You are on page 1of 4
Driveways. Residential Driveway Permit ‘Commercial Access - New Drive up to 8 Spaces ‘Commercial Access - New Drive 9 to 20 Spaces Commercial Access - New Drive 21 to 50 Spaces Commercial Access - New Drive 51 + Spaces 63.00 | 107.10 226.80 258.30 378.00 | NOTE: Second diveay onthe ame parmit would bo an sditonal 50% ofthe above foe. ‘Commercial - Recap Existing Driveway Commercial - Detail Review ‘Temporary Construction Access Private / Public Road New Private / Public Road Approach ‘Approach Detail Review Construction Inspection Inspection Fee Inspection Fee without permit Utilities Single Day Permit Annual Blanket Permit (Utilities & Surveyors) ‘Overhead & Underground Utilty Permits plus $.05 per linear foot Utilities/Boring Road Bore Utilities/Tapping Tapping County Storm Sewer $ $ $ 63.00 81.90 | 63.00 233.10 126.00 | 510.0 | 56.70 2009 Permit Fee Schedule Utilities/Road Cuts Bituminous Roadcut / Replaced by CCRC Includes minimum replacement of 110 sq ft ‘Additional Bituminous replacement per sq f. Gravel Road Cut Use / Right of Way Seismic Testing Temporary Road Closure - Single Day Permit Miscellaneous Right-of-Way Detour Routes $ 13.20 per mile per day Speci ‘Transportation ‘Annual Cab Card per Vehicle Single Move Permit Frost Law Permits Frost Law Pormits are only issued to exemptions {as defined in Act 300 of the Michigan Vehicle Code, Subsection 257.722 1108 Vehicles 4107 Vehicles 810 10 Vehicles Bituminous Roadcut / Replaced by Utlity Company 8 s $ 8 $ $ 8 8 2,024.40 18.13 378.00 252.00 157.50 31.50 128.00 316.00 630.00 2009 Permit Fee Schedule (page 2) Soil Erosion & Sediment Control™ Residential Earth Change - Up to and incl 2 acres 1-30 days 31-60 days - ADD 61-90 days - ADD 91-120 days - ADD 121-150 days - ADD 151-180 days - ADD 181-210 days - ADD 211-240 days - ADD 241-270 days - ADD. 271-300 days - ADD 301-330 days - ADD 831-361 days - ADD $ $ $ $ $ 8 8 8 8 8 8 42.00 INCL. 27.60 55.20 82.80 110.40 198.00 165.60 493.20 220,80 248.40 276.00 203.60 ‘Other Earth Change - > 2 and incl § acres $ 165.60 1-30 days INCL. 91-60 days- ADD $ 276.00 61-90 days-ADD $ 386.40 91-120 days-ADD $ 496.80 121-150 days-ADD $ 607.20 151-180 days -ADD $ 717.60 181-210 days-ADD $ 828.00 211-240 days ADD $ 938.40 241-270 days -ADD § 1,048.80 271-300 days -ADD $ 1,159.20 301-330 days ADD $ 1,269.60 831-61 days -ADD $ 1,380.00 [Gvor acres tare wil bo an dations 10.00 fos par aote por 5 days. AcToage wil bo round up tothe nearest ace, (Ve 23 il be rounded to 3 and charged an adctinal § 0.00 per 30 day period) [over s acres thar willbe an adational $10.00 fee por acre per 30 days. Acreage vibe rounded to upto the nearest acre. (V0 5.3 will bo rounded to 6 and charged an adtonal 860.00 1230 day pid) (Other Earth Change - Up to and ine! 2 acres 1-30 days 81-60 days - ADD. 61-90 days - ADD 91-120 days - ADD 421-150 days - ADD 181-180 days - ADD 181-210 days - ADD 211-240 days - ADD 241-270 days - ADD 271-900 days - ADD 301-330 days - ADD 331-361 days - ADD 110.40 INCL 165.60 220.80 276.00 331.20 386.40 441.60 496.80 552.00 607.20 662.40 717.60 "NOTE: In determining costs forall soil erosion permits 20 days will equal one compete ‘month regardless ofthe # of days in any specific month. JExainple of coats for @ 12 acre pemil for six months: ‘st 5 acres - six months (180 days) use above chart. $ 716.60 Adatl 7 acres ($10.00 per acre) = $ 70.00 per month 1 fora total of six months = $ 70.00 x 6) $ 420.004 “if not within 500" of Waters of the State and under 1 acre a SESC permit is not required. If within 500’ of Waters of the State then a