PROGRESS REPORT

PROJECT

: PEMBANGUNAN 4 GARDU TRAKSI BERIKUT UJL


(CAWANG, DEPOK BARU, RATU JAYA, TANAH ABANG)
CLIENT
: PT. CHRISTALENTA PRATAMA
PROJECT NO. : PN/16/01/0001
PO NO.
: 210/CP/II/2016
LOKASI
: CAWANG,DEPOK BARU,TANAH ABANG & RATU JAYA

WEEK NO

: XIV

PERIOD

:30 May S/D 05 JUNI 2016

DATE : 06 JUNI 2016


REVISI : 01

PROGRESS REPORT
PERIOD: 30 May S/D 05 JUNI 2016
PROJECT

CLIENT
:
LOCATION :
DATE
:

PEMBANGUNAN 4 UNIT GARDU TRAKSI BERIKUT UJL (CAWANG, DEPOK BARU, RATU
JAYA, TANAH ABANG)
PT CHRISTALENTA PRATAMA
DEPOK BARU,CAWANG,TANAH ABANG & RATUJAYA
06 JUNI 2016

PERIOD : XIV
REV
: 01

ii. CONTENTS
i.
ii.
I.
II.
III.
IV

Halaman Judul
i
Contents
1
Progress
2
Documentation
3
Others/Problem
4
Time schedule (updated)
5

PROGRESS REPORT
PERIOD: 30 May S/D 5 June 2016
PROJECT

PEMBANGUNAN 4 UNIT GARDU TRAKSI BERIKUT UJL (CAWANG, DEPOK BARU, RATU JAYA, TANAH ABANG)

CLIENT

PT CHRISTALENTA PRATAMA

LOCATION

CAWANG

DATE

16 May 2016

PERIOD

: XIV

REV

: 01

I. PROGRESS
Progress
No

Activities

Weight Portion

Previous
Up to last week

A.

Contract Signed/ PO Received

B.

Work Permit / Local Permit

C.

Topography Survey

D.

Soil Investigation + Report (all location)

0.66%

100%

0.66%

CLOSE
By Client

ENGINEERING WORK (TANAH ABANG, CAWANG, DEPOK BARU)


A.

E-House Design

0.66%

100%

100%

0.66%

CLOSE

B.

Civil Design

0.66%

100%

100%

0.66%

CLOSE

C.

M/E Design

0.66%

100%

100%

0.66%

CLOSE

D.

As Built Drawing

0.66%

0%

0%

0.00%

0.27%
0.19%
0.50%

100%
100%
100%

100%
100%
100%

0.27%
0.19%
0.50%

CLOSE
CLOSE
CLOSE

SITE PREPARATION WORK


Land Clearing
Bowplank Work
Temporary Fences Work

CIVIL WORK (FOUNDATION, PEDESTAL, STEEL STRUCTURE)


A.

Ground Breaking

1.82%

85%

90%

1.64%

ON PROGRESS

B.

Re-bar + laydown

2.15%

95%

95%

2.04%

ON PROGRESS

C.

Formwork

1.82%

50%

50%

0.91%

ON PROGRESS

D. Pouring Concrette

3.65%

10%

30%

1.09%

E. Demolishing the Formwork

1.37%

0%

0%

0.00%

A. Baseframe Fabrication c/w floor and painting

18.37%

85%

100%

18.37%

B. Wall Panel Fabrication c/w painting

15.49%

90%

100%

15.49%

CLOSE

C. Roof & Ceiling Fabrication

5.69%

50%

50%

2.84%

ON PROGRESS

D. Door Fabrication

4.36%

25%

25%

1.09%

ON PROGRESS

E. Accessories(Z Bar, Ceiling, Canopy)

2.83%

0%

75%

2.12%

2.34%

0%

0%

0.00%

1. Base Frame + Floor Plate (E-House)

3.27%

0%

0%

0.00%

2. Wall (E-House)

3.16%

0%

0%

0.00%

3. Ceiling (E-House)

1.58%

0%

0%

0.00%

4. Roof (E-House)

1.58%

0%

0%

0.00%

5. Vinyl Floor

0.50%

0%

0%

0.00%

6. Door

0.22%

0%

0%

0.00%

7. Downspout pipe

0.27%

0%

0%

0.00%

4.81%

0%

0%

0.00%

13.30%

0%

0%

0.00%

7.18%

0%

0%

0.00%

FABRICATION WORK (E-HOUSE)

F. Walkway + Stairs

CLOSE

Additional

ERECTION WORK
A.

