carried out in the equipment during it's period of service. Correct Answer Equipment history card Your Answer Equipment history card Select The Blank Question The ________ pertain to the climatic conditions which the component , product or material should withstand. Correct Answer Environmental specifications Your Answer Environmental specifications Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Operation Select The Blank Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Answer Condition monitoring Your Answer Condition monitoring True/False Question A lot declared rejected in sampling inspection should not be inspected 100% in any case. Correct Answer False Your Answer False Multiple Choice Single Answer Question The ratio of output to input of a production system is commonly known as Correct Answer Productivity Your Answer Productivity Multiple Choice Single Answer Question What do you mean by the graphical representation of the project which is composed as series of connected arrows and circles to describe the interrelationship of the activities involved? Correct Answer Network Your Answer Network True/False Question Since value of p can never be positive, hence" if LCLp works out to be positive, it is taken as zero." Correct Answer False Your Answer False True/False Question Kanban system is essentially a computer based system for production scheduling and control Correct Answer False Your Answer False Multiple Choice Multiple Answer Question Which of the following possibilities can be explored by using flow process chart?

Correct Answer Eliminating the operations or combining the operations with another , Reducing the distance traveled by the workmen or materials , Avoiding the waiting time and thereby reduce production losses Your Answer Eliminating the operations or combining the operations with another , Reducing the distance traveled by the workmen or materials , Avoiding the waiting time and thereby reduce production losses Multiple Choice Multiple Answer Question Which are the subfactors of community facilities or social infrastructure? Correct Answer Accomodation , Educational , Entertainment Your Answer Accomodation , Educational , Entertainment True/False Question Only skilled worker can use the fixed limit gauge. Correct Answer False Your Answer False Select The Blank Question The term ________ emplies the foregone profit due to inability of company to produce. Correct Answer Opportunity cost Your Answer Opportunity cost Multiple Choice Single Answer Question A good plant layout helps in Correct Answer Reducing handling costs Your Answer Reducing handling costs Multiple Choice Multiple Answer Question Which kind of possible defectives can be reduced due to first off inspection? Correct Answer Due to wrong machine set up , Due to mistakes in reading blue prints , Due to errors in tooling Your Answer Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machine set up Select The Blank Question The ________ is a set of tools and techniques by which products are made to comply with the specifications at minimum cost to the firm. Correct Answer Quality control system Your Answer Quality control system Multiple Choice Single Answer Question What do you understand by identification of defects in materials, components, machining processes or men to fix responsibility of defectives, thereby preventing or minimising occurance of defectives? Correct Answer Preventive function Your Answer Preventive function Multiple Choice Multiple Answer Question Which of the following products should be produced by using mass production? Correct Answer Refrigerator , Tyre for automobile , Television Set Your Answer Refrigerator , Tyre for automobile , Television Set Select The Blank Question Work study is also called ________ study Correct Answer Time and Motion Your Answer Time and Motion

Multiple Choice Single Answer Question Which kind of relationship exists between those activities which can be carried out simultaneously and both activities require definite time to finish? Correct Answer Concurrent activities Your Answer Concurrent activities Multiple Choice Multiple Answer Question Which are the sources of information to update the progress card daily? Correct Answer Detachable ticket , Daily production report , Job Card Your Answer Detachable ticket , Daily production report , Job Card Multiple Choice Single Answer Question Out of two basic criteria for the selection of a manufacturing method, one is, it must be able to meet the specifications of final product and the other is, it must be Correct Answer Cost effective method Your Answer Cost effective method Multiple Choice Multiple Answer Question Which of the following charts are used for the recording of data during the method study? Correct Answer Operation process chart , Multiple activity chart , Flow process chart Your Answer Operation process chart , Multiple activity chart , Flow process chart Select The Blank Question The ________ is the probability that a bad lot will be accepted by the sampling plan. Correct Answer Consumer's risk Your Answer Consumer's risk True/False Question Suburban location provides the compromise netween rural and urban locations. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Which of the following method can be used to record the facts during the method study? Correct Answer Micromotion study , Cyclegraph , Chronocyclegraph Your Answer Micromotion study , Cyclegraph , Chronocyclegraph Match The Following Question Correct Answer Your Answer Combined Layout Mixed Layout Mixed Layout Fixed Position Layout Project Layout Project Layout Product Layout Line Layout Line Layout Process Layout Functional Layout Functional Layout

Multiple Choice Single Answer Question Inadequate production capacity ultimately leads to Correct Answer Poor Customer Service Your Answer Low Productivity Multiple Choice Single Answer

Question Which varaible is taken along the ordinate or Y axis? Correct Answer Quality Your Answer Quality Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory Multiple Choice Multiple Answer Question Which of the following defects can be observed during preventive inspection by using human senses? Correct Answer Leakage of a gas , Deviation from normal sound , Excessive Vibration Your Answer Deviation from normal sound , Excessive Vibration , Leakage of a gas Multiple Choice Multiple Answer Question Which of the following are uses of the lubricants? Correct Answer Retard rate of wear and tear of moving parts , Protect parts from moisture and dust , Keep temperature of bearings within allowable limits Your Answer Retard rate of wear and tear of moving parts , Protect parts from moisture and dust , Keep temperature of bearings within allowable limits Multiple Choice Single Answer Question Why method study should precede work measurement? Correct Answer Time for a job can be accessed accurately only after standardizing the method Your Answer Time for a job can be accessed accurately only after standardizing the method True/False Question In case of two handed process chart, storage symbol is used when either hand is used as grip or vice to hold an object. Correct Answer True Your Answer True Multiple Choice Single Answer Question Process type layout is suitable when Correct Answer there is wide variation in processing time of operations Your Answer there is wide variation in processing time of operations Multiple Choice Single Answer Question Site factors for plant location include Correct Answer Suitability of land Your Answer Suitability of land Select The Blank Question The ________ is the probability that a good lot will be rejected by the sampling plan. Correct Answer Producer's risk Your Answer Producer's risk Multiple Choice Single Answer Question What is the location of upper control limit in the X bar-R control chart? Correct Answer 3 standard deviations above central line Your Answer 3 standard deviations above central line Multiple Choice Single Answer Question Which of the following data is unnecessary for scheduling process? Correct Answer Cost breakup of products

Your Answer Cost breakup of products Multiple Choice Multiple Answer Question Which of the following are typical examples of limit gauges? Correct Answer Snap gauge , Plug gauge , Ring gauge Your Answer Snap gauge , Plug gauge , Ring gauge True/False Question Sample sizes for the construction of p-chart are typicaly larger that for Xbar-R-charts. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Which of the following are the basic requirements of quality standard? Correct Answer Deifinite , Undesrstandable , Economically viable Your Answer Deifinite , Undesrstandable , Economically viable Multiple Choice Multiple Answer Question Which of the following is not the characteristic of Project Production? Correct Answer Continuous flow of material , Highly mechanised material handling , Virtually zero manufacturing cycle time Your Answer Continuous flow of material , Highly mechanised material handling , Virtually zero manufacturing cycle time Match The Following Question Correct Answer Your Answer Community Facilities Educational facility Educational facility Proximity to market Fragile product Fragile product Industrial and labour attitude Productivity of labour Productivity of labour Legislation and taxation Licenses Licenses

True/False Question Breakdown of a machine is normally accompanied by added machine setup cost such as resetting of jobs or change of jobs. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Which of the following are examples of gross materials? Correct Answer Timber , Iron ore , Sugar cane Your Answer Timber , Iron ore , Sugar cane Select The Blank Question The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________. Correct Answer Overtime working Your Answer Overtime working

LIST OF ATTEMPTED QUESTIONS AND ANSWERS Select The Blank Question Production Planning is a centralised activity which includes functions such as ________ Correct Answer Scheduling Your Answer Scheduling Multiple Choice Single Answer Question In case of Batch Production which kind of labour is expected? Correct Answer Skilled in one specific Manufacturing Process Your Answer Skilled in one specific Manufacturing Process Select The Blank Question A good maintenance system is not a luxary but a ________. Correct Answer Necessity Your Answer Necessity Multiple Choice Single Answer Question A good layout makes effective use of space. Utilization of space for a department like Stores can be measured by Correct Answer Proportion of Cubic volume space utilized Your Answer No such measure in use True/False Question One major difference between CPM and PERT is the former's adaptability for the projects where high degree of uncertainty prevails and activity times during performance are expected to vary considerably for certain activities. Correct Answer False Your Answer False Multiple Choice Multiple Answer Question In an organization there may not be a formal PPC department if Correct Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large Your Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large Multiple Choice Single Answer Question Which industry out of the following industries require maximum consideration for safety factor while selecting plant location? Correct Answer Nuclear power plant Your Answer Nuclear power plant Select The Blank Question The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________. Correct Answer Overtime working Your Answer Overtime working Select The Blank Question OC curve of ideal sampling plan suggests that all lots less than 3% defectives have the probability of acceptance of ________. Correct Answer One Your Answer One Multiple Choice Multiple Answer

Question Following are some of the Principles of Management advocated by F W Taylor Correct Answer Selection of best worker for each particular task , Division of work between worker and management , Training and development of the workmen Your Answer Selection of best worker for each particular task , Division of work between worker and management , Training and development of the workmen Multiple Choice Single Answer Question Out of two basic criteria for the selection of a manufacturing method, one is, it must be able to meet the specifications of final product and the other is, it must be Correct Answer Cost effective method Your Answer Cost effective method Multiple Choice Single Answer Question What does CPA stand for? Correct Answer Critical Path Analysis Your Answer Critical Path Analysis Multiple Choice Multiple Answer Question What is the basic minimum requirement for those who are responsible for the quality of design? Correct Answer In depth knowledge about alternative materials and manufacturing processes , access to latest technology and production process adopted by industries in the developed market , Continuous effort in product development Your Answer In depth knowledge about alternative materials and manufacturing processes , access to latest technology and production process adopted by industries in the developed market , Continuous effort in product development True/False Question A lot declared rejected in sampling inspection should not be inspected 100% in any case. Correct Answer False Your Answer False True/False Question A network should employ only those dummy activities which are absolutely necessary. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Which of the following are scheduling techniques? Correct Answer Critical Path Analysis , Index Method , Johnson's two machine algorithm Your Answer Critical Path Analysis , Index Method , Johnson's two machine algorithm True/False Question The component produced on completely automatic machines may be subjected to sampling inspection while parts produced on semi-automatic and completely manual operated machines require cent percent inspection. Correct Answer True Your Answer True Multiple Choice Single Answer Question The ratio of output to input of a production system is commonly known as Correct Answer Productivity Your Answer Productivity Multiple Choice Single Answer Question Which of the following policies is advisable in case of low product variety and large volumes?

Correct Answer Low Skilled Labour & Special Purpose Machines Your Answer Low Skilled Labour & Special Purpose Machines Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory Multiple Choice Multiple Answer Question Plant layout facilitates processing of products in most effective manner through the following Correct Answer Shortest possible distance , Shortest processing time , Minimum movement Your Answer Shortest possible distance , Shortest processing time Multiple Choice Single Answer Question Site factors for plant location include Correct Answer Suitability of land Your Answer Suitability of land Multiple Choice Single Answer Question A good plant layout helps in Correct Answer Reducing handling costs Your Answer Reducing handling costs Match The Following Question Correct Answer Your Answer Combined Layout Mixed Layout Mixed Layout Fixed Position Layout Project Layout Project Layout Product Layout Line Layout Line Layout Process Layout Functional Layout Functional Layout

Multiple Choice Single Answer Question Which kind of inspection is followed in case of process layout? Correct Answer First off inspection Your Answer First off inspection True/False Question Even if any activity on the critical path is delayed, project completes on the scheduled time. Correct Answer False Your Answer False Multiple Choice Single Answer Question Inadequate production capacity ultimately leads to Correct Answer Poor Customer Service Your Answer Poor Customer Service Select The Blank Question The ________ is the probability that a bad lot will be accepted by the sampling plan. Correct Answer Consumer's risk Your Answer Consumer's risk Multiple Choice Multiple Answer

Question Which are the different methods of recording actual progress of work? Correct Answer Display boards , Progress cards , Network updating Your Answer Display boards , Progress cards , Network updating Select The Blank Question Production control work is ________ in case of floor inspection as compared with the centralised inspection. Correct Answer easier Your Answer easier Multiple Choice Single Answer Question Product layout offer following advantages Correct Answer There is economy in manufacturing time Your Answer There is economy in manufacturing time True/False Question Flow process charts do record movements as well as visual pictures. Correct Answer False Your Answer False Multiple Choice Single Answer Question Main objective of a good plant layout is Correct Answer Reduce material handling cost Your Answer Reduce material handling cost Select The Blank Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________. Correct Answer 0.01 to 10% Your Answer 0.01 to 10% Multiple Choice Multiple Answer Question Features of Cellular layout are Correct Answer It is a type of mixed layout , Uses concept of Group Technology , Facilities are grouped in to cells Your Answer It is a type of mixed layout , Uses concept of Group Technology , Facilities are grouped in to cells True/False Question Cent percent inspection is required on WIP prior to the key, critical or costly operation. Correct Answer True Your Answer True Select The Blank Question The ________ is the defect level for which lots are regarded as bad lots. Correct Answer Lot Tolerance Percentage Defective Your Answer Lot Tolerance Percentage Defective Multiple Choice Multiple Answer Question What are the benefits of reconditioning? Correct Answer Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps to plan requirement of replacement spares Your Answer Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps to plan requirement of replacement spares Multiple Choice Single Answer Question What does head of an arrow represent?

Correct Answer End of an activity Your Answer End of an activity Multiple Choice Single Answer Question What do you mean by planned corrective manitenance which provides an opportunity to undertake design modifications in the equipment to eliminate or reduce frequency of breakdowns. Correct Answer Design-out Maintenance Your Answer Design-out Maintenance Select The Blank Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Answer Condition monitoring Your Answer Condition monitoring Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Operation Multiple Choice Multiple Answer Question Which of the following are characteristics of an operating characteristics curve? Correct Answer Producer risk , Consumer Risk , Acceptable Quality Level Your Answer Producer risk , Consumer Risk , Acceptable Quality Level Match The Following Question Correct Answer Your Answer Toung Sweet Sweet Eye Crack Crack Nose Burnout Burnout Ear Impact Impact

Select The Blank Question The ________ is a set of tools and techniques by which products are made to comply with the specifications at minimum cost to the firm. Correct Answer Quality control system Your Answer Quality control system Multiple Choice Multiple Answer Question Which three of the following options can be used to reduce the duration of activity during project crashing? Correct Answer Allocating more manpower and machines than originally planned for. , Working additional shifts or overtime. , Awarding work to vendors who charge extra but expedite deliveries. Your Answer Allocating more manpower and machines than originally planned for. , Working additional shifts or overtime. , Awarding work to vendors who charge extra but expedite deliveries. Select The Blank Question Goods after final inspection should accompany ________to enable dispatch department to identify and draw correct reference. Correct Answer Forwarding note

Your Answer Forwarding note

LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Single Answer Question Which of the following technique makes three time estimates for each activity? Correct Answer Project Evaluation & Review Technique Your Answer Project Evaluation & Review Technique True/False Question Mixed layouts are generally used in case of product is to be produced in different sizes/types: contains too many components Correct Answer True Your Answer True True/False Question In case of two handed process chart, storage symbol is used when either hand is used as grip or vice to hold an object. Correct Answer True Your Answer True Match The Following Question Correct Answer Your Answer Fixation of inventory level Reorder level Reorder level Symptom of ill planned purchasing Over ordering Over ordering Factor influencing material planning Lead time Lead time Net requirement of material under MRP Stock on hand Stock on hand

Multiple Choice Multiple Answer Question Following are the commonly used factors considered for evaluation of layout in factor analysis method Correct Answer Flow of material , Equipment utilization , Working condition Your Answer Flow of material , Equipment utilization , Working condition Multiple Choice Multiple Answer Question Which of the following are examples of pure materials? Correct Answer Bakeries , Ice factories , Woolen Your Answer Bakeries , Ice factories , Woolen Multiple Choice Multiple Answer Question Which of the following factors decide the choice between the cent percent and sampling inspection? Correct Answer Nature of inspection , Natural tolerance versus design tolerance , Vendor's quality rating Your Answer Nature of inspection , Natural tolerance versus design tolerance , Vendor's quality rating Multiple Choice Single Answer Question What do you mean by planned corrective manitenance which provides an opportunity to undertake design modifications in the equipment to eliminate or reduce frequency of breakdowns. Correct Answer Design-out Maintenance Your Answer Design-out Maintenance Multiple Choice Single Answer Question The product layout has following disadvantage

Correct Answer Layout is not flexible Your Answer Layout is not flexible Multiple Choice Multiple Answer Question Which utilities are considered as infrastructural requirements? Correct Answer Disposal of waste , Power , Water Your Answer Disposal of waste , Power , Water Multiple Choice Multiple Answer Question Which are the factors on which the structure of the transportation cost depends? Correct Answer Average distance of shipment , Characteristics of the commodity , Medium of shipment Your Answer Average distance of shipment , Characteristics of the commodity , Medium of shipment Multiple Choice Multiple Answer Question Which are the three basic types of control chart by attribute? Correct Answer p-chart , c-chart , np-chart Your Answer p-chart , c-chart , np-chart True/False Question It would not affect the project completion time if non-critical activities take little loner time than planned. Correct Answer True Your Answer True Multiple Choice Single Answer Question A good layout makes effective use of space. Utilization of space for a department like Stores can be measured by Correct Answer Proportion of Cubic volume space utilized Your Answer Proportion of Cubic volume space utilized Multiple Choice Single Answer Question Process planning is the process of Correct Answer establishing shortest and most economic path of production Your Answer establishing shortest and most economic path of production Multiple Choice Single Answer Question Who prepares the daily production report? Correct Answer Shop Supervisor Your Answer Shop Supervisor Multiple Choice Multiple Answer Question Which of the following are examples of gross materials? Correct Answer Timber , Iron ore , Sugar cane Your Answer Timber , Iron ore , Sugar cane Multiple Choice Multiple Answer Question Which of the following defects can be observed during preventive inspection by using human senses? Correct Answer Deviation from normal sound , Excessive Vibration , Leakage of a gas Your Answer Deviation from normal sound , Excessive Vibration , Leakage of a gas Multiple Choice Multiple Answer Question Which of the following are the objectives of a good maintenance system? Correct Answer Elimination of unsafe conditions , Minimisation of wear and tear of machines , Ensuring maximum plant availability

Your Answer Elimination of unsafe conditions , Minimisation of wear and tear of machines , Ensuring maximum plant availability Select The Blank Question Production control work is ________ in case of floor inspection as compared with the centralised inspection. Correct Answer easier Your Answer easier Select The Blank Question The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________. Correct Answer Overtime working Your Answer Overtime working True/False Question Latest starting date is the latest finishing time minus activity duration. Correct Answer True Your Answer True Select The Blank Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________. Correct Answer 0.01 to 10% Your Answer 0.01 to 10% Select The Blank Question The ________ advocates maintenance procedures whereby the condition of the plant is constantly watched through systematic inspection to unearth unhealthy conditions and preventive Correct Answer Preventive Maintenance Your Answer Preventive Maintenance Select The Blank Question The ________ breakdowns usually cost more, partly due to damage done to the adjustment components and partly due to emergency actions. Correct Answer Unexpected Your Answer Unexpected Select The Blank Question The term ________ emplies the foregone profit due to inability of company to produce. Correct Answer Opportunity cost Your Answer Opportunity cost Multiple Choice Single Answer Question Process type layout is suitable when Correct Answer there is wide variation in processing time of operations Your Answer there is wide variation in processing time of operations Select The Blank Question The ________ is the process of withdrawing the equipment from the production line, dismantling it unitwise, visualising defects, effecting adjustments, replacing worn-out parts and finally building it up to get desired accuracies. Correct Answer Reconditioning Your Answer Reconditioning True/False

Question One major difference between CPM and PERT is the former's adaptability for the projects where high degree of uncertainty prevails and activity times during performance are expected to vary considerably for certain activities. Correct Answer False Your Answer False True/False Question Kanban system is essentially a computer based system for production scheduling and control Correct Answer False Your Answer False Select The Blank Question The ________ is the defect level for which lots are regarded as bad lots. Correct Answer Lot Tolerance Percentage Defective Your Answer Lot Tolerance Percentage Defective Multiple Choice Single Answer Question How dummy activities are shown in the time chart during project scheduling? Correct Answer Vertical lines Your Answer Dotted lines Match The Following Question Correct Answer Your Answer Factor Analysis Method to evaluate layouts Method to evaluate layouts Minimization of production delays Objective of good layout Objective of good layout Maximum visibility Principles of good layout Principles of good layout Scale model Layout analysis Layout analysis

Multiple Choice Multiple Answer Question In an organization there may not be a formal PPC department if Correct Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large Your Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large Multiple Choice Multiple Answer Question Which three of the following are causes of continuous upward pattern of Xbar-R control chart? Correct Answer Wear of tool , Abnormal rise in temperature , Accumulation of dirt Your Answer Wear of tool , Abnormal rise in temperature , Accumulation of dirt True/False Question A network should employ only those dummy activities which are absolutely necessary. Correct Answer True Your Answer True Select The Blank Question The ________ includes preventive maintenance activities whose needs are identified through inspection which requires stoppage of machines. Correct Answer Shutdown Maintenance Your Answer Shutdown Maintenance

Multiple Choice Single Answer Question What do you understand by identification of defects in materials, components, machining processes or men to fix responsibility of defectives, thereby preventing or minimising occurance of defectives? Correct Answer Preventive function Your Answer Preventive function Select The Blank Question OC curve of ideal sampling plan suggests that all lots less than 3% defectives have the probability of acceptance of ________. Correct Answer One Your Answer One Select The Blank Question A set of activities to keep an equipment in the specified condition is called as ________. Correct Answer Maintenance Your Answer Maintenance Multiple Choice Single Answer Question One of the external factors influencing Material Planning is Correct Answer Price trends Your Answer Price trends Multiple Choice Multiple Answer Question What is indicated by the erratic pattern points falling above and below the control limits in the Xbar-R-control chart? Correct Answer Defects in materials , Poorly trained operators , Frequent adjustments of machines Your Answer Defects in materials , Poorly trained operators , Frequent adjustments of machines True/False Question Inspection should be conducted prior to an operaion, after whose completion no rework whatsoever is possible. Correct Answer True Your Answer True Multiple Choice Single Answer Question What do you mean by CPM? Correct Answer Critical Path Method Your Answer Critical Path Method True/False Question Planned lubrication is said to be the nervous system of the equipment. Correct Answer True Your Answer True True/False Question In case of X bar-R charts,it is ensured that the assignable causes are detected before the tolerances are violated, upper and lower statistical limits are worked out and inserted into a chart. Correct Answer True Your Answer True Multiple Choice Single Answer Question Provision of drainage facilities is important for the following type of industry Correct Answer Chemical Process Your Answer Chemical Process

LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Multiple Answer Question How the concept of float is helpful to planners? Correct Answer To minimize the requirement of resources , To prevent peaks and valleys in requirement of resources , To decide priorities in allocation of resources Your Answer To decide priorities in allocation of resources , To minimize the requirement of resources , To prevent peaks and valleys in requirement of resources True/False Question Floor inspection delays the identification of faults which can not be rectified immediately before large lots are spoiled. Correct Answer False Your Answer False Multiple Choice Single Answer Question What is the location of lower control limit in the X bar-R control chart? Correct Answer 3 standard deviations below central line Your Answer 3 standard deviations below central line Multiple Choice Multiple Answer Question Which of the following variables which operate periodically are the reasons for the cyclic pattern depicting peaks and valleys during Xbar-R control chart? Correct Answer Wornout positions , Fatigue , Roller eccentricity Your Answer Wornout positions , Fatigue , Roller eccentricity Select The Blank Question The ________ pertain to the climatic conditions which the component , product or material should withstand. Correct Answer Environmental specifications Your Answer Environmental specifications Multiple Choice Multiple Answer Question Order preparation process for products manufatured to order requires following documents Correct Answer Sales Order , Work order , Shop order Your Answer Sales Order , Work order , Shop order Multiple Choice Single Answer Question What do you understand by the measurement of work to establish allowed time for a job for the defined method? Correct Answer Work measurement Your Answer Work measurement True/False Question Suburban location provides the compromise netween rural and urban locations. Correct Answer True Your Answer True Match The Following Question Correct Answer Your Answer Scale model Layout analysis Technique for evolving and analysis of layouts Factor Analysis Method to evaluate layouts Method to evaluate layouts Minimization of production delays Objective of good layout Objective of good layout

Maximum visibility Principles of good layout Principles of good layout

Multiple Choice Multiple Answer Question Plant Layout is concerned with optimum arrangement of the following Correct Answer Storage space , Machines , Material Handling Equipment Your Answer Storage space , Machines , Material Handling Equipment Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Production True/False Question A sampling plan which perfectly discriminates will have vertical OC curve. Correct Answer True Your Answer False Multiple Choice Multiple Answer Question Which kind of possible defectives can be reduced due to first off inspection? Correct Answer Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machine set up Your Answer Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machine set up Multiple Choice Multiple Answer Question Which of the following concepts must be understood for the achievement of quality? Correct Answer Quality of conformance , Purpose of product , Quality of design Your Answer Quality of conformance , Quality of design Multiple Choice Single Answer Question Site factors for plant location include Correct Answer Suitability of land Your Answer Suitability of land Multiple Choice Single Answer Question The ratio of output to input of a production system is commonly known as Correct Answer Productivity Your Answer Productivity Multiple Choice Multiple Answer Question Which of the following cases indicated that the operation has occurred? Correct Answer Movement of components to assembly section , Raw material movement , A worker's trip to grinder to sharpen the tools Your Answer Movement of components to assembly section , Raw material movement , A worker's trip to grinder to sharpen the tools Multiple Choice Single Answer Question Which kind of gauge consists of electrical contacts operating a series of colloured signal lamps which indicate whether the dimension is correct, oversize or undersize? Correct Answer Multiple gauging Your Answer Multiple gauging Select The Blank

Question A ________helps to avoid crowding of jobs at a particular machine by change of route of some of the jobs or by diverting work to other machine. Correct Answer Control board Your Answer Forwarding note True/False Question Proper care and storage is not an essential part of a well planned lubrication system. Correct Answer False Your Answer False Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory Multiple Choice Multiple Answer Question Major contributors in the development of Control Charts, Sampling plan are Correct Answer F H Dodge , H G Roming , Walter Schewhart Your Answer F H Dodge , Walter Schewhart , L H C Tippet Multiple Choice Single Answer Question How to claculate the producer risk in the OC Curve? Correct Answer Probability that a good lot will be rejected by the sampling Your Answer Probability that a good lot will be rejected by the sampling Multiple Choice Single Answer Question How many types of charts are used for the purpose of method study? Correct Answer Four Your Answer Eight Multiple Choice Multiple Answer Question Which three of the following options can be used to reduce the duration of activity during project crashing? Correct Answer Allocating more manpower and machines than originally planned for. , Working additional shifts or overtime. , Awarding work to vendors who charge extra but expedite deliveries. Your Answer Allocating more manpower and machines than originally planned for. , Working additional shifts or overtime. , Awarding work to vendors who charge extra but expedite deliveries. Multiple Choice Single Answer Question What does head of an arrow represent? Correct Answer End of an activity Your Answer End of an activity Match The Following Question Correct Answer Your Answer Combined Layout Mixed Layout Project Layout Fixed Position Layout Project Layout job layout Product Layout Line Layout Mixed Layout Process Layout Functional Layout Functional Layout

Multiple Choice Single Answer

Question How to reveal the capability of the sampling plan to discriminate between good lots and bad lots? Correct Answer Operating characteristics curve ( OC ) Your Answer Operating characteristics curve ( OC ) Select The Blank Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Answer Condition monitoring Your Answer Condition monitoring Select The Blank Question The ________ is the probability that a good lot will be rejected by the sampling plan. Correct Answer Producer's risk Your Answer Producer's risk Multiple Choice Multiple Answer Question Which of the following are minimum requirement for a good quality of design? Correct Answer Resonable procurement time , Resonable cost , Resonable manufacturing time Your Answer Resonable cost , Resonable procurement time , Resonable manufacturing time Select The Blank Question The ________ is a set of tools and techniques by which products are made to comply with the specifications at minimum cost to the firm. Correct Answer Quality control system Your Answer Quality control system Select The Blank Question The ________ is necessary when the job requires detailed of one or more of the job characteristics with the help of special equipment which is not available at the producing company. Correct Answer Inspection order Your Answer Inspection order True/False Question Delay in completion of projects result in unwelcome additions to the fixed manufacturing expenses. Correct Answer True Your Answer True Select The Blank Question One detachable ticket is prepared for each ________. Correct Answer Operation Your Answer Operation True/False Question Objective of Work Study is to improve Productivity Correct Answer True Your Answer False True/False Question As a general rule, the number of tail event of an activity is more than that of it's head event. Correct Answer False Your Answer False Multiple Choice Single Answer Question How critical activities are shown in the time chart during project scheduling?

