You are on page 1of 31

LEGEND:

A - Approved
B - Approved w/ Comments

CONTROL NO : ________________________
Date

THE PRINCEVIEW PARKSUITES


SUBMITTAL

ITEM

SUBMITTAL NO.
TARGET

1.0

2.0

4.0

5.0

6.0

7.0

8.0

9.0

PP-DMCI-ML- 001

PP-DMCI-ML- 001a

ACTUAL

1-Jul-15

24-Jul-15

PP-DMCI-ML- 001 b

17-Aug-15

PP-DMCI-ML- 001c

20-Sep-15

PP-DMCI-ML- 002

PP-DMCI-ML- 003

PP-DMCI-ML- 004

PP-DMCI-ML- 004A

PP-DMCI-ML- 005

24-Jul-15

1-Sep-15

1-Sep-15

19-Sep-15

4-Sep-15

DESCRIPTION
OF ITEMS

Proposed 750mm x
350mm Exhaust & Fresh
air duct FRM STP to ground
floor
Proposed
750mm x
350mm Exhaust Duct @
STP 1st Parking & 750mm
X 350mm Fresh air Duct @
STP to GF
ACCU & ducting layout for
fresh air duct & exhaust
ACCU and Ducting layout
for fresh air duct and
exhaust and resized duct
at STP

FCD

FCD

KED Layout from GF to 8th


floor Amenity. Proposed
resize of duct from
Mezzanine to 8th floor
Amenity

FCD

Gasket Tape (airseal)


PPCSI-40 Aluminum Duct
tape

PP-DMCI-ML- 008

4-Sep-15 HILTI Fire Stopping Sealant

PP-DMCI-ML- 009

4-Sep-15

Lucky PVC Pipe Blue and


Lucky PVC Pipe Fittings
Blue (Elbow, Tee and
Coupling)
Armaflex
Rubber Insulation
4-Sep-15
TUBE class 1

4-Sep-15 Idenden duct sealant

APPROVAL DATE
SCHEDULED

SAMPLES

CERT.

TEST
DATA

OTHERS
(SPECIFY)

TARGET

ACTUAL

8-Jul-15

6-Jul-15

-2

Follow as per mechanical


FCD

31-Jul-15

30-Jul-15

-1

Revise and Resubmit

Revise and Resubmit

24-Aug-15 25-Aug-15

DAYS ACTION
DATE OF
LAPSED CODE INSTALLATION

REMARKS

7-Oct-15

7-Oct-15

Approved with comments

31-Jul-15

1-Aug-15

Revise and Resubmit

8-Sep-15

3-Sep-15

-5

Approved

8-Sep-15

3-Sep-15

-5

Revise and Resubmit

4-Sep-15 22-Sep-15

11

Revise and Resubmit

4-Sep-15 22-Sep-15

11

Revise and Resubmit

4-Sep-15 22-Sep-15

11

Revise and Resubmit

23-Sep-15

APO G.I sheet,Galvaprime


and Superzinc

4-Sep-15

PP-DMCI-ML- 011

KED Layout from GF to 8th


floor Amenity. Proposed
resize of duct from
Mezzanine to 8th floor
Amenity

4-Sep-15

15.0

FCD

PP-DMCI-ML- 007

PP-DMCI-ML- 010

Proposed EF-2 and Duct


layout @ female & male
toilet and EADR from GF
up to Mezzanine( dry area)

PP-DMCI-ML- 006

14.0

FCD

11.0

13.0

L O G ( CP08 - MECHANICAL WORKS)

Proposed 150mm PVC


toilet exhaust duct layout
& 175mm sleeves @ GF
to mezzanine

10.0

12.0

STATUS

REFERENC
SHOP
CAT.
E
SPECS DRWGS. BROCH.

FCD

27-Mar-16
C - Disapproved / Re-submit

SUBMITTAL REQUIREMENTS

SUBMISSION DATE

11-Sep-15 14-Sep-15

11-Sep-15 14-Sep-15

11-Sep-15 14-Sep-15

11-Sep-15 14-Sep-15

Approved with comments


(Submit fire stoppong
certification, Apply
sample on board and
provide pull out test
result)
Resubmit as per Specs.
( All fittings shall be
insulated
Resubmit should be
20mm thick
Resubmit ( submit fire
rating certification, pullout test report, w/
physical sample and with
sealant application

LEGEND:
A - Approved
B - Approved w/ Comments

CONTROL NO : ________________________
Date

THE PRINCEVIEW PARKSUITES


SUBMITTAL

ITEM

SUBMITTAL NO.
TARGET

ACTUAL

DESCRIPTION
OF ITEMS

STATUS

REFERENC
SHOP
CAT.
E
SPECS DRWGS. BROCH.

Themawool
16.0

PP-DMCI-ML- 012

18-Sep-15

17.0

PP-DMCI-ML- 013

18-Sep-15

18.0

PP-DMCI-ML- 014

18-Sep-15

19.0

PP-DMCI-ML- 015

18-Sep-15

20.0

PP-DMCI-ML- 016

21.0

PP-DMCI-ML- 017

22.0

PP-DMCI-ML- 018

23.0

PP-DMCI-ML- 018a

18-Sep-15

3-Oct-15

5-Oct-15

23-Oct-15

Electrical wires (Orion


wires and Columbia wires)
Electrical pipes ( Arrow IMC
pipe and Ega Honeywell
IMC pipe)
Electrical Fittings (Wright)

Flexible Duct

800mm X 600mm Fresh air


Duct layout ( Stub-out)
and 1500mm X 600mm
Fresh air grille
Exhaust duct layout and
grilles @mezzanine level
(TVR)
Exhaust duct layout and
grilles @mezzanine level
(TVR)

FCD

FCD

FCD

27-Mar-16
C - Disapproved / Re-submit

L O G ( CP08 - MECHANICAL WORKS)

SUBMITTAL REQUIREMENTS

SUBMISSION DATE

APPROVAL DATE
SCHEDULED

SAMPLES

CERT.

