CTEP : MORAGOT HUB PLATFORM (MGWA) DETAILED ENGINEERING DESIGN
*
*
================================================================
*
*
*
*
TECHNIP ENGINEERING (THAILAND) LTD
*
*
---------------------------------*
*
*
*
FATIGUE ANALYSIS - FOUNDATION LINEARIZATION (FOR 10-YRS CONDITION)
*
*
*
*
*
CREATED IN
: APRIL 2008
*
*
FILE NAME
: 6600mgwa_jkt_psi.fat
*
*
ORIGINATED BY : TECHNIP ENGINEERING (THAILAND), LTD.
*
*
MODIFIED BY
: RAM WATTANAWIRAWONG
*
*
CHECKED BY
: CHONLAWIT KHAYTONG
*
*
PROJECT NO.
: 6600
*
*
PROJECT TITLE : MORAGOT HUB PLATFORM (MGWA) DETAILED ENGINEERING
*
*
*
*
DESCRIPTION
:
*
*
*
*
1) ALL GEOTECHNICAL INFORMATION IS EXTRACTED FROM
*
*
DESIGN SPECIFICATION:DS-1032, "GENERIC FOUR-PILE WELLHEAD PLATFORM" *
*
, REVISION 5
*
*
2) PILE CONFIGURATIONS ARE AS FOLLOWS,
*
*
PILE DIAMETER
:
42.0 in
*
*
TRUE PENETRATION OF PILE
:
*
*
PILE A1
:
360 FT
*
*
PILE A2
:
360 FT
*
*
PILE B1
:
360 FT
*
*
PILE B2
:
360 FT
*
*
3) THE SCOUR DEPTH OF THE SOIL SURFACE IS ASSUMED TO BE 5 FT BELOW
*
*
MUDLINE
*
*
4) THE DATUM OF SOIL TABLES IS SET AT EL(-)5.0 FT SINCE PILE HEADS IN *
*
THE GLOBAL MODEL ARE MODELED AT THIS ELEVATION.
*
*
5) TO CONSIDER PILE WEIGHT IN THE ANALYSIS, PILE MATERIAL UNIT WEIGHT *
*
IS INPUT IN PSIOPT COMMAND.
*
*
6) GLOBAL AXIS SYSTEM : + Z VERTICALLY UP FROM CHART DATUM
*
*
*
*
*
*
ROW 1
ROW 2
*
*
* * * * * * * * * * * * * * * ROW B
*
*
*PILEHD #81
PILEHD #88*
*
*
^ PLATFORM
*
Y ^
*
*
*
| NORTH
*
|
*
*
*
|
*
|
*
*
*
--|-*
|
*
*
*
|
*
+ --- ---> *
*
*
*
X *
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*PILEHD #11
PILEHD #18*
*
*
* * * * * * * * * * * * * * * ROW A
*
*
*
*
*
* **************************************************************************** *
*
PLTRQ SD DL