Correct Answer Solid lines Your Answer Solid lines Multiple Choice Multiple Answer Question Which of the following products should be produced by using mass production? Correct Answer Refrigerator , Tyre for automobile , Television Set Your Answer Refrigerator , Tyre for automobile , Television Set Select The Blank Question Work study is also called ________ study Correct Answer Time and Motion Your Answer Time and Motion Multiple Choice Multiple Answer Question What are the benefits of reconditioning? Correct Answer Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps to plan requirement of replacement spares Your Answer Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps to plan requirement of replacement spares Select The Blank Question A good maintenance system is not a luxary but a ________. Correct Answer Necessity Your Answer Necessity Multiple Choice Single Answer Question Which of the following technique is event oriented ? Correct Answer Project Evaluation & Review Technique Your Answer Project Evaluation & Review Technique Multiple Choice Multiple Answer Question Which of the following is not the characteristic of Project Production? Correct Answer Continuous flow of material , Highly mechanised material handling , Virtually zero manufacturing cycle time Your Answer Continuous flow of material , Highly mechanised material handling , Virtually zero manufacturing cycle time True/False Question Breakdown of a machine is normally accompanied by added machine setup cost such as resetting of jobs or change of jobs. Correct Answer True Your Answer True True/False Question The problems of congestion, bottlenecks and backtracking can not be visualized by using templates and models. Correct Answer False Your Answer False Multiple Choice Multiple Answer Question Which of the following are illustrations of inspection? Correct Answer Physical count of incoming material against the quantity mentioned in delivery challan , A dimensional check with measuring instrument , Visual check of burrs and finish Your Answer Physical count of incoming material against the quantity mentioned in delivery challan , Visual check of burrs and finish , Check the operator performance

POM assgn : Senthil Multiple Choice Multiple Answer Question Which of the following aspects are essential to ensure quality of purchased items? Correct Answer Defining right quality for the job , Vendor performance evaluation , Maki ng sure that suppliers understand the requirements Your Answer Defining right quality for the job , Vendor performance evaluation , Making sure that suppliers understand the requirements Select The Blank Question Correct Answer Your Answer True/False Question Correct Answer Your Answer True/False Question Correct Answer Your Answer

The ________ breakdowns usually cost more, partly due to damage done to the adjustment components and partly due to emergency actions. Unexpected Unexpected

After goods have been manufactured, route sheets and operation layouts should not be collected back. False False

In case of centralised inspection, inspection rooms generally become bottleneck and cause delay in taking action regarding rejection or rework. True True

Multiple Choice Single Answer Question MRP is based on the concept of inventory demand which is of following type Correct Answer Your Answer Dependent and independent Dependent and independent

Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory

Multiple Choice Multiple Answer Question Components of Production Management include Correct Answer Your Answer Capacity Planning , Job Design , Production Planning Capacity Planning , Job Design , Production Planning

Multiple Choice Single Answer

Question Correct Answer Your Answer

Which of the following is the criteria for the percentage defectives in the zone of the indecision? Lots having the percentage defective more than AQL but less than LPTD Lots having the percentage defective more than AQL but less than LPTD

Multiple Choice Multiple Answer Question Which of the following are examples of addition during recording for method study? Correct Answer Brazing , Welding , Riveting Your Answer Brazing , Welding , Riveting

Select The Blank Question Correct Answer Your Answer

The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________. Overtime working Overtime working

Select The Blank Question Correct Answer Your Answer

An Ideal OC curve is ________ shaped curve that accpets all the lots with quality equal to or better than AQL . Rectangular Rectangular

Multiple Choice Multiple Answer Question Which of the following causes can be responsible for derailing the production schedule in a factory? Correct Answer Errors in drawings , Delay in receipt of material from vendor , Excessive absenteeism Your Answer Errors in drawings , Delay in receipt of material from vendor , Excessive absenteeism Multiple Choice Multiple Answer Question Which of the following situations demand the economic consideration while selecting a job for method study? Correct Answer Unorderly movement of men and materials , Excessive process defectives , Too many suggestions received for improvement from a department or section Your Answer Unorderly movement of men and materials , Excessive process defectives , Inconsistent quality True/False Question Correct Answer Your Answer

During set up of X bar-R control chart, control limts should be practically revised from time to time as additional data is accumulated. True False

Multiple Choice Multiple Answer

Question Correct Answer Your Answer

Which of the following are the basic requirements of quality standard? Deifinite , Undesrstandable , Economically viable Absolute uniformity , Undesrstandable , Economically viable

Match The Following Question Toung Eye Nose Ear

Correct Answer Sweet Crack Burnout Impact

Your Answer Sweet Crack Burnout Roughness

Select The Blank Question Correct Answer Your Answer

The ________ is the defect level for which lots are regarded as bad lots. Lot Tolerance Percentage Defective Acceptable quality level

True/False Question Correct Answer Your Answer

Floor inspection delays the identification of faults which can not be rectified immediately before large lots are spoiled. False False

True/False Question Correct Answer Your Answer

Cent percent inspection is required on WIP prior to the key, critical or costly operation. True True

Multiple Choice Single Answer Question The document which incorporates details of process planning for a job is called Correct Answer Route Sheet Your Answer Route Sheet

True/False Question Correct Answer Your Answer

Repetitive movements between work stations which are difficult to be traced on string diagrams can be conveniently shown on flow diagrams. False True

Multiple Choice Single Answer Question Which of the following is the most popular technique for Project Production? Correct Answer Your Answer PERT & CPM PERT & CPM

Multiple Choice Single Answer Question Technique of Value Engineering can be effectively employed in design of a product to Correct Answer To meet the intended function at lowest cost Your Answer To meet the intended function at lowest cost

Multiple Choice Single Answer Question What can be the worst effect due to excessive vibration? Correct Answer Your Answer Breakdown Breakdown

Multiple Choice Single Answer Question What is the relation between duration of an activity and length of an arrow? Correct Answer Your Answer No relation No relation

Multiple Choice Single Answer Question What is the nature of the sampling plan for critical defects? Correct Answer Your Answer Tight Tight

Select The Blank Question Correct Answer Your Answer

The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Condition monitoring Condition monitoring

Multiple Choice Multiple Answer Question Which of the following are important considerations concerning activity times? Correct Answer Activity time should be obtained from the person responsible for the completion of an activity , Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resources required to carry out the activity are available. Your Answer Activity time should be obtained from the person responsible for the completion of an activity , Activity time must be independent of any

influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resources required to carry out the activity are available. Multiple Choice Single Answer Question Which of the following techniques is used by industrial engineering department to obtain the utilisation index? Correct Answer Work Sampling Studies Your Answer Break Even Analysis

Multiple Choice Multiple Answer Question Which of the following factors play important role while selecting or rejecting a particular site from legislation and taxation point of view? Correct Answer Labour laws , Building codes , Policies regarding issue of licences Your Answer Labour laws , Building codes , Policies regarding issue of licences

Multiple Choice Multiple Answer Question Which of the following cases can be referred as operation in method study recording? Correct Answer Change in physical characteristic , Consumption of physical effort , Change in chemical characteristic Your Answer Change in physical characteristic , Consumption of physical effort , Movement of material True/False Question Correct Answer Your Answer

An activity can share the same tail event and same head event with any other activity. False True

Select The Blank Question Correct Answer Your Answer

The ________ must ensure that the product satisfy the functional requirements of it's usage. Quality of design Quality of design

Multiple Choice Multiple Answer Question Which of the following are examples of pure materials? Correct Answer Your Answer Bakeries , Ice factories , Woolen Bakeries , Ice factories , Woolen

Select The Blank Question Correct Answer Your Answer

The ________ are the definitions of the measurable as well as nonmeasurable characteristics of the product. Specifications Specifications

Multiple Choice Single Answer Question Site factors for plant location include Correct Answer Your Answer Suitability of land Suitability of land

Select The Blank Question Correct Answer Your Answer

The ________ is the probability that a good lot will be rejected by the sampling plan. Producer's risk Producer's risk

Multiple Choice Multiple Answer Question Which of the following defects can be observed during preventive inspection by using human senses? Correct Answer Deviation from normal sound , Excessive Vibration , Leakage of a gas Your Answer Deviation from normal sound , Excessive Vibration , Leakage of a gas

Select The Blank Question Correct Answer Your Answer

The ________ includes preventive maintenance activities whose needs are identified through inspection which requires stoppage of machines. Shutdown Maintenance Working Maintenance

True/False Question Correct Answer Your Answer

Independent float either affects the float of preceding activities or that of succeeding activities. False False

Multiple Choice Multiple Answer Question Lack of material planning results in the following Correct Answer Your Answer Over ordering , under ordering , stockouts Over ordering , under ordering , stockouts

True/False Question Correct Answer Your Answer

F W Taylor devised a system for classifying motions into basic divisions called Therbligs False False

Select The Blank

Question Correct Answer Your Answer

Work study is also called ________ study Time and Motion Time and Motion

Match The Following Question Factor Analysis

Correct Answer Method to evaluate layouts

Your Answer Technique for evolving and analysis of layouts Objective of good layout Principles of good layout Method to evaluate layouts

Minimization of production delays Objective of good layout Maximum visibility Scale model Principles of good layout Layout analysis

Multiple Choice Single Answer Question Following is one of the techniques used for Material Planning for high value material Correct Answer MRP Your Answer MRP

Multiple Choice Single Answer Question What do you understand by totality of features and characteristics of a product or service that bears on it's ability to satisfy the customer? Correct Answer Quality Your Answer Quality

Select The Blank Question Correct Answer Your Answer

One detachable ticket is prepared for each ________. Operation Worker

POM assgn : Senthil True/False Question Correct Answer Your Answer Site selection should also take into account topography and soil structure of the land. True True

Multiple Choice Single Answer Question Which manufacturing method is ideal for the use of air gauges as inspection device? Correct Answer Your Answer Mass Batch

True/False Question Correct Answer Your Answer

Kanban system is essentially a computer based system for production scheduling and control False False

Multiple Choice Multiple Answer Question Which are three different bases to establish an activity time? Correct Answer Your Answer Past experience , Judgement , Historical data Past experience , Judgement , Historical data

True/False Question Correct Answer Your Answer

Inspection order is must even for simple jobs which can be inspected by shop inspector with the tooling available on shop. False False

Multiple Choice Single Answer Question Which of the following policies is advisable in case of low product variety and large volumes? Correct Low Skilled Labour & Special Purpose Machines Answer Your Answer Semiskilled Labour & General Purpose Machines

Select The Blank Question Capacity decisions have a direct influence on performance of production system in respect of ________ Correct Delivery performance Answer Your Answer Delivery performance

True/False

Question Correct Answer Your Answer

In case of X bar, if the process is not under control indicated by some points falling outside the control limits, such points outside the control limits are eliminated and new trial control limits for the remaining points are computed. True True

Select The Blank Question The ________ pertain to the climatic conditions which the component , product or material should withstand. Correct Environmental specifications Answer Your Answer Environmental specifications

Select The Blank Question The ________ is necessary when the job requires detailed of one or more of the job characteristics with the help of special equipment which is not available at the producing company. Correct Inspection order Answer Your Answer Job card

Match The Following Question Crash cost of an activity Normal time of an activity Crash time of activity Normal cost of an activity

Correct Answer Cc Tn Tc Cn

Your Answer Cc Cn Tc Tn

True/False Question Correct Answer Your Answer

Lubrication survey should never be done for a new machine. False False

Multiple Choice Single Answer Question A good plant layout helps in Correct Answer Your Answer Reducing handling costs Reducing handling costs

Multiple Choice Single Answer Question Out of two basic criteria for the selection of a manufacturing method, one is, it must be able to meet the specifications of final product and the other is, it must be

Correct Answer Your Answer

Cost effective method Cost effective method

Multiple Choice Multiple Answer Question Which of the following is a part of preparing manufacturing order set as a primary function of dispatching? Correct Operational layouts , Move orders , Pre-filled stores issue orders Answer Your Answer Operational layouts , Move orders , Pre-filled stores issue orders

Select The Blank Question A ________ is another form of subcontracting. Correct Answer Your Answer Hiring capacity Hiring capacity

Multiple Choice Multiple Answer Question Which are the major types of defects? Correct Answer Your Answer Minor , Major , Critical Minor , Critical , General

Multiple Choice Single Answer Question Which kind of labour force is required in case of Jobbing Production? Correct Answer Your Answer Highly Skilled Highly Skilled

Multiple Choice Multiple Answer Question Which are the sources of information to update the progress card daily? Correct Answer Your Answer Detachable ticket , Daily production report , Job Card Detachable ticket , Daily production report , Job Card

True/False Question Correct Answer Your Answer

In case of forward pass computation, the earliest event time of the first event is zero. True True

Multiple Choice Multiple Answer Question Which are the distinct functions of scientific quality control? Correct Answer Acceptance function , Preventive function , Assurance function

Your Answer

Acceptance function , Preventive function , Assurance function

Multiple Choice Multiple Answer Question Which of the following are examples of specifications? Correct Answer Your Answer Commercial standards , Assembly and testing instructions , Bill of material Production schedule , Commercial standards , Bill of material

Multiple Choice Single Answer Question Technique which can help an organization to reduce inventory is called Correct Answer Your Answer MRP MRP

Multiple Choice Single Answer Question In case of Batch Production which kind of labour is expected? Correct Answer Your Answer Skilled in one specific Manufacturing Process Semiskilled

Multiple Choice Multiple Answer Question Major contributors in the development of Control Charts, Sampling plan are Correct Answer Your Answer F H Dodge , H G Roming , Walter Schewhart F H Dodge , H G Roming , Walter Schewhart

Multiple Choice Single Answer Question What is represented by an arrow in a network? Correct Answer Your Answer Activity Event

True/False Question Correct Answer Your Answer

Feasibility of time schedule requires that an activity be scheduled before any of it's predecessors are scheduled. False True

Multiple Choice Single Answer Question Which method of critical path determination begins with the end event and moves backward to the start event of the project network? Correct Backward pass computation Answer Your Answer Backward pass computation

True/False Question Correct Answer Your Answer

Operation process charts though indicates the sequence of events but do not show movements. True True

Multiple Choice Single Answer Question Which kind of relationship exists between those activities which can be carried out simultaneously and both activities require definite time to finish? Correct Concurrent activities Answer Your Answer Concurrent activities

True/False Question

Correct Answer Your Answer

One major difference between CPM and PERT is the former's adaptability for the projects where high degree of uncertainty prevails and activity times during performance are expected to vary considerably for certain activities. False False

Multiple Choice Multiple Answer Question Following are some of the Principles of Management advocated by F W Taylor Correct Answer Your Answer Selection of best worker for management , Training and Selection of best worker for management , Training and each particular task , Division of work between worker and development of the workmen each particular task , Division of work between worker and development of the workmen

Multiple Choice Single Answer Question Inadequate production capacity ultimately leads to Correct Answer Your Answer Poor Customer Service Poor Machine Utilization

Multiple Choice Multiple Answer Question Which of the following schedules are recommended to prepare and follow as a part of preventive maintenance system? Correct Preventive inspection schedule , Cleaning and upkeep schedule , Lubrication schedule Answer Your Answer Preventive inspection schedule , Cleaning and upkeep schedule , Lubrication schedule

Multiple Choice Single Answer Question What is the reason of fluctuations, if the control chart evaluates that the process is in a state of statistical control? Correct Random variability Answer Your Answer Random variability

True/False

Question Correct Answer Your Answer

Even in a small set up wherein maintenance of a machine is looked after by a mechanic cum worker, he should report directly to the person responsible for the manufacturing operations. True True

Multiple Choice Single Answer Question What do you mean by the chart on which the major activities and entry points of materials are recorded to have graphic view of operations and inspections involved in the process? Correct Operation process chart Answer Your Answer Operation process chart

Multiple Choice Single Answer Question Plant Layout decisions are considered to be Correct Answer Your Answer Strategic Strategic

Multiple Choice Multiple Answer Question What are the uses of the instruction manual provided by the manufacturer of a machine? Correct Answer Your Answer It gives instructions regarding installation and operation of the equipment , It contains note on common troubles with causes and remedies for troubleshooting , It enlists points, frequency and type of lubrication It gives instructions regarding installation and operation of the equipment , It contains note on common troubles with causes and remedies for troubleshooting , It enlists points, frequency and type of lubrication

Multiple Choice Single Answer Question When should operator or supervisor is supposed to sign the perforated route sheet? Correct Answer Your Answer After completion of operation After completion of operation

Multiple Choice Multiple Answer Question Which of the following situations demand that the human consideration should be given preference over other considerations? Correct Inconsistent earnings where the earnings are tied to output , Poor morale evidenced by Answer petty or trivial complaints , Repeated cases of accidents and health hazards Your Answer Excessive rejections , Poor morale evidenced by petty or trivial complaints , Repeated cases of accidents and health hazards True/False Question Correct Answer Your Answer

A network can have more than one starting event but completion event must be only one. False True

Multiple Choice Single Answer Question Which is the ideal place to write a description of an activity in a network? Correct Answer Your Answer Above the arrow Above the arrow

Multiple Choice Multiple Answer Question Which features should be covered by the specifications of materials while defining the qualitative requirement? Correct Material composition , Dimensions , Any heat treatment if required Answer Your Answer Material composition , Dimensions , Any heat treatment if required

Match The Following Question When to inspect What to inspect How to inspect How much to inspect Correct Answer Stages of inspection Specification Inspection devices Sampling or cent percent inspection Your Answer Stages of inspection Specification Inspection devices Sampling or cent percent inspection

Multiple Choice Multiple Answer Question How the concept of float is helpful to planners? Correct Answer Your Answer To decide priorities in allocation of resources , To minimize the requirement of resources , To prevent peaks and valleys in requirement of resources To decide priorities in allocation of resources , To minimize the requirement of resources , To prevent peaks and valleys in requirement of resources

POM assgn : Senthil Multiple Choice Single Answer Question One of the sophisticated operations research techniques used in material planning is Correct Answer Dynamic programming Your Answer True/False Question Correct Answer Your Answer Dynamic programming

Job life is one of the factors that influence Process Planning True True

Multiple Choice Multiple Answer Question Following are some of the Principles of Management advocated by F W Taylor Correct Answer Selection of best worker for each particular task , Division of work between worker and management , Training and development of the workmen Your Answer Selection of best worker for each particular task , Division of work between worker and management , Training and development of the workmen Multiple Choice Single Answer Question Product layout is employed for manufacturing following products Correct Answer Your Answer refrigirators ships

Select The Blank Question Correct Answer Your Answer

Work study is also called ________ study Time and Motion Job

Multiple Choice Multiple Answer Question Which of the following situations demand the technical consideration while selecting a job for method study? Correct Answer Jobs having inconsistent quality , Operations inviting frequent requests from supervisors for relaxation in allowed time because of variations in materials and tool performance , Jobs in which too many man-hours are spend in checking and rechecking work Your Answer Jobs having inconsistent quality , Operations inviting frequent requests from supervisors for relaxation in allowed time because of variations in materials and tool performance , Jobs in which too many man-hours are spend in checking and rechecking work True/False Question Correct Answer

Quality control determines what, when, and how much to inspect while inspection actually conducts examination of goods. True

Your Answer

True

Select The Blank Question Correct Answer Your Answer

The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Acceptable quality level Producer's risk

Select The Blank Question Correct Answer Your Answer

The term ________ emplies the foregone profit due to inability of company to produce. Opportunity cost Opportunity cost

True/False Question Correct Answer Your Answer

All activities must not be tied up into the network False False

True/False Question Correct Answer Your Answer

F W Taylor devised a system for classifying motions into basic divisions called Therbligs False True

Multiple Choice Multiple Answer Question Which of the following may be the objectives of project crashing? Correct Answer Your Answer To achieve uniformity in requirement of resources , To complete the project in the least possible time , To reduce project cost below it's normal cost To complete the project in the least possible time , To achieve uniformity in requirement of resources , To improve the labour efficiency

Multiple Choice Multiple Answer Question What is indicated by the hugging points lying close to mean of the process in X bar-R- control chart? Correct Answer Biases in measurements , Recording done without actual measurements , Improper selection of samples Your Answer Recording done without actual measurements , Improper selection of samples Multiple Choice Single Answer Question Following is one of the techniques used for Material Planning for high value material Correct Answer MRP Your Answer MRP

Select The Blank Question Correct Answer Your Answer

The ________ is the probability that a good lot will be rejected by the sampling plan. Producer's risk Producer's risk

Multiple Choice Single Answer Question One of the characterstic of layout is about the flow of material / personnel. In a good layout the flow should be Correct Answer Unidirectional Your Answer Unidirectional

True/False Question Correct Answer Your Answer

The event numbers as far as possible reflect the logical relationships of the activities. True False

Multiple Choice Multiple Answer Question Material Requirement Planning is very useful in following situations Correct Answer Your Answer Long Long Long Long Lead time for procurement , Several levels of assemblies in product , manufacturing cycle Lead time for procurement , Several levels of assemblies in product , manufacturing cycle

True/False Question Correct Answer Your Answer

Cent percent inspection is often more practical and economical than sampling inspection. False False

Select The Blank Question Correct Answer Your Answer

The ________ must ensure that the product satisfy the functional requirements of it's usage. Quality of design Quality of conformance

True/False Question Correct Answer Your Answer

Both, preventive and breakdown maintenance work must be assigned to the same team. False False

Multiple Choice Single Answer Question Following is one of the tasks of Production Control

Correct Answer Your Answer

Actual issue of forms and documents Actual issue of forms and documents

Multiple Choice Single Answer Question Process Engineer does not get sufficient time for designing tooling for most economic production run when Correct Answer Delivery time is less Your Answer Delivery time is less

Multiple Choice Multiple Answer Question Components of Production Management include Correct Answer Your Answer Capacity Planning , Job Design , Production Planning Capacity Planning , Production Planning , Manpower Planning

Multiple Choice Multiple Answer Question Which of the following products should be produced by using mass production? Correct Answer Refrigerator , Tyre for automobile , Television Set Your Answer Refrigerator , Tyre for automobile , Television Set

Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Manufacturing

Select The Blank Question Correct Answer Your Answer

A good maintenance system is not a luxary but a ________. Necessity Necessity

Multiple Choice Single Answer Question What is the specific name for the Gantt chart when it shows at a glance the scheduling of various operations involved in a job? Correct Answer Job Schedule Your Answer Load Chart

Select The Blank Question Correct Answer Your Answer

A set of activities to keep an equipment in the specified condition is called as ________. Maintenance Maintenance

Multiple Choice Single Answer Question What do you mean by lowest possible direct cost required to complete an activity within it's crashed time? Correct Answer Crash cost Your Answer Crash cost

Multiple Choice Multiple Answer Question Which of the following factors decide the choice between the cent percent and sampling inspection? Correct Answer Nature of inspection , Natural tolerance versus design tolerance , Vendor's quality rating Your Answer Nature of inspection , Natural tolerance versus design tolerance , Vendor's quality rating Select The Blank Question Correct Answer Your Answer

The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Condition monitoring Condition monitoring

Multiple Choice Multiple Answer Question Which of the following are examples of attributes? Correct Answer Your Answer Cracks , Burrs , Texture Cracks , Burrs , Texture

Multiple Choice Single Answer Question Which of the following is the criteria for the percentage defectives in the zone of the indecision? Correct Answer Lots having the percentage defective more than AQL but less than LPTD Your Answer Lots having the percentage defective more than AQL but less than LPTD

Multiple Choice Single Answer Question In mass/batch production organizations where goods are produced for stocking, Work Order is raised on the basis of Correct Answer Sales Programme Your Answer Sales Order

Match The Following Question Fixed Position Layout Product Layout Process Layout

Correct Answer Project Layout Line Layout Functional Layout

Your Answer Functional Layout Project Layout job layout

Combined Layout

Mixed Layout

Mixed Layout

Multiple Choice Single Answer Question What do you understand by the measurement of work to establish allowed time for a job for the defined method? Correct Answer Work measurement Your Answer Work measurement

Select The Blank Question Correct Answer Your Answer

In case of an OC curve, the risk of rejecting a good quality lot may vary between ________. 0.01 to 10% 0.01 to 10%

True/False Question Correct Answer Your Answer

Objective of Work Study is to improve Productivity True False

Multiple Choice Multiple Answer Question Which are the distinct functions of scientific quality control? Correct Answer Your Answer Acceptance function , Preventive function , Assurance function Acceptance function , Feedback function , Preventive function

Match The Following Question Interruption for machine utilisation Input for scheduling Technique of scheduling Scheduling Device

Correct Answer Preventive maintenance Overlapping of operations Critical Path Analysis Strings

Your Answer Preventive maintenance Strings Critical Path Analysis Blackboard

Select The Blank Question Correct Answer Your Answer

An Ideal OC curve is ________ shaped curve that accpets all the lots with quality equal to or better than AQL . Rectangular Rectangular

True/False

Question Correct Answer Your Answer

Breakdown of machines, absenteeism of worker does not dislocate the manufacturing activity in process layout True True

True/False Question Correct Answer Your Answer

Since value of c can never be negativee, hence" if LCLp works out to be negative, it is taken as zero." True True

Multiple Choice Single Answer Question Who prepares the daily production report? Correct Answer Your Answer Shop Supervisor Worker

True/False Question Correct Answer Your Answer

The dispatching function is of very importance in flow and mass production units. False True

Multiple Choice Multiple Answer Question Which are major benefits of identifying the critical path? Correct Answer It helps to identify the set of activities and events which are critical and as such must be carefully controlled and monitored , It identifies activities to be given preference in allocation of resources. , It helps to exercise "control by exception". It helps to identify the set of activities and events which are critical and as such must be carefully controlled and monitored , It helps to exercise "control by exception".

Your Answer

POM assgn : Senthil Multiple Choice Single Answer Question MRP is based on the concept of inventory demand which is of following type Correct Answer Your Answer Dependent and independent Dependent and independent

Multiple Choice Single Answer Question Main objective of a good plant layout is Correct Answer Your Answer Reduce material handling cost Reduce material handling cost

True/False Question Correct Answer Your Answer

As a general rule, the number of tail event of an activity is more than that of it's head event. False False

Select The Blank Question Correct Answer Your Answer

The ________ is the probability that a good lot will be rejected by the sampling plan. Producer's risk Producer's risk

Multiple Choice Multiple Answer Question Which of the following are important considerations concerning activity times? Correct Answer Activity time should be obtained from the person responsible for the completion of an activity , Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resources required to carry out the activity are available. Your Answer Activity time should be obtained from the person responsible for the completion of an activity , Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resources required to carry out the activity are available. Select The Blank Question Correct Answer Your Answer

The ________ pertain to the climatic conditions which the component , product or material should withstand. Environmental specifications Environmental specifications

Multiple Choice Multiple Answer Question Following are some of the factors considered for evaluation of alternative layouts

Correct Answer Your Answer

Flow of Material , Equipment utilization , Ease of supervision Flow of Material , Ease of supervision , Delivery performance

Multiple Choice Multiple Answer Question Which of the following are assignable cause? Correct Answer Your Answer Large varaitions in hardness of material , Tool wear , Errors in setting Large varaitions in hardness of material , Tool wear , Errors in setting

True/False Question Correct Answer Your Answer

All activities must not be tied up into the network False False

Select The Blank Question Correct Answer Your Answer

In case of an OC curve, the risk of rejecting a good quality lot may vary between ________. 0.01 to 10% 0.01 to 10%

True/False Question

Correct Answer Your Answer

In case of X bar, if the process is not under control indicated by some points falling outside the control limits, such points outside the control limits are eliminated and new trial control limits for the remaining points are computed. True True

Multiple Choice Single Answer Question What is the base for considering activity time as single time estimate or three time estimate? Correct Answer Level of uncertainty Your Answer Availability of labour

Select The Blank Question Correct Answer Your Answer

The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Acceptable quality level Acceptable quality level

Multiple Choice Single Answer Question What do you mean by lowest possible direct cost required to complete an activity within it's normal time?

