You are on page 1of 16

LOG SHEET OF DIVERSIFIED TRAINING FOR

ARCHITECTS LICENSURE EXAMINATION

DT FORM 001

Candidate

SHEET NO.
1 of 1

Jara, Jose Francisco R.

SUMMARY
FIELD OF PRACTICE

%
(MAX.)

MINIMUM
CREDIT
HOURS

TOTAL NO. OF
HOURS
ACCOMPLISHED

30%

1152 hrs.

1232

25%

960 hrs.

1016

15%

576 hrs.

632

10%

384 hrs.

432

10%

384 hrs.

408

10%

384 hrs.

416

3840 hrs.

4136

A. ARCHITECTURAL DESIGNING / DRAFTING, STRUCTURAL


CONCEPTUALIZATION, PLANNING & THE LIKE.
B. PREPARATION OF CONTRA T DOCUMENTS, SPECIFICATIONS
WRITING, BILL OF MATERIALS, COST ESTIMATES, GENERAL
CONDITIONS, BIDDING DOCUMENTS, CLERK OF WORKS AND
THE LIKE.
C. FIELD SUPERENTENDENCE, PROJECT MANAGEMENT
ADMINISTRATION & THE LIKE.
D. TECHNICAL, ECONOMIC AND FINANCIAL FEASIBILITY STUDIES,
PROJECT PROMOTIONAL, PRE-DESIGN & THE LIKE.
E. ARCHITECTURAL LAY-OUTING OF MECHANICAL, ELECTRICAL,
ELECTRONIC, SANITARRY, PLUMBING, COMMUNICATIONS AND
OTHER UTILITY SYSTEMS, EQUIPMENT AND FIXTURES ARCH'L
LIGHTING, ACOUSTICS AND ALLIED FIELDS OF PRACTICE
F.

ARCHITECTURAL INTERIORS/SPACE PLANNING,


RESTORATION/PRESERVATION AND OTHER ANCILLARY
SERVICES.

TOTAL 100%
NOTE:

REMARKS
(To
be filled up by the PRC)

THE TRAINEE MUST ACCOMPLISH THE MINIMUM NUMBER OF HOURS


REQUIRED CREDIT FOR EACH FIELD OF PRACTICE OF
ARCHITECTURE AS DEFINED IN R.A. 9266 AS CATEGORIZED ABOVE.
THE EXCESS OF CREDIT HOURS IN ONE SPECIFIC FIELD WILL NOT BE
CREDITED TO THE OTHER FIELDS OF PRACTICE.

TRAINEE'S SIGNATURE
To be filled up by the Dean or Department head of school graduated:

SCHOOL : University of Santo Tomas

ATTESTED BY:

DATE OF GRADUATION: March 2011


School Control No.

Dean's/Department Head's Signature above Printed Name

IAPOA No.
Date Issued
Expiry Date

LOG SHEET OF DIVERSIFIED TRAINING FOR


ARCHITECTS LICENSURE EXAMINATION

DT FORM 002 "ANNEX A"

Candidate

PERIOD COVERED
PROJECT

TITLE/DESCRIPTION
& LOCATION

FROM

of Total No. of
Hours

Corresponding Number of Hours


Described Training
(FOP)

TO

Day

Mo.

Yr.

Day

Mo.

Yr.

Pre-Design: Feasibility studies, Site Selection


and Analysis

07

03

11

25

03

11

Architectural Designing/Drafting, Planning,


etc.

28

03

11

08

04

11

Preparation of Contract Documents and


Specifications

11

04

11

22

04

11

Architectural Interiors/Space Planning (Floor


Pattern Layout, Toilet Details)

25

04

11

29

04

11

Pre-Design: Preparation of Financial


Feasibility Studies

02

05

11

13

05

11

Architectural Designing/Drafting, Planning,


etc.

16

05

11

03

06

11

Preparation of Bill of Materials

06

06

11

17

06

11

Architectural Lay-Outing of Utility Systems,


Equipment, Fixtures, Lighting, etc.

20

06

11

01

07

11

04

07

11

05

08

11

120

120

08

08

11

09

09

11

120

120

Proposed Condominium Building - Sucat,


Paranaque City

120

120

80

80

80

80
40

40

Mr. Ragaza Residence - Las Pinas City

80

80

120

120

72

72

80

80

"Chateau Elysee" Condominium SMDC Bicutan


Field Superintendence, Project Administration
(MWF only)

SHEET NO.
1 of 7

Jara, Jose Francisco R.

"Field Residence" Condominium SMDC Sucat, Paranaque


Field Superintendence, Project Administration
(MWF only)

Total No. of Hours 200

152

240

200

80

40

NOTE: This statement shall be accomplished per Mentor.