E-House

B. M/E & AC (utility)


C. FM 200
D. CCTV
7

By Client
100%

G. Delivery to Site
6

Remarks

Total

PRELIMINARY WORK

A.
B.
C.
4

to date/ until
this week

SITE CHECK / FINAL INSPECTION


FINISH

TOTAL PROGRESS =

PT. BASUKIGRAHA FABRIKATAMA

100%

49.21%

PT. CHRISTALENTA PRATAMA

Prepared by,

Checked by,

Approved by,

PPIC

Project Manager

____________________________

PROGRESS REPORT
PERIOD: 30 May S/D 5 June 2016
PROJECT

CLIENT
LOCATION
DATE

:
:
:

PEMBANGUNAN 4 UNIT GARDU TRAKSI BERIKUT UJL (CAWANG, DEPOK BARU, RATU JAYA,
TANAH ABANG)
PT CHRISTALENTA PRATAMA
DEPOK BARU
16 May 2016

PERIOD : XIV
REV
: 01

I. PROGRESS
No

Activities

PRELIMINARY WORK
A. Contract Signed/ PO Received
B. Work Permit / Local Permit
C. Topography Survey
D. Soil Investigation + Report (all location)
ENGINEERING WORK (TANAH ABANG, CAWANG, DEPOK BARU)
A. E-House Design
B. Civil Design
C. M/E Design
D. As Built Drawing
SITE PREPARATION WORK
A. Demolish Existing Buiding
B. Land Clearing
C. Bowplank Work
D. Temporary Fences Work
CIVIL WORK (FOUNDATION, PEDESTAL, STEEL STRUCTURE)
A. Ground Breaking
B. Re-bar + laydown
C. Formwork
D. Pouring Concrette
E. Demolishing the Formwork
F. Assembly Streel Strucutre
FABRICATION WORK
A. Baseframe Fabrication c/w floor and painting
B. Wall Panel Fabrication c/w painting
C. Roof & Ceiling Fabrication
D. Door Fabrication
E. Accessories
F. Walkway + Stairs
G. Delivery to Site
ERECTION WORK (ASSEMBLY)
1. Base Frame + Floor Plate (E-House)
2. Wall (E-House)
3. Ceiling (E-House)
4. Roof (E-House)
5. M/E (utility)
6. Air Conditioning
7. FM 200
8. CCTV
9. Vinyl Floor
10. Door
11. Downspout pipe
SITE CHECK / FINAL INSPECTION
FINISH
TOTAL PROGRESS =

7
8

Prepared by,

PPIC

Weight Portion

PT. BASUKIGRAHA FABRIKATAMA


Checked by,

Project Manager

Previous
Up to last
week

Progress
to date/
until this
week

Total

Remarks

By Client
0.63%

100%

100%

0.6%
By Client

0.62%
0.62%
0.62%
0.62%

100%
100%
95%
0%

100%
100%
100%
0%

0.62%
0.62%
0.62%
0.00%

Close
Close
Close

0.40%
0.25%
0.22%
0.57%

100%
95%
60%
100%

100%
100%
100%
100%

0.40%
0.25%
0.22%
0.57%

Close
Close

2.61%
2.61%
2.61%
2.61%
2.61%

50%
85%
0%
0%
0%

100%
85%
50%
40%
0%

2.61%
2.22%
1.31%
1.05%
0.00%

Close
On Progress

Close

Additional
14.92%
17.21%
4.66%
4.54%
2.84%

50%
35%
0%
0%
0%

100% 14.92%
95% 16.35%
50% 2.33%
50% 2.27%
0% 0.00%

1.94%

0%

0%

0.00%

3.31%
5.44%
3.27%
3.27%
3.21%
0.96%
12.59%
6.80%
0.39%
0.00%
0.25%
0.00%
100%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
47.00%

