PEKERJAAN SANITASI

1.

2.

3.

4.

5.

6.

7.

8.

( SNI S. )

1 Bh MEMASANG KLOSET DUDUK / MONOBLOK


1.0000 bh Kloset duduk/monoblok
1.0000
Perlengkapan (6% harga kloset )
3.3000
Pekerja
1.1000
Tukang batu
0.0010
Kep. Tukang batu
0.1600
Mandor

( SNI.S.01 )
a. Rp.
770,000.00
a. Rp.
46,200.00
a. Rp.
39,550.00
a. Rp.
45,470.00
a. Rp.
53,020.00
a. Rp.
60,060.00
Jumlah
Dibulatkan

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

770,000.00
46,200.00
130,515.00
50,017.00
53.02
9,609.60
1,006,394.62
1,006,390.00

1 Bh MEMASANG KLOSET JONGKOK PORSELEN


1.0000 bh Kloset jongkok porselen
6.0000 kg Semen / PC
0.0100 m3 Pasir pasang
1.0000
Pekerja
1.5000
Tukang batu
1.5000
Kep. Tukang batu
0.1600
Mandor

( SNI.S.02 )
a. Rp.
107,250.00
a. Rp.
1,175.63
a. Rp.
84,700.00
a. Rp.
39,550.00
a. Rp.
45,470.00
a. Rp.
53,020.00
a. Rp.
60,060.00
Jumlah
Dibulatkan

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

107,250.00
7,053.75
847.00
39,550.00
68,205.00
79,530.00
9,609.60
312,045.35
312,040.00

a. Rp.
175,000.00
a. Rp.
52,500.00
a. Rp.
1,175.63
a. Rp.
84,700.00
a. Rp.
39,550.00
a. Rp.
45,470.00
a. Rp.
53,020.00
a. Rp.
60,060.00
Jumlah
Dibulatkan

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

175,000.00
52,500.00
7,053.75
847.00
39,550.00
45,470.00
5,302.00
6,006.00
331,728.75
331,720.00

a. Rp.
350,000.00
a. Rp.
42,000.00
a. Rp.
1,175.63
a. Rp.
84,700.00
a. Rp.
39,550.00
a. Rp.
45,470.00
a. Rp.
53,020.00
a. Rp.
60,060.00
Jumlah
Dibulatkan

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

350,000.00
42,000.00
7,053.75
847.00
47,460.00
65,931.50
7,953.00
6,006.00
527,251.25
527,250.00

( SNI.S.05 )
a. Rp.
160,000.00
a. Rp.
19,200.00
a. Rp.
39,550.00
a. Rp.
45,470.00
a. Rp.
53,020.00
a. Rp.
60,060.00
Jumlah
Dibulatkan

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

160,000.00
19,200.00
1,186.50
13,641.00
1,590.60
90.09
195,708.19
195,700.00

a. Rp.
30,250.00
a. Rp.
2,500.00
a. Rp.
39,550.00
a. Rp.
45,470.00
a. Rp.
53,020.00
a. Rp.
60,060.00
Jumlah
Dibulatkan

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

30,250.00
62.50
395.50
4,547.00
530.20
300.30
36,085.50
36,080.00

a. Rp.
23,100.00
a. Rp.
39,550.00
a. Rp.
45,470.00
a. Rp.
53,020.00
a. Rp.
60,060.00
Jumlah
Dibulatkan

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

23,100.00
395.50
4,547.00
530.20
300.30
28,873.00
28,870.00

a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.
a. Rp.

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

200,000.00
36,000.00
395.50
4,547.00
530.20
300.30

1 Bh MEMASANG URINOIR ( SNI.S.03 )


1.0000 bh Urinoir
1.0000
Perlengkapan (30% harga urinoir)
6.0000 kg Semen / PC
0.0100 m3 Pasir pasang
1.0000
Pekerja
1.0000
Tukang batu
0.1000
Kep. Tukang batu
0.1000
Mandor

1 Bh MEMASANG WASTAFEL ( SNI.S.04 )


1.0000 bh Wastafel
1.0000
Perlengkapan (12% hrg.wastafel)
6.0000 kg Semen / PC
0.0100 m3 Pasir pasang
1.2000
Pekerja
1.4500
Tukang batu
0.1500
Kep. Tukang batu
0.1000
Mandor

