Professional Documents
Culture Documents
NO HEAVY LOADS
CROSS BEAMS
PRIMARY BEAMS
U
AB kv
R /11
FO 6
E 20/6
SIT R 2 N
ED PE ATIO
OS SU ST
OP UR UB
S
PR MO
A
H
1
EX
IS
TIN
BA
RW
A
CO
M
PLE
X
3
2
14300
6600
1000
450
4000
500
3700
1000
550
1000
500
500
550
KEY PLAN
1000
500
Date Received:
3 EXTERNAL RAILINGS
450
450
1000
2140
2260
475
650
2000
650
650
1600
850
650
3100
595
A - APPROVED.
B - APPROVED WITH COMMENTS.
C - REVISED & RESUBMIT.
D - REJECTED.
N - NOTED.
550
1000
550
650
850
450
4 BRACING CLAMP B
REFERENCE DRAWINGS
NO HEAVY LOADS
CROSS BEAMS
2250
2250
PRIMARY BEAMS
DRAWING NO.
TITLE
1981-ST-B25C-1-001-001
PLAN
1981-ST-B25C-1-001-002
PLAN
1981-ST-B25C-2-001-001
DETAILS
6200
1
3
2250
2250
3100
Co-ordination Table
Date
Structural
Electrical
3 EXTERNAL RAILINGS
Mechanical
850
550
Infrastructure
4 BRACING CLAMP B
Building Coordination
1000
450
1000
450
550
650
650
Sign
Architectural
850
Name
Trade
SHOP DRAWING
595
2140
2260
1225
475
650
975
2000
650
1000
650
1000
1600
925
650
1175
minimum
SUBSTATION BUILDING-25C
BEAM & SLAB FORMWORK - DOKAFLEX 20
MAIN BEAM + PROPS ARRANGEMENT PLAN
maximum
(range)
PROPS MODEL
EXTENSION
RANGE
ECO 20 250
ECO 20 300
152-250 cm
172-300 cm
ECO 20 350
ECO 20 400
EUREX 20 550
197-350 cm
227-400 cm
297-550 cm
20.05.2015
AS
REV. No.
DATE
BY
RA
JL
CH'KD APP'D
CLIENT
CONSULTANT
LEGEND :
DOKA TIMBER BEAM H20 ECO N
MAIN CONTRACTOR
SCALE 1 : 40A1
LEIGHTON
CONTRACTING
SUBCONTRACTOR
ALL FLOOR PROPS HAVE TO BE PLACED CENTRALLY UNDER THE MAIN BEAMS.
PROJECT
ALL FLOOR PROPS HAVE TO BE ERECTED VERTICALLY.
NOTES :
DISTANCES BETWEEN BEAMS AND DISTANCES BETWEEN FLOOR PROPS HAVE TO CORRESPOND WITH THE DRAWING.
OVERLAPPING OF THE MAIN BEAM MEASURED FROM THE CENTRE OF THE MAIN BEAM TO THE FLOOR PROPS
WITH TRIPOD MAX. 50 CM.
Drawn:
Romeo Apolinario
20.05.2015
Drawing-No.:
Rev.:
Checked:
Jerico Lanto
20.05.2015
345-001037-1025
Scale:
Revised:
MAXIMUM ALLOWABLE
LIVE LOAD:
1.5
INTERMEDIATE FLOOR PROPS WITHOUT TRIPOD SHOULD BE PLACED AT EQUAL DISTANCES BETWEEN THE FLOOR
PROPS WITH TRIPOD. THE NUMBER OF INTERMEDIATE FLOOR PROPS HAS TO BE TAKEN FROM THE DRAWING.
AS SHOWN
Safety instruction:
Do not weld or heat tie rods!
USE OF INTERMEDIATE FLOOR PROPS BY COSTUMER: THE DESIGN CONSIDERS PROPS WITH A LOAD CAPACITY
OF 20kN. THE NUMBER OF PROPS HAS TO BE INCREASED IN THE RATIO OF ITS ALLOWABLE LOAD CAPACITY.
ALL INTERMEDIATE FLOOR PROPS HAVE TO BE SECURED
AGAINST TIPPING OVER.
TO AVOID RISKS REGARDING HEALTH & SAFETY OF USERS OR THIRD PERSONS, "USER INFORMATION",
"OPERATING INSTRUCTIONS" AND "FITTING INSTRUCTIONS" HAVE TO BE NOTED IN ADDITION TO THE INFORMATION
GIVEN ON THE DRAWINGS.
IF REQUIRED ASK YOUR DOKA PARTNER FOR THESE DOCUMENTS.
SCAFFOLD BOARDS FOR PLATFORMS AND RAILING ARE TO BE PROVIDED BY SITE AND MUST BE FIXED ACCORDING
TO HEALTH & SAFETY REGULATIONS AND LOCAL LAW!
TO PROTECT THE FORMWORK SHEET AGAINST DAMAGING USE VIBRATORS WITH PROTECTIVE CAPS.
CONSTRUCTION OF KAHRAMAA
CENTRAL WORKSHOP
TITLE
DRAWING No.
GTC517-25C-S-S-D-501
DATE
SHT.
REV.
2/6