METHOD STATEMENT

LRT ZONE
4

SUPER STRUCTURE

MS No.

MS-003

Revision
No.

R_00

Issue Date

APR 25,
2016

LIFTING PLAN
for

JPO

Project Name

Light

Rail

Transit,

Palembang

(Zona 4)
Main Contractor

: PT. WASKITA KARYA (Persero) Tbk

LRT ZONE
4

MS No.

MS-003

Revision
No.

R_00

Issue Date

APR 25,
2016

METHOD STATEMENT
SUPER STRUCTURE

CONTENTS
1. General Condition
2. Specification and Lifting Capacities
3. Standard Operating Procedures
4. Personnel Requirements
5. Communication and Signaling

LRT ZONE
4

METHOD STATEMENT
SUPER STRUCTURE

MS No.

MS-003

Revision
No.

R_00

Issue Date

APR 25,
2016

1. General Condition
a. Make sure that safe access to and egress from site for all lifting personnel and vehicles are
already exist. And also ensure that the working area is clear of all obstructions to allow the
safe assembly and working of crane.

b. Make sure that the area where the crane is to stand/operate is firm and level, capable of
withstanding the expected loadings that will be imposed upon it.

c. Any personnel that not directly concerned with the lift must warn to stay away from the
lifting area and under the moving object.

d. All crane to be left unattended for a period, shall be left ini safe condition, with not load on
the crane hook. Cranes shall be shut down, secured and locked. Under no circumstances shall
the crane be moved for lifting purpose

e. In the event of extreme weather conditions the lift company may need to suspend the lifting
operation until such time as it is safe to proceed.
2. Specification of Luffing Crane
a. Luffing Crane 1
Model

: Potain MCR 225A

Boom length

: max. 45 m, min 3,7 m

Tail radius

: 8 meter

At edge of the jib

: 4,15 ton @45 meter

Max. collar distance

: 15 meter

Min Collar Distance

: 11 meter

Max. Mast Height

: 33,7 m

b. Luffing Crane 2
Model

: Potain MCR 225A

Boom length

: max. 50 m, min 4 m

Tail radius

: 8 meter

At edge of the jib

: 3.25 ton @50 meter

Max. collar distance

: 13.5 meter

Min Collar Distance

: 11 meter
3

LRT ZONE
4

METHOD STATEMENT
SUPER STRUCTURE

Max. Mast Height

MS No.

MS-003

Revision
No.

R_00

Issue Date

APR 25,
2016

: 30.7 m

Figure 22. Luffing crane allowable load

Luffing crane minimum distance is 3,7 and 4 meter, for any material that too close with luffing
crane such as formwork for core wall should mobilize by pull the chain until reach the
appropriate position another alternative is use another luffing crane because we have 2 luffing
crane.
3. Standard Operating Procedure
a. Preparation Before Lifting Work
1) Check the condition of the oil, radiators, and solar
2) Make sure that workers are not working in the swing areas
3) The crane should be operated in the right position (check the condition of the base plat
and the surrounding area).
4) No one allowed hanging on the crane
5) Check the weather (consider about the wind and bad weather)

LRT ZONE
4

METHOD STATEMENT
SUPER STRUCTURE

MS No.

MS-003

Revision
No.

R_00

Issue Date

APR 25,
2016

b. Rigging
1) Correct use of choker hitches
Make sure there is no cutting action in the running line.

2) Correct hook-up method

Make sure the safety latch is ini good condition

Make sure the shackle is hooked up correctly

LRT ZONE
4

METHOD STATEMENT
SUPER STRUCTURE

MS No.

MS-003

Revision
No.

R_00

Issue Date

APR 25,
2016

3) Correct Rigging Method

Secure the hooks facing out, do not secure the hooks facing in

Make sure the load is rigged correctly before lifting

LRT ZONE
4

METHOD STATEMENT
SUPER STRUCTURE

MS No.