*
PLTSZ8.267711.6930.1 0.1
1
*
PLGRUP
PLGRUP PA1
42. 2.00 29.
PLGRUP PA1
42. 1.75 29.
PLGRUP PA1
42. 1.50 29.
PLGRUP PA1
42. 0.75 29.
PLGRUP PA1
42. 1.50 29.
*
PLGRUP PB1
42. 2.00 29.
PLGRUP PB1
42. 1.75 29.
PLGRUP PB1
42. 1.50 29.
PLGRUP PB1
42. 0.75 29.
PLGRUP PB1
42. 1.50 29.
*
PLGRUP PA2
42. 2.00 29.
PLGRUP PA2
42. 1.75 29.
PLGRUP PA2
42. 1.50 29.
PLGRUP PA2
42. 0.75 29.
PLGRUP PA2
42. 1.50 29.
*
PLGRUP PB2
42. 2.00 29.
PLGRUP PB2
42. 1.75 29.
PLGRUP PB2
42. 1.50 29.
PLGRUP PB2
42. 0.75 29.
PLGRUP PB2
42. 1.50 29.
*
PILE
PILE
811181 PB1
PILE
881188 PB2
PILE
111111 PA1
PILE
181118 PA2
*
SOIL
SOIL TZAXIAL HEAD 13
SOIL
SLOCSM 8
0.0
SOIL
T-Z 0.000 0.000 0.010
SOIL
T-Z 0.030 0.420 0.020
SOIL
SLOCSM 8
2.0
SOIL
T-Z 0.000 0.000 0.160
SOIL
T-Z 0.530 0.420 0.480
SOIL
SLOCSM 8 25.0
SOIL
T-Z 0.000 0.000 0.690
SOIL
T-Z 2.290 0.420 2.060
SOIL
SLOCSM 8 54.0
SOIL
T-Z 0.000 0.000 1.350
SOIL
T-Z 4.510 0.420 4.060
SOIL
SLOCSM 8 56.0
SOIL
T-Z 0.000 0.000 3.100
SOIL
T-Z 10.33 0.420 8.780
SOIL
SLOCSM 8 95.0
SOIL
T-Z 0.000 0.000 3.740
SOIL
T-Z 12.48 0.420 10.61
SOIL
SLOCSM 8 125.0
SOIL
T-Z 0.000 0.000 4.240
SOIL
T-Z 14.13 0.420 12.01
SOIL
SLOCSM 8 145.0
SOIL
T-Z 0.000 0.000 4.570
SOIL
T-Z 15.23 0.420 12.94

11.6
11.6
11.6
11.6
11.6

60.
60.
50.
50.
50.

9.95
75.
95.
170.
5.

1.
1.
1.
1.
1.

11.6
11.6
11.6
11.6
11.6

60.
60.
50.
50.
50.

9.95
75.
95.
170.
5.

1.
1.
1.
1.
1.

11.6
11.6
11.6
11.6
11.6

60.
60.
50.
50.
50.

9.95
75.
95.
170.
5.

1.
1.
1.
1.
1.

11.6
11.6
11.6
11.6
11.6

60.
60.
50.
50.
50.

9.95
75.
95.
170.
5.

1.
1.
1.
1.
1.

0.
0.
9.621
0.
0.
9.621
0.
0.
9.621
0.
0.
9.621

SL02
SL02
SL03
SL03
SL02DIA. 42" PILE
0.001 LAYER 2 TOP = 5'(REFERENCE
0.070 0.010 0.130 0.020 0.240 0.020
0.840 0.020 99.00
0.001 LAYER 3 TOP = 7'
0.070 0.270 0.130 0.400 0.240 0.480
0.840 0.480 99.00
0.001 LAYER 5 TOP = 30'
0.070 1.150 0.130 1.720 0.240 2.060
0.840 2.060 99.00
0.001 LAYER 6 TOP = 59'
0.070 2.250 0.130 3.380 0.240 4.060
0.840 4.060 99.00
0.001 LAYER 7 TOP = 61'
0.070 5.170 0.130 7.750 0.240 9.300
0.840 8.780 99.00
0.001 LAYER 8 TOP = 100'
0.070 6.240 0.130 9.360 0.240 11.23
0.840 10.61 99.00
0.001 LAYER 9 TOP = 130'
0.070 7.060 0.130 10.59 0.240 12.71
0.840 12.01 99.00
0.001 LAYER 10 TOP = 150'
0.070 7.610 0.130 11.42 0.240 13.70
0.840 12.94 99.00

