Professional Documents
Culture Documents
TECHNOLOGY
TRAINING REPORT
ON
SUBMITTED
BY:
HABIB MOLLAH
(2011-6029)
SANCHAYITA DAS
(2011-6010)
SUBMITTED
TO:
Mr. KALLOL ROY
WHAT IS DVC ?
DVC (Damodar Valley Corporation)a legacy to the
people of India, emerged as a culmination of attempts
made over a whole century to control the wild and
erratic Damodar river. The river spans over an area of
24,235 km2 covering the states of Jharkhand
(Dhanbad, Bokaro, Hazaribagh, Koderma, Giridih,
Chhatra, Palamau, Rachi, Lohardaga and Doomka) &
West Bengal (Burdwan , Hooghly, Howrah, Bankura and
Purulia).
OBJECTIVES/PURPOSE :
FLOOD CONTROL.
IRRIGATION.
WATER SUPPLY- INDUSTRIAL AND DOMESTIC.
NAVIGATION & DRAINAGE.
GENERATION, TRANSMISSION
ELECTRICAL ENERGY.
AND
DISTRIBUTION
OF
LANDMARKS ACHIEVED :
SUB-STATIONS AND
RECEIVING STATIONS
AT 220 KV 11 NOS.
AT 132 KV 33 NOS.
AT 33 KV 16 NOS.
TRANSMISSION LINES
BOKARO 'B'
CHANDRAPURA
LOCATION
THERMAL
DIST .- BOKARO
STATE JHARKHAND
DIST .- BOKARO
STATE JHARKHAND
DURGAPUR
DIST .- BARDDHAMAN
STATE - WEST BENGAL
MEJIA
DIST .- BANKURA
STATE - WEST BENGAL
DSTPS
DIST .- BARDHAMAN
STATE - WEST BENGAL
DIST .- KODERMA
STATE JHARKHAND
KTPS
TOTAL THERMAL
CAPACITY
630 MW
(3 X 210 MW)
890MW
(3 X 130 MW)
+
(2 X 250 MW)
350 MW
(1X140 MW)
+
(1X210 MW)
2340 MW
(4 X 210 MW)
+
(2 X 250 MW)
+
(2 X 500 MW)
1000 MW
(2 X 500 MW)
500 MW
(1 X 500 MW)
5710 MW
NAME
LOCATION
EXISTING CAPACITY
HYDEL
TILAIYA
MAITHON
PANCHET
RIVER - BARAKAR
DIST .- HAZARIBAGH
STATE JHARKHAND
RIVER - BARAKAR
DIST .- BURDHAMAN
STATE - WEST BENGAL
RIVER - DAMODAR
DIST .- DHANBAD
STATE JHANKHAND
TOTAL HYDEL
4 MW
(2 X 2 MW)
63.2 MW
(2 X 20 MW)
+
(1 X 23.2 MW)
80 MW
(2 X 40 MW)
147.2 MW
5857.2 MW
DAMS
MAITHON DAM
KEY OBJECTIVES
FLOOD
CONTOL
GENERATION OF
ELECTRIC POWER
IRRIGATIO
N
NAVIGATIO
N&
DRAINAGE
WATER
SUPPLY TO
INDUSTRIE
S AND
DOMESTIC
S
Maithon Hydel
MAITHON HYDEL POWER STATION (MHPS) IS LOCATED ON THE RIVER
BARAKAR.
FIRST UNDERGROUND POWER STATION.
GENERATING CAPACITY OF 60 MW.
MHPS -1000 FEET BELOW THE WATER LEVEL.
TRAINING AT
ON
OVERVIEW
Power Generation
HowHydropower Works
WATER TURBINE:
water turbines are used to convert
theenergy offalling water intomechanical
energy.
PENSTOCK:
It is a closed conduit which connects the fore bay or surge tank to the scroll
case of the turbine.
