1.
and shall be read in conjunction with the General Specifications and any addendum or
appendices hereto.
2.
The tenderer shall insert in the space provided at the end of this Schedule the
percentage increase or decrease which he requires to be applied to the rates in this
Schedule. Where the majority of the rates are acceptable to the Contractor, with the
exception of a few items, then the percentage increase or decrease clause at the end of
this Schedule shall be deleted and he may amend in ink only those rates and initial
them accordingly.
3.
This Schedule of Rates duly filled in (or amended) and signed must be returned
together with the Tender Form.
4.
All rates herein shall held to include for waste on materials, carriage and cartage,
carrying in and return of empties, hoisting, setting, fitting and fixing in position,
making and all other labours and everything else necessary (including any customs
duty, etc.) for the proper completion of each item and for establishment charges and
profit.
5.
Rates for excavation including excavation for drainage) are to include for keeping all
excavations free from water, mud, etc. by pumping or bailing if required and for
planking and strutting, levelling, ramming or preparing bottoms, any double handling
required and for additional excavation for planking and strutting and formwork.
6.
Rates for concrete shall be held to include for forming, leaving or cutting grooves,
chases, mortices, holes and making good and any sundry items of a like nature.
7.
Rates for formwork shall be held to include for erection, raking and circular cutting,
splayed edges, notchings, allowance for overlaps and passing at angles, battens,
strutting, bolting, wedging, easing, striking and removal.
8.
Rates for brickwork and blockwork shall be held to include for all rough and fair
cutting, over-sailing and receding courses, rough relieving and discharging arches,
wedging and pinning, raking out joints for and pointing flashings, bedding plates,
bedding and pointing frames, parging and coring flues, labour caves filling, plumbing
angles, forming square and rebated reveals, cut squints or bird-mouths, notches,
forming, leaving or cutting chases, holes and mortices and cutting and pinning and
making good any other sundry items of a like nature.
9.
Rates for each item of paving shall be held to include for all rounded angles, arises
and making good and any other sundry items of a like nature.
SR/1
10.
Rates for each item of skirtings, risers, channels and the like shiill be held to includi
short lengths, formed, cut and purpose made angles, junctions, ends- etc. and makir
and any other sundry items of a like nature.
11.
Rales for all carpentry timber are to include for all labour to noichings. halvings, the
tenoning and wedging, scarfing, dovetailing, sinking for heads of bolts and ni
12.
Rates for each item of joinery shall be held to include for all cuttings, notching1
housing ends. mitreing ends and shaped ends- angles, junctions, heading joint; lengths
and any other sundry items of a like nature.
13.
Rates for plastering, rendering, etc. shall include for raking out joints of brie
blockwork and masonry or hacking concrete as key.
14.
Overall rates of each item of plastering, etc. shall be held to include for narrow wid'
small quantities, tempotary rules, joints between different types of plastering, i angles,
arises, rounded coves and external angles not exceeding 1" radius, and mitres. etc. on
cornices, mouldings, enrichments, coves, skirtings, gutters and strings, all i good and
any other sundry items of a like nature.
15.
Rates for mild steel tubing are to include all short running lengths, sockets, ba<
elbows and bends.
16.
Rates for driving of Bakau and pressure-treated timber piles shall include for the pn of
all necessary mechanical plant, rig, temporary works, timber, etc. transporting
erecting, dismantling removal on completion and also for travelling efpile frame abi
site.
Rates for driving of precast concrete piles and reinforced concrete extension pile
include for travelling of pile frame about the site.
17.
18.
The percentage increase or decrease and those rates amended by the tenderer si
subject to agreement with the S.O. as to their reasonableness, and subject tc
agreement, shall be used for calculating the cost of any variation which may be ordt
accordance with the terms of the contract.
19.
Abbreviations:No
m
m2
m3
Kg
PR
N.A
=
=
=
=
=
=
=
Number
Metre
Metre Square
Metre Cube
Kilogram
Pair
Not Applicable
SR/2
ITEM
DESCRIPTION
SR/3
UNIT
Rate (RM)
Percentage (%)
Increase/Decrease
ITEM
DESCRIPTION
SR/4
UNIT
Rate (RM)
Percentage (%)
Increase/Decrease
ITEM
DESCRIPTION
UNIT
Rate (RM)
PILING
Bakau Piling
A
No.
19.00
No.
20.00
No.
22.00
No.
24.00
No.