PILE DIA
0.340
0.340
0.340
0.340
0.340
0.340
0.340
0.340

SOIL
SLOCSM 8
SOIL
T-Z 0.000
SOIL
T-Z 16.88
SOIL
SLOCSM 8
SOIL
T-Z 0.000
SOIL
T-Z 19.64
SOIL
SLOCSM 9
SOIL
T-Z 0.000
SOIL
T-Z 23.44
SOIL
SLOCSM 8
SOIL
T-Z 0.000
SOIL
T-Z 27.19
SOIL
SLOCSM 8
SOIL
T-Z 0.000
SOIL
T-Z 27.19
*
SOIL BEARING HEAD 11
SOIL
SLOC
7
SOIL
T-Z
0.0
SOIL
T-Z 0.005
SOIL
SLOC
7
SOIL
T-Z
0.0
SOIL
T-Z 0.234
SOIL
SLOC
7
SOIL
T-Z
0.0
SOIL
T-Z 0.257
SOIL
SLOC
7
SOIL
T-Z
0.0
SOIL
T-Z 0.269
SOIL
SLOC
7
SOIL
T-Z
0.0
SOIL
T-Z 0.281
SOIL
SLOC
7
SOIL
T-Z
0.0
SOIL
T-Z 0.292
SOIL
SLOC
7
SOIL
T-Z
0.0
SOIL
T-Z 0.304
SOIL
SLOC
7
SOIL
T-Z
0.0
SOIL
T-Z 0.316
SOIL
SLOC
7
SOIL
T-Z
0.0
SOIL
T-Z 0.327
SOIL
SLOC
7
SOIL
T-Z
0.0
SOIL
T-Z 0.339
SOIL
SLOC
7
SOIL
T-Z
0.0
SOIL
T-Z 0.339
*
*SOIL TORSION HEAD
*
SOIL LATERAL HEAD 11
SOIL
SLOCSM 10
SOIL
P-Y 0.000
SOIL
P-Y 0.030
SOIL
SLOCSM 10
SOIL
P-Y 0.000
SOIL
P-Y 0.114

175.0
0.000 5.060
0.420 14.34
205.0
0.000 5.910
0.420 16.73
245.0
0.000 7.030
0.420 19.92
285.0
0.000 8.160
0.420 23.11
365.0
0.000 8.160
0.420 23.11

0.001 LAYER 11 TOP = 180'


0.070 8.440 0.130 12.66 0.240
0.840 14.34 99.00
0.001 LAYER 12 TOP = 210'
0.070 9.840 0.130 14.77 0.240
0.840 16.73 99.00
0.001 LAYER 13 TOP = 250'
0.070 11.72 0.130 17.58 0.240
0.840 22.31 9.30 22.31 99.00
0.001 LAYER 14 TOP = 290'
0.070 13.59 0.130 20.39 0.240
0.840 23.11 99.00
0.001 LAYER 15 TOP = 370'
0.070 13.59 0.130 20.39 0.240
0.840 23.11 99.00

0.000
0.000 0.001
4.200 0.005
195.0
0.000 0.058
4.200 0.234
215.0
0.000 0.064
4.200 0.257
225.0
0.000 0.067
4.200 0.269
235.0
0.000 0.070
4.200 0.281
245.0
0.000 0.073
4.200 0.292
255.0
0.000 0.076
4.200 0.304
265.0
0.000 0.079
4.200 0.316
275.0
0.000 0.082
4.200 0.327
285.0
0.000 0.085
4.200 0.339
365.0
0.000 0.085
4.200 0.339

