LAGGING

2" MIN. BEARING LENGTH.


SHIM AS NECESSARY
WORK LINE FOR FULL BEARING.
SLOPE VARIES
LIMITS OF
PIGMENTED
1'-2" SEALER

1'-0"
CEMENT CONCRETE 2'-0" CHIP OUT SHAFT BACKFILL
GUTTER SEE BR. SHT. SP4 TO PLACE LAGGING.

3"
BACKFILL ALL VOIDS BEHIND
LAGGING WITH GRAVEL
BACKFILL FOR WALL.

(TYP.)
5'-0"
PREFABRICATED
W SECTION TYP. DRAINAGE MAT (TYP.)
W.P.
15°(TYP.) LIMITS OF

3'-0"
EXCAVATION PRIOR FRACTURED FIN FINISH

LIMITS OF PAINT ON PILE


TO P.G.A. TENSIONING WITH PIGMENTED SEALER
LINE OF NO .)
(TYP
LOAD ZONE -0" MIN. VARIES
15 '
¾"ø x 6" WELDED

HP
CONCRETE FASCIA REMAINING PORTION SHEAR STUDS
H
NGT OF SOLDIER PILE SHAFT AT 1'-0" (TYP.)
D LE . PANELS
BON

CONTROLLED DENSITY FILL


N
" MI
15"-0
LAGGING (TYP.)
SEE TABLE THIS SHEET PLAN - SOLDIER PILE
WALL WITHOUT P. G. A.
62°

HP/3

1'-0"
3:1
SLO

2'-0" BELOW FINAL


LAGGING

EMBEDMENT "D" VARIES


(5' MIN.)

*
PE 2" MIN. BEARING LENGTH.

2'-0" BELOW FASCIA


SHIM AS NECESSARY FOR

GROUND LINE
FOR DIAMETER OF FULL BEARING.
SOLDIER PILE SHAFT, PGA

¢ PILE
SEE BR. SHT. SP2 FINAL GROUND LINE

è
TIMBER LAGGING SIZES
í í
DEPTH (FT) SIZE
GRAVEL BACKFILL FOR WHERE NECESSARY CHIP OUT CDF
0 - 9 4 x WALL AS REQUIRED TO PLACE LAGGING.

3" CLR.
9 - 18 6 x BACKFILL VOIDS BEHIND LAGGING
WITH GRAVEL BACKFILL FOR WALL
18 - 30 8 x 8"ø XS PIPE (TYP.)
PREFABRICATED
4 x - OPTIONAL 4 x 8, 4 x 10 OR 4 x 12 DRAINAGE MAT (TYP.)
6 x - OPTIONAL 6 x 8, 6 x 10 OR 6 x 12 W SECTION TYP.
* USE CONTROL DENSITY FILL WHEN PLACED
8 x - OPTIONAL 8 x 8, 8 x 10 OR 8 x 12
TYPICAL SECTION

¢ PILE
IN THE DRY. USE LEAN PUMPABLE CONCRETE
WHEN PLACED IN THE WET.
NOTES TO DESIGNER: SHOWN FOR SOLDIER PILE WITH P.G.A.
SIMILAR FOR SOLDIER PILE WITHOUT P.G.A.
í DEPTHS AND SIZES SHOWN ARE ONLY AN EXAMPLE. FILL IN
THE TABLE ACCORDING TO THE EARTH PRESSURE DIAGRAM P.G.A.= PERMANENT GROUND ANCHOR REMAINING PORTION
AND RECOMMENDATIONS FROM THE GEOTECHNICAL SERVICES BRANCH, OF SOLDIER PILE SHAFT
BASED ON LRFD TIMBER DESIGN FOR PERMANENT LAGGING.

è DETERMINE, IF POSSIBLE, THE TIME LENGTH THAT THE


WALL LAGGING WILL BE USED AS THE PRIMARY STRUCTURAL
MEMBER IN THE TRANSVERSE DIRECTION BEFORE A PERMANENT PLAN - SOLDIER PILE
WALL FASCIA IS APPLIED.
WALL WITH P. G. A.

LAGGING IN SERVICE
8.1-A3-2B

0
36 MONTHS OR LONGER

Tue Aug 07 10:19:55 2007