You are on page 1of 48

Presentation made by: Baxi Vishvak 02

4/14/2012

Scope Of POM

Administrative discipline for the effective use of resources in on-schedule production of the targeted number or quantity of end products that meet the specified cost, performance, quality, and waste requirements.

4/14/2012

Scope Of POM

4/14/2012

Scope Of POM

Design, execution, and control of a firm's operations that convert its resources into desired goods and services, and implement its business strategy

4/14/2012

Scope Of POM

4/14/2012

Scope Of POM

Production Planning & Control Quality Control Material Management Maintenance Management Plant/Facility Location Plant/Facility Layout Inventory Control Product Design Process Design
Scope Of POM 6

4/14/2012

4/14/2012

Scope Of POM

Coordination of materials with suppliers Efficient utilization of people and machines Efficient flow of materials Communication with customers

4/14/2012

Scope Of POM

A Typical Manufacturing Systems


SUPPLIERS Raw Materials Materials Machines People CUSTOMERS Finished Products

4/14/2012

Scope Of POM

1.

2.
3.

Overall Manufacturing Planning Detailed Materials and Capacity Planning Execution of Plans

4/14/2012

Scope Of POM

10

Demand Management Forecasting Order Promising Order Processing Order Entry Spare Parts

4/14/2012

Scope Of POM

11

Plans are made Results are compared with plans (control) Results are OK Wait until next control period Results are not OK Go to Step 1 (Revise plans)

4/14/2012

Scope Of POM

12

Quality control (QC) includes the activities from the suppliers, through production, and to the customers. Incoming materials are examined to make sure they meet the appropriate specifications. The quality of partially completed products are analyzed to determine if production processes are functioning properly.

Finished goods and services are studied to determine if they meet customer expectations.

4/14/2012

Scope Of POM

13

Inputs Raw Materials, Parts, and Supplies

Conversion
Production Processes

Outputs
Products and Services

Control Charts and Acceptance Tests

Control Charts

Control Charts and Acceptance Tests

Quality of Inputs
4/14/2012

Quality of Partially Completed Products


Scope Of POM

Quality of Outputs
14

It is concerned with planning, organizing and controlling the flow of materials from their initial purchase through internal operations to the service point through distribution.

Material management is a scientific technique, concerned with Planning, Organizing &Control of flow of materials, from their initial purchase to destination.

4/14/2012 Scope Of POM 15

To get

1. The Right quality


2. Right quantity of supplies

3. At the Right time


4. At the Right place

5. For the Right cost

4/14/2012

Scope Of POM

16

Primary
Right price High turnover Low procurement & storage cost Continuity of supply Consistency in quality Good supplier relations Development of personnel Good information system

Secondary
Forecasting Inter-departmental harmony Product improvement Standardization Make or buy decision New materials & products Favorable reciprocal relationships

4/14/2012

Scope Of POM

17

A maintenance manager typically is a plant engineer who reports to a plant or manufacturing manager Maintenance departments are usually split into two groups:

Buildings and Grounds Equipment

4/14/2012

Scope Of POM

18

Repairs

Repair activities are reactive. Breakdowns and malfunctions typically occur when equipment is in use. Standby machines and parts can speed repairs.

Preventive Maintenance (PM)


Regularly scheduled inspections are performed. PM activities are performed before equipment fails. PM is usually performed during idle periods.

4/14/2012

Scope Of POM

19

Annual Cost ($) Minimum Total Maintenance Cost

Minimum Level of Preventive Maintenance

Total Maintenance Costs Preventive Maintenance Cost Breakdown and Repair Cost
20

Degree of Preventive Maintenance


4/14/2012 Scope Of POM

Common for a large variety of products in batch volumes. Similar processes are grouped together. Inefficient: Long material transport routes from dept. to dept. Work in progress is high. Tracking of orders can be difficult. Advantages: Specialist labour and supervision. Flexibility as material can be rerouted in any sequence
Material 1 Material 2

L
L

L
L

M
M

M
M

ASSEMBLY 1

D D

D D

Product 1

Product 2

ASSEMBLY 2

4/14/2012

Scope Of POM

21

Mass production where variety is small and production volumes are very high. AKA flow or line layout. More efficient, but less flexible than functional layout. Work in progress is minimised, and jobs are easily tracked. Investment in specialised capital equipment is high, so a reliable and steady demand is required. Very sensitive to machine breakdown or disruption to material supply.

A S S E M B L Y

4/14/2012

Scope Of POM

22

AKA Group Technology Each cell manufactures products belonging to a single family. Cells are autonomous manufacturing units which can produce finished parts. Commonly applied to machined parts.

L
D

M
G

ASSEMBLY
CELL 1

Often single operators supervising CNC machines in a cell, with robots for materials handling.
Productivity and quality maximised. Throughput times and work in progress kept to a minimum. Flexible. Suited to products in batches and where design changes often occur.

M D

M G

ASSEMBLY CELL 2

L
L

L
G

ASSEMBLY CELL 3

4/14/2012

Scope Of POM

23

Fixed Position Layout (right) Single large, high cost components or products. Product is static. Labour, tools and equipment come to the work rather than vice versa. Random Layout Very inefficient Small factories, start-up companies. Process Layout Process industries, e.g. steelmaking. The process determines layout.