SESC permit is required regardless the earth change size. Waters of the State are defined as-Great Lakes and their connecting waters, inland lakes and streams as defined in rules, promulgated under the part, and wetland regulated under part 303. nor loxainance for Calhoun County. allure to obtain a Soll Erosion permit prior to earth change will result ina eease-and-desist order followed by a violation notice per Sol Erosion and Sedimentation Control Barricade Rentals Rontal Class Il Lighted plus $ 2.00 per day Rental Ciass Ill Lighted plus $ 4.00 per day Replacement Class Il Lighted Replacement Class Ill Lighted Delivery and Pick Up Sign Rentals & Purchases Signs - Rental plus $2.00 per day Signs - Replacement 10 replace above signs If lost Hidden Driveway Sign Used Sign Posts Misc. Road Materials Used Scrapper Blades Cold Patch - Per Ton (must sign annual contract) ‘Standards Handbook Standard Specification Book printed or CD Road Certification Book ‘CCRC Road Certification Book Traffic Basie Traffic Count- New Data Basic Speed Study- Now Data ‘Traffic Count and Analysis - New Data Speed Study and Analysis- New Data Note: Existing Data - photocopy fee and actual postage rate 2009 Other Fees & Services Ss 87.80 S 69.30 S$ 9450 $ 378.00 $ 189.00 $ 1890 $ 126.00 $ 187.50 8 6.00 8 10.00 $95.00 $37.80 $50.40 S$ 94.60 $ 9450 $ 189.00 $ 189.00 Jrtsestareoee Fees i Photocopies Single Sided (8.5x11 to 11x17) Photocopies Double Sided (8.5x1 1 to 11x17) Retumed Cheok Fee ‘Addressing Fees New Address ‘Address Change ‘Street Name Change plus’ *Each additional address change “Each additional road marker “Mapping change Abandonments / Site Reviews ‘Abandonment Request plus actual cost of land survey PlalSubdivision Site Review (Preliminary & Final) Condo Site Review FOIA FEES Office Help Time Including fringes and overhead above fee is per hour Photo Copy - Single sided - paper included Photo Copy - Double sided - paper included Large Malling Envelope 4# 10 Business Envelope Postage Charge 33.19 0.30 0.35 0.25, 0.10 ‘Actual Taps ‘County Maps (limits may apply) USGS Maps s Aerials ‘The following prices are for either black and white or color Photo. ‘Map Aerial maps from 2009 - 2006, Placing Data on C.D. 8 plus $ 10.00 per 1/4 hour as needed Map Size -8.5"x 11" $.25 for each additional copy Map Size - 8.5" x 14" $.25 for each additional copy Map Size - 11" x17" $.50 for each additional copy Map Size beyond 11" x 14" Plus $.02 per sq inch ‘The following 1966 that have been archived, 8,5" x 11" - black and white only 8 plus $ 10.00 per 1/4 hour for retrieval of maps 8.5" x 14" - black and white only plus $ 10.00 per 1/4 hour for retrieval of maps 11" 17" black and white only plus $ 10.00 per 1/4 hour for retrieval of maps NOTE: Because size and variations in media of existing planning/zoning ‘maps, costs associated in thelr production may vary 2009 Other Fees & Services (pat FREE 12.60 GIS Services Development of GIS Map and One Color Plot on Opaque Bond Paper * ‘plus labor costs for development time Development of GIS Map and One Color Plot on High Gloss Paper? ‘plus labor costs for development time Development of GIS Data placed on a Compact Disc.” ‘plus labor costs for development time 19.50 | Color Plots of Existing GIS Maps on Bond Paper 9.46 |) Color Plots of Existing GIS Maps on Gloss Paper E 9.46 | Parks & Recreation B Kimball Pines Pavilion Rental q (Includes $ 20.00 refundable key deposit) Historie Bridge Park Pavilion Rental ‘Special Use Permit (Parks) 0.30 $ 50.40 8 56:70 8 50.40 048 per sq in 8 56.70 S$ 84.00 $48.00 $ 210.00 $50.40

You might also like