You are on page 1of 51

02

23.09.10

Issued for Acceptance

01

08.06.10

Issued for Review

Rev.

Issued
date

JK

Description

GA

GA

JK

GA

GA

Made
by

Chk'd
by

Disc.
appr.

LM
Proj.
appr.

Client
appr.

Contractor

Client:

Contract No.:

NSBU-061201
Project no:

Project title

160012
Document type:

GREATER EKOFISK AREA DEVELOPMENT

Platform(s)

RA

Area(s):

BD01

System(s):

A00

G00

Document title:

PIPE SUPPORT PROCEDURE


Document no.:

Page:

Rev.:

BD01-AK-P-06042

02

1 of 51

Greater Ekofisk Area Development


Pipe support procedure

Rev.02:

Page :
Date :

2 of 51
23.09.2010

TABLE OF CONTENTS
1.
1.1
1.2
1.2.1
1.2.2
1.3
1.4
1.5
1.6
1.7
1.7.1
1.7.2
1.7.3
1.7.4

Introduction
Revision history
General
Work included
Work excluded
Definitions
Location
Environmental data
Compliance with statutory regulations
Normative and informative references
Normative references
Informative references
Apparent conflict in requirements
Deviation from specifications

7
7
8
8
8
8
9
9
9
10
10
11
11
11

2.
2.1
2.1.1
2.1.2
2.1.3
2.1.4
2.1.5
2.1.6
2.1.7
2.1.8
2.2
2.2.1
2.2.2
2.2.3
2.2.4

Scope of work
For engineering contractor
Pipe support modelling & drawing
Pipe support on engineering isometrics
Interface with structural department
Interface with mechanical department
Interface with piping stress group
Multidiscipline interface
Pipe support index
Spring index
For fabrication contractor
Final preparation, drawing, bracing & material take off
Temporary pipe supports
Pipe support location tolerances
Pipe support design requirements

11
11
11
11
12
12
12
12
12
12
13
13
13
13
13

3.
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.7.1
3.7.2
3.7.3
3.7.4
3.7.5
3.7.6
3.8
3.9
3.10

Design basis
General
Layout considerations
Expansion
Deflections
Explosion drag/blast
Design factors and acceptance criterias
Loads
Acting loads
Hydrostatic load
Wind 16
Blast 16
Acceleration
Run-up & spray load
Design loads
Welded pipe support framework
Welded attachment to pipe (WA)

13
13
14
14
14
14
15
16
16
16
17
17
17
17
18

Greater Ekofisk Area Development


Pipe support procedure

Rev.02:

Page :
Date :

3 of 51
23.09.2010

3.11
3.12
3.12.1
3.13
3.13.1
3.13.2
3.13.3
3.13.4

Acoustic fatigue
Bolted pipe support frame connections
Bolt holes
Temporary supports
Interfaces
Hydro test
Fastening for transport
Tagging

18
18
18
18
18
19
19
19

4.
4.1

Pipe spans
Guide spans

19
19

5.
5.1
5.2
5.3
5.4
5.5
5.6
5.7
5.8
5.9

Pipe support locations


Personnel hazard
Maintenance
Equipment requirements
Spring location
Pipe supports on equipment
Use of existing structure
Pipe supports from another pipe
Pipe support in module / area volumes
Pipe Flange supports

20
20
20
20
20
20
20
20
20
20

6.
6.1
6.2
6.3

Structural steel interface


No-go areas
Bolted supports on structural flanges
Heavy pipe support loads to structural steelwork

21
21
21
21

7.
7.1
7.2
7.2.1
7.2.2
7.2.3
7.3
7.4
7.4.1
7.4.2
7.4.3
7.5
7.5.1
7.6
7.7
7.8
7.9

Material specification
Fabrication
Welding
General
Fabrication welding
Welded attachment to piping
Painting
Inspection and non destructive examination (NDE)
Inspection / NDE of pipe support structure
Inspection / NDE of welded attachment to piping
Inspection / NDE of welded attachment to structure
Selection of materials
Temperature limitations
Bolts and nuts (U-bolts and U-straps inclusive)
Material for attachments clamped or welded to the pipe
Welding between stainless/alloy steel and carbon steel
Preferred rolled sections

21
21
22
22
22
22
22
22
22
22
22
22
23
23
24
25
25

8.
8.1
8.1.1
8.1.2
8.1.3
8.2

Pipe support identification and documentation


Outline description of pipe support system
Documents for identification and documentation of pipe supports
Engineering isometrics
Pipe support index
Pipe support numbering

26
26
26
26
26
26

Greater Ekofisk Area Development


Pipe support procedure

Rev.02:

Page :
Date :

4 of 51
23.09.2010

8.2.1
8.2.2
8.3

Pipe support numbering


Pipe support numbering in area borders
Document numbering system

26
27
27

9.
9.1
9.2
9.3
9.4
9.5

Pipe support detail drawing


Drawing layout
Positioning information on pipe support drawing
Material list
Iso/Stress iso numbers on pipe support drawing
Location references

27
27
27
28
28
28

10.
10.1
10.2
10.3
10.4
10.5
10.5.1
10.5.2
10.6
10.6.1
10.6.2
10.7
10.7.1

Detail design
General
Standard pipe support components / framing
Special supports
Surface of contact between pipe/pS detail and ps structure
Supporting of carbon steel pipes
Non insulated carbon steel pipes
Insulated carbon steel pipes
Supporting of stainless and alloy steel pipes
Non insulated stainless and alloy steel pipes
Insulated stainless and alloy steel pipes
Supporting of GRE/GRP pipes
Non insulated and insulated GRE/GRP pipes

28
28
28
28
28
29
29
29
29
29
29
29
30

11.
11.1
11.1.1
11.1.2
11.2
11.3
11.4
11.5
11.6
11.7
11.8
11.9
11.9.1
11.9.2
11.9.3
11.9.4
11.10
11.11
11.12

Standard pipe support details


Shoes
Welded shoes and trunnions
Clamped shoes
Wear plates
U-bolts
U-straps
Non metallic pads
Sliding supports
Low friction supports
Spring supports
Attachments to piping
Material
Clamped Attachment
Welded Attachment
Attachments to pipe with inside lining
Hanger rods
Removable supports
BOP elevations above pipe support structure.

30
30
30
30
30
31
31
31
31
31
31
32
32
32
32
32
32
32
32

12.
12.1
12.2
12.3
12.4
12.5
12.6

Special considerations
Adjustable supports
Supporting of pressure relief valves (PSV)
Supporting of small bore branches - vent & drain connections
Hold-down supports
Shock absorbers (Mechanical snubbers)
Supporting from mechanical equipment

34
34
34
34
35
35
35

Greater Ekofisk Area Development


Pipe support procedure

Rev.02:

Page :
Date :

5 of 51
23.09.2010

12.7
12.8
12.9
12.10
12.11
12.12
12.13
12.14

Control valve set


Utility stations
Tundishes
Rodding out points
Manifolds
Mudbulk-solid
Heavy support loads
Piping submerged in seawater

35
35
35
35
35
35
35
35

13.

Pipe penetrations

36

14.
14.1
14.2
14.3
14.4
14.5
14.6
14.7
14.8
14.9

Insulated pipes
Heat conservation Class 1
Cold conservation Class 2
Personnel protection Class 3
Frost protection Class 4
Fire protection Class 5
Acoustic insulation Class 6, 7 & 8
External condensation and icing protection Class 9
Fire protection on flanges
Future insulation

36
36
36
36
36
36
36
36
36
37

15.
15.1

General supporting of small bore pipes


Special considerations for supporting of small bore piping

37
37

16.

Hook-up supports

38

17.

Starter bars

38

18.
18.1
18.2
18.2.1
18.2.2
18.2.3

Surface preparation and protection


Colour / Coating
Fireproofing
Full fire protection
Integrity protection
Deck / beam deflection effects due to fire

39
39
39
39
39
39

19.

Tagging of pipe supports

39

20.
20.1

Filing system
Documents to be filed internally

40
40

21.
21.1
21.2
21.3
21.4

MAINTENANCE & MODIFICATION PROJECTS. (V&M).


Pipe Support Design Practice.
Use of adhesive for pipe supports.
Tapped and screwed bolted connections
Planning / working methods / LIAISON with other disciplines

40
40
40
41
41

22.
22.1

Interface with structural discipline


Loads

41
41

23.
23.1
23.2

Typical bolted frames and connections


General rules for bolted connection
Typical bolted frames

42
42
43

Greater Ekofisk Area Development


Pipe support procedure

Rev.02:

Page :
Date :

6 of 51
23.09.2010

23.3
STANDARD BACK-MARKS FOR DRILLED BOLT HOLES IN ROLLED
STEEL ANGLES (Unless noted otherwise on the pipe support drawing):
23.4
STANDARD BACK-MARKS FOR DRILLED BOLT HOLES IN UNP profiles.
(Unless noted otherwise on the pipe support drawing)
23.5
STANDARD BACK-MARKS FOR DRILLED BOLT HOLES IN IPE, HEA &
HEB profiles. (Unless noted otherwise on the pipe support drawing)
23.6
Typical offshore connection to primary steelwork.

48
49
50
50

Greater Ekofisk Area Development


Pipe support procedure

1.

INTRODUCTION

1.1

REVISION HISTORY

01 Issued for review.

02 Issued for Acceptance:

Rev.02:

Page :
Date :

7 of 51
23.09.2010

1.2:

Re-phrased.

1.7.1:

References added. Existing references updated.

1.7.2:

Updated and re-phrased.

2.1.3:

Re-phrased.

3:

Heading changed.

3.1:

Bullet point added (facilitate access for inspection).


Reference to TCD4583 and NORSOK L-002 added.

3.6:

Heading changed and section re-phrased.

3.7.1:

Wave loads added.

3.7.4:

Re-phrased.

3.7.6:

Re-phrased. Note to be transferred to TCD 4583, next rev.

3.10:

Alternative methodology (EN-13480) added.

3.11:

The effect of vibration. and Fatigue calculations. added.

3.12:

Re-phrased.

3.12.1: Updated.

5.9:

Heading changed. Such supports need to. added.

6.2:

New section.

6.3:

Reference to section 2.1.3 added. One bullet point added.

7.2.1:

Re-phrased.

7.4.1:

Re-phrased.