On Progress
On Progress
On Progress
On Progress
Additional

PT. CHRISTALENTA PRATAMA


Approved by,

____________________________

PROGRESS REPORT
PERIOD: 30 May S/D 5 June 2016
PROJECT

CLIENT
:
LOCATION :
DATE
:

PEMBANGUNAN 4 UNIT GARDU TRAKSI BERIKUT UJL (CAWANG, DEPOK BARU, RATU
JAYA, TANAH ABANG)
PT CHRISTALENTA PRATAMA
TANAH ABANG
16 May 2016

PERIOD : XIV
REV
: 01

I. PROGRESS
Weight
Portion

No

Activities

PRELIMINARY WORK
A. Contract Signed/ PO Received
B. Work Permit / Local Permit
C. Topography Survey
D. Soil Investigation + Report (all location)
ENGINEERING WORK (TANAH ABANG, CAWANG, DEPOK BARU)
A. E-House Design
B. Civil Design
C. M/E Design
D. As Built Drawing
SITE PREPARATION WORK
A. Relocation
B. Demolish Existing Buiding
C. Land Clearing
D. Bowplank Work
E. Temporary Fences Work
CIVIL WORK (FOUNDATION, PEDESTAL, STEEL STRUCTURE)
A. Ground Breaking
B. Re-bar + laydown
C. Formwork
D. Pouring Concrette
E. Demolishing the Formwork
FABRICATION WORK (E-HOUSE)
A. Baseframe Fabrication c/w floor and painting
B. Wall Panel Fabrication c/w painting
C. Roof & Ceiling Fabrication
D. Door Fabrication
E. Accessories
F. Walkway + Stairs
G. Delivery to Site
ERECTION WORK
A. E-House
1. Base Frame + Floor Plate (E-House)
2. Wall (E-House)
3. Ceiling (E-House)
4. Roof (E-House)
5. Vinyl Floor
6. Door
7. Downspout pipe
B. M/E & AC (utility)
C. FM 200
D. CCTV
SITE CHECK / FINAL INSPECTION
FINISH
TOTAL PROGRESS =

7
8

PT. BASUKIGRAHA FABRIKATAMA


Prepared by,
Checked by,

PPIC

Project Manager

0.66%
0.65%
0.65%
0.65%
0.65%

Previous
Up to last
week

Progress
to date/
until this
week

Total

By Client
100%

100%

0.66%
By Client

100%
95%
100%
0%

100%
100%
100%
0%

0.65%
0.65%
0.65%
0.00%

0.53%
0.19%
0.22%

0%
0%
0%

0%
0%
0%

0.00%
0.00%
0.00%

2.03%
2.06%
2.06%
4.13%
1.03%

0%
0%
0%
0%
0%

0%
0%
0%
0%
0%

0.00%
0.00%
0.00%
0.00%
0.00%

17.15%
15.59%
5.64%
5.19%
3.14%
2.32%

60%
48%
0%
0%
0%
0%

0%

0.00%

3.09%
3.13%
1.57%
1.57%
0.49%
0.26%
0.26%
4.77%
13.19%
7.12%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

100%

Remarks

Close
Close
Close

By Client
By Client

85% 14.58%
48% 7.48%
0% 0.00%
0% 0.00%
0% 0.00%

on progress
on progress

Additional

24.67%

PT. CHRISTALENTA PRATAMA


Approved by,

____________________________

PROGRESS REPORT
PERIOD: 30 May S/D 5 June 2016
PROJECT

CLIENT
:
LOCATION :
DATE
:

PEMBANGUNAN 4 UNIT GARDU TRAKSI BERIKUT UJL (CAWANG, DEPOK BARU, RATU
JAYA, TANAH ABANG)
PT CHRISTALENTA PRATAMA
RATU JAYA
16 May 2016

