You are on page 1of 3

ANALISA HARGA SATUAN

PROYEK GALIAN PASIR / SAND BLASTING


DESA CITERAS RANGKAS BITUNG BANTEN
Harga Satuan Jumlah Harga
No Mata Pembayaran Volume Satuan
Rp Rp
I Fee Lahan 1.043 Rit 208,500 217,465,500

II Fee Asosiasi 1.043 Rit 90,000 93,870,000

III Mesin Sedot all in 1.043 Rit 345,000 359,835,000

IV Excavator all in 1.043 Rit 153,403 159,999,329

V Management 1.043 Rit 50,000 52,150,000

VI Maintenance 1.043 Rit 153,000 159,999,329

VII Biaya Lainnya 1.043 Rit 100,000 104,300,000

Jumlah I s/d VII 1,147,619,158

Asumsi = Produksi 1.043 rit Perebulan


Penjualan 1.043 Rit X Rp. 1.390.000 / Rit = Rp. 1.449770.000
Biaya Produksi 1.043 Rit X Rp. 1.100.306 / Rit = Rp. 1.147.619.158
Laba = 1.043 Rit X Rp. 289.694 / Rit = Rp. 302.150.842
DATA ASSET BIAYA INVESTASI
GALIAN PASIR DESA CITERAS RANGKAS BITUNG

No Jenis Asset Volume Harga Taksir Jumlah Harga


Rp
DATA ASSET BIAYA INVESTASI
GALIAN PASIR DESA CITERAS RANGKAS BITUNG

Harga Taksir Jumlah Harga


No Jenis Asset Volume
Rp Rp.
I Badan Jalan / Batu 200 M1
II Kantor + Direksi Keet 12 x 6
III Pivanisasi / 10-8 Inc 200 M1
IV Mesin Sedot RE 8 1 Unit
V Mesin Air RD 8 1 Unit
VI Mesin Las 1 Unit
VII Gensett / Penerangan 1 Unit
VIII Unit Maintenance Lengkap
IX Bak Penampung 7 x 12 x 6
X Pengupasan Topsoil 15.000 M2
XI Penampungan Air 10.000 M2
XII Penampungan Limbah 10.000 M2
XIII Perizinan + SJAP Lengkap

JUMLAH I s/d XIII