Correct Answer Your Answer

Normal cost Normal cost

Select The Blank Question Correct Answer Your Answer

A good maintenance system is not a luxary but a ________. Necessity Necessity

Select The Blank Question Correct Answer Your Answer

A ________helps to avoid crowding of jobs at a particular machine by change of route of some of the jobs or by diverting work to other machine. Control board Move order

Select The Blank Question Correct Answer Your Answer

The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable. Quality control Quality control

Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory

Match The Following Question Emerson Efficiency Plan Craft Work Sampling Gantt Chart

Correct Answer Wage Payment Facilities Planning Machine utilization Production Scheduling

Your Answer Wage Payment Facilities Planning Machine utilization Production Scheduling

Select The Blank Question Correct Answer Your Answer

A ________ is another form of subcontracting. Hiring capacity Hiring capacity

Multiple Choice Multiple Answer Question In an organization there may not be a formal PPC department if Correct Answer Your Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large

Multiple Choice Multiple Answer Question Which of the following cases can be treated as delay during recording of method study? Correct Answer Operators awaiting instructions from supervisor , Worker waiting for his turn at tools stores , Jobs awaiting at the machines for their turn Your Answer Operators awaiting instructions from supervisor , Worker waiting for his turn at tools stores , Jobs awaiting at the machines for their turn True/False Question Correct Answer Your Answer

Inspection order is must even for simple jobs which can be inspected by shop inspector with the tooling available on shop. False False

Multiple Choice Multiple Answer Question Order preparation process for products manufatured to order requires following documents Correct Answer Sales Order , Work order , Shop order Your Answer Sales Order , Work order , Purchase order

Multiple Choice Single Answer Question Technique of Value Engineering can be effectively employed in design of a product to Correct Answer To meet the intended function at lowest cost Your Answer Reduce lead time

True/False Question Correct Answer Your Answer

Cent percent inspection is often more practical and economical than sampling inspection. False False

Multiple Choice Multiple Answer Question Scale model used for layout analysis have following advantages Correct Answer Your Answer Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown , Models can be shifted easily Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown , Models can be shifted easily

Multiple Choice Single Answer

Question Correct Answer Your Answer

Which of the following technique is event oriented ? Project Evaluation & Review Technique Project Evaluation & Review Technique

Multiple Choice Single Answer Question What is the meaning of " Product features" according to J.M.Juran? Correct Answer Your Answer Quality of design Quality of design

Match The Following Question Crash cost of an activity Normal time of an activity Crash time of activity Normal cost of an activity

Correct Answer Cc Tn Tc Cn

Your Answer Cc Tn Tc Cn

Multiple Choice Multiple Answer Question What are uses of diagrams in method study? Correct Answer Study different plant layouts and select the most optimum one , Study the extent of traffic over the different routes of the plant , Identify the extent of backtracking, cross traffic and obstacles encountered during the movement of material. Study different plant layouts and select the most optimum one , Study the extent of traffic over the different routes of the plant , Identify the extent of backtracking, cross traffic and obstacles encountered during the movement of material.

Your Answer

True/False Question Correct Answer Your Answer

A load chart specifies the work to be carried out by each person of company during shift hours. False True

Multiple Choice Multiple Answer Question Route Sheet generally contains following information Correct Answer Your Answer Material Specification , Sequence of operation , Skill of Labour Material Specification , Sequence of operation , Skill of Labour

True/False Question

Cellular layout is based on the concept of Group Technology

Correct Answer Your Answer

True True

Multiple Choice Single Answer Question Which varaible is taken along the abscissa or X axis? Correct Answer Your Answer Time Standard deviation

Multiple Choice Multiple Answer Question Which are the advantages of suburban location? Correct Answer Your Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction

Select The Blank Question Correct Answer Your Answer

The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Condition monitoring Condition monitoring

Multiple Choice Multiple Answer Question Expediting function is concerned with following activities Correct Answer Progress chasing to identify delays which may hold up production , Communicating possible delays in delivery date commitment to sales department , Devising cures to keep rate of production in line with schedule Recording progress of work , Progress chasing to identify delays which may hold up production , Communicating possible delays in delivery date commitment to sales department

Your Answer

Select The Blank Question Correct Answer Your Answer

Production control work is ________ in case of floor inspection as compared with the centralised inspection. easier time consuming

Select The Blank Question Correct Answer Your Answer

The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________. Overtime working Overtime working

True/False

Question Correct Answer Your Answer

In case of forward pass computation, the earliest event time of the first event is zero. True True

Multiple Choice Single Answer Question What is represented by an arrow in a network? Correct Answer Your Answer Activity Activity

True/False Question Correct Answer Your Answer

As a general rule, a site five times the actual plant size is considered minimum for parking, access facilities and future expansion. True True

True/False Question Correct Answer Your Answer

Independent float either affects the float of preceding activities or that of succeeding activities. False False

Multiple Choice Single Answer Question The document raised by PPC which authorises different functions to take action as per instruction is called Correct Answer Work Order Your Answer Work Order

Multiple Choice Single Answer Question A good layout makes effective use of space. Utilization of space for a department like Stores can be measured by Correct Answer Proportion of Cubic volume space utilized Your Answer Ratio of area utilised to area available

Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Operation

LIST OF ATTEMPTED QUESTIONS AND ANSWERS Select The Blank Question The ________ must ensure that the product satisfy the functional requirements of it's usage. Correct Answer Quality of design Your Answer Quality of design

Multiple Choice Multiple Answer Question Which of the following information is available in summary of part in a chart during methods study? Correct Answer Frequency of each symbol , Total time for each symbol , Total distance travelled by the object Your Answer Frequency of each symbol , Total time for each symbol True/False Question

The event numbers as far as possible reflect the logical relationships of the activities. Correct Answer True Your Answer False

Multiple Choice Single Answer Question Which varaible is taken along the ordinate or Y axis? Correct Answer Quality Your Answer Quality

Multiple Choice Multiple Answer Question Which of the following schedules are recommended to prepare and follow as a part of preventive maintenance system? Correct Answer Preventive inspection schedule , Cleaning and upkeep schedule , Lubrication schedule Your Answer Preventive inspection schedule , Cleaning and upkeep schedule , Lubrication schedule Multiple Choice Single Answer Question Which kind of preventive inspection detects some maintenance related characteristics by making use of human senses, when equipment is in operation? Correct Answer Extrernal inspection

Your Answer

Extrernal inspection

Multiple Choice Multiple Answer Question Which are different ways to show critical path in a network? Correct Answer Thick Line , Red Line , Double Line Your Answer Thick Line , Red Line , Double Line

Multiple Choice Multiple Answer Question What are the benefits of overhauling? Correct Answer It increases useful life of an equipment and it's parts , Advance planning allows to attend equipment without disturbing the production programme , Advance planning allows to prepare and keep ready the list of replacement spares Your Answer It increases useful life of an equipment and it's parts , Advance planning allows to attend equipment without disturbing the production programme , Advance planning allows to prepare and keep ready the list of replacement spares Match The Following Question Combined Layout Fixed Position Layout Product Layout Process Layout

Correct Answer Mixed Layout Project Layout Line Layout Functional Layout

Your Answer Mixed Layout Line Layout Shop layout Functional Layout

Multiple Choice Multiple Answer Question Which of the following factors play important role while selecting or rejecting a particular site from legislation and taxation point of view? Correct Answer Labour laws , Building codes , Policies regarding issue of licences Your Answer Labour laws , Building codes , Policies regarding issue of licences Select The Blank Question The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered

satisfactory as a process average. Correct Answer Acceptable quality level Your Answer Acceptable quality level

Multiple Choice Multiple Answer Question Major contributors in the development of Control Charts, Sampling plan are Correct Answer F H Dodge , H G Roming , Walter Schewhart Your Answer True/False Question F H Dodge , H G Roming , Walter Schewhart

Skill of labour force in a product type layout is usually higher than in the process type of layout Correct Answer False Your Answer True

True/False Question

Repetitive movements between work stations which are difficult to be traced on string diagrams can be conveniently shown on flow diagrams. Correct Answer False Your Answer True

Select The Blank Question The ________ is necessary when the job requires detailed of one or more of the job characteristics with the help of special equipment which is not available at the producing company. Correct Answer Inspection order Your Answer Job card

Multiple Choice Multiple Answer Question Which of the following cases can be referred as operation in method study recording? Correct Answer Change in physical characteristic , Consumption of physical effort , Change in chemical characteristic Your Answer Change in physical characteristic , Consumption of physical effort , Change in chemical characteristic Select The Blank

Question

The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Answer Condition monitoring Your Answer True/False Question Overhauling

All activities lying on the non-critical paths must have total float and free float. Correct Answer False Your Answer False

Select The Blank Question Work study is also called ________ study Correct Answer Time and Motion Your Answer Method

Match The Following Question

Correct Answer

Your Answer Cc Tn Tc Cn

Crash cost of an activity Cc Normal time of an activity Crash time of activity Normal cost of an activity Tn Tc Cn

Multiple Choice Multiple Answer Question Which are the advantages of suburban location? Correct Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction Your Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction True/False

Question

In case of X bar-R charts,it is ensured that the assignable causes are detected before the tolerances are violated, upper and lower statistical limits are worked out and inserted into a chart. Correct Answer True Your Answer False

Multiple Choice Single Answer Question Which of the following is the criteria for the percentage defectives in the zone of the indecision? Correct Answer Lots having the percentage defective more than AQL but less than LPTD Your Answer Lots having the percentage defective less than AQL but more than LPTD Select The Blank Question The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________. Correct Answer Overtime working Your Answer Overtime working

Multiple Choice Single Answer Question What do you mean by lowest possible direct cost required to complete an activity within it's crashed time? Correct Answer Crash cost Your Answer Crash cost

Multiple Choice Single Answer Question In case of Batch Production which kind of labour is expected? Correct Answer Skilled in one specific Manufacturing Process Your Answer Semiskilled

Multiple Choice Multiple Answer Question Which three of the following are causes of continuous upward pattern of Xbar-R control chart? Correct Answer Wear of tool , Abnormal rise in temperature , Accumulation of dirt Your Answer Wear of tool , Abnormal rise in temperature , Accumulation of dirt

True/False Question

Root cause of most of the breakdowns is failure of the lubrication system. Correct Answer True Your Answer True

True/False Question

It is not necessary to know spare time available on the non-critical path to allow a little delay for noncritical activity. Correct Answer False Your Answer False

True/False Question

MRP software generates time periodwise requiremetn of subassemblies Correct Answer True Your Answer True

True/False Question

In case of two handed process chart, the simultaneous activities of both hands are recorded opposite to each other on the chart. Correct Answer True Your Answer True

Multiple Choice Single Answer Question What do you mean by CPM? Correct Answer Critical Path Method Your Answer Critical Path Method

Multiple Choice Multiple Answer Question Which of the following are major inputs to scheduling? Correct Answer Overlapping of operations , Effective Capacity per work centre , Performance standards Your Answer Overlapping of operations , Effective Capacity per work centre , Performance standards Multiple Choice Multiple Answer

Question

Lack of material planning results in the following

Correct Answer Over ordering , under ordering , stockouts Your Answer Over ordering , under ordering , stockouts

Multiple Choice Single Answer Question What do you mean by the verification of object against predetermined standards of quality or quantity or both? Correct Answer Inspection Your Answer Inspection

Multiple Choice Multiple Answer Question What are the advantages of templates over diagrams? Correct Answer Can be conveniently moved on the graph paper , Less laborious , Saves time Your Answer Can be conveniently moved on the graph paper , Less laborious , Unskilled person can do and analyze it True/False Question

It would not affect the project completion time if noncritical activities take little loner time than planned. Correct Answer True Your Answer True

Select The Blank Question The ________ is the probability that a good lot will be rejected by the sampling plan. Correct Answer Producer's risk Your Answer Producer's risk

Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory

Select The Blank Question An Ideal OC curve is ________ shaped curve that accpets all the lots with quality equal to or better than AQL .

Correct Answer Rectangular Your Answer Bell

Multiple Choice Single Answer Question Which is the right time to prepare stores issue order? Correct Answer When route sheet is ready Your Answer When route sheet is ready

Multiple Choice Single Answer Question Which element of a network represents a task which has got a definite beginning and definite end? Correct Answer Activity Your Answer Activity

Multiple Choice Single Answer Question Which kind of preventive inspection detects some defects in moving parts, internal cracks, and others , when machine is under preplanned shutdown? Correct Answer Internal inspection Your Answer Internal inspection

Select The Blank Question Production Planning is a centralised activity which includes functions such as ________ Correct Answer Scheduling Your Answer Dispatching

Select The Blank Question The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable. Correct Answer Quality control Your Answer Quality control

Select The Blank Question Goods after final inspection should accompany ________to enable dispatch department to identify and

draw correct reference. Correct Answer Forwarding note Your Answer Forwarding note

Multiple Choice Single Answer Question Who has introduced the useful concept of control chart in 1931? Correct Answer Walter Shewhart Your Answer Walter Shewhart

LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Single Answer Question MRP is based on the concept of inventory demand which is of following type Correct Answer Dependent and independent Your Answer Dependent and independent

Multiple Choice Single Answer Question Main objective of a good plant layout is Correct Answer Reduce material handling cost Your Answer Reduce material handling cost

True/False Question

As a general rule, the number of tail event of an activity is more than that of it's head event. Correct Answer False Your Answer False

Select The Blank Question The ________ is the probability that a good lot will be rejected by the sampling plan. Correct Answer Producer's risk Your Answer Producer's risk

Multiple Choice Multiple Answer Question Which of the following are important considerations concerning activity times? Correct Answer Activity time should be obtained from the person responsible for the completion of an activity , Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resources required to carry out the activity are available. Your Answer Activity time should be obtained from the person responsible for the completion of an activity , Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resources required to carry out the activity are available. Select The Blank

Question

The ________ pertain to the climatic conditions which the component , product or material should withstand. Correct Answer Environmental specifications Your Answer Environmental specifications

Multiple Choice Multiple Answer Question Following are some of the factors considered for evaluation of alternative layouts Correct Answer Flow of Material , Equipment utilization , Ease of supervision Your Answer Flow of Material , Ease of supervision , Delivery performance

Multiple Choice Multiple Answer Question Which of the following are assignable cause? Correct Answer Large varaitions in hardness of material , Tool wear , Errors in setting Your Answer Large varaitions in hardness of material , Tool wear , Errors in setting True/False Question

All activities must not be tied up into the network

Correct Answer False Your Answer False

Select The Blank Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________. Correct Answer 0.01 to 10% Your Answer 0.01 to 10%

True/False Question

In case of X bar, if the process is not under control indicated by some points falling outside the control limits, such points outside the control limits are eliminated and new trial control limits for the remaining points are computed. Correct Answer True Your Answer True

Multiple Choice Single Answer Question What is the base for considering activity time as single time estimate or three time estimate?

Correct Answer Level of uncertainty Your Answer Availability of labour

Select The Blank Question The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Correct Answer Acceptable quality level Your Answer Acceptable quality level

Multiple Choice Single Answer Question What do you mean by lowest possible direct cost required to complete an activity within it's normal time? Correct Answer Normal cost Your Answer Normal cost

Select The Blank Question A good maintenance system is not a luxary but a ________. Correct Answer Necessity Your Answer Necessity

Select The Blank Question A ________helps to avoid crowding of jobs at a particular machine by change of route of some of the jobs or by diverting work to other machine. Correct Answer Control board Your Answer Move order

Select The Blank Question The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable. Correct Answer Quality control Your Answer Quality control

Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory

Your Answer

Factory

Match The Following Question Emerson Efficiency Plan Craft Work Sampling Gantt Chart

Correct Answer Wage Payment Facilities Planning Machine utilization Production Scheduling

Your Answer Wage Payment Facilities Planning Machine utilization Production Scheduling

Select The Blank Question A ________ is another form of subcontracting. Correct Answer Hiring capacity Your Answer Hiring capacity

Multiple Choice Multiple Answer Question In an organization there may not be a formal PPC department if Correct Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large Your Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large Multiple Choice Multiple Answer Question Which of the following cases can be treated as delay during recording of method study? Correct Answer Operators awaiting instructions from supervisor , Worker waiting for his turn at tools stores , Jobs awaiting at the machines for their turn Your Answer Operators awaiting instructions from supervisor , Worker waiting for his turn at tools stores , Jobs awaiting at the machines for their turn True/False Question

Inspection order is must even for simple jobs which can be inspected by shop inspector with the tooling available on shop. Correct Answer False Your Answer False

Multiple Choice Multiple Answer Question Order preparation process for products manufatured to order requires following documents Correct Answer Sales Order , Work order , Shop order Your Answer Sales Order , Work order , Purchase order

Multiple Choice Single Answer Question Technique of Value Engineering can be effectively employed in design of a product to Correct Answer To meet the intended function at lowest cost Your Answer Reduce lead time

True/False Question

Cent percent inspection is often more practical and economical than sampling inspection. Correct Answer False Your Answer False

Multiple Choice Multiple Answer Question Scale model used for layout analysis have following advantages Correct Answer Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown , Models can be shifted easily Your Answer Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown , Models can be shifted easily Multiple Choice Single Answer Question Which of the following technique is event oriented ? Correct Answer Project Evaluation & Review Technique Your Answer Project Evaluation & Review Technique

Multiple Choice Single Answer Question What is the meaning of " Product features" according to J.M.Juran? Correct Answer Quality of design Your Answer Quality of design

Match The Following Question Crash cost of an activity

Correct Answer Cc

Your Answer Cc

Normal time of an activity Tn Crash time of activity Tc

Tn Tc Cn

Normal cost of an activity Cn

Multiple Choice Multiple Answer Question What are uses of diagrams in method study? Correct Answer Study different plant layouts and select the most optimum one , Study the extent of traffic over the different routes of the plant , Identify the extent of backtracking, cross traffic and obstacles encountered during the movement of material. Your Answer Study different plant layouts and select the most optimum one , Study the extent of traffic over the different routes of the plant , Identify the extent of backtracking, cross traffic and obstacles encountered during the movement of material. True/False Question

A load chart specifies the work to be carried out by each person of company during shift hours. Correct Answer False Your Answer True

Multiple Choice Multiple Answer Question Route Sheet generally contains following information Correct Answer Material Specification , Sequence of operation , Skill of Labour Your Answer Material Specification , Sequence of operation , Skill of Labour

True/False Question

Cellular layout is based on the concept of Group Technology

Correct Answer True Your Answer True

Multiple Choice Single Answer Question Which varaible is taken along the abscissa or X axis? Correct Answer Time Your Answer Standard deviation

Multiple Choice Multiple Answer

Question

Which are the advantages of suburban location?

Correct Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction Your Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction Select The Blank Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Answer Condition monitoring Your Answer Condition monitoring

Multiple Choice Multiple Answer Question Expediting function is concerned with following activities Correct Answer Progress chasing to identify delays which may hold up production , Communicating possible delays in delivery date commitment to sales department , Devising cures to keep rate of production in line with schedule Your Answer Recording progress of work , Progress chasing to identify delays which may hold up production , Communicating possible delays in delivery date commitment to sales department Select The Blank Question Production control work is ________ in case of floor inspection as compared with the centralised inspection. Correct Answer easier Your Answer time consuming

Select The Blank Question The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________. Correct Answer Overtime working Your Answer Overtime working

True/False Question

In case of forward pass computation, the earliest event time of the first event is zero. Correct Answer True Your Answer True

Multiple Choice Single Answer Question What is represented by an arrow in a network? Correct Answer Activity Your Answer Activity

True/False Question

As a general rule, a site five times the actual plant size is considered minimum for parking, access facilities and future expansion. Correct Answer True Your Answer True

True/False Question

Independent float either affects the float of preceding activities or that of succeeding activities. Correct Answer False Your Answer False

Multiple Choice Single Answer Question The document raised by PPC which authorises different functions to take action as per instruction is called Correct Answer Work Order Your Answer Work Order

Multiple Choice Single Answer Question A good layout makes effective use of space. Utilization of space for a department like Stores can be measured by Correct Answer Proportion of Cubic volume space utilized Your Answer Ratio of area utilised to area available

Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Operation

LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Multiple Answer Question Why graphical method of recording is preferred over the descriptive method during method study? Correct Answer It segregates effective part form ineffective parts , It reduces effort involved in writing , Critical examinations easier and more effective Your Answer Critical examinations easier and more effective , It segregates effective part form ineffective parts , It reduces effort involved in writing Multiple Choice Multiple Answer Question Which are the subfactors of community facilities or social infrastructure? Correct Answer Accomodation , Educational , Entertainment Your Answer Accomodation , Educational , Entertainment Select The Blank Question The ________ is the probability that a bad lot will be accepted by the sampling plan. Correct Answer Consumer's risk Your Answer Consumer's risk Multiple Choice Multiple Answer Question Which of the following are examples of consumption of physical effort during recording for method study? Correct Answer Bending , Positioning , Unloading Your Answer Bending , Positioning , Unloading Multiple Choice Single Answer Question How to claculate the producer risk in the OC Curve? Correct Answer Probability that a good lot will be rejected by the sampling Your Answer Probability that a good lot will be rejected by the sampling Select The Blank Question The ________ are the definitions of the measurable as well as nonmeasurable characteristics of the product. Correct Answer Specifications Your Answer Specifications Select The Blank Question The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable. Correct Answer Quality control Your Answer Quality control True/False

Question Expediting action is necessary if the delays and interruptions are abnormal and hence any subsequent delay is bound to extend the promised delivery date. Correct Answer True Your Answer True Multiple Choice Single Answer Question Process Engineer does not get sufficient time for designing tooling for most economic production run when Correct Answer Delivery time is less Your Answer Delivery time is less Select The Blank Question The ________ includes preventive maintenance activities whose needs are identified through inspection which requires stoppage of machines. Correct Answer Shutdown Maintenance Your Answer Shutdown Maintenance True/False Question Breakdown of machines, absenteeism of worker does not dislocate the manufacturing activity in process layout Correct Answer True Your Answer True Select The Blank Question The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Correct Answer Acceptable quality level Your Answer Acceptable quality level Multiple Choice Single Answer Question What do you mean by lowest possible direct cost required to complete an activity within it's crashed time? Correct Answer Crash cost Your Answer Crash cost Multiple Choice Multiple Answer Question Which are the first three steps of Critical Path Analysis technique? Correct Answer Activity relationships , Activity identification , Network construction Your Answer Activity relationships , Activity identification , Network construction True/False Question Dust gets mixed with lubricants, forms an abrasive substance and causes premature failure of machinery. Correct Answer True Your Answer True

Multiple Choice Multiple Answer Question Which of the following can be subtypes of corrective maintenance? Correct Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance Your Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance Select The Blank Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Answer Condition monitoring Your Answer Condition monitoring Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Production Match The Following Question Correct Answer Your Answer Toung Sweet Sweet Eye Crack Crack Nose Burnout Burnout Ear Impact Impact

Select The Blank Question The ________ is a set of tools and techniques by which products are made to comply with the specifications at minimum cost to the firm. Correct Answer Quality control system Your Answer Quality control system Multiple Choice Single Answer Question What is the meaning of " Product features" according to J.M.Juran? Correct Answer Quality of design Your Answer Quality of design Multiple Choice Multiple Answer Question Which of the following method can be used to record the facts during the method study? Correct Answer Micromotion study , Cyclegraph , Chronocyclegraph

Your Answer Micromotion study , Photograph , Cyclegraph , Chronocyclegraph True/False Question All activities must not be tied up into the network Correct Answer False Your Answer False Multiple Choice Multiple Answer Question Which of the following are types of sampling plan? Correct Answer Single sampling plan , Double sampling plan , Multiple sampling plan Your Answer Single sampling plan , Double sampling plan , Multiple sampling plan Multiple Choice Multiple Answer Question How many of the following are types of specification? Correct Answer Material specifications , Dimensional specifications , Performance specifications Your Answer Material specifications , Dimensional specifications , Performance specifications Multiple Choice Multiple Answer Question Plant layout facilitates processing of products in most effective manner through the following Correct Answer Shortest possible distance , Shortest processing time , Minimum movement Your Answer Shortest possible distance , Minimum movement Select The Blank Question Work study is also called ________ study Correct Answer Time and Motion Your Answer Time and Motion True/False Question Operation Process Chart provides information on time and distances Correct Answer False Your Answer False Multiple Choice Multiple Answer Question Plant Layout is concerned with optimum arrangement of the following Correct Answer Storage space , Machines , Material Handling Equipment Your Answer Storage space , Machines , Sequence of operation Multiple Choice Single Answer Question Management often fails to realize the importance of efficient layout due to following reason Correct Answer losses resulting from poor layout are not directly shown in the financial statements

Your Answer losses resulting from poor layout are not directly shown in the financial statements True/False Question Inspection order is must even for simple jobs which can be inspected by shop inspector with the tooling available on shop. Correct Answer False Your Answer True True/False Question Feasibility of time schedule requires that an activity be scheduled before any of it's predecessors are scheduled. Correct Answer False Your Answer True Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory True/False Question Planned lubrication is said to be the nervous system of the equipment. Correct Answer True Your Answer True Multiple Choice Single Answer Question What is the basic philosophy of statistical process control? Correct Answer Prevention is better than cure Your Answer Prevention is better than cure Multiple Choice Single Answer Question How does the control chart of statistical quality control helps the operating personnel? Correct Answer Identify the presence of an assignable cause before it develops Your Answer Identify the presence of an assignable cause before it develops Multiple Choice Single Answer Question Where does the central line is located in case of p-chart? Correct Answer at p bar Your Answer at p bar Multiple Choice Multiple Answer Question Which of the following may be the objectives of project crashing? Correct Answer To complete the project in the least possible time , To reduce project cost below it's normal cost , To achieve uniformity in requirement of resources

Your Answer To complete the project in the least possible time , To reduce project cost below it's normal cost , To achieve uniformity in requirement of resources Select The Blank Question The ________ advocates maintenance procedures whereby the condition of the plant is constantly watched through systematic inspection to unearth unhealthy conditions and preventive Correct Answer Preventive Maintenance Your Answer Preventive Maintenance True/False Question A network should be progression of activities always moving forward. Correct Answer True Your Answer True Multiple Choice Single Answer Question Which is the ideal place to write a description of an activity in a network? Correct Answer Above the arrow Your Answer Above the arrow Select The Blank Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________. Correct Answer 0.01 to 10% Your Answer 0.01 to 10% True/False Question For p-chart, the central line of fraction defectives is determined by average percentage defectives. Correct Answer True Your Answer True Multiple Choice Single Answer Question Which phase of method study is concerned with analyzing the facts critically, generating alternatives which form the basis for selection and development of improved methods? Correct Answer Critical examination Your Answer Critical examination Multiple Choice Single Answer Question Which of the following policies is advisable in case of low product variety and large volumes? Correct Answer Low Skilled Labour & Special Purpose Machines Your Answer Low Skilled Labour & Special Purpose Machines Multiple Choice Single Answer

Question Which kind of inspection is followed in case of product layout? Correct Answer Pilot inspection Your Answer Pilot inspection Match The Following Question Correct Answer Your Answer Emerson Efficiency Plan Wage Payment Wage Payment Craft Facilities Planning Facilities Planning Work Sampling Machine utilization Sampling Inspection Gantt Chart Production Scheduling Production Scheduling

LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Single Answer Question MRP is based on the concept of inventory demand which is of following type Correct Answer Dependent and independent Your Answer Dependent and independent

Multiple Choice Single Answer Question Main objective of a good plant layout is Correct Answer Reduce material handling cost Your Answer Reduce material handling cost

True/False Question

As a general rule, the number of tail event of an activity is more than that of it's head event. Correct Answer False Your Answer False

Select The Blank Question The ________ is the probability that a good lot will be rejected by the sampling plan. Correct Answer Producer's risk Your Answer Producer's risk

Multiple Choice Multiple Answer Question Which of the following are important considerations concerning activity times? Correct Answer Activity time should be obtained from the person responsible for the completion of an activity , Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resources required to carry out the activity are available. Your Answer Activity time should be obtained from the person responsible for the completion of an activity , Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resources required to carry out the activity are available. Select The Blank

Question

The ________ pertain to the climatic conditions which the component , product or material should withstand. Correct Answer Environmental specifications Your Answer Environmental specifications

Multiple Choice Multiple Answer Question Following are some of the factors considered for evaluation of alternative layouts Correct Answer Flow of Material , Equipment utilization , Ease of supervision Your Answer Flow of Material , Ease of supervision , Delivery performance

Multiple Choice Multiple Answer Question Which of the following are assignable cause? Correct Answer Large varaitions in hardness of material , Tool wear , Errors in setting Your Answer Large varaitions in hardness of material , Tool wear , Errors in setting True/False Question

All activities must not be tied up into the network

Correct Answer False Your Answer False

Select The Blank Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________. Correct Answer 0.01 to 10% Your Answer 0.01 to 10%

True/False Question

In case of X bar, if the process is not under control indicated by some points falling outside the control limits, such points outside the control limits are eliminated and new trial control limits for the remaining points are computed. Correct Answer True Your Answer True

Multiple Choice Single Answer Question What is the base for considering activity time as single time estimate or three time estimate?

