Professional Documents
Culture Documents
RIHAND
STANDARD CHECKLIST:: SYSTEM COMMISSIONING
WALL DE SLAGGERS
SHEET
1 OF 2
Date -
1.
2.
3.
4.
Check the perpendicularity of wall sleeve and swivel type (90 deg +
30 ) (Certificate from erection personnel to be obtained)
Check the accessibility for hand crank and the switch box
assembly.
STATUS
Yes / No
NTPC
RIHAND
SHEET 2 OF 2
ACTIVITY
The rotary and traverse gear boxes are thoroughly flushed and
filled with the recommended lubricant.
10
11
Check that the stop nuts are in place on the guide rods.
12
Check that the drain holes in the motor frames point downwards
and are open.
13
The SBV head valve is serviced for proper opening and closing.
14
Check that the blower, before starting or at the end of its operation
is in the correct parking position.
15
16
Remarks: -
STATUS
Yes / No
Name
Agency
NTPC-Erection
NTPC-Commissioning
Signature
Date