CRONOGRAMA DE ACTIVIDADES

ALTERNATIVA I
en la I.E.S "JULIO C. TELLO"
ACCIONES
ANUAL
MESUAL
Elabracion de Expediente Tcnico
Construccion de las Infraestructuras
impacto ambintal
Mantenimiento y conservacion

Construccion de Sala de uso multiple

ALTERNATIVA II

Construccion de Auditorium, cerco perimetrico,ambiente para la direccion, sala

U.M.
Doc.
M2
gbl.

0
6 7

1
8

3 4....7

9 10

9 10 11 12

***
*** *** ***
*** *** ***
**** **** ****

****

**** **** ****

CONSTRUCCION Y EQUIPAMIENTO DE LA SALA DE USO MULTIPLE EN LA I.E. JULIO C. TELLO, ICA


CON MATERIAL NOBLE
ALTERNATIVA UNICA
SIN IMPUESTOS
DESCRIPCION
A. INVERSION
Constr. Infraestruc Fisca y Equipa
Estudios
Gastos Generales
Supervision
B. COSTO DE OPERATIVOS
Remuneracin Administrativa
Remuneracin de Docentes
Remuneracin Personal de Limpiez
Material de Limpieza
Material de Escritorio
Mantenimiento y Conservacin
FLUJO DE COSTOS

0
481,365.92
296,787.71
24,930.17
141,840.78
17,807.26

10

208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97
2,134.45
18,957.98
18,957.98
18,957.98
18,957.98
18,957.98
18,957.98
18,957.98
18,957.98
18,957.98
18,957.98
56,386.55
177,478.99
177,478.99
177,478.99
177,478.99
177,478.99
177,478.99
177,478.99
177,478.99
177,478.99
177,478.99
907.56
10,890.76
10,890.76
10,890.76
10,890.76
10,890.76
10,890.76
10,890.76
10,890.76
10,890.76
10,890.76
126.05
504.20
504.20
504.20
504.20
504.20
504.20
504.20
504.20
504.20
504.20
168.07
504.20
504.20
504.20
504.20
504.20
504.20
504.20
504.20
504.20
504.20
100.84
100.84
100.84
100.84
100.84
100.84
100.84
100.84
100.84
100.84
100.84
59,823.53 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97

DESCRIPCION
A. INVERSION
Construc. Infraestructura Fisca
Estudios
Gastos Generales
supervision
Valor residual
B. COSTO DE OPERATIVOS
Remuneracin Administrativa
Remuneracin de Docentes
Remuneracin Personal de Limpiez
Material de Limpieza
Material de Escritorio
Mantenimiento y Conservacin
FLUJO DE COSTOS

HORIZONTE DEL PROYECTO


4
5

10.00
481,365.92
296,787.71
24,930.17
141,840.78
17,807.26

11.00

12.00

13.00

HORIZONTE DEL PROYECTO


14.00
15.00
16.00

17.00

18.00

19.00

20.00

-24,068.30
59,823.53 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97
2,134.45
18,957.98
18,957.98
18,957.98
18,957.98
18,957.98
18,957.98
18,957.98
18,957.98
18,957.98
18,957.98
56,386.55
177,478.99
177,478.99
177,478.99
177,478.99
177,478.99
177,478.99
177,478.99
177,478.99
177,478.99
177,478.99
907.56
10,890.76
10,890.76
10,890.76
10,890.76
10,890.76
10,890.76
10,890.76
10,890.76
10,890.76
10,890.76
126.05
504.20
504.20
504.20
504.20
504.20
504.20
504.20
504.20
504.20
504.20
168.07
504.20
504.20
504.20
504.20
504.20
504.20
504.20
504.20
504.20
504.20
100.84
100.84
100.84
100.84
100.84
100.84
100.84
100.84
100.84
100.84
100.84
59,823.53 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 184,368.68

COSTO EN SITUACION CON PROYECTO PARA LOS 20 AOS DE DURACIN


CON IMPUESTO
DESCRIPCION
A. INVERSION
Construc. Infraestructura Fisca
Estudios
Gastos Generales
supervision
B. COSTO DE OPERATIVOS
Remuneracin Administrativa
Remuneracin de Docentes
Remuneracin Personal de Limpiez
Material de Limpieza
Material de Escritorio
Mantenimiento y Conservacin
FLUJO DE COSTOS

DESCRIPCION
A. INVERSION
Construc. Infraestructura Fisca
Estudios
Gastos Generales
Supervision
Valor residual
B. COSTO DE OPERATIVOS
Remuneracin Administrativa
Remuneracin de Docentes
Remuneracin Personal de Limpiez
Material de Limpieza
Material de Escritorio
Mantenimiento y Conservacin
FLUJO DE COSTOS

