1. Scales for weighing aggregates and cement shall be accurate within ____
% throughout the range of use. Scales shall be inspected and sealed as
often as the Engineer may deem necessary to assure their continued 7. A sample from a bituminous mix weighs 1000 grams. At
accuracy.
extraction, it was found out that the dry aggregate weighed 950
a) 1.0 %
c) 0.5 %
grams. What is the % of asphalt by weight of mix?
b) 1.5 %
d) 2.0 %
a) 5.2 %
c) 5.4 %
b) 5.0 %
d) 4.8%
2. When cement is placed in contact with the aggregate, batches may be
rejected unless mixed within _____ hours of such contact.
8. The minimum penetration of the preservative with the surface of
a) 1.5 hours
c) 0.5 hours
the timber piles shall be ____
b) 2.0 hours
d) 2.5 hours
a) 150 mm
c) 250 mm
b) 200 mm
d) 100 mm
3. When mixed at the site or in a central mixing plant, the mixing time shall
not be less than ______ nor more than ____ unless mixer performance test
9. The contractor shall submit in writing a job-mix formula for the
prove adequate mixing of concrete in a shorter time period.
mixture supported by laboratory test data along with samples of
a) 30 seconds nor more than 90 seconds
resources of components and viscosity temperature relationships to
b) 50 seconds nor more than 90 seconds
the Engineer for testing and approval at least ____.
c) 60 seconds nor more than 120 seconds
a) two weeks
c) one week
d) 90 seconds nor more than 120 seconds
b) three weeks
d) four weeks
4. The flow of water shall be uniform and all water should be in the drum
10.by
The concrete samples should be stored in a moist conditioned
the end of the first ____ seconds of the mixing period.
a) 45 seconds
c) 15 seconds
b) 30 seconds
d) 20 seconds
5. Concrete not place within ____ minutes from the time the ingredients11. This is used in soil stabilized road surface due to its high ____
were charged into the mixing drum shall be used.
a) 120 minutes
c) 60 minutes
b) 150 minutes
d) 90 minutes
6. When concrete is delivered in truck mixers, additional water may be12. The mass % wear of soil aggregate used in cement/lime
added to the batch and additional mixing performed to increase the slump
proportions should not be more than ____ .
to meet the specified requirement if permitted by the Engineer, provided all
these operation are performed within ____ after the initial mixing operation
1-
a) 40 %
b) 50 %
c) 45 %
d) 55 %
a) 1.151 to 1.174
b) 1.250 to 1.178
c) 1.051 to 1.154
d) 1.058 to 1.184
13. The uniform rate at which the movable head of the CBR machine travel
20. The specific gravity magnesium sulfate solution used in
is _____ .
/ min
b) 0.10 in /min
c) 0.08 in /min
d) 0.09 in /min
a) 0.05
soundness
in
test for aggregate should be within the range of ____ .
a) 1.280 to 1.408
c) 1.295 to 1.308
b) 1.180 to 1.308
d) 1.195 to 1.318
14. Cast in place concrete shall not be post tensioned until at least ____21. Aggregate accounts for 92 95 % of the weight of the bituminous
and until the compressive strength has reached the strength specified. mixture asphalt accounts for 5 8 % of the weight of the mix. The
a) 7 days
c) 14 days
exact percentage to be used is determined by the _____
b) 10 days
d) 20 days
a) Trial mix
c) Job mix
b) Design mix
d) Job order
15. The penetration test is an indication of the ____ of asphalt.
22. _____ is an indication that the asphalt mix is overheated.
a) Consistency
c) Hardness
b) Softness
d) Flash Point
a) Blue smoke
c) Rising steam
b) Stiff appearance
d) Mix slumps in truck
16.Specification requires one (1) Quality test for every ____ of
asphalt
a) 20 tons
23.In checking the temperature of the mix, the thermometer
c) 50 tons
should be inserted into the mix at least ____.
b) 200 tons
d) 40 tons
a) 2 inches
c) 4 inches
b) 6 inches
d) 6.0 mm
17. The ____ is the most commonly used method in the design and
24. _____ is applied on existing bit, or cement concrete surface with
evaluation of bituminous concrete mixes.
a) Job mix formula
c) Marshall Stability
bituminous materials.
b) Design mix
d) Extraction
a) Bituminous Prime Coat
c) Bituminous Seal Coat
b) Bituminous Tack Coat
d) Bituminous Surface Treatment
18. Vibration shall operate a frequency of 8,300 to 9,600 impulses per
25. The solution used in the soundness test of aggregate shall be
minute under load at a maximum spacing of ____ cm.
a) 30 cm
c) 60 cm
cooled to a temperature of 21 +or 1* C and maintain at that
b) 50 cm
d) 40 cm
temperature for at least
_____.
a) 24 hours
c) 48 hours
b)
36
hours
d) 18 hours
19. The specific gravity of Sodium Sulfate used in soundness test for
aggregate should be with in the range of ____.
2-
26. Proper compaction of the fill materials is very important, as it will ______.
33. Before the cement is to be used, sampling must be done at least
a) Increase the shear strength
b) Decrease permeability
c) Minimize compressibility
d) All of the above
34. Asphalt cement shall not be used while it is foaming nor shall be
c) two weeks
d) 12 days
c) Item 304
d) Item 308
c) 3 %
c) Bearing test
d) All of the above
3-
a) 2.0 mm
c) 2.7 mm
b) 2.2 mm
d) 3.4 mm
40. After concrete has been placed, it is advisable to maintain fully welted
and in position for how many hours?