1 Bh MEMASANG BAK CUCI PIRING STAINLES STEEL


1.0000 bh Bak cuci stainless
1.0000 set Waterdrain + aksesoris
0.0300
Pekerja
0.3000
Tukang batu
0.0300
Kep. Tukang batu
0.0015
Mandor

1 Bh MEMASANG KRAN AIR f 3/4" atau 1/2"


1.0000 bh Kran air
0.0250 bh Seal tape
0.0100
Pekerja
0.1000
Tukang batu
0.0100
Kep. Tukang batu
0.0050
Mandor

( SNI.S.06 )

1 Bh MEMASANG FLOOR DRAIN ( SNI.S.07 )


1.0000 set Floor drain
0.0100
Pekerja
0.1000
Tukang batu
0.0100
Kep. Tukang batu
0.0050
Mandor

1 Bh MEMASANG BAK MANDI FIBERGLASS


1.0000 bh Bak Fiberglass
1.0000
Perlengkapan (18% hrg.bak)
0.0100
Pekerja
0.1000
Tukang batu
0.0100
Kep. Tukang batu
0.0050
Mandor
1

( SNI.S.08 )
200,000.00
36,000.00
39,550.00
45,470.00
53,020.00
60,060.00

Jumlah
Dibulatkan

= Rp.
= Rp.

241,773.00
241,770.00

9.

1 Bh MEMASANG BAK KONTROL PASANGAN BATU BATA (Uk. 30x30 cm tinggi 35 cm)
0.1450 m3 Batu bata kw. 2
a. Rp.
495.00 = Rp.
44.0000 kg Semen / PC
a. Rp.
1,175.63 = Rp.
0.0700 m3 Pasir Pasang
a. Rp.
84,700.00 = Rp.
0.0700 m3 Batu Kerikil
a. Rp.
199,760.00 = Rp.
1.6000 kg Besi beton
a. Rp.
7,700.00 = Rp.
0.0600 m3 Pasir Beton
a. Rp.
110,000.00 = Rp.
0.0100
Pekerja
a. Rp.
39,550.00 = Rp.
0.1000
Tukang batu
a. Rp.
45,470.00 = Rp.
0.0100
Kep. Tukang batu
a. Rp.
53,020.00 = Rp.
0.0050
Mandor
a. Rp.
60,060.00 = Rp.
Jumlah
= Rp.
Dibulatkan
= Rp.

( SNI.S.09 )
71.78
51,727.50
5,929.00
13,983.20
12,320.00
6,600.00
395.50
4,547.00
530.20
300.30
96,404.48
96,400.00

10.

1 M' MEMASANG PIPA GALVANIS F 1/2" ( SNI.S.10 )


1.2000 m' Pipa galvanis
1.0000
Perlengkapan (35% harga pipa)
0.0540
Pekerja
0.0900
Tukang batu
0.0090
Kep. Tukang batu
0.0270
Mandor

11.

12.

13.

1 M' MEMASANG PIPA GALVANIS F 3/4" ( SNI.S.11 )


1.2000 m' Pipa galvanis
1.0000
Perlengkapan (35% harga pipa)
0.0540
Pekerja
0.0900
Tukang batu
0.0090
Kep. Tukang batu
0.0270
Mandor

1 M' MEMASANG PIPA GALVANIS F 1" ( SNI.S.12 )


1.2000 m' Pipa galvanis
1.0000
Perlengkapan (35% harga pipa)
0.0540
Pekerja
0.0900
Tukang batu
0.0090
Kep. Tukang batu
0.0270
Mandor

1 M' MEMASANG PIPA GALVANIS F 3" ( SNI.S.13 )


1.2000 m' Pipa galvanis
1.0000
Perlengkapan (35% harga pipa)
0.1080
Pekerja
0.1800
Tukang batu
0.0180
Kep. Tukang batu
0.0054
Mandor

a. Rp.
23,375.00
a. Rp.
8,181.25
a. Rp.
39,550.00
a. Rp.
45,470.00
a. Rp.
53,020.00
a. Rp.
60,060.00
Jumlah
Dibulatkan