TEST
DATA

OTHERS
(SPECIFY)

TARGET

ACTUAL

DAYS ACTION
DATE OF
LAPSED CODE INSTALLATION

REMARKS

25-Sep-15 7-Oct-15

12

Approved with correction


and comments RESUBMIT
(see commnets on
physical sample)

25-Sep-15 7-Oct-15

12

25-Sep-15 7-Oct-15

12

25-Sep-15 7-Oct-15

12

25-Sep-15 7-Oct-15

12

10-Oct-15 12-Oct-15

Approved and see


comments on physical
samples)
resubmit (Approved and
see comments on
physical samples)
Approved with comments
(check comments on
physical samples)
Disapproved, resubmit
(see comments on
Physical samples)
Approved with comments

12-Oct-15 10-Oct-15

-2

Approved with comments.


Subject to resubmission

30-Oct-15 2-Nov-15

Appoved with comments

LEGEND:
A - Approved
B - Approved w/ Comments

CONTROL NO : ________________________
Date

THE PRINCEVIEW PARKSUITES


SUBMITTAL

ITEM

SUBMITTAL NO.
TARGET

ACTUAL

DESCRIPTION
OF ITEMS

27-Mar-16
C - Disapproved / Re-submit

STATUS

L O G ( CP08 - MECHANICAL WORKS)

SUBMITTAL REQUIREMENTS

SUBMISSION DATE

REFERENC
SHOP
CAT.
E
SPECS DRWGS. BROCH.

APPROVAL DATE
SCHEDULED

SAMPLES

CERT.

TEST
DATA

OTHERS
(SPECIFY)

TARGET

ACTUAL

DAYS ACTION
DATE OF
LAPSED CODE INSTALLATION

REMARKS

REMARKS:

PREPARED & REVIEWED BY:

CONCURRED BY:

>

APPROVED BY:

AJ QUINTERO

TESS SANTOS

RENE NOMA

MEPF HEAD

CQC - HEAD

PIC / PROJECT MANAGER

OP-C-073-0
D.M Consunji, Inc.

LEGEND:
Date

THE PRINCEVIEW PARKSUITES


SUBMITTAL

SUBMITTAL NO.
TARGET

1.0

2.0

PP-DMCI-EL- 001

PP-DMCI-EL- 002

3.0

PP-DMCI-EL- 003

4.0

PP-DMCI-EL- 004

5.0

6.0

PP-DMCI-EL- 005

PP-DMCI-EL- 006
PP-DMCI-EL- 006A

7.0

8.0

9.0

10.0

11.0

12.0

PP-DMCI-EL- 007

PP-DMCI-EL- 008

PP-DMCI-EL- 009

PP-DMCI-EL- 009a

PP-DMCI-EL- 010

PP-DMCI-EL- 010a

ACTUAL

DESCRIPTION
OF ITEMS

27-Jul-15 G/F: power layout for admin


& storage room
G/F: telephone Layout for
admin office
25-Jul-15 As per bid plan: Grounding
System
Proposed Lay-out:
Grounding System Grounding
Pit detail

REFERENC
SHOP
CAT.
E
SPECS
DRWGS. BROCH.

A - Approved
B - Approved w/ Comments

27-Mar-16

C - Disapproved / Re-submit

L O G ( CP04 - ELECTRICAL WORKS)

SUBMITTAL REQUIREMENTS

SUBMISSION DATE
ITEM

STATUS

APPROVAL DATE
SCHEDULED

SAMPLES

CERT.

TEST
DATA

OTHERS
(SPECIFY)

TARGET

ACTUAL

3-Aug-15

1-Aug-15

DAYS ACTION
LAPSED CODE

DATE OF
INSTALLATION

REMARKS

-2

refer to the IN/IR pp-dmciel-001-15

1-Aug-15 13-Aug-15

12

Approved as noted for


grounding system
revise and resubmit for
grounding pit

11-Aug-15 13-Aug-15

Approved

1-Aug-15 13-Aug-15

12

NOTED. Revise and


resubmit

Approved

Resubmit

Revise and Resubmit

Bid Plan

Request barrow
4-Aug-15 Electrical Plan @ STP
(Lightings, Panelboard
location, Auxillary (FDAS)
25-Jul-15 Junction Box, Utility Box,
Square Boxes, Ground Rod &
Clamp, PVC Endbell &
Adapter, EMT & FMC
Connectors, FMC
10-Aug-15 Specification and Product
Catalogue
29-Oct-15 Grounding Rod -Erico Brand
-Cadweld Connection
-EMT Panasonic Brand
10-Aug-15 Proposed homerun route @
Corewall from ceiling going
to Reception area.
11-Aug-15 Grounding block-out for
Grounding System and Riser
15-Aug-15 ISD for Ground Floor
(lighting, power,auxiliary
systtem, emergency and
nightlight)
24-Oct-15 ISD for Ground Floor
(lighting, power,auxiliary
systtem, emergency and
nightlight)
17-Aug-15 ISD for Mezzanine Floor
(lighting, power,auxiliary
systtem, emergency and
nightlight)
24-Oct-15 ISD for Mezzanine Floor
(lighting, power,auxiliary
systtem, emergency and
nightlight)

FCD

17-Aug-15 24-Aug-15

6-Nov-15

6-Nov-15

17-Aug-15 24-Aug-15

FCD

18-Aug-15 24-Aug-15

Approved

22-Aug-15 1-Sep-15

10

Approved

10

Approved as noted
work may proceed

FCD

FCD

31-Oct-15
FCD

25-Aug-15 4-Sep-15
FCD

31-Oct-15

FCD

LEGEND:
Date

THE PRINCEVIEW PARKSUITES


SUBMITTAL

SUBMITTAL NO.
TARGET

13.0

14.0

15.0

16.0

17.0

18.0

19.0

20.0

21.0

22.0

23.0

24.0

25.0

26.0

27.0

28.0

PP-DMCI-EL- 011

PP-DMCI-EL- 011A

0 012

PP-DMCI-EL- 013

PP-DMCI-EL- 013a

PP-DMCI-EL- 014

PP-DMCI-EL- 014a

PP-DMCI-EL- 015

PP-DMCI-EL- 015a

PP-DMCI-EL- 016

PP-DMCI-EL- 016a

PP-DMCI-EL- 017

PP-DMCI-EL- 017a

PP-DMCI-EL- 018

PP-DMCI-EL- 018a

PP-DMCI-EL- 019

ACTUAL

DESCRIPTION
OF ITEMS

25-Aug-15 ISD for 1st Floor ((lighting,


power,auxiliary systtem,
emergency and nightlight)
24-Oct-15 ISD for 1st Floor ((lighting,
power,auxiliary systtem,
emergency and nightlight)
27-Aug-15

