You are on page 1of 68

TREE TYPES

and
INSTALLATION METHODS
James Pappas Devon
Jamie Patrick-Maxwell FMC
Ray Guillory FMC
2
Deepwater Subsea Completion Systems
3

Contents
• Trends
• Technology
• Design Variables
• Subsea Configurations
• Drivers
• Tree Types
• Current & Future Technology
• Installation Methods
4

Subsea Equipment Trends


2000’s

1990’s ‹ 15,000 psi


‹ 20,000 psi
‹ High Temperature
1960-
1990
‹ 10,000 psi

‹ 1,000 to 5,000 psi


5
Deepwater Installations Trends

1980
1980 1983
Bonito
Bonito Piraúna 1985
RJS-39 RJS-232
RJS-39 Marimbá
189m
189m 293m RJS-284 1988
FMC Kvaerner 383m Marimbá
RJS-376D 1988
619 ft 961 ft FMC 492m Placid
1,256 ft Green 1992
FMC Canyon 31 Marlim
1,613 ft 684m MRL-9 1994
781m Marlim
VG MRL-4 1997
2,244 ft FMC 1027m Marlim Sul
1997
2,561 ft MLS-3
FMC Shell Mensa
1709m
1618m
3,368 ft 1999
FMC Roncador
5,308 ft VG RJS-436 2000
1853m Petrobras
5,605 ft 2002
Roncador Marathon 2004
1877m Camden Shell
FMC Hills Coulomb
6,080 ft 2197m 2307m
VG
6,157 ft Cameron
7,209 ft FMC
7,570 ft
6
Installation Vessels
Semi- submersible
Drill Ship

Jack-up

Water Depth (Feet) Surface Vessel Type of Mooring

< 400 Jack-up Spud Can or Mudmat

400-4000 Semi-Submersible Mooring (Anchors)

Dynamically
> 4000 Semi-Submersible
Positioned (Thrusters)
Dynamically
> 2000 Drill Ship
Positioned (Thrusters)
7

Host Facilities Geographic Trends


Existing Popularity
Gulf of North West
Mexico Brazil Atlantic Africa
TLP/Spar High Med Med Med

Subsea to Platform High Low Med Low

Subsea to FPSO Med High High High


8

Subsea Tree & Control Module Trends


9

Early Trees …

Texaco Tartan Stacked Valve Tree

Shell Dry Chamber Tree

Archives from Various Operating Companies and Entities


10

My Career Early Trees …

Main Pass 261 #1 FMC CM-1 Mudline Tree


VK 739 #2 (Pecten) Dril-Quip Vertical Tree

GC 157 (Shell
Manatee) #1 Vertical
VK 739 #3 Kvaerner Side Valve Tree Tree
11
Deep Water Tree Technology

1992 1994 1996-1998 2000


12
Tree Interfaces that Govern Design
Well
– Tubing Size, Pressure,
Temperature, Material Class
The Well

• Controls
– Direct, Piloted, Electro/Hydraulic Controls

• Flowlines
– Pipeline Size, Pressure, Connection
Type Flowline
Connection Wellhead

• Wellhead
– Mudline, Clamp Hub, Mandrel,
Different Vendors

Optimum Subsea Tree Configuration Driven by Reservoir Requirements


Fundamental Subsea Configurations
13

VXT
(TH in Tubing Head)
• The type of
completion defines
where the tubing
VXT
hanger resides (TH in the wellhead) HXT and EHXT

• Anything above the


tubing hanger can
be removed
without disturbing
the well
Tubing
Tubing Head
Hanger Subsea
Wellhead
14

Typical Tree Decision Drivers


Horizontal Tree Vertical Tree

• Financial driver is “installed • Financial driver is “life-of-field


CAPEX” OPEX”
• Lower well count projects that • Large well count projects (or
cannot justify expense of open portfolios of projects) that can
water completion riser justify and benefit from
• High drive wells or multilaterals investment in open water
(have need for large bore ≥ 7”) completion riser system
• Complex reservoirs or frequent • Lower drive wells (smaller bore)
workovers requiring tubing • Simple reservoirs or low
retrieval frequency of tubing retrieval
• ESP technology workovers
• Batch drilling/completion and/or • High pressure - difficult well
requirement for drill thru control issues
systems
15