Trainee's Doversified Training must conform with RA 9266
Sec. 3 (4) for Scope of the Practice of Architecture
LEGEND
FIELD OF PRACTICE (FOP)
A. ARCHITECTURAL DESIGNING / DRAFTING, STRUCTURAL
CONCEPTUALIZATION, PLANNING & THE LIKE

MINIMU
%
M
(MAX.) CREDIT
HOURS
1152
30%
hrs.

MENTOR'S SIGNATURE ABOVE PRINTED NAME


(Pls. affix your Architect's Dry seal)
Address:

B. PREPARATION OF CONTRA T DOCUMENTS, SPECIFICATIONS


WRITING, BILL OF MATERIALS, COST ESTIMATES, GENERAL
CONDITIONS, BIDDING DOCUMENTS, CLERK OF WORKS AND
THE LIKE.

25%

960 hrs.

C. FIELD SUPERENTENDENCE, PROJECT MANAGEMENT


ADMINISTRATION & THE LIKE.

15%

576 hrs.

Expiry Date:

D. TECHNICAL, ECONOMIC AND FINANCIAL FEASIBILITY STUDIES,


PROJECT PROMOTIONAL, PRE-DESIGN & THE LIKE.

10%

384 hrs.

IAPOA NO.

E. ARCHITECTURAL LAY-OUTING OF MECHANICAL, ELECTRICAL,


ELECTRONIC, SANITARRY, PLUMBING, COMMUNICATIONS AND
OTHER UTILITY SYSTEMS, EQUIPMENT AND FIXTURES ARCH'L
LIGHTING, ACOUSTICS AND ALLIED FIELDS OF PRACTICE

10%

384 hrs.

F. ARCHITECTURAL INTERIORS/SPACE PLANNING,


RESTORATION/PRESERVATION AND OTHER ANCILLARY
SERVICES.

10%

384 hrs.

100%

3840
hrs.

TOTAL

Date Signed:
Prof. ID Card No.
Date Issued:

Date Issued:
Expiry Date
Valid PTR No.
Date Issued:
Expiry Date

912

LOG SHEET OF DIVERSIFIED TRAINING FOR


ARCHITECTS LICENSURE EXAMINATION

DT FORM 002 "ANNEX A"

Candidate

PERIOD COVERED
PROJECT

SHEET NO.
2 of 7

Jara, Jose Francisco R.

TITLE/DESCRIPTION
& LOCATION

FROM

of Total No. of
Hours

Corresponding Number of Hours


Described Training
(FOP)

TO

Day

Mo.

Yr.

Day

Mo.

Yr.

Pre-Design: Archl Programming and Space


Management Studies

12

09

11

16

09

11

Architectural Designing/Drafting, Planning,


etc.

19

09

11

07

10

11

Preparation of Contract Documents and


Specifications

10

10

11

11

11

11

Architectural Lay-Outing of Utility Systems,


Equipment, Fixtures, Lighting, etc.

14

11

11

25

11

11

Architectural Interiors/Space Planning (Floor


Pattern Layout, Toilet Details)

28

11

11

09

12

11

Field Superintendence, Project Administration


(Every Saturdays only)

03

09

11

03

09

11

Field Superintendence, Project Administration


(Every Saturdays only)

10

09

11

10

09

11

Field Superintendence, Project Administration


(Every Saturdays only)

17

09

11

17

09

11

Field Superintendence, Project Administration


(Every Saturdays only)

24

09

11

24

09

11

Field Superintendence, Project Administration


(Every Saturdays only)

01

10

11

01

10

11

Field Superintendence, Project Administration


(Every Saturdays only)

08

10

11

08

10

11

Field Superintendence, Project Administration


(Every Saturdays only)

15

10

11

15

10

11

Field Superintendence, Project Administration


(Every Saturdays only)

22

10

11

22

10

11

Field Superintendence, Project Administration


(Every Saturdays only)

29

10

11

29

10

11

Field Superintendence, Project Administration


(Every Saturdays only)

11

11

11

11

Field Superintendence, Project Administration


(Every Saturdays only)

12

11

11

12

11

11

Multi-purpose Gym - San Sebastian, Lipa


City

40

40

120

120

200

200

80

80
80

80

Barreto - Isla Two storey Residence - BF


Homes, Paranaque

Total No. of Hours 120

200

88

40

80

80

NOTE: This statement shall be accomplished per Mentor.


Trainee's Doversified Training must conform with RA 9266
Sec. 3 (4) for Scope of the Practice of Architecture
LEGEND
FIELD OF PRACTICE (FOP)
A. ARCHITECTURAL DESIGNING / DRAFTING, STRUCTURAL
CONCEPTUALIZATION, PLANNING & THE LIKE

MINIMU
%
M
(MAX.) CREDIT
HOURS
1152
30%
hrs.

