ARAHAN TEKNIK 6/85

GUIDELINES FOR PRESENTATION OF


ENGINEERING DRAWING

PREFACE

This is the first revision of Arahan Teknik (Jalan) 6/85 on 'Guideline for Presentation
of Engineering Drawings'. Although it is basically similar in essence and format to the one
published in 1985, various modifications have been made to suit current JKR requirements.

These guidelines should be followed for the presentation of engineering drawings for all road
projects under Cawangan Jalan, Ibu Pejabat J.K.R.

This Arahan Teknik will continue to be updated from time to time and in this respect, any
feedback regarding these guide lines will be most welcome. All comments should be
sent to Cawangan Jalan, Ibu Pejabat JKR, Malaysia.

Page 1
ARAHAN TEKNIK 6/85
FOR INTERNAL USE ONLY

1. INTRODUCTION must have a Professional Engineer's chop and


signature of at least a director of the consulting
The following guidelines have been prepared eagineer's firm.
in order to standardise the presentation of
engineering design drawings for road projects 3. SEQUENCE OF DRAWINGS
undertaken by JKR.
Engineering data should be prepared in a
The objectives of setting these guidelines are : logical method starting from general
information and scope of work to increasingly
(a) to maintain a consistent standard in the specific details or items and method of work.
production of engineering drawings that The recommended sequence for the Drawings
will clearly and concisely describe the is set out in Section 5.
works to be carried out;
4. SCALES OF DRAWING
(b) to simplify the draughting process, the
checking of drawings and where possible The scales of drawings should be selected to
reduce the draughting requirements without clearly illustrate the information that is to be
detracting from the completeness of the relayed. Generally, to show more details, larger
works; scale of drawing and greater number of
drawings are required. However, the smaller
(c) to produce drawings that can be readily the scale, the more limited the designer is in
modified with a minimum of redrafting to relaying the complete information on one
provide complete "as constructed" records f drawing. Accordingly, informations may have
for the project. to be disaggregated so that one drawing may be
limited to one subject at a time.
These guidelines have been compiled by
incorporating the good features of design All scales are to be in metric system except for
drawings prepared by JKR and those submitted Land Acquisiton Plans which have to be in
by Consultants. accordance to the respective Land Office's
requirement.
2. DRAWINGS REQUIREMENT
5. SEQUENCE AND SCALES OF
All drawings (master tracings) are to be A1 DRAWINGS
size, 594mm, by 841mm with a 10mm, 12mm
and 21mm border. The title block as shown in 5.1 The following illustrates the sequence of
Model Drawings No.1A should be used for all Tender Drawings and scales that are to
drawings. No deviation from this is allowed. be used in a typical road project:

General notes and legends are to be located on DRAWING TITLE SCALE


the right hand side of the title block.
(a) cover or title page not applicable
Drawings should be arranged so that the
Northing Arrow is at the top right hand corner (b) drawing index not applicable
of the drawings.The Northing Arrow to be
used is as shown in Model Drawing No. 1A. (c) key plan 1:2,000,000 to 1:3,000,000
No other type of Northing Arrow is allowed.
All drawings submitted (including draft copies) (d) location plan 1:25,000 to 1:250,000

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 2


ARAHAN TEKNIK 6/85
FOR INTERNAL USE ONLY

(e) abbreviation, symbol and legend plan not 6. CONTENTS OF DRAWINGS


applicable
6.1 Cover or Title Page
(f) elements of curve plan not applicable
The cover or title page shall follow Model
(g) superelevation details plan not applicable Drawing No. 2A.

