Amps X 100 33kV(BB-2) SWGR-A (Nom. kV=33, Plot Ref.

kV=33)
.5

10

30

50

100

300

500

1K

3K

5K

1K

10K
1K

H08-RP - G
OC1

500

500

120MVA I/C
ABB
REF615
CT Ratio 2500:1
IEC - Normal Inverse
Pickup = 20 (1 - 100 xCT Sec)
Time Dial = 0.51
3x = 3.21 s, 5x = 2.18 s, 8x = 1.68 s

300

100

300

100

50

50

H14-RP - G
OC1

30

10

Seconds

30

20MVA T/F
ABB
REF615
CT Ratio 600:1
IEC - Normal Inverse
Pickup = 20 (1 - 100 xCT Sec)
Time Dial = 0.06
3x = 0.378 s, 5x = 0.257 s, 8x = 0.198 s

10

21684 A, 0.884 s
0.272 s

.5

.5

0.748 s

.3

.3

H05-RP - G
OC1

.1

.1

33kV B/C
ABB
REF615
CT Ratio 2500:1
IEC - Normal Inverse
Pickup = 20 (1 - 100 xCT Sec)
Time Dial = 0.39
3x = 2.46 s, 5x = 1.67 s, 8x = 1.29 s

.05

.03

.05

.03

.01
.5

10

30

50

100

300

500

1K

3K

Amps X 100 33kV(BB-2) SWGR-A (Nom. kV=33, Plot Ref. kV=33)


N7733-ZAKHER
Project:
Location:
Contract:
Engineer:
Filename:

CASE:2.3 EF

220/33/11kV Zakher Grid


Zakher Area of Al Ain
N7733
JM
C:\Users\joshi\Desktop\LATEST RELAY SETTING\DUBAI\TRANSCO-Supercede 01.03.1

Date:
SN:
Rev:
Fault:
Circuit:

21-01-2016
LARSENTRN2
Base
Ground
120MVAI/C,33kVB/C,20MVA

5K

.01
10K

ETAP Star 12.5.0C