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

28,050.00
8,181.25
2,135.70
4,092.30
477.18
1,621.62
44,558.05
44,550.00

a. Rp.
30,708.33
a. Rp.
10,747.92
a. Rp.
39,550.00
a. Rp.
45,470.00
a. Rp.
53,020.00
a. Rp.
60,060.00
Jumlah
Dibulatkan

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

36,850.00
10,747.92
2,135.70
4,092.30
477.18
1,621.62
55,924.72
55,920.00

a. Rp.
36,208.33
a. Rp.
12,672.92
a. Rp.
39,550.00
a. Rp.
45,470.00
a. Rp.
53,020.00
a. Rp.
60,060.00
Jumlah
Dibulatkan

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

43,450.00
12,672.92
2,135.70
4,092.30
477.18
1,621.62
64,449.72
64,440.00

a. Rp.
162,708.33
a. Rp.
56,947.92
a. Rp.
39,550.00
a. Rp.
45,470.00
a. Rp.
53,020.00
a. Rp.
60,060.00
Jumlah
Dibulatkan

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

195,250.00
56,947.92
4,271.40
8,184.60
954.36
324.32
265,932.60
265,930.00

DAFTAR HARGA UPAH PEKERJA


NO.

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

URAIAN TENAGA

MANDOR
KEPALA TUKANG GALI TANAH
KEPALA TUKANG BATU
KEPALA TUKANG KAYU
KEPALA TUKANG BESI
KEPALA TUKANG CAT
KEPALA TUKANG LISTRIK
TUKANG GALI TANAH
TUKANG BATU
TUKANG KAYU
TUKANG BESI
TUKANG CAT
TUKANG ASPAL
TUKANG PLITUR
TUKANG LISTRIK
PEKERJA TUKANG GALI TANAH
PEMBANTU TUKANG BATU
PEMBANTU TUKANG KAYU
PEMBANTU TUKANG CAT
PEMBANTU TUKANG BESI
PEMBANTU TUKANG LISTRIK
SOPIR TRUK
PENJAGA API
PENJAGA MALAM
OPERATOR
PEMBANTU OPERATOR

SATUAN

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

UPAH HARIAN

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

75,000.00
65,000.00
65,000.00
65,000.00
65,000.00
65,000.00
65,000.00
60,000.00
60,000.00
60,000.00
60,000.00
60,000.00
61,000.00
61,000.00
60,000.00
45,000.00
45,000.00
45,000.00
45,000.00
45,000.00
45,000.00
65,000.00
50,000.00
50,000.00
55,000.00
50,000.00

Halaman : 1
DAFTAR HARGA SATUAN BAHAN
KEGIATAN
PEKERJAAN
LOKASI
TAHUN ANGGARAN

#REF!
#REF!
#REF!
: 2010

HARGA SATUAN
KETERANGAN
(Rp.)
4
5

NO.

JENIS / NAMA BAHAN

SATUAN

1
I

BAHAN TANAH / PASIR

Tanah Urug

m3

59,400.00

Pasir Urug

68,860.00

Pasir Cor

110,000.00

Pasir Lokal / Pasir Kali

79,750.00

Sirtu Alam Hitam

m3

60,500.00

Pasir Pasang

84,700.00

Pasir Ayak Beton

82,500.00

Pedel

m3

55,000.00

Pasir Grosok

m3

66,000.00

II

BAHAN BATU

Batu Brongkol

m3

60,500.00

Batu Kali hitam

88,000.00

3
4

3
3

Kerikil kali

55,000.00

Batu Pecah 3-5 mesin

m3

194,260.00

Batu Pecah 2-3 mesin

m3

199,760.00

Batu Pecah 1-2 mesin

214,500.00

Batu Pecah 1/2-1 mesin

m3

170,500.00

Batu Pecah 5/7, 6/8 tangan

65,670.00

Batu Pecah 3/5 tangan

66,770.00

10

Batu Belah 20/25 tangan

m3

60,170.00

11
12
13
14

Batu Belah 15/20 tangan


Batu Bata Kw. 1
Batu Bata Kw. 2
Batu Putih Lokal / kumbung

m
bj
bj
bj

60,170.00
770
495
880.00

16

Pavingstone Beton Blok 8 Cm Abu-abu ( k.400)

m2

72,050.00

17

Pavingstone Beton Blok 6 Cm ( k.200) warna

41,800.00

18

Pavingstone Beton Blok 6 Cm abu-abu ( k.200)