48. Minimum density of gabions is ___________.
a) 14 hours
c) 72 hours
a) 1,000 kg/cu. m
c) 1,400 kg/cu. m
b) 24 hours
d) 15 18 hours
b) 1,200 kg/cu. m
d) 1,500 kg/cu. m
41. Rock shall be excavated to a depth ____ below sub grade within the 49.
limitSoundness loss of field gabions is __________________.
of the roadbed
mm
b) 150 mm
a)a)100
9 % after 5 cycles
b) 10 % after 5 cycles
c) 200 mm
c) 11 % after 5 cycles
d) 12 % after 5 cycles
c) 7 meter
d) 4.5 meter
43. Piles shall not be driven within 7 meters of concrete less than _____ 51.
old.Submission of sample minimum quantity of material for asphalt
a) 7 days
b) 14 day
cement is -------.
a) 5 kg
b) 10 kg
c) 28 days
c) 79 % & 21 %
d) 80 % & 20 %
c) 200 mm
52. For how many years does the small Contractor given to procure
necessary testing equipment?
a) 2 years
c) 5 years
b) 4 years
d) 6 years
53. The depth of the weakened joints must not be less than ____ and
a width of ___.
a) 40 mm & 6 mm
b) 50 mm & 5 mm
c) 20 kg
d) 100 kg
c) +/- 3 %
d) +/- 4 %
c) 40 mm & 5 mm
d) 50 mm & 6 mm
54. Used of bituminous cold mix for potholes patching during rainy/
wet period is acceptable
a) false
b) true
4-
55. In soil, all boring shall be carried to a depth of at least ____ below thepsi/sec
a)psi/sec
0.50
b) 20 - 50
d) 15 40 psi/sec
c) 20 long
c) 12 hours
d) 24 hours
5-
c) 15 18* C
78. The first phase of rolling the spread bituminous mix is called
breakdown rolling which is carried out by pneumatic roller,
a) 1 %
c) 3 %
temperature requirement must be _____.
b) 2 %
d) 4 %
a) 200 225* F
c) 160 180* F
b)
190
199*
F
d)150 185* F
71. Retarder can delay the setting time of concrete up to how many hours?
a) 1 hour
c) 4 hours
79. How many gradation ranges for hot plant mix bituminous
b) 2 hours
d) 8 hours
pavement are there in the blue book?
a) 5
c) 7
72. Super plasticizer can increase the strength of concrete up to how many
b)
6
d) 8
percent?
a) 40
70. What is the wash loss of fine aggregates in the no. 200 sieve?
60 %
b) 50 60 %
c) 50 70 %
d) 60 70 %
81. If no core had been taken at the end of each day of operation and
the project has already been completed, a core shall be taken
________.
for every 75 l.m,/lane c) for every 100 l.m/lane
b) for every 150 l.m/lane d) for every 1,000 l.m/lane
a)
a) 10 20 mm
75. _________ Number of measurement taken in a core sample for thickness
b) 10 40 mm
determination of the finish asphalt pavement
a) 3
c) 5
83. ________ Burnt product
b) 4
d) 8
to form Portland Cement.
a) Hydraulic cement
76. In the absence of beam mold in site, cylinder mold is allowed by
b) Clinker
specification. What is the required strength?
a) 2,500 psi
c) b) 3,000 psi
d) 4,000 psi
6-
c) 40 50 mm
d) 40 75 mm
which is used by Gypsum and pulverized
c) Fly Ash
d) Volcanic Ash
c) 0 20
d) 0 25
85. ______ is a process of breaking down of rocks into small pieces of various
93. It indicates good subbase materials when G.I. is equal to _____.
size that can range from large boulders to very small clay particles.
a) 0
c) 10
a) Consolidation
c) Weathering
b) 5
d) 20
b) Unconsolidation
7-
c) Good subgrade
good subgrade
101.
102.
103.
104.
105.
106.
107.
108.
b) Very
109.
If slag is used, the density of coarse aggregate is ______.
a) 30 100 kg/cu. m
c) 1,120 kg/cu. m
b) 150 kg /cu. m
d) 1,400 kg/cu. m
Mass percent loose for fine aggregates when tested in Clay lumps
is _____.
The weight of Clayey or Silty soil for Hydrometer Analysis is ______. a) 0.10
c) 0.80
10 grams
c) 50 grams
b) 0.25
d) 1.0
25 grams
d) 100 grams
111.
_________ is a type of cement which shall be transferred to an
A 25 grams fine grained soil can be dried in about ______.
elevated, air tight and weather proof bins storage.
1 hour
c) 3 hours
a) Portland Cement
c) Bulk Cement
2 hours
d) 4 hours
b) Pozzolan Cemenr
d) None of the above
110.
112.
8-
of water shall be uniform and all water should be in the drum by the
How many days does the emulsified asphalt must be tested after end of the _15_ seconds of the mixing period
delivery at temperature 40*F(4.5*C).
a) 10 days
c) 14 days
124.
The time elapsed from the time water is added to the mix until
b) 12 days
d) 16 days
the concrete is deposited at the site shall not exceed _90_ minutes
when concrete is hauled in the truck.