HORIZONTE DEL PROYECTO


0.00
555,404.24
350,209.49
29,417.60
154,764.58
21,012.57
2,540.00
67,100.00
1,080.00
150.00
200.00
120.00

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

10.00

248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00
22,560.00
22,560.00
22,560.00
22,560.00
22,560.00
22,560.00
22,560.00
22,560.00
22,560.00
22,560.00
211,200.00
211,200.00
211,200.00
211,200.00
211,200.00
211,200.00
211,200.00
211,200.00
211,200.00
211,200.00
12,960.00
12,960.00
12,960.00
12,960.00
12,960.00
12,960.00
12,960.00
12,960.00
12,960.00
12,960.00
600.00
600.00
600.00
600.00
600.00
600.00
600.00
600.00
600.00
600.00
600.00
600.00
600.00
600.00
600.00
600.00
600.00
600.00
600.00
600.00
120.00
120.00
120.00
120.00
120.00
120.00
120.00
120.00
120.00
120.00

555,404.24 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00

10.00
555,404.24
350,209.49
29,417.60
154,764.58
21,012.57

11.00

12.00

13.00

HORIZONTE DEL PROYECTO


14.00
15.00
16.00

17.00

18.00

19.00

20.00

-27,770.21
71,190.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00
2,540.00
22,560.00
22,560.00
22,560.00
22,560.00
22,560.00
22,560.00
22,560.00
22,560.00
22,560.00
22,560.00
67,100.00
211,200.00
211,200.00
211,200.00
211,200.00
211,200.00
211,200.00
211,200.00
211,200.00
211,200.00
211,200.00
1,080.00
12,960.00
12,960.00
12,960.00
12,960.00
12,960.00
12,960.00
12,960.00
12,960.00
12,960.00
12,960.00
150.00
600.00
600.00
600.00
600.00
600.00
600.00
600.00
600.00
600.00
600.00
200.00
600.00
600.00
600.00
600.00
600.00
600.00
600.00
600.00
600.00
600.00
120.00
120.00
120.00
120.00
120.00
120.00
120.00
120.00
120.00
120.00
120.00
71,190.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 220,269.79

COSTO EN SITUACION SIN PROYECTO PARA LOS 20 AOS DE DURACIN


SIN IMPUESTO

DESCRIPCION
A. INVERSION
B. COSTO DE OPERATIVOS
Remuneracin Administrativa
Remuneracin de Docentes
Remuneracin Personal de Limpiez
Material de Limpieza
Material de Escritorio
Mantenimiento y Conservacin
FLUJO DE COSTOS SIN PROY

DESCRIPCION
A. INVERSION
B. COSTO DE OPERATIVOS
Remuneracin Administrativa
Remuneracin de Docentes
Remuneracin Personal de Limpiez
Material de Limpieza
Material de Escritorio
Mantenimiento y Conservacin
FLUJO DE COSTOS SIN PROY

HORIZONTE DEL PROYECTO


0.00
0.00

1.00
0.00

2.00
0.00

3.00
0.00

4.00
0.00

5.00
0.00

6.00
0.00

7.00
0.00

8.00
0.00

9.00
0.00

10.00
0.00

59,823.53 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97
2,134.45
18,957.98
18,957.98
18,957.98
18,957.98
18,957.98
18,957.98
18,957.98
18,957.98
18,957.98
18,957.98
56,386.55
177,478.99
177,478.99
177,478.99
177,478.99
177,478.99
177,478.99
177,478.99
177,478.99
177,478.99
177,478.99
907.56
10,890.76
10,890.76
10,890.76
10,890.76
10,890.76
10,890.76
10,890.76
10,890.76
10,890.76
10,890.76
126.05
504.20
504.20
504.20
504.20
504.20
504.20
504.20
504.20
504.20
504.20
168.07
504.20
504.20
504.20
504.20
504.20
504.20
504.20
504.20
504.20
504.20
100.84
100.84
100.84
100.84
100.84
100.84
100.84
100.84
100.84
100.84
100.84
0.00 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97

10.00
0.00

11.00
0.00

12.00
0.00

13.00
0.00

HORIZONTE DEL PROYECTO


14.00
15.00
16.00
0.00
0.00
0.00

17.00
0.00

18.00
0.00

19.00
0.00

20.00
0.00

59,823.53 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97
2,134.45
18,957.98
18,957.98
18,957.98
18,957.98
18,957.98
18,957.98
18,957.98
18,957.98
18,957.98
18,957.98
56,386.55
177,478.99
177,478.99
177,478.99
177,478.99
177,478.99
177,478.99
177,478.99
177,478.99
177,478.99
177,478.99
907.56
10,890.76
10,890.76
10,890.76
10,890.76
10,890.76
10,890.76
10,890.76
10,890.76
10,890.76
10,890.76
126.05
504.20
504.20
504.20
504.20
504.20
504.20
504.20
504.20
504.20
504.20
168.07
504.20
504.20
504.20
504.20
504.20
504.20
504.20
504.20
504.20
504.20
100.84
100.84
100.84
100.84
100.84
100.84
100.84
100.84
100.84
100.84
100.84
59,823.53 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97 208,436.97

