1. Any clauses that indicate 415V and 240V will be replaced to 400V and 230V.
2. Connection Guidelines
Table 2-1: Steady –state voltage level fluctuation limits under normal conditions
3. Replacement of LV Board
All new substations will no longer be equipped with LV Board inside the substation building
and will be replaced by Feeder Pillar that has to be installed outside of the substation
building.
All new substations (PPU, SSU & PE) can now be painted with other colour scheme as
requested by developer to blend with the surrounding environment with agreement of the
local TNB Area Manager. However, the TNB logo and substation name have to be
maintained as per-existing practice.