MS-003

Revision
No.

R_00

Issue Date

APR 25,
2016

4) Hook up unused chain/slings


Make sure any used chain/slings are hooked up properly, and do not leave the unused
chain/slings unhooked.

c. Shifting of Loads
1) Verify if:

Hook safety latch is fitted

Tag lines are used

Slings are correctly sized and fixed

LRT ZONE
4

MS No.

MS-003

Revision
No.

R_00

Issue Date

APR 25,
2016

METHOD STATEMENT
SUPER STRUCTURE

2) Always use tag line, and control the line during the load lifting and moving

d. Lowering The Loads


1) The load must be lowered with attention and verify the stability before remove the slings
2) Good stacking (neat), minimize the near misses case and accident
3) Bad stacking can create an accident.
e. Unloading
1) Do not ever to remove the slings lifting by the crane, it can cause overturning the material
that lifted

LRT ZONE
4

METHOD STATEMENT
SUPER STRUCTURE

MS No.

MS-003

Revision
No.

R_00

Issue Date

APR 25,
2016

2) Remove the slings by hands, provide the gloves for the worker.

3) Place load on shoring planks during unloading


4) Never stand under suspended loads, its dangerous area

4. Personel Requirement
a. Crane Operator
All crane operators should have a license for crane operation. And all crane operators should
know their responsibility as follows:
Should check the condition of the crane, safety device, and the other equipment before
the operation
Has the responsibility to operate the crane safely
The operator is not allowed to leave the device when the engine still on
9

LRT ZONE
4

METHOD STATEMENT
SUPER STRUCTURE

MS No.

MS-003

Revision
No.

R_00

Issue Date

APR 25,
2016

If there is any crane device that doesnt work properly the operator should Stop the crane
operation and tell to the supervisor
b. Rigger
Rigger is the man who allowed to attach chain/ slings for the lifting process. 2 Rigger will
be appointed from the worker who had experiences and ability, and that worker will given
the internal training to be a rigger. The Worker who has certified as a rigger will be given an
identity as a rigger like red helmet with the inscription RIGGER. Rigger has roles and
responsibilities as mentioned below:
1) Check the slings and ensure that the rigging angle is correct
2) Make sure the load is properly secured
3) Make sure the lifting gears such as slings and shackles are well use and in good condition
4) Make sure the load is stable, secured and balanced before any lifting operation.
5) Immediately report any defective or fault lifting gear to the supervisor.
c. Signalman
Signalman is a person who has responsibility to give signals for lifting, swinging, and
lowering loads. 2 Signalman will be appointed from the worker who had experiences and
ability, and that worker will be given the internal training to be a signalman. The worker
who has been trained as a signalman will be given an identity as a signalman like red helmet
with the inscription SIGNALMAN. Signalman has roles and responsibilities as mentioned
below:
1) Check the load is properly rigged before giving clear signal to the Crane Operator to lift
the load
2) Give the correct crane hand signals clearly to the Crane Operator to lift the load.
5. Communication and Signaling
Communication between the operator and rigger is very important to make sure that the tools
operating safely. Communication between Lifting Supervisor, Rigger and Signalman must be
maintained at all times. The communication methods that will be used is by using two-ways
radio.
10

LRT ZONE
4

METHOD STATEMENT
SUPER STRUCTURE

MS No.

MS-003

Revision
No.

R_00

Issue Date

APR 25,
2016

6. Lifted Material and Equipment


Super structure work will supported by two luffing crane. However, before luffing crane can
installed, we will use a crawler crane and a mobile crane to supporting lifting operation. For
some condition some material that very close or narrow with the luffing crane will lift up using
another luffing crane. In this condition, position of LC1 jib and position of LC2 mast section
will be very close. LC2 should be at idle condition to avoid any struck of this two crane.
The supervisor and crane operator should consider the material weight before lifting, the
material should not over the maximum crane capacity. Always check crane monitor that shown
crane allowable load. Material to be lifted during super structure work are as follows:
a. Rebar
b. Scaffolding
c. Corewall climbing set formwork
d. Timber
e. Hollow
f. Pipe
g. Air compressor
h. Waste rebar and wooden
i. Toilet
j. Others material
Table 1 shows us the maximum rebar pieces to be lifting using luffing
crane #1, with maximum capacity 4.15 ton at the jib edge. Closer range
make the maximum capacity become bigger as shown in figure 4.
Therefore, the signalman must know the luffing crane specification, the
material distance and material load before lifting.