117.
In bituminous mixture asphalt content is 5 8% and 92 - 95%
aggregates, what will be the amount of additives?
125.
When concrete is delivered in truck mixers, additional water may
a) not more than 2%
c) more than 2%
be added to the batch and additional mixing performed to increase
b) not more than 3%
d) more than 4%
the slump to meet the specified requirement if permitted by the
Engineer, provided all these operation are performed within _45_
118.
___________ determines the effect of water on the cohesion of the mixture
minutes after the initial mixing operation and the water and cement
a) Stability Test
c) Distillation
ratio is not exceeded
b) Solubility
d) Immersion-Comprssion Test
126.
Concrete not placed within _90_ minutes from the time the
119.
The distance of the sample by grooving before rotating the brass cup
ingredients
is
were charge into the mixing drum should not be use.
_____.
a)
c)
b)
127.
The completed pavement shall be accepted on a lot basis. A lot
d) 1
shall be considered as _500_ linear meter double lane
116.
120.
9-
133.
134.
135.
138.
Asphalt shall be homogeneous, free from water, and shall not foam
155. when
The diameter of penetration piston is ____ . Ans. 49.63 +/- 0.23
heated to _175* C(347* F)_
mm ( 1935 cu m )
10 -
156.
157.
158.
159.
160.
161.
173. Ans.
This mean porosity or perviousness of the mixture, a dense grade
________ is used to determine the settlement characteristic of soil.
mix prevent water from entering the base through the surface.
Consolidation
Ans.. Permeability
163.
The weight of disturbed samples from hard auger or split spoon shall be
174.
This is used in classifying liquid asphalt into grades. It is useful as
at least__________
Ans. 1.0 kg
a measure to control of consistency, particularly when run at the
temperature of intended application
Ans
164.
The undisturbed samples from Shellby Tube shall be at
Viscosity
Test
least______. Ans.. 18 long
162.
11 -
177.
This test classifies the different asphalt into types and the different
186. types
The bottom bearing block shall be at least _______ thick after any
into grade.
Ans.. Consistency Test
resurfacing operations..
Ans. 0.9 ( 22.50 mm )
178.
For liquid asphaltic materials, this test is run on the residue after
187.
The curing temperature of a specimen before testing is ______.
distillation..
Ans.. Quality Test
Ans. 18*C to 24*C
179.
180.
181.
182.
183.
184.
12 -
a) Coarse
b) Fine
c) Mineral Filler
d) Admixture
196.
197.
198.
199.
200.
201.
202.
203.
204.
205.
13 -
m)
2,400 psi. ( 16.7 MN/sq. m. )
c) 5,000 psi. ( 37.7 MN/sq. m. )
219.
b)
The solvent used in extraction of bitumen is _____.
a) Diesel oil
b) Gasoline
c) Water
212.
222.
c) flat bar
223.
14 -
b) Blown Asphalt
c) Joint Filler
227.
228.
229.
230.
231.
232.
233.
234.
15 -
242.
245.
246.
247.
248.
249.
16 -
258.
259.
260.
261.
262.
263.
264.
265.
17 -
273.
274.
275.
276.
277.
278.
279.
280.
281.
282.
The minimum flexural strength requirement of beam sample when b) Sieve No. 200
tested by third point loading method is ____________.
c) Gillmore
a) 3.5 Mpa
b) 3.8 Mpa
c) 4.0 Mpa
283.
A mixture of cement and water is called ____________.
The minimum flexural strength requirement of beam sample when a) cement paste
b) mortar paste
c)
tested by midpoint method is ____________.
concrete paste
a) 4.5 Mpa
b) 3.5 Mpa
c) 5.0 Mpa
284.
The apparatus used to determine the initial and final setting of
____________ are additives used in mixing concrete.
cement in the laboratory is _________.
a) sodium chloride
b) admixtures
c) curing agent
a) Gillmore needles
b) Bailey needle
c) Vicat
apparatus
____________ determines the consistency of concrete.
a) Slump Test
b) consolidation test
c) viscosity
285.
The compressive strength of cement mortar sample in seven
days is not less than _________.
a) 19.3 MN/sq. m
Equipment used in the consolidation of fresh concrete.
b) 20 MN/sq. m
c) 24 MN/sq. m
a) jack hammer
b) vibrator
c) drilling
machine
286.
What is the appearance of the molded cement paste which fails
to meet the autoclave expansion.______________.
The prescribed forms to be used in concrete paving is called ____________
a) crumble
b) shiny
c) changes color
a) steel forms
b) wooden
c) combination of
steel and wood
287.
The dimension of beam sample for paving concrete is ___________.
a) 6 x 6 x 21
b) 6 x 6 x 24
c) 4 x 4
The initial setting time of Portland cement is not less than
x218
_________________.
a) 30
min.
b) 60 min.
c) 90 min. 288.
The critical number of days of curing concrete is ____________.
a) first seven days
b) first 10 days
c) 28 days
The final setting time of Portland cement Type I is _____________.
a) 10 hrs.
b) 24 hrs.
c) 36 hrs.
289.
The standard dimension of concrete cylindrical sample is
___________.
a) 6 dia. and 12 tall
b)
The standard sand used in testing the mortar strength of Portland 6 dia. and 6 tall
c) 6 dia. and 8 tall
cement is called __________.
a) Ottawa Sand
b) Beach Sand
c) River Sand
290.
