You are on page 1of 1

Amps X 100 33kV(BB-2) SWGR-A (Nom. kV=33, Plot Ref.

kV=33)
.5

10

30

50

100

300

500

1K

3K

5K

1K

10K
1K

500

500

300

300

H08-RP - G
OC1
120MVA I/C
ABB
REF615
CT Ratio 2500:1
IEC - Normal Inverse
Pickup = 20 (1 - 100 xCT Sec)
Time Dial = 0.51
3x = 3.21 s, 5x = 2.18 s, 8x = 1.68 s

100

50

30

100

50

30

H14-RP - G
OC1
20MVA T/F
ABB
REF615
CT Ratio 600:1
IEC - Normal Inverse
Pickup = 20 (1 - 100 xCT Sec)
Time Dial = 0.06
3x = 0.378 s, 5x = 0.257 s, 8x = 0.198 s

Seconds

10

10

21610 A, 0.884 s

0.272 s

.5

.5

0.748 s
.3

.3

.1

.1

H17-RP - G
OC1
.05

.05

33kV B/S
ABB
REF615
CT Ratio 2500:1
IEC - Normal Inverse
Pickup = 20 (1 - 100 xCT Sec)
Time Dial = 0.39
3x = 2.46 s, 5x = 1.67 s, 8x = 1.29 s

.03

.01
.5

10

.03

30

50

100

300

500

1K

3K

Amps X 100 33kV(BB-2) SWGR-A (Nom. kV=33, Plot Ref. kV=33)


N7733-ZAKHER
Project:
Location:
Contract:
Engineer:
Filename:

CASE:2.6 EF

220/33/11kV Zakher Grid


Zakher Area of Al Ain
N7733
JM
C:\Users\joshi\Desktop\LATEST RELAY SETTING\DUBAI\TRANSCO-Supercede 01.03.1

Date:
SN:
Rev:
Fault:
Circuit:

21-01-2016
LARSENTRN2
Base
Ground
120MVA I/C,33kV B/S,20MVA

5K

.01
10K

ETAP Star 12.5.0C