27.00
2.30
2.65
2.95
3.30
3.60
No.
15.00
No.
16.00
Provide all equipment kentledge etc. and initial load test pile 6m
long as described including all extra costs in setting out and
driving one pile before commencement of the main piling works.
No.
140/ton
No.
125/ton
No.
72.00
No.
90.00
No.
100.00
No.
106.00
No.
130.00
No.
150.00
SR/5
Percentage (%)
Increase/Decrease
ITEM
DESCRIPTION
UNIT
Rate (RM)
No.
2.50
No.
3.00
No.
4.00
No.
3.30
No.
4.30
No.
4.00
No.
17.00
No.
21.00
No.
16.00
No.
18.00
No.
2.50
No.
3.00
No.
140/ton
No.
125/ton
No.
140/ton
No.
125/ton
timber
piles
L Sum
2200.00
40.00
Kg
2.00
SR/6
Percentage (%)
Increase/Decrease
ITEM
DESCRIPTION
UNIT
Rate (RM)
Kg
2.00
Kg
2.10
Kg
2.10
Kg
2.10
No.
9.5/kg
No.
2.00
No.
5.00
No.
21.00
No.
26.00
No.
30.00
No.
17.00
No.
26.00
No.
30.00
12.50
13.10
13.10
11.80
No.
43.00
300mm x 300mm x 16mm Mild steel pile extension base cap ditto.
No.
43.00
32mm Diameter mild steel centring bar 900mm long and inserting
into and including boxing in concrete to form 2 Nos. 38mm
diameter mortices 450mm deep, 1 No. in head of pile and 1 No. in
No.
17.00
No.
21.00
SR/7
Percentage (%)
Increase/Decrease
ITEM
DESCRIPTION
UNIT
Rate (RM)
No.
51.00
No.
25.50
Testing:C
4.30
No.
70/ton
No.
60/ton
L Sum
2550.00
50.00
Kg
2.00
Kg
2.00
Kg
2.10
Kg
2.10
Kg
2.10
No.
9.50
No.
2.60
No.
5.00
No.
34.00
No.
38.00
No.
47.00
SR/8
Percentage (%)
Increase/Decrease
ITEM
DESCRIPTION
UNIT
Rate (RM)
No.
34.00
No.
38.00
No.
47.00
16.50
16.50
16.50
14.10
No.
51.00
375mm x 375mm x 16mm Mild steel pile extension base cap ditto.
No.
47.00
32mm Diameter mild steel centring bars 900nun long and inserting
into and including boxing in concrete to form 2 Nos. 38mm
diameter mortices 450mm deep 1 No. in head of pile and 1 No. in
bottom of extension pile.
No.
17.00
No.
26.00
No.
68.00
No.
34.00
Testing: N
5.00
No.
70/ton
No.
60/ton
SR/9
Percentage (%)
Increase/Decrease
ITEM
DESCRIPTION
UNIT
Rate (RM)
m2
0.50
m3
8.50
m3
3.50
m3
10.00
m3
18.20
m3
26.00
m3
5.20
m3
7.20
m3
8.50
m3
14.30
m3
19.50
m3
6.50
m3
9.10
m3
15.60
m3
20.80
m3
65.00
m3
32.50
m3
9.10
m3
15.60
Load and cart away excess/surplus soil from site to Contractor's own tip. m3
2.60
3.90
m3
SR/10
Percentage (%)
Increase/Decrease
ITEM
DESCRIPTION
UNIT
Rate (RM)
Ditto to areas outside the site and designated by the S.O. within a
radius of 1km from the site.
m3
2.00
m3
0.65
m3
2.35
m3
5.20
Hardcore as specified.
m3
36.50
50mm Sand filling spread and levelled under precast slabs and floor.
m3
1.45
EXCAVATOR (Cont'd)
N.B
(i)
(ii)
Type
Gravel
Sand
Ordinary Earth
Clay
Chalk
Rock
Per Cent
10
121/2
25
331/2
331/3
50
CONCRETOR
A
m3
180.00
m3
200.00
m3
190.00
m3
230.00
m3
270.00
m3
240.00
m3
285.00
m3
265.00
m3
290.00
m2
9.00
SR/11
Percentage (%)
Increase/Decrease
ITEM
DESCRIPTION
UNIT
Rate (RM)
CONCRETOR (Cont'd)
A
m2
10.20
Kg
2.10
(b)
10mm Diameter
Kg
2.10
(c)
12mm Diameter
Kg
2.05
(d)
Kg
2.05
(e)
Kg
2.05
Kg
2.15
(b)
12mm Diameter
Kg
2.15
(c)
Kg
2.10
(d)
Kg
2.10
m2
5.90
Ditto 150mm x 150mm mesh weighing 2.36 kg per m2 ditto. (BRC 65)
m2
8.80
Ditto 150mm x 150mm mesh weighing 2.82 kg per m2 ditto. (BRC 64)
m2
10.00
m2
11.20
6.50
m2
14.20
m2
18.00
To sides of wall.