PERIOD : XIV
REV
: 01

I. PROGRESS
Weight
Portion

No

Activities

PRELIMINARY WORK
A. Contract Signed/ PO Received
B. Work Permit / Local Permit
C. Topography Survey
D. Soil Investigation + Report (all location)
ENGINEERING WORK (TANAH ABANG, CAWANG, DEPOK BARU)
A. E-House Design
B. Civil Design
C. M/E Design
D. As Built Drawing
SITE PREPARATION WORK
A. Land Clearing
B. Bowplank Work
C. Temporary Fences Work
CIVIL WORK (FOUNDATION, PEDESTAL, STEEL STRUCTURE)
A. Ground Breaking
B. Re-bar + laydown
C. Formwork
D. Pouring Concrette
E. Demolishing the Formwork
FABRICATION WORK (E-HOUSE)
A. Baseframe Fabrication c/w floor and painting
B. Wall Panel Fabrication c/w painting
C. Roof Fabrication
D. Door Fabrication
E. Accessories
F. Walkway + Stairs
G. Delivery to Site
ERECTION WORK
A. E-House
1. Base Frame + Floor Plate (E-House)
2. Wall (E-House)
3. Ceiling (E-House)
4. Roof (E-House)
5. Vinyl Floor
6. Door
7. Downspout pipe
B. M/E & AC (Utility)
C. FM 200
D. CCTV
SITE CHECK / FINAL INSPECTION
FINISH
TOTAL PROGRESS =

7
8

PT. BASUKIGRAHA FABRIKATAMA


Prepared by,
Checked by,

PPIC

Project Manager

0.58%
-

Previous
Up to last
week

Progress
to date/
until this
week

Total

By Client
0%

0%

0.00%
By Client

0.58%
0.58%
0.58%
0.58%

0%
0%
0%
0%

0%
0%
0%
0%

0.00%
0.00%
0.00%
0.00%

0.47%
0.20%
0.44%

0%
0%
0%

0%
0%
0%

0.00%
0.00%
0.00%

2.17%
2.17%
2.17%
2.17%
2.17%

0%
0%
0%
0%
0%

0%
0%
0%
0%
0%

0.00%
0.00%
0.00%
0.00%
0.00%

15.23%
17.56%
5.19%
5.05%
2.64%
0.00%
2.83%

0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

3.07%
5.05%
3.03%
3.03%
0.37%
0.00%
0.23%
3.87%
11.68%
6.31%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

100%

Remarks

0.00%

PT. CHRISTALENTA PRATAMA


Approved by,

____________________________

PROGRESS REPORT
PERIOD: 30 May S/D 05 JUNI 2016
PROJECT
CLIENT
LOCATION
DATE

:
:
:
:

PEMBANGUNAN 4 UNIT GARDU TRAKSI BERIKUT UJL (CAWANG, DEPOK


PT CHRISTALENTA PRATAMA
CAWANG
06 JUNI 2016

PERIOD : XIV
REV : 01

II. DOCUMENTATION
No

CIVIL WORK CAWANG

PEKERJAAN GALIAN TANAH TITIK AS PONDASI P3 & PEMASANGAN HEBEL

CIVIL WORK DEPOK BARU


PASIR URUG & LANTAI KERJA
2

FABRICATION WORK
No

BASEFRAME DEPOK BARU

BASEFRAME CAWANG

WALL DEPOK BARU

WALL CAWANG

BASEFRAME TANAH ABANG

WALL TANAH ABANG

PT. BASUKIGRAHA FABRIKATAMA


Prepared by,

PPIC

Cheked by,

PT. CHRISTALENTA PRATAMA


Approved by,

Project Manager

__________________________

TIME SCHEDULE
PROJECT
CLIENT
DATE

NO.

:
:
:

URAIAN PEKERJAAN

PEMBANGUNAN 4 UNIT GARDU TRAKSI BERIKUT UJL (CAWANG, DEPOK BARU, RATU JAYA, TANAH ABANG)
PT CHRISTALENTA PRATAMA

Rev00
47.58%

MINGGU KE-

BOBOT
1

0.00

10

11

12

BOBOT
13

14

15

16

17

18

19

20

21

22

23

24

TANAH ABANG

KET

%
100.00%

PRELIMINARY WORK

0.16%

0.00

0.00

ENGINEERING WORK

0.65%

0.00

0.00

SITE PREPARATION WORK

CIVIL WORK (FOUNDATION, PEDESTAL, STEEL STRUCTURE)