MENTOR'S SIGNATURE ABOVE PRINTED NAME


(Pls. affix your Architect's Dry seal)
Address:

B. PREPARATION OF CONTRA T DOCUMENTS, SPECIFICATIONS


WRITING, BILL OF MATERIALS, COST ESTIMATES, GENERAL
CONDITIONS, BIDDING DOCUMENTS, CLERK OF WORKS AND
THE LIKE.

25%

960 hrs.

C. FIELD SUPERENTENDENCE, PROJECT MANAGEMENT


ADMINISTRATION & THE LIKE.

15%

576 hrs.

Expiry Date:

D. TECHNICAL, ECONOMIC AND FINANCIAL FEASIBILITY STUDIES,


PROJECT PROMOTIONAL, PRE-DESIGN & THE LIKE.

10%

384 hrs.

IAPOA NO.

E. ARCHITECTURAL LAY-OUTING OF MECHANICAL, ELECTRICAL,


ELECTRONIC, SANITARRY, PLUMBING, COMMUNICATIONS AND
OTHER UTILITY SYSTEMS, EQUIPMENT AND FIXTURES ARCH'L
LIGHTING, ACOUSTICS AND ALLIED FIELDS OF PRACTICE

10%

384 hrs.

F. ARCHITECTURAL INTERIORS/SPACE PLANNING,


RESTORATION/PRESERVATION AND OTHER ANCILLARY
SERVICES.

10%

384 hrs.

100%

3840
hrs.

TOTAL

Date Signed:
Prof. ID Card No.
Date Issued:

Date Issued:
Expiry Date
Valid PTR No.
Date Issued:
Expiry Date

608

LOG SHEET OF DIVERSIFIED TRAINING FOR


ARCHITECTS LICENSURE EXAMINATION

DT FORM 002 "ANNEX A"

Candidate

PERIOD COVERED
PROJECT

SHEET NO.
3 of 7

Jara, Jose Francisco R.

TITLE/DESCRIPTION
& LOCATION

FROM

of Total No. of
Hours

Corresponding Number of Hours


Described Training
(FOP)

TO

Day

Mo.

Yr.

Day

Mo.

Yr.

Field Superintendence, Project Administration


(Every Saturdays only)

19

11

11

19

11

11

Field Superintendence, Project Administration


(Every Saturdays only)

26

11

11

26

11

11

Field Superintendence, Project Administration


(Every Saturdays only)

03

12

11

03

12

11

Field Superintendence, Project Administration


(Every Saturdays only)

10

12

11

10

12

11

Field Superintendence, Project Administration


(Every Saturdays only)

17

12

11

17

12

11

Field Superintendence, Project Administration


(Every Saturdays only)

07

01

12

07

01

12

Field Superintendence, Project Administration


(Every Saturdays only)

14

01

12

14

01

12

Field Superintendence, Project Administration


(Every Saturdays only)

21

01

12

21

01

12

Field Superintendence, Project Administration


(Every Saturdays only)

28

01

12

28

01

12

Field Superintendence, Project Administration


(Every Saturdays only)

04

02

12

04

02

12

Field Superintendence, Project Administration


(Every Saturdays only)

11

02

12

11

02

12

Field Superintendence, Project Administration


(Every Saturdays only)

18

02

12

18

02

12

Field Superintendence, Project Administration


(Every Saturdays only)

27

02

12

27

02

12

Field Superintendence, Project Administration


(Every Saturdays only)

03

03

12

03

03

12

Field Superintendence, Project Administration


(Every Saturdays only)

10

03

12

10

03

12

Field Superintendence, Project Administration


(Every Saturdays only)

17

03

12

17

03

12

Field Superintendence, Project Administration


(Every Saturdays only)

31

03

12

31

03

12

Field Superintendence, Project Administration


(Every Saturdays only)

07

04

12

07

04

12

Total No. of Hours

144

NOTE: This statement shall be accomplished per Mentor.


Trainee's Doversified Training must conform with RA 9266
Sec. 3 (4) for Scope of the Practice of Architecture
LEGEND
FIELD OF PRACTICE (FOP)
A. ARCHITECTURAL DESIGNING / DRAFTING, STRUCTURAL
CONCEPTUALIZATION, PLANNING & THE LIKE

MINIMU
%
M
(MAX.) CREDIT
HOURS
1152
30%
hrs.

MENTOR'S SIGNATURE ABOVE PRINTED NAME


(Pls. affix your Architect's Dry seal)
Address:

B. PREPARATION OF CONTRA T DOCUMENTS, SPECIFICATIONS


WRITING, BILL OF MATERIALS, COST ESTIMATES, GENERAL
CONDITIONS, BIDDING DOCUMENTS, CLERK OF WORKS AND
THE LIKE.

25%

960 hrs.

C. FIELD SUPERENTENDENCE, PROJECT MANAGEMENT


ADMINISTRATION & THE LIKE.

15%

576 hrs.