(h) typical road cross sections and pavement 6.2 Drawing Index
details plan suitable scale
(i) alignment control plan 1:3,000 to 1:6,000 This drawing lists all the titles and number of
each drawing within the contract set.Please see
(j) plan and longitudinal horizontal 1:1,000 Model Drawing No. 3A for guidance.A
profile plans vertical 1:100 Drawing Numbering System has been drawn
up and all drawings must follow this system.
(k) cross section plans 1:100 or 1:200 For all projects, whether designed
(recommended) epartmentally or by Consultants, the project
number must be obtained from the
(I) junction details plans 1:250 or 1:500 Documentation Unit.Please refer to Section 7
for full explanation of the system.
(m) road marking plans suitable scale
6.3 Key Plan
(n) traffic, guide and and temporary sign plans
suitable scale This drawing should indicate :

(o) drainage plans suitable scale (a) project location with respect to other states
in the country;
(p) structures plans stated in section 6.16
(b) state boundaries;
(q) relocation of services suitable scale plans
(c) name of states and main towns
(r) miscellaneous plans suitable scale where the project is located;

(d) all the major Federal Routes;


5.2 Land Acquisition plans will not form
part of the Tender Drawings but have to (e) northing arrow;
be prepared for the purposes of Land
cquisition.The scale will be as that (f) suitable scales - 1:2,000,000 to 1:3,000,000
required by the Land Office, usually The key plan can be combined with the
1 inch to 4 chains or 8 chains.The details location plan.
are given in JKR publication "GARIS
PANDUAN UNTUK PENYEDIAAN 6.4Location Plan
PELAN PENGAMBILAN BALIK
TANAH BAGI PROJEK JALAN This drawing shows:
PERSEKUTUA.N - ARAHAN TEKNIK
(JALAN) 7/85". (a) specific location of the project with respect
to the surrounding areas, limit of project
and kilometre post.

(b) the proposed alignment;

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 3


ARAHAN TEKNIK 6/85
FOR INTERNAL USE ONLY

(c) other projects in the vicinity if any; 6.7 Superelevation Details Plan

(d) local towns, villages, rivers,reservoirs This plan shall contain the following :
roads, railway tracks and other physical
features etc; (a) superelevation for curves with or
without transition;
(e) boxes encompassing a particular stretch of (b) superelevation for the single carriageway
alignment, details of which are shown in and where applicable, dual carriageway
the Plan and Profile plans whose reference too;
numbers are indicated next to the boxes; (c) typical shoulder treatment on superelevation
Please see Model Drawing No.7A for
(f) trigonometrical stations with heights; guidance.

(g) route number; 6.8 Typical Road Cross Section and


Pavement Details Plan This
(h) northing arrow; drawing shall indicate the
following :
(i) suitable scales - 1:25,000 to 1:250,000.
(a) typical road cross section in
Please see Model Drawing No.4A for embankment and cutting (for both flat and
guidance. rolling terrain where applicable) showing
width of carriageway, shoulders, camber,
6.5 Abbreviation, Symbol and drainage features etc;
Legend Plan
(b) superelevated typical cross sections where
This drawing shall contain : applicable;
(c) typical cross sections for urban and rural
(a) abbreviations, symbols and legends carriageways with drainage details and
and their corresponding full words, details access road,if applicable;
and representations.
(d) typical section for ground treatment
The abbreviations, symbols and legends (where applicable);
are standardised and should not be changed.
Please see Model Drawing No.5A for (e) section details of pavement including details
guidance. for the construction of pavement over
the existing pavement (where applicable);

6.6 Elements of Curve Plan (f) pavement design details such as design
period, cummulative total equivalent
This plan shall indicated thef ollowing : standard axles, base year, and design
subgrade CBR;
(a) typical horizontal curves with or
without transition; Please see Model Drawing No.8A for
guidance.
(b) typical vertical curve - parabolic curve;

(c) clothoid formulae or other for mulae


used and their notations.Please see Model
Drawing No. 6A for guidance.

