180 KVA

Micro activities upto Functional test


PDC Status/remarks
1 110 V circuit protection & indication for
logic test.
2 Checking feed backs
3. Inverter

a Module Pulse transmission


 From Control rack to Interface
card
 From Interface card to Gate drive
card
 From gate Drive card to IGBT
gate
b Test with Low voltage DC input
connected to the DC Link
i) IGBT turn on/turn off wave form
iii) Testing with 3 phase balanced low
current load .
iii) Transition delay
iv) Deadband
v) Short circuit test
vi) di/dt protection
c. Test with increased DC Voltage input
connected to DC link
i) With 110 V DC
 Check gate pulse
 With low current 3 ph load
 With higher current 3 ph.load
ii)With 220 V DC
 Check Gate pulse
 With low current 3 ph load
 With higher current 3 ph.load
iii) With 560 V DC
 Check Gate Pulse
 With low current 3 ph load
 With higher current 3 ph.load

4. Rectifier
a Gate Pulse :-
 Transmission from Software to
Pulse transformer
 Gate Pulse
b Check DC Link Voltage with Low
voltage AC input
c Check DC Link Voltage (in isolation
from inverter ) with increased AC input
voltage
iv) With 110 V AC
 Check gate pulse
 With low current load
 With higher current load
v)With 230 V AC
 Check gate pulse
 With low current load
 With higher current load
vi) With V DC
 Check Gate Pulse
 With low current 3 ph load
 With higher current 3 ph

1. 110 V circuit protection & indication for logic test.


Nuct plan
2. Checking feed marks.
3. Checking of pulses &device protection.
4. Inverter module plus- transmission &device protection.
5. Rectifier Loop - lower voltage and then high voltage & loading & parameter monitoring & protection.
6. Inverter Loop - establishment with inverter DC Voltage input,
i) IGBT turn on vas form
ii) IGBT turn off vas form
iii) transition delay
iv) Deadhead
v) Short circuit test
vi) di/dr protection
4) Control lock -I
1) PI for 5/5 27th oct. spec. is 80% ready.
2) Precautions for Backplane Gerber from SLS.

3) Protection of ing. for Backplane +Classics PI

4) Hard work &insulation items Gerber of Backplane.

Eng. document for control rack.