COSTO EN SITUACION SIN PROYECTO PARA LOS 20 AOS DE DURACIN


CON IMPUESTO

DESCRIPCION

HORIZONTE DEL PROYECTO


0.00

A. INVERSION
B. COSTO DE OPERATIVOS
Remuneracin Administrativa
Remuneracin de Docentes
Remuneracin Personal de Limpiez
Material de Limpieza
Material de Escritorio
Mantenimiento y Conservacin
FLUJO DE COSTOS SIN PROY

DESCRIPCION
A. INVERSION
B. COSTO DE OPERATIVOS
Remuneracin Administrativa
Remuneracin de Docentes
Remuneracin Personal de Limpiez
Material de Limpieza
Material de Escritorio
Mantenimiento y Conservacin
FLUJO DE COSTOS SIN PROY

1.00
0.00

2.00
0.00

3.00
0.00

4.00
0.00

5.00
0.00

6.00
0.00

7.00
0.00

8.00
0.00

9.00
0.00

10.00
0.00

248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00
2,540.00
22,560.00
22,560.00
22,560.00
22,560.00
22,560.00
22,560.00
22,560.00
22,560.00
22,560.00
22,560.00
67,100.00
211,200.00
211,200.00
211,200.00
211,200.00
211,200.00
211,200.00
211,200.00
211,200.00
211,200.00
211,200.00
1,080.00
12,960.00
12,960.00
12,960.00
12,960.00
12,960.00
12,960.00
12,960.00
12,960.00
12,960.00
12,960.00
150.00
600.00
600.00
600.00
600.00
600.00
600.00
600.00
600.00
600.00
600.00
200.00
600.00
600.00
600.00
600.00
600.00
600.00
600.00
600.00
600.00
600.00
120.00
120.00
120.00
120.00
120.00
120.00
120.00
120.00
120.00
120.00
120.00
71,190.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00 248,040.00

10.00
0.00

11.00
0.00

12.00
0.00

13.00
0.00

HORIZONTE DEL PROYECTO


14.00
15.00
16.00
0.00
0.00
0.00

17.00
0.00

18.00
0.00

19.00
0.00

20.00
0.00

71,190.00 247,640.00 247,640.00 247,640.00 247,640.00 247,640.00 247,640.00 247,640.00 247,640.00 247,640.00 247,640.00
2,540.00
22,560.00
22,560.00
22,560.00
22,560.00
22,560.00
22,560.00
22,560.00
22,560.00
22,560.00
22,560.00
67,100.00
211,200.00
211,200.00
211,200.00
211,200.00
211,200.00
211,200.00
211,200.00
211,200.00
211,200.00
211,200.00
1,080.00
12,960.00
12,960.00
12,960.00
12,960.00
12,960.00
12,960.00
12,960.00
12,960.00
12,960.00
12,960.00
150.00
600.00
600.00
600.00
600.00
600.00
600.00
600.00
600.00
600.00
600.00
200.00
200.00
200.00
200.00
200.00
200.00
200.00
200.00
200.00
200.00
200.00
120.00
120.00
120.00
120.00
120.00
120.00
120.00
120.00
120.00
120.00
120.00
71,190.00 247,640.00 247,640.00 247,640.00 247,640.00 247,640.00 247,640.00 247,640.00 247,640.00 247,640.00 247,640.00

