PH solar ADVANCE Corporation will develop and operate a Solar Power Plant located in bacolod city. 100% of the generated capacity will be sold to energy regulating commission (ERC) through FIT rate scheme or by means of Power Sales Agreement. Power generated from the plant will be delivered to CENECO / NONECO and to the grid through Department of Energy (DOE) of the Philippines, National grid Corporation of the Philippines (NGCP)
PH solar ADVANCE Corporation will develop and operate a Solar Power Plant located in bacolod city. 100% of the generated capacity will be sold to energy regulating commission (ERC) through FIT rate scheme or by means of Power Sales Agreement. Power generated from the plant will be delivered to CENECO / NONECO and to the grid through Department of Energy (DOE) of the Philippines, National grid Corporation of the Philippines (NGCP)
PH solar ADVANCE Corporation will develop and operate a Solar Power Plant located in bacolod city. 100% of the generated capacity will be sold to energy regulating commission (ERC) through FIT rate scheme or by means of Power Sales Agreement. Power generated from the plant will be delivered to CENECO / NONECO and to the grid through Department of Energy (DOE) of the Philippines, National grid Corporation of the Philippines (NGCP)
coming from the sun to a solar panel (DC) to generate electricity at a rated capacity of 50 MW which in turns converted into AC using an inverter Flow of electricity generated is diverted to the generating plant take-off substation to the tapping point. Power generated from the plant will be delivered to CENECO/NONECO and to the grid through
Department of Energy (DOE) of
the Philippines, National Grid Corporation of the Philippines (NGCP) steward and operator of the country electrical transmission line agreed to the Negros PH Solar, Inc. to develop and operate a Solar Power Plant located in Bacolod City Project Location: Brgy. Blumentritt, Murcia, Negros Occidental Land Area: 80 hectares (leased for 25 years) Land Owner: partel Agricultural ent., Inc. Materials: 70% of the equipment
ELECTRIC ITY
100% of the generated
capacity will be sold to Energy Regulatory Commission (ERC) through FIT rate scheme or by means of Power Sales Agreement to Local