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 4


ARAHAN TEKNIK 6/85
FOR INTERNAL USE ONLY

6.9 Alignment Control Plan 6.10 Plan and Longitudinal Profile


Plan
This drawing is to indicate the bearings and
distances of the various Intersection Points 6.10.1 Plan Profile
(I.P.'s) together with the details of the
horizontal curves and I.P. points. The details The details shall include the following
shall include the following :
(a) horizontal alignment of centreline
(a) points of limit of project and horizontal together with the limits of carriageway and
alignment indicated by all the I.P. points; shoulder;

(b) co-ordinates of all the I.P. points including (b) extend of R.O.W. to be acquired;
the starting and finishing points;
(c) running chainages along centreline;
(c) distances and bearings between all I.P.
(d) extend of cut and fill areas and
(d) horizontal curve data (as shown) carriageways in distinct shades;
for all I.P. points;
(e) location of any proposed culverts
(e) reference mark information for all and its details (including catchment and
I.P. points; discharge figures)and any proposed stream
deviation;
(f) locations and c'hainages of all ST and TS
points; (f) location of all structures such as
bridges and box culverts and their levels;
(g) location and chainages of all SC and CS
points; (g) locations of boreholes, temporary
bench marks and bench marksand their
(h) temporary bench marks with their levels; levels;

(i) all relevant Survey Department's (h) direction of flow of all proposed
bench marks with their levels; side drains and their levels;

(j) all relevant references to bound ary stone in (i) physical features such as existing roads,
setting out the first intersection point shall paths, tracks, public utilities etc. and
be indicated; contour lines;

(k) northing arrow; (j) vegetation of the area passed through, such
as rubber estate,padi fields, swamps etc.;
(1) suitable scales - 1:3,000 to 1:6,000.
(k) existing buildings, property lines and types
More than one section of the horizontal of buildings;
alignment can be shown on the same plan
using separator lines but the northing arrow (1) match lines;
should be indicated for each section. Please see
Model Drawing No. 9A for guidance.

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 5


ARAHAN TEKNIK 6/85
FOR INTERNAL USE ONLY

(m) existing stream, rivers (with names), 6.11 Cross Section Plan
culverts, sumps,side drains etc., their flow
directions and levels and bridges and other This plan shall show the cross sections of the
structures; proposed road at various chainages along the
horizontal alignment. The details shall include:
(n) lot numbers and boundaries the alignment
passes through; (a) the existing ground's sectional profile;

(o) northing arrow; (b) the proposed finished cross section


indicating the extent and shape of cut and
(p) scale - 1:1,000. fill required;

6.10.2 Longitudinal Profile (c) the proposed finished road level at the
centreline;
The presentation shall be on graphical format
and shall include the following details: (d) the cross fall or superelevation of the
carriageway;
(a) running chainages as per the horizontal
alignment; (e) any other details deemed useful for
clarity;
(b) existing ground and proposed finished
levels; (f) suitable scales - 1:100 or 1:200
(recommended).Plans from computer
(c) profile of existing ground and the proposed printouts can be used, but must be presented
vertical alignment with the gradients; in A1 size drawings.

(d) details of vertical intersection points, 6.12 Junction Details Plans


including the chainage and data on the
vertical curve. Locations of the BVC and 6.12.1 Junction details shall include
EVC are to be indicated too; the following:

(e) locations of all proposed culverts, (a) general layout plan showing details of
sidedrains (with flow directions), guardrails carriageway widths, islands, limit of
and structures; R.O.W., property lots, dwellings and its
type,limit of project on minor roads etc.
(f) above the finished levels, details of the The shoulder should be shaded for better
superelevation and the horizontal alignment visual impact.
along a linear scale is to be provided;
(b) setting out plan with the sufficient details so
(g) scale - 1:100 as to enable the setting out of the junction;

Please see Model Drawing No. 10A for (c) drainage and kerb details of the junction
guidance. showing proposed type and position of
drain and kerbs, culverts etc.Proposed
superelevations of various pavement and
longitudinal section can also be indicated;

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 6


ARAHAN TEKNIK 6/85
FOR INTERNAL USE ONLY

(d) road marking and traffic sign plan showing 6.15 Drainage Plans
the type and positions of the proposed road
markings,traffic signs and signals The drainage plans shall be sufficient enough
(if applicable). to depict all detail pertaining to drainage
matters and should include the following :
(e) suitable scales - 1:250 or 1:500.
(a) details of interceptor drain, bench drain,
Please see Model Drawing No. 11A, 12A, 13A roadside drain,shoulder drain, berm drain,
and 14A for guidance. toe drain,outfall drain, subsoil drain etc;

6.12.2 Traffic signal details shall (b) details of precast concrete slab,kerb,
include the location of the traffic kerb inlet, catchpit, sump,stream deviation,
signal posts, the type of lantern and bakau piling etc;
the proposed cycle times.Schematic
plans showing the various phases (c) details of culverts (whether reinforced
should also be included. concrete pipe,corrugated metal pipe or
box) with details of headwall and
6.13 Road Marking Plan wingwalls.