There are two layers in performing sampling of beam samples.
How many number of blows are required per layer?
The apparatus used in determining the fineness of Portland cement a)
by 63 blows
b) 75 blows
c) 50 blows
air permeability is __________ .
a) Blaine Air Permeability Apparatus
18 -
291.
294.
c)
How many set of beam samples taken for every 75 cu. m. of concrete
305.
The minimum test requirement for paint is ______________.
poured per day?
a)
a) 1 sample for every 100 cans or fraction thereof
19 -
312.
c) unstable soil
d) good subgrade soil
306.
307.
308.
309.
310.
311.
20 -
320.
321.
322.
323.
324.
a) 4
c) 6
Lower water content ratio in concrete mixes improves ________________.
b) 5
d) 7
a) strength
c) water tightness
b) durability
d) all of the preceding
329.
What is the correct proportion for concrete masonry work?
a) 1: 2
c) 1: 4
When concrete must be placed in a sloping surface, placing should start
b) 1: 3
d) 1 : 5
at the __________.
a) bottom
c) can be top or
bottom
b) top
330.
The opening of No. 4 sieve is bigger than the opening of a
sieve.
a) true
b)
The maximum percent abrasion loss allowed for concrete coarse
false
c) they are the same
aggregate is __________.
a) 30%
c) 45%
b) 40%
d) 50%
331.
The standard compaction test on predominantly fine grained soils
is performed on soil fraction passing sieve no. ___________.
The plasticity index of aggregate base course should be not greater a)
than
200
c) 16
___________.
a) 6
c)10
b) 40
d) 4
b) 8
d) 12
332.
Which plasticity index would you prefer for the base course of
In casting of reinforced concrete pile, the concrete used is ____________.
PCCP?
a) less than 6
a) A1
c) C1
c) 10 to 12
b)
b) D
d) C2
6 to 9
d) more than 12
325.
335.
328.
21 -
337.
338.
339.
340.
341.
342.
343.
344.
22 -
354.
355.
356.
357.
358.
359.
a) 60%
b) 55%
360.
c) 50%
d) 70%
361.
23 -
Mix = 1010.
A. a) 6.32%
B. a) 5.50%
367.
368.
369.
370.
c) 6.0%
c) 6.0%
371.
24 -
382.
383.
384.
385.
386.
387.
388.
Steel bars for the concrete reinforcement are tested for their __________
397.
Mortar that is not used within ______ minutes after the water has
properties.
a) tensile and bending
b) compressive
been added shall be discarded.
c) crushing
Ans. 90 minutes
389.
25 -
400.
401.
402.
403.
404.
405.
406.
407.
408.
409.
26 -
426.
27 -
436.
437.
440.
441.
442.
443.
28 -
450.
451.
452.
453.
454.
455.
Who should take samples of materials and bring them to the laboratory
458.
In what item of work emulsified asphalt and cut back asphalt
for acceptance purposes?
used?
a) Tack Coat
a) DPWH Materials Engineer
c) Contractors Project Engineerc) Seal Coat
b)
b) Contractors Materials Engineer
d) DPWH Project Engineer
Prime Coat
d) Bituminous Surface Course HotLaid
How do you determine the diameter of RSB?
a) by Vernier Caliper
b) by unit weight
459.
What is the boundary between Coarse and Fine aggregates used
in concreting.
a) passing No. 3/8 sieve
Cement which has been in storage for so long period that there is c) passing No. 6 sieve
b)
already doubt as to its quality should be _____________.
passing No. 4 sieve
d) passing No. 8 sieve
a) retested prior to use
c) authorized to use
b) not to used
460.
The purpose of trial section is to check ___________________.
a) the suitability of materials
In abrasion test, a sample of 5,000 grams was subjected to abrasion,b)athe efficiency of the equipment
2,000 grams sample was retained in no. 12 sieve after washing, what isc)
the
the construction method proposed to be used
abrasion loss?
a) 50
d) all of the above
c) 60
b) 40
d) 30
461.
In FDT, the volume of hole is determined by what?
a) Sand to fill hole over unit weight of dry sand
Different brand of cement should not be allowed because _____________.
b) Total material taken from hole over volume of hole
a) different in texture
c) varies in strength
c) Wet unit weight over 1 + MC/100
b) different in color when dried
d) Dry unit weight over MDD x 100
An apparatus used for field density test is called ___________.
a) Sand cone
c) Nuclear density meter
b) Rubber balloon
d) all of the above
462.
456.
29 -
a) 14
b) 17
465.
466.
467.
468.
469.
c) 21
d) 15
470.
30 -
475.
476.
477.
478.
479.
480.
481.
482.
483.
31 -
491.
492.
493.
494.
495.
496.
497.
498.
499.
32 -
506.
507.
508.
509.
510.
511.
512.
A soil aggregate that has a CBR value of 20 means that in the condition
a) 211*C
c) 135*C
tested, the resistance to penetration of the standard piston was ______ of
b)the
159*C
d) 204*C
standard resistance of a compacted soil or aggregate.
a) 40%
c) 10%
514.
