Project Partners
City of Toledo, Department of Utilities, Division of
Environmental Services
Tetra Tech
Biohabitats
American Rivers
Northwest Consultants, Inc.
Agenda
Background
Planning
Design
Construction
Monitoring
Future Plans
3
Project Goals
Funding Source
Schedule
Location
Location
Maywood Avenue
Ashwood Avenue
Stickney Avenue
Mulberry Street
Russell Street
Location
Demographics
Single family residential
Median home income $25,384
(average income in Toledo
$32,546)
1/12 acre lots (30 by 120-ft)
66 lots (46 with houses)
25% Homeowners*
*Based on Lucas County Auditor AREIS Information
10
11
12
Site Characteristics
Some healthy mature trees
50-ft ROW
5-ft
8-ft
24-ft
8-ft
5-ft
13
Community Garden
Project Planning
Concept Planning
Description
Approximate
Length
Equivalent
Runoff 2
Existing
7.8 cf/lf
60% of Road,
760 Feet
0.14 Inch
Pervious
13.8 cf/lf
60% of Road,
760 Feet
0.25 Inch
None
20.5 cf/lf
60% of Road,
760 Feet
0.37 Inch
None
21.8 cf/lf
60% of Road,
760 Feet
0.40 Inch
28.8 cf/lf
(1) Bioswale calculations are shown for one side of the road only
(2) Equivalent runoff based on 11.5-ac drainage area
0.006 Inch/Box
17 Boxes = 0.1 Inch
17
Collection
System
CB
4.00
WWTP
DEWATER
Tunnel
Storage
3.50
3.00
INTERCEPTOR
OVERFLOW
Land
OVERFLOW
River
(GREY)
2.50
2.00
1.50
1.00
Typical rainfall
portion causing
CSO
0.50
0.00
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
16.0
18.0
20.0
22.0
24.0
Time (hrs)
CSO
NPDES MS4
0-inches
Probably Maximum
18
19
20
Design
Bioswales
Curb cuts
Underdrained
Design
Bioswale cells typ.
22
Details
23
Honeylocust
Black Cherry
Shingle Oak
Ground Cover
Buffalo Grass
24
Buffalo Grass
(Buchloe dactyloides)
25
26
Goal
Community Involvement
Methodology
28
O&M Plan
Maintenance
Grass cutting
Street trees
Vacuum porous concrete
Rain garden (plants and mulch)
Project Deliverables
Homeowner maintenance manual
Homeowner trainings
Project walk through
29
Construction Bids
3 bids received (December 2009)
Total base bid
~$500k total project (swales, sidewalks, driveway
approaches, curb and gutter, plantings, etc.)
~$278k green infrastructure
Highlights
Bioswales ~ $150/lf
Pervious concrete sidewalk 6-inch ~ $5/sf
30
Construction Schedule
5 month estimated schedule
Construction delayed for utility
relocation of water taps and
gas lines.
31
Monitoring Plan
2 flow meters
Downstream (east) end of Maywood Ave
Surrogate monitor on adjacent street (Russell St)
Planned 6-month monitoring period
32
Future Plans
Quantify change in flow (peak and volume)
Model system (calibrated to monitoring data)
Relate
BMP type
Amount of BMPs
Change in flow
Cost
Summary
19-23 cf/lf storage in swale/sidewalk combination
0.58-in storage (of runoff, not rainfall)
Not Including:
Abstractions
Infiltration
Evapotranspiration
Discharge through underdrains
$1.50/gallon stored
New infrastructure (swales, sidewalks and approaches)
34
Questions