AND SHUTDOWN
INTRODUCTION
START-UP SEQUENCE
TURBINE ROLLING.
SYNCHRONISATION
FULL LOAD
START UP MODES
Boiler
Economiser
FCS
11+1
2x
7
HP
T
IPT
3
HPH - 2
HPH - 1
RH
2x
7
LPT A
5
LPT B
7
LPH -7A
LPH -8A
LPH -7B
LPH -8B
Condensor
(HP)
Deaerator
Condensor
(LP)
EXT From
CRH
(MD BFBP
1x35%)
HPH -3
TDBFP 2X50%
CEP
3x50
%
1994 TPH
GSC
CPP
1482 TPH
LPH -5
LPH -6
CCCW SYSTEM
COMPRESSOR SYSTEM
WHY BCP ?
PURPOSE-
TEMP.<= 45 OC
pH >= 6.5
: MAX. 5 L/MIN
Boiler flushing
SP SP
START-UP
LINE
Sampling
Fe+
Below
Above
500ppb
500ppb
MIXER
BCP
WW
ECO
CW
LINE
HOTWELL
> 100PPB
< 100PPB
FE
< 50PPB
SIO2
< 30PPB
LDO/HFO GUN
Fuel
Light Oil
Fuel Pressure
0.8MPa-2.0MPa
Fuel Flow
500kg/h -3000kg/h
0.6MPa-1.2MPa
100-600kg/h
Ignition Method
Fuel
Heavy Oil
Fuel Pressure
0.8MPa- 2.0MPa
Fuel Flow
1000-4000 kg/h
0.8MPa-1.2MPa
100-400kg/h
Ignition Method
TURBINE LINE UP
ENSURE:
TURBINE LINE UP
ENSURE TDBFP IN BARRING.
GLAND STEAM CHARGING: ENSURE STEAM TEMP. IS 56C 111 C MORE THAN ROTOR TEMP & DEGREE OF SH > 50C.
CHARGE THE GLAND SEAL SYSTEM OF TDBFP.
START THE VACUUM PULLING WITH VACUUM PUMP.
MAINTAIN VACUUM -0.9 KG/CM2.
CHARGE THE HP-LP BYPASS SYSTEM .MAINTAIN THE MS
STEAM PRESSURE AND FIRING RATE FOR ACHIEVING
TURBINE ROLLING PARAMETERS.
HOT ROLLING
MS TEMP
RH TEMP
SPEED
MS FLOW
LOAD
MS PRESS
AFTER ATTAINING THE CASING TEMP > 150C CLOSE THE RFV VALVE AND
OPEN HP CYLINDER VENTILATION VALVE TO CONDENSOR.
MS
HPBP
HPT
CRH NRV
RFV
IPT
Ventilator valve
TO CONDENSER
BDV
TO CONDENSER
CRH LINE
TURBINE ROLLING
TURBINE ROLLING
LOADING
AFTER ACHIEVING FURNACE TEMP. MORE THEN 450C. TAKE COAL MILL-B AT.
STEAM T/PR 380C/8.7 MPA.
660
LOAD
(MW)
350
660 MW
495
330MW
330
198MW
165
60MW
33MW
400
450
500
MINUTES
550
600
650
MILL-B CUT IN
SYNCHRONISE
&CHARGE D/A
LPT A
2nd
LPT B
2nd
5th
5th
6th
6th
5th
4th
4th
5th
6th
6th
LP HEATER 7A
LP HEATER 7B
LP HEATER 8A
LP HEATER 8B
CONDENSER
HP HEATER
LP HEATER
5
5
CONDENSER
HP HEATER
LP HEATER
6
6
TDBFP START UP
TAKE ONE TDBFP IN SERVICE( CHANGE OVER WITH MD BFP) WHILE DRIVING
STEAM IS AVAILABLE. SECOND TD BFP WILL BE TAKEN AT 180 MW.
GIVE THE TARGET SPEED 500 RPM AND THAN TO 1000 HOLD FOR 40
MIN.CHECK THE TSI PARAMETER
HP
IP
1.12 Mpa
378 C
1.3 MPa
350 C
Aux. Steam
Header
To
CRH
Changeover Valve
From
CRH
E
M
4 MPa
315.3 C
TDBFP-B
To
Condenser
Deaerato
r
TDBFP-A
Booster
pumps
LOADING
INCREASE THE LOAD TO 150 MW AND TAKE THE HPH-3, HPH-2 &
HPH-1 IN SERVICE. MS T/PR 410C/8.7 MPA.
MS LINE
HRH LINE
IP EXHAUST
CRH LINE
9th stage
5th stage
TDBFP A
HP HEATER
1
HP HEATER
2
HP
HP HEATER
HEATER
33
DEAERATOR
TDBFP B
DURING LOAD RAISING >25% BMCR, THE BCP FLOW AND FEED WATER
FLOW TO BE MONITORED CLOSELY.
ONCE THE CONDITION FULFILLS THE BCP STOPS AND FEED FLOW
CONTROL CHANGES OVER FRS.
LOADING
Parameters
1
Unit
390.37
t/h
Design fuel
2111
t/h
25.4
MPa
569
1749.1
t/h
4.73
MPa
4.49
MPa
324
10
569
Feedwater pressure
28.8
MPa.g
11
Feedwater temperature
280
12
421
153.3
147.2
13
14
Indian coal
87.19% BMCR
TURBINE PARAMETERS
Steam Admission Parameters at Turbine Inlet
HPT
IPT
LPT
Pressure (MPa)
24.2
3.961
1.12
566
566
378
O/L Temp(deg C)
315.3
378
1959.25
1649
No of Control valves
1.12MPa / 378c
RSV
MS LINE
MSV
CV
CV
CV
TO BLR RH
CV
CRH
HPT
IPT
LPT
#1
LPT #2
CRH
RCV
CV
CV
MSV
MS LINE
HRH
CV
CV
RCV
CV
CONDENSOR A
RSV
RSV
CONDENSOR B
GEN
SHUT DOWN
WHEN THE LOAD < 30% BOILER COMES IN WET MODE FROM DRY
MODE. START THE BCP AND MAINTAIN THE SEPEARTOR LEVEL.
SHUT DOWN
WHEN THE LOAD HAS DECREASED TO 20% OF RATED LOAD TRIP THE
TURBINE ON TURBINE PROTECTION. THIS CLOSES THE THROTTLE VALVES,
GOVERNOR VALVES, REHEAT STOP VALVES AND INTERCEPTOR VALVES
SHUT DOWN
WHEN THE VACUUM REACHES ZERO, SHUT OFF THE SEALING STEAM TO
THE GLAND STEAM CONTROL VALVES.
THANK YOU