40,700.00

19

Paving abu-abu 8 cm (k.300)

m2

51,700.00

20

Paving model Segi Empat Abu - abu K 200

40,700.00

21

Paving model Segi Empat Warna K 200

41,800.00

22

Paving model Segi Empat Warna tanpa K tb. 6 cm

m2

25,300.00

23
24

Paving model Segi Empat Abu - abu tanpa K tb. 6 cm


Kerep uk. 0175x0,2x0,3x0,6

m
bj

23,100.00
47,300.00

25

Batu Palimanan uk.10/20 kasar

m2

57,200.00

26

Batu Palimanan uk.15/30

74,250.00

27

Batu Palimanan uk.20/20 halus

m2

64,900.00

28

Batu Palimanan uk.15/15 halus

62,700.00

29

Batu Palimanan uk.20/30 halus

77,550.00

30

Batu Palimanan Hijau Segala Ukuran

m2

82,500.00

*) Harga 2009

31
32
33
34
35

Batu Candi
Ornamen / Batu Paras uk. 25/25
Ornamen / Batu Paras uk. 20/20
Ornamen / Batu Paras uk. 15/15
Ornamen / Batu Paras uk. 20/40

m2
bh
bh
bh
bh

77,000.00
83,050.00
79,750.00
74,800.00
93,500.00

36
37
38
39

Batu Gilang Hitam / Lempeng


Batu Raen Hitam
Batu Raen Kuning / Putih
Roster Terawang

m2
bj
bj
bj

35,750.00
330.00
220.00
4,950.00

40

Beton Alur 20x40 cm

m2

60,500.00

41

Batu Sisir Andesit

132,000.00

Halaman : 2
NO.
1
III
1
2
3
4
IV

JENIS / NAMA BAHAN


2
BAHAN SEMEN / PC

SATUAN
3

Semen 40 kg
Semen 50 kg
Semen Putih
Semen Warna

HARGA SATUAN
KETERANGAN
(Rp.)
4
5

zak
zak
zak
kg

47,025.00
70,950.00
4,700.00

m3
kg

192,500.00
1,650.00

kg
kg
ljr
ljr
ljr
ljr
ljr
ljr
kg
kg
kg
kg
kg
kg
kg

7,700.00
7,700.00
133,925.00
74,250.00
51,700.00
34,100.00
21,450.00
12,980.00
8,800.00
8,800.00
8,800.00
8,250.00
15,400.00
12,540.00
13,200.00

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
bt
bt

9,900,000.00
11,550,000.00
6,820,000.00
5,830,000.00
7,480,000.00
6,050,000.00
6,050,000.00
3,850,000.00
4,620,000.00
3,520,000.00
6,875,000.00
5,500,000.00
7,480,000.00
6,050,000.00
6,050,000.00
4,070,000.00
4,620,000.00
3,410,000.00
4,180,000.00
3,190,000.00
4,400,000.00
3,520,000.00
3,300,000.00
2,750,000.00
3,300,000.00
2,750,000.00
1,540,000.00
176,000.00
16,500.00

BAHAN KAPUR

1
2

Kapur Bubuk / Kapur Pasang


Kapur Gamping

BAHAN BESI

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

Besi Beton Polos (tulangan)


Besi Beton Ulir
Besi Beton Polos 16 mm Panjang 12 m
Besi Beton Polos 12 mm Panjang 12 m
Besi Beton Polos 10 mm Panjang 12 m
Besi Beton Polos 8 mm Panjang 12 m
Besi Beton Polos 6 mm Panjang 12 m
Besi Beton Polos 5 mm Panjang 12 m
Besi WF 150 Berat/Batang 168 kg
Besi WF 200 Berat/Batang 256 kg
Besi WF 250 Berat/Batang 355 kg
Besi Siku
Kawat Beton / Bendrat
Kawat Bronjong ( f 42,7 mm ) BMG 10
Besi strip