SL02 42"
0.7218 LAYER 0 TOP = 5'(REFERENCE PILE DI
.080 0.002 0.550 0.004 1.760 0.004 3.070
99.00
0.7218 LAYER 1 TOP = 200'
.080 0.117 0.550 0.175 1.760 0.210 3.070
99.00
0.7218 LAYER 2 TOP = 220'
.080 0.129 0.550 0.193 1.760 0.231 3.070
99.00
0.7218 LAYER 3 TOP = 230'
.080 0.134 0.550 0.202 1.760 0.242 3.070
99.00
0.7218 LAYER 4 TOP = 240'
.080 0.140 0.550 0.210 1.760 0.252 3.070
99.00
0.7218 LAYER 5 TOP = 250'
.080 0.146 0.550 0.219 1.760 0.263 3.070
99.00
0.7218 LAYER 6 TOP = 260'
.080 0.152 0.550 0.228 1.760 0.274 3.070
99.00
0.7218 LAYER 7 TOP = 270'
.080 0.158 0.550 0.237 1.760 0.284 3.070
99.00
0.7218 LAYER 8 TOP = 280'
.080 0.164 0.550 0.245 1.760 0.295 3.070
99.00
0.7218 LAYER 9 TOP = 290'
.080 0.170 0.550 0.254 1.760 0.305 3.070
99.00
0.7218 LAYER 10 TOP = 370'
.080 0.170 0.550 0.254 1.760 0.305 3.070
99.00

15.19 0.340
17.72 0.340
21.09 0.340
24.47 0.340
24.47 0.340

1379049. SL02 TORSION STIFF


42.0
0.000 0.007
4.200 0.035
5.0
0.000 0.026
4.200 0.130

SL02DIA. 42" PILE


LAYER 1 TOP = 5'
0.050 0.011 0.210 0.018 0.840
6.300 0.020 16.80 0.000 31.50
LAYER 1 TOP = 10'
0.050 0.042 0.210 0.067 0.840
6.300 0.100 16.80 0.057 31.50

0.024 2.100
0.000 99.00
0.090 2.100
0.057 99.00

SOIL
SLOCSM 10
SOIL
P-Y 0.000
SOIL
P-Y 0.243
SOIL
SLOCSM 10
SOIL
P-Y 0.000
SOIL
P-Y 0.452
SOIL
SLOCSM 8
SOIL
P-Y 0.000
SOIL
P-Y 0.637
SOIL
SLOCSM 8
SOIL
P-Y 0.000
SOIL
P-Y 0.873
SOIL
SLOCSM 8
SOIL
P-Y 0.000
SOIL
P-Y 1.073
SOIL
SLOCSM 8
SOIL
P-Y 0.000
SOIL
P-Y 2.461
SOIL
SLOCSM 8
SOIL
P-Y 0.000
SOIL
P-Y 2.631
SOIL
SLOCSM 8
SOIL
P-Y 0.000
SOIL
P-Y 2.893
SOIL
SLOCSM 8
SOIL
P-Y 0.000
SOIL
P-Y 3.233
*
SOIL TZAXIAL HEAD 13
SOIL
SLOCSM 8
SOIL
T-Z 0.000
SOIL
T-Z 0.030
SOIL
SLOCSM 8
SOIL
T-Z 0.000
SOIL
T-Z 0.530
SOIL
SLOCSM 8
SOIL
T-Z 0.000
SOIL
T-Z 2.290
SOIL
SLOCSM 8
SOIL
T-Z 0.000
SOIL
T-Z 4.510
SOIL
SLOCSM 8
SOIL
T-Z 0.000
SOIL
T-Z 10.33
SOIL
SLOCSM 8
SOIL
T-Z 0.000
SOIL
T-Z 12.48
SOIL
SLOCSM 8
SOIL
T-Z 0.000
SOIL
T-Z 14.13
SOIL
SLOCSM 8
SOIL
T-Z 0.000
SOIL
T-Z 15.23
SOIL
SLOCSM 8
SOIL
T-Z 0.000
SOIL
T-Z 16.88
SOIL
SLOCSM 8
SOIL
T-Z 0.000
SOIL
T-Z 19.64
SOIL
SLOCSM 9

12.0
0.000 0.055
4.200 0.277
22.0
0.000 0.102
4.200 0.516
30.0
0.000 0.145
4.200 0.728
43.0
0.000 0.198
4.200 0.998
54.0
0.000 0.244
4.200 1.227
56.0
0.000 0.559
1.050 2.812
69.0
0.000 0.597
1.050 3.007
89.0
0.000 0.657
1.050 3.306
115.0
0.000 0.734
1.050 3.695