What is the rate of application of bituminous prime coat using cut
b) 20%
d) 80%
back asphalt?
a) 0.5 to 0.7 liters/sq. m.
c)
For liquid asphaltic materials, these are run on the residue after
1.0 to 1.1 liters/sq. m.
distillation.
a) consistency test
c) to 2.0 liters/sq. m.
b) 1.0
d) 1.10 to 2.0 liters/sq.m.
ductility test
b) quality
test
d) cement mixing test
515.
What is the weight boulders required for class A grouted riprap?
The basic aim of compaction is to produce a soil mass that will satisfy
a) 10 to 25 kgs
c) 15 to 30 kgs.
what criteria?
a) settlement
c)
b) 15 to 25 kgs.
d) 20 to 30 kgs.
permeability
b) stability
d) all of the above
516.
Based on the maximum dry density obtained by laboratory test,
When do the embankment become friable in dry weather , ravel at the
the degree of compaction required for aggregate subbase should be
edges and abrade severely under traffic and will become dusty in service
at least _____________.
a) 95%
and much of the binder soil is simply blown away during the dry season.c) 100%
a) the embankment is non- plastic
b) 98%
d) 90%
b) the embankment lacks compaction
c) materials fails CBR test
517.
Where to determine the amount of mixing water to use when
d) none of the above
compacting the soil in the field to attain maximum density.
When the embankment tends to soften in wet weather, and PCCP a) Trial Section
c) Control Strip
constructed of such material develop ruts under traffic an d may shift and
b) Field Density Test
d) Lab. Compaction Test
shove to develop a wash board surface, the plasticity index of such material
is ____________.
a)518.
P.I. is too
For soil classification purposes as in AASHTO M45, what is not
high
c) P.I. is too low
required?
a) combined sieve and
b) neither a & b
d) both a & b
mechanical analysis
What is the allowable smooth riding quality of PCCP?
b) sieve analysis
a) 5.00 mm.
c) 3.00 mm.
c) the wash test
b) 8.00 mm.
d) 6.00 mm.
d) none of the above
What is the penetration grade of bitumen prime coat?
a) 60 70
c) 85 100
b 120 150
d) none of the above
519.
33 -
520.
521.
522.
523.
524.
525.
In direct shear test, the soil is sheared to failure by moving one partc)
ofBituminous stabilization
the soil sample relatively to the other part along a pre-determined plane.
d) Lime stabilization
When several test are made on a soil under different normal loads and the
results are plotted in arithmetic scales, the resulting line is made in
the form
526.
As per guidelines on submission of samples, laboratory trial mixes
of ____________.
should be made on aggregates which are proposed tube used for the
a) straight line
c) parabola
first time, in this case what is the weight of fine aggregates to be
b) hyperbola
d) semi-elliptical
submitted for testing?
a) 100 kgs.
c) 50 kgs.
In conducting soil exploration survey, what equipment you will use in
b) 70 kgs.
d) 80 kgs.
obtaining undisturbed samples.
a) split spoon sampler
c)screw type soil auger sampler
527.
The phosphorous content of reinforcing steel bars bigger than 9.0
b) thin-walled sampler
d) Post-hole auger sampler
mm shall not exceed _______.
a) 0.18%
b) 0.06%
Bituminous stabilization in the process of mixing intimately pulverized
c) 0.08%
d) 0.05%
soil and bituminous material. What is the minimum bearing capacity (soaked
CBR ) of the mixture?
a) 80%
528. c) The permissible variation of reinforcing steel bars bigger than 9.0
98%
b)mm. shall not exceed _____.
a) 10%
100%
d) 95%
b) 5%
c)
8%
d) 6%
Portland cement stabilization roadmix base course is an intimate mixture
of pulverized soil, Portland cement and water which is thoroughly 529.
A type of cement that sets and hardens by chemical interaction
compacted while in a moist condition to form a structural road material with water and is capable of doing so underwater.
when the cement hydrates and crystallizes. What is the mass percent wear
a) Portland Cement
b) Hydraulic Cement
of soil aggregate used in this stabilization?
c) Air-Retaining Portland Cement d) All of the above
a) 40%
c) not more than 40%
b) 45%
d) 50%
530.
The spacing center to center of circumferential reinforcement of
all pipes shall not exceed its wall thickness and shall in no case
For a rich mixture of cement in concrete, what determines the flexural
exceed _______________.
a) 150
strength of the concrete?
a) Mortar strength
c) both a &mm.
b
b) 200 mm.
b) the strength of aggregate
d) the water/cement ratio
c) 100 mm.
d) 250 mm.
This is a new method of soil stabilization being introduced to improved
531.
Oversanded and undersanded concrete mixtures require more
the properties of soil which is effective and at the same time cheaper. water in order to be workable but will only result to ______________.
a) Stabilization by the use of Geotextiles
a) good surface texture
b) water tightens
b) Cement stabilization
c) weak strength
d) all of the above
34 -
532.
For every lean mixes or low cement content of the mixture, What
539.
What are the common field test?
determines the flexural strength of the concrete.
Ans. To determine the degree of compaction of soil or it is a control
a) The strength of aggregate
b) The mortar strength
test in embankment construction to ensure adequate compaction
c) The water cement ratio
d) All of the above
540.
What is moisture content?
533.
This is a method of determining in-place density of soil that can be used
Ans. It is the amount of water present in the soil
satisfactorily in moist, cohesive fine grained material only. The sample is
obtained by forcing a small thin walled cylinder into the material with
541.a
What is the different between natural moisture content with
driving head and hammer or other suitable apparatus.
