You are on page 1of 2

Radiogram No.

5213u Form 24 for 04/27/07


Replacing АСУ Components. ВД-СУ Mode Deactivation and БИТС Power off
GMT CREW ACTIVITY

06:00-06:10 Morning inspection


06:10-06:40 Post-sleep
06:40-07:30 BREAKFAST
07:30-07:55 Prep for Work
07:55-08:10 Daily Planning Conference (S-band)
08:10-08:25 ISS crew and ГОГУ (RSA Flight Control Team) weekly conference (S-band)
08:25-11:55 FE-2 SPHERES - session
08:25-08:40 CDR, FE-1 IMS tagup (S-band)
08:40-09:55 CDR PNEVMOCARD. Experiment ops. Tagup as necessary (S-band)
08:40-09:40 FE-1 Physical Exercise (RED) day 2
09:40-13:10 FE-1 Replacement of АСУ package (including urine receptacle and filter-insert)
09:55-11:05 CDR Measuring voltage on ДВ2 bus, lane БСК-0.5-ТА075. Tagup (S-band)
11:15-11:25 CDR Temperature monitoring on secondary purification unit after Elektron activation
11:55-13:25 CDR Physical Exercise (CEVIS) day 2
11:55-12:55 FE-2 Physical Exercise (RED)
12:55-13:05 FE-2 O2 level check
13:05-13:10 FE-2 Mating of ER16 moderate temperature loop QD to UIP in LAB 102
13:10-14:10 FE-2, FE-1 LUNCH
13:25-14:25 CDR LUNCH
14:10-14:35 FE-1 Crew time for ISS adaptation and orientation
14:30-14:35 FE-2 SAMS ICU Activation
14:35-15:35 Medical Emergency Training using CHeCS
15:35-15:55 CDR IMS update
15:35-17:05 FE-1 Physical Exercise (TVIS), day 2
15:40-16:00 FE-2 EXPRESS Rack 3 - Laptop replacement
16:00-17:00 CDR Crew time for ISS adaptation and orientation
16:00-16:10 FE-2 FMK stow
16:10-17:40 FE-2 Physical Exercise (CEVIS)
17:05-18:05 CDR Physical Exercise (VELO+RED) day 2
17:15-17:45 FE-1 Relabel Kit 6 bag for [СОТР ТК]. Tagup as necessary (S-band)
17:40-18:00 FE-2 EXPRESS Rack 3: Starting software upload
17:45-18:05 FE-1 Evening work prep
18:00-18:05 FE-2 Connect LTL QD
18:05-18:20 Daily Planning Conference (S-band)
18:20-18:55 FE-1 Crew time for ISS adaptation and orientation
18:20-18:50 CDR СОЖ maintenance
18:20-18:25 FE-2 Transfer of TVIS/RED/CVIS data to MEC
18:25-18:30 FE-2 SSC file server reboot
18:30-18:35 FE-2 OCA SSC router reboot
18:35-18:40 FE-2 Evening work prep
18:40-18:50 FE-2 EXPRESS Rack 3: terminate Interface Controller software upload
18:50-19:10 CDR,FE-2 Evening work prep
18:55-19:10 FE-1 Evening work prep
19:10-19:40 DINNER
19:40-20:00 Flight Director / ISS Crew Tagup (S-band)
20:00-20:30 Daily food prep
20:30-21:30 Pre-sleep
21:30-06:00 SLEEP
Note: See OSTP for references to US activities.
End of Radiogram

You might also like