Expiry Date:

D. TECHNICAL, ECONOMIC AND FINANCIAL FEASIBILITY STUDIES,


PROJECT PROMOTIONAL, PRE-DESIGN & THE LIKE.

10%

384 hrs.

IAPOA NO.

E. ARCHITECTURAL LAY-OUTING OF MECHANICAL, ELECTRICAL,


ELECTRONIC, SANITARRY, PLUMBING, COMMUNICATIONS AND
OTHER UTILITY SYSTEMS, EQUIPMENT AND FIXTURES ARCH'L
LIGHTING, ACOUSTICS AND ALLIED FIELDS OF PRACTICE

10%

384 hrs.

F. ARCHITECTURAL INTERIORS/SPACE PLANNING,


RESTORATION/PRESERVATION AND OTHER ANCILLARY
SERVICES.

10%

384 hrs.

100%

3840
hrs.

TOTAL

Date Signed:
Prof. ID Card No.
Date Issued:

Date Issued:
Expiry Date
Valid PTR No.
Date Issued:
Expiry Date

144

LOG SHEET OF DIVERSIFIED TRAINING FOR


ARCHITECTS LICENSURE EXAMINATION

DT FORM 002 "ANNEX A"

Candidate

PERIOD COVERED
PROJECT

SHEET NO.
4 of 7

Jara, Jose Francisco R.

TITLE/DESCRIPTION
& LOCATION

FROM

of Total No. of
Hours

Corresponding Number of Hours


Described Training
(FOP)

TO

Day

Mo.

Yr.

Day

Mo.

Yr.

Field Superintendence, Project Administration


(Every Saturdays only)

14

04

12

14

04

12

Field Superintendence, Project Administration


(Every Saturdays only)

21

04

12

21

04

12

Field Superintendence, Project Administration


(Every Saturdays only)

28

04

12

28

04

12

Field Superintendence, Project Administration


(Every Saturdays only)

05

05

12

05

05

12

Field Superintendence, Project Administration


(Every Saturdays only)

12

05

12

12

05

12

Field Superintendence, Project Administration


(Every Saturdays only)

19

05

12

19

05

12

Field Superintendence, Project Administration


(Every Saturdays only)

26

05

12

26

05

12

Total No. of Hours

56

NOTE: This statement shall be accomplished per Mentor.


Trainee's Doversified Training must conform with RA 9266
Sec. 3 (4) for Scope of the Practice of Architecture
LEGEND
FIELD OF PRACTICE (FOP)
A. ARCHITECTURAL DESIGNING / DRAFTING, STRUCTURAL
CONCEPTUALIZATION, PLANNING & THE LIKE

MINIMU
%
M
(MAX.) CREDIT
HOURS
1152
30%
hrs.

MENTOR'S SIGNATURE ABOVE PRINTED NAME


(Pls. affix your Architect's Dry seal)
Address:

B. PREPARATION OF CONTRA T DOCUMENTS, SPECIFICATIONS


WRITING, BILL OF MATERIALS, COST ESTIMATES, GENERAL
CONDITIONS, BIDDING DOCUMENTS, CLERK OF WORKS AND
THE LIKE.

25%

960 hrs.

C. FIELD SUPERENTENDENCE, PROJECT MANAGEMENT


ADMINISTRATION & THE LIKE.

15%

576 hrs.

Expiry Date:

D. TECHNICAL, ECONOMIC AND FINANCIAL FEASIBILITY STUDIES,


PROJECT PROMOTIONAL, PRE-DESIGN & THE LIKE.

10%

384 hrs.

IAPOA NO.

E. ARCHITECTURAL LAY-OUTING OF MECHANICAL, ELECTRICAL,


ELECTRONIC, SANITARRY, PLUMBING, COMMUNICATIONS AND
OTHER UTILITY SYSTEMS, EQUIPMENT AND FIXTURES ARCH'L
LIGHTING, ACOUSTICS AND ALLIED FIELDS OF PRACTICE

10%

384 hrs.

F. ARCHITECTURAL INTERIORS/SPACE PLANNING,


RESTORATION/PRESERVATION AND OTHER ANCILLARY
SERVICES.

10%

384 hrs.

100%

3840
hrs.

TOTAL

Date Signed:
Prof. ID Card No.
Date Issued:

Date Issued:
Expiry Date
Valid PTR No.
Date Issued:
Expiry Date

56

LOG SHEET OF DIVERSIFIED TRAINING FOR


ARCHITECTS LICENSURE EXAMINATION

DT FORM 002 "ANNEX A"

Candidate

PERIOD COVERED
PROJECT

SHEET NO.
5 of 7

Jara, Jose Francisco R.

TITLE/DESCRIPTION
& LOCATION

FROM

of Total No. of
Hours

Corresponding Number of Hours


Described Training
(FOP)

TO

Day

Mo.

Yr.

Day

Mo.

Yr.

Architectural Designing/Drafting, Planning,


etc.