Ans.hydroscopic moisture content?
Ans. Natural moisture content
Drive Cylinder Method
is the moisture of undisturbed soil sample while hydroscopic
moisture content is the moisture of air-dried soil sample.
534.
This method of test is intended to determine the density of cohesive soil
and stabilized soil by measuring the weight and volume of undisturbed
542.
What is the formula used for moisture content determination?
samples.
Ans. Block, Chunk orAns. Moisture Content = (wt. Of water/wt. Of oven dried sample) x
Core Sampling
100
535.
35 -
549.
554.
555.
556.
557.
558.
36 -
569.
570.
571.
572.
573.
574.
Ans. All particle size will pass a sieve 75 mm. or 3 square opening andm.
notand an average moisture content of 8.85%?
more than 15% will pass 0.075 mm. (No. 20) AASHTO 11
Ans. % Degree of Compaction = (Dry density/Max. dry density) x 100
Where ; Dry density = Wet density/(1+MC/100)
Wet density = wt of soil filled in a hole/volume of hole
P.I. requirement for item 104 (selected common borrow) is __________.
% degree of compaction = {(2,335)/[1+(8.85/100)] x 100}/2,250
Ans. 6 maximum
= (2,145.15/2,250) x 100
= 95.34%
L.L. requirement for item 104 (selected common borrow) is ____________.
Ans. 30 maximum
579.
Is the soil for No.45 passed the item 104 requirement for %
Ans. G or Grading = 2
What is the LL requirement for item 200 (aggregate subbase course)degree of compaction?
P or Plasticity = 2
passing sieve # 40?
Ans. 12 maximum
C or Compaction = 2
D or Density = three in-site density test/500 sq. m.
Coarse portion retained on sieve # 10 (2.00 mm.) of item 200 shall have
a mass percent of wear by Los Angeles Abrasion test of _______________.
580.
What are the test and number of test needed for 2,960 cu. m.
Ans. 50% maximum
Aggregate Base Course?
Ans. sand cone, jug (at least
4 liters), guide plate, moisture cans, sand, weighing scale, oven with
The required CBR value for item 300?
temperature control, chisel or digging tools, plastic bags and labeling
Ans. 25% minimum (AASHTO T 180 method D)
materials (tag number)
What is the minimum percent field density or degree of compaction for
581.
What is the standard diameter of an orifice in FDT sand cone?
item 104 (embankment)?
Ans. inch (12.7 mm.)
Ans. 95% minimum
582.
How many hours does a fine aggregates tested for specific
What is the minimum degree of compaction for item 200 and 201?
gravity and absorption be soaked in water?
Ans. 100% minimum
Ans. 15 to 19 hrs.
576.
What is the highest point in moisture density curve of the moisture
583.
How will you determine if the fine aggregates reaches the
density relation test or compaction test of soil represent?
saturated
surface dry condition?
Ans. It is determine by the
Ans. MDD(Maximum Dry Density) and OMC (Optimum Moisture Content)
use of cone test for surface moisture and if the molded shape of fine
aggregate slump slightly it indicates that it has reached a surface-dry
577.
What is the required size of calibrated sand used for FDT?
Ans. Any clean, dry, free-flowing uncemented sand passing # 10 and condition.
retained # 200 sieves
584.
What are the test required for concrete aggregates?
Ans. 1) Fine Agg: Grading, specific gravity, absorption, dry unit wt.
578.
What is the degree of compaction of soil having a maximum dry density
2) Coarse Agg: grading, specific gravity, absorption, dry unit wt, and
2,250kg/cu. m. and wet density of soil from hole equivalent to 2,335kg/cu.
575.
37 -
abrasion
request
585.
What is the required total wt. of sample for abrasion test of coarse
598.
How to compute for the slump of concrete?
aggregate grading A with 12 number of sphere?
Ans. Slump = Ht. Of slump cone ht. Of fresh concrete after
Ans. 5,000 grams +/- 25 grams
subsidence
589.
602.
What is the minimum flexural strength for third point loading
What is the percent tolerance of error in calibrating the machine?
test?
Ans. 3.8 Mpa (550 psi)
Ans. +/- 1%
38 -
603.
604.
605.
Which part of the batch for fresh concrete should the sample be
615.
taken What is the common components of house paint?
from a stationary mixers, revolving drum truck mixers or agitators?
Ans. pigment and vehicle
Ans. two or more regular intervals during discharge of middle portion of the
batch
616.
What is this construction material that is dark brown to black
cementatious material in which the predominating constituent are
What is the size of tamping rod use in sampling concrete?
bitumen?
Ans. 16 mm. (5/8 inches) diameter and 610 mm. (24 inches) long with the
Ans. Asphalt
tamping end rounded to a hemispherical tip of the same dia. as the rod
617.
What asphalt is commonly called hot asphalt?
Concrete Masonry (hollow blocks) if subject to test, how many sample
Ans.
is Asphalt cement
required?
Ans. 6 pcs./10,000 units
12 pcs. if more
than 10,000 units
618.
What are liquid asphalt?
Ans. Cut-back asphalt and Emulsified Asphalt
What is the strength requirement for load bearing concrete masonry
units?
Ans. individual = 5.5 Mpa (800619.
psi)
What is the use of blown asphalt or hard asphalt?
minimum
Ans. Use as joint filler or water proofing
Average(for 3 samples) = 4.14 Mpa (600 psi) minimum
620.