7.4.3:

Heading changed. Section re-phrased.

7.5:

Material table updated.

7.7:

LDSS added to table column welded to reinf. plt.. Note 1 added.

7.8:

Filler material re-phrased. Sketch added.

7.9:
Sentence The exceptions are.. re-phrased. Table updated (Beams
and 40mm thk plate deleted).

11.1.1: If shoes are required. added.

11.1.2: Re-phrased.

11.12: Note added.

12.13: Section replaced with reference to 2.1.3.

21.1:

Re-phrased.

21.4:

Re-phrased.

22.1:

Section replaced with reference to 2.1.3.

Greater Ekofisk Area Development


Pipe support procedure

1.2

Rev.02:

Page :
Date :

8 of 51
23.09.2010

GENERAL

The purpose of this procedure is to outline the philosophy for supporting pipes, define activities to
be performed and assign responsibilities to parties involved. This is to ensure that the scope of
work pertaining to design of pipe supports and associated structures on ConocoPhillips
installations is fully covered, taking into account all the applicable codes of practice, standards,
guidelines and regulations that are relevant for detail engineering.

1.2.1

WORK INCLUDED

This Procedure is applicable for pipe supporting of all platform production and utility piping
systems in the scope of work.

1.2.2

WORK EXCLUDED

All instrument control piping, risers and sub sea pipe work, all heating & ventilation systems, and
air & water service systems within the living quarter.

1.3

DEFINITIONS

All terms, phrases and abbreviations within the entire scope of this procedure shall be interpreted
as follows:
Company:

ConocoPhillips

Company's representatives:

Any agent(s) appointed by the Company to specify, or conduct


inspections, tests, verifications and expediting functions that assure
the quality and performance of the work specified.

Engineering contractor:

Company responsible for detail engineering of pipe supports

The work specified:

The scope of work in all "agreements", which contractually obligate


the "supplier" to Company's specified requirements

Vendor/fabricator:

The Company's contractor (whether a main contractor, subcontractor, supplier, agent or manufacturer) who is responsible for
meeting all requirements of the work specified and liable for the result

"Unless Other":

The phrase used to indicate the precedence over this Procedure of


special requirements in Company's associated documentation or in
any mandatory regulations.

Will:

Is normally used in connection with an action by the Company, rather


than by a Contractor.

May:

Is used where a provision is completely discretionary.

Should:

Is used where a provision is advisory only.

Shall:

Is used where a provision is mandatory.

If (When):

Requirement at the Company's option, beyond minimum specification


requirement.

Alloy steel lines:

Mean lines made of 6MO, Duplex, Super Duplex or Titanium.

Lean Duplex Steel

LDSS

Stainless Steel:

316 / 316 L

Greater Ekofisk Area Development


Pipe support procedure

Rev.02:

Page :
Date :

9 of 51
23.09.2010

Abbreviations:
NORSOK

Norsk sokkels konkurranseposisjon

ANSI:

American national standards institute

ASME:

American society of mechanical engineers

API:

American petroleum institute

BLAST:

Forces created by explosion

TOS

Top of steel

BOS

Bottom of steel

BOP:

Bottom of pipe (Elevation)

CL

Centreline

EL

Elevation

BS:

British standard

DN:

Nominal diameter (In mm)

GRP:

Glass fibre reinforced plastic

NS:

Norwegian standard

PS:

Pipe support

Sch:

Schedule

WA:

Welded attachment to pipe

WT:

Wall thickness

UNO

Unless noted otherwise

FB

Flatbar

SHS

Square hollow section

RHS

Rectangular hollow section

NDE

Non-destructive examination

MPI

Magnetic particle inspection

DPI

Dye penetrant inspection

1.4

LOCATION

Location is the site of final installation.

1.5

ENVIRONMENTAL DATA

The atmosphere is saline.


Ref. Project document Metocean Design Basis or similar

1.6

COMPLIANCE WITH STATUTORY REGULATIONS

The vendor is responsible for compliance of the Work Specified within the relevant code for the
piping system.

Greater Ekofisk Area Development


Pipe support procedure

1.7

Rev.02:

Page :
Date :

10 of 51
23.09.2010

NORMATIVE AND INFORMATIVE REFERENCES

The following standards include provisions and guidelines which, through reference in this text,
constitute provisions and guidelines. Latest issue of the references shall be used unless otherwise
agreed. Other recognized standards may be used provided it can be shown that they meet the
requirements of the referenced standards

1.7.1

NORMATIVE REFERENCES

NORSOK L-002, rev.3

Piping system layout, design and structural analysis.

NORSOK M-001, rev.4

Materials selection.

NORSOK M-101, rev.4

Structural steel fabrication.

NORSOK M-102, rev.1

Structural aluminium fabrication.

NORSOK M-120, rev.5

Material data sheets for structural steel.

NORSOK M-121, rev.1

Aluminium structural material.

NORSOK M-601, rev.5

Welding and inspection of piping.

NORSOK N-001, rev.7

Integrity of offshore structures.

NORSOK N-004, rev.2

Design of steel structures.

TCD 4583

Piping system design requirements for new installations, modifications


and repair of existing facilities

TCD 4650

Material Selection

TCD 2169

ConocoPhillips engineering numbering system

TCD 4314

Documentation for operation (DFO)

TCD 6296

Structural Design

BD01-AK-K-05001

Material Selection Philosophy

BD01-AK-K-05002

Coating Specification

ASME B31.3 (2008)

Process piping

ISO 14692, rev.1

Glass-reinforced plastics (GRP) piping.

API RP14E

Recommended practice for design and installation of offshore production


platform piping systems.

NS 1871, rev.1

ISO general purpose screw threads - Basic profile.

ISO 262, rev2

ISO general purpose metric screw threads - Selected sizes for screws,
bolts and nuts.

ISO 1461, rev1

Hot dip galvanized coatings on fabricated iron and steel articles.

EN 1090-2, rev.1

Execution of Steel Structures and aluminium structures Part 2:


Technical requirements for steel structures.

EN 1993-1-1, rev.1

Eurocode 3: Design of steel structures - Part 1-1: General rules and


rules for buildings

ASTM A153 (2009)

Standard specification for zinc coating (hot dip) on iron and steel
hardware

EN 10025, rev.1

Hot rolled products of structural steels.

Greater Ekofisk Area Development


Pipe support procedure

DIN 933

Hexagon head bolts

DIN 934

Hexagon head nuts

BD01-AK-P-06043

Pipe support detail standard

1.7.2

Rev.02:

Page :
Date :

11 of 51
23.09.2010

INFORMATIVE REFERENCES

BD01-AK-F-05001

Safety strategy

BD01-AK-F-05006

Passive fire protection philosophy

ELDS-AK-F-00101

Design accidental load specification

BD01-AK-P-06016

Piping detail standard

Other informative references are: Pipe stress procedure, Comprehensive analyses, Metocean
design basis, and Line list.

1.7.3

APPARENT CONFLICT IN REQUIREMENTS

The engineering contractor shall inform Company immediately if a significant doubt occurs about
the specified requirements. The subject must be clarified and necessary confirmation given in
writing from the Company before the work is executed. Company is the sole judge.

1.7.4

DEVIATION FROM SPECIFICATIONS

Deviations may only be made after Company approval, alternatives to the above referenced
codes, standards, specifications and guidelines may be offered if considered equivalent or better.
All deviations shall be approved by Company thru treatment of non conformance in SAP.

2.

SCOPE OF WORK

2.1

FOR ENGINEERING CONTRACTOR

2.1.1

PIPE SUPPORT MODELLING & DRAWING

Engineering contractor shall perform detail design of pipe supports for process and utility pipes.
A volume model of calculated structural elements will be placed in the 3D model based on support
details selected from the Pipe Support Detail Standard on lines specified as scope in point 1.
Engineering contractor shall produce detail pipe support drawings for specified scope above,
including annotation to complete the drawing with material list and references.
Pipe support details, like springs, clamps, shoes, guides etc. (non-structural pipe supports on pipe
items) will be located/indicated with reference to particular sheet in the Pipe Support Detail
Standard.

2.1.2

PIPE SUPPORT ON ENGINEERING ISOMETRICS

Support location and number will be shown on the engineering isometric together with welded
attachment information if applicable.

Greater Ekofisk Area Development


Pipe support procedure

2.1.3

Rev.02:

Page :
Date :

12 of 51
23.09.2010

INTERFACE WITH STRUCTURAL DEPARTMENT

The Pipe Support Group shall at the start of a project agree on a clear and consistent
format/routine for communicating pipe support layouts and reporting pipe support reactions (i.e.
vertical, horizontal and moment force components at pipe support footings) to the Structural
Department. Pipe supports with one or more reaction components (vertical/horizontal) exceeding
10KN shall be included in a list/ plot as well as those where the sum of several adjacent
components exceeds 10KN on the same structural member. Reactions exceeding 10kN shall be
approved by the Structural Department prior to commencing prefabrication. The overall layout and
configuration of pipe supports with reactions less than 10KN shall also be agreed with the
Structural Department.
The Pipe Support Group shall calculate and design pipe support frames carrying total vertical or
horizontal pipe loads to 35KN. Design and calculations of frames carrying more than 35KN
vertical or horizontal pipe load shall be checked and approved by the Structural Department prior
to commencing prefabrication. Pipe support frames shall be designed to avoid significant moment
reactions.

2.1.4

INTERFACE WITH MECHANICAL DEPARTMENT

The pipe support group/designer shall coordinate with, and give input to Mechanical Department
regarding load input and interface requirements such as attachment plates/lugs to vessel etc.
Requirements shall be marked up on vendor drawings.

2.1.5

INTERFACE WITH PIPING STRESS GROUP

The pipe support group/designer shall coordinate with stress department to get all required
information regarding critical pipes (i.e. load, function & spring information). Load information
should be provided using reports from applicable 3D modelling tool (i.e. PDMS) used by
engineering contractor for this purpose.

2.1.6

MULTIDISCIPLINE INTERFACE

The pipe support group/designer should seek to coordinate for common rack support locations for
cable trays, HVAC ducts and piping.

2.1.7

PIPE SUPPORT INDEX

The pipe support group/designer shall enter support information into the pipe support index. This
document shall be issued before project end. The index shall contain pipe support information
such as pipe support number, function, line number reference etc. See TCD-4314 for required
information to be included. Before issue to the Company, the pipe support index shall be updated
with spring information where applicable.