VI

BAHAN KAYU

1
2
3
4
5
6
7
8
9
10
11
12
13
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28

Ky. Jati balok ( Macam-macam Ukuran kelas 1 )


Kayu Jati Papan ( Macam-macam Ukuran kelas 1 )
Ky. Kamper balok 8/15, 8/12, 6/12 = 4m kw. I
Ky. Kamper balok 8/15, 8/12, 6/12 = 4m kw. II
Ky. Kamper Papan 2/20, 3/20 = 4m kw. I
Ky. Kamper Papan 2/20, 3/20 = 4m kw. II
Ky. Kamper Usuk 5/7, 4/6 = 4m kw. I
Ky. Kamper Usuk 5/7, 4/6 = 4m kw. II
Ky. Kamper Reng 2/3, 3/5 = 4m kw. I
Ky. Kamper Reng 2/3, 3/5 = 4m kw. II
Ky. Bengkirai balok 8/15, 8/12 = 4 m Kw. I
Ky. Bengkirai balok 8/15, 8/12 = 4 m Kw. II
Ky. Bengkirai papan 2/20, 3/20 = 4 m Kw. I
Ky. Bengkirai papan 2/20, 3/20 = 4 m Kw. II
Ky. Bengkirai usuk 5/7, 4/6 = 4 m Kw. I
Ky. Bengkirai usuk 5/7, 4/6 = 4 m Kw. II
Ky. Bengkirai Reng kw. I
Ky. Bengkirai Reng kw. II
Ky. Meranti balok 8/12, 6/12 = 4 m kw. I
Ky. Meranti balok 8/12, 6/12 = 4 m kw. II
Ky. Meranti papan 2/20, 3/20 = 4 m kw. I
Ky. Meranti papan 2/20, 3/20 = 4 m kw. II
Ky. Meranti usuk 4/6, 5/7 = 4 m
Ky. Meranti reng
Ky. Papan begesting 2/20 = 4 m
Ky. Acuan / cetakan
Ky. Gelam
Dolken dia. 16-19 cm Pj. 4m
Bongkotan Pj. 3 m

Semen Gresik
Tiga Roda

VII
1
2
3
4
5
6
7
8

BAHAN PIPA PARALON / PVC / 4M


Pipa PVC 1/2" AW
Pipa PVC 3/4" AW
Pipa PVC 1" AW
Pipa PVC 1 1/4" AW
Pipa PVC 1 1/2" AW
Pipa PVC 2" AW
Pipa PVC 2 1/2" AW
Pipa PVC 3" AW

ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr

17,930.00
21,835.00
27,445.00
38,830.00
50,600.00
75,240.00
91,000.00
137,775.00

Maspion

Halaman : 3
NO.
1
9
10
11
12
13
14
VIII

JENIS / NAMA BAHAN

SATUAN

3
ljr
ljr
bh
bh
bh
tube

Pipa PVC 4" AW


Talang PVC f 4" = 4m
Knee PVC f 3/4"
Klem PVC
Socket PVC f 3/4"
Lem PVC Isarflas

HARGA SATUAN
KETERANGAN
(Rp.)
4
5
200,750.00
68,750.00
1,210.00
1,650.00
697.67
3,336.67

BAHAN PVC UNTUK AIR BERSIH / SNI-RJJ


KUALITAS S.10

1
2
3
4
5
6
7
8
9
10

Pipa PVC f 2"


Pipa PVC f 2 1/2"
Pipa PVC f 3"
Pipa PVC f 4"
Pipa PVC f 6"
Pipa PVC f 8"
Pipa PVC f 10"
Pipa PVC f 12"
Pipa PVC f 14"
Pipa PVC f 16"

IX

KUALITAS S.12,5

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

Pipa PVC f 2"


Pipa PVC f 2 1/2"
Pipa PVC f 3"
Pipa PVC f 4"
Pipa PVC f 6"
Pipa PVC f 8"
Pipa PVC f 10"
Pipa PVC f 12"
Pipa PVC f 14"
Pipa PVC f 16"
Pipa GI f 1/2"
Pipa GI f 3/4"
Pipa GI f 1"
Pipa Galvanis ( GI ) f 2"
Pipa Galvanis ( GI ) f 3"
Pipa Galvanis ( GI ) f 4"
Pipa Galvanis ( GI ) f 6"
Pipa Galvanis ( GI ) f 8"
Pipa Galvanis ( GI ) f 10"
Pipa Galvanis ( GI ) f 12"
Pipa Galvanis ( GI ) f 2"
Pipa Galvanis ( GI ) f 3"