Correct Answer Level of uncertainty Your Answer Availability of labour

Select The Blank Question The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Correct Answer Acceptable quality level Your Answer Acceptable quality level

Multiple Choice Single Answer Question What do you mean by lowest possible direct cost required to complete an activity within it's normal time? Correct Answer Normal cost Your Answer Normal cost

Select The Blank Question A good maintenance system is not a luxary but a ________. Correct Answer Necessity Your Answer Necessity

Select The Blank Question A ________helps to avoid crowding of jobs at a particular machine by change of route of some of the jobs or by diverting work to other machine. Correct Answer Control board Your Answer Move order

Select The Blank Question The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable. Correct Answer Quality control Your Answer Quality control

Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory

Your Answer

Factory

Match The Following Question Emerson Efficiency Plan Craft Work Sampling Gantt Chart

Correct Answer Wage Payment Facilities Planning Machine utilization Production Scheduling

Your Answer Wage Payment Facilities Planning Machine utilization Production Scheduling

Select The Blank Question A ________ is another form of subcontracting. Correct Answer Hiring capacity Your Answer Hiring capacity

Multiple Choice Multiple Answer Question In an organization there may not be a formal PPC department if Correct Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large Your Answer Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large Multiple Choice Multiple Answer Question Which of the following cases can be treated as delay during recording of method study? Correct Answer Operators awaiting instructions from supervisor , Worker waiting for his turn at tools stores , Jobs awaiting at the machines for their turn Your Answer Operators awaiting instructions from supervisor , Worker waiting for his turn at tools stores , Jobs awaiting at the machines for their turn True/False Question

Inspection order is must even for simple jobs which can be inspected by shop inspector with the tooling available on shop. Correct Answer False Your Answer False

Multiple Choice Multiple Answer Question Order preparation process for products manufatured to order requires following documents Correct Answer Sales Order , Work order , Shop order Your Answer Sales Order , Work order , Purchase order

Multiple Choice Single Answer Question Technique of Value Engineering can be effectively employed in design of a product to Correct Answer To meet the intended function at lowest cost Your Answer Reduce lead time

True/False Question

Cent percent inspection is often more practical and economical than sampling inspection. Correct Answer False Your Answer False

Multiple Choice Multiple Answer Question Scale model used for layout analysis have following advantages Correct Answer Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown , Models can be shifted easily Your Answer Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown , Models can be shifted easily Multiple Choice Single Answer Question Which of the following technique is event oriented ? Correct Answer Project Evaluation & Review Technique Your Answer Project Evaluation & Review Technique

Multiple Choice Single Answer Question What is the meaning of " Product features" according to J.M.Juran? Correct Answer Quality of design Your Answer Quality of design

Match The Following Question Crash cost of an activity

Correct Answer Cc

Your Answer Cc

Normal time of an activity Tn Crash time of activity Tc

Tn Tc Cn

Normal cost of an activity Cn

Multiple Choice Multiple Answer Question What are uses of diagrams in method study? Correct Answer Study different plant layouts and select the most optimum one , Study the extent of traffic over the different routes of the plant , Identify the extent of backtracking, cross traffic and obstacles encountered during the movement of material. Your Answer Study different plant layouts and select the most optimum one , Study the extent of traffic over the different routes of the plant , Identify the extent of backtracking, cross traffic and obstacles encountered during the movement of material. True/False Question

A load chart specifies the work to be carried out by each person of company during shift hours. Correct Answer False Your Answer True

Multiple Choice Multiple Answer Question Route Sheet generally contains following information Correct Answer Material Specification , Sequence of operation , Skill of Labour Your Answer Material Specification , Sequence of operation , Skill of Labour

True/False Question

Cellular layout is based on the concept of Group Technology

Correct Answer True Your Answer True

Multiple Choice Single Answer Question Which varaible is taken along the abscissa or X axis? Correct Answer Time Your Answer Standard deviation

Multiple Choice Multiple Answer

Question

Which are the advantages of suburban location?

Correct Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction Your Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction Select The Blank Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Answer Condition monitoring Your Answer Condition monitoring

Multiple Choice Multiple Answer Question Expediting function is concerned with following activities Correct Answer Progress chasing to identify delays which may hold up production , Communicating possible delays in delivery date commitment to sales department , Devising cures to keep rate of production in line with schedule Your Answer Recording progress of work , Progress chasing to identify delays which may hold up production , Communicating possible delays in delivery date commitment to sales department Select The Blank Question Production control work is ________ in case of floor inspection as compared with the centralised inspection. Correct Answer easier Your Answer time consuming

Select The Blank Question The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________. Correct Answer Overtime working Your Answer Overtime working

True/False Question

In case of forward pass computation, the earliest event time of the first event is zero. Correct Answer True Your Answer True

Multiple Choice Single Answer Question What is represented by an arrow in a network? Correct Answer Activity Your Answer Activity

True/False Question

As a general rule, a site five times the actual plant size is considered minimum for parking, access facilities and future expansion. Correct Answer True Your Answer True

True/False Question

Independent float either affects the float of preceding activities or that of succeeding activities. Correct Answer False Your Answer False

Multiple Choice Single Answer Question The document raised by PPC which authorises different functions to take action as per instruction is called Correct Answer Work Order Your Answer Work Order

Multiple Choice Single Answer Question A good layout makes effective use of space. Utilization of space for a department like Stores can be measured by Correct Answer Proportion of Cubic volume space utilized Your Answer Ratio of area utilised to area available

Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Operation

POM assgn Multiple Choice Single Answer Question MRP is based on the concept of inventory demand which is of following type Correct Answer Your Answer Dependent and independent Dependent and independent

Multiple Choice Single Answer Question Main objective of a good plant layout is Correct Answer Your Answer Reduce material handling cost Reduce material handling cost

True/False Question Correct Answer Your Answer

As a general rule, the number of tail event of an activity is more than that of it's head event. False False

Select The Blank Question The ________ is the probability that a good lot will be rejected by the sampling plan. Correct Answer Your Answer Producer's risk Producer's risk

Multiple Choice Multiple Answer Question Which of the following are important considerations concerning activity times? Correct Answer Your Answer Activity time should be obtained from the person responsible for the completion of an activity , Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resources required to carry out the activity are available. Activity time should be obtained from the person responsible for the completion of an activity , Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume that just the normal quantity of resources required to carry out the activity are available.

Select The Blank Question The ________ pertain to the climatic conditions which the component , product or material should withstand. Correct Environmental specifications Answer Your Answer Environmental specifications

Multiple Choice Multiple Answer Question Following are some of the factors considered for evaluation of alternative layouts Correct Answer Flow of Material , Equipment utilization , Ease of supervision

Your Answer

Flow of Material , Ease of supervision , Delivery performance

Multiple Choice Multiple Answer Question Which of the following are assignable cause? Correct Answer Your Answer Large varaitions in hardness of material , Tool wear , Errors in setting Large varaitions in hardness of material , Tool wear , Errors in setting

True/False Question Correct Answer Your Answer

All activities must not be tied up into the network False False

Select The Blank Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________. Correct 0.01 to 10% Answer Your Answer 0.01 to 10%

True/False Question

Correct Answer Your Answer

In case of X bar, if the process is not under control indicated by some points falling outside the control limits, such points outside the control limits are eliminated and new trial control limits for the remaining points are computed. True True

Multiple Choice Single Answer Question What is the base for considering activity time as single time estimate or three time estimate? Correct Level of uncertainty Answer Your Answer Availability of labour

Select The Blank Question The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Correct Acceptable quality level Answer Your Answer Acceptable quality level

Multiple Choice Single Answer Question What do you mean by lowest possible direct cost required to complete an activity within it's normal time? Correct Normal cost Answer

Your Answer

Normal cost

Select The Blank Question A good maintenance system is not a luxary but a ________. Correct Answer Your Answer Necessity Necessity

Select The Blank Question A ________helps to avoid crowding of jobs at a particular machine by change of route of some of the jobs or by diverting work to other machine. Correct Control board Answer Your Answer Move order

Select The Blank Question The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable. Correct Quality control Answer Your Answer Quality control

Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Factory Answer Your Answer Factory

Match The Following Question Emerson Efficiency Plan Craft Work Sampling Gantt Chart

Correct Answer Wage Payment Facilities Planning Machine utilization Production Scheduling

Your Answer Wage Payment Facilities Planning Machine utilization Production Scheduling

Select The Blank Question A ________ is another form of subcontracting. Correct Answer Your Answer Hiring capacity Hiring capacity

Multiple Choice Multiple Answer

Question Correct Answer Your Answer

In an organization there may not be a formal PPC department if Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen is not very large

Multiple Choice Multiple Answe r Question Which of the following cases can be treated as delay during recording of method study? Correct Answer Your Answer Operators awaiting instructions from supervisor , Worker waiting for his turn at tools stores , Jobs awaiting at the machines for their turn Operators awaiting instructions from supervisor , Worker waiting for his turn at tools stores , Jobs awaiting at the machines for their turn

True/False Question Correct Answer Your Answer

Inspection order is must even for simple jobs which can be inspected by shop inspector with the tooling available on shop. False False

Multiple Choice Multiple Answer Question Order preparation process for products manufatured to order requires following documents Correct Sales Order , Work order , Shop order Answer Your Answer Sales Order , Work order , Purchase order

Multiple Choice Single Answer Question Technique of Value Engineering can be effectively employed in design of a product to Correct Answer Your Answer To meet the intended function at lowest cost Reduce lead time

True/False Question Correct Answer Your Answer

Cent percent inspection is often more practical and economical than sampling inspection. False False

Multiple Choice Multiple Answer Question Scale model used for layout analysis have following advantages Correct Answer Your Answer Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown , Models can be shifted easily Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown , Models can be shifted easily

Multiple Choice Single Answer Question Which of the following technique is event oriented ?

Correct Answer Your Answer

Project Evaluation & Review Technique Project Evaluation & Review Technique

Multiple Choice Single Answer Question What is the meaning of " Product features" according to J.M.Juran? Correct Answer Your Answer Quality of design Quality of design

Match The Following Question Crash cost of an activity Normal time of an activity Crash time of activity Normal cost of an activity

Correct Answer Cc Tn Tc Cn

Your Answer Cc Tn Tc Cn

Multiple Choice Multiple Answer Question What are uses of diagrams in method study? Correct Answer Your Answer Study traffic traffic Study traffic traffic different plant layouts and select the most optimum one , Study the extent of over the different routes of the plant , Identify the extent of backtracking, cross and obstacles encountered during the movement of material. different plant layouts and select the most optimum one , Study the extent of over the different routes of the plant , Identify the extent of backtracking, cross and obstacles encountered during the movement of material.

True/False Question Correct Answer Your Answer

A load chart specifies the work to be carried out by each person of company during shift hours. False True

Multiple Choice Multiple Answer Question Route Sheet generally contains following information Correct Answer Your Answer Material Specification , Sequence of operation , Skill of Labour Material Specification , Sequence of operation , Skill of Labour

True/False Question Correct Answer

Cellular layout is based on the concept of Group Technology True

Your Answer

True

Multiple Choice Single Answer Question Which varaible is taken along the abscissa or X axis? Correct Answer Your Answer Time Standard deviation

Multiple Choice Multiple Answer Question Which are the advantages of suburban location? Correct Answer Your Answer Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction

Select The Blank Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Condition monitoring Answer Your Answer Condition monitoring

Multiple Choice Multiple Answer Question Expediting function is concerned with following activities Correct Answer Your Answer Progress chasing to identify delays which may hold up production , Communicating possible delays in delivery date commitment to sales department , Devising cures to keep rate of production in line with schedule Recording progress of work , Progress chasing to identify delays which may hold up production , Communicating possible delays in delivery date commitment to sales department

Select The Blank Question Production control work is ________ in case of floor inspection as compared with the centralised inspection. Correct easier Answer Your Answer time consuming

Select The Blank Question The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________. Correct Overtime working Answer Your Answer Overtime working

True/False Question

In case of forward pass computation, the earliest event time of the first event is zero.

Correct Answer Your Answer

True True

Multiple Choice Single Answer Question What is represented by an arrow in a network? Correct Answer Your Answer Activity Activity

True/False Question Correct Answer Your Answer

As a general rule, a site five times the actual plant size is considered minimum for parking, access facilities and future expansion. True True

True/False Question Correct Answer Your Answer

Independent float either affects the float of preceding activities or that of succeeding activities. False False

Multiple Choice Single Answer Question The document raised by PPC which authorises different functions to take action as per instruction is called Correct Work Order Answer Your Answer Work Order Multiple Choice Single Answer Question A good layout makes effective use of space. Utilization of space for a department like Stores can be measured by Correct Proportion of Cubic volume space utilized Answer Your Answer Ratio of area utilised to area available

Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Operation Answer Your Answer Operation

POM assgn Select The Blank Question Correct Answer Your Answer The ________ must ensure that the product satisfy the functional requirements of it's usage. Quality of design Quality of design

Multiple Choice Multiple Answer Question Which of the following information is available in summary of part in a chart during methods study? Correct Answer Frequency of each symbol , Total time for each symbol , Total distance travelled by the object Your Answer Frequency of each symbol , Total time for each symbol

True/False Question Correct Answer Your Answer

The event numbers as far as possible reflect the logical relationships of the activities. True False

Multiple Choice Single Answer Question Which varaible is taken along the ordinate or Y axis? Correct Answer Your Answer Quality Quality

Multiple Choice Multiple Answer Question Which of the following schedules are recommended to prepare and follow as a part of preventive maintenance system? Correct Answer Preventive inspection schedule , Cleaning and upkeep schedule , Lubrication schedule Your Answer Preventive inspection schedule , Cleaning and upkeep schedule , Lubrication schedule Multiple Choice Single Answer Question Which kind of preventive inspection detects some maintenance related characteristics by making use of human senses, when equipment is in operation? Correct Answer Extrernal inspection Your Answer Extrernal inspection

Multiple Choice Multiple Answer Question Which are different ways to show critical path in a network? Correct Answer Your Answer Thick Line , Red Line , Double Line Thick Line , Red Line , Double Line

Multiple Choice Multiple Answer

Question Correct Answer Your Answer

What are the benefits of overhauling? It increases useful life of an equipment and it's parts , Advance planning allows to attend equipment without disturbing the production programme , Advance planning allows to prepare and keep ready the list of replacement spares It increases useful life of an equipment and it's parts , Advance planning allows to attend equipment without disturbing the production programme , Advance planning allows to prepare and keep ready the list of replacement spares

Match The Following Question Combined Layout Fixed Position Layout Product Layout Process Layout

Correct Answer Mixed Layout Project Layout Line Layout Functional Layout

Your Answer Mixed Layout Line Layout Shop layout Functional Layout

Multiple Choice Multiple Answer Question Which of the following factors play important role while selecting or rejecting a particular site from legislation and taxation point of view? Correct Answer Labour laws , Building codes , Policies regarding issue of licences Your Answer Labour laws , Building codes , Policies regarding issue of licences

Select The Blank Question Correct Answer Your Answer

The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Acceptable quality level Acceptable quality level

Multiple Choice Multiple Answer Question Major contributors in the development of Control Charts, Sampling plan are Correct Answer Your Answer F H Dodge , H G Roming , Walter Schewhart F H Dodge , H G Roming , Walter Schewhart

True/False Question Correct Answer Your Answer

Skill of labour force in a product type layout is usually higher than in the process type of layout False True

True/False Question Correct Answer

Repetitive movements between work stations which are difficult to be traced on string diagrams can be conveniently shown on flow diagrams. False

Your Answer

True

Select The Blank Question Correct Answer Your Answer

The ________ is necessary when the job requires detailed of one or more of the job characteristics with the help of special equipment which is not available at the producing company. Inspection order Job card

Multiple Choice Multiple Answer Question Which of the following cases can be referred as operation in method study recording? Correct Answer Change in physical characteristic , Consumption of physical effort , Change in chemical characteristic Your Answer Change in physical characteristic , Consumption of physical effort , Change in chemical characteristic Select The Blank Question Correct Answer Your Answer

The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Condition monitoring Overhauling

True/False Question Correct Answer Your Answer

All activities lying on the non-critical paths must have total float and free float. False False

Select The Blank Question Correct Answer Your Answer

Work study is also called ________ study Time and Motion Method

Match The Following Question Crash cost of an activity Normal time of an activity Crash time of activity Normal cost of an activity

Correct Answer Cc Tn Tc Cn

Your Answer Cc Tn Tc Cn

Multiple Choice Multiple Answer

Question Correct Answer Your Answer

Which are the advantages of suburban location? Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant expansion is easier due to less or no restriction for building and construction

True/False Question Correct Answer Your Answer

In case of X bar-R charts,it is ensured that the assignable causes are detected before the tolerances are violated, upper and lower statistical limits are worked out and inserted into a chart. True False

Multiple Choice Single Answer Question Which of the following is the criteria for the percentage defectives in the zone of the indecision? Correct Answer Lots having the percentage defective more than AQL but less than LPTD Your Answer Lots having the percentage defective less than AQL but more than LPTD

Select The Blank Question Correct Answer Your Answer

The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly holiday is ________. Overtime working Overtime working

Multiple Choice Single Answer Question What do you mean by lowest possible direct cost required to complete an activity within it's crashed time? Correct Answer Crash cost Your Answer Crash cost

Multiple Choice Single Answer Question In case of Batch Production which kind of labour is expected? Correct Answer Your Answer Skilled in one specific Manufacturing Process Semiskilled

Multiple Choice Multiple Answer Question Which three of the following are causes of continuous upward pattern of Xbar-R control chart? Correct Answer Wear of tool , Abnormal rise in temperature , Accumulation of dirt Your Answer Wear of tool , Abnormal rise in temperature , Accumulation of dirt

True/False

Question Correct Answer Your Answer

Root cause of most of the breakdowns is failure of the lubrication system. True True

True/False Question Correct Answer Your Answer

It is not necessary to know spare time available on the non-critical path to allow a little delay for noncritical activity. False False

True/False Question Correct Answer Your Answer

MRP software generates time periodwise requiremetn of subassemblies True True

True/False Question Correct Answer Your Answer

In case of two handed process chart, the simultaneous activities of both hands are recorded opposite to each other on the chart. True True

Multiple Choice Single Answer Question What do you mean by CPM? Correct Answer Your Answer Critical Path Method Critical Path Method

Multiple Choice Multiple Answer Question Which of the following are major inputs to scheduling? Correct Answer Your Answer Overlapping of operations , Effective Capacity per work centre , Performance standards Overlapping of operations , Effective Capacity per work centre , Performance standards

Multiple Choice Multiple Answer Question Lack of material planning results in the following Correct Answer Your Answer Over ordering , under ordering , stockouts Over ordering , under ordering , stockouts

Multiple Choice Single Answer Question What do you mean by the verification of object against predetermined standards of quality or quantity or both? Correct Answer Inspection

Your Answer

Inspection

Multiple Choice Multiple Answer Question What are the advantages of templates over diagrams? Correct Answer Your Answer Can be conveniently moved on the graph paper , Less laborious , Saves time Can be conveniently moved on the graph paper , Less laborious , Unskilled person can do and analyze it

True/False Question Correct Answer Your Answer

It would not affect the project completion time if non-critical activities take little loner time than planned. True True

Select The Blank Question Correct Answer Your Answer

The ________ is the probability that a good lot will be rejected by the sampling plan. Producer's risk Producer's risk

Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory

Select The Blank Question Correct Answer Your Answer

An Ideal OC curve is ________ shaped curve that accpets all the lots with quality equal to or better than AQL . Rectangular Bell

Multiple Choice Single Answer Question Which is the right time to prepare stores issue order? Correct Answer Your Answer When route sheet is ready When route sheet is ready

Multiple Choice Single Answer Question Which element of a network represents a task which has got a definite beginning and definite end? Correct Answer Activity Your Answer Activity

Multiple Choice Single Answer Question Which kind of preventive inspection detects some defects in moving parts, internal cracks, and others , when machine is under preplanned shutdown? Correct Answer Internal inspection Your Answer Internal inspection

Select The Blank Question Correct Answer Your Answer

Production Planning is a centralised activity which includes functions such as ________ Scheduling Dispatching

Select The Blank Question

Correct Answer Your Answer

The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable. Quality control Quality control

Select The Blank Question Correct Answer Your Answer

Goods after final inspection should accompany ________to enable dispatch department to identify and draw correct reference. Forwarding note Forwarding note

Multiple Choice Single Answer Question Who has introduced the useful concept of control chart in 1931? Correct Answer Your Answer Walter Shewhart Walter Shewhart

LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Multiple Answer Question Why graphical method of recording is preferred over the descriptive method during method study? Correct Answer It segregates effective part form ineffective parts , It reduces effort involved in writing , Critical examinations easier and more effective Your Answer Critical examinations easier and more effective , It segregates effective part form ineffective parts , It reduces effort involved in writing Multiple Choice Multiple Answer Question Which are the subfactors of community facilities or social infrastructure? Correct Answer Accomodation , Educational , Entertainment Your Answer Accomodation , Educational , Entertainment Select The Blank Question The ________ is the probability that a bad lot will be accepted by the sampling plan. Correct Answer Consumer's risk Your Answer Consumer's risk Multiple Choice Multiple Answer Question Which of the following are examples of consumption of physical effort during recording for method study? Correct Answer Bending , Positioning , Unloading Your Answer Bending , Positioning , Unloading Multiple Choice Single Answer Question How to claculate the producer risk in the OC Curve? Correct Answer Probability that a good lot will be rejected by the sampling Your Answer Probability that a good lot will be rejected by the sampling Select The Blank Question The ________ are the definitions of the measurable as well as nonmeasurable characteristics of the product. Correct Answer Specifications Your Answer Specifications Select The Blank Question The ________ is the watch dog which ensures that every element of production and activities which could affect the quality of end product are regulated to the extent desirable. Correct Answer Quality control Your Answer Quality control True/False

Question Expediting action is necessary if the delays and interruptions are abnormal and hence any subsequent delay is bound to extend the promised delivery date. Correct Answer True Your Answer True Multiple Choice Single Answer Question Process Engineer does not get sufficient time for designing tooling for most economic production run when Correct Answer Delivery time is less Your Answer Delivery time is less Select The Blank Question The ________ includes preventive maintenance activities whose needs are identified through inspection which requires stoppage of machines. Correct Answer Shutdown Maintenance Your Answer Shutdown Maintenance True/False Question Breakdown of machines, absenteeism of worker does not dislocate the manufacturing activity in process layout Correct Answer True Your Answer True Select The Blank Question The ________ is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. Correct Answer Acceptable quality level Your Answer Acceptable quality level Multiple Choice Single Answer Question What do you mean by lowest possible direct cost required to complete an activity within it's crashed time? Correct Answer Crash cost Your Answer Crash cost Multiple Choice Multiple Answer Question Which are the first three steps of Critical Path Analysis technique? Correct Answer Activity relationships , Activity identification , Network construction Your Answer Activity relationships , Activity identification , Network construction True/False Question Dust gets mixed with lubricants, forms an abrasive substance and causes premature failure of machinery. Correct Answer True Your Answer True

Multiple Choice Multiple Answer Question Which of the following can be subtypes of corrective maintenance? Correct Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance Your Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance Select The Blank Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine or continuous checking. Correct Answer Condition monitoring Your Answer Condition monitoring Multiple Choice Single Answer Question The process of changing inputs into outputs thereby adding some value to entity can be defined as Correct Answer Operation Your Answer Production Match The Following Question Correct Answer Your Answer Toung Sweet Sweet Eye Crack Crack Nose Burnout Burnout Ear Impact Impact

Select The Blank Question The ________ is a set of tools and techniques by which products are made to comply with the specifications at minimum cost to the firm. Correct Answer Quality control system Your Answer Quality control system Multiple Choice Single Answer Question What is the meaning of " Product features" according to J.M.Juran? Correct Answer Quality of design Your Answer Quality of design Multiple Choice Multiple Answer Question Which of the following method can be used to record the facts during the method study? Correct Answer Micromotion study , Cyclegraph , Chronocyclegraph

Your Answer Micromotion study , Photograph , Cyclegraph , Chronocyclegraph True/False Question All activities must not be tied up into the network Correct Answer False Your Answer False Multiple Choice Multiple Answer Question Which of the following are types of sampling plan? Correct Answer Single sampling plan , Double sampling plan , Multiple sampling plan Your Answer Single sampling plan , Double sampling plan , Multiple sampling plan Multiple Choice Multiple Answer Question How many of the following are types of specification? Correct Answer Material specifications , Dimensional specifications , Performance specifications Your Answer Material specifications , Dimensional specifications , Performance specifications Multiple Choice Multiple Answer Question Plant layout facilitates processing of products in most effective manner through the following Correct Answer Shortest possible distance , Shortest processing time , Minimum movement Your Answer Shortest possible distance , Minimum movement Select The Blank Question Work study is also called ________ study Correct Answer Time and Motion Your Answer Time and Motion True/False Question Operation Process Chart provides information on time and distances Correct Answer False Your Answer False Multiple Choice Multiple Answer Question Plant Layout is concerned with optimum arrangement of the following Correct Answer Storage space , Machines , Material Handling Equipment Your Answer Storage space , Machines , Sequence of operation Multiple Choice Single Answer Question Management often fails to realize the importance of efficient layout due to following reason Correct Answer losses resulting from poor layout are not directly shown in the financial statements

Your Answer losses resulting from poor layout are not directly shown in the financial statements True/False Question Inspection order is must even for simple jobs which can be inspected by shop inspector with the tooling available on shop. Correct Answer False Your Answer True True/False Question Feasibility of time schedule requires that an activity be scheduled before any of it's predecessors are scheduled. Correct Answer False Your Answer True Multiple Choice Single Answer Question Any premise in which persons are employed for purpose of making any product/s is called Correct Answer Factory Your Answer Factory True/False Question Planned lubrication is said to be the nervous system of the equipment. Correct Answer True Your Answer True Multiple Choice Single Answer Question What is the basic philosophy of statistical process control? Correct Answer Prevention is better than cure Your Answer Prevention is better than cure Multiple Choice Single Answer Question How does the control chart of statistical quality control helps the operating personnel? Correct Answer Identify the presence of an assignable cause before it develops Your Answer Identify the presence of an assignable cause before it develops Multiple Choice Single Answer Question Where does the central line is located in case of p-chart? Correct Answer at p bar Your Answer at p bar Multiple Choice Multiple Answer Question Which of the following may be the objectives of project crashing? Correct Answer To complete the project in the least possible time , To reduce project cost below it's normal cost , To achieve uniformity in requirement of resources

Your Answer To complete the project in the least possible time , To reduce project cost below it's normal cost , To achieve uniformity in requirement of resources Select The Blank Question The ________ advocates maintenance procedures whereby the condition of the plant is constantly watched through systematic inspection to unearth unhealthy conditions and preventive Correct Answer Preventive Maintenance Your Answer Preventive Maintenance True/False Question A network should be progression of activities always moving forward. Correct Answer True Your Answer True Multiple Choice Single Answer Question Which is the ideal place to write a description of an activity in a network? Correct Answer Above the arrow Your Answer Above the arrow Select The Blank Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________. Correct Answer 0.01 to 10% Your Answer 0.01 to 10% True/False Question For p-chart, the central line of fraction defectives is determined by average percentage defectives. Correct Answer True Your Answer True Multiple Choice Single Answer Question Which phase of method study is concerned with analyzing the facts critically, generating alternatives which form the basis for selection and development of improved methods? Correct Answer Critical examination Your Answer Critical examination Multiple Choice Single Answer Question Which of the following policies is advisable in case of low product variety and large volumes? Correct Answer Low Skilled Labour & Special Purpose Machines Your Answer Low Skilled Labour & Special Purpose Machines Multiple Choice Single Answer

Question Which kind of inspection is followed in case of product layout? Correct Answer Pilot inspection Your Answer Pilot inspection Match The Following Question Correct Answer Your Answer Emerson Efficiency Plan Wage Payment Wage Payment Craft Facilities Planning Facilities Planning Work Sampling Machine utilization Sampling Inspection Gantt Chart Production Scheduling Production Scheduling

SM assgn :01: Shagun Multiple Choice Single Answer Question The decisions which are relate to daily decisions like leave records etc. which are mundane in nature & highly routined & can be done at a junior level are Correct Answer operational decisions Your Answer operational decisions

Multiple Choice Single Answer Question Strategic management is concerned with Correct Answer Your Answer long- range planning long- range planning

Multiple Choice Single Answer Question Mass media includes Correct Answer Your Answer radio, TV, internet etc. customer & dealers

