METHOD STATEMENT
SUPER STRUCTURE
CONTENTS
1. General Condition
2. Specification and Lifting Capacities
3. Standard Operating Procedures
4. Personnel Requirements
5. Communication and Signaling
LRT ZONE
4
METHOD STATEMENT
SUPER STRUCTURE
MS No.
MS-003
Revision
No.
R_00
Issue Date
APR 25,
2016
1. General Condition
a. Make sure that safe access to and egress from site for all lifting personnel and vehicles are
already exist. And also ensure that the working area is clear of all obstructions to allow the
safe assembly and working of crane.
b. Make sure that the area where the crane is to stand/operate is firm and level, capable of
withstanding the expected loadings that will be imposed upon it.
c. Any personnel that not directly concerned with the lift must warn to stay away from the
lifting area and under the moving object.
d. All crane to be left unattended for a period, shall be left ini safe condition, with not load on
the crane hook. Cranes shall be shut down, secured and locked. Under no circumstances shall
the crane be moved for lifting purpose
e. In the event of extreme weather conditions the lift company may need to suspend the lifting
operation until such time as it is safe to proceed.
2. Specification of Luffing Crane
a. Luffing Crane 1
Model
Boom length
Tail radius
: 8 meter
: 15 meter
: 11 meter
: 33,7 m
b. Luffing Crane 2
Model
Boom length
: max. 50 m, min 4 m
Tail radius
: 8 meter
: 13.5 meter
: 11 meter
3
LRT ZONE
4
METHOD STATEMENT
SUPER STRUCTURE
MS No.
MS-003
Revision
No.
R_00
Issue Date
APR 25,
2016
: 30.7 m
Luffing crane minimum distance is 3,7 and 4 meter, for any material that too close with luffing
crane such as formwork for core wall should mobilize by pull the chain until reach the
appropriate position another alternative is use another luffing crane because we have 2 luffing
crane.
3. Standard Operating Procedure
a. Preparation Before Lifting Work
1) Check the condition of the oil, radiators, and solar
2) Make sure that workers are not working in the swing areas
3) The crane should be operated in the right position (check the condition of the base plat
and the surrounding area).
4) No one allowed hanging on the crane
5) Check the weather (consider about the wind and bad weather)
LRT ZONE
4
METHOD STATEMENT
SUPER STRUCTURE
MS No.
MS-003
Revision
No.
R_00
Issue Date
APR 25,
2016
b. Rigging
1) Correct use of choker hitches
Make sure there is no cutting action in the running line.
LRT ZONE
4
METHOD STATEMENT
SUPER STRUCTURE
MS No.
MS-003
Revision
No.
R_00
Issue Date
APR 25,
2016
Secure the hooks facing out, do not secure the hooks facing in
LRT ZONE
4
METHOD STATEMENT
SUPER STRUCTURE
MS No.
MS-003
Revision
No.
R_00
Issue Date
APR 25,
2016
c. Shifting of Loads
1) Verify if:
LRT ZONE
4
MS No.
MS-003
Revision
No.
R_00
Issue Date
APR 25,
2016
METHOD STATEMENT
SUPER STRUCTURE
2) Always use tag line, and control the line during the load lifting and moving
LRT ZONE
4
METHOD STATEMENT
SUPER STRUCTURE
MS No.
MS-003
Revision
No.
R_00
Issue Date
APR 25,
2016
2) Remove the slings by hands, provide the gloves for the worker.
4. Personel Requirement
a. Crane Operator
All crane operators should have a license for crane operation. And all crane operators should
know their responsibility as follows:
Should check the condition of the crane, safety device, and the other equipment before
the operation
Has the responsibility to operate the crane safely
The operator is not allowed to leave the device when the engine still on
9
LRT ZONE
4
METHOD STATEMENT
SUPER STRUCTURE
MS No.
MS-003
Revision
No.
R_00
Issue Date
APR 25,
2016
If there is any crane device that doesnt work properly the operator should Stop the crane
operation and tell to the supervisor
b. Rigger
Rigger is the man who allowed to attach chain/ slings for the lifting process. 2 Rigger will
be appointed from the worker who had experiences and ability, and that worker will given
the internal training to be a rigger. The Worker who has certified as a rigger will be given an
identity as a rigger like red helmet with the inscription RIGGER. Rigger has roles and
responsibilities as mentioned below:
1) Check the slings and ensure that the rigging angle is correct
2) Make sure the load is properly secured
3) Make sure the lifting gears such as slings and shackles are well use and in good condition
4) Make sure the load is stable, secured and balanced before any lifting operation.