2.83%

FABRICATION WORK (E-HOUSE)

12.26%

ERECTION WORK

0.24%

A. E-HOUSE

2.59%

B. M/E & AC (UTILITY)

1.19%

C. FM200

3.30%

D. CCTV

1.78%

0.01

0.01

0.01

0.00

0.00

0.00

0.01

0.01

0.01

0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.01

0.01

0.01

0.01

0.01

0.01

0.01

90.00%

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01
0.02

0.02

80.00%

0.02

0.00

SITE PREPARATION WORK

0.24%

CIVIL WORK (FOUNDATION, PEDESTAL, STEEL STRUCTURE)

2.70%

FABRICATION WORK (E-HOUSE)

12.27%

ERECTION WORK
A. E-HOUSE

2.64%

B. M/E & AC (UTILITY)

1.20%

C. FM200

3.32%

D. CCTV

1.80%

0.00

0.00

0.01

0.00

0.00

0.01

0.01

0.00

0.00

0.00

0.00

0.01

0.01

0.01

0.01

0.00

0.00

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.00

0.00
0.01

0.01

0.01
0.00
0.01

0.01

0.01

0.01

Mile Stone VI

0.00

0.00

Mile Stone V

0.00

0.66%

Mile Stone IV

0.17%

ENGINEERING WORK

Mile Stone III

PRELIMINARY WORK

Mile Stone I

Mile Stone II

CAWANG
70.00%

60.00%

50.00%

DEPOK BARU
1

PRELIMINARY WORK

0.16%

0.00

0.00

ENGINEERING WORK

0.62%

0.00

0.00

SITE PREPARATION WORK

0.36%

CIVIL WORK (FOUNDATION, PEDESTAL, STEEL STRUCTURE)

3.27%

FABRICATION WORK (E-HOUSE)

11.53%

ERECTION WORK
A. E-HOUSE

3.17%

B. M/E & AC (UTILITY)

1.04%

C. FM200

3.15%

D. CCTV

1.70%

0.00

0.01

0.00

0.00

40.00%

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.00

0.00

0.00

0.01

0.01

30.00%
0.01
0.01

0.01

RATU JAYA
1

PRELIMINARY WORK

0.15%

0.00

0.00

ENGINEERING WORK

0.58%

0.00

0.00

SITE PREPARATION WORK

0.28%

CIVIL WORK (FOUNDATION, PEDESTAL, STEEL STRUCTURE)

2.72%

FABRICATION WORK (E-HOUSE)

12.12%

ERECTION WORK

0.00

0.01

20.00%

0.00

0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.00

0.00

0.00

0.01

0.01

10.00%

A. E-HOUSE

3.69%

B. M/E & AC (UTILITY)

0.97%

C. FM200

2.92%

D. CCTV

1.58%

0.01
0.01

0.01

0.00%

100%

RENCANA KEMAJUAN
REALISASI KEMAJUAN

Note

PERMINGGU

1.13%

4.19%

3.65%

3.31%

3.37%

3.37%

3.70%

5.11%

5.04%

5.38%

5.67%

6.08%

6.86%

8.10%

AKUMULASI

1.13%

5.32%

8.97%

12.28%

15.64%

19.01%

22.71%

27.82%

32.86%

38.24%

43.91%

49.99%

56.85%

64.95%

REALISASI PERMINGGU
DEVIASI CEPAT/LAMBAT

0.47%
-0.66%

0.74%
-4.58%

1.48%
-7.49%

2.23%
-10.05%

3.87%
-11.77%

6.42%
-12.59%

8.23%
-14.48%

9.45%
-18.38%

12.48%
-20.39%

15.35%
-22.89%

19.56%
-24.35%

24.70%
-25.29%

27.47%
-29.37%

30.22%
-34.73%

7.39%
72.34%

3.05%
75.39%

3.56%
78.9%

3.84%
82.8%

4.37%
87.2%

5.36%
92.51%

2.90%
95.41%

2.03%
97.45%

0.02
99.21%

0.79%
100.00%

100%
19.56%

Prepared By

Checked by,

Approved by,

PPIC

Project Manager

PT Christalenta Pratama