Multiple Choice Multiple Answer Question What is Statistical Quality Control(SQC) Correct Answer Your Answer Identifies quality and productivity from a production process , Identifies impact of any change on performance , Instantly spots malfunctions and show where they occur Identifies quality and productivity from a production process , Identifies impact of any change on performance , Integrates manufacturing with business strategy ETOP stands for ________. environmental threat & opportunity profile environmental threat & opportunity profile

Select The Blank Question Correct Answer Your Answer Select The Blank Question Correct Answer Your Answer

ETOP stands for ________. environmental threat & opportunity profile environmental threat & opportunity profile

Multiple Choice Multiple Answer Question The various areas covered by social responsibility are Correct Answer Your Answer Select The Blank Inner Circle , Intermediate circle , Outer Circle Inner Circle , Outer Circle , Middle Circle

Question Correct Answer Your Answer

________ is the drive to achieve beyond one's expectations Motivation Inspiration

Multiple Choice Single Answer Question They enact the formal role of reviewing and screening executive decisions in the light of their environmental, business and organisational implications Correct Answer Board of director Your Answer True/False Question Correct Answer Your Answer External auditor

HR implementation involues a series of action programme like production, estimation of raw materials, labour & machine hours. False True

Multiple Choice Single Answer Question The decisions which are applied to structured or routine problems are Correct Answer Your Answer programmed decisions programmed decisions

Multiple Choice Single Answer Question CAP related to internal appraisal of firm stands for Correct Answer Your Answer competitive advantage profile competitive advantage profile

Multiple Choice Multiple Answer Question Factors to be considered in political- legal environmental scanning are Correct Answer Your Answer govt. policies, stability, philosophy of govt. , legal system, implementation, infrastructure , import-export govt. policies, stability, philosophy of govt. , legal system, implementation, infrastructure , import-export

Multiple Choice Single Answer Question Denominator management Correct Answer Your Answer True/False Question Correct Answer cost reduction cost reduction

Counterfeiter copy but with a difference that can be seen. False

Your Answer True/False Question Correct Answer Your Answer

True

The actual performance deviates positively over the budgeted performanve. This is an indication of superior performance True True

Multiple Choice Single Answer Question Strategic management is mainly the responsibility of Correct Answer Your Answer Top Management Top Management

Select The Blank Question Correct Answer Your Answer

Value chain analysis is an effective tool for ________. internal analysis product performance analysis

Multiple Choice Single Answer Question This strategic posture invests sufficiently to stay in the race but avoids premature commitments Correct Answer Reserve the right to play Your Answer Reserve the right to play

Select The Blank Question Correct Answer Your Answer

________ and greater accountability replace formal control. Self-discipline Co-operation

True/False Question Correct Answer Your Answer

Macro environment has got immediate impact on business. False True

Multiple Choice Multiple Answer Question Three important managerial qualities required for the effective strategic management Correct Answer Conceptual, human & intellectual skills , Decision making ability , Vision Your Answer Conceptual, human & intellectual skills , Decision making ability , communication skills

True/False

Question Correct Answer Your Answer

Scheduling is a part of strategic management. False True

Multiple Choice Single Answer Question This strategic posture takes the current industry structure and its future evolution as given and then react to the opportunities the market offers Correct Answer Adapters Your Answer Adapters

Multiple Choice Multiple Answer Question Attack strategies are Correct Answer Your Answer frontal attack , flank attack , encirclement attack frontal attack , flank attack , Enrichment attack

Multiple Choice Multiple Answer Question Merger takes place Correct Answer Your Answer between a buyer and a seller , to avail tax concessions , to increase growth rates between a buyer and a seller , to increase growth rates , to end rivalry between the two

Multiple Choice Multiple Answer Question Principles to manage strategic alliances are Correct Answer Your Answer clarity in strategy & responsibilities , blending cultures , provide for an exit strategy clarity in strategy & responsibilities , blending cultures

Select The Blank Question Correct Answer Your Answer

________ identifies the impact of any change on performance Statistical quality control Statistical quality control

Multiple Choice Multiple Answer Question The Hallmarks for self-regulation are Correct Answer Your Answer Trust & fairness , Changed Management , Integrity & thoughtfulness Trust & fairness , Changed Management , Integrity & thoughtfulness

Match The Following Question

Correct Answer

Your Answer

Ballast business Gap analysis Corporate parenting Heartland business

Fit well but low opportunities Difference between desired and projected performance Managing SBU's by a corporate Give the highest priority

Fit well but low opportunities Difference between desired and projected performance Managing SBU's by a corporate Give the highest priority

True/False Question Correct Answer Your Answer

Standards of performance act as the benchmark against which the actual performance is compared. True True

True/False Question Correct Answer Your Answer

Change in company's strategy gives rise to problems necessitating a new structure to be made True False

Select The Blank Question Correct Answer Your Answer

Modern Accounting uses ________ as a unit of measure Time Possession

Multiple Choice Single Answer Question Corporate strategy ensures Correct Answer Your Answer fit between the firm and its environment fit between the firm and its environment

True/False Question Correct Answer Your Answer

Divestiture is opposed to diversification. False True

Match The Following Question Marketing a product Environmental Analysis Swot Analysis

Correct Answer Mass segmentation Social, Political, legal & technology Matching, converting, minimizing

Your Answer Product formulated Social, Political, legal & technology Availability of resources

& avoiding strategies Marketing strategy Life cycle considerations Product formulated

Multiple Choice Single Answer Question It is the process of analyzing, dividing and arranging work or activities into manageable portion for individuals, sections & departments Correct Answer departmentation Your Answer policy framing

Multiple Choice Multiple Answer Question Factors to be considered while deciding candidates for divestiture are Correct Answer Your Answer taxes , availability of buyers , market reaction taxes , availability of buyers , willingness of employees

Select The Blank Question Correct Answer Your Answer

________ is a modern plant consisting of modules centered around a stage in the production process Flotilla concept Flotilla concept

Multiple Choice Multiple Answer Question An unhealthy portfolio has Correct Answer Your Answer More dogs , Few stars More dogs , Few stars

Multiple Choice Multiple Answer Question Strategic intent Correct Answer Your Answer obsession with an organization , ambitions in proportion to their existing resources & capabilities , what the organization strives for. obsession with an organization , what the organization strives for. , concept of optimization

True/False Question Correct Answer Your Answer

The actual performance matches the budgeted performance. This is a realistic situation. False False

Select The Blank Question Correct Answer

________ should have the ability to develop a visionto see patterns into the future. Leaders

Your Answer

Inspectors

Multiple Choice Single Answer Question Financial environment is concerned with Correct Answer Your Answer demand & supply of money, capital markets demand & supply of money, capital markets

Multiple Choice Multiple Answer Question The control process requires the following types of information Correct Answer Your Answer Planned performance , Variances , Reasons Planned performance , Variances , Motivation

Select The Blank Question Correct Answer Your Answer

Strategic evaluation determines the effectiveness of ________ Strategy Strategy

Multiple Choice Multiple Answer Question Various phases of Growth are Correct Answer Your Answer Creativity , Delegation , Co-ordination Creativity , Delegation , Co-ordination

SM assgn :03: Baizu True/False Question Correct Answer Your Answer Staffing function applies to all company levels irrespective of levels of hierarchy True True

Multiple Choice Multiple Answer Question The reasons for acquisition are Correct Answer Your Answer Increased market power , Increased diversification , Increased speed to market Increased diversification , Increased speed to market , Increased market power

Multiple Choice Multiple Answer Question Principles to manage strategic alliances are Correct Answer Your Answer clarity in strategy & responsibilities , blending cultures , provide for an exit strategy clarity in strategy & responsibilities , blending cultures , provide for an exit strategy

Multiple Choice Multiple Answer Question Merger takes place Correct Answer Your Answer between a buyer and a seller , to avail tax concessions , to increase growth rates between a buyer and a seller , to avail tax concessions , to increase growth rates

Select The Blank Question Titan going into setting their won retail outlets- this is ________ integration. Correct Answer Your Answer vertical ( forward ) vertical ( forward )

Select The Blank Question Delay in ________ measurement defeats the purpose of evaluation. Correct Answer Your Answer Time Goals

Select The Blank Question Bajaj started manufacturing of sunny is an example of ________. Correct Answer Your Answer concentration strategy concentration strategy

Multiple Choice Single Answer

Question Correct Answer Your Answer

A Large-scale community development project was funded to enable farmers to use local resources effectively by Asian Paints Asian Paints

True/False Question Correct Answer Your Answer

The actual performance deviates positively over the budgeted performanve. This is an indication of superior performance True True

Multiple Choice Single Answer Question It concentrates on organisation design and work flow Correct Answer Your Answer Flotilla Flotilla

Multiple Choice Single Answer Question It is the process of selecting people for company positions and developing skills and abilities for assignments in the company Correct Staffing Answer Your Answer Staffing

Select The Blank Question A hardware manufacture enters into software is an example of ________integration. Correct Answer Your Answer vertical ( forward ) horizontal

Multiple Choice Single Answer Question This strategic posture invests sufficiently to stay in the race but avoids pre-mature commitments Correct Reserve the right to play Answer Your Answer Reserve the right to play

Multiple Choice Multiple Answer Question The various areas covered by social responsibility are Correct Answer Your Answer Inner Circle , Intermediate circle , Outer Circle Inner Circle , Intermediate circle , Outer Circle

Multiple Choice Multiple Answer Question supplier & technological environment is concerned with

Correct Answer Your Answer

quality & no. of suppliers , logistics , raw material , trends and rate of change of technology quality & no. of suppliers , logistics , raw material , trends and rate of change of technology

Multiple Choice Single Answer Question The decisions which are applied to structured or routine problems are Correct Answer Your Answer programmed decisions programmed decisions

True/False Question Correct Answer Your Answer

Labour satisfaction may result in unethical behaviour as anger. False False

True/False Question Correct Answer Your Answer

Reciprocal responsibility means equal blames and credit. False False

True/False Question Correct Answer Your Answer

Excelling in one market guarantees success in a new. False False

Multiple Choice Single Answer Question Empower people through great software anytime , any place, on any device'- Microsoft Correct Answer Your Answer vision vision

Select The Blank Question ETOP stands for ________. Correct Answer Your Answer environmental threat & opportunity profile environmental threat & opportunity profile

Multiple Choice Multiple Answer Question How does 'structure' reduce external uncertainity arising out of human behaviour Correct Answer Research and planning , Forecasting

Your Answer

Research and planning , Forecasting , Division of labour

Multiple Choice Multiple Answer Question A Company's strategy Correct Answer Your Answer Vital ingredient in determinig it's future , Yields growth, profits etc , may result in disaster if inappropriate Vital ingredient in determinig it's future , Only factor determing it's success or failure , may result in disaster if inappropriate

True/False Question Correct Answer Your Answer

Three C's affecting today's companies are customer, competition & change True True

Select The Blank Question Control should involve________ amount of information. Correct Answer Your Answer Minimum Maximum

True/False Question Correct Answer Your Answer

HR implementation involues a series of action programme like production, estimation of raw materials, labour & machine hours. False True

Match The Following Question Ballast business Gap analysis Corporate parenting Heartland business

Correct Answer Fit well but low opportunities Difference between desired and projected performance Managing SBU's by a corporate Give the highest priority

Your Answer Fit well but low opportunities Difference between desired and projected performance Managing SBU's by a corporate Give the highest priority

Multiple Choice Multiple Answer Question Strategic intent Correct Answer Your Answer obsession with an organization , ambitions in proportion to their existing resources & capabilities , what the organization strives for. obsession with an organization , what the organization strives for. , concept of optimization

Multiple Choice Multiple Answer

Question Correct Answer Your Answer

Attack strategies are frontal attack , flank attack , encirclement attack frontal attack , flank attack , encirclement attack

Multiple Choice Single Answer Question An approach that strives to follow ethical principles and percepts is Correct Answer Your Answer Moral management Moral management

Multiple Choice Multiple Answer Question Limitations of Traditional cost accounting are Correct Answer Your Answer Assumes factory as an isolated entity , It measures only the cost of producing Assumes factory as an isolated entity , It measures only the cost of producing

Multiple Choice Multiple Answer Question Business is rated on which dimensions Correct Answer Your Answer Market attractiveness , Business strength Business strength , Profit margin , Competition level

Select The Blank Question Like roots of a tree, ________of organization is hidden from direct view. Correct Answer Your Answer core competence goodwill

Select The Blank Question Factors leading to personnel capability are________. Correct Answer Your Answer IR, OB PRM

True/False Question Correct Answer Your Answer

All policies are 'statements' False True

Multiple Choice Single Answer Question W in SWOT stands for

Correct Answer Your Answer

inherent inadequacy of organization inherent inadequacy of organization

True/False Question Correct Answer Your Answer

Divestiture is opposed to diversification. False True

Select The Blank Question ________ should have the ability to develop a visionto see patterns into the future. Correct Answer Your Answer Leaders Leaders

Multiple Choice Single Answer Question The process of forecasting an organization's future demands for and supply of right type of people in right number is Correct Man-power planning Answer Your Answer Man-power planning

Match The Following Question Comparative analysis is Benchmarking is Michael Hammer & James Chapy GDP stands for

Correct Answer historical analysis competitive analysis Reengineering gross domestic product

Your Answer historical analysis competitive analysis Reengineering gross domestic product

Multiple Choice Multiple Answer Question Organizational models are Correct Answer Your Answer multinational model , international model , global organizational model multinational model , international model , global organizational model

Multiple Choice Single Answer Question It enables the strategists to take corrective action at the right time Correct Answer Your Answer Premise control Strategic surveillance

Select The Blank Question Value chain analysis is an effective tool for ________. Correct Answer Your Answer internal analysis internal analysis

Multiple Choice Single Answer Question The aim in stability strategies isCorrect Answer Your Answer move slowly & surely move slowly & surely

True/False Question Correct Answer Your Answer

Business ethics is how personal norms do not apply to activities & goals of a commercial firm. False False

Select The Blank Question ________ support managers by keeping track of the elementary activities & transactions of the organization such as sales, receipts, raw materials etc. Correct Operational level systems Answer Your Answer Operational level systems

Multiple Choice Single Answer Question General Electric Matrix is divided into how many cells Correct Answer Your Answer 9 9

LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Single Answer Question Reaction evaluation is defined in terms of processes involved in gaining and using information about :Correct Answer Trainees expressed reactions Your Answer True/False Question Trainees expressed reactions

Employees should feel self-motivated to acquire new skills.

Correct Answer True Your Answer True/False Question True

Manager and follower may negotiate only for what the manager is going to contribute Correct Answer False Your Answer False

Select The Blank Question Independence is the desire for ________ Correct Answer Self reliance Your Answer Self reliance

Multiple Choice Multiple Answer Question The promotion system should bring about full utilization of :Correct Answer Functional resources in the company's employment policy , Technical resources in the company's employment policy , Service resources in the company's employment policy Your Answer Functional resources in the company's employment policy , Technical resources in the company's employment policy , Service resources in the company's employment policy Multiple Choice Single Answer Question MBO technique has undergone modification over the :Correct Answer Last two decades Your Answer Last one decade

Multiple Choice Single Answer

Question

People with the merit quality 'poor' :-

Correct Answer Demotivate others Your Answer Need lot of help

Multiple Choice Single Answer Question Communication skills indicate :Correct Answer Effective listening Your Answer Effective listening

Multiple Choice Multiple Answer Question Some famous value-driven corporate leaders who serve as role models are :Correct Answer Mr. Ratan D.Tata , Late Mr. S.L. Kirloskar , Mr. Mukesh Ambani Your Answer True/False Question Mr. Ratan D.Tata , Late Mr. S.L. Kirloskar , Mr. Mukesh Ambani

Value-based happiness can be sought by directly aiming for it.

Correct Answer False Your Answer True

Multiple Choice Single Answer Question For everyone to be pulling in the same direction, organizations require :Correct Answer Multiple communication channels Your Answer Multiple communication channels

Multiple Choice Single Answer Question During training, free exchange of ideas should :Correct Answer Deserve top attention Your Answer Deserve top attention

Select The Blank Question Dependability is a ________. Correct Answer Assessment factor Your Answer Merit quality

Multiple Choice Single Answer Question Self assessment is :Correct Answer The best assessment Your Answer The best assessment

Multiple Choice Multiple Answer Question A good manager :Correct Answer Applies his thoughts , Applies his knowledge , Is willing to overcome speed breakers Your Answer Applies his thoughts , Applies his knowledge , Is willing to overcome speed breakers Multiple Choice Single Answer Question In taking care of future needs, the race is between :Correct Answer Capable junior vs experienced senior Your Answer Capable junior vs experienced senior

Multiple Choice Single Answer Question Long term training plans :Correct Answer Need vision and planning Your Answer Need vision and planning

Multiple Choice Single Answer Question People bring :Correct Answer Variety of skills with them to the workplace Your Answer Variety of skills with them to the workplace

Multiple Choice Multiple Answer Question The atmosphere during counseling should be :Correct Answer Informal , Friendly Your Answer Informal , Friendly

Select The Blank Question In addition to managerial functions, other areas of equal concern in PA are ________. Correct Answer Personality, maturity, intelligence, loyalty, co-operation etc. Your Answer Personality, maturity, intelligence, loyalty, co-operation etc.

True/False Question

People resist the way in which a change is introduced.

Correct Answer True Your Answer True

Select The Blank Question Majority of people believe in ________. Correct Answer Steady pattern and steady growth Your Answer Steady pattern and steady growth

Select The Blank Question Managers should guide changes in organizations in such a way that ________ Correct Answer Worker performance and productivity are maximized Your Answer Worker performance and productivity are maximized

Select The Blank Question The person who is going to administer the instrument (questionnaire) must be ________ person. Correct Answer An experienced and well-trained Your Answer True/False Question An experienced and well-trained

Cultural differences exist between various countries and societies. Correct Answer True Your Answer True

Select The Blank Question In the appraisal writing, there should be________. Correct Answer Firmness and punch Your Answer Firmness and punch

Select The Blank Question Every organization has a ________. Correct Answer Business vision

Your Answer

Business vision

Match The Following Question Impact Achievement Control Affection

Correct Answer

Your Answer

Desire to make people do Concern for self-excellence what one thinks is right Concern for selfexcellence To find value-based happiness

Desire for power to control Desire for power to control others others Need to be concerned Need to be concerned

Multiple Choice Multiple Answer Question Managerial skills can be developed by :Correct Answer Consulting , Education , Training Your Answer Consulting , Education , Training

Select The Blank Question We must approach people without preconceptions and concentrate on ________. Correct Answer Performance Your Answer True/False Question Performance

Knowledge of the latest fields helps a great deal in one's field

Correct Answer True Your Answer True

Multiple Choice Multiple Answer Question Spirit of performance is the spirit that :Correct Answer Calls upon a man's reserves of dedication and effort , Motivates Your Answer Motivates , Calls upon a man's reserves of dedication and effort

Multiple Choice Multiple Answer Question When giving presentations :Correct Answer Do preparation , Practice

Your Answer

Do preparation , Practice , Wear attractive clothes

Multiple Choice Single Answer Question In any organization, it is a very common cause to :Correct Answer Get fired for poor performance Your Answer Get fired for poor performance

Match The Following Question

Correct Answer

Your Answer Do what the customers want Upward as well as downward Better managing, elicits commitment, develop effective controls

Businesses from Japan We can learn from the and S.Korea have proved failures of others that There is a shift in demand Upward as well as downward Advantages of goal setting Better managing, elicits are commitment, develop effective controls One guideline for achieving excellence

Identify your weaknesses Identify your weaknesses first first

Select The Blank Question To have competent managers, we need ________. Correct Answer Effective appraisals Your Answer True/False Question Effective appraisals

The letter 'T' in SWOT stands for training

Correct Answer False Your Answer True/False Question False

Men cannot work like machines.

Correct Answer True Your Answer True/False Question True

An executive must see beyond the current problem or situation

and generate new ideas/ practices. Correct Answer True Your Answer True/False Question True

The main purpose of communication in business is to convey certain ideas and messages to the other party. Correct Answer True Your Answer True

Multiple Choice Multiple Answer Question Success can be achieved through :Correct Answer Hard work , Determination , Confidence in your abilities Your Answer Hard work , Determination , Confidence in your abilities

Multiple Choice Multiple Answer Question Every executive's ultimate goal is Correct Answer to maximize pleasure , to minimize pain , to maximize productivity Your Answer to maximize pleasure , to minimize pain Multiple Choice Multiple Answer Question Trade cycle has :Correct Answer Prosperity , Depression , Boom Your Answer Prosperity , Depression , Boom

Multiple Choice Multiple Answer Question MBO is a tool by which managers:Correct Answer Improve their performance , Increase their effectiveness Your Answer Improve their performance , Increase their effectiveness

Multiple Choice Single Answer Question One category of waste is :Correct Answer Rejections of goods for various reasons Your Answer Rejections of goods for various reasons

Multiple Choice Multiple Answer Question Performance review can be :Correct Answer Annual , Continuous , Periodic Your Answer Annual , Continuous , Periodic

Select The Blank Question A superb negotiator manages a response that ________. Correct Answer Brings people together Your Answer Brings people together

LIST OF ATTEMPTED QUESTIONS AND ANSWERS Select The Blank Question Individual level where people are usually motivated to close the gap between their current and desired ________. Correct Answer Capabilities Your Answer Capabilities

Multiple Choice Single Answer Question During the 70's & 80's much work was done to produce models to facilitate :Correct Answer Rational process Your Answer Rational process

Multiple Choice Single Answer Question The following is included in QWL practices :Correct Answer Employment guarantees Your Answer Employment guarantees

Multiple Choice Single Answer Question Which systems need to complement each other for the success of knowledge management? Correct Answer IT & HR systems Your Answer IT & HR systems

Select The Blank Question People are ________ and developed to do jobs defined by the organization's formal structure. Correct Answer Recruited Your Answer Recruited

Select The Blank Question Strategy as an emerging process of ________. Correct Answer Action Your Answer Action

Match The Following

Question Cost of external failure

Correct Answer The cost arising outside the organisation due to failure to achieve the quality specified after the transfer of ownership to the customer

Your Answer The cost arising outside the organisation due to failure to achieve the quality specified after the transfer of ownership to the customer

Cost of prevention

The cost of an action to The cost of an action to prevent or reduce defects prevent or reduce defects and failures and failures The cost of assessing the The cost of assessing the quality achieved quality achieved The costs arising within the organisation due to failure to achieve the quality specified before the transfer of ownership to the customer The costs arising within the organisation due to failure to achieve the quality specified before the transfer of ownership to the customer

Cost of appraisal Cost of internal failure

Multiple Choice Single Answer Question Development strategy should be guided by a :Correct Answer Vision & Set of values Your Answer True/False Question Vision & Policies

In practice, the right balance between individuals & team has never proved to be elusive. Correct Answer False Your Answer True

Multiple Choice Single Answer Question Individual employees have the technical knowledge to achieve :Correct Answer Short-term Results Your Answer Long-term Results

Multiple Choice Single Answer Question The word Strategy is derived from which sphere ? Correct Answer Military sphere Your Answer Military sphere

Multiple Choice Multiple Answer Question The QWL program provides a framework for co-ordinating what in order to produce improvements in QWL outcomes? Correct Answer The introduction , Maintenance , Improvement Your Answer The introduction , Improvement , Implementation

Multiple Choice Multiple Answer Question During mergers, effective HR integration is carried out on the following :Correct Answer Remuneration , Benefits , Terms and conditions Your Answer Remuneration , Benefits , Terms and conditions

Multiple Choice Multiple Answer Question Organizations are battle field in which workers and managers vie for the :Correct Answer Scarce resources of power , Income , Opportunity Your Answer Income , Opportunity , Career

Multiple Choice Multiple Answer Question Problem of integration are :Correct Answer Diversity of strategic processes, level & styles , Evolutionary nature of business strategy , Absence of written business strategies Your Answer Diversity of strategic processes, level & styles , Evolutionary nature of business strategy , Absence of written business strategies True/False Question It is one thing to measure an activity, another to assess how good it is ! Correct Answer True Your Answer True

Multiple Choice Single Answer Question Part of the problem is that the dominant means of measuring and assessing organizational success are quantitative and :Correct Answer Financial Your Answer Qualitative

Multiple Choice Multiple Answer

Question

What should not be underestimated in the pre merger phase?

Correct Answer Company brand , Employee's loyalty to their colleagues , Ways of working Your Answer Employee's loyalty to their colleagues , Ways of working , Understanding the cultural differences Multiple Choice Multiple Answer Question Types of contribution are :Correct Answer Exceptional teamwork , Excellence in normal key tasks , High achievement in a special project Your Answer Exceptional teamwork , Excellence in normal key tasks , Attitude to quality Multiple Choice Multiple Answer Question Primary sources of data are :Correct Answer Interviews with senior Management , Interviews and questionnaires with line Management , In-depth questionnaires from human resource staff Your Answer Interviews with senior Management , Interviews and questionnaires with line Management , Collecting data Multiple Choice Multiple Answer Question Mergers & alliances are an opportunity to develop :Correct Answer A new management style , A new culture , And manage plus improve costs Your Answer A new management style , A new culture , Better customer relationships True/False Question

Executives often need couching in the arts of leadership especially during major change. Correct Answer True Your Answer True

True/False Question

Communication can help create buy - in to new ways of operating. Correct Answer True Your Answer True

True/False Question

Many central HR teams in large organization have decreased in size. Correct Answer True

Your Answer

True

Select The Blank Question The team consists of experienced ________ who have both internal consultancy and business experience. Correct Answer OD practitioners Your Answer OD practitioners

Multiple Choice Multiple Answer Question IT sector employers are looking for :Correct Answer Specific skills , Experience , High market value Your Answer True/False Question Specific skills , Experience , High market value

Communications should be honest & should involve all stakeholders. Correct Answer True Your Answer True

True/False Question

The belief among employers that union wages are higher than non union wages is true. Correct Answer True Your Answer True

Select The Blank Question The generalists should develop ________. Correct Answer At least one area of expertise Your Answer Business skills

Match The Following Question T&D executives HR planning

Correct Answer Full part in strategic planning process

Your Answer Full part in strategic planning process

Effective development of Effective development of an organizational strategy an organizational strategy Job analyses for long-term objectives

Maximum strategy impact Job analyses for longterm objectives

Unisys

International on-line service centre

International on-line service centre

Multiple Choice Single Answer Question Which culture disempowers through restricting autonomy & creativity & erects barriers to co-operation? Correct Answer Role culture Your Answer Role culture

Multiple Choice Single Answer Question What is the effect of downsizing & retrenchment constitutes for human resource manager? Correct Answer New challenge Your Answer New challenge

Multiple Choice Multiple Answer Question Computerised personnel information have major benefits such as :Correct Answer Producing better quality letters , Reducing the chance of errors , Reducing tedious clerical work Your Answer Reducing tedious clerical work , Producing better quality letters , Saving the filing work True/False Question According to Hudson relationship more in terms of a divorce from all that is familiar. Correct Answer False Your Answer False

Select The Blank Question The questionnaire of Towers Perrin study asked respondents to select and rank 5 items from a list of 17 ________ factors affecting Human Resource Management. Correct Answer Environmental Your Answer True/False Question Environmental

Business and HR issues influence each other, and in turn influence corporate and business unit strategy. Correct Answer True Your Answer True

Select The Blank

Question

Developing characteristics of people needed to run business in ________ . Correct Answer Long term Your Answer Long term

Select The Blank Question In some companies there is a senior level ________ who can ensure broad level attention for knowledge issues. Correct Answer Knowledge sponsor Your Answer Knowledge sponsor

Select The Blank Question A Further key concept in TQ is that of the ________. Correct Answer Internal customer Your Answer Internal customer

Multiple Choice Single Answer Question Whose role is most critical to minimize the potential for `winners & losers'? Correct Answer A skilled human resources professional Your Answer A skilled human resources professional

Multiple Choice Multiple Answer Question Typical actions that reduce the scope of activity of an organization include :Correct Answer Cost cutting programs , Reduction of capacity , Divestitures Your Answer Cost cutting programs , Reduction of capacity

Multiple Choice Multiple Answer Question Formal communication should aim to :Correct Answer Informing the head hunter , Clarify , Provide direction Your Answer Informing the head hunter , Clarify , Provide direction

Select The Blank Question The process of eliminating jobs is frequently compared to ________. Correct Answer Death and murder Your Answer Death and murder

Multiple Choice Single Answer Question Who argues that firm must see their roles as contributing to society over the long term, rather than simply increasing shareholder dividends in the short term? Correct Answer Charles Handy Your Answer Dave Ulrich

Multiple Choice Single Answer Question Who confirm that to survive quality of product & service should be an integral part of the strategic direction of an organisation? Correct Answer Most chief executives Your Answer True/False Question Most chief executives

Management agenda was completed by a cross-sector population of managers mainly based in the USA. Correct Answer False Your Answer True

Select The Blank Question There are ________ for sharing & developing knowledge inside the company. Correct Answer Opportunities Your Answer Opportunities

LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Single Answer Question Reaction evaluation is defined in terms of processes involved in gaining and using information about :Correct Answer Trainees expressed reactions Your Answer True/False Question Trainees expressed reactions

Employees should feel self-motivated to acquire new skills.