LAYER 1 TOP = 17'


0.050 0.089 0.210 0.142 0.840
6.300 0.240 16.80 0.189 31.50
LAYER 1 TOP = 27'
0.050 0.165 0.210 0.265 0.840
6.300 0.490 16.80 0.454 31.50
LAYER 1 TOP = 35'
0.050 0.232 0.210 0.374 0.840
6.300 0.728 99.00
LAYER 1 TOP = 48'
0.050 0.319 0.210 0.513 0.840
6.300 0.998 99.00
1.0
LAYER 1 TOP = 59'
0.050 0.392 0.210 0.630 0.840
6.300 1.227 99.00
1.0
LAYER 1 TOP = 61'
0.010 0.898 0.050 1.445 0.210
1.580 2.812 99.00
1.0
LAYER 1 TOP = 74'
0.010 0.960 0.050 1.545 0.210
1.580 3.007 99.00
1.0
LAYER 1 TOP = 94'
0.010 1.056 0.050 1.699 0.210
1.580 3.306 99.00
1.0
LAYER 1 TOP = 120'
0.010 1.180 0.050 1.899 0.210
1.580 3.695 99.00

0.0
0.000 0.010
0.420 0.020
2.0
0.000 0.160
0.420 0.480
25.0
0.000 0.690
0.420 2.060
54.0
0.000 1.350
0.420 4.060
56.0
0.000 3.100
0.420 8.780
95.0
0.000 3.740
0.420 10.61
125.0
0.000 4.240
0.420 12.01
145.0
0.000 4.570
0.420 12.94
175.0
0.000 5.060
0.420 14.34
205.0
0.000 5.910
0.420 16.73
245.0

SL03DIA. 42" PILE


0.001 LAYER 2 TOP = 5'(REFERENCE
0.070 0.010 0.130 0.020 0.240 0.020
0.840 0.020 99.00
0.001 LAYER 3 TOP = 7'
0.070 0.270 0.130 0.400 0.240 0.480
0.840 0.480 99.00
0.001 LAYER 5 TOP = 30'
0.070 1.150 0.130 1.720 0.240 2.060
0.840 2.060 99.00
0.001 LAYER 6 TOP = 59'
0.070 2.250 0.130 3.380 0.240 4.060
0.840 4.060 99.00
0.001 LAYER 7 TOP = 61'
0.070 5.170 0.130 7.750 0.240 9.300
0.840 8.780 99.00
0.001 LAYER 8 TOP = 100'
0.070 6.240 0.130 9.360 0.240 11.23
0.840 10.61 99.00
0.001 LAYER 9 TOP = 130'
0.070 7.060 0.130 10.59 0.240 12.71
0.840 12.01 99.00
0.001 LAYER 10 TOP = 150'
0.070 7.610 0.130 11.42 0.240 13.70
0.840 12.94 99.00
0.001 LAYER 11 TOP = 180'
0.070 8.440 0.130 12.66 0.240 15.19
0.840 14.34 99.00
0.001 LAYER 12 TOP = 210'
0.070 9.840 0.130 14.77 0.240 17.72
0.840 16.73 99.00
0.001 LAYER 13 TOP = 250'

0.193 2.100
0.189 99.00
0.358 2.100
0.454 99.00
0.505 2.100
0.693 2.100
0.852 2.100
1.953 0.530
2.088 0.530
2.296 0.530
2.566 0.530

