PROJECT
WEEK NO
: XIV
PERIOD
PROGRESS REPORT
PERIOD: 30 May S/D 05 JUNI 2016
PROJECT
CLIENT
:
LOCATION :
DATE
:
PEMBANGUNAN 4 UNIT GARDU TRAKSI BERIKUT UJL (CAWANG, DEPOK BARU, RATU
JAYA, TANAH ABANG)
PT CHRISTALENTA PRATAMA
DEPOK BARU,CAWANG,TANAH ABANG & RATUJAYA
06 JUNI 2016
PERIOD : XIV
REV
: 01
ii. CONTENTS
i.
ii.
I.
II.
III.
IV
Halaman Judul
i
Contents
1
Progress
2
Documentation
3
Others/Problem
4
Time schedule (updated)
5
PROGRESS REPORT
PERIOD: 30 May S/D 5 June 2016
PROJECT
PEMBANGUNAN 4 UNIT GARDU TRAKSI BERIKUT UJL (CAWANG, DEPOK BARU, RATU JAYA, TANAH ABANG)
CLIENT
PT CHRISTALENTA PRATAMA
LOCATION
CAWANG
DATE
16 May 2016
PERIOD
: XIV
REV
: 01
I. PROGRESS
Progress
No
Activities
Weight Portion
Previous
Up to last week
A.
B.
C.
Topography Survey
D.
0.66%
100%
0.66%
CLOSE
By Client
E-House Design
0.66%
100%
100%
0.66%
CLOSE
B.
Civil Design
0.66%
100%
100%
0.66%
CLOSE
C.
M/E Design
0.66%
100%
100%
0.66%
CLOSE
D.
As Built Drawing
0.66%
0%
0%
0.00%
0.27%
0.19%
0.50%
100%
100%
100%
100%
100%
100%
0.27%
0.19%
0.50%
CLOSE
CLOSE
CLOSE
Ground Breaking
1.82%
85%
90%
1.64%
ON PROGRESS
B.
Re-bar + laydown
2.15%
95%
95%
2.04%
ON PROGRESS
C.
Formwork
1.82%
50%
50%
0.91%
ON PROGRESS
D. Pouring Concrette
3.65%
10%
30%
1.09%
1.37%
0%
0%
0.00%
18.37%
85%
100%
18.37%
15.49%
90%
100%
15.49%
CLOSE
5.69%
50%
50%
2.84%
ON PROGRESS
D. Door Fabrication
4.36%
25%
25%
1.09%
ON PROGRESS
2.83%
0%
75%
2.12%
2.34%
0%
0%
0.00%
3.27%
0%
0%
0.00%
2. Wall (E-House)
3.16%
0%
0%
0.00%
3. Ceiling (E-House)
1.58%
0%
0%
0.00%
4. Roof (E-House)
1.58%
0%
0%
0.00%
5. Vinyl Floor
0.50%
0%
0%
0.00%
6. Door
0.22%
0%
0%
0.00%
7. Downspout pipe
0.27%
0%
0%
0.00%
4.81%
0%
0%
0.00%
13.30%
0%
0%
0.00%
7.18%
0%
0%
0.00%
F. Walkway + Stairs
CLOSE
Additional
ERECTION WORK
A.
E-House
By Client
100%
G. Delivery to Site
6
Remarks
Total
PRELIMINARY WORK
A.
B.
C.