Correct Answer True Your Answer True/False Question True

Manager and follower may negotiate only for what the manager is going to contribute Correct Answer False Your Answer False

Select The Blank Question Independence is the desire for ________ Correct Answer Self reliance Your Answer Self reliance

Multiple Choice Multiple Answer Question The promotion system should bring about full utilization of :Correct Answer Functional resources in the company's employment policy , Technical resources in the company's employment policy , Service resources in the company's employment policy Your Answer Functional resources in the company's employment policy , Technical resources in the company's employment policy , Service resources in the company's employment policy Multiple Choice Single Answer Question MBO technique has undergone modification over the :Correct Answer Last two decades Your Answer Last one decade

Multiple Choice Single Answer

Question

People with the merit quality 'poor' :-

Correct Answer Demotivate others Your Answer Need lot of help

Multiple Choice Single Answer Question Communication skills indicate :Correct Answer Effective listening Your Answer Effective listening

Multiple Choice Multiple Answer Question Some famous value-driven corporate leaders who serve as role models are :Correct Answer Mr. Ratan D.Tata , Late Mr. S.L. Kirloskar , Mr. Mukesh Ambani Your Answer True/False Question Mr. Ratan D.Tata , Late Mr. S.L. Kirloskar , Mr. Mukesh Ambani

Value-based happiness can be sought by directly aiming for it.

Correct Answer False Your Answer True

Multiple Choice Single Answer Question For everyone to be pulling in the same direction, organizations require :Correct Answer Multiple communication channels Your Answer Multiple communication channels

Multiple Choice Single Answer Question During training, free exchange of ideas should :Correct Answer Deserve top attention Your Answer Deserve top attention

Select The Blank Question Dependability is a ________. Correct Answer Assessment factor Your Answer Merit quality

Multiple Choice Single Answer Question Self assessment is :Correct Answer The best assessment Your Answer The best assessment

Multiple Choice Multiple Answer Question A good manager :Correct Answer Applies his thoughts , Applies his knowledge , Is willing to overcome speed breakers Your Answer Applies his thoughts , Applies his knowledge , Is willing to overcome speed breakers Multiple Choice Single Answer Question In taking care of future needs, the race is between :Correct Answer Capable junior vs experienced senior Your Answer Capable junior vs experienced senior

Multiple Choice Single Answer Question Long term training plans :Correct Answer Need vision and planning Your Answer Need vision and planning

Multiple Choice Single Answer Question People bring :Correct Answer Variety of skills with them to the workplace Your Answer Variety of skills with them to the workplace

Multiple Choice Multiple Answer Question The atmosphere during counseling should be :Correct Answer Informal , Friendly Your Answer Informal , Friendly

Select The Blank Question In addition to managerial functions, other areas of equal concern in PA are ________. Correct Answer Personality, maturity, intelligence, loyalty, co-operation etc. Your Answer Personality, maturity, intelligence, loyalty, co-operation etc.

True/False Question

People resist the way in which a change is introduced.

Correct Answer True Your Answer True

Select The Blank Question Majority of people believe in ________. Correct Answer Steady pattern and steady growth Your Answer Steady pattern and steady growth

Select The Blank Question Managers should guide changes in organizations in such a way that ________ Correct Answer Worker performance and productivity are maximized Your Answer Worker performance and productivity are maximized

Select The Blank Question The person who is going to administer the instrument (questionnaire) must be ________ person. Correct Answer An experienced and well-trained Your Answer True/False Question An experienced and well-trained

Cultural differences exist between various countries and societies. Correct Answer True Your Answer True

Select The Blank Question In the appraisal writing, there should be________. Correct Answer Firmness and punch Your Answer Firmness and punch

Select The Blank Question Every organization has a ________. Correct Answer Business vision

Your Answer

Business vision

Match The Following Question Impact Achievement Control Affection

Correct Answer

Your Answer

Desire to make people do Concern for self-excellence what one thinks is right Concern for selfexcellence To find value-based happiness

Desire for power to control Desire for power to control others others Need to be concerned Need to be concerned

Multiple Choice Multiple Answer Question Managerial skills can be developed by :Correct Answer Consulting , Education , Training Your Answer Consulting , Education , Training

Select The Blank Question We must approach people without preconceptions and concentrate on ________. Correct Answer Performance Your Answer True/False Question Performance

Knowledge of the latest fields helps a great deal in one's field

Correct Answer True Your Answer True

Multiple Choice Multiple Answer Question Spirit of performance is the spirit that :Correct Answer Calls upon a man's reserves of dedication and effort , Motivates Your Answer Motivates , Calls upon a man's reserves of dedication and effort

Multiple Choice Multiple Answer Question When giving presentations :Correct Answer Do preparation , Practice

Your Answer

Do preparation , Practice , Wear attractive clothes

Multiple Choice Single Answer Question In any organization, it is a very common cause to :Correct Answer Get fired for poor performance Your Answer Get fired for poor performance

Match The Following Question

Correct Answer

Your Answer Do what the customers want Upward as well as downward Better managing, elicits commitment, develop effective controls

Businesses from Japan We can learn from the and S.Korea have proved failures of others that There is a shift in demand Upward as well as downward Advantages of goal setting Better managing, elicits are commitment, develop effective controls One guideline for achieving excellence

Identify your weaknesses Identify your weaknesses first first

Select The Blank Question To have competent managers, we need ________. Correct Answer Effective appraisals Your Answer True/False Question Effective appraisals

The letter 'T' in SWOT stands for training

Correct Answer False Your Answer True/False Question False

Men cannot work like machines.

Correct Answer True Your Answer True/False Question True

An executive must see beyond the current problem or situation

and generate new ideas/ practices. Correct Answer True Your Answer True/False Question True

The main purpose of communication in business is to convey certain ideas and messages to the other party. Correct Answer True Your Answer True

Multiple Choice Multiple Answer Question Success can be achieved through :Correct Answer Hard work , Determination , Confidence in your abilities Your Answer Hard work , Determination , Confidence in your abilities

Multiple Choice Multiple Answer Question Every executive's ultimate goal is Correct Answer to maximize pleasure , to minimize pain , to maximize productivity Your Answer to maximize pleasure , to minimize pain Multiple Choice Multiple Answer Question Trade cycle has :Correct Answer Prosperity , Depression , Boom Your Answer Prosperity , Depression , Boom

Multiple Choice Multiple Answer Question MBO is a tool by which managers:Correct Answer Improve their performance , Increase their effectiveness Your Answer Improve their performance , Increase their effectiveness

Multiple Choice Single Answer Question One category of waste is :Correct Answer Rejections of goods for various reasons Your Answer Rejections of goods for various reasons

Multiple Choice Multiple Answer Question Performance review can be :Correct Answer Annual , Continuous , Periodic Your Answer Annual , Continuous , Periodic

Select The Blank Question A superb negotiator manages a response that ________. Correct Answer Brings people together Your Answer Brings people together

LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Single Answer Question Reaction evaluation is defined in terms of processes involved in gaining and using information about :Correct Answer Trainees expressed reactions Your Answer True/False Question Trainees expressed reactions

Employees should feel self-motivated to acquire new skills.

Correct Answer True Your Answer True/False Question True

Manager and follower may negotiate only for what the manager is going to contribute Correct Answer False Your Answer False

Select The Blank Question Independence is the desire for ________ Correct Answer Self reliance Your Answer Self reliance

Multiple Choice Multiple Answer Question The promotion system should bring about full utilization of :Correct Answer Functional resources in the company's employment policy , Technical resources in the company's employment policy , Service resources in the company's employment policy Your Answer Functional resources in the company's employment policy , Technical resources in the company's employment policy , Service resources in the company's employment policy Multiple Choice Single Answer Question MBO technique has undergone modification over the :Correct Answer Last two decades Your Answer Last one decade

Multiple Choice Single Answer

Question

People with the merit quality 'poor' :-

Correct Answer Demotivate others Your Answer Need lot of help

Multiple Choice Single Answer Question Communication skills indicate :Correct Answer Effective listening Your Answer Effective listening

Multiple Choice Multiple Answer Question Some famous value-driven corporate leaders who serve as role models are :Correct Answer Mr. Ratan D.Tata , Late Mr. S.L. Kirloskar , Mr. Mukesh Ambani Your Answer True/False Question Mr. Ratan D.Tata , Late Mr. S.L. Kirloskar , Mr. Mukesh Ambani

Value-based happiness can be sought by directly aiming for it.

Correct Answer False Your Answer True

Multiple Choice Single Answer Question For everyone to be pulling in the same direction, organizations require :Correct Answer Multiple communication channels Your Answer Multiple communication channels

Multiple Choice Single Answer Question During training, free exchange of ideas should :Correct Answer Deserve top attention Your Answer Deserve top attention

Select The Blank Question Dependability is a ________. Correct Answer Assessment factor Your Answer Merit quality

Multiple Choice Single Answer Question Self assessment is :Correct Answer The best assessment Your Answer The best assessment

Multiple Choice Multiple Answer Question A good manager :Correct Answer Applies his thoughts , Applies his knowledge , Is willing to overcome speed breakers Your Answer Applies his thoughts , Applies his knowledge , Is willing to overcome speed breakers Multiple Choice Single Answer Question In taking care of future needs, the race is between :Correct Answer Capable junior vs experienced senior Your Answer Capable junior vs experienced senior

Multiple Choice Single Answer Question Long term training plans :Correct Answer Need vision and planning Your Answer Need vision and planning

Multiple Choice Single Answer Question People bring :Correct Answer Variety of skills with them to the workplace Your Answer Variety of skills with them to the workplace

Multiple Choice Multiple Answer Question The atmosphere during counseling should be :Correct Answer Informal , Friendly Your Answer Informal , Friendly

Select The Blank Question In addition to managerial functions, other areas of equal concern in PA are ________. Correct Answer Personality, maturity, intelligence, loyalty, co-operation etc. Your Answer Personality, maturity, intelligence, loyalty, co-operation etc.

True/False Question

People resist the way in which a change is introduced.

Correct Answer True Your Answer True

Select The Blank Question Majority of people believe in ________. Correct Answer Steady pattern and steady growth Your Answer Steady pattern and steady growth

Select The Blank Question Managers should guide changes in organizations in such a way that ________ Correct Answer Worker performance and productivity are maximized Your Answer Worker performance and productivity are maximized

Select The Blank Question The person who is going to administer the instrument (questionnaire) must be ________ person. Correct Answer An experienced and well-trained Your Answer True/False Question An experienced and well-trained

Cultural differences exist between various countries and societies. Correct Answer True Your Answer True

Select The Blank Question In the appraisal writing, there should be________. Correct Answer Firmness and punch Your Answer Firmness and punch

Select The Blank Question Every organization has a ________. Correct Answer Business vision

Your Answer

Business vision

Match The Following Question Impact Achievement Control Affection

Correct Answer

Your Answer

Desire to make people do Concern for self-excellence what one thinks is right Concern for selfexcellence To find value-based happiness

Desire for power to control Desire for power to control others others Need to be concerned Need to be concerned

Multiple Choice Multiple Answer Question Managerial skills can be developed by :Correct Answer Consulting , Education , Training Your Answer Consulting , Education , Training

Select The Blank Question We must approach people without preconceptions and concentrate on ________. Correct Answer Performance Your Answer True/False Question Performance

Knowledge of the latest fields helps a great deal in one's field

Correct Answer True Your Answer True

Multiple Choice Multiple Answer Question Spirit of performance is the spirit that :Correct Answer Calls upon a man's reserves of dedication and effort , Motivates Your Answer Motivates , Calls upon a man's reserves of dedication and effort

Multiple Choice Multiple Answer Question When giving presentations :Correct Answer Do preparation , Practice

Your Answer

Do preparation , Practice , Wear attractive clothes

Multiple Choice Single Answer Question In any organization, it is a very common cause to :Correct Answer Get fired for poor performance Your Answer Get fired for poor performance

Match The Following Question

Correct Answer

Your Answer Do what the customers want Upward as well as downward Better managing, elicits commitment, develop effective controls

Businesses from Japan We can learn from the and S.Korea have proved failures of others that There is a shift in demand Upward as well as downward Advantages of goal setting Better managing, elicits are commitment, develop effective controls One guideline for achieving excellence

Identify your weaknesses Identify your weaknesses first first

Select The Blank Question To have competent managers, we need ________. Correct Answer Effective appraisals Your Answer True/False Question Effective appraisals

The letter 'T' in SWOT stands for training

Correct Answer False Your Answer True/False Question False

Men cannot work like machines.

Correct Answer True Your Answer True/False Question True

An executive must see beyond the current problem or situation

and generate new ideas/ practices. Correct Answer True Your Answer True/False Question True

The main purpose of communication in business is to convey certain ideas and messages to the other party. Correct Answer True Your Answer True

Multiple Choice Multiple Answer Question Success can be achieved through :Correct Answer Hard work , Determination , Confidence in your abilities Your Answer Hard work , Determination , Confidence in your abilities

Multiple Choice Multiple Answer Question Every executive's ultimate goal is Correct Answer to maximize pleasure , to minimize pain , to maximize productivity Your Answer to maximize pleasure , to minimize pain Multiple Choice Multiple Answer Question Trade cycle has :Correct Answer Prosperity , Depression , Boom Your Answer Prosperity , Depression , Boom

Multiple Choice Multiple Answer Question MBO is a tool by which managers:Correct Answer Improve their performance , Increase their effectiveness Your Answer Improve their performance , Increase their effectiveness

Multiple Choice Single Answer Question One category of waste is :Correct Answer Rejections of goods for various reasons Your Answer Rejections of goods for various reasons

Multiple Choice Multiple Answer Question Performance review can be :Correct Answer Annual , Continuous , Periodic Your Answer Annual , Continuous , Periodic

Select The Blank Question A superb negotiator manages a response that ________. Correct Answer Brings people together Your Answer Brings people together

LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Single Answer Question For increasing the creative potential :Correct Answer Do job rotation Your Answer Do job rotation

Multiple Choice Multiple Answer Question Changes are occuring at :Correct Answer International level , National level , Technology level Your Answer True/False Question National level , Technology level , International level

Customers pay for waste.

Correct Answer False Your Answer False

Multiple Choice Multiple Answ er Question Knowledge workers will have to be responsible for :Correct Answer More than one job , More than one assignment , More than one career Your Answer More than one job , More than one assignment Select The Blank Question In large-scale organizations, there will be ________. Correct Answer Main and sub-organization charts Your Answer Main and sub-organization charts

Multiple Choice Multiple Answer Question Desire for power is :Correct Answer Desire the power to control others , Desire the power to make an impact on others , Desire the power to do something for others Your Answer Desire the power to control others , Desire the power to make an impact on others Select The Blank Question Success comes by hard work ,________ and confidence in your abilities

Correct Answer Determination Your Answer Determination

Multiple Choice Single Answer Question Progress meetings must be held at :Correct Answer Stipulated time schedules Your Answer True/False Question Stipulated time schedules

A manager's job is to have delighted service to customers.

Correct Answer True Your Answer True

Multiple Choice Single Answer Question Exit interviews will :Correct Answer Reduce staff turnover Your Answer Reduce staff turnover

Multiple Choice Multiple Answer Question During presentation, the main things that will take the audience along is :Correct Answer Presenter's positive attitude , Presenter's energy , Presenter's enthusiasm Your Answer Presenter's enthusiasm , Presenter's positive attitude , Presenter's energy True/False Question While drawing organization charts, care should be taken to see that no important function is omitted from its structure. Correct Answer True Your Answer True

Multiple Choice Multiple Answer Question Good managers are :Correct Answer Proactive , Self-starters Your Answer Proactive , Self-starters

Multiple Choice Multiple Answer

Question

Essential qualities in good communication are :-

Correct Answer Speak and write clearly , Speak and write concisely , Speak and write accurately to match diverse audience needs Your Answer Speak and write clearly , Speak and write concisely , Speak and write accurately to match diverse audience needs True/False Question Two important factors in assessing communication skills are voice and listening skills. Correct Answer True Your Answer True

Multiple Choice Multiple Answer Question Management values :Correct Answer Quality of experience , Ability to deliver , Performance-oriented culture Your Answer Quality of experience , Ability to deliver , Performance-oriented culture Multiple Choice Single Answer Question For selection of faculty, criterion should be :Correct Answer Merit of the trainer Your Answer True/False Question Merit of the trainer

A coach should be a hard judge of himself

Correct Answer True Your Answer True

Select The Blank Question Management is ________. Correct Answer Culture bound Your Answer Culture bound

Multiple Choice Single Answer Question The duration of training will :Correct Answer Vary from system to system Your Answer Vary from system to system

True/False Question

If a person scores nine or ten points on a scale of ten, it means his performance is satisfactory. Correct Answer False Your Answer False

Select The Blank Question When a person's potential is converted into performance, it is called ________ growth. Correct Answer Spontaneous Your Answer Spontaneous

Match The Following Question Performance management system Foster among people Make creativity Potential appraisal has

Correct Answer Is a control tool A passion for work A habit Two-fold objective-to assess the existing performance and to assist organizations to select leaders

Your Answer Is a control tool A passion for work A habit Two-fold objective-to assess the existing performance and to assist organizations to select leaders

Select The Blank Question In order to influence behavior, ________. Correct Answer Be willing to pay generously for achievements Your Answer Be willing to pay generously for achievements

Select The Blank Question The method of implementing MBO will ________. Correct Answer Vary from organization to organization Your Answer Vary from organization to organization

Multiple Choice Single Answer Question The superior and the subordinate managers of an organization :Correct Answer Jointly define its common goals and each individuals major areas of responsibility

Your Answer

Jointly define its common goals and each individuals major areas of responsibility

Select The Blank Question In KRAs, an employee's ________ are listed out. Correct Answer Strengths Your Answer True/False Question Strengths

If wastes are avoided, there will be value adding activity.

Correct Answer True Your Answer True

Select The Blank Question In 360 degree evaluation, systems are ________ Correct Answer Transparent Your Answer Transparent

Multiple Choice Single Answer Question Dynamic growth is :Correct Answer More productive than static perfection Your Answer True/False Question More productive than static perfection

The atmosphere during coaching should be formal and strict

Correct Answer False Your Answer False

Match The Following Question Diversification

Correct Answer Work effectively with people who have diverse ideas, perspectives and values

Your Answer Work effectively with people who have diverse ideas, perspectives and values

Self management

First manage the self then First manage the self then manage others manage others

Initiation Team work

Be pro-active Individual performance alone is not enough. Together, organisation should achieve

Be pro-active Individual performance alone is not enough. Together, organisation should achieve

Select The Blank Question In appraisals, there are ________. Correct Answer Objective facts Your Answer Objective facts

Multiple Choice Single Answer Question Every person has a will to set :Correct Answer Challenging goals for the self Your Answer True/False Question Challenging goals for the self

The context in which assessments are made may vary from place to place. Correct Answer True Your Answer True

Multiple Choice Single Answer Question An essential foundation for motivation is :Correct Answer A positive workplace environment Your Answer True/False Question Decent salary

The universal principle is 'The Best Never Stays at one place'.

Correct Answer True Your Answer True

Multiple Choice Single Answer Question To be a good decision maker one should :Correct Answer Be optimistic

Your Answer

Be optimistic

Multiple Choice Multiple Answer Question A manager should be able to :Correct Answer Organize , Plan , Direct Your Answer Organize , Plan , Direct

Multiple Choice Multiple Answer Question The essentials of a good appraisal system are :Correct Answer It should be fit for the organization's existing operations , It should take care of the organization's future needs , It should be easily understandable Your Answer It should be fit for the organization's existing operations , It should take care of the organization's future needs , It should be easily understandable Select The Blank Question In terms of man-days, the range for training is ________ days per year. Correct Answer Four to twenty Your Answer Thirty to forty

Multiple Choice Single Answer Question Self-awareness is :Correct Answer The best awareness Your Answer The best awareness

Multiple Choice Multiple Answer Question People normally respond best to :Correct Answer Fair treatment , Equitable treatment Your Answer Fair treatment , Equitable treatment

Multiple Choice Multiple Answer Question Benefits of performance planning are :Correct Answer It takes time initially but saves at the end , It is an indispensable function , It increases the probability of setting challenging and realistic objectives Your Answer It takes time initially but saves at the end , It increases the probability of setting challenging and realistic objectives , It

imparts training Select The Blank Question For good performance planning ________ and sympathies Correct Answer Empathies Your Answer Empathies

Multiple Choice Single Answer Question Performance management is a :Correct Answer HRD technique Your Answer HRD technique

Multiple Choice Multiple Answer Question The net result of adopting Japanese techniques to improve productivity is:Correct Answer Improved morale , Better productivity Your Answer Lower costs , Better productivity

LIST OF ATTEMPTED QUESTIONS AND ANSWERS Select The Blank Question Communication is the transfer of ideas from ________. Correct Answer One mind to the other mind Your Answer One mind to the other mind

Multiple Choice Single Answer Question The average life expectancy of a successful business is :Correct Answer About thirty years Your Answer About fifty years

Multiple Choice Single Answer Question A good appraisal system should be :Correct Answer Feasible to implement Your Answer Quick to implement

Multiple Choice Single Answer Question Good performers are :Correct Answer Problem solvers as well as opportunity seekers Your Answer Problem solvers as well as opportunity seekers

Multiple Choice Multiple Answer Question Communication skills include :Correct Answer Impressive oral/ written communication skills , Effective listening , Presentation skills Your Answer Impressive oral/ written communication skills , Effective listening , Presentation skills Multiple Choice Single Answer Question Self assessment is :Correct Answer The best assessment Your Answer The best assessment

Multiple Choice Single Answer

Question

The reporting method used in the costing system should be based on the principle of :Correct Answer Management by exception Your Answer Management by exception

Select The Blank Question Every manager has to be ________ seeker.. Correct Answer An opportunity Your Answer True/False Question An opportunity

Only the concerned individual knows his best level of performance. Correct Answer True Your Answer True

Select The Blank Question Incentive is ________. Correct Answer A process adopted to motivate a person to work Your Answer True/False Question A process adopted to motivate a person to work

The crux of counseling is trust

Correct Answer True Your Answer True

Select The Blank Question The assessment factor ________ indicates the person's problem solving ability, instructions following reliability etc. Correct Answer Work practices Your Answer Work practices

Multiple Choice Multiple Answer Question A good manager :Correct Answer Applies his thoughts , Applies his knowledge , Is willing to overcome speed breakers Your Answer Applies his thoughts , Applies his knowledge , Is willing to overcome speed breakers

Multiple Choice Multiple Answer Question When doing performance planning, adopt :Correct Answer Enthusiastic communication style , Alert communication style , Exciting communication style Your Answer Enthusiastic communication style , Alert communication style , Exciting communication style True/False Question

The main purpose of communication in business is to convey certain ideas and messages to the other party. Correct Answer True Your Answer True

Select The Blank Question Performance is a ________ word Correct Answer Magic Your Answer Taboo

Match The Following Question Sales objectives Production objectives Design objectives Planning objectives

Correct Answer Are linked with service objectives

Your Answer Are linked with marketing objectives

Are linked with marketing Are linked with materials objectives objectives Are linked with testing Are linked with materials objectives Are linked with testing Are dependent on the objectives of every department

Select The Blank Question KAIZEN is a ________ technique Correct Answer Japanese Your Answer Japanese

Multiple Choice Multiple Answer Question Stages in performance improvement are:Correct Answer Thinking differently , Feeling differently , Behaving differently

Your Answer

Thinking differently , Feeling differently , Behaving differently

Select The Blank Question Potential appraisal has ________ objectives Correct Answer Two fold Your Answer Two fold

Multiple Choice Multiple Answer Question Some famous value-driven corporate leaders who serve as role models are :Correct Answer Mr. Ratan D.Tata , Late Mr. S.L. Kirloskar , Mr. Mukesh Ambani Your Answer Mr. Ratan D.Tata , Late Mr. S.L. Kirloskar , Mr. Mukesh Ambani

Multiple Choice Multiple Answer Question No individual or organization would like to be :Correct Answer Static , Stagnant Your Answer Static , Stagnant

Select The Blank Question Every problem has a ________ Correct Answer Solution Your Answer Solution

Multiple Choice Single Answer Question The manager's job is to know the existing performance level of his sub-ordinates and:Correct Answer Help him to take to a higher level Your Answer Help him to take to a higher level

Multiple Choice Single Answer Question Any progressive organization is concerned about :Correct Answer Employee development Your Answer Employee development

Multiple Choice Multiple Answer Question Managerial skills can be developed by :-

Correct Answer Consulting , Education , Training Your Answer True/False Question Consulting , Education , Training

Men cannot work like machines.

Correct Answer True Your Answer True/False Question True

The atmosphere during coaching should be formal and strict

Correct Answer False Your Answer False

Multiple Choice Single Answer Question An organization's performance is :Correct Answer Is the performance of the human beings Your Answer True/False Question Is the performance of the human beings

If wastes are avoided, there will be value adding activity.

Correct Answer True Your Answer True

Multiple Choice Single Answer Question The functional heads in an organization :Correct Answer Must join hands and look like one entity Your Answer Must join hands and look like one entity

Multiple Choice Single Answer Question Self assessment process has :Correct Answer Five steps Your Answer True/False Five steps

Question

A rigid climate has to be created to be able to understand the career of the employee Correct Answer False Your Answer False

Select The Blank Question Every problem has a ________ Correct Answer Lifespan Your Answer Lifespan

Multiple Choice Multiple Answer Question Success can be achieved through :Correct Answer Hard work , Determination , Confidence in your abilities Your Answer Hard work , Determination , Confidence in your abilities

Match The Following Question Impact Achievement Control Affection

Correct Answer

Your Answer

Desire to make people do Desire to make people do what one thinks is right what one thinks is right Concern for selfexcellence Concern for self-excellence

Desire for power to control Desire for power to control others others Need to be concerned Need to be concerned

True/False Question

Two important factors in assessing communication skills are voice and listening skills. Correct Answer True Your Answer True

Multiple Choice Single Answer Question Before deciding on our career options, what one should do? Correct Answer Analyse our strengths as well as our limitations Your Answer Analyse our strengths as well as our limitations

Multiple Choice Multiple Answer

Question

The reasons for making appraisals are :-

Correct Answer To know existing quality of managers , To put the right man for the right job , To re-structure the organization Your Answer To know existing quality of managers , To put the right man for the right job , To re-structure the organization Multiple Choice Multiple Answer Question Management values :Correct Answer Quality of experience , Ability to deliver , Performance-oriented culture Your Answer Quality of experience , Ability to deliver , Performance-oriented culture Multiple Choice Single Answer Question 360 degrees evaluation method is :Correct Answer Generally useful to assess Senior executives Your Answer Generally useful to all staff at all levels

Select The Blank Question Once change is accepted there will be ________ leading to superior performance. Correct Answer Better customer satisfaction Your Answer Better customer satisfaction

Select The Blank Question The person who is going to administer the instrument (questionnaire) must be ________ person. Correct Answer An experienced and well-trained Your Answer True/False Question An experienced and well-trained

A coach should be a hard judge of himself

Correct Answer True Your Answer True

Multiple Choice Multiple Answer Question The stages in feedback are Correct Answer Planning , Implementation , Result

Your Answer

Planning , Implementation , Result

Multiple Choice Multiple Answer Question The atmosphere during counseling should be Correct Answer informal , friendly Your Answer True/False Question informal , friendly

Change means deviation in today's practice towards better.