m2
21.00
m2
22.00
m2
21.00
m2
21.00
m2
1.10
Extra over for strutting to soffits exceeding 3.6m high for every 0.6m stages.
m2
2.20
m2
5.50
m2
6.50
7.25
SR/12
Percentage (%)
Increase/Decrease
ITEM
DESCRIPTION
UNIT
Rate (RM)
CONCRETOR (Cont'd)
Sawn Formwork As Specified: - (Contd')
A
7.90
20.00
40.00
50.00
60.00
75.00
9.85
11.50
m2
60.00
m2
11.50
m2
33.50
Half brick wall. built honey-comb with 113mm spaces (Clay bricks).
m2
20.00
m2
10.60
Half brick walls in facing bricks in gauged mortar struck pointed both sides.
m2
53.00
Extra over standard brickwork for fair face one side, including pointing. m2
7.10
m2
16.20
m2
2.50
Precast cement and sand hollow blocks in 75mm thick walling as specified.m2
19.20
m2
24.00
m2
50.40
m2
110.00
Extra over random rubble walling for fair face and pointing as specified. m2
211.00
31.30
SR/13
m2
Percentage (%)
Increase/Decrease
ITEM
DESCRIPTION
UNIT
Rate (RM)
4.00
8.30
Ditto for 150mm diameter drains not exceeding 1.5m deep and
average 0.9m deep ditto.
4.20
Ditto exceeding 1.5m deep but not exceeding 3m deep and average 1.8m deep
m ditto. 9.20
15.00
25.00
100mm Diameter (Medium Duty) cast iron drains laid complete as specified.
m
27.00
52.00
No.
2,500.00
No.
3,000.00
No.
5,000.00
No.
7,000.00
No.
9,500.00
12.80
13.40
Ditto under 100mm diameter drain pipe and completely surround as specified.
m
22.90
25.00
m2
43.20
m2
13.00
m2
12.50
No.
8.00
18.00
No.
11.90
No.
11.90
DRAINLAYER
SR/14
Percentage (%)
Increase/Decrease
ITEM
DESCRIPTION
UNIT
Rate (RM)
DRAINLAYER (Cont'd)
A
No.
15.00
19mm Diameter mild steel rod 750mm girth bent as required and
with ends split, caulked and built in to brickwork as step iron.
No.
6.00
600mm x 450mm Coated cast iron light duty single seal flat type
manhole cover and frame to B.S. 497 grade 'C' weighing not less
than 25 kg including setting frame in cement and sand (1:3) and
No.
60.00
No.
80.00
600mm x 600mm Coated cast iron heavy duty manhole cover and
frame weighing not less than 400 Ibs. including ditto.
No.
450.00
No.
500.00
m3
36.50
m3
45.50
100mm Diameter unglazed clayware subsoil drain pipe and laying with open
m joints. 10.00
16.50
Clay roofing tiles laid to 338mm gauge on and including battens as specified.
m2
60.00
14.80
m2
41.00
Low pitch ditto laid to 275mm gauge on and including battens as specified.m2
45.40
13.10
m2
17.30
13.10
13.50
11.80
m2
30.00
m2
37.00
m2
38.00
m2
48.00
ROOFER
SR/15
Percentage (%)
Increase/Decrease
ITEM
DESCRIPTION
UNIT
Rate (RM)
Frame to door, window and vent including fixing (Grade 'A' timber).
m3
1090.00
m3
1000.00
m3
970.00
m2
53.00
m2
59.00
m2
72.00
m2
65.00
m2
40.00
m2
24.00
m3
1220.00
m3
1600.00
m3
1200.00
m3
1500.00
m3
1500.00
Wrot pressure-treated Grade "C timber in shelving 32mm thick and including
m2 fixing 41.00
m2
18.00
10mm Chipboard in ceiling fixed complete including butt or Vjoints and cutting.
m2
21.00
12mm Ditto
m2
23.00
m2
22.00
m2
20.00
6mm ditto
m2
25.00
m2
13.00
m2
21.00
12mm Ditto.
m2
23.00
m2
35.70
m2
14.20
SR/16
Percentage (%)
Increase/Decrease
ITEM
DESCRIPTION
UNIT
Rate (RM)
m2
24.00
m2
64.80
m2
15.20
m2
15.20
m2
2.70
m2
7.50
m2
3.25
IRONMONGERY
Supply And Fix The Following Ironmongery: H
PR
2.50
100mm Ditto.