4
to date/ until
this week
TOTAL PROGRESS =
100%
49.21%
Prepared by,
Checked by,
Approved by,
PPIC
Project Manager
____________________________
PROGRESS REPORT
PERIOD: 30 May S/D 5 June 2016
PROJECT
CLIENT
LOCATION
DATE
:
:
:
PEMBANGUNAN 4 UNIT GARDU TRAKSI BERIKUT UJL (CAWANG, DEPOK BARU, RATU JAYA,
TANAH ABANG)
PT CHRISTALENTA PRATAMA
DEPOK BARU
16 May 2016
PERIOD : XIV
REV
: 01
I. PROGRESS
No
Activities
PRELIMINARY WORK
A. Contract Signed/ PO Received
B. Work Permit / Local Permit
C. Topography Survey
D. Soil Investigation + Report (all location)
ENGINEERING WORK (TANAH ABANG, CAWANG, DEPOK BARU)
A. E-House Design
B. Civil Design
C. M/E Design
D. As Built Drawing
SITE PREPARATION WORK
A. Demolish Existing Buiding
B. Land Clearing
C. Bowplank Work
D. Temporary Fences Work
CIVIL WORK (FOUNDATION, PEDESTAL, STEEL STRUCTURE)
A. Ground Breaking
B. Re-bar + laydown
C. Formwork
D. Pouring Concrette
E. Demolishing the Formwork
F. Assembly Streel Strucutre
FABRICATION WORK
A. Baseframe Fabrication c/w floor and painting
B. Wall Panel Fabrication c/w painting
C. Roof & Ceiling Fabrication
D. Door Fabrication
E. Accessories
F. Walkway + Stairs
G. Delivery to Site
ERECTION WORK (ASSEMBLY)
1. Base Frame + Floor Plate (E-House)
2. Wall (E-House)
3. Ceiling (E-House)
4. Roof (E-House)
5. M/E (utility)
6. Air Conditioning
7. FM 200
8. CCTV
9. Vinyl Floor
10. Door
11. Downspout pipe
SITE CHECK / FINAL INSPECTION
FINISH
TOTAL PROGRESS =
7
8
Prepared by,
PPIC
Weight Portion
Project Manager
Previous
Up to last
week
Progress
to date/
until this
week
Total
Remarks
By Client
0.63%
100%
100%
0.6%
By Client
0.62%
0.62%
0.62%
0.62%
100%
100%
95%
0%
100%
100%
100%
0%
0.62%
0.62%
0.62%
0.00%
Close
Close
Close
0.40%
0.25%
0.22%
0.57%
100%
95%
60%
100%
100%
100%
100%
100%
0.40%
0.25%
0.22%
0.57%
Close
Close
2.61%
2.61%
2.61%
2.61%
2.61%
50%
85%
0%
0%
0%
100%
85%
50%
40%
0%
2.61%
2.22%
1.31%
1.05%
0.00%
Close
On Progress
Close
Additional
14.92%
17.21%
4.66%
4.54%
2.84%
50%
35%
0%
0%
0%
100% 14.92%
95% 16.35%
50% 2.33%
50% 2.27%
0% 0.00%
1.94%
0%
0%
0.00%
3.31%
5.44%
3.27%
3.27%
3.21%
0.96%
12.59%
6.80%
0.39%
0.00%
0.25%
0.00%
100%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
47.00%
On Progress
On Progress
On Progress
On Progress
Additional
____________________________
PROGRESS REPORT
PERIOD: 30 May S/D 5 June 2016
PROJECT
CLIENT
:
LOCATION :
DATE
:
PEMBANGUNAN 4 UNIT GARDU TRAKSI BERIKUT UJL (CAWANG, DEPOK BARU, RATU
JAYA, TANAH ABANG)
PT CHRISTALENTA PRATAMA
TANAH ABANG
16 May 2016
PERIOD : XIV
REV
: 01
I. PROGRESS
Weight
Portion
No
Activities
PRELIMINARY WORK
A. Contract Signed/ PO Received
B. Work Permit / Local Permit
C. Topography Survey
D. Soil Investigation + Report (all location)
ENGINEERING WORK (TANAH ABANG, CAWANG, DEPOK BARU)
A. E-House Design
B. Civil Design
C. M/E Design
D. As Built Drawing
SITE PREPARATION WORK
A. Relocation
B. Demolish Existing Buiding
C. Land Clearing
D. Bowplank Work
E. Temporary Fences Work
CIVIL WORK (FOUNDATION, PEDESTAL, STEEL STRUCTURE)
A. Ground Breaking
B. Re-bar + laydown
C. Formwork
D. Pouring Concrette
E. Demolishing the Formwork
FABRICATION WORK (E-HOUSE)
A. Baseframe Fabrication c/w floor and painting
B. Wall Panel Fabrication c/w painting