Correct Answer True Your Answer True

LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Multiple Answer Question A person's technical functional skills can be gauged by :Correct Answer His technical proficiency , His quick identification of business problems , His logical conclusions Your Answer His logical conclusions , His technical proficiency , His quick identification of business problems Match The Following Question Professional design Machine design Entrepreneurial design Team work design

Correct Answer Standardization of skills Standardization of work Quick design with timebased urgency Standardization of performance goals

Your Answer Standardization of work Standardization of skills Quick design with timebased urgency Individualistic

Multiple Choice Multiple Answer Question People who have a security viewpoint :Correct Answer Are not likely to pioneer , Are not likely to innovate , Are not likely to reach out for the new Your Answer Are not likely to pioneer , Are not likely to innovate , Are not likely to reach out for the new Multiple Choice Single Answer Question Appraisals are truly effective when :Correct Answer They are tied with the reward system Your Answer They are tied with the reward system

Multiple Choice Multiple Answer Question The net result of adopting Japanese techniques to improve productivity is Correct Answer improved morale , better productivity Your Answer improved morale , better productivity

Multiple Choice Single Answer Question Result is a combination of :-

Correct Answer Excitement, challenge and satisfaction of achievement Your Answer Excitement, challenge and satisfaction of achievement

Multiple Choice Single Answer Question Progress meetings must be held at :Correct Answer Stipulated time schedules Your Answer Stipulated time schedules

Multiple Choice Multiple Answer Question People normally respond best to :Correct Answer Fair treatment , Equitable treatment Your Answer True/False Question Fair treatment , Equitable treatment

To make a person an example for others, he must take pride in self motivation. Correct Answer True Your Answer True

Select The Blank Question Independence is the desire for ________ Correct Answer Self reliance Your Answer Self reliance

Select The Blank Question In terms of man-days, the range for training is ________ days per year. Correct Answer Four to twenty Your Answer True/False Question Four to twenty

While drawing organization charts, care should be taken to see that no important function is omitted from its structure. Correct Answer True Your Answer True

Select The Blank

Question

Compensation should be directly connected with ________.

Correct Answer The objectives set earlier for the manager's job Your Answer The objectives set earlier for the manager's job

Match The Following Question Performance management system Foster among people Make creativity Potential appraisal has

Correct Answer Is a control tool A passion for work A habit Two-fold objective-to assess the existing performance and to assist organizations to select leaders

Your Answer Is a control tool A passion for work A habit Two-fold objective-to assess the existing performance and to assist organizations to select leaders

True/False Question

Theory is painless, practice is painful.

Correct Answer True Your Answer True

Multiple Choice Multiple Answer Question Organization systems need to be constantly reviewed because of change in :Correct Answer Demand/supply chain , Customer satisfaction levels , Globalization Your Answer Government policies , Demand/supply chain , Customer satisfaction levels True/False Question

If a person scores nine or ten points on a scale of ten, it means his performance is satisfactory. Correct Answer False Your Answer False

Select The Blank Question A superb negotiator manages a response that ________. Correct Answer Brings people together

Your Answer

Brings people together

Select The Blank Question ________ organization charts in order to maintain organizational efficiency. Correct Answer Constant improvements should be made in Your Answer Constant improvements should be made in

Multiple Choice Single Answer Question Key to effective leadership :Correct Answer Master a wide range of skills Your Answer Master a wide range of skills

Multiple Choice Multiple Answer Question Benefits of performance planning are :Correct Answer It takes time initially but saves at the end , It is an indispensable function , It increases the probability of setting challenging and realistic objectives Your Answer It takes time initially but saves at the end , It is an indispensable function , It increases the probability of setting challenging and realistic objectives Multiple Choice Single Answer Question Performance management is a :Correct Answer HRD technique Your Answer True/False Question HRD technique

Knowledge of the latest fields helps a great deal in one's field

Correct Answer True Your Answer True

Multiple Choice Single Answer Question Performance appraisal is also known as:Correct Answer Merit rating Your Answer Merit rating

Multiple Choice Multiple Answer Question When giving presentations :Correct Answer Do preparation , Practice Your Answer Do preparation , Practice

Multiple Choice Multiple Answer Question Information sources for finding career options are :Correct Answer Internet , Friends and acquaintances involved in various professions , Television Your Answer Television , Internet , Friends and acquaintances involved in various professions Multiple Choice Single Answer Question Merit rating refers to :Correct Answer What the employee is Your Answer What the employee is

Select The Blank Question Success comes by hard work ,________ and confidence in your abilities Correct Answer Determination Your Answer Determination

Select The Blank Question In large-scale organizations, there will be ________. Correct Answer Main and sub-organization charts Your Answer Main and sub-organization charts

Multiple Choice Multiple Answer Question Faces in problem solving are :Correct Answer Nesting , Testing , Arresting Your Answer True/False Question Nesting , Testing , Arresting

When presenting, close the presentation abruptly.

Correct Answer False

Your Answer True/False Question

False

It is not advisable to copy the PA system of any other company.

Correct Answer True Your Answer True/False Question True

If a supervisor is convinced about the success of his subordinates, he must ensure that they get rewards. Correct Answer True Your Answer True

True/False Question

Value-based happiness can be sought by directly aiming for it.

Correct Answer False Your Answer True/False Question False

Cultural differences exist between various countries and societies. Correct Answer True Your Answer True

Multiple Choice Single Answer Question Human resource is :Correct Answer The most valuable asset but is also likely to be the most wasted one Your Answer The most valuable asset but is also likely to be the most wasted one Multiple Choice Multiple Answer Question Realistic career assessment involves :Correct Answer Understanding strengths , Recognizing limitations , Identifying with successful role models Your Answer Understanding strengths , Recognizing limitations , Identifying with successful role models Multiple Choice Multiple Answer

Question

Good managers are :-

Correct Answer Proactive , Self-starters Your Answer Proactive , Self-starters

Select The Blank Question A manager should promptly share all technical information ________. Correct Answer With his subordinates and bosses Your Answer With his subordinates and bosses

Multiple Choice Multiple Answer Question A resume should be summary of :Correct Answer One's skills , One's accomplishments , One's education Your Answer One's skills , One's accomplishments , One's education

Multiple Choice Single Answer Question For peak performance :Correct Answer Every team member has to be motivated Your Answer Every team member has to be motivated

Multiple Choice Single Answer Question Performance is :Correct Answer Consistent ability to produce results over prolonged periods of time Your Answer To work in a variety of assignments Multiple Choice Single Answer Question For increasing the creative potential :Correct Answer Do job rotation Your Answer Do job rotation

Select The Blank Question In addition to managerial functions, other areas of equal concern in PA are ________. Correct Answer Personality, maturity, intelligence, loyalty, co-operation etc. Your Answer Personality, maturity, intelligence, loyalty, co-operation etc.

Select The Blank Question In the appraisal writing, there should be________. Correct Answer Firmness and punch Your Answer Firmness and punch

Select The Blank Question To increase creativity ________ with R&D Correct Answer Experiment Your Answer Experiment

Multiple Choice Single Answer Question An Appraisal is a :Correct Answer Judgment Your Answer Programme

LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Single Answer Question For selection of faculty, criterion should be :Correct Answer Merit of the trainer Your Answer Merit of the trainer

Multiple Choice Single Answer Question Long term training plans :Correct Answer Need vision and planning Your Answer Need vision and planning

Multiple Choice Single Answer Question Result is a combination of :Correct Answer Excitement, challenge and satisfaction of achievement Your Answer Excitement, challenge and satisfaction of achievement

Multiple Choice Multiple Answer Question Desire for power is :Correct Answer Desire the power to control others , Desire the power to make an impact on others , Desire the power to do something for others Your Answer Desire the power to control others , Desire the power to make an impact on others , Desire the power to do something for others True/False Question The letter 'T' in SWOT stands for training

Correct Answer False Your Answer True/False Question False

People resist the way in which a change is introduced.

Correct Answer True Your Answer True

Multiple Choice Single Answer Question The first essential of a good appraisal system is that it should be easily understood by :Correct Answer Even a common man Your Answer Even a common man

Match The Following Question Diversification

Correct Answer Work effectively with people who have diverse ideas, perspectives and values First manage the self then manage others Be pro-active Individual performance alone is not enough. Together, organisation should achieve

Your Answer Work effectively with people who have diverse ideas, perspectives and values First manage the self then manage others Be pro-active Individual performance alone is not enough. Together, organisation should achieve

Self management Initiation Team work

Multiple Choice Multiple Answer Question A manager should be able to :Correct Answer Organize , Plan , Direct Your Answer Organize , Plan , Direct

Select The Blank Question Majority of people believe in ________. Correct Answer Steady pattern and steady growth Your Answer Steady pattern and steady growth

Select The Blank Question In KRAs, an employee's ________ are listed out. Correct Answer Strengths Your Answer Strengths

Match The Following

Question

Correct Answer

Your Answer We can learn from the failures of others Upward as well as downward

Businesses from Japan We can learn from the and S.Korea have failures of others proved that There is a shift in demand Advantages of goal setting are One guideline for achieving excellence Upward as well as downward

Better managing, elicits Better managing, elicits commitment, develop commitment, develop effective controls effective controls Identify your weaknesses first Identify your weaknesses first

Multiple Choice Single Answer Question For increasing the creative potential :Correct Answer Do job rotation Your Answer Do job rotation

Multiple Choice Single Answer Question To achieve excellence, a manager should:Correct Answer Have a vision Your Answer Have a vision

Multiple Choice Single Answer Question The objective of potential appraisal is :Correct Answer To make a projection Your Answer True/False Question To make a projection

Appraisals are one of the means of getting yourself formally assessed by your seniors Correct Answer True Your Answer True

Multiple Choice Single Answer Question Good managers are :Correct Answer Good in both planning and in execution

Your Answer

Good in both planning and in execution

Select The Blank Question Communication is the transfer of ideas from ________. Correct Answer One mind to the other mind Your Answer One mind to the other mind

Multiple Choice Multiple Answer Question During presentations, the aids used are :Correct Answer Audio-visual aids , Case studies , Instruments/ questionnaires Your Answer Audio-visual aids , Case studies , Instruments/ questionnaires Multiple Choice Single Answer Question KRA stands for :Correct Answer Key Result Areas Your Answer Key Result Areas

Multiple Choice Single Answer Question People bring :Correct Answer Variety of skills with them to the workplace Your Answer Variety of skills with them to the workplace

Multiple Choice Single Answer Question The reporting method used in the costing system should be based on the principle of :Correct Answer Management by exception Your Answer Management by objectives

Multiple Choice Multiple Answer Question Superiors, in consultation with subordinates can :Correct Answer Set objectives , Measure objectives , Evaluate progress Your Answer True/False Set objectives , Measure objectives , Distribute objectives

Question

Indian industries are not undergoing any cultural change after globalization. Correct Answer False Your Answer False

Select The Blank Question In coaching do not be ________ Correct Answer Boastful Your Answer Boastful

Multiple Choice Single Answer Question Training is essential, but there is:Correct Answer No substitute for experience Your Answer No substitute for experience

Multiple Choice Multiple Answer Question Essential qualities in good communication are :Correct Answer Speak and write clearly , Speak and write concisely , Speak and write accurately to match diverse audience needs Your Answer Speak and write clearly , Speak and write concisely , Speak and write accurately to match diverse audience needs Multiple Choice Multiple Answer Question Information sources for finding career options are :Correct Answer Television , Internet , Friends and acquaintances involved in various professions Your Answer Television , Internet , Friends and acquaintances involved in various professions True/False Question

If a supervisor is convinced about the success of his subordinates, he must ensure that they get rewards. Correct Answer True Your Answer True

True/False

Question

In communication, use simple direct sentences.

Correct Answer True Your Answer True

Select The Blank Question Assessment Centers method of PA is a useful method for ________. Correct Answer Internal promotions Your Answer Internal promotions

Multiple Choice Multiple Answer Question When coaching :Correct Answer Share the credit for achievement , Admit failings , Have a good idea of what you want to achieve and why Your Answer Admit failings , Have a good idea of what you want to achieve and why , Share the credit for achievement Select The Blank Question ________ organization charts in order to maintain organizational efficiency. Correct Answer Constant improvements should be made in Your Answer Constant improvements should be made in

Multiple Choice Single Answer Question Key to effective leadership :Correct Answer Master a wide range of skills Your Answer Master a wide range of skills

Multiple Choice Multiple Answer Question System is :Correct Answer A total approach to a problem , Comprehensive , A combination of interrelated procedures Your Answer A total approach to a problem , Comprehensive , A combination of interrelated procedures Select The Blank Question In 360 degree evaluation, systems are ________ Correct Answer Transparent

Your Answer

Transparent

Multiple Choice Multiple Answer Question Some performance parameters are :Correct Answer Technical knowledge , Self-management , People development Your Answer Technical knowledge , Self-management , People development Multiple Choice Single Answer Question The trainer assumes the responsibility of:Correct Answer Influencing the trainees under him Your Answer True/False Question Influencing the trainees under him

The job of a boss is to keep finding fault in his employees

Correct Answer False Your Answer False

Multiple Choice Single Answer Question How many steps are there in appraisal process? Correct Answer Five Your Answer Five

Select The Blank Question One type of training need is________. Correct Answer Campaign programme Your Answer Outcome evaluation

Select The Blank Question The person who is going to administer the instrument (questionnaire) must be ________ person. Correct Answer An experienced and well-trained Your Answer An experienced and well-trained

Multiple Choice Single Answer

Question

A good appraisal system :-

Correct Answer Defines responsibility Your Answer Defines responsibility

Select The Blank Question In the appraisal writing, there should be________. Correct Answer Firmness and punch Your Answer Firmness and punch

Multiple Choice Single Answer Question When you are preparing your resume :Correct Answer Sell yourself by creating a good first impression Your Answer Sell yourself by creating a good first impression

Multiple Choice Single Answer Question To understand the term 'appraisal' :Correct Answer One should know the term merit rating Your Answer True/False Question One should know about commodity rating

Change means deviation in today's practice towards better. Correct Answer True Your Answer True

True/False Question

Theory is painless, practice is painful.

Correct Answer True Your Answer True

Multiple Choice Single Answer Question Career assessment process should be :Correct Answer An open-ended process Your Answer An open-ended process

Select The Blank Question Compensation should be directly connected with ________. Correct Answer The objectives set earlier for the manager's job Your Answer Salary

Multiple Choice Single Answer Question A good appraisal system :Correct Answer Defines responsibility Your Answer Defines responsibility

Multiple Choice Multiple Answer Question Benefits of performance planning are :Correct Answer It takes time initially but saves at the end , It is an indispensable function , It increases the probability of setting challenging and realistic objectives Your Answer It takes time initially but saves at the end , It increases the probability of setting challenging and realistic objectives , It imparts training True/False Question

While drawing organization charts, care should be taken to see that no important function is omitted from its structure. Correct Answer True Your Answer True

Multiple Choice Single Answer Question A person with poor merit quality will score:Correct Answer Zero points on a scale of ten

Your Answer

Zero points on a scale of ten

Multiple Choice Multiple Answer Question A manager should be able to :Correct Answer Organize , Plan , Direct Your Answer Organize , Plan , Direct

Select The Blank Question Every problem has a ________ Correct Answer Lifespan Your Answer True/False Question Lifespan

People resist the way in which a change is introduced.

Correct Answer True Your Answer True

Select The Blank Question In coaching do not be ________ Correct Answer Boastful Your Answer Boastful

Multiple Choice Multiple Answer Question People normally respond best to :Correct Answer Fair treatment , Equitable treatment Your Answer True/False Question Fair treatment , Equitable treatment

Irrespective of one's age, one must fulfill certain social responsibilities. Correct Answer True Your Answer True

Multiple Choice Multiple Answer Question The net result of adopting Japanese techniques to improve productivity is:-

Correct Answer Improved morale , Better productivity Your Answer True/False Question Improved morale , Lower costs , Better productivity

If a supervisor is convinced about the success of his subordinates, he must ensure that they get rewards. Correct Answer True Your Answer True

True/False Question

Cultural differences exist between various countries and societies.

Correct Answer True Your Answer True

Multiple Choice Single Answer Question For peak performance :Correct Answer Every team member has to be motivated Your Answer Every team member has to be motivated

Select The Blank Question To have competent managers, we need ________. Correct Answer Effective appraisals Your Answer Effective appraisals

Select The Blank Question ________ organization charts in order to maintain organizational efficiency. Correct Answer Constant improvements should be made in Your Answer Constancy should be maintained in

Select The Blank Question Tranquility is the desire for ________ Correct Answer Emotional calm Your Answer Emotional calm

Select The Blank

Question

Computer graphics is ________.

Correct Answer A useful audio-visual aid in which software is used to display graphs, charts etc. Your Answer A useful audio-visual aid in which software is used to display graphs, charts etc. Multiple Choice Single Answer Question One for the three fundamental questions which should be asked regarding training evaluation is :Correct Answer What needs to be changed Your Answer What needs to be changed

Multiple Choice Single Answer Question Communication skills indicate :Correct Answer Effective listening Your Answer Effective listening

Multiple Choice Single Answer Question KRA stands for :Correct Answer Key Result Areas Your Answer Key Result Areas

Multiple Choice Multiple Answer Question Trade cycle has :Correct Answer Prosperity , Depression , Boom Your Answer True/False Question Prosperity , Depression , Boom

Change means deviation in today's practice towards better.

Correct Answer True Your Answer True/False Question True

When presenting, close the presentation abruptly.

Correct Answer False Your Answer False

Multiple Choice Multiple Answer Question Communication skills include :Correct Answer Impressive oral/ written communication skills , Effective listening , Presentation skills Your Answer Impressive oral/ written communication skills , Effective listening , Presentation skills Multiple Choice Single Answer Question Every person has a will to set :Correct Answer Challenging goals for the self Your Answer Impossible goals for the self

Select The Blank Question Every problem has a ________ Correct Answer Solution Your Answer True/False Question Solution

Manager and follower may negotiate only for what the manager is going to contribute Correct Answer False Your Answer False

Multiple Choice Single Answer Question An essential foundation for motivation is :Correct Answer A positive workplace environment Your Answer A positive workplace environment

Multiple Choice Multiple Answer Question Faces in problem solving are :Correct Answer Nesting , Testing , Arresting Your Answer Nesting , Testing , Harvesting

Select The Blank Question The assessment factor ________ indicates the person's problem solving ability, instructions following reliability etc.

Correct Answer Work practices Your Answer Self development

Multiple Choice Multiple Answer Question During presentation, the main things that will take the audience along is :Correct Answer Presenter's enthusiasm , Presenter's positive attitude , Presenter's energy Your Answer Presenter's enthusiasm , Presenter's positive attitude , Presenter's energy , Presenter's listening skills Select The Blank Question Majority of people believe in ________. Correct Answer Steady pattern and steady growth Your Answer Steady pattern and steady growth

Multiple Choice Multiple Answer Question Information sources for finding career options are :Correct Answer Television , Internet , Friends and acquaintances involved in various professions Your Answer Television , Internet , Friends and acquaintances involved in various professions Multiple Choice Multiple Answer Question Whenever excellence appears it must be:Correct Answer Recognized , Encouraged , Rewarded Your Answer Recognized , Encouraged , Rewarded

Multiple Choice Multiple Answer Question Realistic career assessment involves :Correct Answer Understanding strengths , Recognizing limitations , Identifying with successful role models Your Answer Understanding strengths , Recognizing limitations , Identifying with successful role models Multiple Choice Multiple Answer Question When doing performance planning, adopt :Correct Answer Enthusiastic communication style , Alert communication style , Exciting communication style Your Answer Enthusiastic communication style , Alert communication style , Modern techniques

Match The Following Question

Correct Answer

Your Answer A central waste

Waiting time, watching time, Not value adding activities walking time etc. are Waste means Overproduction is

Adding cost but not adding A waste value A central waste Adding value Adding cost but not adding value

Duplication of paper work is A waste

Select The Blank Question Success comes by hard work ,________ and confidence in your abilities Correct Answer Determination Your Answer Determination

Match The Following Question

Correct Answer

Your Answer Two-fold objective-to assess the existing performance and to assist organizations to select leaders To keep creativity within the desired limits A habit Is a control tool

Performance management Is a control tool system

Foster among people Make creativity Potential appraisal has

A passion for work A habit Two-fold objective-to assess the existing performance and to assist organizations to select leaders

Multiple Choice Single Answer Question Professional design should be :Correct Answer Process design with learned competence Your Answer True/False Question Process design with learned competence

Employees should feel self-motivated to acquire new skills.

Correct Answer True

Your Answer

True

Multiple Choice Single Answer Question MBO technique has undergone modification over the :Correct Answer Last two decades Your Answer Last one decade

Multiple Choice Single Answer Question Performance management is a :Correct Answer HRD technique Your Answer HRD technique

LIST OF ATTEMPTED QUESTIONS AND ANSWERS Multiple Choice Single Answer Question For selection of faculty, criterion should be :Correct Answer Merit of the trainer Your Answer Merit of the trainer

Multiple Choice Single Answer Question Long term training plans :Correct Answer Need vision and planning Your Answer Need vision and planning

Multiple Choice Single Answer Question Result is a combination of :Correct Answer Excitement, challenge and satisfaction of achievement Your Answer Excitement, challenge and satisfaction of achievement

Multiple Choice Multiple Answer Question Desire for power is :Correct Answer Desire the power to control others , Desire the power to make an impact on others , Desire the power to do something for others Your Answer Desire the power to control others , Desire the power to make an impact on others , Desire the power to do something for others True/False Question The letter 'T' in SWOT stands for training

Correct Answer False Your Answer True/False Question False

People resist the way in which a change is introduced.

Correct Answer True Your Answer True

Multiple Choice Single Answer Question The first essential of a good appraisal system is that it should be easily understood by :Correct Answer Even a common man Your Answer Even a common man

Match The Following Question Diversification

Correct Answer Work effectively with people who have diverse ideas, perspectives and values First manage the self then manage others Be pro-active Individual performance alone is not enough. Together, organisation should achieve

Your Answer Work effectively with people who have diverse ideas, perspectives and values First manage the self then manage others Be pro-active Individual performance alone is not enough. Together, organisation should achieve

Self management Initiation Team work

Multiple Choice Multiple Answer Question A manager should be able to :Correct Answer Organize , Plan , Direct Your Answer Organize , Plan , Direct

Select The Blank Question Majority of people believe in ________. Correct Answer Steady pattern and steady growth Your Answer Steady pattern and steady growth

Select The Blank Question In KRAs, an employee's ________ are listed out. Correct Answer Strengths Your Answer Strengths

Match The Following

Question

Correct Answer

Your Answer We can learn from the failures of others Upward as well as downward

Businesses from Japan We can learn from the and S.Korea have failures of others proved that There is a shift in demand Advantages of goal setting are One guideline for achieving excellence Upward as well as downward

Better managing, elicits Better managing, elicits commitment, develop commitment, develop effective controls effective controls Identify your weaknesses first Identify your weaknesses first

Multiple Choice Single Answer Question For increasing the creative potential :Correct Answer Do job rotation Your Answer Do job rotation

Multiple Choice Single Answer Question To achieve excellence, a manager should:Correct Answer Have a vision Your Answer Have a vision

Multiple Choice Single Answer Question The objective of potential appraisal is :Correct Answer To make a projection Your Answer True/False Question To make a projection

Appraisals are one of the means of getting yourself formally assessed by your seniors Correct Answer True Your Answer True

Multiple Choice Single Answer Question Good managers are :Correct Answer Good in both planning and in execution

Your Answer

Good in both planning and in execution

Select The Blank Question Communication is the transfer of ideas from ________. Correct Answer One mind to the other mind Your Answer One mind to the other mind

Multiple Choice Multiple Answer Question During presentations, the aids used are :Correct Answer Audio-visual aids , Case studies , Instruments/ questionnaires Your Answer Audio-visual aids , Case studies , Instruments/ questionnaires Multiple Choice Single Answer Question KRA stands for :Correct Answer Key Result Areas Your Answer Key Result Areas

Multiple Choice Single Answer Question People bring :Correct Answer Variety of skills with them to the workplace Your Answer Variety of skills with them to the workplace

Multiple Choice Single Answer Question The reporting method used in the costing system should be based on the principle of :Correct Answer Management by exception Your Answer Management by objectives

Multiple Choice Multiple Answer Question Superiors, in consultation with subordinates can :Correct Answer Set objectives , Measure objectives , Evaluate progress Your Answer True/False Set objectives , Measure objectives , Distribute objectives

Question

Indian industries are not undergoing any cultural change after globalization. Correct Answer False Your Answer False

Select The Blank Question In coaching do not be ________ Correct Answer Boastful Your Answer Boastful

Multiple Choice Single Answer Question Training is essential, but there is:Correct Answer No substitute for experience Your Answer No substitute for experience

Multiple Choice Multiple Answer Question Essential qualities in good communication are :Correct Answer Speak and write clearly , Speak and write concisely , Speak and write accurately to match diverse audience needs Your Answer Speak and write clearly , Speak and write concisely , Speak and write accurately to match diverse audience needs Multiple Choice Multiple Answer Question Information sources for finding career options are :Correct Answer Television , Internet , Friends and acquaintances involved in various professions Your Answer Television , Internet , Friends and acquaintances involved in various professions True/False Question

If a supervisor is convinced about the success of his subordinates, he must ensure that they get rewards. Correct Answer True Your Answer True

True/False

Question

In communication, use simple direct sentences.

