PH SOLAR ADVANCE CORPORATION

Business Model
ELECTRICITY
MARKET

RESOURCES

REVENUE STREAM

(Direct Source from the Sun)


OPERATIONS

Harness the energy


coming from the sun to a
solar panel (DC) to
generate electricity at a
rated capacity of 50 MW
which in turns converted
into AC using an inverter
Flow of electricity
generated is diverted to
the generating plant
take-off substation to the
tapping point.
Power generated from
the plant will be delivered
to CENECO/NONECO and
to the grid through

Department of Energy (DOE) of


the Philippines, National Grid
Corporation of the Philippines
(NGCP) steward and operator of
the country electrical
transmission line agreed to the
Negros PH Solar, Inc. to develop
and operate a Solar Power
Plant located in Bacolod City
Project Location: Brgy.
Blumentritt, Murcia, Negros
Occidental
Land Area: 80 hectares (leased for
25 years)
Land Owner: partel Agricultural
ent., Inc.
Materials: 70% of the equipment

ELECTRIC
ITY

100% of the generated


capacity will be sold to
Energy Regulatory
Commission (ERC) through
FIT rate scheme or by
means of Power Sales
Agreement to Local