SS-1 or SS-1h is what kind of asphalt?
What is the significance of testing reinforcing steel bars?
Ans. Slow Setting Emulsified Asphalt
Ans. to determine the yield and tensile strength of the bar as well as its
elongation and is used to classify the bars into grade
621.
What are the three (3) kinds of Emulsified Asphalt?
Ans. Rapid Setting, Medium Setting and Slow Setting
What is the required length of RSB for testing?
Ans. 1 meter/10,000 kgs./size/shipment
622.
What asphalt contains water?
Ans. Emulsified Asphalt
What is the significance of bending test for RSB?
Ans. to evaluate the ductile properties of RSB
623.
What is the penetration grade for blown asphalt?
Ans. 0 to 30
What is the required size of test specimen for G.I. sheets?
Ans. 60 mm. x 60 mm. ( 3pcs. from one sheet/100 sheets
606.
607.
608.
609.
610.
611.
612.
39 -
624.
625.
626.
627.
628.
637.
638.
For how many hours or how long shall a bituminous prime coat left
undisturbed?
Ans. 24 hrs.
639.
629.
630.
640.
641.
How to determine the asphalt content of bituminous mix?
Ans.
No tack coat or prime coat shall be applied when the weather is foggy
or by means of extraction test
rainy.
Ans. True
642.
In an extraction test, aside from the asphalt what other materials
being extracted?
Ans. Aggregates or composite
632.
What kind of asphalt is used as tack coat?
aggregates ( minerals of fine & coarse aggregates)
Ans. cut-back asphalt (rapid curing) or emulsified asphalt
631.
633.
643.
What is being determined in a core sample from asphalt
Where should the bituminous seal coat be used?
pavement/
Ans. thickness of
Ans. on an existing bituminous surface course with or without an application
pavement and density of pavement
of aggregates
634.
40 -
645.
646.
647.
648.
649.
650.
658.is
The spot test on asphalt is used to determine what?
Per program of work, the estimated volume of item 201 materials
Ans.
overheating during manufacture
7,500 cu. m. How many grading and plasticity test are required based on
the DPWH minimum testing requirements?
Ans. 25 grading and 25
659.
Under what climatic condition(s) do we use the lower penetration
plasticity
grades or hard asphalt?
Ans. hot climate
652.
Bituminous concrete mixes contain asphalt by weight equivalent to
660.
Sampling of the freshly mixed concrete should be taken on the
what?
Ans. 5 to 8%
_______ batch discharge of the transit mixer.
653.
Quality of factory-produced reinforced concrete pipes may be best Ans. middle
established through what?
Ans. Test of concrete pipe samples
651.
41 -
661.
662.
663.
664.
665.
666.
667.
Soft and unstable soils were encountered during the course of 670.
subgradesample from compacted bituminous mix shall be neatly cut by
preparation. If you were the Materials Engineer assigned to the project, saw
whator core drill. Each sample shall be at least ____________.
is the most effective and cheaper method that you would recommend toAns. 150 mm. x 150 mm. or 100mm diameter full depth
stabilized the soil prior to the construction of the subbase course?
Ans. Geotextiles
671.
For surface tolerance the surface (bituminous mix) will be check
by the use of a _____ at sites selected by the Engineer.
How many times per layer should a concrete specimen molded in a Ans. 3 meter straight edge
6x6x21 beam mold be rodded?
Ans. 63 times
672.
What is the sample requirement for paving concrete for every 75
cu. m. or fraction thereof?
Ans. One (1) set (consisting of 3
What is the basis for acceptance or rejection of any construction
pcs.) concrete beam sample
materials?
Ans. Materials Test Report
673.
In testing bituminous mix sample for Immersion-Compression
In testing concrete cylinder sample the load applied should be
Stability the sample is soaked in water bath for ______ days.
continuous without shock at a constant rate within the range of _______ Ans.
per four (4)
second.
Ans. 0.14 to 0.34
Mpa per second or 20 to 50 psi per second
674.
Given: Wt. of dry aggregate = 950 grams
Wt. of asphalt
= 50 grams
During the application of the first half of the anticipated load a _______
What is the total % of asphalt weight of total mix
rate of loading shall be permitted.
Ans. Wt. of total mix = wt. of dry agg. + wt. of asphalt
Ans. higher rate
= 950 + 50 = 1,000 grams
therefore: (50grams/1,000grams) x 100 = 5%
Initial rolling in bituminous mixes shall be perform with a _____ roller.
Ans. Pneumatic Tire Roller
675.
Does the percent asphalt in problem above meet the required
specification for percent asphalt in bituminous mixes? Why?
Ans. yes, because standard specification for percent asphalt in
Final rolling in bituminous mixes shall be perform with a _________ roller.
bituminous mixes is 5 to 8%
Ans. 3-wheel or Tandem type steel wheel roller
676.
If the actual percent asphalt in the problem above is 5% and the
Rolling of bituminous mix shall be discounted whenever it begins
to
percent asphalt in a job-mix 5.6% did it pass the required tolerance?
produce excessive ______ or ________.
Why?
Ans. No,
Ans. pulverizing of the aggregate or displacement of the mixture
because the required tolerance for % asphalt in a job-mix formula is
669.