2.1.8

SPRING INDEX

The pipe support group/designer shall enter spring information into the Spring Support Index. The
index shall include information such as pipe support number, line number reference, spring type,
spring size, preset load, operating load, travel, and stress isometric reference. This information
need to be included in the pipe support index before the pipe support index is issued to the
Company (ref. 2.1.7).

Greater Ekofisk Area Development


Pipe support procedure

Rev.02:

2.2

FOR FABRICATION CONTRACTOR

2.2.1

FINAL PREPARATION, DRAWING, BRACING & MATERIAL TAKE OFF

Page :
Date :

13 of 51
23.09.2010

Final preparation of shop fabrication drawings based upon drawings delivered by Engineering
Contractor.
Install bracing in line with Piping Detail Standard
Material take-off and procurement of pipe support items except for spring assembly.

2.2.2

TEMPORARY PIPE SUPPORTS

Locate and design temporary supports (Sea fastening, testing, interface) and Tow Out/Transport
supports. Additional supports in follow on engineering at the fabrication yard.

2.2.3

PIPE SUPPORT LOCATION TOLERANCES

Pipe support locations given by Engineering Contractor are to be regarded as fixed, but
Fabrication Contractor is allowed a certain location tolerance as long as all other requirements are
met such as maximum allowable pipe span etc. Following location tolerances are acceptable
without prior Company approval:

Pipes that require comprehensive analyses:

All other lines: 250 mm location tolerances

100 mm location tolerances

For location of welded attachments to a pipe, the isometric drawing is the governing document.

2.2.4

PIPE SUPPORT DESIGN REQUIREMENTS

The fabrication contractor shall design the pipe supports in his scope according to the
requirements given in this procedure and in the pipe support detail standard and piping detail
standard.

3.

DESIGN BASIS

3.1

GENERAL

The pipe supports function is to support the pipe from the surrounding structure. They shall:

Carry the weight of the pipe as well as that of any equipment connected to the pipe.

Control the movement of the pipe.

Direct and transfer the loads from the pipe to the surrounding structure, and generally
remove or restrain one or more of the six degrees of freedom at particular points on the
pipe.

The supports for piping shall be positioned and selected to:

Prevent piping stresses in excess of those permitted by the design code for the system.

Avoid the possibility of liquid pockets.

Prevent deflections in pipe supports beyond stated requirements.

Prevent leakage at joints.

Greater Ekofisk Area Development


Pipe support procedure

Rev.02:

Page :
Date :

14 of 51
23.09.2010

Prevent thrusts and moments on connected equipment in excess of those permitted by


applicable requirements.

Prevent resonance with imposed wind forces or contained fluid induced vibrations.

Prevent resonance with imposed mechanical or acoustically induced vibrations from


reciprocating machines.

Prevent interference with free thermal expansion or contraction as required by the pipe
stress analysis.

Prevent unintentional disengagement of piping from its support.

Prevent deflections of piping greater than those, which the span selection tables in the
Pipe Support Detail Standard, are based on.

Facilitate access for inspection

Piping requiring drainage slope shall be given special consideration.

Pipe supports shall be designed to fulfil requirements stated in TCD4583 sect. 2.2.17 and
NORSOK L-002 sect. 6.17

3.2

LAYOUT CONSIDERATIONS

The pipe supports shall be considered an integral part of the pipe work and structural design and
shall be considered from piping layout studies through to final support selection. Common
supports for other services such as Electrical/Instrument Cables and HVAC ducting should be
utilised whenever practical.

3.3

EXPANSION

Expansion calculations for piping shall be based on maximum/minimum design temperatures


stated in the process line list.

3.4

DEFLECTIONS

The effect of deck deflections, platform sway and flexibility in structures and equipment such as
storage tanks shall be considered in selection of supports and incorporated in design/calculation
where relevant. Magnitude of deflection and sway shall be obtained from the Structural- and
Marine Disciplines.

3.5

EXPLOSION DRAG/BLAST

The design of the pipe supports shall consider the effects of explosion drag/blast loads.

Greater Ekofisk Area Development


Pipe support procedure

3.6

Rev.02:

Page :
Date :

15 of 51
23.09.2010

DESIGN FACTORS AND ACCEPTANCE CRITERIA

Pipe supports shall be proven to satisfy the limit states outlined in NORSOK Standard N-001, i.e.:

Ultimate Limit State, ULS

Serviceability Limit State, SLS (eg. deflections)

Accidental Limit State, ALS (eg. blast)

Fatigue Limit State, FLS where relevant (eg. acoustic induced vibrations)

Material factors (MF):


Material factors shall be applied as outlined in NORSOK Standard N-001, i.e.:

ULS: MF for the selected pipe support material (ref. section 7.5) shall according to
NORSOK Standard N-001 be set to 1,15 for steel material and 1,2 for aluminium material.
Material factors for welds and bolt connections shall be 1,3 according to NORSOK
Standard N-004.

SLS/ ALS: MF for the selected pipe support material (ref. section 7.5) shall according to
NORSOK Standard N-001 be set to 1.0

Load combinations and -factors (LF):


Loads acting on the pipe support shall be factored and combined in the limit states listed above
and as outlined in NORSOK Standard N-001.

ULS: In most cases this means that the loads on the pipe support coming from the pipe
stress analysis shall be factored by 1,3 in ULS and 1,0 otherwise, unless the pipe support
receive environmental loads such as wind and/ or waves (typically for pipe supports under
or at the periphery of platform cellar decks, ref. section 3.7.6). Also a surplus load factor of
1.2 may be used in addition to 1.3 when the exact loads are not known.

SLS/ALS/FLS: All combinations shall apply a load factor of 1,0.

Acceptance criteria:

The design stresses calculated from the applied (factored) loads shall not exceed the
yield stress of the material, all limit states included.

Deflections shall not exceed the most conservative of L/360 or 3mm (where L is the span
of the pipe support member) in the restrained directions (i.e. RS, LG, HD, LS). Structural
deflection in tie in point also to be included.

Greater Ekofisk Area Development


Pipe support procedure

3.7

LOADS

3.7.1

ACTING LOADS

Rev.02:

Page :
Date :

16 of 51
23.09.2010

The design of pipe support elements and supporting structures shall be based on all concurrently
acting loads. This may include the following:

Weight of pipe, fluid, insulation etc.

Hydrostatic test loads

Loads introduced by service pressure and temperature

Variable operating loads

Friction effects

Loads due to liquid slugs

Pulsation forces caused by reciprocating equipment

Wind forces

Blast loads

Heat loads

Acceleration

Wave loads /Run-up & spray

3.7.2

HYDROSTATIC LOAD

For piping containing gas or vapour subject to hydro test, support design shall take account of
hydrostatic test load.

3.7.3

WIND

The effect of wind on exposed piping shall be calculated in accordance with the design code and
wind speeds applicable to the project

3.7.4

BLAST

The project safety discipline shall specify which pipes and pipe supports require to be designed to
withstand the pressure/blast from an explosion. The pipe stress group shall calculate the pipeline
blast loads. The calculated blast loads shall be shown on the stress isometric and reported to the
pipe support group for design of pipe supports. Blast loads on the pipe support structure shall be
added to the pipeline blast loads. Ref. NORSOK L-002.
When calculating the pipe support frame for blast, the drag pressure effect acting directly on the
pipe support itself, shall also be accounted for.
Allowable stress is to be set to 1.0 x yield stress for the support material. Pipe support deflection
limit is 200mm. Use load factor = 1, and material factor = 1.
When designing / checking pipe supports for blast, possible shielding from another pipe,
equipment etc. should be taken into account.
Less conservative blast calculations (but more complex) are possible if the above mentioned
procedure is found to cause unwanted effects on the pipe support design. In these cases, the
structural department is to be consulted for optimizations/new calculations.

Greater Ekofisk Area Development


Pipe support procedure

3.7.5

Page :
Date :

Rev.02:

17 of 51
23.09.2010

ACCELERATION

Gravity factors applicable to the project shall be added to design loads for pipe supports.

3.7.6

RUN-UP & SPRAY LOAD

Pipes that are exposed to wave run-up and spray must be designed to withstand these loads.
Run-up & spray loads are to be regarded as design loads.
NOTE:
Due to subsidence (present and/or future) the location of new or modified pipe runs under or at
the periphery of platform cellar decks shall preferably be avoided. If this is not possible the
locations and supporting of such pipes shall be approved by ConocoPhillips' Asset Integrity
Department. The reason for this is:

To confirm future freeboard and design wave (local/global) criteria.

Design wave kinematics can be complex (eg. under deck jetting) and require third party
input.

The additional wave loading may not be acceptable for the platform (jacket) as a whole.

THIS NOTE TO BE TRANSFERRED TO NEXT REVISION OF TCD 4583

3.8

DESIGN LOADS

The pipe support loads should be based on the following:


Vertical load:

The weight of the pipe span carried by the actual support.

Horizontal load:

For rest supports, the horizontal load may be assumed equal to the
friction force. The following coefficient of friction should be used to
determine forces at sliding surfaces.
Surfaces
Steel to steel (Corroded)
Stainless Steel to Stainless Steel
Stainless Steel to Teflon

Friction coefficient

0.3
0.15
0.1

For anchors, line stops and in some cases guides, the vertical
load may be used as design load in horizontal direction.
Load effects listed above shall be considered. Loads given on stress sketches shall also be
reflected.

3.9

WELDED PIPE SUPPORT FRAMEWORK

Standard pipe support weld is (UNO):


a = 1 x WT for SHS & RHS profiles with WT up to and including 6.3mm. For wall thickness
>6.3mm part pen weld is to be used

Greater Ekofisk Area Development


Pipe support procedure

Rev.02:

Page :
Date :

18 of 51
23.09.2010

a = 0.7 x WT CFW for all other profiles.


Should the weld size differ from the above mentioned, the weld shall be specified according to
applicable fabrication standards (EN-1090-2).

