COMMENT RESPONSE SHEET

(RESPONSES TO ADCO COMMENTS ON REV.A OF SURFACE CASING INSPECTION PROCEDURE)

24th March, 2016

Velosi Project No: VAIL-15-101


A
Sr.
No.

Clause

24

11.1

25

11.2

Section
Detailed
Procedure/
Process Overview
Determination of
inspection
frequency

Rev.

ADCO Comments

Velosi Response

ADD- Work Over Well surface casing inspection to be


included

Noted.

ADD- High age and RIG work Over well frequency.

Review of Maximum period between well drill date and


Rig workover movement. also, Review of Maximum
period between 1st inspection / repair of surface casing
and Rig workover movement. TC(IO) to comment
Considering the better quality of cementing and coating
normally done during the 1st inspection / repair job of
the surface casing, Consideration to be given to regular
program for cellar inspection of surface casing.

This should be addressed with


consultation from ADCO TC (IO)

47

Procedure or cross ref. for the measurement of soil


resistivity.

Soil Resistivity measurement shall


be carried out by Soil Box test
method as per ASTM G57.
Procedure included in the Annexure
of the procedure.

48

Are the well casing with tag nos.? how are they
identified?

Well casing is generally identified by


Well Tag #.

49

Are the well casing with tag nos. part of CIMS


equipment master list?

ADCO to comment

General

41

50

Does CREDO have the inspection history / details of


well casings?

Page 1 of 2

CREDO?? to be discussed

Status

COMMENT RESPONSE SHEET


(RESPONSES TO ADCO COMMENTS ON REV.A OF SURFACE CASING INSPECTION PROCEDURE)

24th March, 2016

Velosi Project No: VAIL-15-101


Sr.
No.
51

Clause

Section

Rev. A
ADCO Comments
How is the inspection plan generated on the well
casing?

Page 2 of 2

Velosi Response
To be discussed with ADCO

Status