FLUJO NETO INCREMENTAL


DESCRIPCION

0.00
59,823.53
484,214.24

1.00
0.00
0.00

2.00
0.00
0.00

3.00
0.00
0.00

10.00
0.00
0.00

11.00
0.00
400.00

12.00
0.00
400.00

13.00
0.00
400.00

0.00
59,823.53
484,214.24

1.00
0.00
0.00

2.00
0.00
0.00

3.00
0.00
0.00

SIN IMPUESTO
CON IMPUESTO

10.00
0.00
0.00

11.00
0.00
114.99

12.00
0.00
102.67

13.00
0.00
91.67

VACT
SIN IMPUESTO
CON IMPUESTO

VACT2 AL 11%
57,328.45
482,063.08

SIN IMPUESTO
CON IMPUESTO

DESCRIPCION
SIN IMPUESTO
CON IMPUESTO

HORIZONTE DEL PROYECTO


4.00
5.00
0.00
0.00
0.00
0.00

6.00
0.00
0.00

7.00
0.00
0.00

8.00
0.00
0.00

9.00
0.00
0.00

10.00
0.00
0.00

HORIZONTE DEL PROYECTO


14.00
15.00
16.00
0.00
0.00
0.00
400.00
400.00
400.00

17.00
0.00
400.00

18.00
0.00
400.00

19.00
0.00
400.00

20.00
-24,068.30
-27,370.21

6.00
0.00
0.00

7.00
0.00
0.00

8.00
0.00
0.00

9.00
0.00
0.00

10.00
0.00
0.00

HORIZONTE DEL PROYECTO


14.00
15.00
16.00
0.00
0.00
0.00
81.85
73.08
65.25

17.00
0.00
58.26

18.00
0.00
52.02

19.00
0.00
46.44

20.00
-2,495.08
-2,837.38

ANALISIS DEL VACT AL 12%


DESCRIPCION
SIN IMPUESTO
CON IMPUESTO

DESCRIPCION

ANALSIS DEL VAE AL 11%

VAE AL 11%
VAE

VAE(Coef)
VALOR ACTUAL ECONOMICO
SIN IMPUESTO
CON IMPUESTO

VACT x

0.13
7,199.06
60,535.38

-1.00
1 - (1+Cok)^ -n
Cok

HORIZONTE DEL PROYECTO


4.00
5.00
0.00
0.00
0.00
0.00

ANEXOS
ANALISIS DE SENCIBILIDAD
SI LA INVERSION INCREMENTA AL 20%
FLUJO NETO INCREMENTAL
DESCRIPCION

0.00
71,788.24
581,057.09

1.00
0.00
0.00

2.00
0.00
0.00

3.00
0.00
0.00

10.00
0.00
0.00

11.00
0.00
400.00

12.00
0.00
400.00

13.00
0.00
400.00

0.00
71,788.24
581,057.09

1.00
0.00
0.00

2.00
0.00
0.00

3.00
0.00
0.00

SIN IMPUESTO
CON IMPUESTO

10.00
0.00
0.00

11.00
0.00
114.99

12.00
0.00
102.67

13.00
0.00
91.67

VACT
SIN IMPUESTO
CON IMPUESTO

VACT2 AL 11%
69,293.15
578,905.93

SIN IMPUESTO
CON IMPUESTO

DESCRIPCION
SIN IMPUESTO
CON IMPUESTO

HORIZONTE DEL PROYECTO


4.00
5.00
0.00
0.00
0.00
0.00

6.00
0.00
0.00

7.00
0.00
0.00

8.00
0.00
0.00

9.00
0.00
0.00

10.00
0.00
0.00

HORIZONTE DEL PROYECTO


14.00
15.00
16.00
0.00
0.00
0.00
400.00
400.00
400.00

17.00
0.00
400.00

18.00
0.00
400.00

19.00
0.00
400.00

20.00
-24,068.30
-27,370.21

6.00
0.00
0.00

7.00
0.00
0.00

8.00
0.00
0.00

9.00
0.00
0.00

10.00
0.00
0.00

HORIZONTE DEL PROYECTO


14.00
15.00
16.00
0.00
0.00
0.00
81.85
73.08
65.25

17.00
0.00
58.26

18.00
0.00
52.02

19.00
0.00
46.44

20.00
-2,495.08
-2,837.38

ANALISIS DEL VACT AL 11%

DESCRIPCION
SIN IMPUESTO
CON IMPUESTO

DESCRIPCION

ANALSIS DEL VAE AL 11%


VAE AL 11%

-1.00
VAE

VAE(Coef)
VALOR ACTUAL ECONOMICO