16

01

12

20

01

12

40

Preparation of Contract Documents and


Specifications

23

01

12

27

01

12

Architectural Lay-outing of Mechanical,


Plumbing, Electrical (Lighting)

30

01

12

02

02

12

Field Superintendence, Project Administration

03

02

12

03

02

12

Architectural Designing/Drafting, Planning,


etc.

06

02

12

15

02

12

Preparation of Contract Documents and


Specifications

16

02

12

28

02

12

Architectural Interiors/Space Planning (Floor


Pattern Layout, Toilet Details)

29

02

12

01

03

12

Lay-Outing of Utility Systems, Equipment,


Fixtures, Lighting, etc.

02

03

12

06

03

12

Field Superintendence, Project Administration

07

03

12

09

03

12

Pre-Design: Architectural Programming and


Land-use Studies

12

03

12

16

03

12

Architectural Designing/Drafting, Planning,


etc.

19

03

12

30

03

12

Preparation of Contract Documents and


Specifications

02

04

12

06

04

12

SM Hypermarket Renovation- Sucat,


Paranaque

40
40

40

32

32

SM Hypermarket Renovation - Las Pinas


City

64

64

80

80
16

16
24

24

24

24

Proposed SM Savemore EDSA Mandaluyong

Project Management Administration

09

04

12

23

04

12

Lay-Outing of Utility Systems, Equipment,


Fixtures, Lighting, etc.

10

04

12

27

04

12

Architectural Interiors/Space Planning


(Leasable Spaces, Toilet Details)

10

04

12

27

04

12

40

40

80

80

40

40

24

24

48

48

Total No. of Hours 184

160

56

40

104

50

50

66

610

NOTE: This statement shall be accomplished per Mentor.


Trainee's Doversified Training must conform with RA 9266
Sec. 3 (4) for Scope of the Practice of Architecture
LEGEND
FIELD OF PRACTICE (FOP)
A. ARCHITECTURAL DESIGNING / DRAFTING, STRUCTURAL
CONCEPTUALIZATION, PLANNING & THE LIKE

MINIMU
%
M
(MAX.) CREDIT
HOURS
1152
30%
hrs.

MENTOR'S SIGNATURE ABOVE PRINTED NAME


(Pls. affix your Architect's Dry seal)
Address:

B. PREPARATION OF CONTRA T DOCUMENTS, SPECIFICATIONS


WRITING, BILL OF MATERIALS, COST ESTIMATES, GENERAL
CONDITIONS, BIDDING DOCUMENTS, CLERK OF WORKS AND
THE LIKE.

25%

960 hrs.

C. FIELD SUPERENTENDENCE, PROJECT MANAGEMENT


ADMINISTRATION & THE LIKE.

15%

576 hrs.

Expiry Date:

D. TECHNICAL, ECONOMIC AND FINANCIAL FEASIBILITY STUDIES,


PROJECT PROMOTIONAL, PRE-DESIGN & THE LIKE.

10%

384 hrs.

IAPOA NO.

E. ARCHITECTURAL LAY-OUTING OF MECHANICAL, ELECTRICAL,


ELECTRONIC, SANITARRY, PLUMBING, COMMUNICATIONS AND
OTHER UTILITY SYSTEMS, EQUIPMENT AND FIXTURES ARCH'L
LIGHTING, ACOUSTICS AND ALLIED FIELDS OF PRACTICE

10%

384 hrs.

F. ARCHITECTURAL INTERIORS/SPACE PLANNING,


RESTORATION/PRESERVATION AND OTHER ANCILLARY
SERVICES.

10%

384 hrs.

100%

3840
hrs.

TOTAL

Date Signed:
Prof. ID Card No.
Date Issued:

Date Issued:
Expiry Date
Valid PTR No.
Date Issued:
Expiry Date

LOG SHEET OF DIVERSIFIED TRAINING FOR


ARCHITECTS LICENSURE EXAMINATION

DT FORM 002 "ANNEX A"

Candidate

PERIOD COVERED
PROJECT

10

11

12

SHEET NO.
6 of 7

Jara, Jose Francisco R.

TITLE/DESCRIPTION
& LOCATION

FROM

of Total No. of
Hours

Corresponding Number of Hours


Described Training
(FOP)

TO

Day

Mo.

Yr.

Day

Mo.

Yr.

Pre-Design: Archl Programming and Space


Management Studies

30

04

12

04

05

12

Architectural Designing/Drafting, Planning,


etc.

07

05

12

18

05

12

Preparation of Contract Documents and


Specifications

21

05

12

25

05

12

Architectural Interiors/Space Planning (Living


Room, Masters' Bedroom)

28

05

12

01

06

12

Pre-Design: Archl Programming and Space


Management Studies

04

06

12

09

06

12

Architectural Designing/Drafting, Planning,


etc.

