You are on page 1of 12

C-25 S-300

Km Ks
19.00 3.95
20.00 3.96
21.00 3.96
22.00 3.97
23.00 3.98
24.00 3.98
25.00 3.99
26.00 4.00
27.00 4.02
28.00 4.03
29.00 4.04
30.00 4.05
31.00 4.06
32.00 4.07
33.00 4.08
34.00 4.09
35.00 4.10
36.00 4.11
37.00 4.12
38.00 4.15
39.00 4.17
40.00 4.18
41.00 4.20
42.00 4.21
43.00 4.24
44.00 4.26
45.00 4.29
46.00 4.31
47.00 4.34
48.00 4.36
49.00 4.39
50.00 4.41
51.00 4.46
52.00 4.49
53.00 4.51
54.00 4.56
55.00 4.62
56.00 4.65
57.00 4.67
58.00 4.73
Design of slab mat fondatiooon

P1= 1308.60 P3 P4
P2= 1368.00 B
Mx= -
My= - 3.5
P3= 729.00 P1 P2
P4= 849.60 A
Mx= -
My= -
S-1= 1432.49 4
S-2= 982.13
1 2
S-3= 1575.45
N.B .For dimensions please refer the drawings

a) Calculation of SP, exand ey

SP 8245.269 KN

M1,2 17597.73

x= 2.13

MA,B 17265.8655

y= 2.09

Eccentricity about the center of the slab

ex= 0.13 m
ey= -0.09 m

b) Calculation of contact pressure

s=SP(1/A+-ex*y/Ix+-ey*x/Iy)

Ix = 126.00 m4
Iy = 171.50 m4

Mx= 775.33
My= 1107.19

s = 277+-4.82*y+-4.82*x Mx/Ix= 6.15

sA1= 247.71 My/Iy= 6.46


sA2= 273.54
sB1= 226.18
sB2= 252.00
c) Calculation of Bending Moment and Determination of the Required
Depth to Satisfy the shear stress

Divide them in to two equivalent beams

A1-B1 s= 236.94

A2-B2 s= 262.77

MAB= 290.26 In the short direction

M12= 420.43 In the long direction

M= 295.61 Cantilever

Maximum shear would be the punching shear under the 1306KN

4x(0.4+d)dx641.67=1306

4x(0.4+d)d= 2.04

4d2+1.6d-2.04=0

solving the quadratic equation


d= 0.540 m
D= 0.570 m

Reinforcement determination

I- short direction

Km= 31.55
Ks= 4.06
f 20
A S= 2182.31 140 mm

II- Long direction

Km= 37.97
Ks= 4.12
f 20
A S= 3207.72 98 mm

III- Cantilever

Km= 31.84
Ks= 4.06
f 20
A S= 2222.58 140 mm
Shop and office Wzr Sewunet

Design of Ribbed slabs / With Hollow concrete slabs/

Design Date

Concrete class- C-25

fck= 20 MPa
fcd= 11.33 MPa

Steel grade S-300

fy= 300 Mpa


fyd= 260.87 Mpa

Use Class I Workmanship

HCB size 40x24x20 cm


g= 14 KN/m3
Concrete
g= 24 KN/m3
Floor finish
g= 23 KN/m3 (Cement screed
g= 23 KN/m3 (Terrazzo tiles)
g= 16 KN/m3 ( PVC tiles)
g= 27 KN/m3 (Marle )

Design procedure

The ribs are placed at a clear spacing of 400mm.


The Depth of the topping is 60mm and the concrete strength
shall be of the same class as that of the ribs.

Loading

The function of the building is for office and shop(Mixed use).


Therefore the live loading depends on the specific use of the floors.

Shop 5.00 KN/m2


Department sores 5.00 KN/m2
Offices 3.00 KN/m2
Restaurants and dining rooms 3.00 KN/m2

Structural analysis and design


Shop and office Wzr Sewunet

References:
EBCS 1, 2, 3 ,& 8

Slab Analysis
Solid slabs are preferable in areas where soil waste pipes pass.