SIN IMPUESTO
CON IMPUESTO

VACT x

1 - (1+Cok)^ -n
Cok

0.13
8,701.53
72,696.48

HORIZONTE DEL PROYECTO


4.00
5.00
0.00
0.00
0.00
0.00

SI LA INVERSION SE INCREMENTA AL 10% Y LOS BENEF SE REDUCEN AL 10%


FLUJO NETO INCREMENTAL
DESCRIPCION

0.00
65,805.88
532,635.66

1.00
0.00
0.00

2.00
0.00
0.00

3.00
0.00
0.00

10.00
0.00
0.00

11.00
0.00
400.00

12.00
0.00
400.00

13.00
0.00
400.00

0.00
65,805.88
532,635.66

1.00
0.00
0.00

2.00
0.00
0.00

3.00
0.00
0.00

SIN IMPUESTO
CON IMPUESTO

10.00
0.00
0.00

11.00
0.00
114.99

12.00
0.00
102.67

13.00
0.00
91.67

VACT
SIN IMPUESTO
CON IMPUESTO

VACT2 AL 11%
63,310.80
530,484.50

SIN IMPUESTO
CON IMPUESTO

DESCRIPCION
SIN IMPUESTO
CON IMPUESTO

HORIZONTE DEL PROYECTO


4.00
5.00
0.00
0.00
0.00
0.00

6.00
0.00
0.00

7.00
0.00
0.00

8.00
0.00
0.00

9.00
0.00
0.00

10.00
0.00
0.00

HORIZONTE DEL PROYECTO


14.00
15.00
16.00
0.00
0.00
0.00
400.00
400.00
400.00

17.00
0.00
400.00

18.00
0.00
400.00

19.00
0.00
400.00

20.00
-24,068.30
-27,370.21

6.00
0.00
0.00

7.00
0.00
0.00

8.00
0.00
0.00

9.00
0.00
0.00

10.00
0.00
0.00

HORIZONTE DEL PROYECTO


14.00
15.00
16.00
0.00
0.00
0.00
81.85
73.08
65.25

17.00
0.00
58.26

18.00
0.00
52.02

19.00
0.00
46.44

20.00
-2,495.08
-2,837.38

ANALISIS DEL VACT AL 11%

DESCRIPCION
SIN IMPUESTO
CON IMPUESTO
DESCRIPCION

ANALSIS DEL VAE AL 14%


VAE AL 11%

-1.00
VAE

VAE(Coef)
VALOR ACTUAL ECONOMICO
SIN IMPUESTO
CON IMPUESTO

VACT x

1 - (1+Cok)^ -n
Cok

0.13
7,950.29
66,615.93

HORIZONTE DEL PROYECTO


4.00
5.00
0.00
0.00
0.00
0.00

318158.61 269625.9407

Presupuesto
Cliente COLEGIO JULIO C. TELLO

Costo
12/2010

Lugar ICA - ICA - ICA


Item
01
01.01

02

Descripcin
Und. Metr
CONSTRUCCION DE UNA SALA DE USO MULTIPLE
TRABAJOS PROVISIONALES
INSTALACION DE OFICINA Y ALMACEN

glb

1.00

Pre S/. Parcial S/.


800.00
800.00

TRABAJOS PRELIMINARES

800.00

2,318.49

02.01

LIMPIEZA MANUAL DE TERRENO

m2

515.22

2.58

1,329.27

02.02

TRAZO Y REPLANTEO PRELIMINAR SALA USO Mm2

515.22

1.92

989.22

03

MOVIMIENTO DE TIERRAS

###

03.01

CORTE SUPERFICIAL HASTA H=0.10 ML

m2

351.21

2.56

899.10

03.01

EXCAVACION PARA CIMIENTO HASTA 1 M TERR m2

141.71

20.40

2,890.88

03.02

ACARREO DE MATERIAL EXCEDENTE HASTA D m3

141.71

17.07

2,418.99

03.03

RELLENO CON MATERIAL PROPIO

m3

43.75

12.20

533.75

03.04

REFINE, NIVELACION Y COMPACTACION

m2

590.20

1.79

1,056.46

03.05

ELIMINACION DE DESMONTE A MAQUINA 20% m3

170.05

13.99

2,379.00

04

CONCRETO SIMPLE

###

04.01

CONCRETO CICLOPEO 1:10+30 PG

m3

196.81

133.99

04.02

SOLADO PARA ZAPATAS E = 4"