11

06

12

13

07

12

Preparation of Contract Documents and


Specifications

16

07

12

06

08

12

Lay-Outing of Utility Systems, Equipment,


Fixtures, Lighting, etc.

07

08

12

10

08

12

Architectural Interiors/Space Planning (Living


Room, Masters' Bedroom, Toilet Detail)

13

08

12

17

08

12

Pre-Design: Archl Programming and Space


Management Studies

22

08

12

25

08

12

Architectural Designing/Drafting, Planning,


etc.

27

08

12

11

09

12

Preparation of Contract Documents and


Specifications

12

09

12

21

09

12

Project Management Administration, Site


Superintendence

24

09

12

05

11

12

Lay-Outing of Utility Systems, Equipment,


Fixtures, Lighting, etc.

24

09

12

28

09

12

Architectural Interiors/Space Planning (Living


Room, Bedroom, Toilet Detail)

10

12

05

10

12

Mr. Luke Tan Two Storey Residence - Fort


Bonifacio, Taguig City

40

40

80

80

40

40
40

40

Mr. Domaine Le Jardine Model House


"Global Estates" - Laurel, Batangas

40

40

200

200

128

128

32

32
40

40

"BTS 8-11" Townhouses - BF Homes,


Paranaque City

32

32

96

96

64

64

16

16

32

32

Total No. of Hours 376

232

16

112

64

30

30

110

910

NOTE: This statement shall be accomplished per Mentor.


Trainee's Doversified Training must conform with RA 9266
Sec. 3 (4) for Scope of the Practice of Architecture
LEGEND
FIELD OF PRACTICE (FOP)
A. ARCHITECTURAL DESIGNING / DRAFTING, STRUCTURAL
CONCEPTUALIZATION, PLANNING & THE LIKE

MINIMU
%
M
(MAX.) CREDIT
HOURS
1152
30%
hrs.

MENTOR'S SIGNATURE ABOVE PRINTED NAME


(Pls. affix your Architect's Dry seal)
Address:

B. PREPARATION OF CONTRA T DOCUMENTS, SPECIFICATIONS


WRITING, BILL OF MATERIALS, COST ESTIMATES, GENERAL
CONDITIONS, BIDDING DOCUMENTS, CLERK OF WORKS AND
THE LIKE.

25%

960 hrs.

C. FIELD SUPERENTENDENCE, PROJECT MANAGEMENT


ADMINISTRATION & THE LIKE.

15%

576 hrs.

Expiry Date:

D. TECHNICAL, ECONOMIC AND FINANCIAL FEASIBILITY STUDIES,


PROJECT PROMOTIONAL, PRE-DESIGN & THE LIKE.

10%

384 hrs.

IAPOA NO.

E. ARCHITECTURAL LAY-OUTING OF MECHANICAL, ELECTRICAL,


ELECTRONIC, SANITARRY, PLUMBING, COMMUNICATIONS AND
OTHER UTILITY SYSTEMS, EQUIPMENT AND FIXTURES ARCH'L
LIGHTING, ACOUSTICS AND ALLIED FIELDS OF PRACTICE

10%

384 hrs.

F. ARCHITECTURAL INTERIORS/SPACE PLANNING,


RESTORATION/PRESERVATION AND OTHER ANCILLARY
SERVICES.

10%

384 hrs.

100%

3840
hrs.

TOTAL

Date Signed:
Prof. ID Card No.
Date Issued:

Date Issued:
Expiry Date
Valid PTR No.
Date Issued:
Expiry Date

LOG SHEET OF DIVERSIFIED TRAINING FOR


ARCHITECTS LICENSURE EXAMINATION

DT FORM 002 "ANNEX A"

Candidate

PERIOD COVERED
PROJECT

TITLE/DESCRIPTION
& LOCATION

Yr.

Day

Mo.

Yr.

08

10

12

12

10

12

Architectural Designing/Drafting, Planning,


etc.

15

10

12

19

10

12

Architectural Interiors/Space Planning (Living


Room, Bedroom Layout)

22

10

12

26

10

12

Architectural Designing/Drafting, Planning,


etc.

29

10

12

11

12

Preparation of Contract Documents and


Specifications

12

11

12

23

11

12

Project Management Administration, Site


Superintendence

26

11

12

29

11

12

Pre-Design: Archl Programming and Space


Management Studies

03

12

12

07

12

13

Architectural Designing/Drafting, Planning,


etc.

10

12

12

25

01

13

Preparation of Contract Documents and


Specifications

28

01

13

21

02

13

Lay-Outing of Utility Systems, Equipment,


Fixtures, Lighting, etc.

22

02

13

08

03

13

Architectural Interiors/Space Planning (Living


room, Dining Room, Kitchen, China Cabinet)

11

03

13

22

03

13

14

"6 on Rallos" Townhouses w/ attic Quezon City

Preparation of Bill of Materials

of Total No. of
Hours

Corresponding Number of Hours


Described Training
(FOP)

TO

Mo.