Slabs for first floor and second floor


Panel Type Case No.= 2
Fck 20.00 Fcd 11.33 1 Fck
Fyk 300.00 Fyd 260.87 Fyk

0 S-1 1

ba for 2:1 ba for 1:1 Ratio calc. ba calc 1 ba for 2:1


30.00 40.00 1.14 38.57 1 -Continuous 30.00
Lx/4 0.88 0 -Discontinous

Panel Name S-1 D [mm] Panel Name


Depth Lx [m] Ly [m] ba calc d [mm] 60.00 Depth
3.50 4.00 38.57 36.30 200.00
D-Load Floor finish 5cm Screed Weight Ceiling Plaster Other.D.Load D-Load
0.06 1.15 5.00 0.46 0.00
Wall Load L(in) L(out) Wall Height Wall unit weight q Wall Load
1.70 1.70 2.70 3.30 2.50
Total dead load 9.17 Cover [mm] Total dead load
Live Load 5.00 15.00 Live Load
Design load 0.88 19.93 Design load
r values r1 r2 r3 r4 nd r values
0.00 1.33 1.33 1.33 1.00
Alpha values axs a ys a xf a yf b Alpha values
0.045 0.037 0.034 0.028 0.32
Moment Mxs Mys Mxf Myf Moment
10.98 9.03 8.30 6.83
k-value 340 280 260 220 k-value
r 0.13 0.11 0.10 0.08 r
Amin[sq.mm] 300 300 300 300 Amin
Ascal [sq.mm] 238 195 179 147 Ascal
Asfinal [sq.mm] 300 300 300 300 Asfinal
f # of bars # of bars # of bars # of bars f
10.00 5 5 5 5 10.00
S.max [mm] 400 400 400 400 S.max [mm]
S.calc[mm] 260.00 260.00 260.00 260.00 S.calc [mm]
S.final [mm] 260.00 260.00 260.00 260.00 S.final [mm]
Load Transfer on Beams Ly/Lx= 1.14
Shear coeffcient bvcx bvdx bvcy bvdy Shear coeffcient
#DIV/0! 0.00 0.36 0.24
Load on Beams #VALUE! Rdx Rcy Rdy Load on Beams
Total design load #DIV/0! N.A. 25.11 16.74 Total design load
Live Load #DIV/0! N.A. 6.30 4.20 Live Load
Dead Load #DIV/0! N.A. 11.56 7.71 Dead Load

Note:- N.A.-Means Not Applicable


Fck for C25 is 20Mpa

Structural analysis and design


Shop and office Wzr Sewunet

Analysis and design of staircase

Depth determination
d= 133.52 mm
D= 164.52 mm
Use D= 200.00 mm
d= 169.00 mm
q= 29.74 o

0.52 rad
Dead load
Inclined part Concrete 4.8
Screeed 0.69
Marble 0.54
tread + riser 0.54
Total 6.57 Kn/m2
Live load 5 Kn/m2

Pdead= 7.57
Plive= 5.00
Pd= 17.84

Landing part
Concrete 4.8
Screeed 0.69
Marble 0.54
Total 6.03 Kn/m

Live load 3 Kn/m2


Pd= 12.64

17.84
12.64 12.64

a b
1.25 2.52 1.6

Reaction determination
Taking moment about b)
Ra= 23.91
Rb= 57.06
Mmax= 22.01 Kn-m Span
Mmax= -15.92 Kn-m Support

Km= 27.76
Ks= 4.02
Ascal= 522.81
Reinf 12 c/c 150 mm

Structural analysis and design


Shop and office Wzr Sewunet

x M(x) Mmax

0 -
0.20 (4.53)
0.40 (8.55)
0.60 (12.07)
0.80 (15.08)
1.00 (17.59)
1.20 (19.59)
1.40 (20.06)
1.60 (19.49)
1.80 (18.21)
2.00 (16.21)
2.20 (13.50) (13.50)
2.40 (10.08)
2.60 (5.94)
2.80 (1.09)
3.00 4.47
3.20 10.75
3.40 17.74
3.60 25.44
3.77 32.55
3.80 30.84
4.00 19.76
4.20 9.18
4.40 (0.89)
4.60 (10.46)
4.80 (19.52)
5.00 (28.07)
5.20 (36.12) 0 0.5 1 1.5 2 2.5 3
5.37 (42.57) 35

