First Revised
Proposa Proposa
l Total l Total
Departments Hrs % Rate Rate
Casting/Stamping 21 17% 52.97 1,112 53.12 1,116
Grinding 12 10% 48.14 578 46.75 561
Machining 58 46% 87.52 5,076 86.5 5,017
Assembly 35 28% 40.19 1,407 39.14 1,370
Total Proposed Method 126 8,173 8,063
Total present method 126 55.96 7,051 55.96 7,051
First Revised
Proposa Proposa
l Total l Total
Departments Hrs % Rate Rate
Casting/Stamping 304 18% 52.97 16,103 53.12 16,148
Grinding 270 16% 48.14 12,998 46.75 12,623
Machining 1115 66% 87.52 97,585 86.5 96,448
Assembly 0% 0 39.14 0
Total Proposed Method 1689 126,685 125,218
Total present method 1689 55.96 94,516 55.96 94,516