m2

45.23

21.12

05

CONCRETO ARMADO

###
955.26
###

05.01

CONCRETO PARA ZAPATAS f'c=210 kg/cm2

m3

22.62

262.76

5,943.63

05.02

ZAPATAS ACERO Fy= 210 kg/cm2 fierro de 1/2 m3

674.68

4.33

2,921.36

05.03

CONCRETO VIGAS DE CIMENTACION Fc=210 k m3

10.33

255.86

2,643.03

05.04

ENCOFRADO Y DESENCOFRADO DE VIGAS DE m2

35.93

40.22

1,445.10

05.05

VIGA DE CIMENTACION ACERO Fy = 4200 kg/ kg

4.33

5,642.73

###

05.06

CONCRETO SOBRECIMIENTO ARMADO Fy= 210m3

16.52

203.62

3,363.80

05.07

ENCOFRADO Y DESENCOFRADO DE SOBRECIMm2

134.38

30.46

4,093.21

05.08

SOBRECIMIENTO ARMADO ACERO Fy = 4200 kkg

394.00

4.33

1,706.02

05.09

CONCRETO EN COLUMNAS f'y=210 kg/cm2

m3

18.13

335.13

6,075.91

05.10

ENCOFRADO Y DESENCOFRADO DE COLUMNASm2

297.34

38.48

###

05.11

COLUMNAS ACERO FY= 4200 KG /CM2

kg

4.33

###

05.12

CONCRETO EN VIGAS Fc = 210 kg /cm2

kg

05.13

ENCOFRADO Y DESENCOFRADO DE VIGAS

m2

05.14

VIGA ACERO Fy =4200 kg/cm2

kg

05.15

CONCRETO LOSA ALIGERADO Fc =210 kg/cm2m3

05.16

ENCOFRADO Y DESENCOFRADO DE LA LOSA A m2

05.17

LOSA ALIGERADO ALERO Fy = 4200 kg/m2

kg

###

4.33

6,437.24

05.18

LADRILLO DE TECHO DE 15X30X30 FABRICA

###

0.87

2,580.78

06

23.07

272.33

6,282.65

160.81

52.52

8,445.74

###

4.33

###

47.63

262.01

###

422.06

41.29

###

MURO Y TABIQUES

###

06.01

MUROS DE LADRILLO KK DE FABRICA

06.02

ACERO DE REFUERZO HORIZONTAL ALAMBRE N


kg

07

###

m2

230.99

89.16

43.75

4.33

REVOQUES Y ENLUCIDOS

###
189.44
###

07.01

TARRAJEO DE MUROS INTERIORES Y EXTERIORm2

486.97

19.68

9,583.57

07.02

TARRAJEO DE VIGAS

m2

106.10

19.68

2,088.05

07.03

TARRAJEO DE COLUMNAS

m2

116.86

19.68

2,299.80

07.04

DERRAMES ESPESOR DE 15 CM

19.35

11.21

216.91

07.05

BRUAS 1.00 CM

40.00

6.18

247.20

08
08.01
09
09.01

CIELORRASOS
TARRAJEO DE CIELO RASO CON MEZCLA 1:3

###
m2

679.12

19.68

PISOS Y PAVIMENTOS
FALSO PISO E = 4" MEZCLA 1:10

###
###

m2

397.70

22.05

8,769.29

09.02

PISO DE CEMENTO PULIDO SIN COLOREAR E= m2

397.70

4.36

1,733.97

09.03

PISO CERAMICA Y MAYOLICA VENECIANA

m2

52.07

43.39

2,259.32

09.04

VEREDA DE CONCRETO E=4" /FRONTAL

m2

120.44

46.97

5,657.07

09.05

ENCOFRADO Y DESENCOFRADO DE VEREDAS Em2

30.56

30.46

930.86

09.06

CONTRAPISO E= 40 MM

52.07

4.19

218.17

10

m2

ZOCALOS Y CONTRAZOCALOS

###

10.01

CONTRAZOCALO DE CEMENTO SIN COLOREADO


m

150.98

30.53

4,609.42

10.02

CONTRAZOCALO DE CEMENTO SIN COLOREAR m

90.64

30.53

2,767.24

10.03

ZOCALO CERAMICA DE 0.20 ML X 0.20 ML

79.54

39.42

3,135.47

11
11.01
12

m2

CUBIERTAS

###

CUBIERTA CON LADRILLO PASTELERA Y MEZCLm2

12.02

VENTANAS DE MADERA TORNILLO E=11/4"

14

m2

23.94

58.24

1,394.27

5.40

93.39

504.31

CARPINTERIA METALICA
VENTANA METALICA CON ACCESORIOS

###
1,898.58

PUERTA DE APANELADO DE MADERA TORNILLOm2

13.01

41.17

CARPINTERIA DE MADERA

12.01

13

463.83

240.01
m2

2.57

93.39

CERRAJERIA

240.01
681.90

14.01

BISAGRA CAPUCHINA

36.00

5.44

195.84

14.02

CERRADURA ALPHA PARA PUERTA EXTERIOR

7.00

46.11

322.77

14.03

CERRADURA DE PERILLA LIVIANA PARA BAO u

2.00

39.56

79.12

14.04

MANIJA DE BRONCE PARA PUERTAS

11.00

3.55

39.05

14.05

MANIJA DE BRONCE PARA PORTAUELAS

12.00

3.76

45.12

15
15.01
16

VIDRIOS, CRISTALES Y SIMILARES


VIDRIOS SEMIDOBLE

135.74
p2

40.64

3.34

PINTURA

135.74
###

16.01

PINTURA EN CIELO RASO AL LATEX

m2

617.38

6.91

4,266.10

16.02

PINTURA EN MUROS INTERIORES Y EXTERIOREm2

442.70

4.97

2,200.22

16.03

PINTURA EN COLUMNAS A LATEX

m2

100.24

4.79

480.15

16.04

PINTURA EN PUERTAS Y VENTANAS DE MADER m2

96.45

14.01

1,351.26

16.05

PUERTAS APANELADAS DE MADERA TORNILLO m2

23.94

113.07

2,706.90

16.06

VENTANAS DE MADERA TORNILLO E = 11/4"