"Casa Paradiso" TownHouses - Masinag,


Antipolo City

16

FROM
Day

13

15

SHEET NO.
7 of 7

Jara, Jose Francisco R.

40

40

40

40
40

40

Mr. Sarmiento Two Storey Residence w/


attic, Mandaluyong

72

72

80

80

32

32

Mr. Arriola Two Storey Residence w/ attic Brgy Carmen, Silang, Cavite

40

40

240

240

152

152

80

80
80

80

120

896

NOTHING FOLLOWS

Total No. of Hours 352

272

32

40

80

NOTE: This statement shall be accomplished per Mentor.


Trainee's Doversified Training must conform with RA 9266
Sec. 3 (4) for Scope of the Practice of Architecture
LEGEND
FIELD OF PRACTICE (FOP)
A. ARCHITECTURAL DESIGNING / DRAFTING, STRUCTURAL
CONCEPTUALIZATION, PLANNING & THE LIKE

MINIMU
%
M
(MAX.) CREDIT
HOURS
1152
30%
hrs.

MENTOR'S SIGNATURE ABOVE PRINTED NAME


(Pls. affix your Architect's Dry seal)
Address:

B. PREPARATION OF CONTRA T DOCUMENTS, SPECIFICATIONS


WRITING, BILL OF MATERIALS, COST ESTIMATES, GENERAL
CONDITIONS, BIDDING DOCUMENTS, CLERK OF WORKS AND
THE LIKE.

25%

960 hrs.

C. FIELD SUPERENTENDENCE, PROJECT MANAGEMENT


ADMINISTRATION & THE LIKE.

15%

576 hrs.

Expiry Date:

D. TECHNICAL, ECONOMIC AND FINANCIAL FEASIBILITY STUDIES,


PROJECT PROMOTIONAL, PRE-DESIGN & THE LIKE.

10%

384 hrs.

IAPOA NO.

E. ARCHITECTURAL LAY-OUTING OF MECHANICAL, ELECTRICAL,


ELECTRONIC, SANITARRY, PLUMBING, COMMUNICATIONS AND
OTHER UTILITY SYSTEMS, EQUIPMENT AND FIXTURES ARCH'L
LIGHTING, ACOUSTICS AND ALLIED FIELDS OF PRACTICE

10%

384 hrs.

F. ARCHITECTURAL INTERIORS/SPACE PLANNING,


RESTORATION/PRESERVATION AND OTHER ANCILLARY
SERVICES.

10%

384 hrs.

100%

3840
hrs.

TOTAL

Date Signed:
Prof. ID Card No.
Date Issued:

Date Issued:
Expiry Date
Valid PTR No.
Date Issued:
Expiry Date

LOG SHEET OF DIV


ARCHITECTS L

DT FORM 002 "ANNEX A"

Candidate

SAMUEL B. SORIANO JR
PERIOD COVERED

PROJECT

TITLE/DESCRIPTION
& LOCATION

FROM

Corresponding
Described Tra

TO

Day

Mo.

Yr.

Day

Mo.

Yr.

Pre-Design: Archl Programming and Space


Management Studies

18

mar

13

29

mar

13

Architectural Designing/Drafting, Planning,


etc.

30

mar

13

18

apr

13

Preparation of Contract Documents and


Specifications

19

apr

13

07

may

13

Lay-Outing of Utility Systems, Equipment,


Fixtures, Lighting, etc.

08

may

13

13

may

13

Pre-Design: Archl Programming and Space


Management Studies,project analysis

14

may

13

18

may

13

Architectural Designing/Drafting, Planning,


etc.

20

may

13

01

jun

13

Preparation of Contract Documents and


Specifications, BOQ, BOM

03

jun

13

21

june

13

Lay-Outing of Utility Systems, Equipment,


Fixtures, Lighting, etc.

22

june

13

03

jul

13

Architectural Interiors/Space Planning

04

july

13

09

jul

13

Pre-Design: Archl Programming and Space


Management Studies

10

july

13

17

jul

13

Architectural Designing/Drafting, Planning,


etc.

18

july

13

29

jul

13

Architectural Interiors/Space Planning

30

july

13

09

aug

13

RAMOS RESIDENCE "Two storey


residential with basement"-lavista Q.C

136

BAUTISTA RESIDENCE duplex type - BLUE


RIDGE A Q.C

96

HORTALEZA RESIDENCE interior and pool


design -quezon city

PREGO ITALIAN RESTAURANT-CITY OF


DREAMS PARANAQUE city

80

Pre-Design: Archl Programming and Space


Management Studies

10

aug

13

20

aug

13

Architectural Designing/Drafting, Planning,


etc.