7-Sep-15

24-Oct-15

7-Sep-15

24-Oct-15

7-Sep-15

24-Oct-15

10-Sep-15

24-Oct-15

10-Sep-15

24-Oct-15

10-Sep-15

1. ground pit detail


2. Actual location of remaining
ground rod
3.Detail of grounding riser as per
comments of ASYA design of
SRF (PP-DMCI-EL-008-15)
ISD for 2nd Floor ((lighting,
power,auxiliary systtem,
emergency and nightlight)
ISD for 2nd Floor ((lighting,
power,auxiliary systtem,
emergency and nightlight)
ISD for 3rd Floor ((lighting,
power,auxiliary systtem,
emergency and nightlight)
ISD for 3rd Floor ((lighting,
power,auxiliary systtem,
emergency and nightlight)
ISD for 4th Floor ((lighting,
power,auxiliary systtem,
emergency and nightlight)
ISD for 4th Floor ((lighting,
power,auxiliary systtem,
emergency and nightlight)
ISD for 5th Floor ((lighting,
power,auxiliary systtem,
emergency and nightlight)
ISD for 5th Floor ((lighting,
power,auxiliary systtem,
emergency and nightlight)
ISD for 6th Floor ((lighting,
power,auxiliary systtem,
emergency and nightlight)
ISD for 6th Floor ((lighting,
power,auxiliary systtem,
emergency and nightlight)
ISD for 7th Floor ((lighting,
power,auxiliary systtem,
emergency and nightlight)
ISD for 7th Floor ((lighting,
power,auxiliary systtem,
emergency and nightlight)

1-Sep-15 Proposal for Transformer


Vault room

REFERENC
SHOP
CAT.
E
SPECS
DRWGS. BROCH.

C - Disapproved / Re-submit

APPROVAL DATE
SCHEDULED

SAMPLES

CERT.

TEST
DATA

OTHERS
(SPECIFY)

TARGET

ACTUAL

1-Sep-15 10-Sep-15
FCD

FCD

A - Approved
B - Approved w/ Comments

27-Mar-16

L O G ( CP04 - ELECTRICAL WORKS)

SUBMITTAL REQUIREMENTS

SUBMISSION DATE
ITEM

STATUS

DAYS ACTION
LAPSED CODE

DATE OF
INSTALLATION

REMARKS

Revise and Resubmit


work may proceed

14-Sep-15 17-Sep-15

Approved with correction,


work may proceed

14-Sep-15 23-Sep-15

Revise and Resubmit with


comments

Revise and Resubmit with


comments

31-Oct-15

FCD

FCD

FCD

FCD

FCD

FCD

FCD

FCD

FCD

FCD

FCD

FCD

FCD

FCD

31-Oct-15

14-Sep-15 23-Sep-15

31-Oct-15

14-Sep-15 23-Sep-15

31-Oct-15

17-Sep-15 23-Sep-15

Revise and Resubmit with


comments

31-Oct-15

17-Sep-15 23-Sep-15

Revise and Resubmit with


comments

31-Oct-15

Revise and Resubmit with


comments

17-Sep-15 23-Sep-15

Revise and Resubmit with


comments

9-Sep-15 14-Sep-15

Revise and Resubmit with


comments

LEGEND:
Date

THE PRINCEVIEW PARKSUITES


SUBMITTAL

SUBMITTAL NO.
TARGET

ACTUAL

DESCRIPTION
OF ITEMS

REFERENC
SHOP
CAT.
E
SPECS
DRWGS. BROCH.

29.0

PP-DMCI-EL- 019A

Proposal for Transformer


Vault room

FCD

30.0

PP-DMCI-EL- 019B

10-Oct-15 Proposal for Transformer


Vault room

FCD

31.0

PP-DMCI-EL- 020

3-Sep-15 Proposed grounding riser

A - Approved
B - Approved w/ Comments

27-Mar-16

C - Disapproved / Re-submit

L O G ( CP04 - ELECTRICAL WORKS)

SUBMITTAL REQUIREMENTS

SUBMISSION DATE
ITEM

STATUS

APPROVAL DATE
SCHEDULED

SAMPLES

CERT.

TEST
DATA

OTHERS
(SPECIFY)

TARGET

ACTUAL

DAYS ACTION
LAPSED CODE

33.0

PP-DMCI-EL- 021

PP-DMCI-EL- 022

8-Sep-15 Proposed blockout of cable


tray for auxiliary riser
8-Sep-15 Proposal for relocation of
layout for turbo fans and car
ramp signalling system

Revise and Resubmit

17-Oct-15 21-Oct-15

Approved with correction


and comments

10-Sep-15 17-Sep-15

Approved with
correction , work may
proceed

15-Sep-15 17-Sep-15

Revise and Resubmit


susperceeded the latest
SRF (09-17-15)

15-Sep-15 17-Sep-15

Approved with
correction , work may
proceed

34.0

PP-DMCI-EL- 023

35.0

PP-DMCI-EL- 024

5-Oct-15 Proposal for auxiliary cable


tray routing at G/F

12-Oct-15 21-Oct-15

Revise and Resubmit

36.0

PP-DMCI-EL- 025

21-Oct-15 As Built plan for embedded


pipes of GF,MF and 1F

REMARKS:

PP-DMCIEL-010-15

FCD

REMARKS

32.0

DATE OF
INSTALLATION

29-Oct-15

LEGEND:
Date

THE PRINCEVIEW PARKSUITES


SUBMITTAL

SUBMITTAL NO.
TARGET

PREPARED & REVIEWED BY:

ACTUAL

DESCRIPTION
OF ITEMS

CONCURRED BY:

REFERENC
SHOP
CAT.
E
SPECS
DRWGS. BROCH.

A - Approved
B - Approved w/ Comments

27-Mar-16

C - Disapproved / Re-submit

L O G ( CP04 - ELECTRICAL WORKS)

SUBMITTAL REQUIREMENTS

SUBMISSION DATE
ITEM

STATUS

APPROVAL DATE
SCHEDULED

SAMPLES

>

CERT.

TEST
DATA

OTHERS
(SPECIFY)

TARGET

ACTUAL

DAYS ACTION
LAPSED CODE

DATE OF
INSTALLATION

REMARKS

APPROVED BY:

AJ QUINTERO

TESS SANTOS

RENE NOMA

MEPF HEAD

CQC - HEAD

PIC / PROJECT MANAGER

OP-C-073-0
D.M Consunji, Inc.