30

25

20

15

10

-5

-10

Structural analysis and design


Shop and office Wzr Sewunet

Slabs for third floor and fourth floor


Panel Type Case No.= 2
20.00 Fcd 11.33 1
300.00 Fyd 260.87

2.55 1.51 0 S-1 1

ba for 1:1 Ratio calc. ba calc 1


40.00 1.14 38.57 1
Lx/4 0.88 0 -Discontinous

S-1 D [mm]
Lx [m] Ly [m] ba calc d[mm] 60.00
3.50 4.00 38.57 36.30 270.00
Floor finish 5cm Screed Weight Ceiling Plaster Other.D.Load
0.06 1.15 6.75 0.35 0.00
L(in) L(out) h Wall unit weight q
1.70 1.70 2.70 3.30 2.50
10.81 Cover [mm]
3.00 15.00
18.85
r1 r2 r3 r4 nd
0.00 1.33 1.33 1.33 1.00
axs a ys a xf a yf b
0.045 0.037 0.034 0.028 0.32
Mxs Mys Mxf Myf
10.39 8.54 7.85 6.47
170 140 130 110
0.06 0.05 0.05 0.04
417 417 417 417
161 132 121 100
417 417 417 417
# of bars # of bars # of bars # of bars
7 7 7 7
540 540 540 540
180.00 180.00 180.00 180.00
180.00 180.00 180.00 180.00
Load Transfer on Beams Ly/Lx= 1.14
bvcx bvdx bvcy bvdy
0.42 0.00 0.36 0.24
Rcx Rdx Rcy Rdy
27.97 N.A. 23.75 15.84
4.45 N.A. 3.78 2.52
16.04 N.A. 13.62 9.08

Structural analysis and design


Shop and office Wzr Sewunet

1.5 2 2.5 3 3.5 4 4.5 5 5.5 6

Structural analysis and design


Shop and office Wzr Sewunet

1) Design of Ribbed slabs / With Hollow concrete slabs/

Design Date

Concrete class- C-25

fck= 20 MPa
fcd= 11.33 MPa

Steel grade S-300

fy= 300 Mpa


fyd= 260.87 Mpa

Use Class I Workmanship

HCB size 40x24x20 cm


g= 14 KN/m3
Concrete
g= 24 KN/m3
Floor finish
g= 23 KN/m3 (Cement screed
g= 23 KN/m 3
(Terrazzo tiles)
g= 16 KN/m 3
( PVC tiles)
g= 27 KN/m3 (Marle )

2) Design procedure

The ribs are placed at a clear spacing of 400mm.


The Depth of the topping is 60mm and the concrete strength
shall be of the same class as that of the ribs.

Structural analysis and design


Shop and office Wzr Sewunet

2.1 Loading

The function of the building is for hospital.


Therefore the live loading depends on the specific use of the floors.

Offices 3.00 KN/m2


Wards 3.00 KN/m2

Rib slab

Topping 60mm use f 8 c/c200mm

Each rib carry half of the load b/n the ribs


Loading
Dead load HCB 1.34 KN/m
Conc. Topping 0.58 KN/m
Plastering 0.29 KN/m
PVC tiles 0.02 KN/m
Light wt. conc 0.92 KN/m
Total 3.14 KN/m
Live Load 1.50 KN/m

Load carried by end rib


Dead load 1.57 KN/m

Live Load 0.75 KN/m

Load carried by intermidiate rib


Dead load 3.14 KN/m

Live Load 1.50 KN/m

Analyze and design the rib beams as per the AR requirment

Structural analysis and design


Shop and office Wzr Sewunet

Structural analysis and design

You might also like