21

aug

13

14

sept

13

Preparation of Contract Documents and


Specifications, bill of materials

16

sept

13

05

oct

13

Lay-Outing of Utility Systems, Equipment,


Fixtures, Lighting, etc.

07

oct

13

19

oct

13

Architectural Interiors/Space Planning

21

oct

13

05

nov

13

Architectural Designing/Drafting, Planning,


etc.

09

mar

15

26

mar

15

Preparation of Contract Documents and


Specifications

27

mar

15

14

apr

15

Lay-Outing of Utility Systems, Equipment,


Fixtures, Lighting, etc.

16

apr

15

24

apr

15

Architectural Interiors/Space Planning

25

apr

15

07

may

15

Pre-Design: Archl Programming and Space


Management Studies

08

may

15

13

may

15

Architectural Designing/Drafting, Planning,


etc.

14

may

15

13

jun

15

Preparation of Contract Documents and


Specifications

15

june

15

09

july

15

Lay-Outing of Utility Systems, Equipment,


Fixtures, Lighting, etc.

10

july

15

18

july

15

Architectural Interiors/Space Planning

20

july

15

07

aug

15

08

aug

15

nov

15

Pre-Design: Archl Programming and Space


Management Studies

07

nov

15

20

nov

15

Architectural Designing/Drafting, Planning,


etc.

21

nov

15

23

jan

16

Preparation of Contract Documents and


Specifications

25

jan

16

03

mar

16

176

TEXMEX RESTAURANT- quezon city

128

ANICO RESIDENCE- nuvali laguna

216

SANCHEZ RESIDENCE "Two storey


residential with basement"-cabanatuan
Field Superintendence, Project Administration
(on-site supervision)
CACNIO RESIDENCE- west groove heights
quezon city

392

Lay-Outing of Utility Systems, Equipment,


Fixtures, Lighting, etc.

04

mar

16

21

mar

16

Architectural Interiors/Space Planning

22

mar

16

22

apr

16

NOTHING FOLLOWS

Total No. of Hours

1224

NOTE: This statement shall be accomplished per Mentor.


Trainee's Doversified Training must conform with RA 9266
Sec. 3 (4) for Scope of the Practice of Architecture

LEGEND
MINIMU
%
M
(MAX.) CREDIT
HOURS

MENTOR'S SIGNATU
(Pls. affix y

ARCHITECTURAL DESIGNING / DRAFTING,


STRUCTURAL CONCEPTUALIZATION,
PREPARATION OF CONTRA T DOCUMENTS,
PLANNING & THE LIKE
SPECIFICATIONS WRITING, BILL OF
FIELD SUPERENTENDENCE, PROJECT
MATERIALS, COST ESTIMATES, GENERAL
MANAGEMENT ADMINISTRATION & THE LIKE.
TECHNICAL,
AND FINANCIAL
CONDITIONS,ECONOMIC
BIDDING DOCUMENTS,
CLERK
FEASIBILITY
STUDIES,
PROJECT
OF
WORKS AND
THE
LIKE.
ARCHITECTURAL
LAY-OUTING
OF
PROMOTIONAL, PRE-DESIGN & THE LIKE.
MECHANICAL, ELECTRICAL, ELECTRONIC,
FIE SANITARRY, PLUMBING, COMMUNICATIONS
OTHER UTILITY
SYSTEMS, EQUIPMENT
LD AND
ARCHITECTURAL
INTERIORS/SPACE
AND
FIXTURES
ARCH'L
ACOUSTICS
PLANNING,
RESTORATION/PRESERVATION
AND
OF AND ALLIED FIELDS OF LIGHTING,
PRACTICE
OTHER ANCILLARY SERVICES.

PR
AC
TIC
E
A.
(F
OP
B.
)
C.

D.
E.

25%

1152
hrs.
960 hrs.

15%

576 hrs.

10%

384 hrs.

10%

384 hrs.

10%

384 hrs.

100%

3840
hrs.

30%

Address:
Date
Signed:
Prof. ID Card No.
Date Issued:
Expiry
Date:
IAPOA NO.
Date Issued:
Expiry Date
Valid PTR No.
Date Issued:
Expiry Date

SHEET OF DIVERSIFIED TRAINING FOR


ARCHITECTS LICENSURE EXAMINATION
SHEET NO.
1 of 5

JR

of Total No. of
Hours

Corresponding Number of Hours


Described Training
(FOP)
B

F
392

88

128
40

392
40

136
80
40

216
56

80

600

72

144
96
112

408

128
64
88

632
40

176
64
136

624
624

1104
96

272

120
224

984

624

392

464

680

4368

ENTOR'S SIGNATURE ABOVE PRINTED NAME


(Pls. affix your Architect's Dry seal)

eress:
Signed:
. ID Card No.
e Issued:
iry
Date:
OA NO.
Date Issued:
Expiry Date

d PTR No.
Date Issued:
Expiry Date

You might also like