Correct Answer True Your Answer True

Select The Blank Question Assessment Centers method of PA is a useful method for ________. Correct Answer Internal promotions Your Answer Internal promotions

Multiple Choice Multiple Answer Question When coaching :Correct Answer Share the credit for achievement , Admit failings , Have a good idea of what you want to achieve and why Your Answer Admit failings , Have a good idea of what you want to achieve and why , Share the credit for achievement Select The Blank Question ________ organization charts in order to maintain organizational efficiency. Correct Answer Constant improvements should be made in Your Answer Constant improvements should be made in

Multiple Choice Single Answer Question Key to effective leadership :Correct Answer Master a wide range of skills Your Answer Master a wide range of skills

Multiple Choice Multiple Answer Question System is :Correct Answer A total approach to a problem , Comprehensive , A combination of interrelated procedures Your Answer A total approach to a problem , Comprehensive , A combination of interrelated procedures Select The Blank Question In 360 degree evaluation, systems are ________ Correct Answer Transparent

Your Answer

Transparent

Multiple Choice Multiple Answer Question Some performance parameters are :Correct Answer Technical knowledge , Self-management , People development Your Answer Technical knowledge , Self-management , People development Multiple Choice Single Answer Question The trainer assumes the responsibility of:Correct Answer Influencing the trainees under him Your Answer True/False Question Influencing the trainees under him

The job of a boss is to keep finding fault in his employees

Correct Answer False Your Answer False

Multiple Choice Single Answer Question How many steps are there in appraisal process? Correct Answer Five Your Answer Five

Select The Blank Question One type of training need is________. Correct Answer Campaign programme Your Answer Outcome evaluation

Select The Blank Question The person who is going to administer the instrument (questionnaire) must be ________ person. Correct Answer An experienced and well-trained Your Answer An experienced and well-trained

Multiple Choice Single Answer

Question

A good appraisal system :-

Correct Answer Defines responsibility Your Answer Defines responsibility

Select The Blank Question In the appraisal writing, there should be________. Correct Answer Firmness and punch Your Answer Firmness and punch

Multiple Choice Single Answer Question When you are preparing your resume :Correct Answer Sell yourself by creating a good first impression Your Answer Sell yourself by creating a good first impression

Multiple Choice Single Answer Question To understand the term 'appraisal' :Correct Answer One should know the term merit rating Your Answer True/False Question One should know about commodity rating

Change means deviation in today's practice towards better. Correct Answer True Your Answer True

Performance & Potential Management


List of Attempted Questions and Answers

Multiple Choice Multiple Answer Question Correct Answer Select The Blank Question Correct Answer True/False Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer Match The Following Question Businesses from Japan and S.Korea have proved that There is a shift in demand Advantages of goal setting are One guideline for achieving excellence Select The Blank Question Correct Answer True/False Question Correct Answer True/False

Managerial skills can be developed by :Consulting , Education , Training We must approach people without preconceptions and concentrate on ________. Performance Knowledge of the latest fields helps a great deal in one's field True When giving presentations :Do preparation , Practice In any organization, it is a very common cause to :Get fired for poor performance Correct Answer We can learn from the failures of others Upward as well as downward Better managing, elicits commitment, develop effective controls Identify your weaknesses first To have competent managers, we need ________. Effective appraisals The letter 'T' in SWOT stands for training False

Question Correct Answer True/False Question Correct Answer True/False Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer Select The Blank Question Correct Answer Multiple Choice Single Answer Question

Men cannot work like machines. True An executive must see beyond the current problem or situation and generate new ideas/ practices. True The main purpose of communication in business is to convey certain ideas and messages to the other party. True Success can be achieved through :Hard work , Determination , Confidence in your abilities Every executive's ultimate goal is to maximize pleasure , to minimize pain , to maximize productivity Trade cycle has :Prosperity , Depression , Boom MBO is a tool by which managers:Improve their performance , Increase their effectiveness One category of waste is :Rejections of goods for various reasons Performance review can be :Annual , Continuous , Periodic A superb negotiator manages a response that ________. Brings people together For increasing the creative potential :-

Correct Answer Multiple Choice Multiple Answer Question Correct Answer True/False Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer Select The Blank Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer Select The Blank Question Correct Answer Multiple Choice Single Answer Question Correct Answer True/False Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer True/False

Do job rotation Changes are occuring at :International level , National level , Technology level Customers pay for waste. False Knowledge workers will have to be responsible for :More than one job , More than one assignment , More than one career In large-scale organizations, there will be ________. Main and sub-organization charts Desire for power is :Desire the power to control others , Desire the power to make an impact on others , Desire the power to do something for others Success comes by hard work ,________ and confidence in your abilities Determination Progress meetings must be held at :Stipulated time schedules A manager's job is to have delighted service to customers. True Exit interviews will :Reduce staff turnover During presentation, the main things that will take the audience along is :Presenter's positive attitude , Presenter's energy , Presenter's enthusiasm

Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer True/False Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer True/False Question Correct Answer Select The Blank Question Correct Answer Multiple Choice Single Answer Question Correct Answer True/False Question Correct Answer

While drawing organization charts, care should be taken to see that no important function is omitted from its structure. True Good managers are :Proactive , Self-starters Essential qualities in good communication are :Speak and write clearly , Speak and write concisely , Speak and write accurately to match diverse audience needs Two important factors in assessing communication skills are voice and listening skills. True Management values :Quality of experience , Ability to deliver , Performance-oriented culture For selection of faculty, criterion should be :Merit of the trainer A coach should be a hard judge of himself True Management is ________. Culture bound The duration of training will :Vary from system to system If a person scores nine or ten points on a scale of ten, it means his performance is satisfactory. False

Select The Blank Question Correct Answer Match The Following Question Performance management system Foster among people Make creativity Potential appraisal has Select The Blank Question Correct Answer Select The Blank Question Correct Answer Multiple Choice Single Answer Question Correct Answer Select The Blank Question Correct Answer True/False Question Correct Answer Select The Blank Question Correct Answer Multiple Choice Single Answer Question Correct Answer When a person's potential is converted into performance, it is called ________ growth. Spontaneous Correct Answer Is a control tool A passion for work A habit Two-fold objective-to assess the existing performance and to assist organizations to select leaders In order to influence behavior, ________. Be willing to pay generously for achievements The method of implementing MBO will ________. Vary from organization to organization The superior and the subordinate managers of an organization :Jointly define its common goals and each individuals major areas of responsibility In KRAs, an employee's ________ are listed out. Strengths If wastes are avoided, there will be value adding activity. True In 360 degree evaluation, systems are ________ Transparent Dynamic growth is :More productive than static perfection

True/False Question Correct Answer Match The Following Question Diversification Self management Initiation Team work Select The Blank Question Correct Answer Multiple Choice Single Answer Question Correct Answer True/False Question Correct Answer Multiple Choice Single Answer Question Correct Answer True/False Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer Multiple Choice Single Answer Question

The atmosphere during coaching should be formal and strict False Correct Answer Work effectively with people who have diverse ideas, perspectives and values First manage the self then manage others Be pro-active Individual performance alone is not enough. Together, organisation should achieve In appraisals, there are ________. Objective facts Every person has a will to set :Challenging goals for the self The context in which assessments are made may vary from place to place. True An essential foundation for motivation is :A positive workplace environment The universal principle is 'The Best Never Stays at one place'. True To be a good decision maker one should :Be optimistic A manager should be able to :Organize , Plan , Direct Career assessment process should be :-

Correct Answer Select The Blank Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer Select The Blank Question Correct Answer True/False Question Correct Answer Select The Blank Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer True/False Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer True/False

An open-ended process Compensation should be directly connected with ________. The objectives set earlier for the manager's job A good appraisal system :Defines responsibility Benefits of performance planning are :It takes time initially but saves at the end , It is an indispensable function , It increases the probability of setting challenging and realistic objectives A person with poor merit quality will score:Zero points on a scale of ten Every problem has a ________ Lifespan People resist the way in which a change is introduced. True In coaching do not be ________ Boastful People normally respond best to :Fair treatment , Equitable treatment Irrespective of one's age, one must fulfill certain social responsibilities. True The net result of adopting Japanese techniques to improve productivity is:Improved morale , Better productivity

Question Correct Answer True/False Question Correct Answer Multiple Choice Single Answer Question Correct Answer Select The Blank Question Correct Answer Select The Blank Question Correct Answer Select The Blank Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer True/False Question Correct Answer True/False

If a supervisor is convinced about the success of his subordinates, he must ensure that they get rewards. True Cultural differences exist between various countries and societies. True For peak performance :Every team member has to be motivated ________ organization charts in order to maintain organizational efficiency. Constant improvements should be made in Tranquility is the desire for ________ Emotional calm Computer graphics is ________. A useful audio-visual aid in which software is used to display graphs, charts etc. One for the three fundamental questions which should be asked regarding training evaluation is :What needs to be changed Communication skills indicate :Effective listening KRA stands for :Key Result Areas Change means deviation in today's practice towards better. True

Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer Select The Blank Question Correct Answer True/False Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer Select The Blank Question Correct Answer Select The Blank Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer

When presenting, close the presentation abruptly. False Communication skills include :Impressive oral/ written communication skills , Effective listening , Presentation skills Every problem has a ________ Solution Manager and follower may negotiate only for what the manager is going to contribute False Faces in problem solving are :Nesting , Testing , Arresting The assessment factor ________ indicates the person's problem solving ability, instructions following reliability etc. Work practices Majority of people believe in ________. Steady pattern and steady growth Information sources for finding career options are :Television , Internet , Friends and acquaintances involved in various professions Whenever excellence appears it must be:Recognized , Encouraged , Rewarded Realistic career assessment involves :Understanding strengths , Recognizing limitations , Identifying with successful role models

Multiple Choice Multiple Answer Question Correct Answer Match The Following Question Waiting time, watching time, walking time etc. are Waste means Overproduction is Duplication of paper work is Multiple Choice Single Answer Question Correct Answer True/False Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Single Answer

When doing performance planning, adopt :Enthusiastic communication style , Alert communication style , Exciting communication style Correct Answer Not value adding activities Adding cost but not adding value A central waste A waste Professional design should be :Process design with learned competence Employees should feel self-motivated to acquire new skills. True MBO technique has undergone modification over the :Last two decades Performance management is a :HRD technique Long term training plans :Need vision and planning Result is a combination of :Excitement, challenge and satisfaction of achievement The first essential of a good appraisal system is that it should be easily understood by :Even a common man

Question Correct Answer Multiple Choice Single Answer Question Correct Answer True/False Question Correct Answer Multiple Choice Single Answer Question Correct Answer Select The Blank Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer True/False Question Correct Answer Multiple Choice Single Answer Question

To achieve excellence, a manager should:Have a vision The objective of potential appraisal is :To make a projection Appraisals are one of the means of getting yourself formally assessed by your seniors True Good managers are :Good in both planning and in execution Communication is the transfer of ideas from ________. One mind to the other mind During presentations, the aids used are :Audio-visual aids , Case studies , Instruments/ questionnaires People bring :Variety of skills with them to the workplace The reporting method used in the costing system should be based on the principle of :Management by exception Superiors, in consultation with subordinates can :Set objectives , Measure objectives , Evaluate progress Indian industries are not undergoing any cultural change after globalization. False Training is essential, but there is:-

Correct Answer True/False Question Correct Answer Select The Blank Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer True/False Question Correct Answer Multiple Choice Single Answer Question Correct Answer Select The Blank Question Correct Answer

No substitute for experience In communication, use simple direct sentences. True Assessment Centers method of PA is a useful method for ________. Internal promotions When coaching :Share the credit for achievement , Admit failings , Have a good idea of what you want to achieve and why Key to effective leadership :Master a wide range of skills System is :A total approach to a problem , Comprehensive , A combination of interrelated procedures Some performance parameters are :Technical knowledge , Self-management , People development The trainer assumes the responsibility of:Influencing the trainees under him The job of a boss is to keep finding fault in his employees False How many steps are there in appraisal process? Five One type of training need is________. Campaign programme

Select The Blank Question Correct Answer Select The Blank Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer Select The Blank Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer True/False Question The person who is going to administer the instrument (questionnaire) must be ________ person. An experienced and well-trained In the appraisal writing, there should be________. Firmness and punch When you are preparing your resume :Sell yourself by creating a good first impression To understand the term 'appraisal' :One should know the term merit rating Reaction evaluation is defined in terms of processes involved in gaining and using information about :Trainees expressed reactions Independence is the desire for ________ Self reliance The promotion system should bring about full utilization of :Functional resources in the company's employment policy , Technical resources in the company's employment policy , Service resources in the company's employment policy People with the merit quality 'poor' :Demotivate others Some famous value-driven corporate leaders who serve as role models are :Mr. Ratan D.Tata , Late Mr. S.L. Kirloskar , Mr. Mukesh Ambani Value-based happiness can be sought by directly aiming for it.

Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer Select The Blank Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer Select The Blank Question Correct Answer Select The Blank Question Correct Answer Select The Blank Question Correct Answer

False For everyone to be pulling in the same direction, organizations require :Multiple communication channels During training, free exchange of ideas should :Deserve top attention Dependability is a ________. Assessment factor Self assessment is :The best assessment A good manager :Applies his thoughts , Applies his knowledge , Is willing to overcome speed breakers In taking care of future needs, the race is between :Capable junior vs experienced senior The atmosphere during counseling should be :Informal , Friendly In addition to managerial functions, other areas of equal concern in PA are ________. Personality, maturity, intelligence, loyalty, co-operation etc. Managers should guide changes in organizations in such a way that Worker performance and productivity are maximized Every organization has a ________. Business vision

Match The Following Question Impact Achievement Control Affection Select The Blank Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer Select The Blank Question Correct Answer Select The Blank Question Correct Answer Match The Following Question Cost of external failure Cost of prevention Cost of appraisal

Correct Answer Desire to make people do what one thinks is right Concern for self-excellence Desire for power to control others Need to be concerned Individual level where people are usually motivated to close the gap between their current and desired ________. Capabilities During the 70's & 80's much work was done to produce models to facilitate :Rational process The following is included in QWL practices :Employment guarantees Which systems need to complement each other for the success of knowledge management? IT & HR systems People are ________ and developed to do jobs defined by the organization's formal structure. Recruited Strategy as an emerging process of ________. Action Correct Answer The cost arising outside the organisation due to failure to achieve the quality specified after the transfer of ownership to the customer The cost of an action to prevent or reduce defects and failures The cost of assessing the quality achieved

Cost of internal failure Multiple Choice Single Answer Question Correct Answer True/False Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer True/False Question Correct Answer Multiple Choice Single Answer

The costs arising within the organisation due to failure to achieve the quality specified before the transfer of ownership to the customer Development strategy should be guided by a :Vision & Set of values In practice, the right balance between individuals & team has never proved to be elusive. False Individual employees have the technical knowledge to achieve :Short-term Results The word Strategy is derived from which sphere ? Military sphere The QWL program provides a framework for co-ordinating what in order to produce improvements in QWL outcomes? The introduction , Maintenance , Improvement During mergers, effective HR integration is carried out on the following :Remuneration , Benefits , Terms and conditions Organizations are battle field in which workers and managers vie for the :Scarce resources of power , Income , Opportunity Problem of integration are :Diversity of strategic processes, level & styles , Evolutionary nature of business strategy , Absence of written business strategies It is one thing to measure an activity, another to assess how good it is ! True

Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer Match The Following Question Anxiety Success Confusion Frustration Multiple Choice Single Answer Question Correct Answer Select The Blank Question Correct Answer True/False Question Correct Answer True/False Question Correct Answer Match The Following

Part of the problem is that the dominant means of measuring and assessing organizational success are quantitative and :Financial What should not be underestimated in the pre merger phase? Company brand , Employee's loyalty to their colleagues , Ways of working Types of contribution are :Exceptional teamwork , Excellence in normal key tasks , High achievement in a special project Primary sources of data are :Interviews with senior Management , Interviews and questionnaires with line Management , In-depth questionnaires from human resource staff Correct Answer Vision+strategy+incentives + resources + action plan (absence of skills) Vision+strategy+skills+incentives + resources+action plan Strategy+skills+incentives + resources + action plan (minus vision) Vision+strategy+skills+incentives + action plan The originator of the concept of Management by Objectives (MBO) is :Peter Drucker Performance is a ________ word Magic It is not advisable to copy the PA system of any other company. True One must never treat the red marks as means of development False

Question Daniel Palumbo Tata Engineering Sterlite Dr.Y.V. Reddy Multiple Choice Single Answer Question Correct Answer Select The Blank Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer Select The Blank Question Correct Answer Select The Blank Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer Select The Blank Question Correct Answer Multiple Choice Single Answer

Correct Answer Chief Marketing Officer of COCA-COLA The biggest automobile plant in India A USD 2 billion group One of the contenders for appointment as RBI Governor Any progressive organization is concerned about :Employee development Frequent and timely review of organization charts is necessary ________. To keep pace with the changing times and environments Keeping oneself abreast of the latest developments in one's field will :Help add value to one's work The atmosphere during counseling should be informal , friendly As a manager, one must actively search for ways to :Increase customer satisfaction In order to find value-based happiness, ________ We have to aim for fulfillment of our most important basic desires A good presenter/ performer is able to ________. Motivate staff to achieve goals of the organization Stages in performance improvement are:Thinking differently , Feeling differently , Behaving differently For good performance planning ________ and sympathies Empathies

Question Correct Answer Match The Following Question Attitudes and related values are Poor listening Skills are Poor listening Multiple Choice Multiple Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer Select The Blank Question Correct Answer Select The Blank Question Correct Answer True/False Question Correct Answer True/False Question Correct Answer Multiple Choice Single Answer Question Correct Answer Select The Blank Question Correct Answer

As a good boss, your role should be :Supportive Correct Answer Harder to change than work habits May be because it is uninteresting Inherent or developed May be because it is too complicated No individual or organization would like to be :Static , Stagnant Good performers are :Problem solvers as well as opportunity seekers A boss needs a quality called ________ in making appraisals. Judgment Every person is the ________ of his life. Architect In communication, imitate the top boss. False One of the key areas of control is the measurement of the quality of being 'human' in the organization. True People are usually convinced by :Reasons discovered by themselves rather than those found by others Before beginning feedback in 360 degrees evaluation ________ One needs coaching and practice

Multiple Choice Single Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer Select The Blank Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer Select The Blank Question Correct Answer Select The Blank Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Single Answer

The action plan should be oriented to have :Genuine improvement in business performance MBA also stands for :Management by Action Being needed is a very ________ situation. Joyful Spirit of performance is the spirit that :Motivates , Calls upon a man's reserves of dedication and effort Criteria for promotions are :High standard of fairness and performance , Integrity rather than intelligence , Based on factual record of performance against goals and objectives set earlier KAIZEN is a ________ technique Japanese We must make efforts to find out ________. What work interests us and motivates us Training activity is :An integral part of the total management development activities of an organization Human resource is :The most valuable asset but is also likely to be the most wasted one Appraisals are truly effective when :They are tied with the reward system

Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Single Answer Question

In a universal organization, there will be a need to :Re-structure Planning for certain milestones along our career will provide us with :The opportunity to check our career midway and to stay on course Name the tactics used in the intensity of rivalry amongst existing competitors Price competition , Advertising battles , Product introduction Who said, Management is a multiple organ that manages a business, manages a manager and manages workers and work? Peter Drucker What did chanakya write ? Arthashastra Under the climate of morale what is the result of broadening the interest of the individual to include the whole group. Team-work A vision statement should have the following components ability to inspire people , achievable , precise and objective The different components of EQ would be Self-awareness , Emotional management , empathy Who said, Management is management of Men, Money, Machinery Materials and Information? Anonymous Who said, Management is the creation and maintenance of internal environment in an enterprise, where individuals working in groups can perform efficiently and effectively towards the attainment of gr

Correct Answer True/False Question Correct Answer True/False Question Correct Answer Multiple Choice Single Answer Question Correct Answer Select The Blank Question Correct Answer Select The Blank Question Correct Answer Match The Following Question Decision-making Forecasting Planning Objectives True/False Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer Multiple Choice Single Answer Question

Koontz & O Donell Poverty is an asset of the insurance sector. False Planning can eliminate risk, but can not minimize it. False A business unit must meet specific criteria, if it wants to be called an SBU. These are Definable group of competitors ________acts are done willfully and not by chance. Virtuous Learning from mistakes is often more powerful than learning from________. Success Correct Answer These are the first step leading to the attainment of objectives. These are the goals established towards which the organisation activities are directed These are specific required action or non-actions, allowing no discretion These are tomorrow's expectation, based on yesterday's achievements and today's plans. Human thoughts are classified under Tamas Rajas and Hettwa False Management is multidisciplinary, it includes knowledge from Psychology , Economics , Maths Objectives are classified on the basis of

Correct Answer Select The Blank Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer Match The Following Question Indian consumer demand Favourable factor which will further develop the retail sector in India Challenge faced by the retail sector Liberalization of markets Multiple Choice Single Answer Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer True/False Question

Time and Levels A study by a consultant at Kearney has projected that the organized retail business in India would be worth________by 2005. Rs.1,60,000 crore One of the internal environment factors that influences management is Place Indian companies are neither technically nor financially sound, they are always under the threat of Takeovers Correct Answer Environmental and political considerations play an important role Awareness being created by satellite T.V. channels Giving value to the consumer Given MNC's an inroad into India One of the external environment factors that influences Management is Legal Few of the management principles given by Henry Fayol are: Division of work , Discipline , Authority and responsibility Management is Creative The potential external opportunities faced by an organization are additional customer groups , faster market groups , falling trade barriers Indian business families are still avoiding joint ventures and tie-ups.

Correct Answer True/False Question Correct Answer Select The Blank Question Correct Answer True/False Question Correct Answer Select The Blank Question Correct Answer Select The Blank Question Correct Answer Multiple Choice Single Answer Question Correct Answer True/False Question Correct Answer Select The Blank Question Correct Answer Select The Blank Question Correct Answer Multiple Choice Multiple Answer

False Good motivation lead to low morale. High morale is the manifestation of a weak or defective motivating process. False ________ is practiced like all other managerial functions at all levels of management All level exercise Science is a body of organized knowledge True Closed mind, attitudes, ego, status, consciousness are ________ barriers. Psychological ________ is the result of human limitation to the span of management. Delegation What is the challenge insurance will face like any other service sector? Branding Delegation has basically five degrees - zero, low, moderate, high and fifth degree True Business ________ is the calculation of probable events to provide against future. forecasting ________ behaviour is obtained when there is a one-way transmission of orders from superior to subordinates. Linear

Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer Select The Blank Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer True/False Question Correct Answer True/False Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer True/False Question Correct Answer

Emotional intelligence is said to be the ability to sense, understand and effectively apply the power and acumen of emotions as a source of information , trust , human energy Modern developments in management theory are: Development of the Personnel function , Decentralization of decision making , Increased recognition Control, like other elements of management process has to be ________ and not an emergency operation continuous The different kinds of relationships for selecting the span of control would be : One to one , Cross relationship , Direct group All consumers in India are looking for price alone. False Successful consultants must be foreign culture savvy. True The channels through which corporate governance may bear on performance are activated through several structural and institutional factors as follows legal, political and regulatory environment , financial structure of corporation , structure and functioning of co. What is the other important ingredient of hi-tech service industries, besides labour? knowledge Financial institutions should maintain a close relationship to seek a seat on the board. False

Multiple Choice Single Answer Question Correct Answer Select The Blank Question Correct Answer Multiple Choice Single Answer Question Correct Answer True/False Question Correct Answer Match The Following Question Different people work and People get attracted by We must learn to One must move from Multiple Choice Single Answer Question Correct Answer Select The Blank Question Correct Answer True/False Question Correct Answer Multiple Choice Single Answer Question Correct Answer Select The Blank

Which among the following is an event management company? Planet E Managers should be effective ________ so that they may influence the activities of subordinates without dissatisfying them. leaders In which type of equilibrium, the man is compared to a cone resting on its base Perfect equilibrium Theory is painless, practice is painful. True Correct Answer Perform differently Multi-national companies Be mentally active Knowledge to action For successful operations of organizational personnel policies, the elements of prime importance are:Trainers, trainees and the policy concerning training A manager should promptly share all technical information ________. With his subordinates and bosses Preparing a resume is one of the steps to accomplish your career plan True There are generally :Three levels of objectives the trainer has

Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer True/False Question Correct Answer True/False Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer Select The Blank Question Correct Answer Multiple Choice Multiple Answer

In terms of man-days, the range for training is ________ days per year. Four to twenty Self assessment process has :Five steps The requirement today is of :Team work design Format designing is :A very skilful job Organization systems need to be constantly reviewed because of change in :Demand/supply chain , Customer satisfaction levels , Globalization The crux of counseling is trust True A rigid climate has to be created to be able to understand the career of the employee False The manager's job is to know the existing performance level of his subordinates and:Help him to take to a higher level People who have a security viewpoint :Are not likely to pioneer , Are not likely to innovate , Are not likely to reach out for the new In business communication is always a ________. Two way process

Question Correct Answer Select The Blank Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer True/False Question Correct Answer Select The Blank Question Correct Answer Multiple Choice Single Answer Question Correct Answer Select The Blank Question Correct Answer Select The Blank

A person's technical functional skills can be gauged by :His technical proficiency , His quick identification of business problems , His logical conclusions Every manager has to be ________ seeker.. An opportunity A manager's objectives, goals, actions should be suitable for :Buyer's market Creativity means :To take risks and learn from failures Habits :Are consistent , Speak for our character , Are powerful factors in our lives The common goal for all knowledge and service work should be :To increase the value received by customers The appraisal system should be able to define the specific responsibility of accountability. True Potential appraisal has ________ objectives Two fold The functional heads in an organization :Must join hands and look like one entity A supervisor must not be ________ in assessing the performance of subordinates. Ambiguous

Question Correct Answer Select The Blank Question Correct Answer Multiple Choice Single Answer Question Correct Answer Select The Blank Question Correct Answer True/False Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer Match The Following Question Enjoy the bouquets We are living in an Realistic career assessment should involve After deciding your career goal Multiple Choice Single Answer Question Correct Answer

The feedback received by 360 degree evaluation is ________. More objective than individual assessment People are a great ________ for any organization. Asset One must learn to :Develop oneself as well as seek the opportunities Realistic career assessment involves ________ and recognize your limitations Understand your strengths Only the concerned individual knows his best level of performance. True Goal Setting is a :Prominent activity Performance is :Consistent ability to produce results over prolonged periods of time Every management job should be :Rewarding , Satisfying Correct Answer And the brickbats Information age Drawing inspirations from the biographies of persons who have overcome adverse situations Train yourself People get attracted by :Multi-national companies

Select The Blank Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer Select The Blank Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer

To increase creativity ________ with R&D Experiment An Appraisal is a :Judgment Effective leadership :Lies in mastering a wide range of skills Once change is accepted there will be ________ leading to superior performance. Better customer satisfaction When giving presentations, audience will be impressed by :The depth of presenter's knowledge , The breadth of presenter's knowledge Self-awareness is :The best awareness For best performance from people :Form your own opinions of your colleagues and staff , Be as natural as possible , Stretch people with goals that push them to perform better The essentials of a good appraisal system are :It should be fit for the organization's existing operations , It should take care of the organization's future needs , It should be easily understandable During counseling, atmosphere should be:Informal Procedures must be designed :To help accomplish enterprise's objectives and policies

Multiple Choice Single Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer Select The Blank Question Correct Answer Match The Following Question Sales objectives Production objectives Design objectives Planning objectives Multiple Choice Single Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer Match The Following Question

360 degrees evaluation method is :Generally useful to assess Senior executives The average life expectancy of a successful business is :About thirty years A good appraisal system should be :Feasible to implement Incentive is ________. A process adopted to motivate a person to work Correct Answer Are linked with service objectives Are linked with marketing objectives Are linked with testing Are linked with materials objectives An organization's performance is :Is the performance of the human beings Before deciding on our career options, what one should do? Analyse our strengths as well as our limitations The reasons for making appraisals are :To know existing quality of managers , To put the right man for the right job , To re-structure the organization The stages in feedback are Planning , Implementation , Result Correct Answer

Professional design Machine design Entrepreneurial design Team work design True/False Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer True/False Question Correct Answer True/False Question Correct Answer True/False Question Correct Answer Select The Blank Question Correct Answer

Standardization of skills Standardization of work Quick design with time-based urgency Standardization of performance goals To make a person an example for others, he must take pride in self motivation True Performance appraisal is also known as:Merit rating Merit rating refers to :What the employee is Effective MBO stresses :Manager planning Mergers & alliances are an opportunity to develop :A new management style , A new culture , And manage plus improve costs Executives often need couching in the arts of leadership especially during major change. True Communication can help create buy - in to new ways of operating. True Many central HR teams in large organization have decreased in size. True The team consists of experienced ________ who have both internal consultancy and business experience. OD practitioners

Multiple Choice Multiple Answer Question Correct Answer True/False Question Correct Answer True/False Question Correct Answer Select The Blank Question Correct Answer Match The Following Question T&D executives HR planning Maximum strategy impact Unisys Multiple Choice Single Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer True/False

IT sector employers are looking for :Specific skills , Experience , High market value Communications should be honest & should involve all stakeholders. True The belief among employers that union wages are higher than non union wages is true. True The generalists should develop ________. At least one area of expertise Correct Answer Full part in strategic planning process Effective development of an organizational strategy Job analyses for long-term objectives International on-line service centre Which culture disempowers through restricting autonomy & creativity & erects barriers to co-operation? Role culture What is the effect of downsizing & retrenchment constitutes for human resource manager? New challenge Computerised personnel information have major benefits such as :Producing better quality letters , Reducing the chance of errors , Reducing tedious clerical work

Question Correct Answer Select The Blank Question Correct Answer True/False Question Correct Answer Select The Blank Question Correct Answer Select The Blank Question Correct Answer Select The Blank Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer Select The Blank Question

According to Hudson relationship more in terms of a divorce from all that is familiar. False The questionnaire of Towers Perrin study asked respondents to select and rank 5 items from a list of 17 ________ factors affecting Human Resource Management. Environmental Business and HR issues influence each other, and in turn influence corporate and business unit strategy. True Developing characteristics of people needed to run business in ________ . Long term In some companies there is a senior level ________ who can ensure broad level attention for knowledge issues. Knowledge sponsor A Further key concept in TQ is that of the ________. Internal customer Whose role is most critical to minimize the potential for `winners & losers'? A skilled human resources professional Typical actions that reduce the scope of activity of an organization include :Cost cutting programs , Reduction of capacity , Divestitures Formal communication should aim to :Informing the head hunter , Clarify , Provide direction The process of eliminating jobs is frequently compared to ________.

Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer True/False Question Correct Answer Select The Blank Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer Match The Following Question HALO effect Incentive

Death and murder Who argues that firm must see their roles as contributing to society over the long term, rather than simply increasing shareholder dividends in the short term? Charles Handy Who confirm that to survive quality of product & service should be an integral part of the strategic direction of an organisation? Most chief executives Management agenda was completed by a cross-sector population of managers mainly based in the USA. False There are ________ for sharing & developing knowledge inside the company Opportunities Team work is the highest when :It is a question of life and death If feedback on faculty knowledge / presentation is average or poor :Get new faculty or discuss with existing faculty An increase in salary :May or may not give proportionate increase in productivity Controlling is a :Fundamental managerial function at every level Correct Answer A limitation of PA method A process adopted to motivate a person to work

Action plan Role play method Multiple Choice Single Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Multiple Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer True/False Question Correct Answer True/False Question Correct Answer Multiple Choice Multiple Answer Question

Planning the sequence of events in accordance with priority in relation of effect on desired result An effective method of PA "Train the trainers' programmers" are organized :To train the trainees who in turn will train further lot Promotion is :A very effective method of compensation Training needs get generated to bridge the gap between :Present performance and defined performance Every executive's ultimate goal is :To maximize pleasure , To minimize pain , To maximize productivity Measurable things are :Relevant Salary structure should offer rewards :For extraordinary performance on the job A majority of jobs require that :Two or more people work together In managers, there is a combination of will and skill. True To motivate a person for peak performance, management must set on itself high standards for its own performance of the relevant functions. True A resume should be summary of :-

Correct Answer Match The Following Question Training programmes Campaign programmes Trainer Trainees Multiple Choice Single Answer Question Correct Answer Multiple Choice Single Answer Question Correct Answer

One's skills , One's accomplishments , One's education Correct Answer Should be result-oriented Is complex and is for all employees Is the person who imparts training Are the participants in a training programme Team communication requires that :Team members are free to express their feelings without fear The number of stages which form part of any genuine attempt at outcome evaluations is :Four