11

LRT ZONE
4

MS No.

MS-003

Revision
No.

R_00

Issue Date

APR 25,
2016

METHOD STATEMENT
SUPER STRUCTURE

Table 4. Rebar maximum pieces for LC#1


Length (m)
<1
1-2
2-3
3-4
4-5
5-6
6-7
7-8
8-9
9 - 10
10 - 11
11 - 12

10
6731
3365
2243
1682
1346
1121
961
841
747
673
611
560

13
3982
1991
1327
995
796
663
568
497
442
398
362
331

Diameter (mm)
16
19
22
2629
1864
1390
1314
932
695
876
621
463
657
466
347
525
372
278
438
310
231
375
266
198
328
233
173
292
207
154
262
186
139
239
169
126
219
155
115

25
1076
538
358
269
215
179
153
134
119
107
97
89

32
657
328
219
164
131
109
93
82
73
65
59
54

25
843
421
281
210
168
140
120
105
93
84
76
70

32
514
257
171
128
102
85
73
64
57
51
46
42

Table 5. Rebar maximum pieces for LC#2


Length (m)
<1
1-2
2-3
3-4
4-5
5-6
6-7
7-8
8-9
9 - 10
10 - 11
11 - 12

10
5271
2635
1757
1317
1054
878
753
658
585
527
479
439

13
3119
1559
1039
779
623
519
445
389
346
311
283
259

Diameter (mm)
16
19
2059
1460
1029
730
686
486
514
365
411
292
343
243
294
208
257
182
228
162
205
146
187
132
171
121

22
1089
544
363
272
217
181
155
136
121
108
99
90

Column C9 is the biggest column and the heaviest one to be pre-fabrication. Total weight for its
rebar at GF~3rd Fl. is almost 8 ton. Therefore, to overtake this problem, we will make the rebar in
12

LRT ZONE
4

METHOD STATEMENT
SUPER STRUCTURE

MS No.

MS-003

Revision
No.

R_00

Issue Date

APR 25,
2016

separately. For 3rd floor below, divide the pre-fab into three time installation or 1 time for 1 layer, as
we know that C9 column at this floor has three layer rebar.
First layer = 62D32 with 6 meter length = 2.349 t
Second layer = 64D32 6 meter = 2.425 t
Third layer = 70D32 6 meter = 2.652 t
Mobile crane is the most possible equipment to be used for lifting this column rebar because
crawler crane can not reach the C9 position and we still does not have any luffing crane. Base on the
mobile crane specification, we can lift up the rebar within range 22 meter. Therefore, pre-fab location
should be within 22 meter from mobile crane current position. After luffing crane finish installed, we
can use this luffing crane to lifting this column rebar. Range between LC location to the C9 column is
less than 25 meter and LC#2, and the luffing crane allowable load for that range is 9.3 meter.
Furthermore, C9 rebar at 3rd floor above only 156D32, this is fewer than 3rd floor below.
Scaffolding weight list is shown at below table
Table 8. Scaffold weight
Scaffold type
MF1700
EF1200
EF900
EF500
U-head
Jack Base
Cross Brace
Cross Brace
Joint Pin

Size (mm)
1219x1700
1219x1200
1219x900
1219x500
600
600
2198
1952
-

Weight (kg)
12
9.0
7.5
5.0
4.8
4.5
4.2
3.7
0.5

13