You are on page 1of 4

APPENDIX

MINUTE OF MEETING
SLOPE PROTECTION USING SCRAP RUBBER TYRE
DATE:

5 April 2016

TIME :

5 p.m.

PLACE

Library Tun Aminah, Universiti Tun Hussein Onn

Malaysia.

Members Present:
1.
2.
3.
4.
5.
6.

NO.
1.0

Hazimullah Dimasyqi bin Abdullah Zawawi(Chairperson)


Siti Nurfatin binti Zainuddin(Secretary)
Izza Atira binti Abdul Halim
Nor Imran bin Nor Azlan
Ahmed Mirdza bin Esa
Nurul Fadilah binti Saupi

SUBJECT
ACTION BY
CHAIRPERSON ADDRESS
The chairperson called the meeting to

FEEDBACK

order at 5.00 p.m. and thanked the


committee members for being present.
He mentioned that the purpose of this
meeting
2.0

was

to

describe

Chairperson

All members agreed

the

geotechnology of problematic soil


INTRODUCING SLOPE PROTECTION USING SCRAP RUBBER TYRE
Waste tyres have become a common
method

of

erosion

control

to

preventing soil erosion. It is a process


of a slope protection system to reduce

Secretary

All members agreed

APPENDIX

severe erosion that occurs in non3.0

vegetated slopes
CLOSING
The Chairperson summarized the
decisions made at the meeting and
thanked the committee members for
having

worked

assessment.

The

hard

for

this

meeting

was

adjourned at 6.30 p.m. with a vote of


thanks to the Chairperson.

Prepared by:
Approved by:

...
(Secretary)
(Chairperson)

Secretary

All members agreed

APPENDIX

MINUTE OF MEETING
SLOPE PROTECTION USING SCRAP RUBBER TYRE
DATE:

18 April 2016

TIME :

4 p.m.

PLACE

Library Tun Aminah, Universiti Tun Hussein Onn

Malaysia.

Members Present:
1.
2.
3.
4.
5.
6.

NO.
1.0

Hazimullah Dimasyqi bin Abdullah Zawawi(Chairperson)


Izza Atira binti Abdul Halim (Secretary)
Siti Nurfatin binti Zainuddin
Nor Imran bin Nor Azlan
Ahmed Mirdza bin Esa
Nurul Fadilah binti Saupi

SUBJECT
ACTION BY
CHAIRPERSON ADDRESS
The chairperson called the meeting to

FEEDBACK

order at 4.00 p.m. and thanked the


committee members for being present.
He mentioned that the purpose of this

Chairperson

All members agreed

meeting was to analyze the progress


of the report and to discuss works that
2.0

need to be done.
DISCUSSIONS AND ANALYZING OF REPORT
Each contents of the report were
analyzed

and

compiled

together.

Proposal for materials needed to build

Secretary

All members agreed

APPENDIX

a model of the project including the


cost to build the model. Group
members discussed on creating the
model and approximate total cost
3.0

were concluded.
CLOSING
The Chairperson summarized the
decisions made at the meeting and
thanked the committee members for
having

worked

assessment.

The

hard

for

this

meeting

was

adjourned at 5.30 p.m. with a vote of


thanks to the Chairperson.

Prepared by:
Approved by:

...
(Secretary)
(Chairperson)

Secretary

All members agreed

You might also like