SUBMITTAL REQUIREMENTS

SUBMISSION DATE
ITEM

DESCRIPTION

SUBMITTAL NO.
TARGET

ACTUAL

1.0

PP-DMCI-PL-

001

30-Jul-15

2.0

PP-DMCI-PL-

001a

30-Jul-15

OF ITEMS

Proposed plumbing lay out


at Ground Floor
Proposed plumbing lay out
at Ground Floor

REFERENC
SHOP
CAT.
E
SPECS
DRWGS. BROCH.

FCD

FCD

3.0

4.0

5.0

6.0

7.0

PP-DMCI-PL- 002

PP-DMCI-PL- 003

PP-DMCI-PL- 004

PP-DMCI-PL- 005

PP-DMCI-PL- 006

8-Jul-15

8-Jul-15

14-Jul-15

14-Jul-15

14-Jul-15

Proposed pipe sleeve &


Block out at Pump room
Ground floor

FCD

Proposed pipe sleeve on


main waterline supply
(100mm) going to Pump
Room
Proposed piping at pump
room at ground floor
(plumbing & fire
protection)
Proposed relocation of
W.S.1 & collector S.S 1&2
base on the plan (with cost
implication)

FCD

APPROVAL DATE
SCHEDULED

SAMPLES

CERT.

TEST

OTHERS

DATA

(SPECIFY)

TARGET

ACTUAL

DAYS

ACTION

DATE OF

LAPSED

CODE

INSTALLATION

6-Aug-15

revise and resubmit

6-Aug-15

4-Aug-15

-2

We cannot evaluate the


elevation/slope the pipes
because we still don't
have the existing side
walk invert elevation

15-Jul-15

21-Jul-15

revise and resubmit

15-Jul-15

revise and resubmit

FCD

21-Jul-15

30-Jul-15

Refer to SRF No. PP-DMCI002-15 revise and


resubmit

21-Jul-15

30-Jul-15

Approved as noted ( no
cost implication to the
owner)

21-Jul-15

30-Jul-15

Resubmit Refer as per


specification

Approved

FCD

Crown pipes and fittings

8.0

PP-DMCI-PL- 007

14-Jul-15

9.0

PP-DMCI-PL- 008

14-Jul-15

REMARKS

HDPE pipes nd fittings


(Valsir)
PPR pipes and
fittings(mega green)

21-Jul-15
21-Jul-15

30-Jul-15

Resubmit Refer as per


specification

10.0

PP-DMCI-PL- 009

14-Jul-15

Superior Pipes

21-Jul-15

30-Jul-15

Approved

11.0

PP-DMCI-PL- 010

14-Jul-15

Mech. Fittings

21-Jul-15

30-Jul-15

Approved

12.0

PP-DMCI-PL- 011

23-Jul-15

Proposed pipe sleeve


passing on the beam
andslab for Plumbing/ Fire
Protection
Proposed Piping and Pipe
sleeve at Mezzanine Floor

FCD

30-Jul-15

8-Aug-15

Approved By NGY+A

13-Aug-15 27-Aug-15

14

Proposed Piping and Pipe


sleeve at Mezzanine Floor

FCD

15-Sep-15 18-Sep-15

Approved as noted By
NGY+A (revised and
resubmit)
Disapproved, Resubmit
-coordinate to other
trade to avoid conflict
-all concrete
pouring without approval
that causes conflict is
chargeable to contractor

18

Disapproved, Resubmit
-coordinate to other
trade to avoid conflict
-all concrete
pouring without approval
that causes conflict is
chargeable to contractor

approved with corrections


and comments.
-RESUBMIT

13.0

14.0

PP-DMCI-PL- 012

PP-DMCI-PL- 012A

6-Aug-15

15-Sep-15

FCD

15.0

PP-DMCI-PL- 012B

24-Sep-15

Proposed Piping and Pipe


sleeve at Mezzanine Floor

FCD

1-Oct-15

19-Oct-15

PP-DMCI-PL- 012C

23-Oct-15

Proposed Piping and Pipe


sleeve at Mezzanine Floor

FCD

30-Oct-15 30-Oct-15

SUBMITTAL REQUIREMENTS

SUBMISSION DATE
ITEM

DESCRIPTION

SUBMITTAL NO.
TARGET

16.0

17.0

18.0

19.0

PP-DMCI-PL- 013

PP-DMCI-PL- 013A

PP-DMCI-PL- 014

PP-DMCI-PL- 014A

ACTUAL

19-Aug-15

17-Sep-15

25-Aug-15

15-Sep-15

OF ITEMS

REFERENC
SHOP
CAT.
E
SPECS
DRWGS. BROCH.

Proposed Relocationand
detail of Main Water Meter

Proposed Relocationand
detail of Main Water Meter

Proposed detail of Invert


elevation for main
colllector at GF
Proposed detail of Invert
elevation for main
colllector at GF

APPROVAL DATE
SCHEDULED

SAMPLES

CERT.

TEST

OTHERS

DATA

(SPECIFY)

TARGET

DAYS

ACTION

DATE OF

LAPSED

CODE

INSTALLATION

26-Aug-15 4-Sep-15

10

24-Sep-15 1-Oct-15

1-Sep-15

ACTUAL

22-Sep-15 1-Oct-15

Revised and Resubmit


NGY+A comments
(incoming pipe from the
building shall be at least
50mm above water level,
catch basin size shall be
(L=1000mm, W=600mm)

29-Oct-15 7-Nov-15

Resubmit for Final


approval

2-Sep-15

4-Sep-15

2-Sep-15

4-Sep-15

2-Sep-15

4-Sep-15

Disapproved

2-Sep-15

4-Sep-15

Disapproved

PP-DMCI-PL- 014B

22-Oct-15

Proposed detail of Invert


elevation for main
colllector at GF

FCD

Disapproved
Provide section and
elevation for Approval
Noted by ASYA
Approved as noted
by NGY+A (see
comments)
Disapproved
Resubmit

3-Sep-15

FCD

REMARKS

20.0

PP-DMCI-PL- 015

26-Aug-15

Pressure Relieve Valve (Ztype)

Noted by ASYA
Approved by NGY+A

21.0

PP-DMCI-PL- 016

26-Aug-15

Clean out, Floor Drain and


Roof Drain (Jaman)

Noted by ASYA
Resubmit ( Specify
Location of these drawing
w/ key plan)

22.0

PP-DMCI-PL- 017

26-Aug-15

Water Meter ECOTech

23.0

PP-DMCI-PL- 018

26-Aug-15

Gate Valve (ECOTEch)

SUBMITTAL REQUIREMENTS

SUBMISSION DATE
ITEM

DESCRIPTION

SUBMITTAL NO.
TARGET

24.0

PP-DMCI-PL- 019

ACTUAL

26-Aug-15

OF ITEMS

REFERENC
SHOP
CAT.
E
SPECS
DRWGS. BROCH.