COMPONENTS MATERIAL LABOUR

PRODUCT

LABOUR COMPONENTS

MATERIAL

4/14/2012

Scope Of POM

24

Stock of items kept to meet future demand Purpose of inventory management


how many units to order when to order

4/14/2012

Scope Of POM

25

Raw materials Purchased parts and supplies Work-in-process (partially completed) products (WIP) Items being transported Tools and equipment

4/14/2012

Scope Of POM

26

Bullwhip effect

demand information is distorted as it moves away from the end-use customer higher safety stock inventories to are stored to compensate

Seasonal or cyclical demand Inventory provides independence from vendors Take advantage of price discounts Inventory provides independence between stages and avoids work stop-pages
Scope Of POM 27

4/14/2012

Customers usually perceive quality service as availability of goods they want when they want them

Inventory must be sufficient to provide highquality customer service in TQM

4/14/2012

Scope Of POM

28

Carrying cost cost of holding an item in inventory Ordering cost cost of replenishing inventory Shortage cost temporary or permanent loss of sales when demand cannot be met

4/14/2012

Scope Of POM

29

Continuous system (fixed-order-quantity)

constant amount ordered when inventory declines to predetermined level


order placed for variable amount after fixed passage of time

Periodic system (fixed-time-period)

4/14/2012

Scope Of POM

30

Class A

5 15 % of units 70 80 % of value 30 % of units 15 % of value 50 60 % of units 5 10 % of value

Class B

Class C

4/14/2012

Scope Of POM

31

Safety stock

buffer added to on hand inventory during lead time an inventory shortage


probability that the inventory available during lead time will meet demand

Stockout

Service level

4/14/2012

Scope Of POM

32

Uncertainties

Selection method

Selected design

Scaled Objective Values

1 0.8 0.6 0.4 0.2 0 0 1 2 3 4

No. of Operations Time/Operation Weight Cost

Pareto optimal designs

Design alternatives Objective: Select the product design that accounts for both customers requirements and 4/14/2012 Scope Of POM 33 designers preferences

Design Variables

Set of input variables (parameters) to the design simulation software


(e.g. Motor type, Gear type, Gear ratio, DC voltage, Ambient temperature)

Performance Attributes
Set of attributes that is the output of the simulation software,and identifies a product design (e.g. Manufacturing cost, Weight, Time per operation per battery charge)
Input Design Variables Simulation Software
Scope Of POM

Design Attributes
34

4/14/2012

Market Pull (We Make What We Can Sell)

food industry
electronics

Technology Push (We Sell What We Can Make)

Interfunctional View

personal computers

4/14/2012

Scope Of POM

35

Concept Development Product or Service Design Pilot Production/Testing

4/14/2012

Scope Of POM

36

4/14/2012

Scope Of POM

37

Value Analysis (or engineering)

Simplification of products and processes

Modular Design

Multiple products using common parts, processes and modules.


Scope Of POM 38

4/14/2012

Terms in Value Analysis:

Objective: primary purpose of the product Basic Function: Makes the objective possible Secondary Function: How to perform the basic function

Value analysis seeks to improve the secondary function, e.g. how to open a can or make a tool box
Scope Of POM 39

4/14/2012

(a) The original design

(b) Revised design

(c) Final design

Assembly using common fasteners

One-piece base & elimination of fasteners

Design for push-and-snap assembly

4/14/2012

Scope Of POM

40

a.

Original Design

24 different parts to assemble


7 unique parts to manage in inventory 4 different parts to assemble 3 unique parts to manage in inventory 2 parts to assemble and manage Question: How easy would it be to detect an assembly error with each of the designs?
Scope Of POM 41

b.

Revised Design

c.

Final Design

4/14/2012

Process view Ops strategy (1) Process Analysis Proc select in manufac (4) Project (2)

4/14/2012

Transformation Process

Process types Product-process matching

Scope Of POM

42

Process: how to make it? Flexibility Labor skills Capacity change


4/14/2012 Scope Of POM

Product: what to make? Variety Volume

43

Different processes have different characteristics, requiring different skills and managerial tasks. It is convenient to identify basic process categories. We can then map the process of interest into one of these basic categories.

4/14/2012

Scope Of POM

44

Project

Building a house, getting married


Custom furniture, hospital, university Garment, grand piano DVD player, hamburger Cereal, sugar, oil refinery
Scope Of POM 45

Job shop

Batch flow

Line flow

Continuous flow

4/14/2012

Low Volume, One of a Kind Job Shop Batch Assembly Line Continuous Flow
4/14/2012

Multiple Products, Low Volume

Few Major Products, Higher Volume

High Volume, High Standardization


Flexibility (High) Unit Cost (High)

Commercial Printer French Restaurant Heavy Equipment Coffee Shop Automobile Assembly Burger King Sugar Refinery
Scope Of POM

Flexibility (Low) Unit Cost (Low) 46

Low Volume, One of a Kind Job Shop Batch Assembly Line Continuous Flow
4/14/2012

Few High Multiple Major Volume, Products, Products, High Low Higher StandardVolume Volume ization
Flexibility (High) Unit Cost (High)

Commercial Printer French Restaurant Heavy Equipment Coffee Shop Automobile Assembly Burger King Sugar Refinery

Scope Of POM

Flexibility (Low) Unit Cost (Low) 47

4/14/2012

Scope Of POM

48

You might also like