Final rolling shall be continued until roller marks are eliminated and +/-0.4%
a
minimum of _____ mass percent of the density of the laboratory compacted
677.
Which is not the duty or responsibility of Materials Engineer?
specimens prepared in accordance with AASHTO T160 has been obtained.
Ans. quantity of construction materials
Ans. 95 mass percent
668.
42 -
678.
679.
680.
681.
682.
683.
684.
687.
692.
Emulsified asphalt are either _____ and _________.
If there is a necessary to add water to the concrete mix in order
to
Ans. 1) cationic emulsion which work better with wet agg. And in
increase is workability (provided concrete does not exceed specified slump).
cold weather
2) anionic emulsion which
How many minutes after the initial of the mixing does adding of water be
adhere
better
to
agg.
Which
have
positive
charges
permitted?
Ans.
not exceeding 45 minutes and that water cement ratio is not exceeded
693.
What is the bituminous material commonly used in item 310?
Ans. Asphalt cement (AC)
686.
What is the percent weight of aggregates (coarse, fine and mineral filler)
in the mixture of bituminous concrete surface coarse?
694.
What greatly influence the service of an asphalt pavement?
Ans. 92 to 95%
Ans. grade and quantity of asphalt
685.
43 -
695.
696.
697.
698.
699.
700.
701.
702.
703.
704.
The mixture shall have a mass percent air voids with the range712.
of
What kind of roller should be used for the initial or breakdown
_________.
Ans. 3.0% - 5%
compaction?
Ans. Pneumatic smooth
wheeled roller (not less than 10 tons)
44 -
713.
714.
715.
716.
717.
718.
How many samples shall be taken for each full days operation?729.
What is the difference between item 504 and item 505?
Ans. at least one but not more than three (3) core samples
Ans. placement of stone or boulders and the ratio of cement and fine
sand
What is the dimension of the samples taken full depth from the finish
pavement for thickness determination?
730.
What is the ratio of fine aggregates to number of bags of cement
Ans. 150 mm. or 100 mm diameter
for grout in item 504 and 505?
Ans. for item 504 its one part
cement to three part fine sand (1:3)
for item 505 its one part cement to two parts fine sand (1:2)
How is the sample taken from the finished pavement?
Ans. by means of core drill or saw
731.
Penetration and ductility test of asphalt are done in __________
temperature.
a) 60*C
How is the surface level of the finished pavement being check?
b) 25*C
Ans. by the use of 3 meters straight edge
c) 50*C
d) 10*C
The variation of the surface from the testing edge of the straight
732.
This is the most fluidest and lightest of all the grade of Medium
between contacts with the surface shall not exceed ________..
Curing Cut-back Asphalt.
a) MC 30
b) MC
Ans. 6 mm.
70
c)
MC 800
d) MC 300
What determine the thickness and density of compacted asphalt
pavement?
Ans. core test
719.
720.
721.
722.
723.
724.
726.
45 -
733.
The only kind of asphalt that can be used in all bituminous item741.
of work.Tie bars shall not be coated or painted with ____________.
a) Asphalt Cement
b) Cut-back Asphalt
Ans. asphalt or other materials
c) Emulsified Asphalt
d) All of the above
742.
What is the metal device that are used as a load transfer device
734.
Retempering of concrete or mortar, which has partially hardened, will
held
be in a position parallel to the surface and centerline of the slab of
permitted with the addition of cement, aggregate or water.
pavement?
a) yes
b) no
Ans. dowels
c) it depends on the condition of concrete
d) check the slump
743.
To protect dowel from corrosion and to facilitate sliding in
735.
What is the minimum number of representative cores that shall be taken
concrete, it shall be coated with _________.
from each member area of concrete in place that is considered deficient?
Ans. thin film of bitumen
a) 3 cores
b) 4 cores
c) 5 cores
d) core must be taken at 5 meter interval
744.
The surface of the pavement shall be roughened by means of
backward & forward of the designed sta.
____________.
Ans. brooming
736.
737.
747.
For major interchanges and busy intersection, PCCP will be allowed
open on the ----------- to minimize occurrence of road congestion.
a) 14th day
b) 10th day
th
c) 12 day
d) 7th day
738.
739.
748.
749.
What is item 504 in DPWH specification?
Ans.
740.
What shall be done if cracks appear at or near the joint prior to the time Grouted Riprap
of sawing?
Ans. sawing shall be omitted
46 -
750.
15 days
c) 21 days
751.
752.
When water is added to the mixture to bring the slump within required
limit, it shall be injected into the mixer under such pressure and direction of
flow that the requirement for uniformity and desired slump of concrete are
met. The drum shall be turned on additional _______ revolution or more.
a) 10 revolutions
b) 45 revolutions
c) 30 revolutions
d) 15 revolutions
753.
754.
For small contract project of the DPWH located in remote areas where
the quality of cement to be used is too small and where there are no
accessible testing laboratory to check the quality of materials, exception in
the requirements for performance of laboratory test in cement prior to use
may be allowed provided that the trial mixes be done for every ___________.
a) deformation characteristic of soil
b) Engineering properties of the underlying soils
c) Arrangement of soil strata
d) Field Density of soil
755.
How many days shall the Engineer be notified in advance of the date
that the treating process will be performed in order that the untreated
lumber, the treatment process and the finished treatment timber may all be
inspected?
a)
47 -
b) 10 days
d) 7 days