APPROVAL DATE
SCHEDULED

SAMPLES

CERT.

TEST

OTHERS

DATA

(SPECIFY)

Double Sphere Rubber


expansion joint
(Honeywell)

TARGET

ACTUAL

DAYS

ACTION

DATE OF

LAPSED

CODE

INSTALLATION

REMARKS

2-Sep-15

4-Sep-15

NOTED (Provide sample


for the approval)

2-Sep-15

4-Sep-15

NOTED (Provide sample


for the approval)

2-Sep-15

4-Sep-15

NOTED (Provide sample


for the approval)

25.0

PP-DMCI-PL- 020

26-Aug-15

Pressure Gauge
(Honeywell)

26.0

PP-DMCI-PL- 021

26-Aug-15

V4-CHS-A125 CHECK
VALVE (Honeywell)

27.0

28.0

PP-DMCI-PL- 022

PP-DMCI-PL- 023

15-Sep-15

15-Sep-15

Methiod of Statement
(MOS) for Pipe Sleeve and
Blockout
Proposed piping and pipe
sleeve at 1st Floor
FCD

29.0

PP-DMCI-PL- 023A

24-Sep-15

PP-DMCI-PL- 024

24-Sep-15

Revised and Resubmit


Superceeded the latest
SRF

22-Sep-15 18-Sep-15

-4

Disapproved, Resubmit
-coordinate to other
trade to avoid conflict
-all concrete
pouring without approval
that causes conflict is
chargeable to contractor
Approved with
corrections, work may
proceed, pending
submission of additional
attachment.
-coordinate to other
trade to avoid conflicts
and obstruction of utilities
-incorporate to
CSD coordinator
-incorporate all
comments
-Resubmit
Disapproved, Resubmit

Proposed piping and pipe


sleeve at 1st Floor

FCD

30.0

22-Sep-15 29-Sep-15

19-Oct-15

18

1-Oct-15

19-Oct-15

18

Proposed piping and pipe


sleeve at 2nd Floor
FCD

1-Oct-15

-coordinate to other
trade to avoid conflicts
and obstruction of utilities
-incorporate to all
comments

SUBMITTAL REQUIREMENTS

SUBMISSION DATE
ITEM

DESCRIPTION

SUBMITTAL NO.
TARGET

PP-DMCI-PL- 024a

ACTUAL

OF ITEMS

23-Oct-15

Proposed piping and pipe


sleeve at 2nd Floor

REFERENC
SHOP
CAT.
E
SPECS
DRWGS. BROCH.

APPROVAL DATE
SCHEDULED

SAMPLES

CERT.

TEST

OTHERS

DATA

(SPECIFY)

TARGET

ACTUAL

DAYS

ACTION

DATE OF

LAPSED

CODE

INSTALLATION

REMARKS

30-Oct-15

FCD

31.0

PP-DMCI-PL- 025

24-Sep-15

Proposed piping and pipe


sleeve at 3rd Floor
FCD

32.0

PP-DMCI-PL- 026

24-Sep-15

33.0

PP-DMCI-PL- 027

24-Sep-15

34.0

PP-DMCI-PL- 028

24-Sep-15

Approved with
corrections, work may
proceed, pending
submission of additional
attachment.
-Resubmit

1-Oct-15

19-Oct-15

18

Approved with
corrections, work may
proceed, pending
submission of additional
attachment.
-Resubmit

1-Oct-15

19-Oct-15

18

1-Oct-15

19-Oct-15

18

Approved with
corrections, work may
proceed, pending
submission of additional
attachment.
-coordinate to other
trade to avoid conflicts
and obstruction of utilities
-incorporate to
CSD coordinator
-incorporate all
commentswith
Approved
corrections, work may
proceed, pending
submission of additional
attachment.
-Resubmit

Proposed piping and pipe


sleeve at 6th Floor
FCD

18

Proposed piping and pipe


sleeve at 5th Floor

FCD

19-Oct-15

Proposed piping and pipe


sleeve at 4th Floor
FCD

1-Oct-15

SUBMITTAL REQUIREMENTS

SUBMISSION DATE
ITEM

DESCRIPTION

SUBMITTAL NO.
TARGET

PREPARED & REVIEWED BY:

ACTUAL

OF ITEMS

CONCURRED BY:

REFERENC
SHOP
CAT.
E
SPECS
DRWGS. BROCH.

APPROVAL DATE
SCHEDULED

SAMPLES

>

CERT.

TEST

OTHERS

DATA

(SPECIFY)

TARGET

ACTUAL

DAYS

ACTION

DATE OF

LAPSED

CODE

INSTALLATION

REMARKS

APPROVED BY:

AJ QUINTERO

TESS SANTOS

RENE NOMA

M&E HEAD

CQC - HEAD

PIC / PROJECT MANAGER

OP-C-073-0
D.M Consunji, Inc.

LEGEND:

D.M. CONSUNJI, INC.

Date

THE PRINCEVIEW PARKSUITES


STATUS

TARGET

1.0

8-Aug-15
PP-DMCI-FP-

001

PP-DMCI-FP-

002

PP-DMCI-FP-

003

PP-DMCI-FP-

004

PP-DMCI-FP-

005

PP-DMCI-FP-

006

PP-DMCI-FP-

007

PP-DMCI-FP-

008

2.0

3.0
4.0
5.0

8-Aug-15

6.0

7.0
8.0

ACTUAL

19-Aug-15
19-Aug-15
19-Aug-15
19-Aug-15

9.0

19-Aug-15
19-Aug-15
19-Aug-15

PP-DMCI-FP-

REFERENC SHOP
CAT.
E
SPECS
DRWGS. BROCH.

*Proposed AFSS layout at


Ground Floor *Proposed
Pipes Sleeves at
Mezzanine under Slab

FCD

*Proposed AFSS layout at


Mezzanine Floor *Proposed
Pipes Sleeves at 1st Floor
under Slab

FCD

SCHEDULED
SAMPLES

CERT.