Subsea Trees by Water Depth

Mudline Tree
Diverless Tree
Guidelineless (GLL)
(Guideposts/Guidelines)
Tree (Funnels)

Water Depth (Feet) Surface Vessel Type of Tree

< 400 Jack-up Mudline – Diver Assist

200-800 Floating Vessel Diver Assist


Diver Assist Tree
800-2500 Floating Vessel Diverless

¾2500 Floating Vessel Guidelineless


16

Tree
Configurations

10K Vertical Deep Water Standard


10K Vertical Shallow Water Tree
15K Enhanced Vertical Tree 15K Standard EHXT 10K Standard EHXT
Comparison of Traditional and
17

Enhanced Vertical Trees


ROV Tree Cap

Flowline
U-Loop

Tubing Hanger Tubing Head


With Annulus Slim OD
Installed in
Isolation Valve Tubing Hanger
Wellhead

Traditional VXT Enhanced VXT


Traditional Vertical Tree with Tubing
18

Hanger Completion in Wellhead


• Eliminates Need for Tubing
Head
• 18-3/4” Dual Bore Tubing
Hanger Features Integral
Annulus Valve
• 14-1/2” TH and Adapter
Sleeve used on Competitor
Wellheads
• Trip Saving ROV Tree Cap
• Guideline or Guidelineless
Configurations
• BOP Setup Required for TH
Orientation
19

4” x 2” 5K Dual Bore GL Tree


EG MAGY “C
20
EVXTTM-SB EVXTTM-DB

Total Girassol


Shell Std

Enhanced Slim Bore Enhanced Dual Bore


Vertical Tree Vertical Tree
4” x 2” 10,000 psi 5” x 2” 5,000 psi
5” x 2” 15,000 psi 5” x 2” 10,000 psi
GLL 10K Enhanced Vertical Tree
21

and Tubing Head Stack Section View

Tree Valves
22

GLL 10K Enhanced Vertical Tree System

ROV Tree Cap

Tree Assembly Subsea Control Module

Tubing Hanger

Tubing Head
Assembly
Vertical Hub
for Well Jumper
23

GLL 10K Enhanced Vertical Tree


ROV Tree Cap

Tree Cap Parking


Slot

Subsea Control
Module

Flowline Hydraulic Flying


Connector Lead Receptacles

Tree Connector
24
10K EVXT Tubing Head

Hub for Tree


Flowline Connector

Vertical Hub for


Well Jumper

Flowline Hub
Latch/Release

Annulus Access
Valve
10K Concentric Slimbore
25

Tubing Hanger
Running Tool Latch Profile
Locking Mandrel
Lock Ring

Dual Elastomer
Secondary Seals

Alignment Key
Tubing Suspension
Threads (4” to 5 1/2”)
National Hydraulic
Couplings