PR
4.00
PR
6.50
100mm Ditto.
PR
9.00
PR
6.50
No.
1.50
No.
4.30
No.
6.20
No.
17.20
No.
55.20
No.
11.00
No.
8.90
No.
4.50
No.
4.80
No.
8.00
250mm Ditto.
No.
9.00
No.
15.00
No.
17.00
SR/17
Percentage (%)
Increase/Decrease
ITEM
DESCRIPTION
UNIT
Rate (RM)
IRONMONGERY (Cont'd)
Supply And Fix The Following Ironmongery: - (Cont'd)
A
No.
13.00
No.
15.00
No.
8.50
No.
11.00
No.
15.00
No.
20.00
No.
73.00
Single action floor spring (hold open at 90) equal to Union 524 L255 & 546 SC.
No.
380.00
Double action floor spring 44mm shoe (ditto) equal to Union 512-
No.
420.00
No.
1.70
No.
10.00
No.
25.50
No.
8.50
No.
32.00
No.
40.00
No.
49.30
No.
80.00
No.
23.00
3 - Lever ditto
No.
37.40
34.00
No.
38.00
34.00
No.
38.00
Kg
3.30
Kg
3.75
AA
Wrot iron straps, hangers, etc. complete with all bolts, washers, etc.
fixed complete.
Kg
3.75
SR/18
Percentage (%)
Increase/Decrease
ITEM
DESCRIPTION
UNIT
Rate (RM)
Kg
3.75
Kg
5.10
Kg
Kg
Kg
Kg
Kg
5.10
5.30
5.95
5.95
5.95
Supply And Fix The Following Complete With Nuts And Washers: (a)
19mm - 25mm Diameter bolts.
(b)
12mm and 16mm Ditto.
(c)
10mm Ditto.
(d)
5/16" Ditto.
(e)
6mm Ditto.
C
m2
9.75
m2
8.65
m2
162.00
m2
119.00
PR
5.50
No.
1.00
2.60
PR
9.00
No.
1.00
m2
11.50
m2
13.80
19mm Thick ditto skirling 150mm high with rounded top edge and
cove at bottom.
m2
5.30
m2
9.00
m2
10.20
m2
10.80
3.30
m2
10.20
m2
10.80
m2
11.50
SR/19
Percentage (%)
Increase/Decrease
ITEM
DESCRIPTION
UNIT
Rate (RM)
3.60
m2
54.00
12.50
m2
43.20
6.60
m2
43.20
8.20
m2
44.50
m2
54.00
10.50
m2
50.50
19mm Thick ditto skirting 100mm high with rounded top edge and
cove at bottom.
9.85
m2
60.00
2.80
m2
12.00
Ditto skirting 100mm high with rounded top edge and cove at bottom.
2.65
m2
22.00
2.30
28mm x 3mm Aluminium strip fixed and cast in floor finish as specified. m
2.65
m2
8.20
m2
8.50
m2
10.20
m2
44.00
m2
45.60
150mm x 150mm x 6mm While glazed wall tiles, first quality, and ditto. m2
46.80
48.00
m2
SR/20
Percentage (%)
Increase/Decrease
ITEM
DESCRIPTION
UNIT
Rate (RM)
m2
28.00
m2
34.50
9.50
bends,
11.20
12.20
10.50
14.50
13.80
No.
8.00
50mm Diameter medium duty coated cast iron soil and waste or
ventilating pipe as specified.
28.00
No.
12.00
No.
15.00
75mm Diameter medium duty coated cast iron soil and waste or
ventilating pipe as specified.
36.00
No.
15.00
No.
18.00
50.00
No.
18.00
No.
20.00
150mm Diameter medium duty coated casted cast iron soil, waste
or ventilating pipe as specified.
60.00
No.
20.00
No.
25.00
No.
No.
No.