5) Immediately report any defective or fault lifting gear to the supervisor.
c. Signalman
Signalman is a person who has responsibility to give signals for lifting, swinging, and
lowering loads. 2 Signalman will be appointed from the worker who had experiences and
ability, and that worker will be given the internal training to be a signalman. The worker
who has been trained as a signalman will be given an identity as a signalman like red helmet
with the inscription SIGNALMAN. Signalman has roles and responsibilities as mentioned
below:
1) Check the load is properly rigged before giving clear signal to the Crane Operator to lift
the load
2) Give the correct crane hand signals clearly to the Crane Operator to lift the load.
5. Communication and Signaling
Communication between the operator and rigger is very important to make sure that the tools
operating safely. Communication between Lifting Supervisor, Rigger and Signalman must be
maintained at all times. The communication methods that will be used is by using two-ways
radio.
10
LRT ZONE
4
METHOD STATEMENT
SUPER STRUCTURE
MS No.
MS-003
Revision
No.
R_00
Issue Date
APR 25,
2016
11
LRT ZONE
4
MS No.
MS-003
Revision
No.
R_00
Issue Date
APR 25,
2016
METHOD STATEMENT
SUPER STRUCTURE
10
6731
3365
2243
1682
1346
1121
961
841
747
673
611
560
13
3982
1991
1327
995
796
663
568
497
442
398
362
331
Diameter (mm)
16
19
22
2629
1864
1390
1314
932
695
876
621
463
657
466
347
525
372
278
438
310
231
375
266
198
328
233
173
292
207
154
262
186
139
239
169
126
219
155
115
25
1076
538
358
269
215
179
153
134
119
107
97
89
32
657
328
219
164
131
109
93
82
73
65
59
54
25
843
421
281
210
168
140
120
105
93
84
76
70
32
514
257
171
128
102
85
73
64
57
51
46
42
10
5271
2635
1757
1317
1054
878
753
658
585
527
479
439
13
3119
1559
1039
779
623
519
445
389
346
311
283
259
Diameter (mm)
16
19
2059
1460
1029
730
686
486
514
365
411
292
343
243
294
208
257
182
228
162
205
146
187
132
171
121
22
1089
544
363
272
217
181
155
136
121
108
99
90
Column C9 is the biggest column and the heaviest one to be pre-fabrication. Total weight for its
rebar at GF~3rd Fl. is almost 8 ton. Therefore, to overtake this problem, we will make the rebar in
12
LRT ZONE
4
METHOD STATEMENT
SUPER STRUCTURE
MS No.
MS-003
Revision
No.
R_00
Issue Date
APR 25,
2016
separately. For 3rd floor below, divide the pre-fab into three time installation or 1 time for 1 layer, as
we know that C9 column at this floor has three layer rebar.
First layer = 62D32 with 6 meter length = 2.349 t
Second layer = 64D32 6 meter = 2.425 t
Third layer = 70D32 6 meter = 2.652 t
Mobile crane is the most possible equipment to be used for lifting this column rebar because
crawler crane can not reach the C9 position and we still does not have any luffing crane. Base on the
mobile crane specification, we can lift up the rebar within range 22 meter. Therefore, pre-fab location
should be within 22 meter from mobile crane current position. After luffing crane finish installed, we
can use this luffing crane to lifting this column rebar. Range between LC location to the C9 column is
less than 25 meter and LC#2, and the luffing crane allowable load for that range is 9.3 meter.
Furthermore, C9 rebar at 3rd floor above only 156D32, this is fewer than 3rd floor below.
Scaffolding weight list is shown at below table
Table 8. Scaffold weight
Scaffold type
MF1700
EF1200
EF900
EF500
U-head
Jack Base
Cross Brace
Cross Brace
Joint Pin
Size (mm)
1219x1700
1219x1200
1219x900
1219x500
600
600
2198
1952
-
Weight (kg)
12
9.0
7.5
5.0
4.8
4.5
4.2
3.7
0.5
13