Section 1.
Gauge Problem Exercises are constructed from a completed kill sheet filled-in with all relevant
volume and pressure calculations.
Each question is based on the strokes, pump rate, drill pipe and casing gauge readings at a
specific point in time during a well kill operation. Any one or a combination of these readings could
indicate the action required. Options are shown in the multiple-choice answers.
The casing and/or drill pipe pressures will only be relevant to the action if
The casing and/or drill pipe pressures given in the question are below the expected pressures,
or
The casing and/or drill pipe pressures given in the question are 70 psi or more above the
expected pressures.
Section 2.
Calculation Formula.
Abbreviations used in this document
bbl
bbl/ft
bbl/min
bbl/stroke
BHP
BOP
ft
ft/hr
ft/min
lb/bbl
LOT
MAASP
ppg
psi
psi/ft
psi/hr
SICP
SIDPP
SPM
TVD
0.052
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
Barrels (US)
Barrels (US) per foot
Barrels (US) per minute
Barrels (US) per stroke
Bottom Hole Pressure
Blowout Preventer
Feet
Feet per hour
Feet per minute
Pounds per barrel
Leak-off Test
Maximum Allowable Annular Surface Pressure
Pounds per gallon
Pounds per square inch
Pounds per square inch per foot
Pounds per square inch per hour
Shut in Casing Pressure
Shut in Drill Pipe Pressure
Strokes per minute
True Vertical Depth
Constant factor
April 2016
EX-0035
Version 1.0
Page 1 of 4
Printed copies are UNCONTROLLED: It is the users responsibility to verify printed material against the controlled document
10. NEW PUMP PRESSURE (psi) WITH NEW MUD DENSITY approximate
Old Pump Pressure (psi)
April 2016
Version 1.0
Page 2 of 4
Printed copies are UNCONTROLLED: It is the users responsibility to verify printed material against the controlled document
P1 x V1 = P2 x V2
P2 =
P1 V1
V2
V2 =
P1 V1
P2
April 2016
EX-0035
Version 1.0
Page 3 of 4
Printed copies are UNCONTROLLED: It is the users responsibility to verify printed material against the controlled document
23. LEVEL DROP PULLING REMAINING COLLARS OUT OF HOLE WET (ft)
Length of Collars (ft) Closed End Displacement (bbl/ft)
Riser or Casing Capacity (bbl/ft)
[Air Gap (ft) + Water Depth (ft)] Mud Density (ppg) [Water Depth (ft) Sea Water Density (ppg)]
TVD (ft) Air Gap (ft) Water Depth (ft)
April 2016
EX-0035
Version 1.0
Page 4 of 4
Printed copies are UNCONTROLLED: It is the users responsibility to verify printed material against the controlled document