Customer Services Department 

Building Permit Application (Electrical)
Refer Also to Building Permit No.               Or Consumer No.
Municipality Permit No.

Owner's Name  ..………............……………………   Main Consultant ………………...........…… Electrical Consultant Stamp


ID No. ………………………………………………… 
Tel. ……………………..……...............……
Tel. ………………………………………………….…
 Postal Address  ……………………………….........
Elect. Consultant  ………........……………

Owner's Signature ………………………........... Tel. ……………………..…...............………

Type of Project: 
Expected Date of Completion (Date Supply Required)                        /        /            
day    month      year
        
AREA: PIN: Grid Ref.:  
A/C W/H Cooker/s Gen.Load Others Total Civil Engineer's Remarks:
Substation Civil work details approval with
comments on drawing No. ……......……………
…………………………………………………..
…………………………………………………..
TOTAL …………………………………………….…….
Method of Connection: …………………………………………….…….
Service Cabinet Direct to MSB Electric Room MV Panel
   M.D.                                                                                                
KW Installation Engineer's Remarks:
………………………………………………......…….
   C.L.                                                                                                 
KW
……………………………………………......……….
Planning Engineer Remarks:       .……………………………………………...........…..
 N              S               E              W …………………………………........………………..
………………………………………………......……………………………………… ………………………………….........……………….
…………......…….………………………………………………......…...….…………
……………………………………......…….………………………………...…………
Thermal Insulation Required for :
……......……………………………………………………......……..……...…………  Roof              Wall                Window 

Electrical supply to the plot is subject to the following conditions :
a- Availability of generation transmission capacity .
b-Availability of sufficient funds in the relevant budget .
c- Availability of sufficient roads in the area to permit the laying of necessary cables for power supply .
d- Upgrading of existing distribution network .
e- Allocation of substation in the area by the Municipality and its operations .
f- Applicant should construct a sub-station in his premises.
g- Kahramaa reserves the right to use the Substation and Transformer(s) in applicant's plot to supply 
     electricity to other customers.
h- Additional Conditions for The B.P.  :
  1-
  2-
  3-

* The owner should notify the Customer Services Department befor starting construction
* The electricity contractor of the project should prepare the connection point 
and submit the Supply Connection Form before six months of the building completion

* (The building permit is subject to the Qatari Law and the Law No. 4 for 2009)