m2

5.40

9.74

52.60

16.07

PINTURA PARA CARPINTERIA METALICA V-1 (

m2

25.68

16.93

434.76

16.08

PINTURA DE CONTRAZOCALO CON ESMALTE SIN


m

137.25

4.64

636.84

16.09

PINTURA DE CONTRAZOCALO CON ESMALTE SIm

82.40

3.95

325.48

17

APARATOS SANITARIOS Y ACCESORIOS

8,076.64

17.01

INODORO TANQUE BAJO COLOR BLANCO

pza

10.00

339.09

3,390.90

17.02

LAVATORIO DE PARED DE COLOR BLANCO

pza

8.00

446.08

3,568.64

17.03

ORINARIO DE LOSA BLANCO

pza

3.00

230.60

691.80

17.04

PAPELERA DE LOSA BLANCO

pza

10.00

33.96

339.60

17.05

DUCHA CROMADA 1 LLAVE INCLUYE ACCESOR u

1.00

85.70

85.70

18

INSTALACIONES SANITARIOS

###

18.01

SALIDA DE DESAGUE PVC SAL ( PROMEDIO)

pto

21.00

249.32

5,235.72

18.02

TUBERIAS DESAGUE PVC SAL 4"

20.00

180.69

3,613.80

18.03

TUBERIA DESAGUE PVC SAL 2"

50.00

157.35

7,867.50

18.04

SOMBRERO VENTILACION PVC SAL 2"

10.00

10.20

102.00

18.05

REGISTRO DE BRONCE 4"

3.00

32.27

96.81

18.06

CAJA DE REGISTRO DE 12" x 24" TAPA DE CO u

2.00

102.35

204.70

19

SISTEMA DE AGUA FRIA

1,816.37

19.01

SALIDA DE AGUA FRIA CON TUBERIAS PVC - SApto

19.02

VALVULA COMPUERTA DE BRONCE DE 1/2"

19.03

RED DE DISTRIBUCION DE TUBERIA 1/2" PVC m

20
20.01

pza

21.00

52.17

1,095.57

8.00

66.35

530.80

40.00

4.75

190.00

INSTALACIONES ELECTRICAS
SALIDA PARA CENTRO DE LUZ

2,396.88
pto

26.00

56.52

1,469.52

20.02
21
21.01
22
22.01
23

SALIDA PARA TOMACORRIENTE PVC

pto

16.00

57.96

CANALIZACIONES Y TUBERIAS

414.60

TUBERIA PVC SAL DE 20 MM PARA CENTRO DEm

60.00

6.91

CONDUCTORES DE TUBERIAS
ALIMENTADOR TW - 26 MM

927.36

414.60
1,342.00

200.00

6.71

TABLEROS DE DISTRIBUCION

1,342.00
938.50

23.01

TABLERO GENERAL 2 x 15 A, 2 x 20 A , 2 x 30 u

1.00

213.48

213.48

23.02

INTERRUPTOR THERMOMAGNETICO 2 x 30 A u

3.00

102.98

308.94

23.03

INTERRUPTOR THERMOMAGNETICO 2 x 20 A u

4.00

72.18

288.72

23.04

INTERRUPTOR THERMOMAGNETICO 2 x 15 A u

2.00

63.68

127.36

24
24.01
25
25.01

VARIOS

242.88

JUNTA DE DILATACION CON RC-250

66.00

3.68

ARTEFACTOS ELECTRICOS
ARTEFACTOS PARA ILUMINACION

1,877.98
u

26.00

72.23

COSTO DIRECTO DE CONTRUCCION


Item
02

242.88

1,877.98

###

Descripcin
Und. Metr
EQUIPAMIENTO DE SALA DE USO MULTIPLE
EQUIPAMIENTO

Pre S/. Parcial S/.


###

02.01

ESCRITORIO DE OFICINA TIPO "L"

UND

1.00

500.00

500.00

02.02

MUEBLE PARA COMPUTADORA

UND

1.00

250.00

250.00

03.01

EQUIPO MULTIMEDIA

UND

1.00

03.02

ECRANS

UND

1.00

500.00

500.00

03.03

SILLON GIRATORIO

UND

1.00

210.00

210.00

03.04

GUARDAROPA

UND

2.00

300.00

600.00

03.05

SILLAS NEGRAS

UND 200.00

115.00

04

EQUIPO DE SONIDO
UND
COSTO DIRECTO DE EQUIPAMIENTO

### 1,600.00

###

2500 2,500.00
###

RESUMEN
COSTO DIRECTO DE CONSTRUCCION Y EQUPAMIENTO
GASTOS GENERALES
UTILIDAD
SUB TOTAL

350,209.49
35020.9494
35020.9494
420,251.39

ESTUDIOS
SUPERVISION
SUB TOTAL DEL PROYECTO
IGV 18%

29417.60
21012.57
470,681.56
84,722.68

COSTO TOTAL DEL PROYECTO

555,404.24

319750.51

427.892327215
362.620616284

EVALUACIN DE ALTERNATIVAS

ALTERNATIVA I

Construccion de SALON DE USO MULTIPLE


con material de Ladrillo en la I.E.S "Julio C. Tello"

Periodo de Diseo:

20 aos

Tasa de Descuento anual


Sin Impuetos

ALTERNATIVA II

11%
Con Impuestos

VACT = S/.