420.00
360.00
280.00
PLUMBER
SR/21
including
Percentage (%)
Increase/Decrease
ITEM
DESCRIPTION
UNIT
Rate (RM)
No.
No.
No.
No.
No.
1500.00
750.00
650.00
550.00
380.00
Appro HDPE Storage Water Tanks With Lids Complete As Specified: (a)
Size 4000 litres (nominal)
No.
(b)
Size 1800 litres (nominal)
No.
(c)
Size 900 litres (nominal)
No.
(d)
Size 450 litres (nominal)
No.
(e)
Size 230 litres (nominal)
No.
2750.00
980.00
520.00
190.00
5.30
PLUMBER (Cont'd)
A
(a)
(b)
(c)
(d)
(e)
(f)
D
(a)
(b)
E
(a)
(b)
(c)
(d)
(c)
(f)
F
(a)
(b)
(c)
(d)
(e)
(f)
No.
5.30
No.
No.
No.
No.
No.
6.80
10.50
15.80
25.00
37.00
No.
32.00
No.
63.00
No.
79.00
No.
No.
No.
No.
No.
137.00
294.00
336.00
420.00
780.00
No.
9.50
No.
No.
No.
No.
No.
15.00
17.00
23.00
30.00
44.00
6.00
6.90
9.50
12.20
14.50
18.00
26.00
SR/22
Percentage (%)
Increase/Decrease
ITEM
DESCRIPTION
UNIT
Rate (RM)
PLUMBER (Cont'd)
A
33.80
5.30
5.90
8.20
10.50
12.20
15.10
21.30
28.20
No.
25.00
(b)
No.
30.00
(c)
No.
45.50
(d)
No.
31.60
(e)
No.
25.00
(f)
No.
45.00
(g)
No.
300.00
(h)
No.
227.00
(i)
No.
296.00
(j)
No.
347.00
(k)
No.
197.00
(l)
No.
230.00
(m)
No.
140.00
(n)
No.
480.00
SR/23
Percentage (%)
Increase/Decrease
ITEM
DESCRIPTION
UNIT
Rate (RM)
PLUMBER (Cont'd)
(o)
No.
247.00
(p)
No.
296.00
(q)
No.
700.00
(r)
No.
800.00
(s)
No.
44.50
(t)
No.
247.00
(u)
650.00
(v)
900.00
(w)
No.
89.00
(x)
No.
69.00
GLAZER
A
m2
23.80
32 Oz. ditto.
m2
30.30
4.60
m2
48.00
5.60
m2
45.50
5.60
m2
97.00
13.20
6.30
m2
57.50
8.20
6mm Polished plate sheet glass and glazing to wood or metal as specified. m2
99.40
13.80
m2
205.00
5mm Grey heat absorbing glass and glazing to wood or metal as specified.m2
106.00
SR/24
Percentage (%)
Increase/Decrease
ITEM
DESCRIPTION
UNIT
Rate (RM)
GLAZER (Cont'd)
A
13.80
6mm Grey heat absorbing glass and glazing to wood or metal as specified.m2
112.00
14.80
PAINTER
D
Knot, prime, stop and paint three coats of oil based paint on woodwork.
m2
4.30
0.90
1.20
1.55
1.80
Clean down, prime and paint three coats glass enamel paint on
metal surfaces generally as specified.
m2
4.20
0.90
1.00
1.20
1.55
Clean down. dampen surface and supply two coats cement based
water paint on walls and soffits as specified.
m2
3.30
Clean down and supply one coat of petrifying liquid and two coats
of distemper on walls as specified.
m2
3.30
Clean down prime and paint three coals of emulsion paint on walls
and ceiling as specified.
m2
4.20
m2
5.10
Prepare and apply two coats of floor dressing on parquet or other timber floor.
m2
3.60
m2
2.20
m2
6.50
m2
4.60
1.00
1.10
1.30
1.40
m2
8.20
SR/25
Percentage (%)
Increase/Decrease
ITEM
DESCRIPTION
UNIT
Rate (RM)
50mm Sand spread and levelled and well rolled and compacted to
falls and cambers with an 8 ton roller.
m2
1.80
m2
11.00
m2
6.80
m2
4.80
m2
2.40
Provide and lay 50mm thick premix carpet course consisting stones
of maximum size 19mm and including a bituminous emulsion tack
coat applied at the rate of 0.67 litre per m2 .
m2
16.80
m2
180.00
m2
230.00
m2
16.50
200.00
280.00
400.00
550.00
25.00
Ditto 2100mm high ditto 50mm Diamond mesh (No. 10 S.W.G.) ditto.
