You are on page 1of 4
MECHANICAL WORKS SPECIFICATION PUBLIC HEALTH ENGINEERING. INFRASTRUCTURE WORKS fh. The whole of the installation shall be left clean and free from debris. J The Contractor shall keep a record of the tests carried out on the drainage installation throughout the Contract, recording date of test, by whom tested and the result, one copy of the records shall be sent to the Engineer on completion of the Contract. MATERIAL OF CONSTRUCTION SI ‘Component MOC No. A | impeller ‘Cast Stainless steel - DIN W-Nr. 14408 AIST CESM. B_ | Shaft Cast Stainless steel C | Shaft seal Double mechanical seal. D_| Bearings Ball bearing. Steel. E [Pump Casing Cast Sails scl - DIN WN LORE AST CHANT Cable: Special flexible rubber Installation: Each Pump shall be installed on a auto coupling type guide rail system with guide rail pipe & chain in Stainless steel. Sluice Valve and Non-return Valves shall be Swing type Check Valve with counter weight, suitable for Sewage application. Following spare parts should be supplied along with the pumps 1. Mechanical seal set 2. Bearings: 1 set 3. Control panel spares 1 set. 4. Float Switch Ino. Local agent should have adequate after sales service facility in Oman & experienced team of technicians for troubleshooting. ‘The complete sewage lifting pumping system shall be fully warranted for five years from the date of handing over. ‘OMAN MARITIME SECURITY CENTER AT MAM ME38 MECHANICAL WORKS SPECIFICATION PUBLIC HEALTH ENGINEERING INFRASTRUCTURE WORKS ASSEMBLY AND TESTING ‘The pumps shall be tested individually at the manufacturer's works for their hydraulic & electrical performances. The Pump set shall be assembled in a factory approved for such purposes, painted, tested regulated and ready for installation. The pump set shail be tested as a whole locally and shell be offered for Witness Testing to Consultant / Client if required, APTER SALES SUPPORT ‘The Pump Manufacturer shall have local supplier & adequate spare parts stock and also shall have skilled personnel for the servicing of the system and its components, The pump supplier shall be required to attend any problem with the pump set during the defect liability period within 48 Hours The method and details of connection shall be entirely in accordance with the requirements of and in full co-ordination with the municipality and all authorised delegation. ‘The Tenderer shall include in his offer forall cost, together with carrying out all necessary work in liaison with them. ‘The Contractor shall verify all cover and invert levels on site and shall prepare a comprehensive manhole schedule for Engineers approval, prior to installation works, ‘The contractor shall submit their proposed method statements separately in detail along with necessary sketches/drawings for each services connection to existing lines ‘well in time and obtain approval from the Employer/Engineer. Supply of Water ‘The Contractor shall be responsible for the supply and subsequent disposal of all water used for the testing of pipelines snd water retaining structures and for the washing out and Sterilisation of all pipelines and tanks on the potable water systems. Spare Parts ‘The Contractor shall submit with his tender a list of manufacturer’s recommended spare parts which in his opinion should be kept at the works to enable quick repairs in case of a breakdown or during replacement of worn parts. The cost of these spare parts shall be included in the tender price and provided to site. “OMAN MARITIME SECURITY CENTER AT MAM WEA38 MECHANICAL WORKS SPECIFICATION PUBLIC HEALTH ENGINEERING INFRASTRUCTURE WORKS. Final Connection ‘The actual connection and provision of isolating valves shall be done by the specialist, Sub-contractor, in co-ordination with Engineering Department of FMPLOYER. The tenderer shall include in his offer for all cost, together with carrying out all necessary ‘work in liaison with them, Spare Parts ‘The Contractor shall submit with his tender a list of manufacturer's recommended spare parts which in his opinion should be kept at the works to enable quick repairs in case of a breakdown for one year. The cost of these spare parts shall be included in the tender price and provided to site, Installations Bases for Pumps and Similar Builders Work Generally Contractor shall provide all necessary details and drawings of bases of any description required. These bases shall at all times be constructed to avoid transmission of noise or vibration to other parts of the building or structure. Base designs shall be submitted to the Engineer/Employer for approval. ‘The Contractor, unless othenwise instructed in writing, before putting work in hand shall submit to the Engineer's representative drawings to scale of the layout of Plant rooms of any description. Dimensions of Plant or Equipment As mentioned in all relevant sections, notwithstanding the heights, lengths etc. of the equipment indicated on the drawings or specifications, the Comtractor shall be responsible for ascertaining that all dimensions and sizes correspond to the position indicated. Any changes having to be made on site and/or arising from the Contractor not having complied with these instructions, shall be his responsibility and no extra will be entertained in this respect. Machinery Guards All moving parts of machinery shall be protected by strong guards to adequately protect all personnel working on or in the vicinity of the equipment. Where necessary, moving parts should be protected by guards supplied by the equipment manufacturer. All guards must be sttongly attached to equipment and be designed to be easily removed for access, servicing, adjustment and maintenance. Builders’ Work ‘OMAN MARITIME SECURITY CENTER AT WANT WE Tao 'HANICAL WORKS SPECIFICATION PUBLIC HEALTH ENGINEERING IRPRASTRUCTURE WORKS The expression “Builders’ Work” shall mean the ancillary work carried out by the Contractor in connection with the Plumbing and Sanitary installation, Builder's Work shail include, but not be limited to, the following, ‘© Drilling, cutting or leaving of holes for pipes, ducts and the like, through walls, floors, partitions, roois etc. and subsequently making good. ‘© Cutting and pinning ends of supports for pipes, equipment, appliances, fittings and the like to walls, floors, partitions, softs, etc. and making good. © Cutting or leaving mortices, sinkings, etc., for holding down bolts brackets, supports and the like and grouting in. ‘© Cutting chases for pipes and the like in walls, floors, partitions ete. and subsequently making good. ‘= Cutting and fiting around, boring holes through and making good of finishing upto pipes, supports, brackets and the like ‘The painting of exposed pipe work, fittings, equipments ete. © Appropriate pedestal/beam foundations for water tanks on terraces. * Appropriate concrete bedding around vertical pipes sleeves at terrace levels, including fillets, waterproofing etc. ‘OMAN MARITIME SECURITY CENTER AT MAM MEA41 |

You might also like