You are on page 1of 1

VYANKATESH CITY -III

KANHAIYA BUILDERS & DEVELOPERS


KANHAIYA ARCADE - III

SPECIFICATION
STRUCTURE : RCC FRAMED STRUCTURE
SUPER STRUCTURE : OUTER BRICKWORK 6" & INTERNAL 4 1/2"
DOOR : RCC DOOR FRAME WITH FLUSH DOORS &
ENTRANCE DOOR IN TEAKWOOD.
WINDOWS : ALUMINIUM GLAZED WINDOW WITH M.S. GRILL.
CEMENT PLASTER : SAND FACE PLASER ON EXTERNAL WALL &
FUNTY PLASTER FOR INTERNAL WALLS.
PAINT : OIL-BOUND DISTEMPER WITH PUTTY IN ALL ROOMS &
EXTERNAL PAINTING WITH WATERPROOF SNOWCEM PAINT.
FLOORING : SEMI-VETRIFIED IN HALL & CERAMIC TILES IN ALL OTHER ROOMS.
ANTISKID TILES FOR STEPS.
HANDRAIL : M.S. STEEL.
DADO : GLAZED TILES UPTO 7'00" HEIGHT IN TOILET & BATH,
3'00" IN WC.
KITCHEN OTTA : POLISH GREEN MARBLE TOP WITH STEEL SINK.
GLAZED TILES UPTO SILL LEVEL ABOVE KITCHEN OTTA.
WASH BASIN : ONE IN EACH TOILET.
W.C. : INDIAN OR WESTERN STYLE.
WATER SUPPLY : FROM OVER HEAD TANK.
PLUMBING : CONCEALED PLUMBING FITTING WITH
REQUIRED FIXTURES.
ELECTRIFICATION : COCEALED ELECTRIC FITTING WITH
FOUR POINTS IN EACH ROOMS, ONE POWER POINT IN
KITCHEN & GEYSER POINT IN BATHROOM.
CABLE & TELEPHONE CONNECTION.

MODE OF PAYMENT
AT THE TIME OF BOOKING 15 % OF ABOVE COST
AT THE COMPLETION OF PLINTH LEVEL 20 % OF ABOVE COST
AT THE COMPLETION OF G.F. SLAB LEVEL 10 % OF ABOVE COST
AT THE COMPLETION OF F.F. SLAB LEVEL 10 % OF ABOVE COST
AT THE COMPLETION OF S.F. SLAB LEVEL 10 % OF ABOVE COST
AT THE COMPLETION OF T.F. SLAB LEVEL 10 % OF ABOVE COST
AT THE COMPLETION OF BRICKWORK 10 % OF ABOVE COST
AT THE COMPLETION OF PLASTERING WORK 10 % OF ABOVE COST
AT THE COMPLETION OF FINISHING & POSSESSION 5 % OF ABOVE COST

ADDITIONAL CHARGES
SERVICE TAX 12.24 % OF 33 % OF THE ABOVE MENTION AMOUNT
STAMP DUTY AS APPLICABLE BY THE LEGAL AUTHORITY
M.S.E.B CHARGES RS. 20000/- FOR THE INDIVIDUAL UNIT OF FLAT
MAINTAINANCE CHARGES 50,000.00 Rs. FOR TEN YEARS

You might also like