3.10

WELDED ATTACHMENT TO PIPE (WA)

Pipe wall stresses caused by loading on WA shall be less than requirements stated in ASME
B31.3 and guidelines stated in Kelloggs: Design of piping systems (Alternatively the methodology
outlined in EN-13480, part 3). Welding of field welded shear lugs shall comply with valid welding
specifications and procedures.
Maximum stress level on these welds must not exceed limits stated in ASME B31.3.
Minimum distance between two welds on a pipe shall not normally be less than 50 mm (toe to
toe).
No welded attachment, including trunnions, shall be welded to Cold Pulled Bends.
Wear plates or doubler plates shall under no circumstances be used on elbows.

3.11

ACOUSTIC FATIGUE

Special attention shall be paid to welded attachment / doubler plates on lines subject to acoustic
fatigue conditions. A full circumferential reinforcement ring shall be welded to the pipe when
welded attachment is required. The effect of vibration on pipe support and structure fatigue shall
also be considered. Fatigue calculations of the pipe support (FLS) may be required.

3.12

BOLTED PIPE SUPPORT FRAME CONNECTIONS

With the exception of temporary, hook-up or removable supports, and supports towards
aluminium sections/plates, bolted connections shall (due to inspection/corrosion considerations)
be avoided in pipe support structures and their connections to existing structures (Unless welding
is not possible due to offshore hot-work restrictions). Any bolts used shall have hardened washers
and be tensioned and secured according to applicable standards in the project.
Corrosion between carbon steel and stainless steel must be avoided using an isolation barrier.

3.12.1

BOLT HOLES

Holes for bolts attached to structural steel members shall be according to EN1090-2/ EN1993-1-1:
Bolts M14 = 1mm larger.
Bolts M16-M24 = 2mm larger
Bolts M27 = 3mm larger.

3.13

TEMPORARY SUPPORTS

The Fabrication Contractor shall design and supply all temporary supports needed for, but not
limited to the following cases:

3.13.1

INTERFACES

Temporary supports on pipes at interfaces where the ends of the pipes are insufficiently
supported.

Greater Ekofisk Area Development


Pipe support procedure

3.13.2

Rev.02:

Page :
Date :

19 of 51
23.09.2010

HYDRO TEST

On piping systems to be hydro tested where an optimised pipe and support system would be
overstressed.

3.13.3

FASTENING FOR TRANSPORT

Pipe supports for fastening during tow out/transport.

3.13.4

TAGGING

Temporary supports shall be painted according to Platform Colour Coding Schedule for the
project. "TEMPORARY SUPPORT, REMOVE BEFORE START-UP AND COMMISSIONING",
shall be hard stamped onto the support together with the support number in a rectangular white
painted area visual after erection. The numbering digits shall be minimum 12 mm high. The
instruction for removal shall also be noted on the support drawings if any. Wherever possible,
bolted connections shall be used for easy removal.

4.

PIPE SPANS

The determination of basic pipe spans, overhangs and guide spacing, for piping systems not
covered by detailed stress analysis, shall be in accordance with data in the tables and graphs in
project Pipe Support Detail Standard.
These table values must not be exceeded without approval from the Stress department. These
tables are based on straight pipe runs. If the pipe has one or more directional changes, the span
in the design must be decreased by the pipe support designer.
Piping systems covered by a detailed stress analysis shall be supported strictly in accordance
with the requirements shown on relevant stress isometric. No alteration exceeding specified
tolerances shall be made except by written approval from the stress department.
Standard pipe spans do not apply where concentrated weights such as valves or heavy fittings.
Supports shall be placed as close as possible to these loads in order to keep pipe bending
stresses within code allowable.

4.1

GUIDE SPANS

The piping system shall also be sufficiently guided. Include hold-down function if not in conflict
with the function of the pipe. Following guidelines should be followed (based on straight pipe run):

metal piping DN40 and less:


every support

metal piping DN50 DN100:


every second support

metal piping larger than DN100:


every third support

GRP piping:
according to Vendor Requirement.

Greater Ekofisk Area Development


Pipe support procedure

5.

PIPE SUPPORT LOCATIONS

5.1

PERSONNEL HAZARD

Rev.02:

Page :
Date :

20 of 51
23.09.2010

No pipe supports shall, including springs, shock absorbers etc., be placed in a location likely to be
a safety hazard to personnel e.g., tripping hazard, restricted headroom, blocking escape routes.

5.2

MAINTENANCE

Supports should wherever possible be located such that equipment and control valves etc. can be
removed for maintenance without the necessity of temporary supports for remaining piping.

5.3

EQUIPMENT REQUIREMENTS

Pipe supports shall be located dependent upon equipment requirements, e.g. removable spools
for maintenance etc., pipe size and configuration, location of heavy valves, strainers etc. and the
structure that is available to support the same.

5.4

SPRING LOCATION

The location of spring support shall ensure that load adjusters, load flanges, fixing bolts etc. are
accessible for adjustment or removal.

5.5

PIPE SUPPORTS ON EQUIPMENT

The support of piping from mechanical equipment, vessels and exchangers shall be avoided
wherever possible. When such locations have to be used, full details of clips, loads etc. shall be
advised and agreed with relevant department.

5.6

USE OF EXISTING STRUCTURE

Location of supports shall maximise the use of existing structure with additional structure
members being kept to a minimum.

5.7

PIPE SUPPORTS FROM ANOTHER PIPE

Supporting one pipe from another pipe should only be considered when all other possibilities have
been investigated and is only applicable for pipes less than DN50. On no account shall any lines
be supported from a copper-nickel or GRP pipe.

5.8

PIPE SUPPORT IN MODULE / AREA VOLUMES

Supports shall always be located within the confines of each module/area. They shall not protrude
beyond their perimeters, with the exception of pipe supports classed as hook-up.

5.9

PIPE FLANGE SUPPORTS

Flange supports should be avoided. Flange supports should only be considered if all other
possibilities have been investigated and found not sufficient. It will then be regarded as a special
pipe support. Such supports need to be approved by company for each case.

Greater Ekofisk Area Development


Pipe support procedure

6.

STRUCTURAL STEEL INTERFACE

6.1

NO-GO AREAS

Rev.02:

Page :
Date :

21 of 51
23.09.2010

Structural areas with restrictions regarding pipe support attachments, No Go Areas, must be
defined. This is being done by the structural department. Generally pipe supports welded to these
areas are not allowed. If no other solution is possible, the pipe support has to be accepted by the
structural department in each case.

6.2

BOLTED SUPPORTS ON STRUCTURAL FLANGES

Also, bolted support from structure member flange as shown in figure section 23.6 shall be
avoided as far as practically possible. Such a support configuration shall be approved by the
project structural department in each case before commencing prefabrication (to ensure
documentation of the addition of local stresses to the global stress usage of the structure
member).

6.3

HEAVY PIPE SUPPORT LOADS TO STRUCTURAL STEELWORK

The Pipe Support Group shall coordinate, report and agree pipe support design and
configurations with the Structural Department as outlined in Section 2.1.3.
Point loads above 10 KN (also collective loads from 2 or more pipes, which locally give a load
exceeding 10 KN) shall be reported to Structural Department.
On pipe supports with collective loads exceeding 35 KN, the design and calculation of the pipe
support structural frame shall be transferred to structural scope.
All pipe supports which transmit individual or collective loads above the agreed limits set by
Structural Department for the given project to a structural member or deck plate shall be closely
co-ordinated with, and approved by the Structural Department.
Generally, the following is not allowed:

7.

Un-braced cantilever supports from webs of beams or girders.

Pipe supports attached to truss diagonals should in general be avoided. In cases where
other possibilities are inconvenient, the structural department shall be informed for
eventual approval.

Pipe supports attached to horizontal bracings.

Pipe support attachments that will cause torsion in structural members.

Pipe supports attached to structures subjected to fatigue, e.g. crane pedestal and support
structures, flare stack structures.

Pipe supports attached to deck plate which has insufficient capacity, stiffness or weld to
transfer the reaction loads into supporting structural steel.

MATERIAL SPECIFICATION

All materials shall be according to this procedure, the pipe support detail standard, the pipe
support detail drawing and referenced standards.

7.1

FABRICATION

Fabrication of pipe supports shall comply with project specification for structural steel fabrication.

Greater Ekofisk Area Development


Pipe support procedure

7.2

WELDING

7.2.1

GENERAL

Rev.02:

Page :
Date :

22 of 51
23.09.2010

All welding shall be performed in accordance with company approved welding procedures.

7.2.2

FABRICATION WELDING

Fabrication welding of the pipe supports shall be performed in accordance with specification:
NORSOK M-101 Structural Steel Fabrication.

7.2.3

WELDED ATTACHMENT TO PIPING

All welding of "Welded Attachments" onto piping shall be in accordance with specification:
NORSOK M-601 Welding and Inspection of Piping System.

7.3

PAINTING

Structural steel parts shall be painted after fabrication according to the projects surface
protection specification and platform colour coding schedule.

7.4

INSPECTION AND NON DESTRUCTIVE EXAMINATION (NDE)

7.4.1

INSPECTION / NDE OF PIPE SUPPORT STRUCTURE

Welds within the pipe support shall be subject to NDE in accordance with NORSOK M-101/N-004
and applicable structural documents, specifying design classes and inspection categories for
structural steel.

7.4.2

INSPECTION / NDE OF WELDED ATTACHMENT TO PIPING

NDE of welded attachments onto the pipe shall be in accordance with specification
NORSOK M-601: Welding and Inspection of Piping System.

7.4.3

INSPECTION / NDE OF WELDED ATTACHMENT TO STRUCTURE

NDE of welded attachments onto structural steel shall be in accordance with NORSOK M-101/N004 and applicable structural documents, specifying design classes and inspection categories for
structural steel. Inspection category for the weld between the pipe support and the structural steel
shall be set according to the design class for the structural steel.

7.5

SELECTION OF MATERIALS

Pipe supports materials shall be according to Corporate Requirements; Use of materials in pipe
support structures and material types and temperature limitations for pipe support details.
First choice material for pipe support structural sections is lean duplex stainless steel (LDSS).
First choice material for pipe support standard details is stainless steel (316L).

