Master Schedule for LS Cable Power Factory 2nd Phase

DATE : 2010.12.20
UTILITY AREA FACTORY AREA C.C.V TOWER AREA MISCELLNEOUS WORK & FINISH WORK

DATE READY 2010 2011 SITE progress


WORKS TO WORK DEC JAN FEB MAR APR MAY JUN JUL AUG SEP CLEAN (%)
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 1 3 5 7 9 11 13 15 17 19 21 23 25 27 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31

WORK START WORK FINISH

FENCE TEMPARARY FENCE INSTALLATION TEMPARARY FENCE REMOVAL 100

TEMPORARY LABOUR CAMP LABOUR CAMP BUILD LABOUR CAMP REMOVAL 98

96

EXCAVATION EXCAVATION 94

BACKFILLING BACKFILLING 92

P.C.C P.C.C 90

UTILITY REBAR REBAR INSTALLATION 88

(207DAYS) SHUTTERING SHUTTERING 86

R.C.C R.C.C 84

PLASTER & FINISH PLASTER & FINISH WORK 82

80

EXCAVATION C.B LINE A.D.E LINE MACHINE FDN MANHOLE & ETC 78

BACKFILLING FACTORY AREA FOUNDATION PEDESTAL & PLINTH BEAM MACHINE FOUNDATION MANHOLE & ETC 76

P.C.C B.C LINE A.D.E LINE MACHINE FOUNDATION MANHOLE & ETC 74

REBAR FACTORY AREA FOUNDATION FOOTING PEDESTAL & PLINTH BEAM MACHIN FOUNDATION MANHOLE & ETC 72

SHUTTERING FACTORY AREA FOUNDATION PEDESTAL & PLINTH BEAM MACHNE FOUNDATION MANHOLE & ETC 70

R.C.C FACTORY AREA FOUNDATION PEDESTAL & PLINTH BEAM MACHINE FOUNDATION MANHOLE & ETC 68

BRICKS FACTORY WALL BELOW PART 66

PLASTER FACTORY WALL BELOW PARRT MANHOLE & ETC 64


FACTORY AREA TRUSS & COLUM 62
FACTORY FABRICATION
STAIR CASE & MONITOR 60
AREA FACTORY AREA TRUSS & COLUM 58
(299DAYS) PAINT
STAIR CASE & MONITOR 56
ERECTION FACTORY AREA TRUSS & COLUM ERECTION PURLIN ERECTION 54
INCLUDE DECK
STAIR CASE & MONITOR 52
PLATE FACTORY
PANEL FACTORY ROOF FACTORY WALL
INSIDE
50
MONITOR FRESSING 48
FLASHING INSIDE
ROOF FRESSING OUT SIDE FRESSING
FRESSING
FRESSING FINISH WORK 46
FACTORY AREA SOIL LEVELING 44

FLOOR REBAR INSTALLATION 42


CONCRETE CASTING 40

EXCAVATION C.C.V TOWER 38

P.C.C C.C.V TOWER 36

REBAR C.C.V FOUNDATION C.C.V GROUND FLOOR ~6TH FLOOR 34

SHUTTERING C.C.V FOUNDATION C.C.V GROUND~6TH FLOOR 32

R.C.C C.C.V FOUNDATION C.C.V GROUND~6TH FLOOR 30

BACKFILLING C.C.V FOUNDATION 28


C.C.V BRICKS C.C.V AREA 26

AREA PLASTER C.C.V WATER PROOF C.C.V PLASTER & FINISH WORK 24

FABRICATION
(255 DAYS) 22
C.C.V TOWER MISCELLNEOUS WORK & ETC

PAINT C.C.V TOWER MISCELLNEOUS WORK & ETC 20


ERECTION C.C.V ERECTION MISCELLNEOUS WORK & ETC 18
INCLUDE DECK
C.C.V DECK PLATE 16
PLATE
PANEL C.C.V WALL 14
INSIDE
FLASHING OUT SIDE FRESSING
FRESSING
FRESSING FINISH WORK 12

10

SOIL LEVILING ROAD SOIL LEVELING 8

ROAD REBAR REBAR INSTALLATION 6

(61 DAYS) CONCRETE CONCRETE CAST 4

WINDOW OUT SIDE WINDOW INSTALLATION UTILITY WINDOW INSTALLATION 0

WINDOW INSIDE WINDOWS INSTALLATION

FINISH
TOILET & OFFICE BUILDING WALL
FLOOR, WALL & TOILET & OFFICE BUILDING FLOOR

WORK PAINT
PAINT WORK

(93 DAYS) DOOR INSTALLATION

DOOR & CEILING UTILITY CEILING

OFFICE BUILDING CEILING

weekly progress 0.23 0.31 0.35 0.43 2.36 2.50 3.35 3.50 3.41 4.72 4.42 2.3 4.58 4.56 4.08 4.27 4.02 2.99 2.83 1.7 3.01 3.05 3.16 2.61 2.33 2.07 2.00 1.46 1.94 1.96 1.13 1.08 1.76 1.77 2.27 2.12 2.24 2.89 2.85 1.43

cumulative 0.23 0.54 0.90 1.33 3.69 6.19 9.54 13.04 16.45 21.17 25.59 27.9 32.46 37.02 41.09 45.36 49.39 52.37 55.20 56.9 59.88 62.94 66.10 68.70 71.04 73.11 75.10 76.6 78.50 80.46 81.59 82.67 84.43 86.20 88.46 90.58 92.82 95.71 98.57 100
\