The plan shall show all details of the proposed A culvert schedule with the relevant particulars
lanes and pavement markings for the should also be prepared. Please see Model
centreline, edge line, continuity line, chevron, Drawing No.15A for guidance.
give way marking, stop line, pavement
direction arrows etc. 6.16 Structure Plans

All dimensions and details shall follow those This drawing shall normally be applied to
given in JKR publication "MANUAL ON bridges with following requirements:
TRAFFIC CONTROL DEVICES - ROAD
MARKINGS - ARAHAN TEKNIK (JALAN) 6.16.1 Bridge Structural Plans
2D/85I .
(a) The general arrangement and layout should
6.14 Traffic, Guide and Temporary include the following :
Sign Plans
(i) Location plan indicating the specific
Adequate traffic, guide andtemporary signs location of the bridge project with the
shall be proposed and shall follow those proposed alignment, local town, villages,
approved for use by the Department. rivers, roads, railway tracks and other
physical features. This should include the
The details are given in JKR publication latitude and longitude bearings and the
"MANUAL ON TRAFFIC CONTROL northing arrow (scale 1:10,000).
DEVICES - STANDARD TRAFFIC
SIGNS - ARAHAN TEKNIK (JALAN) 2A/85 (ii) Plan showing horizontal alignment of the
AND 2B/85", "MANUAL ON TRAFFIC centreline complete with limits of
CONTROL DEVICES - TEMPORARY carriageway,boreholes locations,direction
SIGNS AND WORK ZONES of flow, bench marks,physical features such
CONTROL - ARAHAN TEKNIK (JALAN) as public utilities,slope protection,
2C/85" AND "GUIDE SIGNS DESIGN AND drainage behind abutment etc.Pile layout
APPLICATION - ARAHAN TEKNIK can also be included here.
(JALAN) 2E/87".

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 7


ARAHAN TEKNIK 6/85
FOR INTERNAL USE ONLY

Longitudinal profile showing running (f) Beams


chainage as per horizontal alignment, These should include sectional, longitudinal
existing ground and the proposed levels, and plan details indicating all dimensions
extent of cut and fill and limits of bridge and cable profiles. The reinforcement
construction. and end block details may be on the same
or different drawings.
(iii) Detailed cross section showing
arrangement of beams and girders in The notes should include among other
typical section and other deck details. things the design criteria, ultimate bending
moment resistance and shear capacity,
(iv) Notes, legends etc., which should include brief material specifications etc.
the design criteria,relevant codes used and
other useful information. The list of (g) Diaphragms
other related drawings should also be These may be included in the drawings for
inserted. beams or together with details of deck
slab.
(b) Soil Profile
This should include the borehole details at (h) Deck Slabs
various depths till end of boring. Other These should include plan and sectional
laboratory test results such as plasticity details and reinforcement detail complete
index,plastic limit and liquid limit should with relevant notes.
be incorporated if available.
(i) Handrails/Parapet and Expansion Joints
(c) Piles
This should include pile details and joints. These should include plan,elevation and
The numbers and types of piles for sectional details complete with relevant
abutment and piers and their capacities and notes on material properties and installation
estimated lengths should be tabulated. requirements.
The notes should include the materials,
type of piles, (e.g. frictional or end (j) Water Main Brackets And Other
bearing), working loads, test loads and Miscellaneous Details
other relevant information.
Similar requirement as for item (i).
(d) Abutment and Wingwall Details These
should include typical cross section and 6.16.2 Sequence and Scales £or
elevation showing details for bearings and Bridge Structures
pile layout showing principal dimensions
and description of all structural component. The following illustrates the sequence of tender
The notes should normally include the drawings and scales that are to be used for a
concrete strength, cover etc. typical bridge structure :

