Anglo Platinum Management Services (Pty) Limited

REGISTRATION No 1946/023092/07
Anglo Platinum Projects Division
AMS Master SHE Pack: Revision 6.0

The causes of construction related incidents and injuries are well known. The challenge
however is to ensure that effective preventative and precautionary measures are implemented
and maintained. AMS will provide the framework for the Contractor to execute the work in a safe
manner. As Specialist Contractor, the Contractor will remain responsible to ensure the safe
execution of all work for the duration of the project. SHE forms parts of the tender adjudication
criteria and the Contractor shall ensure that SHE documentation is submitted as specified.
(Contractor Project SHE Specification – Section 5: Document 5.1)

A CD containing the AMS SHE Pack is included in the tender documentation. This CD contains
comprehensive documentation on the AMS SHE system and requirements. The essence of the
SHE documentation is summarized in the Assessment Protocol (Section 5: Document 5.3). The
implementation and compliance with all Assessment elements will be a pre-requirement for
work to commence on site. This document is only a guide to assist the Contractor in preparing
the SHE budget when tendering. The issue of the CD does not relief the Contractor from
complying with all legal requirements if not specifically required.

Legal compliance with the Occupational Health and Safety Act 85/1993, Regulations and
Construction Regulations, The Mine Health & Safety Act 29/1996, and Minerals Act 50/1991
and Regulations, Compensation for Occupational Injuries and Diseases Act 130/193 is a
minimum requirement, but does not exclude the tenderer from compliance with all other relevant
legislation.

The Contractor to ensure at all times that they are in possession of the latest revision of the
AMS SHE Pack. The Contractor shall ensure that their contract price specify and include for all
the requirements of AMS SHE Pack.

The information as required by the Contractor Project SHE Specification, Document 5.1
must be contained in a folder with a contents page and dividers between various
documents. The same numbering system as is reflected within this document, to be
adopted. The folder must then be submitted as an annexure to the tender document.