PREFACE
This is the first revision of Arahan Teknik (Jalan) 6/85 on 'Guideline for Presentation
of Engineering Drawings'. Although it is basically similar in essence and format to the one
published in 1985, various modifications have been made to suit current JKR requirements.
These guidelines should be followed for the presentation of engineering drawings for all road
projects under Cawangan Jalan, Ibu Pejabat J.K.R.
This Arahan Teknik will continue to be updated from time to time and in this respect, any
feedback regarding these guide lines will be most welcome. All comments should be
sent to Cawangan Jalan, Ibu Pejabat JKR, Malaysia.
Page 1
ARAHAN TEKNIK 6/85
FOR INTERNAL USE ONLY
(h) typical road cross sections and pavement 6.2 Drawing Index
details plan suitable scale
(i) alignment control plan 1:3,000 to 1:6,000 This drawing lists all the titles and number of
each drawing within the contract set.Please see
(j) plan and longitudinal horizontal 1:1,000 Model Drawing No. 3A for guidance.A
profile plans vertical 1:100 Drawing Numbering System has been drawn
up and all drawings must follow this system.
(k) cross section plans 1:100 or 1:200 For all projects, whether designed
(recommended) epartmentally or by Consultants, the project
number must be obtained from the
(I) junction details plans 1:250 or 1:500 Documentation Unit.Please refer to Section 7
for full explanation of the system.
(m) road marking plans suitable scale
6.3 Key Plan
(n) traffic, guide and and temporary sign plans
suitable scale This drawing should indicate :
(o) drainage plans suitable scale (a) project location with respect to other states
in the country;
(p) structures plans stated in section 6.16
(b) state boundaries;
(q) relocation of services suitable scale plans
(c) name of states and main towns
(r) miscellaneous plans suitable scale where the project is located;
(c) other projects in the vicinity if any; 6.7 Superelevation Details Plan
(d) local towns, villages, rivers,reservoirs This plan shall contain the following :
roads, railway tracks and other physical
features etc; (a) superelevation for curves with or
without transition;
(e) boxes encompassing a particular stretch of (b) superelevation for the single carriageway
alignment, details of which are shown in and where applicable, dual carriageway
the Plan and Profile plans whose reference too;
numbers are indicated next to the boxes; (c) typical shoulder treatment on superelevation
Please see Model Drawing No.7A for
(f) trigonometrical stations with heights; guidance.
6.6 Elements of Curve Plan (f) pavement design details such as design
period, cummulative total equivalent
This plan shall indicated thef ollowing : standard axles, base year, and design
subgrade CBR;
(a) typical horizontal curves with or
without transition; Please see Model Drawing No.8A for
guidance.
(b) typical vertical curve - parabolic curve;
(b) co-ordinates of all the I.P. points including (b) extend of R.O.W. to be acquired;
the starting and finishing points;
(c) running chainages along centreline;
(c) distances and bearings between all I.P.
(d) extend of cut and fill areas and
(d) horizontal curve data (as shown) carriageways in distinct shades;
for all I.P. points;
(e) location of any proposed culverts
(e) reference mark information for all and its details (including catchment and
I.P. points; discharge figures)and any proposed stream
deviation;
(f) locations and c'hainages of all ST and TS
points; (f) location of all structures such as
bridges and box culverts and their levels;
(g) location and chainages of all SC and CS
points; (g) locations of boreholes, temporary
bench marks and bench marksand their
(h) temporary bench marks with their levels; levels;
(i) all relevant Survey Department's (h) direction of flow of all proposed
bench marks with their levels; side drains and their levels;
(j) all relevant references to bound ary stone in (i) physical features such as existing roads,
setting out the first intersection point shall paths, tracks, public utilities etc. and
be indicated; contour lines;
(k) northing arrow; (j) vegetation of the area passed through, such
as rubber estate,padi fields, swamps etc.;
(1) suitable scales - 1:3,000 to 1:6,000.
(k) existing buildings, property lines and types
More than one section of the horizontal of buildings;
alignment can be shown on the same plan
using separator lines but the northing arrow (1) match lines;
should be indicated for each section. Please see
Model Drawing No. 9A for guidance.
(m) existing stream, rivers (with names), 6.11 Cross Section Plan
culverts, sumps,side drains etc., their flow
directions and levels and bridges and other This plan shall show the cross sections of the
structures; proposed road at various chainages along the
horizontal alignment. The details shall include:
(n) lot numbers and boundaries the alignment
passes through; (a) the existing ground's sectional profile;
6.10.2 Longitudinal Profile (c) the proposed finished road level at the
centreline;
The presentation shall be on graphical format
and shall include the following details: (d) the cross fall or superelevation of the
carriageway;
(a) running chainages as per the horizontal
alignment; (e) any other details deemed useful for
clarity;
(b) existing ground and proposed finished
levels; (f) suitable scales - 1:100 or 1:200
(recommended).Plans from computer
(c) profile of existing ground and the proposed printouts can be used, but must be presented
vertical alignment with the gradients; in A1 size drawings.
(e) locations of all proposed culverts, (a) general layout plan showing details of
sidedrains (with flow directions), guardrails carriageway widths, islands, limit of
and structures; R.O.W., property lots, dwellings and its
type,limit of project on minor roads etc.
