Addendum to Electricity Supply Application Handbook (ESAH) Second Edition

1. Any clauses that indicate 415V and 240V will be replaced to 400V and 230V.

2. Connection Guidelines

SECTION 2.0 – PLANNING AND DESIGN CRITERIA

Sub Section 2.1 (a) – Table 2-1 to be replaced as follows:-

Table 2-1: Steady –state voltage level fluctuation limits under normal conditions

Voltage Level % Variation


400V and 230V -6% & +10%
6.6kV, 11kV, 22kV, 33kV +/- 5%
132kV dan 275kV -5% & +10%

3. Replacement of LV Board

All new substations will no longer be equipped with LV Board inside the substation building
and will be replaced by Feeder Pillar that has to be installed outside of the substation
building.

4. Colour Scheme of Substation

All new substations (PPU, SSU & PE) can now be painted with other colour scheme as
requested by developer to blend with the surrounding environment with agreement of the
local TNB Area Manager. However, the TNB logo and substation name have to be
maintained as per-existing practice.