40.00
Ditto 1500mm high ditto 50nun Diamond mesh (12 S-W.G.) ditto.
23.00
Ditto 2100mm high ditto 50mm Diamond mesh (12 S.W.G.) ditto.
36.00
Extra over last 4 items for chain link fencing 150mm high having
three (3) strands of 2 ply barb wire (13 gauge with 4 pointed barbs
at 75mm c/c) on top.
2.70
Ditto for chain link fencing having the bottom of mesh embedded
in concrete kerb.
12.00
SR/26
Percentage (%)
Increase/Decrease
ITEM
DESCRIPTION
UNIT
Rate (RM)
Percentage (%)
Increase/Decrease
Pair mild steel gate to suit opening size 3.6m x 1.5m comprising of
50mm x 50mm x 6mm mild steel frames and braces, 50mm
diamond mesh (No. 10 S.W.G.) chain link infill. 75mm diameter
class 'C' mild steel pipe posts embedded in concrete (1:3:6-25mni)
and including all necessary hinges, lock plates, bolts welding and
No.
425.00
No.
410.00
No.
410.00
No.
400.00
Extra over last 4 items for mild steel gate to suit opening size 3.6m
x 1.8m having three (3) strands of 2 ply barb wire (13 gauge with 4
pointed barbs at 75mm c/c) on top.
No.
18.50
Ditto for use of 100mm diameter in lieu 75mm diameter class 'C'
mild steel pipe posts.
No.
40.80
No.
153.00
No.
144.50
No.
144.50
No.
136.00
Extra over last 4 items for use of 75mm diameter class 'C mild
steel, pipe posts in lieu of 50mm x 50mm x 6mm mild steel angle
No.
39.10
Extra over last 5 items for mild steel gate to suit opening size
900mm x .1800mm having three (3) strands of 2 ply barb wire (13
gauge with 4 pointed barb @ 75mm c/c) on top.
No.
7.60
No.
11.00
No.
15.00
No.
20.00
m2
3.00
m2
3.80
m2
4.50
The Rates contained in the foregoing Schedule of Rates shall be increased/decreased by ______ %. This increase/decrease does
not apply to any altered rate.
(Tenderer)
(Witness)
Date:
Date:
SR/27
DAYWORK RATES
Daywork rates will only be used as a basis for payment when normal rates for supply and fix (as stated before)
are not applicable. No work shall be carried out on Dayworks basis except when ordered in writing by the
When work is so ordered the Contractor shall be paid Daywork Prices plus 15%, which shall include for the use
of all ordinary plant, tools and scaffolding, supervision, establishment charges and profit. Day work prices shall
be taken to mean the actual prime cost to the Contractor of his materials, transport and labour for the work
The Contractor shall produce for verification to the S.O. vouchers specifying the time and materials employed on
the work. If required, the contractor shall also produce his receipted bills and wages books in support of his
Where special mechanical plant is required for use on Dayworks, the cost to be paid to the Contractor shall be
subject to agreement by the S.O.
The cost of any material supplied by Government for use on Dayworks shall not be taken into account when
calculating the amount on which the 15% addition is based.
Only time on work actually done will be allowed A "Day" is considered to be normal working day of 8 hours.
Fractions of a day will be paid by "pro-rata" basis.
Rates for power-driven tools are not included in the labour rates but charges for hand tools shall be deemed to be
included.
ITEM
DESCRIPTION
Day
20
Ditto -Female
Day
15
Day
30
Mason
Day
48
Bricklayer
Day
48
Day
48
Day
45
Day
37
Fitter
Day
37
10
Welder
Day
37
11
Plumber
Day
37
12
Painter
Day
37
SR/26
Percentage (%)
Increase/Decrease
The foregoing Schedule of Rates and percentage increase or decrease and Daywork Labour Rates as set down by
the successful tenderer on Pages SR/1 to SR/26 inclusive have been scrutinized and agreed to by me as
reasonable.
(Superintending Officer)
Date:
CONTRACT NO. ____________________________ of the year ______________ entered into parties to this
Schedule of Rates consisting of ______________ pages, number 1 to _____________ inclusive which shall be
read and construed as part of the said Contract.
(Contractor)
(Witness)
(Witness)
Date:
Date:
SR/27