(f) above the finished levels, details of the The shoulder should be shaded for better
superelevation and the horizontal alignment visual impact.
along a linear scale is to be provided;
(b) setting out plan with the sufficient details so
(g) scale - 1:100 as to enable the setting out of the junction;
Please see Model Drawing No. 10A for (c) drainage and kerb details of the junction
guidance. showing proposed type and position of
drain and kerbs, culverts etc.Proposed
superelevations of various pavement and
longitudinal section can also be indicated;
(d) road marking and traffic sign plan showing 6.15 Drainage Plans
the type and positions of the proposed road
markings,traffic signs and signals The drainage plans shall be sufficient enough
(if applicable). to depict all detail pertaining to drainage
matters and should include the following :
(e) suitable scales - 1:250 or 1:500.
(a) details of interceptor drain, bench drain,
Please see Model Drawing No. 11A, 12A, 13A roadside drain,shoulder drain, berm drain,
and 14A for guidance. toe drain,outfall drain, subsoil drain etc;
6.12.2 Traffic signal details shall (b) details of precast concrete slab,kerb,
include the location of the traffic kerb inlet, catchpit, sump,stream deviation,
signal posts, the type of lantern and bakau piling etc;
the proposed cycle times.Schematic
plans showing the various phases (c) details of culverts (whether reinforced
should also be included. concrete pipe,corrugated metal pipe or
box) with details of headwall and
6.13 Road Marking Plan wingwalls.
The plan shall show all details of the proposed A culvert schedule with the relevant particulars
lanes and pavement markings for the should also be prepared. Please see Model
centreline, edge line, continuity line, chevron, Drawing No.15A for guidance.
give way marking, stop line, pavement
direction arrows etc. 6.16 Structure Plans
All dimensions and details shall follow those This drawing shall normally be applied to
given in JKR publication "MANUAL ON bridges with following requirements:
TRAFFIC CONTROL DEVICES - ROAD
MARKINGS - ARAHAN TEKNIK (JALAN) 6.16.1 Bridge Structural Plans
2D/85I .
(a) The general arrangement and layout should
6.14 Traffic, Guide and Temporary include the following :
Sign Plans
(i) Location plan indicating the specific
Adequate traffic, guide andtemporary signs location of the bridge project with the
shall be proposed and shall follow those proposed alignment, local town, villages,
approved for use by the Department. rivers, roads, railway tracks and other
physical features. This should include the
The details are given in JKR publication latitude and longitude bearings and the
"MANUAL ON TRAFFIC CONTROL northing arrow (scale 1:10,000).
DEVICES - STANDARD TRAFFIC
SIGNS - ARAHAN TEKNIK (JALAN) 2A/85 (ii) Plan showing horizontal alignment of the
AND 2B/85", "MANUAL ON TRAFFIC centreline complete with limits of
CONTROL DEVICES - TEMPORARY carriageway,boreholes locations,direction
SIGNS AND WORK ZONES of flow, bench marks,physical features such
CONTROL - ARAHAN TEKNIK (JALAN) as public utilities,slope protection,
2C/85" AND "GUIDE SIGNS DESIGN AND drainage behind abutment etc.Pile layout
APPLICATION - ARAHAN TEKNIK can also be included here.
(JALAN) 2E/87".
(d) abutment-concrete 1:20, 1:25,1:30,1:40 Please see model Drawing No. 16A for
details butment-reinforcement guidance.
details ditto
(e) pier-concrete details ditto 6.17 Relocation of Services Plans
pier- reinforcement
details ditto This plans shall show detail for the relocation
of:-
(f) beams and diaphragms 1:5, 1:10 ,1:20, 1:25
(a) water mains;
(g) deck slab details 1:20, 1:25 1:50
(b) LLN posts and cables;
(h) handrails/parapet 1:2.5, 1:5,1:20
and expansion joints , (c) Telecom posts and cables.
(i) water main brackets etc. 1:1, 1:7.5,1:25 The drawings shall be in sufficient details to
properly define the scope of work. They shall
show the locations of the existing services and
6.16.3 Requirement for Dimension their proposed relocations.
(d) Descriptive dimensions of more than one (b) types of lanterns together with details of
metre shall be written to three decimal columns.
places and unit abbreviation 'm' included.
Thus,for normal water level is written
as such :- NWL 37.128m.
(iii) R stands for Rekabentuk,LB for rural (d) The eigth space is to be filled up by capital
roads by Unit Rekabentuk Jalan Luar alphabets A, B, C, D etc if there are
Bandar, JP for bridges on Federal components within the package.
Routes and JN for bridges on state
roads designed by Unit Jambatan. (e) The nineth space is to be filled up by two
alphabets represent each categories of detail
as follow:
(b) The first six spaces is to be filled by six
digits. (i)AM - represents general include list of
drawings, key and location plan,
(i) The first two digits (1st and 2nd spaces) general layout, abbreviation symbol
indicate the State code which shall be the and legend, element of curve,
swine as those used by tire JKR superelevation, guardrail, slope
Headquarters Computer Centre. protection, site office, all typical
They are as follows : drawings etc.
(x) LL - lain-lain 7.2 The system shall be used for all projects
represents miscellaneous plans include including all departmental and consultant
soil investigation subsoil profile, street designs.The recording of serial numbers of
lighting etc. projects will be registered by the
Documentation section, Unit Rekabentuk
(f) The tenth space is for the series of drawings Jalan, Cawangan Jalan, Ibu Pejabat JKR,
for the particular detail as described in 7.1 Kuala Lumpur.