PILE DIA
0.340
0.340
0.340
0.340
0.340
0.340
0.340
0.340
0.340
0.340

SOIL
T-Z 0.000 0.000 7.030 0.070 11.72 0.130 17.58 0.240 21.09 0.340
SOIL
T-Z 23.44 0.420 19.92 0.840 22.31 9.30 22.31 99.00
SOIL
SLOCSM 8 285.0
0.001 LAYER 14 TOP = 290'
SOIL
T-Z 0.000 0.000 8.160 0.070 13.59 0.130 20.39 0.240 24.47 0.340
SOIL
T-Z 27.19 0.420 23.11 0.840 23.11 99.00
SOIL
SLOCSM 8 365.0
0.001 LAYER 15 TOP = 370'
SOIL
T-Z 0.000 0.000 8.160 0.070 13.59 0.130 20.39 0.240 24.47 0.340
SOIL
T-Z 27.19 0.420 23.11 0.840 23.11 99.00
*
SOIL BEARING HEAD 11
SL03 42"
SOIL
SLOC
7 0.000
0.7218 LAYER 0 TOP = 5'(REFERENCE PILE DI
SOIL
T-Z
0.0 0.000 0.001 .080 0.002 0.550 0.004 1.760 0.004 3.070
SOIL
T-Z 0.005 4.200 0.005 99.00
SOIL
SLOC
7 195.0
0.7218 LAYER 1 TOP = 200'
SOIL
T-Z
0.0 0.000 0.058 .080 0.117 0.550 0.175 1.760 0.210 3.070
SOIL
T-Z 0.234 4.200 0.234 99.00
SOIL
SLOC
7 215.0
0.7218 LAYER 2 TOP = 220'
SOIL
T-Z
0.0 0.000 0.064 .080 0.129 0.550 0.193 1.760 0.231 3.070
SOIL
T-Z 0.257 4.200 0.257 99.00
SOIL
SLOC
7 225.0
0.7218 LAYER 3 TOP = 230'
SOIL
T-Z
0.0 0.000 0.067 .080 0.134 0.550 0.202 1.760 0.242 3.070
SOIL
T-Z 0.269 4.200 0.269 99.00
SOIL
SLOC
7 235.0
0.7218 LAYER 4 TOP = 240'
SOIL
T-Z
0.0 0.000 0.070 .080 0.140 0.550 0.210 1.760 0.252 3.070
SOIL
T-Z 0.281 4.200 0.281 99.00
SOIL
SLOC
7 245.0
0.7218 LAYER 5 TOP = 250'
SOIL
T-Z
0.0 0.000 0.073 .080 0.146 0.550 0.219 1.760 0.263 3.070
SOIL
T-Z 0.292 4.200 0.292 99.00
SOIL
SLOC
7 255.0
0.7218 LAYER 6 TOP = 260'
SOIL
T-Z
0.0 0.000 0.076 .080 0.152 0.550 0.228 1.760 0.274 3.070
SOIL
T-Z 0.304 4.200 0.304 99.00
SOIL
SLOC
7 265.0
0.7218 LAYER 7 TOP = 270'
SOIL
T-Z
0.0 0.000 0.079 .080 0.158 0.550 0.237 1.760 0.284 3.070
SOIL
T-Z 0.316 4.200 0.316 99.00
SOIL
SLOC
7 275.0
0.7218 LAYER 8 TOP = 280'
SOIL
T-Z
0.0 0.000 0.082 .080 0.164 0.550 0.245 1.760 0.295 3.070
SOIL
T-Z 0.327 4.200 0.327 99.00
SOIL
SLOC
7 285.0
0.7218 LAYER 9 TOP = 290'
SOIL
T-Z
0.0 0.000 0.085 .080 0.170 0.550 0.254 1.760 0.305 3.070
SOIL
T-Z 0.339 4.200 0.339 99.00
SOIL
SLOC
7 365.0
0.7218 LAYER 10 TOP = 370'
SOIL
T-Z
0.0 0.000 0.085 .080 0.170 0.550 0.254 1.760 0.305 3.070
SOIL
T-Z 0.339 4.200 0.339 99.00
*
*SOIL TORSION HEAD
1379049. SL02 TORSION STIFF
*
*************************************************************************
* P VALUE OF P-Y CURVE(SOIL - SL03) IS REDUCE 50% FROM MUDLINE TO 45 FT *
* BELOW MUDLINE DUE TO THE EFFECT OF SPUD CAN AT JACK-UP RIG
*
*************************************************************************
*
SOIL LATERAL HEAD 11
42.0
SL03DIA. 42" PILE
SOIL
SLOCSM 10
0.5
LAYER 1 TOP = 5'
SOIL
P-Y 0.000 0.000 0.007 0.050 0.011 0.210 0.018 0.840 0.024 2.100
SOIL
P-Y 0.030 4.200 0.035 6.300 0.020 16.80 0.000 31.50 0.000 99.00
SOIL
SLOCSM 10
5.0
0.5
LAYER 1 TOP = 10'
SOIL
P-Y 0.000 0.000 0.026 0.050 0.042 0.210 0.067 0.840 0.090 2.100
SOIL
P-Y 0.114 4.200 0.130 6.300 0.100 16.80 0.057 31.50 0.057 99.00
SOIL
SLOCSM 10 12.0
0.5
LAYER 1 TOP = 17'
SOIL
P-Y 0.000 0.000 0.055 0.050 0.089 0.210 0.142 0.840 0.193 2.100

