You are on page 1of 5

Furnace pressure control

CFBC BOILER
ASHVANI SHUKLA
MANAGER(C&I)
BGR ENERGY

PT1

PT2

2 00 3

P 1 avg
FURNACE PRESSURE
TWO OUT OF THREE
LOGIC

PT3

P1

PV
S
P

SV

FIC/PID

O/P

A/M

VFD
POWER
CYLINDER/IGV
M

VVVFD

LOOP CONTROL AND DISCRIPTION

Furnace Pressure Control:

The objective of furnace pressure control is to keep the furnace


pressure stable during operation. This is managed through controlled
inlet vane /Damper.

Typically there are three furnace pressure measurements in use, and


the average of those signals is used as process value of the furnace
pressure controller. The furnace pressure controller is a
proportional/integral type with a variable proportional gain.

The controllers output, that is based on the proportional/integral


action of the controller through auto manual station (to be realized PLC)
will control Inlet Vanes of both ID fans.(Inlet vanes control will be
operational when Fan running at constant speed)

Continue..

As per control loop we starts explain how we control the furnace draft
of boiler.

Furnace draft is controlled through Induced draft fan and Inlet guided
vane or VVVFD.

Initially we measure the furnace draft pressure from three pressure


transmitters(PT-1 ,2,3). We have 2 00 3(two out of three) selection
block by which we can select two healthy(transmitter which have less
deviation) transmitters and generate the process value for PID
controller.

We give the set point of furnace draft to PID controller. PID compare
the set value and the process value and generate the error to drive
the final control element(Dampers/VVVFD) of Induced draft fan.