TEST
DATA

OTHERS
(SPECIFY)

TARGET

ACTUAL

DAYS ACTION
DATE OF
LAPSED CODE INSTALLATION

approved as noted. See


comments

7-Aug-15 24-Aug-15

Alarm Check Valve and


Accessories(Globe)
Fire Protetion valve

Fire Department
Connection(GIACOMINI)
Fire Hose Cabinet and
Accessories (Meek fire
hose cabinet)
System Sensor Swicthes
(System Sensor)
Globe Sprinkler Heads
(Globe)
Fire Stop Sealant (Spec
Seal)

26-Aug-15 4-Sep-15

26-Aug-15 4-Sep-15

26-Aug-15 4-Sep-15

26-Aug-15 4-Sep-15

26-Aug-15 4-Sep-15

26-Aug-15 4-Sep-15

26-Aug-15 4-Sep-15

NOTED (submit physical


samples for approval)
NOTED (submit physical
samples for approval)
NOTED (submit physical
samples for approval)
NOTED (submit physical
samples for approval)

Proposed Relocation of Fire


Department Connection
based on CB-ASYA-PPP-FPCB003-23APRIL15

3-Sep-15 17-Sep-15

FCD

REMARKS

Revise and Resubmit

NOTED (submit physical


samples for approval)
NOTED (submit physical
samples for approval)
NOTED ( Prior to approval
Please submit a
certification from supplier
Guarateeing that their
product isa fire rated)

27-Aug-15

010

APPROVAL DATE

17-Aug-15 24-Aug-15

009

10.0

PP-DMCI-FP-

DESCRIPTION
OF ITEMS

27-Mar-16

L O G ( CP09 - FIRE PROTECTION WORKS)

SUBMITTAL REQUIREMENTS

SUBMISSION DATE
SUBMITTAL NO.

C - Disapproved / Re-submit

SUBMITTAL

ITEM

A - Approved
B - Approved w/ Comments

CONTROL NO : ________________________

14

Noted by ASYA
Approved by NGY+A

LEGEND:

D.M. CONSUNJI, INC.

Date

THE PRINCEVIEW PARKSUITES


STATUS

TARGET

11.0

ACTUAL

27-Aug-15
PP-DMCI-FP-

012

13.0

2-Sep-15
013

14.0

15-Sep-15

PP-DMCI-FP-

Sight flow connection


(GEM)

Proposed AFSS layout at


1st and Proposed Pipe
sleeve at 2nd floor under
slab

Proposed Relocation of Fire


Hose cabinet Base on CBASYA-PPP-AR-CB-00415MAR15

FCD

FCD

18.0

FCD

Proposed AFSS layout at 4th


16-Sep-15 and Proposed Pipe sleeve at
5th floor under slab

29-Sep-15

PP-DMCI-FP-

016

CERT.

TEST
DATA

OTHERS
(SPECIFY)

TARGET

ACTUAL

DAYS ACTION
DATE OF
LAPSED CODE INSTALLATION

REMARKS

3-Sep-15 17-Sep-15

Approved by NGY+A

3-Sep-15 17-Sep-15

Noted by ASYA
Approved by NGY+A

9-Sep-15

4-Sep-15

-5

Revise and Resubmit


Provide Blow-up detail of
Firehise cabinet
embedded to wall

22-Sep-15 5-Oct-15

13

22-Sep-15 5-Oct-15

13

Approved with correction,


work may proceed,
pending resubmission of
additional reqiurement by
ASYA
Approved as noted by
NGY+A
Additional attachment
to this submittal.
Incorporate the
comments as per
Strucatural
consultant
Approved with
correction,

Proposed AFSS layout at


3rd and Proposed Pipe
sleeve at 4th floor under
slab

014

015

SCHEDULED
SAMPLES

15.0

PP-DMCI-FP-

APPROVAL DATE

27-Aug-15

PP-DMCI-FP-

REFERENC SHOP
CAT.
E
SPECS
DRWGS. BROCH.

011

12.0
PP-DMCI-FP-

DESCRIPTION
OF ITEMS

27-Mar-16

L O G ( CP09 - FIRE PROTECTION WORKS)

SUBMITTAL REQUIREMENTS

SUBMISSION DATE
SUBMITTAL NO.

C - Disapproved / Re-submit

SUBMITTAL

ITEM

A - Approved
B - Approved w/ Comments

CONTROL NO : ________________________

Proposed AFSS layout at


5th and Proposed Pipe
sleeve at 6th floor under
slab

FCD

6-Oct-15

FCD

15-Oct-15

work may proceed,


pending resubmission of
additional reqiurement ,
NOTED by ASYA
Approved as noted
by NGY+A
Additional
attachment to this
submittal. Incorporate the
comments as per
Strucatural consultant
Approved with
correction , work may
proceed,pending resubmission of additional
requirement.

LEGEND:

D.M. CONSUNJI, INC.

Date

THE PRINCEVIEW PARKSUITES


STATUS

TARGET

19.0

30-Sep-15

PP-DMCI-FP-

017

20.0

21-Oct-15

PP-DMCI-FP-

21.0

22.0

23.0

25.0

ACTUAL

018

DESCRIPTION
OF ITEMS

Proposed AFSS layout at


6th and Proposed Pipe
sleeve at 7th floor under
slab

Proposed AFSS layout at


2ND and Proposed Pipe
sleeve at 3RDth floor
under slab

REFERENC SHOP
CAT.
E
SPECS
DRWGS. BROCH.

FCD

APPROVAL DATE
SCHEDULED

SAMPLES

CERT.

TEST
DATA

OTHERS
(SPECIFY)

TARGET

ACTUAL

7-Oct-15

28-Oct-15

28-Oct-15

FCD

27-Mar-16

L O G ( CP09 - FIRE PROTECTION WORKS)

SUBMITTAL REQUIREMENTS

SUBMISSION DATE
SUBMITTAL NO.

C - Disapproved / Re-submit

SUBMITTAL

ITEM

A - Approved
B - Approved w/ Comments

CONTROL NO : ________________________

DAYS ACTION
DATE OF
LAPSED CODE INSTALLATION

21

REMARKS

Approved with comments


and with additional
attachment

LEGEND:

D.M. CONSUNJI, INC.