A separate drawing showing rein DRAWING TITLE SCALE


forcement details shall be prepared with
proper legends and notes. (a) general layout 1:50, 1:100,1:150, 1:200

(e) Piers (b) soil profil suitable scale


Similar requirements as for abutments.
(c) pile detail 1:5, 1:10, 1:20, 1:50

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 8


ARAHAN TEKNIK 6/85
FOR INTERNAL USE ONLY

(d) abutment-concrete 1:20, 1:25,1:30,1:40 Please see model Drawing No. 16A for
details butment-reinforcement guidance.
details ditto
(e) pier-concrete details ditto 6.17 Relocation of Services Plans
pier- reinforcement
details ditto This plans shall show detail for the relocation
of:-
(f) beams and diaphragms 1:5, 1:10 ,1:20, 1:25
(a) water mains;
(g) deck slab details 1:20, 1:25 1:50
(b) LLN posts and cables;
(h) handrails/parapet 1:2.5, 1:5,1:20
and expansion joints , (c) Telecom posts and cables.

(i) water main brackets etc. 1:1, 1:7.5,1:25 The drawings shall be in sufficient details to
properly define the scope of work. They shall
show the locations of the existing services and
6.16.3 Requirement for Dimension their proposed relocations.

A typical requirement for dimension is shown 6.18 Miscellaneous Plan


below:
618.1 Miscellaneous plans are for
(a) All dimensions shall be expressed in metres those details not described
or millimetres. above and may consist of
the following :
(b) Units abbreviation shall be 'm' for metre
and 'mm' for millimetres. Abbreviation (a) streetlighting details;
should always be given in description notes
but not for normal dimensioning. (b) general subsoil profile. Please see Model
Drawing No. 17A for guidance.
(c) Normal dimensions of more than one metre
shall be written to three decimal places but 6.18.2 The streetlight detail should include :
with the decimal point omitted.Thus, four
metres three hundred and fifty millimetres (a) locations of all proposed lamp posts,
shall be written as 4350. crossings and feeders pillar boxes;

(d) Descriptive dimensions of more than one (b) types of lanterns together with details of
metre shall be written to three decimal columns.
places and unit abbreviation 'm' included.
Thus,for normal water level is written
as such :- NWL 37.128m.

(e) Dimensions expressed in millimetre shall be


whole numbers.

(f) Dimension shall be written to be read from


the bottom or right handside of the drawing.

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 9


ARAHAN TEKNIK 6/85
FOR INTERNAL USE ONLY

7. DRAWING NUMBERING SYSTEM (c) The seventh space is to be filled up by a


numeral w'nich represents section
7.1 The system used is as follows: component of a project. To standardise,
KPKR/J/R/ 1 2 3 4 5 6 /7 8/ 9 10 11 numeral in the form of 1, 2, 3, etc. is used.
Each numeral will represent a section of the
(a) (i) KPKR stands for Ketua Pengarah Kerja project or package in a package deal project
Raya; etc.This space will be zero if there is no
(ii) 7 stands for Jalan; component within the project.

(iii) R stands for Rekabentuk,LB for rural (d) The eigth space is to be filled up by capital
roads by Unit Rekabentuk Jalan Luar alphabets A, B, C, D etc if there are
Bandar, JP for bridges on Federal components within the package.
Routes and JN for bridges on state
roads designed by Unit Jambatan. (e) The nineth space is to be filled up by two
alphabets represent each categories of detail
as follow:
(b) The first six spaces is to be filled by six
digits. (i)AM - represents general include list of
drawings, key and location plan,
(i) The first two digits (1st and 2nd spaces) general layout, abbreviation symbol
indicate the State code which shall be the and legend, element of curve,
swine as those used by tire JKR superelevation, guardrail, slope
Headquarters Computer Centre. protection, site office, all typical
They are as follows : drawings etc.

