Project Value:
£1.5m
Project Duration:
6 months
• The strip out and removal of old boiler plant and associated asbestos insulation
• Supply and installation of new boiler plant and associated controls
• New gas installation to feed gas fired heaters on the shop floor
• Refurbishment and upgrade of existing wet heating system in staff and back of house areas
• Plumbing and ventilation installations to kitchens, staff and colleagues toilets
• Installation of gas fired over door heaters to customer entrance and exit areas.
Works were carried out over a twenty six week period and were completed to
programme and to budget with absolutely no loss of trading to the store. This
success was despite the lighting system being redesigned after the project start
date and the late instruction to upgrade the store heating system.