Medium A
Medium A
Medium A
Medium A
Medium A
Medium A
Medium A
Medium A
Medium A
Medium A
Medium B
Medium B

ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr

147,370.00
198,352.00
290,600.00
428,980.00
889,850.00
1,483,217.00
2,296,131.20
3,632,700.50
5,187,741.90
6,583,457.10

ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr

122,180.00
165,000.00
242,530.00
350,530.00
731,880.00
1,210,300.00
1,884,670.00
2,977,100.00
3,846,850.00
5,393,350.00
140,250.00
184,250.00
217,250.00
437,250.00
976,250.00
1,185,250.00
1,680,250.00
3,027,750.00
4,317,500.00
5,450,500.00
304,150.00
524,150.00

23
24
25
26
27
28
29
30
31
32
33
34
35
36

Pipa Galvanis ( GI ) f 4"


Pipa Galvanis ( GI ) f 6"
Pipa Galvanis ( GI ) f 8"
Pipa Galvanis ( GI ) f 10"
Pipa Galvanis ( GI ) f 12"
Tee All Socked f 10 x 10"
Tee All Socked f 10 x 8"
Tee All Socked f 10 x 6"
Tee All Socked f 10 x 4"
Tee All Socked f 10 x 3"
Tee All Socked f 8 x 8"
Tee All Socked f 8 x 6"
Tee All Socked f 8 x 4"
Tee All Socked f 8 x 3"

Medium B
Medium B
Medium B
Medium B
Medium B

ljr
ljr
ljr
ljr
ljr
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah

629,750.00
1,376,650.00
2,563,000.00
3,580,500.00
4,633,750.00
2,230,800.00
3,023,900.00
2,586,650.00
2,860,000.00
2,860,000.00
1,008,700.00
898,700.00
750,750.00
772,750.00

Halaman : 4
NO.

JENIS / NAMA BAHAN

SATUAN

3
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah

HARGA SATUAN
KETERANGAN
(Rp.)
4
5
852,500.00
436,150.00
377,300.00
339,900.00
345,950.00
234,300.00
215,600.00
191,125.00
141,350.00
124,850.00
86,350.00
1,900,250.00
1,828,200.00
1,763,850.00
1,681,350.00
1,604,900.00
1,436,600.00
1,405,250.00
1,361,800.00
1,208,900.00
1,037,850.00
1,037,850.00
974,600.00
918,500.00
878,900.00
838,200.00
619,300.00
581,900.00
547,250.00
482,900.00
449,900.00
392,700.00
354,750.00
335,500.00
310,500.00
302,500.00

1
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72

Tee All Socked f 8 x 2"


Tee All Socked f 6 x 6"
Tee All Socked f 6 x 4"
Tee All Socked f 6 x 3"
Tee All Socked f 6 x 2"
Tee All Socked f 4 x 4"
Tee All Socked f 4 x 3"
Tee All Socked f 4 x 2"
Tee All Socked f 3 x 3"
Tee All Socked f 3 x 2"
Tee All Socked f 2 x 2"
Tee All Flange f 12 x 12"
Tee All Flange f 12 x 10"
Tee All Flange f 12 x 8"
Tee All Flange f 12 x 6"
Tee All Flange f 12 x 4"
Tee All Flange f 10 x 10"
Tee All Flange f 10 x 8"
Tee All Flange f 10 x 6"
Tee All Flange f 10 x 4"
Tee All Flange f 10 x 3"
Tee All Flange f 8 x 8"
Tee All Flange f 8 x 6"
Tee All Flange f 8 x 4"
Tee All Flange f 8 x 3"
Tee All Flange f 8 x 2"
Tee All Flange f 6 x 6"
Tee All Flange f 6 x 4"
Tee All Flange f 6 x 3"
Tee All Flange f 6 x 2"
Tee All Flange f 4 x 4"
Tee All Flange f 4 x 3"
Tee All Flange f 4 x 2"
Tee All Flange f 3 x 3"
Tee All Flange f 3 x 2"
Tee All Flange f 2 x 2"