Greater Ekofisk Area Development


Pipe support procedure

Rev.02:

Page :
Date :

23 of 51
23.09.2010

PRODUCT FORM

MATERIAL

GRADE

MDS (Norsok std)

Plates:

LDSS

ASTM A 240 UNS S32304 (With PRE>28)

HOLD

ASTM A 240 UNS S32003

HOLD

SS 316L

ASTM A 240 grade 316L

S01 (M-630)

CS

EN 10025 S355J2 / S355K2

Y05 (M-120)

Aluminium

5083-H2

M01 (M-121)

Titanium

ASTM B 265 gr. 2

T01 (M-630)

SDSS (25Cr)

ASTM A 240 UNS S32750

D55 (M-630)

ASTM A 240 UNS S32760


ASTM A 240 UNS S32550
Profiles:

LDSS

Hanger Rods:
Forgings:

7.5.1

ASTM A 240 UNS S32304 (With PRE>28)

HOLD

ASTM A 240 UNS S32003

HOLD

SS 316L

ASTM A 240 grade 316L

S01 (M-630)

CS

EN 10025 S355J2 / S355K2

Y05 (M-120)

CS

EN 10210 S355J2H

Y04 (M-120)

Aluminium

6082-T6

M01/M02/M03/M04/M05
(M-121)

SS 316L

ASTM A 276 grade 316L

S01 (M-630)

CS

EN 10025 S355J2 / S355K2

Y05 (M-120)

SS 316L

ASTM A 182 grade F 316

S01 (M-630)

LTCS

ASTM A 350 grade LF2

C11 (M-630)

TEMPERATURE LIMITATIONS

Special consideration shall be taken for pipes with design temperature below 46 C. A barrier
(cold trap) might be required between pipe support and steelwork to avoid cold transportation in to
the main steel through the support.
Special consideration shall also be taken for lines with high design temperature (i.e. exhaust
pipes). High temp barrier may be required in order to avoid high temperature being transferred
into pipe support structural framework.

7.6

BOLTS AND NUTS (U-BOLTS AND U-STRAPS INCLUSIVE)

U-Bolts and U-straps

316L

Alloy steel bolts


Semi-finished heavy hex. nuts

DIN 933 GRADE 8.8 (full threaded)


DIN 934 GRADE 8

Bolts and Nuts to be Hot Dip Galvanised to

ASTM A153 or ISO 1461

Bolts with a diameter 10 mm shall be stainless steel Type 316 for metal temperature below 60
C based upon maximum operating temperature.
All threads for bolts, rods, nuts etc. shall be metric. The threads shall be according to NS 1871
and ISO 262.

Greater Ekofisk Area Development


Pipe support procedure

7.7

Page :
Date :

Rev.02:

24 of 51
23.09.2010

MATERIAL FOR ATTACHMENTS CLAMPED OR WELDED TO THE PIPE

The material for attachments to pipes shall be selected to suit the mechanical and chemical
properties and design temperature of parent pipe. The material shall be selected from guidelines
below.
The rule for selection of material in reinforcement plates and shoes/brackets are as follow:

Reinforcement plates and brackets welded directly to pipe: As pipe class material,
alternatively materials compatible with the pipe material (i.e. mechanical properties,
chemical composition and design temperature of the pipe material)

Pipe support welded to reinforcement plates: Stainless steel type 316L is acceptable, also
for temperatures above 60C.

Clamped shoes: Stainless steel type 316L is acceptable, also for temperatures above
60C.

Guidelines for Selection of Materials for Brackets, Reinforcing Plates and Shoes.
PIPE
MATERIAL

REINF.
PLATES
Welded
to pipe

BRACKETS
Welded to
Welded to
pipe
Reinf. plt.

WELDED SHOES
Welded to Welded to
pipe
Reinf. plt.

Carbon
Steel

As pipe
class
material
As pipe
class
material
As pipe
class
material
As pipe
class
material

As pipe
class
material
As pipe
class
material
As pipe
class
material
As pipe
class
material

LDSS/316L

NA

316L

316L

LDSS/316L

NA

316L

316L

LDSS/316L

NA

316L

316L

LDSS/316L

NA

316L
(Note 1)

316L

Austenitic
Stainless (AISI
316)
Super Austenitic
Stainless
Duplex

Titanium
6Mo Stainless
Steel
GRP (ISO 14692)

Titanium B265 Gr. 2


As pipe
class
material

As pipe
class
material

LDSS/316L

NA

As pipe class material

CLAMPED
SHOES

316L
316L

316L

316L

1. When pipe support is subject to seawater (submerged or in spray zone) 25 Cr Duplex


shall be used.

Greater Ekofisk Area Development


Pipe support procedure

7.8

Rev.02:

Page :
Date :

25 of 51
23.09.2010

WELDING BETWEEN STAINLESS/ALLOY STEEL AND CARBON STEEL

Welding between stainless steel and carbon steel is acceptable when the distance between
carbon steel attachment and pipe, is at least 50 mm. A stainless filler material shall be used for
welded connections between stainless steel and carbon steel. The weld and the attachment shall
be painted.

7.9

PREFERRED ROLLED SECTIONS

Material for pipe support steel profiles and plates shall be lean duplex stainless steel (UNS
S32304). The exceptions are where SHS larger than SHS150 is needed, and where pipe support
frames are submerged in seawater or subject to frequent splash/run-up/sea spray. In these cases,
carbon steel frame with suitable flatbar on top shall be used.
The selection of steel sections and qualities should be done as early as possible, in order to
simplify design and keep the stock as small as possible. The following sections may be used as
guidance:

Profile type
Angle

Material: LDSS

Material: Al

L50 x 50 x 5 (Smallbore)
L60 x 60 x 6
L80 x 80 x 8
L100 x 100x 10

(L50 x 50 x 5)
(L75 x 75 x 9)
(L100 x 100 x 10)

Square:
SHS50x50x5 (Smallbore)
SHS 60 x 60 x 5
SHS 80 x 80 x 6
SHS 100 x 100 x 6
SHS 120 x 120 x 6
SHS 150 x 150 x 6
Rectangular:
(RHS 150 x 100 x 6)
Plates:
6 THK
10 THK
15THK

(SHS 80 x 80 x 5)
(SHS 100 x 100 x 5)
(SHS 120 x 120 x 9)

Greater Ekofisk Area Development


Pipe support procedure

Rev.02:

Page :
Date :

26 of 51
23.09.2010

20 THK
Flat bars:
FB 80 x 20
FB 100 x 20
FB 150 x 20
FB 175 x 20
FB 200 x 20
FB 250 x 20 * (See Note)
FB 300 x 20 * (See Note)
FB 400 x 20 * (See Note)
FB 500 x 20 * (See Note)

Note:

(FB 75 x 10)
(FB 100 x 10)
(FB 150 x 10)
(FB 150 x 15)

Profiles enclosed in parentheses shall be second choice. Flat bars marked with * to be cut
from plate by Fabricator.

8.

PIPE SUPPORT IDENTIFICATION AND DOCUMENTATION

8.1

OUTLINE DESCRIPTION OF PIPE SUPPORT SYSTEM

8.1.1

DOCUMENTS FOR IDENTIFICATION AND DOCUMENTATION OF PIPE SUPPORTS

The following documents and drawings are used to locate, identify, list or detail all pipe supports:

Structural steel drawings

Engineering Isometrics

Stress Isometrics

Pipe Support Index

Vessel Clip Data Sheet

Pipe Support Standard Details

Spring index

8.1.2

ENGINEERING ISOMETRICS

Pipe support location and number shall be shown on the Engineering Isometric by using a symbol
and dimensions to nearest reference point. Standard welded attachment on pipe details and
materials shall be included on the Engineering Isometric.

8.1.3

PIPE SUPPORT INDEX

All Pipe Supports shall be listed by unique number in sequential order on an appropriate
index.

The index shall contain pipe support number, line number, line size, stress isometric
number, support functions, welded attachments, support status and welded attachments
Y/N.

8.2

PIPE SUPPORT NUMBERING

8.2.1

PIPE SUPPORT NUMBERING

Each support shall be identified by a unique sequential number within each area.
Pipe support area code should be the same as the area code for the supported pipe.

Greater Ekofisk Area Development


Pipe support procedure

Rev.02:

Page :
Date :

27 of 51
23.09.2010

PS-P543-0101
Where: PS

is Pipe Support.

P543

is Area.

0101

is Sequence number.

The following numbering system shall be used:


0001-2999 shall be for general pipe supports.
3000-3499 shall be for spring supports.
3500-3999 shall be for hook-up.
4000-4999 shall be for small bore pipe supports.
5000-5999 shall be used for Pipe rack / Bridge supports.
6000-6999 shall be for Vendor Package Pipe Supports.
7000-7499 shall be used for Pipe bracings
8000-8999 shall be used for site, yard use only.
9000-9499 welded Penetration.
9500-9999 shall be used for training purposes.
All supports shall be identified in this manner.

8.2.2

PIPE SUPPORT NUMBERING IN AREA BORDERS

A pipe support located on the north and east match line of an area shall be numbered in the
adjacent areas.

8.3

DOCUMENT NUMBERING SYSTEM

Document numbers for pipe support detail drawings and index, will be specified in the
specification project Engineering Numbering System.

9.

PIPE SUPPORT DETAIL DRAWING

The pipe support detail drawing shall contain all the necessary information for the construction
and installation of the pipe support.

9.1

DRAWING LAYOUT

Generally, the detail drawings shall be drawn in scale. The standard drawing size is A3.
The support should normally be drawn using 2 elevation views and supplemented with an iso
view. If necessary, additional supplementary views and details shall be drawn.

9.2

POSITIONING INFORMATION ON PIPE SUPPORT DRAWING

All necessary positional information i.e. co-ordinates and angles shall be shown. Top of steel
(TOS) or bottom of steel (BOS) as well as centre line elevations (CL EL) for the support point shall
be given on the drawing.

Greater Ekofisk Area Development


Pipe support procedure

9.3

Rev.02:

Page :
Date :

28 of 51
23.09.2010

MATERIAL LIST

The material list shall give a detailed description of all erection items, sufficient for purchasing and
fabrication of the pipe supports. Welded attachments will appear on the piping iso.

9.4

ISO/STRESS ISO NUMBERS ON PIPE SUPPORT DRAWING

All line numbers and stress iso numbers shall be shown on the pipe support drawing.

9.5

LOCATION REFERENCES

A location reference (Datum Point) shall be located on the drawing. The support shall also have
reference to existing steel structure that the pipe support is connected to.

10.

