Quantity of 12 mm thick cement sand plaster on ceiling / Walls: (1:4)

L B Thickness Volume Total Volume Dry Volume Cement


m m m Cu-m 20 % filling Gap Cu-m (V) 125% of V Cu-m
5.000 4.000 0.012 0.240 0.048 0.288 0.360 0.072
Quantity of 12 mm thick cement sand plaster on Walls: (1:6)
L H Thickness Volume Total Volume Dry Volume Cement
m m m Cu-m 20 % filling Gap Cu-m (V) 125% of V Cu-m
5.000 4.000 0.012 0.240 0.048 0.288 0.360 0.051
Quantity 1:2:4 concrete
L B D Volume (V) Dry Volume Cement Sand
m m m Cu-m 150 % of V Cu-m Bags Cu-m
28.317 1.000 1.000 28.317 42.476 6.068 182.04 12.136
Quantity 1:4:8 concrete
L B D Volume (V) Dry Volume Cement Sand
m m m Cu-m 150 % of V Cu-m Bags Cu-m
10.000 0.600 0.075 0.450 0.675 0.052 1.56 0.208
Figures in Blues colours only need to be changed
Walls: (1:4)
Cement Sand
Bags Cu-m Cu-ft
2.16 0.288 10.17
s: (1:6)
Cement Sand
Bags Cu-m Cu-ft
1.54 0.309 10.90

Sand Crush
Cu-ft Cu-m Cu-ft
428.57 24.272 857.15

Sand Crush
Cu-ft Cu-m Cu-ft
7.33 0.415 14.67
Compatibility Report for quanthity calculator.xls
Run on 11/1/2009 0:29

The following features in this workbook are not supported by earlier versions
of Excel. These features may be lost or degraded when you save this workbook
in an earlier file format.

Minor loss of fidelity # of occurrences

Some cells or styles in this workbook contain formatting that is not supported 10
by the selected file format. These formats will be converted to the closest
format available.

You might also like