SOIL
SOIL
SOIL
SOIL
SOIL
SOIL
SOIL
SOIL
SOIL
SOIL
SOIL
SOIL
SOIL
SOIL
SOIL
SOIL
SOIL
SOIL
SOIL
SOIL
SOIL
SOIL
SOIL
SOIL
SOIL
END

P-Y 0.243
SLOCSM 10
P-Y 0.000
P-Y 0.452
SLOCSM 8
P-Y 0.000
P-Y 0.637
SLOCSM 8
P-Y 0.000
P-Y 0.873
SLOCSM 8
P-Y 0.000
P-Y 1.073
SLOCSM 8
P-Y 0.000
P-Y 2.461
SLOCSM 8
P-Y 0.000
P-Y 2.631
SLOCSM 8
P-Y 0.000
P-Y 2.893
SLOCSM 8
P-Y 0.000
P-Y 3.233

4.200 0.277
22.0
0.000 0.102
4.200 0.516
30.0
0.000 0.145
4.200 0.728
43.0
0.000 0.198
4.200 0.998
54.0
0.000 0.244
4.200 1.227
56.0
0.000 0.559
1.050 2.812
69.0
0.000 0.597
1.050 3.007
89.0
0.000 0.657
1.050 3.306
115.0
0.000 0.734
1.050 3.695

6.300
0.5
0.050
6.300
0.5
0.050
6.300
0.5
0.050
6.300
0.5
0.050
6.300
1.0
0.010
1.580
1.0
0.010
1.580
1.0
0.010
1.580
1.0
0.010
1.580

0.240 16.80 0.189 31.50


LAYER 1 TOP = 27'
0.165 0.210 0.265 0.840
0.490 16.80 0.454 31.50
LAYER 1 TOP = 35'
0.232 0.210 0.374 0.840
0.728 99.00
LAYER 1 TOP = 48'
0.319 0.210 0.513 0.840
0.998 99.00
LAYER 1 TOP = 59'
0.392 0.210 0.630 0.840
1.227 99.00
LAYER 1 TOP = 61'
0.898 0.050 1.445 0.210
2.812 99.00
LAYER 1 TOP = 74'
0.960 0.050 1.545 0.210
3.007 99.00
LAYER 1 TOP = 94'
1.056 0.050 1.699 0.210
3.306 99.00
LAYER 1 TOP = 120'
1.180 0.050 1.899 0.210
3.695 99.00

0.189 99.00
0.358 2.100
0.454 99.00
0.505 2.100
0.693 2.100
0.852 2.100
1.953 0.530
2.088 0.530
2.296 0.530
2.566 0.530