CUSTOMER SERVICE MODULE

SAP ECC 6.0 USER MANUAL

SAP CS Module Processes

AMC Contract creation


Transaction Code VA41 User Input Contract Type Sales Org Distribution Channel Division Sales Office Sales Group ZWV1 or ZWV2 or ZWV3 or ZWV5 VSO2 SR SV CHEN S02

Press Enter

Page 2 of 53

SAP CS Module Processes

User Input Sold to Party Ship to Party PO No PO Date Material Target Quantity

Page 3 of 53

SAP CS Module Processes

Select the Material Line Item. Then go to Extras Technical Objects

Provide all the functional locations that are included in this contract.

Page 4 of 53

SAP CS Module Processes

Return Back

Page 5 of 53

SAP CS Module Processes

Double Click on the Material Code (in this example - 300017). The following screen opens up.

Go to the Conditions Tab

Page 6 of 53

SAP CS Module Processes

Go to the Billing Plan tab.

Page 7 of 53

SAP CS Module Processes

Click on the Create Dates button.

Remove the line item billing block. Note the Billing date.

Page 8 of 53

SAP CS Module Processes

Go back.

Page 9 of 53

SAP CS Module Processes

Save and Note the Document Number.

Page 10 of 53

SAP CS Module Processes

AMC Contract Billing


Transaction Code VF04 User Input Billing Date from Billing Type Select from the Contract Billing date FV Order-related

Click on Display Billing List.

Page 11 of 53

SAP CS Module Processes

Select the line that corresponds to your contract document number.

Page 12 of 53

SAP CS Module Processes

Click on Individual Billing.

Save.

Page 13 of 53

SAP CS Module Processes

Go back.

Page 14 of 53

SAP CS Module Processes

Trouble Shooting Maintenance


Prerequisites 1. For AMC Customer, the AMC contract should have already been created previously for the WEG for which the maintenance call is raised. 2. For warranty customer, the start and end dates of warranty duration should have been maintained in the Functional Location master data. 3. In all other cases, the WEG would be treated as belonging to a Non-AMC customer.

Transaction Code IW51 User Input Notification Type Z1

Press enter. Create Service Notification Screen opens up.

Page 15 of 53

SAP CS Module Processes

User Input Notification Description Functional Location Priority Reported by

The AMC contract is automatically assigned by the system, if it exists. The AMC contract number can be seen against the field Sales Doc. The sold to party details are read from the functional location master data.

Page 16 of 53

SAP CS Module Processes

Click on the Additional data 1 tab User Input Long text Initial comments or information, if any

The system displays the warranty information, i.e. the warranty start and end dates.

Page 17 of 53

SAP CS Module Processes

Click on the Malfunction, breakdown tab User Input Breakdown Indicator In case of WEG breakdown, if any

The system also displays the Malfunction start date and time. To create the service order directly from within the service notification, click on the Serv.Order button.

Page 18 of 53

SAP CS Module Processes

Click OK. You can now see the service order.

Page 19 of 53

SAP CS Module Processes

Click on the Operations tab. User input Operation short text Work Unit Verify and change if needed Number of hours of work - estimated HR

Click on the Components tab. User input Component Requirement Quantity Item Category (IC) Storage Location (SLoc) Plant (Plnt) Material Code of the Spare(s) Nos required Stock / Non Stock

Page 20 of 53

SAP CS Module Processes

To release the service order, click on the green flag button. Save the service order.

Note the number of the service notification (1000000063) and the service order (4000857).

Page 21 of 53

SAP CS Module Processes

Incase of Some External Service

Page 22 of 53

SAP CS Module Processes

Page 23 of 53

SAP CS Module Processes

Page 24 of 53

SAP CS Module Processes

Page 25 of 53

SAP CS Module Processes

Page 26 of 53

SAP CS Module Processes

Page 27 of 53

SAP CS Module Processes

GOTO ME21N

Page 28 of 53

SAP CS Module Processes

Page 29 of 53

SAP CS Module Processes

Page 30 of 53

SAP CS Module Processes

Page 31 of 53

SAP CS Module Processes

MIGO

Page 32 of 53

SAP CS Module Processes

Item OK

Check Entries

Page 33 of 53

SAP CS Module Processes

Post Document

Page 34 of 53

SAP CS Module Processes

Page 35 of 53

SAP CS Module Processes

Goods Issue to the Service Order


Transaction Code MB11

Click on To Order.

User Input Order Your Order Number

Page 36 of 53

SAP CS Module Processes

Save to post the goods movement.

Page 37 of 53

SAP CS Module Processes

Confirming the Service Order


Transaction Code IW41 User Input Order Your Order Number

User Input Actual Work Number of Hours

Page 38 of 53

SAP CS Module Processes

Save and post the confirmation.

Page 39 of 53

SAP CS Module Processes

Billing the Service Order to the customer


Transaction Code DP90 User Input Order Your Order Number

Press Billing request button.

Page 40 of 53

SAP CS Module Processes

Remove the Billing block.

Page 41 of 53

SAP CS Module Processes

Save the document.

Page 42 of 53

SAP CS Module Processes

Creating the billing document Transaction Code VF01

Press Enter.

Page 43 of 53

SAP CS Module Processes

Save the document (Document 90000182 has been saved).

Page 44 of 53

SAP CS Module Processes

Preventive maintenance planning


General Maintenance Task Lists Transaction Code IA05 User Input Group

Page 45 of 53

SAP CS Module Processes

User Input Group Counter Description

Page 46 of 53

SAP CS Module Processes

Click on MntPack button

Page 47 of 53

SAP CS Module Processes

Assign the relevant maintenance package to each operation. In our case, it will be 180 days cycle so 180 days package.

Page 48 of 53

SAP CS Module Processes

For entering operation wise inspection characteristics, select the corresponding operation and click on Insp.Char button.

Page 49 of 53

SAP CS Module Processes

Assign the various inspection characteristics to the corresponding operations.

Page 50 of 53

SAP CS Module Processes

Maintenance Strategies

Transaction Code IP11

Page 51 of 53

SAP CS Module Processes

Page 52 of 53

SAP CS Module Processes

Scheduling for Maintenance Plans IP10 Schedule IP30 - Deadline Monitoring

Page 53 of 53