01 Johor Darul Takzim (ii) PT - pengambilan balik tanah


02 Kedah Darul Aman represents land acquisition plan.
03 Kelantan Darul Naim
04 Melaka (iii) KB - keratan membujur
05 Negeri Sembilan represents alignment control plan,
06 Pahang Darul Makmur plan and longitudinal profile plan.
07 Perak Darul Ridzuan
08 Parlis (iv) KL - keratan melintang
09 Pulau Pinang represents cross section plan.
10 Sabah
11 Sarawak (v) LP - leaut persimpangan
12 Selangor Darul Ehsan represents junction layout plan,
13 Terengganu Darul Iman junction setting out plan, junction
14 Wilayah Persekutuan drainage and pavement su
perelevation details plan, junction
(ii) The second two digits (3rd and 4th spaces) road markings,traffic signs, traffic
indicate the year the project is approved light etc.
for design.
(vi) KT - kawalan lalulintas represents traffic
(iii) The third two digits (5th and 6th spaces) control plans include road markings,
indicate the series of the projects. traffic signs,guide signs, temporary
signs etc.

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 10


ARAHAN TEKNIK 6/85
FOR INTERNAL USE ONLY

(vii) PP - perparitan than one number of intersections or


represents drainage plans including structures in a project. For example, ST
subsoil drain, drains, culverts etc. 1/1,ST 1 stands for structure No.1 and 1 for
the series of drawings for structure No. 1.
(viii)ST - struktur For the first time of correction, it will be
represents structural plans including ST1/1A.
bridges, flyovers, grade-separated
interchange, retaining walls etc. (g) The eleventh space with capital alphabets in
sequence shall be used for the amendments
(ix) KA - kemudahan awam of drawings, for example;. 10C for third
represents public utilities plans. time of correction of the same drawing.

(x) LL - lain-lain 7.2 The system shall be used for all projects
represents miscellaneous plans include including all departmental and consultant
soil investigation subsoil profile, street designs.The recording of serial numbers of
lighting etc. projects will be registered by the
Documentation section, Unit Rekabentuk
(f) The tenth space is for the series of drawings Jalan, Cawangan Jalan, Ibu Pejabat JKR,
for the particular detail as described in 7.1 Kuala Lumpur.

(e) This space will be changed if there are more

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 11


ARAHAN TEKNIK 6/85
FOR INTERNAL USE ONLY

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 12


ARAHAN TEKNIK 6/85
FOR INTERNAL USE ONLY

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 13


ARAHAN TEKNIK 6/85
FOR INTERNAL USE ONLY

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 14


ARAHAN TEKNIK 6/85
FOR INTERNAL USE ONLY

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 15


ARAHAN TEKNIK 6/85
FOR INTERNAL USE ONLY

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 16


ARAHAN TEKNIK 6/85
FOR INTERNAL USE ONLY

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 17


ARAHAN TEKNIK 6/85
FOR INTERNAL USE ONLY

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 18


ARAHAN TEKNIK 6/85
FOR INTERNAL USE ONLY

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 19


ARAHAN TEKNIK 6/85
FOR INTERNAL USE ONLY

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 20


ARAHAN TEKNIK 6/85
FOR INTERNAL USE ONLY

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 21


ARAHAN TEKNIK 6/85
FOR INTERNAL USE ONLY

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 22


ARAHAN TEKNIK 6/85
FOR INTERNAL USE ONLY

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 23


ARAHAN TEKNIK 6/85
FOR INTERNAL USE ONLY

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 24


ARAHAN TEKNIK 6/85
FOR INTERNAL USE ONLY

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 25


ARAHAN TEKNIK 6/85
FOR INTERNAL USE ONLY
ARAHAN TEKNIK 6/85
FOR INTERNAL USE ONLY

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 27


ARAHAN TEKNIK 6/85
FOR INTERNAL USE ONLY

Cawangan Jalan, Ibu Pejabat JKR, K.L Page 28