SI NO   C H  STRUCTURE DESCRIPTION OF WORK REMARK

1 0+000 Grade Sepatator Vertical load test  ‐ ( A 2  ‐ LHS ‐ P  7)


A 1 ‐  LHS ‐    P  ‐ 9
A 1 ‐  LHS ‐    P  ‐ 11
A1 ‐ RHS ‐ P ‐10 
2 1+746 R O B Excavation Abt ‐ A 1  Raft  
3 1+247 Minor bridge  Abt ‐ A2 final lift wall  RCC  
4 7+412 Major bridge   RCC   for  (  S ‐ 3  / G ‐ 1  )   
RCC   for  (  S ‐ 3  / G ‐ 4  )   
5 9+528 V U P   Retaining wall  ‐ K  /  S   Final   Lift
6 11+380 Box Culvert   Retaining wall  ‐ RHS     ‐ 1 st Lift
7 11+455 Box Culvert   Retaining wall  ‐ LHS   ‐ 1 st Lift
8 11+636 Box Culvert   R / W ‐ Raft Concrete   RHS   ‐  TS&KS
9 11+861 V U P   R / W ‐ Raft concrete ‐     K  / S  
R / W ‐ Raft   PCC  ‐    T  / S 
10 14+188 Major bridge   P ‐ 3  Wall  Final  lift  
Abt ‐  2  Wall  Final lift  
11 14+642 Box Culvert   Wing wall    ‐  Raft concrete  LHS & RHS  
12 16+560 Box Culvert   Balance  Raft concrete 

(  We request you to furnish the RFI No  for the above mentioned activity at the earliest)  

For Elite Engineering and Construction  

PLANNING DEPT  ‐ J012
ELITE ENGINEERING AND CONSTRUCTION

CLIENT : M/S.TECHTRANS CONSTRUCTION INDIA (P) LTD.,
Dated:  08.08.10
th
RFI‐ J012  FOR 10    August   2010  

SI NO   C H  STRUCTURE DESCRIPTION OF WORK REMARK

1 0+000 Grade Sepatator Vertical load test  ‐ ( A 2  ‐ LHS ‐ P  7)


A 1 ‐  LHS ‐    P  ‐ 9
A 1 ‐  LHS ‐    P  ‐ 11
A1 ‐ RHS ‐ P ‐10 
2 1+746 R O B Excavation Abt ‐ A 1  Raft  
3 1+247 Minor bridge  Abt ‐ A2 final lift wall  RCC  
4 7+412 Major bridge   RCC   for  (  S ‐ 3  / G ‐ 1  )   
RCC   for  (  S ‐ 3  / G ‐ 4  )   
5 9+528 V U P   Retaining wall  ‐ K  /  S   Final   Lift
6 11+380 Box Culvert   Retaining wall  ‐ RHS     ‐ 1 st Lift
7 11+455 Box Culvert   Retaining wall  ‐ LHS   ‐ 1 st Lift
8 11+636 Box Culvert   R / W ‐ Raft Concrete   RHS   ‐  TS&KS
9 11+861 V U P   R / W ‐ Raft concrete ‐     K  / S  
R / W ‐ Raft   PCC  ‐    T  / S 
10 14+188 Major bridge   P ‐ 3  Wall  Final  lift  
Abt ‐  2  Wall  Final lift  
11 14+642 Box Culvert   Wing wall    ‐  Raft concrete  LHS & RHS  
12 16+560 Box Culvert   Balance  Raft concrete 