Tronic Wet-Mate
Electrical Connectors Plug Profile

Split Protective Sleeve


For Couplings
26

10K ROV Tree Cap

• Run subsea with tree

• Weighs less than 100 lbs


in water
27

10K Enhanced Vertical Tree


Stack Views
28

15K Enhanced Vertical Tree System


SCM
Choke

Tree Assembly

Tubing Hanger

Tubing Head
Vertical Hub Assembly
for Well Jumper

Capable of handling BOP’s directly


15K Enhanced
29

Vertical Tree
PRODUCTION WING VALVE
18 ¾ - H4
PRODUCTION RE-ENTRY
MASTER VALVE HUB

TREE CHEMICAL
INJECTION VALVE
TREE
CHEMICAL
PRODUCTION
INJECTION
SHUT IN VALVE
VALVE

TREE
CONNECTOR

PROD. MQC
PLATE

DOWNHOLE
FUNCTIONS
CHOKE
ROV PANEL
MANF / SLED
MQC PLATE EROSION DETECTOR BLOCK
15K Enhanced
30

Vertical Tree
SUBSEA CONTROL
TREE CAP PARKING MODULE
RECEPTACLE

ANNULUS
CROSSOVER
VALVE

ANNULUS
WING VALVE

ANNULUS
SWAB
VALVE
PRODUCTION
ANNULUS SHUT DOWN
MASTER VALVE
VALVE CONNECTOR / FLOWLINE
SCSSV ROV PANEL CONNECTOR
31

15K Tubing Hanger Assembly


32
15K ROV Tree Cap
33

Enhanced Horizontal Tree System

5” x 2” 10,000 psi
5” x 2” 15,000 psi
Comparison of Traditional and
34

Enhanced Horizontal Trees

Tubing Hanger Internal Tree Cap

Both Crown Plugs


Installed in
Extended
Tubing Hanger

Traditional HXT Enhanced HXT


Enhanced Horizontal 35

Tree EHXT®

85,000 lbs
14.5’ x 14.5’
footprint x
12.5’ tall
36

10K & 15K ROV Tree Cap


37
EHXT Tubing Hanger Features

Crown
Plug
Tubing Hanger
38
10K & 15K EHXT EH-5 Radial Penetrator

• Enables 9 downhole control lines


through 2 EH-5 Penetrators
– Hydraulic, chemical, electrical
Tree EH-5
Tubing
Spool Penetrator
Hanger
Body

Welded Tubing
Connections on Female Male
Ends of Radial Coupler Coupler
Penetrator Stems
39

15K EHXT
Length
166”
(4.22m)

153”
(3.88m)

134”
(3.40m)
40

5K HXT WireLineLess w/ ESP

Petrobras
41

5K HXT with ESP Features

Tubing
Hanger
With
Dual Ball Valve

ROV
Tree
Cap
42

5K EHXT with Retrievable Choke Module


Choke
Module

TREE
43

5K EHXT Retrievable Choke Module

•MEG Flow Meter


•Wet Gas Meter
•Water Cut Meter
•Choke
•Tree Connector
•Manifold Connector
•Two Sand Detectors
•Suite of Dual PT/TT Sensors
44
Electric Tree with Redundant Battery
System
Standard
Electric
Connectors

Battery
Pack
45

Electric Choke Control Retrofit

• Reported production
gain of 1900 bbl/d
• Fully open to fully
closed 45 seconds.
Electric Flow
46

Control Valves

• Electric Actuators position


control and fast operation
• Electric Actuators for subsea
processing systems
47

Boosting and Processing

Tordis Subsea Separation System


48

Installation Methods
and
Systems
49

Vertical Tree on Drill Pipe


50

Horizontal Tree On Drill Pipe


5” x 2” 5K GLL Dual Bore Tree,
51

LMRP, EDP & Completion Riser


Heave Compensated Landing System (HCLS)
52

Tree overboarding

Tree being moved off Laney deck

Tree lowering into water

HCLS buoy deployment


53
HCLS Tree Installation Boat to Crane

Buoys
Tree
54

HCLS Tree Installation Crane to Overboard


55

HCLS Tree Installation Crane to Boat


56
HCLS Tree Installation Buoys Overboard
HCLS Tree Installation Sling
57
58

HCLS Tree Installation Landout


59

Rig Winch Tree Installation Boat Offload


60

Rig Winch Tree Installation Rig Deployment


61
Rig Winch Tree Installation
62
Rig Winch Tubing Head Spool Deployment
63

Subsea Tree Installation

• Run on monobore riser

• Controlled by SCM
during installation
64
Monobore Completion Riser Systems
• 5” 10K & 15K
monobore riser
systems

• Riser systems
can be used for
light well
intervention on
both vertical and
horizontal trees
15K
65

Monobore EDP
Riser

LRP

Tree

Tubing
Head
66

5” 15K Completion Riser System

Tapered
Stress
Lubricator Valve Joint

HPU

Surface
Tree
Riser
Control
Station

Lubricator
Valve Reel Unit

Tension To EDP
Joint / LRP

Intermediate Joints
Umbilical
Reel
67

THANKS! Tree

QUESTIONS?

Me

One of my Earliest Trees – Happy Holidays, Y’all!


TREE TYPES
and
INSTALLATION METHODS
James Pappas Devon
Jamie Patrick-Maxwell FMC
Ray Guillory FMC

You might also like