DETAIL DESIGN

10.1

GENERAL

For all supports within Engineering Contractor scope of work, the main structural elements will be
designed and placed in the 3D model as a basis for further detailing, clash check etc. All detail
design such as gussets, stiffeners, clamps, shoes, and other necessary information to construct
the support is requested on the pipe support detail drawing and piping isometric.
Pipe support design should be optimised to ensure sufficient stiffness to resist all currently acting
loads, without impairing efficiency. However, weight must be held to a minimum

10.2

STANDARD PIPE SUPPORT COMPONENTS / FRAMING

Wherever possible, the maximum use of standard pipe support components, commercially
available (clamps, beam attachments etc.), shall be used. Special components shall not be
utilised unless absolutely essential to the support design integrity.

10.3

SPECIAL SUPPORTS

A special support shall be designed at any location where requirements fall outside the standard,
whether in type, size, temperature or load.

10.4

SURFACE OF CONTACT BETWEEN PIPE/PS DETAIL AND PS STRUCTURE

Non-insulated piping DN50-DN250 shall rest directly on isolating pad on top of the support
member, except in the following circumstances:

Wear plates shall be introduced at support points subject to repeated line movement.

Where required to limit local pipe wall stresses, a reinforcing pad shall be welded to the
pipe wall.

For large bore piping (DN300 ) or where a reinforcing pad is inadequate to reduce local
stresses sufficiently, saddles/shoes shall be provided.

GRP lines.

Carbon steel piping

Greater Ekofisk Area Development


Pipe support procedure

10.5

SUPPORTING OF CARBON STEEL PIPES

10.5.1

NON INSULATED CARBON STEEL PIPES

Rev.02:

Page :
Date :

29 of 51
23.09.2010

All non-insulated carbon steel pipes shall generally be supported on clamped shoes with isolating
material between the clamps and the pipe. The design temperature for the isolation material shall
cover the design temperatures for the piping system.

10.5.2

INSULATED CARBON STEEL PIPES

DN50 and above.


Insulated Carbon steel lines shall generally be supported on clamped shoes with isolating material
between the shoe and the pipe.
Carbon steel lines with personnel-protection shall have the insulation cut away locally and be
supported as non-insulated pipe.
Special consideration shall be taken for lines with design temperature below -46C. A barrier (cold
trap) might be required between pipe support and steelwork to avoid cold transportation in to the
main steel through the support

10.6

SUPPORTING OF STAINLESS AND ALLOY STEEL PIPES

10.6.1

NON INSULATED STAINLESS AND ALLOY STEEL PIPES

DN50 DN250 shall rest on an isolation pad, providing that both indentation checks and load
bearing capacities of the insulating pad are sufficient. The design temperature for the isolation
material shall cover the design temperatures for the piping system.
DN300 and above shall generally be supported on clamped shoes with isolating material between
the clamps and the pipe. The design temperature for the isolation material shall cover the design
temperatures for the piping system.

10.6.2

INSULATED STAINLESS AND ALLOY STEEL PIPES

DN50 and above.


Insulated Stainless and Alloy steel lines shall rest on clamped shoes. However lines with
personnel-protection shall have the insulation cut away locally and be supported as non-insulated
pipe.
Special consideration shall be taken for lines with design temperature below -46C. A barrier (cold
trap) might be required between pipe and pipe support to avoid cold transportation in to the main
steel through the support

10.7

SUPPORTING OF GRE/GRP PIPES

Supporting of glass fibre reinforced epoxy / plastic piping should be performed according to
Company standard and vendor requirements.
For GRP systems generally ancillary items such as valves, flanges, expansion joints and the like
must be independently supported.
GRP-lines shall be guided according to vendor requirements to avoid the pipe "snaking", but
always taking into account special considerations where the pipe changes direction, connects to
equipment-nozzles, valves etc.
For suitable pipe support items, see Pipe Support Detail Standard.

Greater Ekofisk Area Development


Pipe support procedure

10.7.1

Rev.02:

Page :
Date :

30 of 51
23.09.2010

NON INSULATED AND INSULATED GRE/GRP PIPES

Insulated and non-insulated GRP-lines shall be supported on clamped shoes with a rubber-clip
strip between the clamps and the pipe to avoid damage on the pipe wall.
In vertical pipe runs U-Strap can be used as a guide.

11.

STANDARD PIPE SUPPORT DETAILS

11.1

SHOES

Shoe heights shall generally be according to the table in 11.12 of this procedure.

11.1.1

WELDED SHOES AND TRUNNIONS

Welded shoes and trunnion shall be used for all lines above DN600. For smaller line sizes welded
shoes shall only be used for line stops, anchors and guides with lateral forces. Where welded
attachments are required on titanium pipes, only trunnions shall be used as WA.
If shoes are required on bridges or in flarestacks, welded shoes/trunnions shall be used

11.1.2

CLAMPED SHOES

Company has experienced that clamped shoes has become loose. This standard type must be
used with care, since there is limited friction capacity between the shoe clamp and the pipe.
Clamped shoes shall not be used on bridges, in expansion loops, flare towers or other locations
where the pipe can be exposed to big linear movement. If shoes are required in these areas,
welded shoes/trunnions shall be used.
Clamped shoes shall not be used on:

Lines that experiences slug-loads i.e.:


o

Production flow lines.

Production and test lines from manifolds to the separators.

Lines from sub sea installations.

Lines that experiences excessive pipe movements and high rate of deflection changes.

Lines with large vibrations i.e. lines close to large rotating or reciprocating
equipment/machines. At least, the three first pipe supports from inlet/outlet shall be of
welded type.

Clamped shoes can be used for insulated lines up to and including DN600, and for all noninsulated horizontal lines from DN300 up to and including DN600. For non-insulated vertical lines
between DN300 and DN600, U-strap can be used as guide.

11.2

WEAR PLATES

Wear plates shall be used in cases where reinforcement of the pipe wall is required. For example:

Supports subject to repeated line movements.

Where required to limit local pipe wall stresses especially on thin walled pipe.

Greater Ekofisk Area Development


Pipe support procedure

11.3

Rev.02:

Page :
Date :

31 of 51
23.09.2010

U-BOLTS

U-Bolts may be used to hold the pipe in position, either as guide or hold-down support. For pipe
sizes DN50-DN200. U-Strap is preferred to U-Bolt, use U-Bolt when space is limited.

11.4

U-STRAPS

U-straps may be used as guides for horizontal and vertical lines and 3-way restraint for light duty
purposes. Use lined u-straps for all pipe classes. Size range DN50-DN600.

11.5

NON METALLIC PADS

Pads are used for purposes as:

Erosion (wear).

Galvanic insulation.

Low friction.

Acoustic insulation.

Cold transport trap.

Make up unforeseen differences in elevations on installed supports.

11.6

SLIDING SUPPORTS

Sliding supports for lines subjected to excessive movement, thermal or otherwise, shall be of a
size to cater for the maximum movement in either direction. These supports or attachments shall
be positioned centrally over the supporting member during erection.

11.7

LOW FRICTION SUPPORTS

Pipe supports requiring a low coefficient of friction shall have a slide unit installed between the
surfaces of the support and pipe saddle/attachment. The units shall be commercially available
components. Any bonding of low friction material to steel backing plates shall be by vendor.

11.8

SPRING SUPPORTS

Springs shall only be used when there is no other method of satisfactorily supporting the line.
These locations will be defined by the pipe stress department on the stress sketches. Spring
design criteria will be listed on the stress isometrics.
Variable springs shall be selected where movements are not excessive and where load variation
is below 20%. Spring units will be of the present type.
Constant springs shall be selected where large movements occur or where heavy loads will give
prohibitive out of loads if variable springs were used. Constant springs shall only be used where
stated on the stress isometric.
Springs shall be supplied suitably protected against a saline environment e.g. Plastic coated or
SS 316L springs. Spring support housing shall be SS 316L. Welding to spring housing is not
allowed. Base flanges shall be bolted to the structure. The spring load scale and springinformation sign shall be in SS (Permanent marking).
Spring information shall be listed in the project spring Index / pipe support index.

Greater Ekofisk Area Development


Pipe support procedure

Page :
Date :

Rev.02:

11.9

ATTACHMENTS TO PIPING

11.9.1

MATERIAL

32 of 51
23.09.2010

The materials for all attachment to piping shall be selected according to material specification and
chart in section 7.7., or according to piping material specification.
Wear- / doubler plates on elbows are not allowed.

11.9.2

CLAMPED ATTACHMENT

Where possible, attachments to piping shall be clamped.

11.9.3

WELDED ATTACHMENT

Supports requiring a welded attachment shall be marked on the piping isometrics with a note
"WELDED ATTACHMENT".

11.9.4

ATTACHMENTS TO PIPE WITH INSIDE LINING

Lined Pipe - Welding of supports can be performed in the fabrication shop and only prior to lining
of pipe. No site welding allowed

11.10

HANGER RODS

Use of hanger rods shall be kept to a minimum. When no other alternative is left hanger rods can
be used for supports required to carry vertical loads only.

11.11

REMOVABLE SUPPORTS

Bolted connections shall only be provided as an integral part of the design for supports that will
need to be removed for maintenance purposes, or part of load out/transport.

11.12

BOP ELEVATIONS ABOVE PIPE SUPPORT STRUCTURE.


Pipe Material

Nominal
Diameter
DN 15

Pipe Size

Insulation

Carbon steel

Stainless st.

Duplex

Titan

6Mo

GRP

DN 20

DN 25

DN 32

DN 40

DN 50

DN 80

DN 100

DN 125

DN 150

DN 200

DN 250

10

No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No

+6
+150
+6
+150
+6
+150
+6
+150
+6
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150

+6
+150
+6
+150
+6
+150
+6
+150
+6
+150
+6
+150
+6
+150
+6
+150
+6
+150
+6
+150
+6
+150
+6

+6
+150
+6
+150
+6
+150
+6
+150
+6
+150
+6
+150
+6
+150
+6
+150
+6
+150
+6
+150
+6
+150
+6

+6
+150
+6
+150
+6
+150
+6
+150
+6
+150
+6
+150
+6
+150
+6
+150
+6
+150
+6
+150
+6
+150
+6

+6
+150
+6
+150
+6
+150
+6
+150
+6
+150
+6
+150
+6
+150
+6
+150
+6
+150
+6
+150
+6
+150
+6

+6
+150
+6
+150
+6
+150
+6
+150
+6
+150
+6
+150
+6
+150
+6
+150
+6
+150
+6
+150
+6
+150
+6

Greater Ekofisk Area Development


Pipe support procedure

DN 300

12

DN 350

14

DN 400

16

DN 450

18

DN 500

20

DN 550

22

DN 600

24

DN 650

26

DN 700

28

DN 750

30

DN 800

32

DN 850

34

DN 900

36

DN 950

38

DN 1000

40

Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes

Page :
Date :

Rev.02:

+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150

+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150

Note: On M&M projects 100mm high shoes can be used.