20 Mw Generator Specification
1. Simmens Sehuckert,Germany
2. 3PH,generator no.D73445
3. Type-PFL 670/47-34
4. Y11,000 volt,1310/1525amp
5. RPM-176.6
6. KVA-25000/29000
7. P.F-0.8 const.
Excitor Specification
1. V: 295/330/445
2. A: 465/505/700
Main Excitor
1. DC GEN. NO-D39408
2. TYPE-GV 441/36
3. V-310,333,500
4. RPM-176.6
GENERATED POWER
ELECTRIC POWER
TRANSMISSION
ELECTRIC-POWER TRANSMISSION IS THE BULK TRANSFER
OF ELECTRICAL ENERGY, FROM GENERATING POWER PLANTS
TO ELECTRICAL SUBSTATION LOCATED NEAR DEMAND
CENTERS.
AUTOTRANSFORMERS:
33KV SYSTEM
NAME OF THE CONSUMERS:
1) IMPEX STEEL (PVT) LTD.(CD-7.0MVA)
SUBSTATIO
2) HIRA CONCUST STEEL PVT LTD (CD-7.0MVA)
N
3) CITY ALLOYS PVT. LTD. (CD-3.0MVA)
4) BMA STAINLESS LIMITED (CD-12.0MVA)
5) JAGDAMBA ISPAT PVT LIMITED (CD-3.0MVA)
6) MAA LILORI ISPAT LTD. (CD- 3.0MVA)
SWITCHYA
CONTROL
7) CHHABRA ISPAT PVT. LTD.(CD 8MVA)
RD
BUILDING
OUTDOOR
SWITCHYARD
INCOMING & OUTGOING LINES
BUSBARS
POWER TRANSFORMERS AND MEASUREMENT TRANSFORMERS
INSULATORS
CIRCUIT-BEAKERS & ISOLATORS
LIGHTNING ARRESTORS
GALVANISED STEEL STRUCTURES FOR TOWERS & EQUIPMENT SUPPORTS.
ROADS, RAILWAY TRACK, CABLE TRENCHES
PLCC EQUIPMENT INCLUDING LINE TRAP, TUNING UNIT, COUPLING CAPACITOR, ETC.
STATION EARTHING SYSTEM COMPRISING GROUND MAT, RISERS, AUXILIARY MAT,
EARTHING STRIPS, EARTHING SPIKES & EARTH ELECTRODES.
CONTROL CABLES FOR PROTECTION AND CONTROL
CONTROL BUILDING
1. ALARM FUNCTIONS
2. CONTROL AND INDICATION
3. DATA COLLECTION, RECORDING,
TRANSFORMERS
PRESENT IN KALYANESHWARI SUBSTATION
DISPLAY
150 MVA 220/132KV AUTO-TRANSFORMER
Make BHEL
Year of manufacture: 2003
Type of cooling: ONAN/ONAF/OFAF
Rating HV & LV (VA)- 75/ 105/ 50
( 50%/75%/100%)
Rating LV - 10/ 14/20
(50%/70%/100%)
Temp rise oil- 40 C (Over Ambient of 50 )
Temp rise winding- 45 (Over Ambient of 50 )
Purchase order Ref- PE-SPEC-719(R)/581257
Dated 03.12.02
Maker Sl No- 6006080
Elect Spec No- 601098
Phase 3
Frequency 50 Hz
Connection Symbol- YNa0d1
Impedance Volt at 150MVA Base
HV Position (1/IV)12.6% to 16.24%
HV Position (9b/IV)
14.1% to 15.5%
HV Position (17/IV)
13% to 16.77%
Instrume
nt
transfor
mer
Current
transfor
mer
Potential
transfor
mer
Circuit Breakers:
MAIN FUNCTION OF CIRCUIT BREAKER IS TO SWITCH OFF AND SWITCH ON
THE NORMAL CURRENT AND TOP TRIP THE CIRCUIT AT THE OCCURANCE OF
ANY FAULT.
Isolators:
ISOLATORS GIVE PHYSICAL SEPARATION BETWEEN LIVE
PART AND DEAD PART. PHYSICAL SEPARATION CAN BE
SEEN BY NAKED EYE FROM A DISTANCE.
Bus bars:
REFERENCES
article.wn.com (Generation)
nirmancare.com (Hydro Power Plant)
old.optcl.co.in (Power Grid)
kalkitech.com (block of CLD)
Company Manual (HR Department)
Sub Station Manual