73

Bend All Flange 12" x 900

Buah

1,399,200.00

74

Bend All Flange 12" x 45

Buah

1,303,500.00

75

Bend All Flange 10" x 90

Buah

905,850.00

76

Bend All Flange 10" x 450

Buah

868,450.00

77

Bend All Flange 8" x 90

Buah

647,900.00

78

Bend All Flange 8" x 45

Buah

637,450.00

79

Bend All Flange 6" x 900

Buah

442,750.00

80

Bend All Flange 6" x 45

Buah

415,250.00

81

Bend All Flange 4" x 90

Buah

305,250.00

82

Bend All Flange 4" x 45

Buah

294,250.00

83

Bend All Flange 3" x 900

Buah

261,250.00

84

Bend All Flange 3" x 45

Buah

244,750.00

85

Bend All Flange 2" x 90

Buah

162,250.00

86

Bend All Flange 2" x 450

Buah

156,750.00

87

Bend All Socked 12" x 90

88

Bend All Socked 12" x 450 22,1/2%

Buah

1,291,400.00

Buah

1,200,650.00

89

Bend All Socked 10" x 90

Buah

740,850.00

90

Bend All Socked 10" x 45 22,1/2%

Buah

706,750.00

91

Bend All Socked 8" x 90

Buah

425,150.00

92

Bend All Socked 8" x 450 22,1/2%

Buah

377,850.00

93

Bend All Socked 6" x 90

0
0

Buah

234,300.00

94

Bend All Socked 6" x 45 22,1/2%

Buah

214,500.00

95

Bend All Socked 4" x 900

Buah

108,900.00

96

Bend All Socked 4" x 45 22,1/2%

Buah

102,850.00

97

Bend All Socked 3" x 90

Buah

76,450.00

Halaman : 5
NO.
1
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145

JENIS / NAMA BAHAN

SATUAN

3
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah

Flange Socked f 8"


Flange Socked f 6"
Flange Socked f 4"
Flange Socked f 3"
Flange Socked f 2"
Flange Spigot f 12"
Flange Spigot f 10"
Flange Spigot f 8"
Flange Spigot f 6"
Flange Spigot f 4"
Flange Spigot f 3"
Flange Spigot f 2"
Gate Valve f 12"
Gate Valve f 10"
Gate Valve f 8"
Gate Valve f 6"
Gate Valve f 4"
Gate Valve f 3"
Gate Valve f 2"
Chek Valve f 12"
Chek Valve f 10"
Chek Valve f 8"
Chek Valve f 6"
Chek Valve f 4"
Chek Valve f 3"
Chek Valve f 2"
Gibboult Joint f 12"
Gibboult Joint f 10"
Gibboult Joint f 8"
Gibboult Joint f 6"
Gibboult Joint f 4"
Gibboult Joint f 3"
Gibboult Joint f 2"
Reducer f 10 x 8"
Reducer f 10 x 6"
Reducer f 8 x 6"
Reducer f 8 x 4"
Reducer f 6 x 4"
Reducer f 6 x 3"
Reducer f 6 x 2"
Reducer f 4 x 3"
Reducer f 4 x 2"
Reducer f 3 x 2"

10

HARGA SATUAN
KETERANGAN
(Rp.)
4
5
547,250.00
313,500.00
168,850.00
128,700.00
85,250.00
2,223,100.00
1,120,350.00
467,500.00
144,925.00
135,300.00
107,250.00
83,050.00
5,238,750.00
4,138,750.00
2,645,500.00
1,487,750.00
841,500.00
728,750.00
445,500.00
5,775,000.00
5,395,500.00
3,577,750.00
2,095,500.00
1,168,750.00
976,250.00
525,250.00
605,000.00
*) Harga 2009
541,750.00
437,250.00
305,250.00
195,250.00
151,250.00
107,250.00
747,450.00
708,400.00
613,250.00
176,170.00
159,654.00
129,376.50
118,365.50
206,250.00
118,365.50
206,250.00