+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150

+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150

+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150

33 of 51
23.09.2010

+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150
+150

Greater Ekofisk Area Development


Pipe support procedure

Page :
Date :

Rev.02:

34 of 51
23.09.2010

Notes:
1. All lines with insulation shall be elevated according to this table.
2. Hydraulic lines, high-pressure supply and return lines including DN50 and above shall be
supported as normal lines.
Hydraulic tubing up to and including 38 mm or pipes smaller than DN 50 shall be
supported by special Hydraulic Clamps according to the following BOP table:
Pipe size
Tubing size
BOP el.
BOP el.

No insulation.
Insulation

DN15
16 mm
+21
+121

DN20
20 mm
+19
+119

DN25
25 mm
+21
+121

DN40
38 mm
+31
+131

3. Lines, which require acoustic damping on pipe support needs a minimum BOP elevation
of 188 mm.
4. Lines with personnel protection insulation shall be supported like non-insulated lines and
have the insulation cut away locally

12.

SPECIAL CONSIDERATIONS

12.1

ADJUSTABLE SUPPORTS

Supports for pipes at strain sensitive equipment shall be designed to allow for adjustment during
the life of the plant. Adjustable supports shall be located adjacent to equipment nozzles unless
otherwise specified by stress section.

12.2

SUPPORTING OF PRESSURE RELIEF VALVES (PSV)

Special consideration shall be made to supporting of piping around PSVs. It must be supported in
such a way that PSV removal is possible without temporary supports. Inlet and outlet piping shall
stay in position while the PSV is dismantled for maintenance.

12.3

SUPPORTING OF SMALL BORE BRANCHES - VENT & DRAIN


CONNECTIONS

All small bore branch connections, both critical and non critical, shall be checked for flexibility prior
to the IDC Phase of the project. Branch connections at high bending stress locations are included
in the stress analysis model of the main pipe. In fatigue exposed areas of piping systems, all small
bore branch outlets shall be added into the Stress calculation model. Where applicable, branch
connections shall be braced from the main pipe in accordance project approved Piping Detail
Standard.
Welded bracing is the preferred option, and where practical all bracing supports are to be installed
in prefabrication.
Where unsupported branch outlets occur with concentrated loads such as vent/drain valves, the
branch shall be braced against the parent pipe. Reference should be made to project approved
Piping Detail Standard.

Greater Ekofisk Area Development


Pipe support procedure

12.4

Rev.02:

Page :
Date :

35 of 51
23.09.2010

HOLD-DOWN SUPPORTS

Hold down supports is normally used in combination with guides on non-critical lines. Be aware of
design criteria in sect. 3. Hold down supports shall only be used on critical lines when specified on
stress isometric.

12.5

SHOCK ABSORBERS (MECHANICAL SNUBBERS)

Shock absorbers, struts etc. shall be used only when specified on stress isometric.

12.6

SUPPORTING FROM MECHANICAL EQUIPMENT

Supporting of piping from mechanical equipment or vessels can be done if all other possibilities
investigated are impractical.
In such cases all necessary documentation including a pipe support detail drawing must be
transmitted to the Mechanical or Vessel section for approval by the Vendor and the Company if
required. These supports must be designed as early as possible to be included on the vendors
fabrication drawing.

12.7

CONTROL VALVE SET

Unless dictated otherwise by the stress isometric, all control valve sets shall be anchored up
stream and guided down stream.

12.8

UTILITY STATIONS

The free pipe ends shall be securely fixed, supported by U-clamps either as guides or anchors.

12.9

TUNDISHES

Generally tundishes are located in floor level and welded to the floor plate, but if not e.g. located in
grating, the tundishes may be guides or anchored to keep them in position.

12.10

RODDING OUT POINTS

The rodding out points in the drain system shall normally be anchored to withstand the rodding
forces.

12.11

MANIFOLDS

Manifolds may have an anchor in the middle and guides at both ends to allow free expansion in
both directions. The friction forces must be considered.

12.12

MUDBULK-SOLID

Each pipe spool to be separately supported for easy dismantle and removal.

12.13

HEAVY SUPPORT LOADS

See section 2.1.3

12.14

PIPING SUBMERGED IN SEAWATER

When supporting pipes submerged in seawater, special material selection suitable for seawater
service must be provided.

Greater Ekofisk Area Development


Pipe support procedure

13.

Rev.02:

Page :
Date :

36 of 51
23.09.2010

PIPE PENETRATIONS

Pipes penetrating beams and decks may be supported at or close to penetration sleeve unless it
will interfere with sealing or fireproofing.
In welded (water tight) pipe penetrations, a pipe support point shall be provided. Pipe support
point shall have sequence number from the 9000-9500 series. No 2D-drawings shall be issued for
this series.

14.

INSULATED PIPES

All insulated pipes including DN50 and above shall be supported on shoes except for lines with
Personal Protection Insulation. Class 3.

14.1

HEAT CONSERVATION CLASS 1

Lines with Hot Service Insulation shall be supported on shoes.

14.2

COLD CONSERVATION CLASS 2

Lines with cold conservation insulation shall generally be supported on normal shoes, but lines
which may cool the supporting steel below design temperature -46C might be installed with
insulating barrier (cold trap).

14.3

PERSONNEL PROTECTION CLASS 3

Lines with Personnel Protection Insulation shall be supported like non-insulated lines and have
the insulation cut away locally.

14.4

FROST PROTECTION CLASS 4

Lines with Frost Proofing and electrically traced lines shall rest on shoes.

14.5

FIRE PROTECTION CLASS 5

Lines with Fire Proofing Insulation shall rest on shoes.

14.6

ACOUSTIC INSULATION CLASS 6, 7 & 8

Lines with potential need for Acoustic Insulation shall be supported on a sound-absorbing
arrangement if required by the mechanical department. Shoes may be used in combination with a
sound-absorbing material.

14.7

EXTERNAL CONDENSATION AND ICING PROTECTION CLASS 9

Lines with External Condensation and Icing Protection Insulation shall generally be supported on
normal shoes, but lines which may cool the supporting steel below design temperature -46C
might be installed with insulating barrier (cold trap).

14.8

FIRE PROTECTION ON FLANGES

Supporting of flanges shall under no circumstances be allowed for Lines with Fire protection on
Flanges.

Greater Ekofisk Area Development


Pipe support procedure

14.9

Rev.02:

Page :
Date :

37 of 51
23.09.2010

FUTURE INSULATION

Lines with Future Insulation shall rest on shoes.

15.

GENERAL SUPPORTING OF SMALL BORE PIPES

All non-insulated small bore piping shall be supported with U-bolt, grip type. The exceptions are:

Critical lines were other function is defined, e.g. non-grip clamp or rest only.

Hydraulic lines less than DN50, where hydraulic clamps shall be utilised.

Lines with high temperatures and long straight runs, use of non-grip clamps shall be used
on part of the line.

All insulated small bore piping shall be supported with 100 mm high weld bracket, grip type, which
shall be welded to support structure. The exceptions are:

Critical lines where other function is defined, e.g. non-grip clamp or rest only.

Hydraulic lines less than DN50, where hydraulic clamps shall be utilised.

Lines with high temperatures and long straight runs, use of non-grip clamps shall be used
on part of the line.

On utility stations, use U-bolt instead of weld bracket and cut the insulation locally.

15.1

SPECIAL CONSIDERATIONS FOR SUPPORTING OF SMALL BORE PIPING

a)
For supporting of firewater lines, the length between the end of the sprinkler and the last pipe
support shall not be more than 600 mm for DN25 and DN40 pipe. In cases where this is not
sufficient to avoid vibration at deluge releases the distance shall be reduced.
b)
When positioning the first support on lines away from equipment or branches from larger bore
pipe, allowance should be made for sufficient flexibility in the pipe. It is important to make sure the
small bore pipe routing near connections to equipment/large bore pipe is in such a way that griptype pipe support can be used without introducing stress problems to the connection. This means
that the pipe designer may need to apply several elevation and/or directional changes of the small
bore pipe to get enough flexibility before the first small bore pipe support (See fig. next page for
an illustrated example).

Greater Ekofisk Area Development


Pipe support procedure

Rev.02:

Page :
Date :

38 of 51
23.09.2010

c)
Use of double U-bolt/brackets shall always be provided on all free-end pipe supports and both
side of a valve shall be provided with a pipe support (See fig.).

d)
When supporting lines with design temperature above 150C, pipe clamps for high temperature
service shall be utilised.
e)
Pipe support drawings shall always be issued for critical small bore lines. If nothing else is agreed,
pipe support drawings shall be issued for non-critical small bore piping defined in piping scope.
f)
Critical small-bore pipe support drawings shall be checked as all other pipe support drawings. Non
critical small-bore pipe support drawings only require self check by the pipe support designer and
disc. approval before issue.
g)
Human activity (handling of valves, step etc.) shall be taken in consideration when designing small
bore pipe supports.

16.

HOOK-UP SUPPORTS

Hook-Up lines are lines to be erected during the hook-up phase. These are lines between areas
or modules, or for connecting late installed equipment.
Hook-up Supports are supports for these types of lines or supports that for some legitimate
reason has to be installed in the Hook-Up phase.
The detail drawing shall have HOOK-UP SUPPORT highlighted in a rectangular frame at the top.

17.

STARTER BARS

In areas where the structures will have sprayed on fireproofing it may be necessary to install
starter bars for later installation of supports. Starter bars must not protrude below main girders or
outside modules to interfere with transportation.
The fabricator, who is requesting for starter bars on a structure within another fabricator scope,
shall document it on a structural drawing for the area with necessary references to pipe supports,
and the information issued to the respective module fabricator.

Greater Ekofisk Area Development


Pipe support procedure

Rev.02:

18.