C. Roof & Ceiling Fabrication
D. Door Fabrication
E. Accessories
F. Walkway + Stairs
G. Delivery to Site
ERECTION WORK
A. E-House
1. Base Frame + Floor Plate (E-House)
2. Wall (E-House)
3. Ceiling (E-House)
4. Roof (E-House)
5. Vinyl Floor
6. Door
7. Downspout pipe
B. M/E & AC (utility)
C. FM 200
D. CCTV
SITE CHECK / FINAL INSPECTION
FINISH
TOTAL PROGRESS =
7
8
PPIC
Project Manager
0.66%
0.65%
0.65%
0.65%
0.65%
Previous
Up to last
week
Progress
to date/
until this
week
Total
By Client
100%
100%
0.66%
By Client
100%
95%
100%
0%
100%
100%
100%
0%
0.65%
0.65%
0.65%
0.00%
0.53%
0.19%
0.22%
0%
0%
0%
0%
0%
0%
0.00%
0.00%
0.00%
2.03%
2.06%
2.06%
4.13%
1.03%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0.00%
0.00%
0.00%
0.00%
0.00%
17.15%
15.59%
5.64%
5.19%
3.14%
2.32%
60%
48%
0%
0%
0%
0%
0%
0.00%
3.09%
3.13%
1.57%
1.57%
0.49%
0.26%
0.26%
4.77%
13.19%
7.12%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100%
Remarks
Close
Close
Close
By Client
By Client
85% 14.58%
48% 7.48%
0% 0.00%
0% 0.00%
0% 0.00%
on progress
on progress
Additional
24.67%
____________________________
PROGRESS REPORT
PERIOD: 30 May S/D 5 June 2016
PROJECT
CLIENT
:
LOCATION :
DATE
:
PEMBANGUNAN 4 UNIT GARDU TRAKSI BERIKUT UJL (CAWANG, DEPOK BARU, RATU
JAYA, TANAH ABANG)
PT CHRISTALENTA PRATAMA
RATU JAYA
16 May 2016
PERIOD : XIV
REV
: 01
I. PROGRESS
Weight
Portion
No
Activities
PRELIMINARY WORK
A. Contract Signed/ PO Received
B. Work Permit / Local Permit
C. Topography Survey
D. Soil Investigation + Report (all location)
ENGINEERING WORK (TANAH ABANG, CAWANG, DEPOK BARU)
A. E-House Design
B. Civil Design
C. M/E Design
D. As Built Drawing
SITE PREPARATION WORK
A. Land Clearing
B. Bowplank Work
C. Temporary Fences Work
CIVIL WORK (FOUNDATION, PEDESTAL, STEEL STRUCTURE)
A. Ground Breaking
B. Re-bar + laydown
C. Formwork
D. Pouring Concrette
E. Demolishing the Formwork
FABRICATION WORK (E-HOUSE)
A. Baseframe Fabrication c/w floor and painting
B. Wall Panel Fabrication c/w painting
C. Roof Fabrication
D. Door Fabrication
E. Accessories
F. Walkway + Stairs
G. Delivery to Site
ERECTION WORK
A. E-House
1. Base Frame + Floor Plate (E-House)
2. Wall (E-House)
3. Ceiling (E-House)
4. Roof (E-House)
5. Vinyl Floor
6. Door
7. Downspout pipe
B. M/E & AC (Utility)
C. FM 200
D. CCTV
SITE CHECK / FINAL INSPECTION
FINISH
TOTAL PROGRESS =
7
8
PPIC
Project Manager
0.58%
-
Previous
Up to last
week
Progress
to date/
until this
week
Total
By Client
0%
0%
0.00%
By Client
0.58%
0.58%
0.58%
0.58%
0%
0%
0%
0%
0%
0%
0%
0%
0.00%
0.00%
0.00%
0.00%
0.47%
0.20%
0.44%
0%
0%
0%
0%
0%
0%
0.00%
0.00%
0.00%
2.17%
2.17%
2.17%
2.17%
2.17%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0.00%
0.00%
0.00%
0.00%
0.00%
15.23%
17.56%
5.19%
5.05%
2.64%
0.00%
2.83%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
3.07%
5.05%
3.03%
3.03%
0.37%
0.00%
0.23%
3.87%
11.68%
6.31%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100%
Remarks
0.00%
____________________________
PROGRESS REPORT
PERIOD: 30 May S/D 05 JUNI 2016
PROJECT
CLIENT
LOCATION
DATE
:
:
:
:
PERIOD : XIV
REV : 01
II. DOCUMENTATION
No
FABRICATION WORK
No
BASEFRAME CAWANG
WALL CAWANG
PPIC
Cheked by,
Project Manager
__________________________
TIME SCHEDULE
PROJECT
CLIENT
DATE
NO.
