Professional Documents
Culture Documents
NO CONTENTS PAGE
NO
1 ABSTRACT 1
2 NLC CORPORATION LTD., 3
INTRODUCTION 5
MINE I 5
MINE II 6
THERMAL POWER STATION I 6
THERMAL POWER STATION II 6
MINE IA 7
THERMAL POWER STATION I EXPANSION 7
TRAINING COMPLEX 9
NLC’S CONTRIBUTION TO INDIA 9
9
FUTURE SCENARIO
3 THERMAL POWER STATION II 10
INTRODUCTION 11
FUEL HANDLING SYSTEM 12
STEAM GENERATOR 13
TURBINE 16
ELECTRICAL SYSTEM 17
4 0.4KV NORMAL/EMERGENCY BUS AND DIESEL GENERATOR SET 20
PLC BASED MONITORING OF 0.4KV N/E BUS 21
RELAYS 40
PROTECTION RELAYS 40
PARAMETERS THAT CAN BE MONITORED USING PROTECTION RELAYS 41
STATIC RELAY 42
MICROPROCESSOR BASED RELAYS 42
NUMERIC RELAY 43
DRIVE 43
AN UNIT 44
44
EMERGENCY BUS
OPERATION
5 SYSTEM ANDS CONTROL 46
SEAL OIL PUMP IMPORTANCE 50
6 EMERGENCY DIESEL GENERATOR SET 54
INTRODUCTION 54
CONSTRUCTION DETAILS 55
DESCRIPTION OF LAYOUT 56
AUTOMAINS FAILURE SYSTEM 60
CONTROL & INTERLOCKS OF INCOMERS AND BUS 62
OPERATING INSTRUCTION 67
GENERAL MAINTENANCE 69
EXISTING CONTROL LOGIC 71
7 PROGRAMMABLE LOGIC CONTROL 74
INTRODUCTION 76
PLC 76
USES OF PLC 76
WORKING OF PLC 77
TYPES OF PLC 78
81
TYPES OF PRPGRAMMING LANGUAGES 82
HARDWARE OF PLC 82
INPUTS 83
INPUT MODULE INTERFACING 87
OUTPUT MODULE INTERFACING 90
CENTRAL PROCESSING UNIT 90
SOFTWARE OF PLC 92
ELECTRICAL LADDER DIAGRAM 93
LADDER LOGIC INSTRUCTIONS 96
98
LADDER LOGIC PROGRAMS
100
ADVANTAGES OF PLC
DISADVANTAGES OF PLC
8 MODULAR PLC BASED I/O LISTING FOR 0.4KV SYSTEM 101
INPUTS(DIGITAL)-UCB END 102
OUTPUTS-UCB END 103
INPUTS(DIGITAL)-ANNEX END 104
OUTPUTS-ANNEX END 106
LADDER DIAGRAM 107
9 CONCLUSION 110