You are on page 1of 146
NATIONAL CONTRACTING CO. LTD. Sa goal) Lath gil oY gldall As wis (Abo Dhabi Bronch bat 70. Box: 40927 cee) ‘Abs hots 1a Cet sca Wee), wail Jol: 4971 2 447 2990 / 487 2993 “Sa SAVVY EVAL: / EEA Gib fox 99712 447 2901 ese ph a cab Tan cee etay ost Eel: necBreconratenoe Beg ES pd accel gins an ‘Transmission & Distribution Division ¥ © NCC/OMAN/OETC/74/2010/A8/01 05.10.10 M/s, AL-BABTAIN POWER & TELECOMMUNUICATION CO. Tel : + (82-2) 2189-9378 P.O.Box. 88373, Riyadh 11662. Fax : + (82-2) 2189-9349 Saudi Arabia. E-mail : leonidlee@/scable.com ATIN.: MR. Tamer A. Kalo, Marketing & Sales Manager Dear Sirs, Subject: OETC-85/2010 - UPGRADING 220kV SUR GRID STATION ~ 400kV Tower Design Inputs . NCC email dt. 06.09.10 Al-Babtain Fox Message # TAK-257A/F-Gé5/10/T-A(™) dt. 21.09.10 NCC email dt. 23.09.10 Al-Babtain Fox Message # TAK-2578/F-G65/10/T-A("*) dt. 21.09.10 Meeting @ NCC Abu Dhabi Office on 02.10.10, Reference yeep e With reference to the above and various discussions during meeting, we hereby enciose the followings documents for structural design. 1, OEIC # 74~ 400kV OHL SUR + OETC General Technical Specification for OHL © OETC Circulars * Technical Data for Conductor ‘+ Technical Data for OPGW Drawings for Hardware Fittings Please acknowledge receipt cf above documents. If you require any further clarification, please do not hesitate to contact us. Thanking You, Yours faithfully, For NATIONAL & ‘A Menber ofthe Alteza Group of Componies TD Division Office :Tel- +966 3 8683120 Fox: +966 3.868 3130 Head Office Tel #966 3 8828008 / 2825700 Fax +946 3 8826678, PO Box 90, AlKhohor 31952, Kingdom of Saud Arabia [ASSOCIATED COMPANY : REZAYAT EUROPE {TD, 2, MOUNT STREET, JONDON, WIK 25F OETC, OMAN TENDER NO. 74/2010 : UPGRADING 220kV SUR GRID STATION S.No Description Addi Des. ‘Annexure Comments and Response Sheet from Other Vendors 4 OETCGeneral technical Specification for Vol.2 Sec.40.17; 1 OHL Pages 1-50 2 OETC Circulars 19 Pages 2 ‘Addendum No.1 14 Pages Circular No. 4 18 Pages Circular No.3 1 Page = Circular No.5 7 Pages 3 Technical Data for Conductor 3 Midal Cables - Guaranteed Technical Particulars 41 Page - Drum Drawing 1 Page - Details of Grease 3 Pages | 4 Technical Data for PGW 4 - Technical Particul Guaranteed Technical Particulars 10 Popes from Taihan 5 Technical Drawings for Hardware Fittings los - Drawings of Insulator & Fittings, 20 Pages OPGW fittings from M/s. Pfisterer QETC, OMAN TENDER NO. 74/2010 : UPGRADING 220kV SUR GRID STATION 7a 7 re 70 80 Vendor Enquiry NCC Reply Please confirm the type of Conductor fo be used for this project (whether High Cenchcintty type oe Neral YEW conductor Refer attached M/s. Midal Cable Data Sheets & Drawings of AAAC YEW (HC) Please contirm the OPGW to be used for this project. Refer attached M/s. Tahihan Data Sheets & Drawings of OPGW Please confirm the details of "V" Suspension Insulator to be used for this project. Refer attached M/s. PFSTERER SEFAG AG Drawings Please confirm the details of Double Tension insulator (High Duty] to be used for this project. Refer attached M/s, PESTERER SEFAG AG Drawings Please confirm the details of Pilot Suspension insulator (Sting) lo be used for this project, Refer altached M/s. PFISTERER SEFAG AG Drawings Please provide the details of Pilot Suspension insulator |V-String] including drawing, which cast too wood ols lor smote ceonemne Soxgn Refer attached M/s. PFISTERER SEFAG AG Drawings Please provide claification/confirmation regarding electrical clearances, as follows: Please confirm the Shielding angle required. As per conceptual drawing provided, OPGW ishaving shielding angle of ODeg with respect to Top Phase Conducior, please confim | OF As per conceptual crawing provided, clearances for Safe Live Line Climbing Spaces was rot shown, however, as perllem # 5 of Circular Letter # 5, provision of DIN VDE 0105 i, Please refer Tender Circular Letter # 5. Item # 9 Engineers Clarifications. — Refer acceptable. Please provide the Safe live Line Climbing Spaces to be used for this Annexure -2 project. lease confirm that Top Cioss-aim Projection required to be exlended up-to the mid- portion of 2-Phase conductors in the Bottom Cross-armn as shown in the conceptual ox drawing, Please provide the mid-span separation requirements (arect valve} as per the requirements of Hem # 1 of Circular Letter # 5 Please refer Tender Circular Letter # 5, Item # | Engineer's Claifications. Please provide claiiicalion/confimation regarding OMT accessories, as follows: No. of aviation warming spheres provided for one span per OPGW: Nos. far DS and 7Nos. fenlersion Towers fla Reanored cotengament) Pease conten Maximum spacing shall not be more than 60m & 30mc/c staggered. Page 1 of 2

You might also like