Date

THE PRINCEVIEW PARKSUITES


SUBMITTAL

ITEM

SUBMITTAL NO.
TARGET

26.0

27.0

28.0

29.0

027

30.0

028

31.0

029

ACTUAL

DESCRIPTION
OF ITEMS

27-Mar-16
C - Disapproved / Re-submit

STATUS

L O G ( CP09 - FIRE PROTECTION WORKS)

SUBMITTAL REQUIREMENTS

SUBMISSION DATE

A - Approved
B - Approved w/ Comments

CONTROL NO : ________________________

REFERENC SHOP
CAT.
E
SPECS
DRWGS. BROCH.

APPROVAL DATE
SCHEDULED

SAMPLES

CERT.

TEST
DATA

OTHERS
(SPECIFY)

TARGET

ACTUAL

DAYS ACTION
DATE OF
LAPSED CODE INSTALLATION

REMARKS

LEGEND:

D.M. CONSUNJI, INC.

Date

THE PRINCEVIEW PARKSUITES


SUBMITTAL

ITEM

SUBMITTAL NO.
TARGET

32.0

030

33.0

031

34.0

032

35.0

034

36.0

035

37.0

036

ACTUAL

DESCRIPTION
OF ITEMS

27-Mar-16
C - Disapproved / Re-submit

STATUS

L O G ( CP09 - FIRE PROTECTION WORKS)

SUBMITTAL REQUIREMENTS

SUBMISSION DATE

A - Approved
B - Approved w/ Comments

CONTROL NO : ________________________

REFERENC SHOP
CAT.
E
SPECS
DRWGS. BROCH.

APPROVAL DATE
SCHEDULED

SAMPLES

CERT.

TEST
DATA

OTHERS
(SPECIFY)

TARGET

ACTUAL

DAYS ACTION
DATE OF
LAPSED CODE INSTALLATION

REMARKS

LEGEND:

D.M. CONSUNJI, INC.

Date

THE PRINCEVIEW PARKSUITES


SUBMITTAL

ITEM

SUBMITTAL NO.
TARGET

38.0

ACTUAL

DESCRIPTION
OF ITEMS

27-Mar-16
C - Disapproved / Re-submit

STATUS

L O G ( CP09 - FIRE PROTECTION WORKS)

SUBMITTAL REQUIREMENTS

SUBMISSION DATE

A - Approved
B - Approved w/ Comments

CONTROL NO : ________________________

REFERENC SHOP
CAT.
E
SPECS
DRWGS. BROCH.

APPROVAL DATE
SCHEDULED

CERT.

SAMPLES

TEST
DATA

OTHERS
(SPECIFY)

TARGET

ACTUAL

DAYS ACTION
DATE OF
LAPSED CODE INSTALLATION

REMARKS

037

PREPARED & REVIEWED BY:

CONCURRED BY:

>

APPROVED BY:

AJ QUINTERO

TESS SANTOS

RENE NOMA

MEPF HEAD

CQC - HEAD

PIC / PROJECT MANAGER

OP-C-073-0
D.M Consunji, Inc.

LEGEND:

D.M. CONSUNJI, INC.

Date

THE PRINCEVIEW PARKSUITES


SUBMITTAL

ITEM

SUBMITTAL NO.
TARGET

1.0

001

2.0

001A

3.0
4.0

002
003

5.0

003A

6.0

004

ACTUAL

DESCRIPTION
OF ITEMS

27-Mar-16
C - Disapproved / Re-submit

STATUS

L O G ( CP21 - SEWAGE TREATMENT PLANT )

SUBMITTAL REQUIREMENTS

SUBMISSION DATE

A - Approved
B - Approved w/ Comments

CONTROL NO : ________________________

REFERENC SHOP
CAT. SAMPLES CERT.
E
SPECS DRWGS. BROCH.

APPROVAL DATE
SCHEDULED

TEST
DATA

OTHERS
(SPECIFY)

TARGET

ACTUAL

DAYS ACTION
DATE OF
LAPSED CODE INSTALLATION

REMARKS

REMARKS:

PREPARED & REVIEWED BY:

CONCURRED BY:

>

APPROVED BY:

AJ QUINTERO

TESS SANTOS

RENE NOMA

MEPF HEAD

CQC - HEAD

PIC / PROJECT MANAGER

OP-C-073-0
D.M Consunji, Inc.

LEGEND:

D.M. CONSUNJI, INC.

Date

THE PRINCEVIEW PARKSUITES


SUBMITTAL

ITEM

SUBMITTAL NO.
TARGET

1.0

001

2.0

0013

ACTUAL

STATUS

DESCRIPTION
OF ITEMS

27-Mar-16
C - Disapproved / Re-submit

L O G ( CP06 - FIRE DECTECTION AND ALARM SYSTEM )


SUBMITTAL REQUIREMENTS

SUBMISSION DATE

A - Approved
B - Approved w/ Comments

CONTROL NO : ________________________

REFERENC SHOP
CAT. SAMPLES CERT.
E
SPECS DRWGS. BROCH.

APPROVAL DATE
SCHEDULED

TEST
DATA

OTHERS
(SPECIFY)

TARGET

ACTUAL

DAYS ACTION
DATE OF
LAPSED CODE INSTALLATION

REMARKS

REMARKS:

PREPARED & REVIEWED BY:

CONCURRED BY:

>

APPROVED BY:

AJ QUINTERO

TESS SANTOS

RENE NOMA

MEPF HEAD

CQC - HEAD

PIC / PROJECT MANAGER

OP-C-073-0
D.M Consunji, Inc.

LEGEND:

D.M. CONSUNJI, INC.

Date

THE PRINCEVIEW PARKSUITES

ITEM

SUBMITTAL NO.
TARGET

1.0

001

2.0

01B

2.0

002A

ACTUAL

STATUS

27-Mar-16

L O G ( CP10 - ELEVATOR )

SUBMITTAL REQUIREMENTS
DESCRIPTION
OF ITEMS

C - Disapproved / Re-submit

SUBMITTAL
SUBMISSION DATE

A - Approved
B - Approved w/ Comments

CONTROL NO : ________________________

REFERENC SHOP
CAT. SAMPLES CERT.
E
SPECS DRWGS. BROCH.