:
:
:
URAIAN PEKERJAAN
PEMBANGUNAN 4 UNIT GARDU TRAKSI BERIKUT UJL (CAWANG, DEPOK BARU, RATU JAYA, TANAH ABANG)
PT CHRISTALENTA PRATAMA
Rev00
47.58%
MINGGU KE-
BOBOT
1
0.00
10
11
12
BOBOT
13
14
15
16
17
18
19
20
21
22
23
24
TANAH ABANG
KET
%
100.00%
PRELIMINARY WORK
0.16%
0.00
0.00
ENGINEERING WORK
0.65%
0.00
0.00
2.83%
12.26%
ERECTION WORK
0.24%
A. E-HOUSE
2.59%
1.19%
C. FM200
3.30%
D. CCTV
1.78%
0.01
0.01
0.01
0.00
0.00
0.00
0.01
0.01
0.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.01
0.01
0.01
0.01
0.01
0.01
0.01
90.00%
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.02
0.02
80.00%
0.02
0.00
0.24%
2.70%
12.27%
ERECTION WORK
A. E-HOUSE
2.64%
1.20%
C. FM200
3.32%
D. CCTV
1.80%
0.00
0.00
0.01
0.00
0.00
0.01
0.01
0.00
0.00
0.00
0.00
0.01
0.01
0.01
0.01
0.00
0.00
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.00
0.00
0.01
0.01
0.01
0.00
0.01
0.01
0.01
0.01
Mile Stone VI
0.00
0.00
Mile Stone V
0.00
0.66%
Mile Stone IV
0.17%
ENGINEERING WORK
PRELIMINARY WORK
Mile Stone I
Mile Stone II
CAWANG
70.00%
60.00%
50.00%
DEPOK BARU
1
PRELIMINARY WORK
0.16%
0.00
0.00
ENGINEERING WORK
0.62%
0.00
0.00
0.36%
3.27%
11.53%
ERECTION WORK
A. E-HOUSE
3.17%
1.04%
C. FM200
3.15%
D. CCTV
1.70%
0.00
0.01
0.00
0.00
40.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.00
0.00
0.00
0.01
0.01
30.00%
0.01
0.01
0.01
RATU JAYA
1
PRELIMINARY WORK
0.15%
0.00
0.00
ENGINEERING WORK
0.58%
0.00
0.00
0.28%
2.72%
12.12%
ERECTION WORK
0.00
0.01
20.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.00
0.00
0.00
0.01
0.01
10.00%
A. E-HOUSE
3.69%
0.97%
C. FM200
2.92%
D. CCTV
1.58%
0.01
0.01
0.01
0.00%
100%
RENCANA KEMAJUAN
REALISASI KEMAJUAN
Note
PERMINGGU
1.13%
4.19%
3.65%
3.31%
3.37%
3.37%
3.70%
5.11%
5.04%
5.38%
5.67%
6.08%
6.86%
8.10%
AKUMULASI
1.13%
5.32%
8.97%
12.28%
15.64%
19.01%
22.71%
27.82%
32.86%
38.24%
43.91%
49.99%
56.85%
64.95%
REALISASI PERMINGGU
DEVIASI CEPAT/LAMBAT
0.47%
-0.66%
0.74%
-4.58%
1.48%
-7.49%
2.23%
-10.05%
3.87%
-11.77%
6.42%
-12.59%
8.23%
-14.48%
9.45%
-18.38%
12.48%
-20.39%
15.35%
-22.89%
19.56%
-24.35%
24.70%
-25.29%
27.47%
-29.37%
30.22%
-34.73%
7.39%
72.34%
3.05%
75.39%
3.56%
78.9%
3.84%
82.8%
4.37%
87.2%
5.36%
92.51%
2.90%
95.41%
2.03%
97.45%
0.02
99.21%
0.79%
100.00%
100%
19.56%
Prepared By
Checked by,
Approved by,
PPIC
Project Manager
PT Christalenta Pratama