408,528.03

482,063.08

VAE = S/.

51,301.17

60,535.38

Construccion de Auditorium, Cerco Perimetrico,Ambiente para la direccion, sala de computo,biblioteca, Laboratorio


COSTO EFECTIVIDAD
VAC

482,063.08

BENEFICIARIOS

1298

COSTO/EFECTIVIDAD

371

ALTERNATIVA 1
COSTO DE OPERACION SIN PROYECTO - CON PROYECTO

GASTOS DE OPERACIN
ITEM

ACTIVIDAD

UNIDAD

CANTIDAD

COSTO
UNITARIO

1.00 Profesores
1.01 NOMBRADOS (PRIMARIA Y SECUNDARIA)
1.02 CONTRATADOS (PRIMARIA Y SECUDARIA)
1.03

50.00
11.00

UND.
UND.

1100.00
1100.00

COSTO

PARCIAL

TOTAL

55000.00
12100.00
67100.00

2.00 Peronal administrativo


2.01 DIRECTOR

UND.

1.00
1.00
1.00
1.00
2.00

2000.00
540.00
540.00
800.00
540.00

2000.00
540.00
540.00
800.00
1080.00

gbl
gbl.
gbl

1.00
1.00
1.00

250.00
150.00
200.00

250.00
150.00
200.00

UND.

SECRETARIO

UND.

AUXILIAR DE LABORATORIO

UND.

AUXILIAR EN EDUCACION

UND.

PERSONAL DE SERVICIO

2.02 OTROS.
otros (pago de luz, agua, baja policia , etc.)
Material de limpieza
Material de Escritorio

COSTO TOTAL.

5560.00
72660.00

ALTERNATIVA 1
COSTO DE MANTENIMIENTO RUTINARIO SIN PROYECTO
GASTOS DE MANTENIMIENTO SIN PROYECTO
ITEM

ACTIVIDAD

UNIDAD

CANTIDAD

COSTO
UNITARIO

1.00
1.01
1.02
1.03

COSTO

PARCIAL

TOTAL

MANTENIMIENTO DE INFRAESTRUCTURA
LIMPIEZA GENERAL
REPARACION DE VIDRIOS
PINTADO

2.02 OTROS

M2
P2
M2

0.00
0.00
0.00

GBL.

0.00

0.97
4.19
5.00

0.00
0.00
0.00

1.00

0.00

COSTO DIRECTO
GASTOS GENERALES (7%)
TOTAL

0.00

0.00
0.00
0.00
0.00

COSTOS DE MANTENIMIENTO RUTINARIO


COSTO RUTINARIO CON PROYECTO
GASTOS DE MANTENIMIENTO CON PROYECTO
ITEM

ACTIVIDAD

UNIDAD

CANTIDAD

COSTO
UNITARIO

1.00
1.01
1.02
1.03

COSTO

PARCIAL

TOTAL

MANTENIMIENTO DE INFRAESTRUCTURA
LIMPIEZA GENERAL
REPARACION DE VIDRIOS
PINTADO

2.02 OTROS

M2
P2
M2
GBL.

515.10
4.07
98.00
3000.00

0.97
4.19
5.00

499.65
17.06
490.00

1.00

3000.00

COSTO DIRECTO
GASTOS GENERALES (7%)
TOTAL

1006.71
3000.00
4006.71
280.47
4287.18

72060.00

15.1.2 Costos de inversin de la alternativa seleccionada (a precios sociales) (*)

Principales Rubros
Expediente Tcnico
Costo Directo
Resultado 01
Insumo de origen nacional
Insumo de origen importado
Remuneraciones
Resultado 02
Insumo de origen nacional
Insumo de origen importado
Remuneraciones
Supervisin
Gastos Generales
Total

Costo total
Factor de
a precios
correccin
de mercado
29417.60
321049.494
192629.696
0
128419.798
29160
29160
0
0
21012.57
154764.58
555404.24

0.79

Costo a
precios
sociales
23239.902

0.84 161808.945
0.66 84757.0664
0.79

23036.4

0
18911.3127
130002.247
441755.873

0.9
0.84

You might also like