APPROVAL DATE
SCHEDULED

TEST
DATA

OTHERS
(SPECIFY)

TARGET

ACTUAL

DAYS ACTION
DATE OF
LAPSED CODE INSTALLATION

REMARKS

REMARKS:

PREPARED & REVIEWED BY:

CONCURRED BY:

>

APPROVED BY:

AJ QUINTERO

TESS SANTOS

RENE NOMA

MEPF HEAD

CQC - HEAD

PIC / PROJECT MANAGER

OP-C-073-0
D.M Consunji, Inc.

LEGEND:

D.M. CONSUNJI, INC.

Date

THE OXFORD PARKSUITES


SUBMITTAL

ITEM

SUBMITTAL NO.
TARGET

1.0

TOP-CP04-AUX- 001

2.0

TOP-CP04-AUX- 002

3.0

TOP-CP04-AUX- 003

4.0

TOP-CP04-AUX- 004

5.0

TOP-CP04-AUX- 005A

6.0

TOP-CP04-AUX- 005B

7.0

TOP-CP04-AUX- 006A

8.0

TOP-CP04-AUX- 006B

9.0

TOP-CP04-AUX- 008

10.0

TOP-CP04-AUX- 009

ACTUAL

DESCRIPTION
OF ITEMS

27-Mar-16
C - Disapproved / Re-submit

STATUS

L O G ( CP04 - AUXILIARY SYSTEM)

SUBMITTAL REQUIREMENTS

SUBMISSION DATE

A - Approved
B - Approved w/ Comments

CONTROL NO : ________________________

REFERENC SHOP
CAT. SAMPLES CERT.
E
SPECS DRWGS. BROCH.

APPROVAL DATE
SCHEDULED

TEST
DATA

OTHERS
(SPECIFY)

TARGET

ACTUAL

DAYS ACTION
DATE OF
LAPSED CODE INSTALLATION

REMARKS

LEGEND:

D.M. CONSUNJI, INC.

Date

THE OXFORD PARKSUITES


SUBMITTAL

ITEM

SUBMITTAL NO.
TARGET

11.0

ACTUAL

DESCRIPTION
OF ITEMS

27-Mar-16
C - Disapproved / Re-submit

STATUS

L O G ( CP04 - AUXILIARY SYSTEM)

SUBMITTAL REQUIREMENTS

SUBMISSION DATE

A - Approved
B - Approved w/ Comments

CONTROL NO : ________________________

REFERENC SHOP
CAT. SAMPLES CERT.
E
SPECS DRWGS. BROCH.

APPROVAL DATE
SCHEDULED

TEST
DATA

OTHERS
(SPECIFY)

TARGET

ACTUAL

DAYS ACTION
DATE OF
LAPSED CODE INSTALLATION

REMARKS

TOP-CP04-AUX- 010

REMARKS:

PREPARED & REVIEWED BY:

CONCURRED BY:

>

APPROVED BY:

AJ QUINTERO

TESS SANTOS

RENE NOMA

MEPF HEAD

CQC - HEAD

PIC / PROJECT MANAGER

OP-C-073-0
D.M Consunji, Inc.

D.M.CONSUNJI INC.
OXFORD PARKSUITES
BINONDO, MANILA
SUMMARY OF SUBMITTAL STATUS LOG

ITEM

SCOPE OF WORK

TOTAL
SUBMITTAL AS
PER MASTERLIST

MECHANICAL

ELECTRICAL

PLUMBING & SANITARY

4
5

RESPONDED
SUBMITTED
APPROVED

SUPERCEDED

11

SEWAGE TREATMENT PLANT

FIRE PROTECTION

18

TOTAL:

###

DISAPPROVED

###
3

AS OF: 27-Mar-16
PENDING
APPROVAL

FOR
SUBMISSION

1
1
1
1
4

ITEM

DESCRIPTION

NO.

DATE OF SUBMISSION
TARGET

STRUCTURAL
1

Repair of Superficial
Honeycombs

15-Aug-14

Back fill material

15-Sep-14

3
4

Welding Procedures and


qualification
Rebar Cutting List Shop
Drawing
by: R.A. Guillermo

14-Feb-15

ARCHITECTURAL
5
6
7
8

Precast Concrete wall


Method Statement for
installation of precast wall
panel
EE and Busduct Room
Enclosure
Seperator Beams and
elevator pit screen

23-Oct-14
23-Oct-14
11-Nov-14
11-Nov-14

Mortar Mix Design

14-Nov-14

10

Testing of Mortar

14-Nov-14

11

Testing of CHB

14-Nov-14

12

Precast Concrete Lintel

14-Nov-14

ACTUAL

2014
AUG

SEPT

OCT

NOV

DEC

JAN

FEB

MAR

13

Method Statement for CHB


Laying

14-Nov-14

14

PVC Doors and Hardwares

1-Dec-14

Pull out test on Welding for


Precast Panel
Method Statement for
16
Plastering
15

9-Dec-14
19-Dec-14

17

Plaster Mix Design

19-Dec-14

18

Backer Rod

27-Dec-14

19

Fire sealant (HILTI)

27-Dec-14

24

Stair Nosing (50x50mm B.I.


angle bar)
Stair Nosing (2" x 2.5" Brass
Nosing)
PWD Ramp Handrail ( Full
component)
Steel Retractable stair with
aluminum composite spandrel
stair cover
Column Guard

25

Ladder Rung

14-Feb-15

26

Manhole Cover

14-Feb-15

27

Trench Grating

14-Feb-15

28

Stair railing wall mounted

14-Feb-15

20
21
22
23

14-Feb-15
14-Feb-15
14-Feb-15
14-Feb-15
14-Feb-15

29

ACCU box (50mm x 100mm


aluminum hor. Bar frame)

14-Feb-15

30

Bollards

14-Feb-15

31

Steel roll up doors hardware


and accessories

14-Feb-15

32

Flood Gate

14-Feb-15

33

URRA Tiles

20-Mar-15

34

Tile adhesive and Grout

20-Mar-15

35

Toilet Beveled Mirrors

21-May-15

PWD toilet grab bar


Male and Female toilet
37 partition including urinal
partition
12mm thk Gypsumboard 38 Ceiling System (Ordinary and
Moisture Resistant)
36

39

Stampcrete

40

Aluminum Composite
Spandrel Ceiling

41

Architectural Shop Drawing

22-May-15
25-May-15
6-May-15
15-Jun-15
1-Oct-15

2015
APR

MAY

JUN

JUL

AUG

SEP

OCT

You might also like