Labour ( Mazdoor ) Required For Different Works

Sr. No.

Item

Beldars

Mazdoors

Bhisti

Mason

Excavation in Foundations,trenches
etc. in ordinary soil including disposal
up to 30 m and lift of 1.5 m

1/5.66

1/7.075

Refilling Excavated earth in


foundation, plinth,etc. including
consolidation in 15 cm layers

1/9.43

1/14.15

1/56.6

Disposal of surplus earth within a lead


of 30 m

1/2.83

Laying P.C.C.

1/1.415

1/0.943

1/3.77

1/11.32

Laying R.C.C.

1/0.94

1/0.94

1/2.12

1/5.66

Centering and shuttering for flat


surfaces

1/2.4

Carpenter
1/2.4

Reinforcement work R.C.C.

Blacksmith
1/100

Random Rubble masonry with blue


stone in foundation

1 st class brickwork in 1 : 4 cement


mortar in superstructure,partition wall,
junction of roof,parapet walls, string
course

10

Doors and Windows Frames

1/0.18

11

Pannelled,glazed,etc. shutters

12

Fixing 40 mm x 3 mm x 38 cm flat iron


holdfasts

1/100

1/0.94

1/1.415

1/11.32

1/0.94

1/0.629

1/5.66

1/1.258

Carpenter
1/0.09

1/0.019

Carpenter
1/0.005

1/36

Blacksmith
1/36

1/36

13

Fixing 16 mm dia M.S.Rods

1/5.5

Blacksmith
1/16.5

Carpenter
1/8.25

14

4 cm thick cement concrete flooring


laying ,mixing and finishing

1/10

1/13.33

1/40

1/8

15

12 mm thick plastering with any


mortat

1/13.33

1/40

1/13.33

16

White washing or colour washing ( 3


Coat)

1/60

white
washer
1/60

17

Painting two coats on wood or steel

1/5

Painter
1/3.33

Per Day

m3

m3

m3

m3

m3

m2

Kg.

m3

m3
m3 ( 4 door
frames 7.5 cm x
10 cm ) of 1.2 m
x 2.1 m size
m3 ( 4 shutters
40 mm thick 2.0
m x 1.15 m )

Per holdfasts

Per running m

m2

m2

m2

m2