SURFACE PREPARATION AND PROTECTION

18.1

COLOUR / COATING

Page :
Date :

39 of 51
23.09.2010

Stainless or Alloy Steel materials shall in general not be painted.


All carbon steel pipe support structures and details shall be surface protected according to
Surface protection specification for the project.
Colours shall be according to the colour scheme for the project.

18.2

FIREPROOFING

All requirements/criteria regarding fireproofing of pipes will be specified by the safety department
(Which piping systems, sizes or pipes that need fireproofed pipe supports). Safety will also specify
requirements for protection of critical inline equipment or valves (i.e. EVs). Pipe support
department will then decide which pipe supports to be fireproofed to meet the criteria for the pipe
stated by safety. Usually every second pipe support needs fireproofing but this needs to be
verified for each case. Special attention should be made to deflection effects stated in 18.2.3.

18.2.1

FULL FIRE PROTECTION

A fully fireproofed pipe support shall be modelled as NORMAL/FP or BLAST/FP in applicable 3D


modelling tool (i.e. PDMS), and marked with a note on the 2D pipe support drawing.

18.2.2

INTEGRITY PROTECTION

Integrity fire-protection of deck etc. by partly fireproofing the pipe support connected to the
structure will be the Fabricators scope.

18.2.3

DECK / BEAM DEFLECTION EFFECTS DUE TO FIRE

When deciding which pipe supports to be fireproofed, special attention should be made to deck
deflections due to fire.
Because a structural deck/beam is not fireproofed on top, a major deflection upwards may occur
in the middle of the deck/beam-span. Fireproofed pipe supports shall not be placed in the middle
of a deck/beam-span. These pipe supports shall be placed near bulkheads, walls etc. to avoid
large upward movement that could cause damage to the pipe that needs to be intact in the initial
stage of a fire.
The pipe support dept., along with the safety- and layout dept., are all responsible for making a
piping/pipe support-design that meet the above mentioned requirement.

19.

TAGGING OF PIPE SUPPORTS

Every pipe support shall be tagged with its unique Pipe Support Tag Number hard stamped onto
the support in a rectangular white painted area visual after erection. The numbering digits shall be
minimum 12 mm high.
Parts of a future support assembly may be strapped together and be given a common Tag
Number.
Special notes shall be stamped onto the support together with Pipe Support Tag Number e.g.
HOOK-UP SUPPORT and TEMPORARY SUPPORT.

Greater Ekofisk Area Development


Pipe support procedure

20.

Rev.02:

Page :
Date :

40 of 51
23.09.2010

FILING SYSTEM

The Piping Layout Group shall keep a well documented and up to date filing system showing all
correspondence in and out of the group and ensure that only the latest issue of any drawing is
being worked on.

20.1

DOCUMENTS TO BE FILED INTERNALLY

Pipe Support Detail Standard and Procedure.

Piping Detail Standard.

Structural Drawings.

Plot Plans.

Stress Isometrics.

Line List.

Piping and Valve Material Specification.

Insulation Specification.

Pipe Support Index.

All correspondence and documents produced within the section.

Engineering Isometrics.

Trunnion calculations.

Structural pipe support calculations.

21.

MAINTENANCE & MODIFICATION PROJECTS. (V&M).

21.1

PIPE SUPPORT DESIGN PRACTICE.

Generally, pipe support design principles are the same for both Maintenance & Modification and
for New-Build projects. Pipe supports shall be designed for economy and fitness for purpose and
the use of welded connections to existing structure. However, if hot work is not possible, bolted
connections shall be designed according to typical examples shown in section 23.2. These
examples also apply to welded connections taking due consideration of including backing plates in
transitions/corners of members (to ensure proper transfer of bending moments). Where practical,
pipe support design shall incorporate the use of stainless steel to minimise the need for costly
offshore painting. However, due regard should be paid to the isolation of any dissimilar metals.
During installation, any bolted connections shall be sealed by an insulation barrier approved by
Company.
The typical frames and details in Section 23.2 are shown for the purpose of standardisation and
shall be used to the extent possible. The design of these typical frames shall be documented by
calculations confirming that the stresses in joints/flanges are acceptable for the worst load
conditions and combinations, both for bolted and welded connections. This also applies to any
other "off the shelf" design solutions. The details shown in Section 23.6 shall only be used as a
"last resort" and shall be approved and documented by the project structural department before
commencement of prefabrication.

21.2

USE OF ADHESIVE FOR PIPE SUPPORTS.

The use and type of Adhesive to secure Pipe Support Frames shall be kept to a minimum and is
subject to Client Approval. Adhesive connections shall only be used where welding is not allowed

Greater Ekofisk Area Development


Pipe support procedure

Rev.02:

Page :
Date :

41 of 51
23.09.2010

or impractical such as some In-deck tanks. Adhesive connections shall not be used where large
moments are lightly to occur about the connection.
The Type of adhesive used should have full Vendor documentation governing it use and strength
limitations. Surface preparation and Full HMS and Instructions for use should be supplied
Offshore before commencement of Installation of any Pipe Supports using adhesive

21.3

TAPPED AND SCREWED BOLTED CONNECTIONS

Tapped and Screwed Bolted Connections shall be kept to a minimum and only used where
welding or normal bolted connections are not allowed. All Tapped connections shall use a suitable
thread lock compound such as Loctite or similar Project approved

21.4

PLANNING / WORKING METHODS / LIAISON WITH OTHER DISCIPLINES

Plans, procedures and communication will vary between each M&M contract and sometimes even
between each project (AFE) and/or work order (PM02). It will also depend on time schedules and
the criticality of the lines to be supported. Prioritized action plans should be agreed upon at the
earliest opportunity and coordinated/followed-up continuously throughout execution (engineering,
prefabrication and installation) of the project/work order. The Pipe support designer shall locate
and design the pipe supports with assistance from the piping layout engineer and the piping stress
engineer. Information to assist design can come from existing drawings and or measurements
from offshore surveys. In cases where loads are above 10kN; either from one support or
compounded from several pipe supports acting together, or where torsion loads are unavoidably
transferred through to the existing steel structure from the pipe support, reference should be made
to section 2.1.3.

22.

INTERFACE WITH STRUCTURAL DISCIPLINE

22.1

LOADS

See section 2.1.3.

Greater Ekofisk Area Development


Pipe support procedure

Rev.02:

23.

TYPICAL BOLTED FRAMES AND CONNECTIONS

23.1

GENERAL RULES FOR BOLTED CONNECTION

Page :
Date :

42 of 51
23.09.2010

The positioning of holes for bolts shall be such as to prevent corrosion and local bending, and
facilitate good installation of the bolts.
Minimum spacing of bolts: Where D is the diameter of the hole, the spacing between the centres
of bolts in the direction of load transfer should not be less than 2,2D. The spacing between rows
of bolts perpendicular to the direction of load should normally not be less than 3,0D. This may be
reduced to 2,4D provided that the design bearing resistance is reduced accordingly. Reference
should be made to the Structural code.
Maximum spacing of bolts: Where t is the thickness of the thinnest plate, the maximum spacing
between bolts in each row and the spacing at right between rows of bolts should not exceed the
lesser of 14t or 200mm. Adjacent rows may be symmetrically staggered. Where large centres are
used the connection should be checked for local buckling.
Minimum edge distance for bolts: Where D is the diameter of the hole, the minimum edge
distance from the centre of bolt to the adjacent edge of any part measured at right angles to the
direction of load transfer should not normally be less than 1,5D. The edge distance may be
reduced to a minimum of 1,2D provided that the design bearing resistance is reduced accordingly.
Reference should be made to the latest Structural Design Code.
Minimum end distance for bolts: where D is the diameter of the hole, the minimum end distance
from the centre of bolt to the adjacent end of any part measured in the direction of load transfer
should not normally be less than 1,2D. The end distance should be increased if necessary to
provide adequate bearing resistance. Reference should be made to the latest Structural Design
Code.

Greater Ekofisk Area Development


Pipe support procedure

23.2

TYPICAL BOLTED FRAMES

Rev.02:

Page :
Date :

43 of 51
23.09.2010

Greater Ekofisk Area Development


Pipe support procedure

Rev.02:

Page :
Date :

44 of 51
23.09.2010

Greater Ekofisk Area Development


Pipe support procedure

Rev.02:

Page :
Date :

45 of 51
23.09.2010

Greater Ekofisk Area Development


Pipe support procedure

Rev.02:

Page :
Date :

46 of 51
23.09.2010

Greater Ekofisk Area Development


Pipe support procedure

Rev.02:

Page :
Date :

47 of 51
23.09.2010

Greater Ekofisk Area Development


Pipe support procedure

23.3

Rev.02:

Page :
Date :

STANDARD BACK-MARKS FOR DRILLED BOLT HOLES IN ROLLED


STEEL ANGLES
(Unless noted otherwise on the pipe support drawing):

48 of 51
23.09.2010

Greater Ekofisk Area Development


Pipe support procedure

Page :
Date :

Rev.02:

L ()

S1

S2

S3

Maximum Dia. Bolt (mm)

60

35

16

80

45

20

100

55

24

120

45

50

16

150

55

55

20

23.4

49 of 51
23.09.2010

STANDARD BACK-MARKS FOR DRILLED BOLT HOLES IN UNP profiles.


(Unless noted otherwise on the pipe support drawing)

B ()

S1

Maximum Dia. Bolt (mm)

50

30

10

55

30

10

60

35

12

65

35

16

75

45

20

Greater Ekofisk Area Development


Pipe support procedure

23.5

Rev.02:

Page :
Date :

50 of 51
23.09.2010

STANDARD BACK-MARKS FOR DRILLED BOLT HOLES IN IPE, HEA &


HEB PROFILES.
(UNLESS NOTED OTHERWISE ON THE PIPE SUPPORT DRAWING)

B ()

S1

S2

S3

S4

Maximum Dia. Bolt (mm)

55

30

10

64

34

10

73

40

10

82

44

10

100

54

12

110/120

60

12

140

70

20

150

90

20

170/200

90

24

220/260

140

24

300

(140)

120

60

240

20/24

23.6

TYPICAL OFFSHORE CONNECTION TO PRIMARY STEELWORK.

Greater Ekofisk Area Development


Pipe support procedure

Rev.02:

Page :
Date :

51 of 51
23.09.2010